Search results for: project definition rating index (PDRI)
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 9474

Search results for: project definition rating index (PDRI)

9324 Comparison of Patient Satisfaction and Observer Rating of Outpatient Care among Public Hospitals in Shanghai

Authors: Tian Yi Du, Guan Rong Fan, Dong Dong Zou, Di Xue

Abstract:

Background: The patient satisfaction survey is becoming of increasing importance for hospitals or other providers to get more reimbursement and/or more governmental subsidies. However, when the results of patient satisfaction survey are compared among medical institutions, there are some concerns. The primary objectives of this study were to evaluate patient satisfaction in tertiary hospitals of Shanghai and to compare the satisfaction rating on physician services between patients and observers. Methods: Two hundred outpatients were randomly selected for patient satisfaction survey in each of 28 public tertiary hospitals of Shanghai. Four or five volunteers were selected to observe 5 physicians’ practice in each of above hospitals and rated observed physicians’ practice. The outpatients that the volunteers observed their physician practice also filled in the satisfaction questionnaires. The rating scale for outpatient survey and volunteers’ observation was: 1 (very dissatisfied) to 6 (very satisfied). If the rating was equal to or greater than 5, we considered the outpatients and volunteers were satisfied with the services. The validity and reliability of the measure were assessed. Multivariate regressions for each of the 4 dimensions and overall of patient satisfaction were used in analyses. Paired t tests were applied to analyze the rating agreement on physician services between outpatients and volunteers. Results: Overall, 90% of surveyed outpatients were satisfied with outpatient care in the tertiary public hospitals of Shanghai. The lowest three satisfaction rates were seen in the items of ‘Restrooms were sanitary and not crowded’ (81%), ‘It was convenient for the patient to pay medical bills’ (82%), and ‘Medical cost in the hospital was reasonable’ (84%). After adjusting the characteristics of patients, the patient satisfaction in general hospitals was higher than that in specialty hospitals. In addition, after controlling the patient characteristics and number of hospital visits, the hospitals with higher outpatient cost per visit had lower patient satisfaction. Paired t tests showed that the rating on 6 items in the dimension of physician services (total 14 items) was significantly different between outpatients and observers, in which 5 were rated lower by the observers than by the outpatients. Conclusions: The hospital managers and physicians should use patient satisfaction and observers’ evaluation to detect the room for improvement in areas such as social skills cost control, and medical ethics.

Keywords: patient satisfaction, observation, quality, hospital

Procedia PDF Downloads 299
9323 Functions and Pragmatic Aspects of English Nonsense

Authors: Natalia V. Ursul

Abstract:

In linguistic studies, the question of nonsense is attracting increasing interest. Nonsense is usually defined as spoken or written words that have no meaning. However, this definition is likely to be outdated as any speech act is generated due to the speaker’s pragmatic reasons, thus it cannot be purely illogical or meaningless. In the current paper a new working definition of nonsense as a linguistic medium will be formulated; moreover, the pragmatic peculiarities of newly coined linguistic patterns and possible ways of their interpretation will be discussed.

Keywords: nonsense, nonse verse, pragmatics, speech act

Procedia PDF Downloads 491
9322 A Model Approach of Good Practice Based on the Project Management Body of Knowledge® Guide in the Project Owner

Authors: Claudia Marcela Munoz Gonzalez, Diego Fernando Hernandez Losada, Hugo Alberto Herrera Fonseca

Abstract:

The project owner's role in the public-private investment consists of controlling and verifying the correct execution of the project's objectives and resources. Likewise, it is a discipline little explored in the academic field, whereby this work wishes to contribute with a model of good practices based on the project management methodology proposed by the Project Management Body of Knowledge® Guide. In the same way, highlight what are the controls that an integral project owner should take into account in its exercise and application, through the stages in which its contract runs. This proposal aims to structure its practice and integrate its functions according to a project management methodology. In addition, these practices will be applied in a case study of projects in the agricultural sector, particularly in the construction of irrigation district in Cundinamarca, Colombia.

