Search results for: project implementation
8906 The Development of Directed-Project Based Learning as Language Learning Model to Improve Students' English Achievement
Authors: Tri Pratiwi, Sufyarma Marsidin, Hermawati Syarif, Yahya
Abstract:
The 21st-century skills being highly promoted today are Creativity and Innovation, Critical Thinking and Problem Solving, Communication and Collaboration. Communication Skill is one of the essential skills that should be mastered by the students. To master Communication Skills, students must first master their Language Skills. Language Skills is one of the main supporting factors in improving Communication Skills of a person because by learning Language Skills students are considered capable of communicating well and correctly so that the message or how to deliver the message to the listener can be conveyed clearly and easily understood. However, it cannot be denied that English output or learning outcomes which are less optimal is the problem which is frequently found in the implementation of the learning process. This research aimed to improve students’ language skills by developing learning model in English subject for VIII graders of SMP N 1 Uram Jaya through Directed-Project Based Learning (DPjBL) implementation. This study is designed in Research and Development (R & D) using ADDIE model development. The researcher collected data through observation, questionnaire, interview, test, and documentation which were then analyzed qualitatively and quantitatively. The results showed that DPjBL is effective to use, it is seen from the difference in value between the pretest and posttest of the control class and the experimental class. From the results of a questionnaire filled in general, the students and teachers agreed to DPjBL learning model. This learning model can increase the students' English achievement.Keywords: language skills, learning model, Directed-Project Based Learning (DPjBL), English achievement
Procedia PDF Downloads 1658905 Implementation Principles and Strategies of Bilingual Teaching in Taiwan
Authors: Chinfen Chen
Abstract:
This paper aims to focus on the challenges and doubts encountered in the implementation of ‘bilingual teaching in some fields of courses’, and propose implementation principles and strategies from the four areas of curriculum design, teaching strategies, teaching language application, and bilingual teaching implementation and operation, as a school The administrative team considers when planning bilingual teaching and also clarifies teachers' doubts about the implementation of bilingual teaching to enhance their willingness and confidence to participate in bilingual teaching.Keywords: bilingual education policy, language immersion, partial bilingual education, content knowledge and target language acquisition, inquiry-based teaching.
Procedia PDF Downloads 528904 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options
Authors: Babak H. Tabrizi, Seyed Farid Ghaderi
Abstract:
On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.Keywords: discount strategies, material purchasing, project planning, project scheduling
Procedia PDF Downloads 2618903 Genetic Algorithms Multi-Objective Model for Project Scheduling
Authors: Elsheikh Asser
Abstract:
Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling
Procedia PDF Downloads 4138902 Best Practice for Post-Operative Surgical Site Infection Prevention
Authors: Scott Cavinder
Abstract:
Surgical site infections (SSI) are a known complication to any surgical procedure and are one of the most common nosocomial infections. Globally it is estimated 300 million surgical procedures take place annually, with an incidence of SSI’s estimated to be 11 of 100 surgical patients developing an infection within 30 days after surgery. The specific purpose of the project is to address the PICOT (Problem, Intervention, Comparison, Outcome, Time) question: In patients who have undergone cardiothoracic or vascular surgery (P), does implementation of a post-operative care bundle based on current EBP (I) as compared to current clinical agency practice standards (C) result in a decrease of SSI (O) over a 12-week period (T)? Synthesis of Supporting Evidence: A literature search of five databases, including citation chasing, was performed, which yielded fourteen pieces of evidence ranging from high to good quality. Four common themes were identified for the prevention of SSI’s including use and removal of surgical dressings; use of topical antibiotics and antiseptics; implementation of evidence-based care bundles, and implementation of surveillance through auditing and feedback. The Iowa Model was selected as the framework to help guide this project as it is a multiphase change process which encourages clinicians to recognize opportunities for improvement in healthcare practice. Practice/Implementation: The process for this project will include recruiting postsurgical participants who have undergone cardiovascular or thoracic surgery prior to discharge at a Northwest Indiana Hospital. The patients will receive education, verbal instruction, and return demonstration. The patients will be followed for 12 weeks, and wounds assessed utilizing the National Healthcare Safety Network//Centers for Disease Control (NHSN/CDC) assessment tool and compared to the SSI rate of 2021. Key stakeholders will include two cardiovascular surgeons, four physician assistants, two advance practice nurses, medical assistant and patients. Method of Evaluation: Chi Square analysis will be utilized to establish statistical significance and similarities between the two groups. Main Results/Outcomes: The proposed outcome is the prevention of SSIs in the post-op cardiothoracic and vascular patient. Implication/Recommendation(s): Implementation of standardized post operative care bundles in the prevention of SSI in cardiovascular and thoracic surgical patients.Keywords: cardiovascular, evidence based practice, infection, post-operative, prevention, thoracic, surgery