Keywords: controls, construction of irrigation district, PMBOK®, project owner

Procedia PDF Downloads 433
9321 Infrastructure Project Management and Implementation: A Case Study Of the Mokolo-Crocodile Water Augmentation Project in South Africa

Authors: Elkington Sibusiso Mnguni

Abstract:

The Mokolo-Crocodile Water Augmentation Project (MCWAP) is located in the Limpopo Province in the northern-western part of South Africa. Its purpose is to increase water supply by 30 million cubic meters per year to meet current and future demand for users, including power stations, mining houses, and the local municipality in the Lephalale area. This paper documents the planning and implementation aspects of the MCWAP infrastructure project. The study will add to the body of knowledge with respect to bulk water infrastructure development in water-scarce regions. The method used to gather and collate relevant data and information was the desktop study. The key finding was that the project was successfully completed in 2015 using conventional project management and construction methods. The project is currently being operated and maintained by the National Department of Water and Sanitation.

Keywords: construction, contract management, infrastructure project, project management

Procedia PDF Downloads 275
9320 The Implementation of the Lean Six Sigma Production Process in a Telecommunications Company in Brazil

Authors: Carlos Fontanillas

Abstract:

The implementation of the lean six sigma methodology aims to implement practices to systematically improve processes by eliminating defects, making them cheaper. The implementation of projects with the methodology uses a division into five phases: definition, measurement, analysis, implementation, and control. In this process, it is understood that the implementation of said methodology generates benefits to organizations that adhere through the improvement of their processes. In the case of a telecommunications company, it was realized that the implementation of a lean six sigma project contributed to the improvement of the presented process, generating a financial return with the avoided cost. However, such study has limitations such as a specific segment of performance and procedure, i.e., it can not be defined that return under other circumstances will be the same. It is also concluded that lean six sigma projects tend to contribute to improved processes evaluated due to their methodology that is based on statistical analysis and quality management tools and can generate a financial return. It is hoped that the present study can be used to provide a clearer view of the methodology for entrepreneurs who wish to implement process improvement actions in their companies, as well as to provide a foundation for professionals working with lean six sigma projects. After the review of the processes, the completion of the project stages and the monitoring for three months in partnership with the owner of the process to ensure the effectiveness of the actions, the project was completed with the objective reached. There was an average of 60% reduction with the issuance of undue invoices generated after the deactivation and it was possible to extend the project to other companies, which allowed a reduction well above the initially stipulated target.

Keywords: quality, process, lean six sigma, organization

Procedia PDF Downloads 107
9319 Discrimination between Defective and Non-Defective Coffee Beans Using a Laser Prism Spectrometer

Authors: A. Belay, B. Kebede

Abstract:

The concentration- and temperature-dependent refractive indices of solutions extracted from defective and non-defective coffee beans have been investigated using a He–Ne laser. The refractive index has a linear relationship with the presumed concentration of the coffee solutions in the range of 0.5–3%. Higher and lower values of refractive index were obtained for immature and non-defective coffee beans, respectively. The Refractive index of bean extracts can be successfully used to separate defective from non-defective beans.

Keywords: coffee extract, refractive index, temperature dependence

Procedia PDF Downloads 120
9318 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 625
9317 Hosoya Polynomials of Zero-Divisor Graphs

Authors: Abdul Jalil M. Khalaf, Esraa M. Kadhim

Abstract:

The Hosoya polynomial of a graph G is a graphical invariant polynomial that its first derivative at x= 1 is equal to the Wiener index and second derivative at x=1 is equal to the Hyper-Wiener index. In this paper we study the Hosoya polynomial of zero-divisor graphs.

Keywords: Hosoya polynomial, wiener index, Hyper-Wiener index, zero-divisor graphs

Procedia PDF Downloads 503
9316 The First Japanese-Japanese Dictionary for Non-Japanese Using the Defining Vocabulary

Authors: Minoru Moriguchi

Abstract:

This research introduces the concept of a monolingual Japanese dictionary for non-native speakers of Japanese, whose temporal title is Dictionary of Contemporary Japanese for Advanced Learners (DCJAL). As the language market is very small compared with English, a monolingual Japanese dictionary for non-native speakers, containing sufficient entries, has not been published yet. In such a dictionary environment, Japanese-language learners are using bilingual dictionaries or monolingual Japanese dictionaries for Japanese people. This research started in 2017, as a project team which consists of four Japanese and two non-native speakers, all of whom are linguists of the Japanese language. The team has been trying to propose the concept of a monolingual dictionary for non-native speakers of Japanese and to provide the entry list, the definition samples, the list of defining vocabulary, and the writing manual. As the result of seven-year research, DCJAL has come to have 28,060 head words, 539 entry examples, 4,598-word defining vocabulary, and the writing manual. First, the number of the entry was determined as about 30,000, based on an experimental method using existing six dictionaries. To make the entry list satisfying this number, words suitable for DCJAL were extracted from the Tsukuba corpus of the Japanese language, and later the entry list was adjusted according to the experience as Japanese instructor. Among the head words of the entry list, 539 words were selected and added with lexicographical information such as proficiency level, pronunciation, writing system (hiragana, katakana, kanji, or alphabet), definition, example sentences, idiomatic expression, synonyms, antonyms, grammatical information, sociolinguistic information, and etymology. While writing the definition of the above 539 words, the list of the defining vocabulary was constructed, based on frequent vocabulary used in a Japanese monolingual dictionary. Although the concept of DCJAL has been almost perfected, it may need some more adjustment, and the research is continued.

Keywords: monolingual dictionary, the Japanese language, non-native speaker of Japanese, defining vocabulary

Procedia PDF Downloads 16
9315 Agile Project Management: A Real Application in a Multi-Project Research and Development Center

Authors: Aysegul Sarac

Abstract:

The aim of this study is to analyze the impacts of integrating agile development principles and practices, in particular to reduce project lead time in a multi-project environment. We analyze Arçelik Washing Machine R&D Center in which multiple projects are conducted by shared resources. In the first part of the study, we illustrate the current waterfall model system by using a value stream map. We define all activities starting from the first idea of the project to the customer and measure process time and lead time of projects. In the second part of the study we estimate potential improvements and select a set of these improvements to integrate agile principles. We aim to develop a future state map and analyze the impacts of integrating lean principles on project lead time. The main contribution of this study is that we analyze and integrate agile product development principles in a real multi-project system.

Keywords: agile project management, multi project system, project lead time, product development

Procedia PDF Downloads 278
9314 Developing a Framework to Aid Sustainable Assessment in Indian Buildings

Authors: P. Amarnath, Albert Thomas

Abstract:

Buildings qualify to be the major consumer of energy and resources thereby urging the designers, architects and policy makers to place a great deal of effort in achieving and implementing sustainable building strategies in construction. Green building rating systems help a great deal in this by measuring the effectiveness of these strategies along with the escalation of building performance in social, environmental and economic perspective, and construct new sustainable buildings. However, for a country like India, enormous population and its rapid rate of growth impose an increasing burden on the country's limited and continuously degrading natural resource base, which also includes the land available for construction. In general, the number of sustainable rated buildings in India is very minimal primarily due to the complexity and obstinate nature of the assessment systems/regulations that restrict the stakeholders and designers in proper implementation and utilization of these rating systems. This paper aims to introduce a data driven and user-friendly framework which cross compares the present prominent green building rating systems such as LEED, BREEAM, and GRIHA and subsequently help the users to rate their proposed building design as per the regulations of these assessment frameworks. This framework is validated using the input data collected from green buildings constructed globally. The proposed system has prospects to encourage the users to test the efficiency of various sustainable construction practices and thereby promote more sustainable buildings in the country.

Keywords: BREEAM, GRIHA, green building rating systems, LEED, sustainable buildings

Procedia PDF Downloads 104
9313 Hybrid Project Management Model Based on Lean and Agile Approach

Authors: Fatima-Zahra Eddoug, Jamal Benhra, Rajaa Benabbou

Abstract:

Several project management models exist in the literature and the most used ones are the hybrids for their multiple advantages. Our objective in this paper is to analyze the existing models, which are based on the Lean and Agile approaches and to propose a novel framework with the convenient tools that will allow efficient management of a general project. To create the desired framework, we were based essentially on 7 existing models. Only the Scrum tool among the agile tools was identified by several authors to be appropriate for project management. In contrast, multiple lean tools were proposed in different phases of the project.

Keywords: agility, hybrid project management, lean, scrum

Procedia PDF Downloads 112
9312 Research on the Ecological Impact Evaluation Index System of Transportation Construction Projects

Authors: Yu Chen, Xiaoguang Yang, Lin Lin

Abstract:

Traffic engineering construction is an important infrastructure for economic and social development. In the process of construction and operation, the ability to make a correct evaluation of the project's environmental impact appears to be crucial to the rational operation of existing transportation projects, the correct development of transportation engineering construction and the adoption of corresponding measures to scientifically carry out environmental protection work. Most of the existing research work on ecological and environmental impact assessment is limited to individual aspects of the environment and less to the overall evaluation of the environmental system; in terms of research conclusions, there are more qualitative analyses from the technical and policy levels, and there is a lack of quantitative research results and quantitative and operable evaluation models. In this paper, a comprehensive analysis of the ecological and environmental impacts of transportation construction projects is conducted, and factors such as the accessibility of data and the reliability of calculation results are comprehensively considered to extract indicators that can reflect the essence and characteristics. The qualitative evaluation indicators were screened using the expert review method, the qualitative indicators were measured using the fuzzy statistics method, the quantitative indicators were screened using the principal component analysis method, and the quantitative indicators were measured by both literature search and calculation. An environmental impact evaluation index system with the general objective layer, sub-objective layer and indicator layer was established, dividing the environmental impact of the transportation construction project into two periods: the construction period and the operation period. On the basis of the evaluation index system, the index weights are determined using the hierarchical analysis method, and the individual indicators to be evaluated are dimensionless, eliminating the influence of the original background and meaning of the indicators. Finally, the thesis uses the above research results, combined with the actual engineering practice, to verify the correctness and operability of the evaluation method.

Keywords: transportation construction projects, ecological and environmental impact, analysis and evaluation, indicator evaluation system

Procedia PDF Downloads 79
9311 Empirical Study for the Project and the Project Management Dimensions Comparison between SMEs and Large Companies

Authors: Amina Oukennou, Zitouni Beidouri, Otmane Bouksour

Abstract:

Small to Medium-sized enterprises are a very important component of the economy. They are present in the whole industries all over the world. They are considered as the engine for future growth in the economy. Project management is an economical international factor impacting all types of enterprises including the SMEs. This paper has the aim of measuring the weight of using projects and project management in Moroccan SMEs in comparison with the large companies. The study is based on interviews with experts: project managers, managers, directors, and consultants. They were asked questions measuring the weight of using projects, the level of using project management, and the resources employed. Eighteen Moroccan companies from a range of industries and sizes were consulted. All the companies consider projects as a key element in their strategy. Most of them affirm the great usefulness of the approach 'project', especially for the external activities. The main differences lie in the duration and the size of used projects. Despite the commonly shared idea about the importance of the project management, the interviewed persons believe that the project management knowledge has the same importance or less than the technical knowledge. All the companies affirm the need for a simpler version of project management. The content varies from one company to another.

Keywords: project dimension, project management, small to medium-sized entreprise, Morocco

Procedia PDF Downloads 286
9310 Project Management Agile Model Based on Project Management Body of Knowledge Guideline

Authors: Mehrzad Abdi Khalife, Iraj Mahdavi

Abstract:

This paper presents the agile model for project management process. For project management process, the Project Management Body of Knowledge (PMBOK) guideline has been selected as platform. Combination of computational science and artificial intelligent methodology has been added to the guideline to transfer the standard to agile project management process. The model is the combination of practical standard, computational science and artificial intelligent. In this model, we present communication model and protocols to keep process agile. Here, we illustrate the collaboration man and machine in project management area with artificial intelligent approach.

Keywords: artificial intelligent, conceptual model, man-machine collaboration, project management, standard

Procedia PDF Downloads 314
9309 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria

Authors: Shazali Abdulahi

Abstract:

Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.

Keywords: effetive communication, ineffective communication, stakeholders, project delivery

Procedia PDF Downloads 26
9308 An Approaching Index to Evaluate a forward Collision Probability

Authors: Yuan-Lin Chen

Abstract:

This paper presents an approaching forward collision probability index (AFCPI) for alerting and assisting driver in keeping safety distance to avoid the forward collision accident in highway driving. The time to collision (TTC) and time headway (TH) are used to evaluate the TTC forward collision probability index (TFCPI) and the TH forward collision probability index (HFCPI), respectively. The Mamdani fuzzy inference algorithm is presented combining TFCPI and HFCPI to calculate the approaching collision probability index of the vehicle. The AFCPI is easier to understand for the driver who did not even have any professional knowledge in vehicle professional field. At the same time, the driver’s behavior is taken into account for suiting each driver. For the approaching index, the value 0 is indicating the 0% probability of forward collision, and the values 0.5 and 1 are indicating the 50% and 100% probabilities of forward collision, respectively. The AFCPI is useful and easy-to-understand for alerting driver to avoid the forward collision accidents when driving in highway.

Keywords: approaching index, forward collision probability, time to collision, time headway

Procedia PDF Downloads 267
9307 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries

Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi

Abstract:

Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.

Keywords: physical progress, time progress, financial progress, delays, critical path

Procedia PDF Downloads 351
9306 A High-Resolution Refractive Index Sensor Based on a Magnetic Photonic Crystal

Authors: Ti-An Tsai, Chun-Chih Wang, Hung-Wen Wang, I-Ling Chang, Lien-Wen Chen

Abstract:

In this study, we demonstrate a high-resolution refractive index sensor based on a magnetic photonic crystal (MPC) composed of a triangular lattice array of air holes embedded in Si matrix. A microcavity is created by changing the radius of an air hole in the middle of the photonic crystal. The cavity filled with gyrotropic materials can serve as a refractive index sensor. The shift of the resonant frequency of the sensor is obtained numerically using finite difference time domain method under different ambient conditions having refractive index from n = 1.0 to n = 1.1. The numerical results show that a tiny change in refractive index of Δn = 0.0001 is distinguishable. In addition, the spectral response of the MPC sensor is studied while an external magnetic field is present. The results show that the MPC sensor exhibits a dramatic improvement in resolution.

Keywords: magnetic photonic crystal, refractive index sensor, sensitivity, high-resolution

Procedia PDF Downloads 568
9305 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 236
9304 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 395
9303 Beyond Taguchi’s Concept of the Quality Loss Function

Authors: Atul Dev, Pankaj Jha

Abstract:

Dr. Genichi Taguchi looked at quality in a broader term and gave an excellent definition of quality in terms of loss to society. However the scope of this definition is limited to the losses imparted by a poor quality product to the customer only and are considered during the useful life of the product and further in a certain situation this loss can even be zero. In this paper, it has been proposed that the scope of quality of a product shall be further enhanced by considering the losses imparted by a poor quality product to society at large, due to associated environmental and safety related factors, over the complete life cycle of the product. Moreover, though these losses can be further minimized with the use of techno-safety interventions, the net losses to society however can never be made zero. This paper proposes an entirely new approach towards defining product quality and is based on Taguchi’s definition of quality.

Keywords: existing concept, goal post philosophy, life cycle, proposed concept, quality loss function

Procedia PDF Downloads 279
9302 A New Approach – A Numerical Assessment of Ground Strata Failure Potentials in Underground Mines

Authors: Omer Yeni

Abstract:

Ground strata failure or fall-of-ground is one of the underground mines' most prominent catastrophic risks. Mining companies use various methods/technics to prevent and critically control the associated risks. Some of those are safety by design, excavation methods, ground support, training, and competency, which all require quality control and assurance activities to confirm their efficiencies and performances and identify improvement opportunities through monitoring. However, many mining companies use quality control (QC) methods without quality assurance (QA), and they call it QA/QC together as a habit. From a simple definition, QC is a method of detecting defects, and QA is a method of preventing defects. Testing the final products at the end of the production line is not the way of proper QA/QC application but testing every component before assembly and the final product once completed. The installed ground support elements are some final products mining companies use to prevent ground strata failure. Testing the final product (i.e., rock bolt pull testing, shotcrete strength test, etc.) with QC methods only while those areas are already accessible; is not like testing an airplane full of passengers right after the production line or testing a car after the sale. Can only QC methods be called QA/QC? Can QA/QC activities be numerically scored for each critical control implemented to assess ground strata failure potential? Can numerical scores be used to identify Geotechnical Risk Rating (GRR) to determine the ground strata failure risk and its probability? This paper sets out to provide a specific QA/QC methodology to manage and confirm efficiencies and performances of the implemented critical controls and a numerical approach through the Geotechnical Risk Rating (GRR) process to assess ground strata failure risk to determine the gaps where proactive action is required to evaluate the probability of ground strata failures in underground mines.

Keywords: fall of ground, ground strata failure, QA/QC, underground

Procedia PDF Downloads 52
9301 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 147
9300 A New Prediction Model for Soil Compression Index

Authors: D. Mohammadzadeh S., J. Bolouri Bazaz

Abstract:

This paper presents a new prediction model for compression index of fine-grained soils using multi-gene genetic programming (MGGP) technique. The proposed model relates the soil compression index to its liquid limit, plastic limit and void ratio. Several laboratory test results for fine-grained were used to develop the models. Various criteria were considered to check the validity of the model. The parametric and sensitivity analyses were performed and discussed. The MGGP method was found to be very effective for predicting the soil compression index. A comparative study was further performed to prove the superiority of the MGGP model to the existing soft computing and traditional empirical equations.

Keywords: new prediction model, compression index soil, multi-gene genetic programming, MGGP

Procedia PDF Downloads 346
9299 The Impact of Macroeconomic Factors on Tehran Stock Exchange Index during Economic and Oil Sanctions between January 2006 and December 2012

Authors: Hamed Movahedizadeh, Annuar Md Nassir, Mehdi Karimimalayer, Navid Samimi Sedeh, Ehsan Bagherpour

Abstract:

The aim of this paper is to evaluate Tehran’s Stock Exchange (TSE) performance regarding with impact of four macroeconomic factors including world crude Oil Price (OP), World Gold Price (GP), Consumer Price Index (CPI) and total Supplied Oil by Iran (SO) from January 2006 to December 2012 that Iran faced with economic and oil sanctions. Iran's exports of crude oil and lease condensate reduced to roughly 1.5 million barrels per day (bbl/d) in 2012, compared to 2.5 million bbl/d in 2011 due to hard sanctions. Monthly data are collected and subjected to a battery of tests through ordinary least square by EViews7. This study found that gold price and oil price are positively correlated with stock returns while total oil supplied and consumer price index have negative relationship with stock index, however, consumer price index tends to become insignificant in stock index. While gold price and consumer price index have short run relationship with TSE index at 10% of significance level this amount for oil price is significant at 5% and there is no significant short run relationship between supplied oil and Tehran stock returns. Moreover, this study found that all macroeconomic factors have long-run relationship with Tehran Stock Exchange Index.

Keywords: consumer price index, gold price, macroeconomic, oil price, sanction, stock market, supplied oil

Procedia PDF Downloads 463
9298 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 138
9297 Application of Artificial Neural Network and Background Subtraction for Determining Body Mass Index (BMI) in Android Devices Using Bluetooth

Authors: Neil Erick Q. Madariaga, Noel B. Linsangan

Abstract:

Body Mass Index (BMI) is one of the different ways to monitor the health of a person. It is based on the height and weight of the person. This study aims to compute for the BMI using an Android tablet by obtaining the height of the person by using a camera and measuring the weight of the person by using a weighing scale or load cell. The height of the person was estimated by applying background subtraction to the image captured and applying different processes such as getting the vanishing point and applying Artificial Neural Network. The weight was measured by using Wheatstone bridge load cell configuration and sending the value to the computer by using Gizduino microcontroller and Bluetooth technology after the amplification using AD620 instrumentation amplifier. The application will process the images and read the measured values and show the BMI of the person. The study met all the objectives needed and further studies will be needed to improve the design project.

Keywords: body mass index, artificial neural network, vanishing point, bluetooth, wheatstone bridge load cell

Procedia PDF Downloads 296
9296 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 436
9295 The Effect of Patient Positioning on Pleth Variability Index during Surgery

Authors: Omid Azimaraghi, Noushin Khazaei

Abstract:

Background: Fluid therapy is an important aspect of the perioperative period and a major challenge for anesthesiologists. To authors best knowledge, there is a lack of strong guidance and evidence regarding the optimal approach to fluid therapy. Therefore a variety of medical devices have been introduced to help physicians. In this study, we aimed to evaluate the effectiveness of pleth variability index in guiding fluid therapy in different patient positions. Materials and Methods: Inclusion criteria consisted of patients aged 18-50 years old and classified as American Society of Anesthesiologists physical status I and II, who were candidates for elective thyroidectomy surgery. In total, 36 patients meeting the inclusion criteria were enrolled in the study. After induction of anesthesia and start of mechanical ventilation Pleth variability index was measured in the supine position, then patients were placed in Trendelenburg and reverse Trendelenburg position (30 degrees, 5 minutes); Pleth Variability Index has measured again in the mentioned positions. Results: Mean PVI (Pleth Variability Index) in the supine position was 14.3 ± 3.7 in comparison to 21.5 ± 4.3 in the reverse Trendelenburg position. The mean PVI in Trendelenburg position was 9.1 ± 2.0 in Trendelenburg position (p < 0.05). Conclusion: In conclusion, we found that Pleth Variability Index varies with patient position and this should be taken into account when using this index during fluid therapy.

Keywords: fluid therapy, Pleth Variability Index, position, surgery

Procedia PDF Downloads 142