Procedia PDF Downloads 838901 Identifying Project Delay Factors in the Australian Construction Industry
Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar
Abstract:
Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.Keywords: construction, delay factors, time delay, australian construction industry
Procedia PDF Downloads 1758900 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects
Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco
Abstract:
Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.Keywords: project management, project management maturity, maturity models, project success
Procedia PDF Downloads 1618899 Navigating Uncertainties in Project Control: A Predictive Tracking Framework
Authors: Byung Cheol Kim
Abstract:
This study explores a method for the signal-noise separation challenge in project control, focusing on the limitations of traditional deterministic approaches that use single-point performance metrics to predict project outcomes. We detail how traditional methods often overlook future uncertainties, resulting in tracking biases when reliance is placed solely on immediate data without adjustments for predictive accuracy. Our investigation led to the development of the Predictive Tracking Project Control (PTPC) framework, which incorporates network simulation and Bayesian control models to adapt more effectively to project dynamics. The PTPC introduces controlled disturbances to better identify and separate tracking biases from useful predictive signals. We will demonstrate the efficacy of the PTPC with examples, highlighting its potential to enhance real-time project monitoring and decision-making, marking a significant shift towards more accurate project management practices.Keywords: predictive tracking, project control, signal-noise separation, Bayesian inference
Procedia PDF Downloads 188898 Construction Quality Perception of Construction Professionals and Their Expectations from a Quality Improvement Technique in Pakistan
Authors: Muhammad Yousaf Sadiq
Abstract:
The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. An quantitative survey based approach was adopted in this constructive study. A questionnaire-based survey was conducted for the assessment of construction Quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals of the leading construction organizations/companies of Pakistan construction industry were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. The quality perception was found to be project-scope-oriented and considered as an excess cost for a construction project. Any quality improvement technique was expected to maximize the profit for the employer, by improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.Keywords: construction quality, expectation, improvement, perception
Procedia PDF Downloads 4748897 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey
Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali
Abstract:
Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling
Procedia PDF Downloads 2428896 Piloting a Prototype Virtual Token Economy Intervention for On-Task Support within an Inclusive Canadian Classroom
Authors: Robert L. Williamson
Abstract:
A 'token economy' refers to a method of positive behaviour support whereby ‘tokens’ are delivered to students as a reward for exhibiting specific behaviours. Students later exchange tokens to ‘purchase’ items of interest. Unfortunately, implementation fidelity can be problematic as some find physical delivery of tokens while teaching difficult. This project developed and tested a prototype, iPad-based tool that enabled teachers to deliver and track tokens electronically. Using an alternating treatment design, any differences in on-task individual and/or group behaviours between the virtual versus physical token delivery systems were examined. Results indicated that while students and teachers preferred iPad-based implementation, no significant difference was found concerning on-task behaviours of students between the two methodologies. Perhaps more interesting was that the teacher found implementation of both methods problematic and suggested a second person was most effective in implementing a token economy method. This would represent a significant cost to the effective use of such a method. Further research should focus on the use of a lay volunteer regarding method implementation fidelity and associated outcomes of the method.Keywords: positive behaviour support, inclusion, token economy, applied behaviour analysis
Procedia PDF Downloads 1508895 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method
Abstract:
The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.Keywords: construction management, critical path method, project scheduling network, precedence diagram method
Procedia PDF Downloads 2228894 Design a Network for Implementation a Hospital Information System
Authors: Abdulqader Rasool Feqi Mohammed, Ergun Erçelebi̇
Abstract:
A large number of hospitals from developed countries are adopting hospital information system to bring efficiency in hospital information system. The purpose of this project is to research on new network security techniques in order to enhance the current network security structure of save a hospital information system (HIS). This is very important because, it will avoid the system from suffering any attack. Security architecture was optimized but there are need to keep researching on best means to protect the network from future attacks. In this final project research, security techniques were uncovered to produce best network security results when implemented in an integrated framework.Keywords: hospital information system, HIS, network security techniques, internet protocol, IP, network
Procedia PDF Downloads 4408893 Project Management Framework and Influencing Factors
Authors: Mehrnoosh Askarizadeh
Abstract:
The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.Keywords: project, goal, project management, influencing factors
Procedia PDF Downloads 5438892 Applying the Underwriting Technique to Analyze and Mitigate the Credit Risks in Construction Project Management
Authors: Hai Chien Pham, Thi Phuong Anh Vo, Chansik Park
Abstract:
Risks management in construction projects is important to ensure the positive feasibility of the projects in which financial risks are most concerned while construction projects always run on a credit basis. Credit risks, therefore, require unique and technical tools to be well managed. Underwriting technique in credit risks, in its most basic sense, refers to the process of evaluating the risks and the potential exposure of losses. Risks analysis and underwriting are applied as a must in banks and financial institutions who are supporters for constructions projects when required. Recently, construction organizations, especially contractors, have recognized the significant increasing of credit risks which caused negative impacts to project performance and profit of construction firms. Despite the successful application of underwriting in banks and financial institutions for many years, there are few contractors who are applying this technique to analyze and mitigate the credit risks of their potential owners before signing contracts with them for delivering their performed services. Thus, contractors have taken credit risks during project implementation which might be not materialized due to the bankruptcy and/or protracted default made by their owners. With this regard, this study proposes a model using the underwriting technique for contractors to analyze and assess credit risks of their owners before making final decisions for the potential construction contracts. Contractor’s underwriters are able to analyze and evaluate the subjects such as owner, country, sector, payment terms, financial figures and their related concerns of the credit limit requests in details based on reliable information sources, and then input into the proposed model to have the Overall Assessment Score (OAS). The OAS is as a benchmark for the decision makers to grant the proper limits for the project. The proposed underwriting model is validated by 30 subjects in Asia Pacific region within 5 years to achieve their OAS, and then compare output OAS with their own practical performance in order to evaluate the potential of underwriting model for analyzing and assessing credit risks. The results revealed that the underwriting would be a powerful method to assist contractors in making precise decisions. The contribution of this research is to allow the contractors firstly to develop their own credit risk management model for proactively preventing the credit risks of construction projects and continuously improve and enhance the performance of this function during project implementation.Keywords: underwriting technique, credit risk, risk management, construction project
Procedia PDF Downloads 2088891 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project
Authors: Mohmd Sarireh
Abstract:
The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.Keywords: geotechnical, management, progress, risk, soil unseen conditions management
Procedia PDF Downloads 2248890 Quality Management in Construction Project
Authors: Harsh Panchal, Saurabh Amrutkar
Abstract:
Quality management is an essential part of any project that has directly related to the performance of a project. Quality management is depended on multiple factors at different stages in a project, right from time management to construction logistics. A project is a mixture of various components that include iternary management, health and safety, crew productivity, and many more. From the survey conducted, we came to the conclusion that advancement in technology and indigenous approach to any project will result in maximum quality standards and better project performance. In this paper, we discuss various components of the factors above that lead to compromise the quality of a project and how it can be controlled in order to achieve maximum quality assurance using quality planning and total quality management. The paper also focuses on limitations and problems faced in each factor responsible for quality management and to tackle them using techniques and processes based on activities and identifying the sequence, approaching critical path, and duration. The project management concept that deals with the sequence of scope cost time give us an overview regarding the ongoing quality management, in a nutshell, giving us hints to regulate the current procedure for maximum achievable quality. It also deals with the problems faced by engineers that make the mundane work process slow, reducing the quality outcome drastically.Keywords: management, performance, project, quality
Procedia PDF Downloads 1658889 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal
Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai
Abstract:
Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.Keywords: material management, construction site, inventory, construction project
Procedia PDF Downloads 688888 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine
Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad
Abstract:
In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.Keywords: the urban project, the urban improvement, participation, Constantine
Procedia PDF Downloads 4008887 Linking Excellence in Biomedical Knowledge and Computational Intelligence Research for Personalized Management of Cardiovascular Diseases within Personal Health Care
Authors: T. Rocha, P. Carvalho, S. Paredes, J. Henriques, A. Bianchi, V. Traver, A. Martinez
Abstract:
The main goal of LINK project is to join competences in intelligent processing in order to create a research ecosystem to address two central scientific and technical challenges for personal health care (PHC) deployment: i) how to merge clinical evidence knowledge in computational decision support systems for PHC management and ii) how to provide achieve personalized services, i.e., solutions adapted to the specific user needs and characteristics. The final goal of one of the work packages (WP2), designated Sustainable Linking and Synergies for Excellence, is the definition, implementation and coordination of the necessary activities to create and to strengthen durable links between the LiNK partners. This work focuses on the strategy that has been followed to achieve the definition of the Research Tracks (RT), which will support a set of actions to be pursued along the LiNK project. These include common research activities, knowledge transfer among the researchers of the consortium, and PhD student and post-doc co-advisement. Moreover, the RTs will establish the basis for the definition of concepts and their evolution to project proposals.Keywords: LiNK Twin European Project, personal health care, cardiovascular diseases, research tracks
Procedia PDF Downloads 2168886 A Mixed-Methods Design and Implementation Study of ‘the Attach Project’: An Attachment-Based Educational Intervention for Looked after Children in Northern Ireland
Authors: Hannah M. Russell
Abstract:
‘The Attach Project’ (TAP), is an educational intervention aimed at improving educational and socio-emotional outcomes for children who are looked after. TAP is underpinned by Attachment Theory and is adapted from Dyadic Developmental Psychotherapy (DDP), which is a treatment for children and young people impacted by complex trauma and disorders of attachment. TAP has been implemented in primary schools in Northern Ireland throughout the 2018/19 academic year. During this time, a design and implementation study has been conducted to assess the promise of effectiveness for the future dissemination and ‘scaling-up’ of the programme for a larger, randomised control trial. TAP has been designed specifically for implementation in a school setting and is comprised of a whole school element and a more individualised Key Adult-Key Child pairing. This design and implementation study utilises a mixed-methods research design consisting of quantitative, qualitative, and observational measures with stakeholder input and involvement being considered an integral component. The use of quantitative measures, such as self-report questionnaires prior to and eight months following the implementation of TAP, enabled the analysis of the strengths and direction of relations between the various components of the programme, as well as the influence of implementation factors. The use of qualitative measures, incorporating semi-structured interviews and focus groups, enabled the assessment of implementation factors, identification of implementation barriers, and potential methods of addressing these issues. Observational measures facilitated the continual development and improvement of ‘TAP training’ for school staff. Preliminary findings have provided evidence of promise for the effectiveness of TAP and indicate the potential benefits of introducing this type of attachment-based intervention across other educational settings. This type of intervention could benefit not only children who are looked after but all children who may be impacted by complex trauma or disorders of attachment. Furthermore, findings from this study demonstrate that it is possible for children to form a secondary attachment relationship with a significant adult in school. However, various implementation factors which should be addressed were identified throughout the study, such as the necessity of protected time being introduced to facilitate the development of a positive Key Adult- Key Child relationship. Furthermore, additional ‘re-cap’ training is required in future dissemination of the programme, to maximise ‘attachment friendly practice’ in the whole staff team. Qualitative findings have also indicated that there is a general opinion across school staff that this type of Key Adult- Key Child pairing could be more effective if it was introduced as soon as children begin primary school. This research has provided ample evidence for the need to introduce relationally based interventions in schools, to help to ensure that children who are looked after, or who are impacted by complex trauma or disorders of attachment, can thrive in the school environment. In addition, this research has facilitated the identification of important implementation factors and barriers to implementation, which can be addressed prior to the ‘scaling-up’ of TAP for a robust, randomised controlled trial.Keywords: attachment, complex trauma, educational interventions, implementation
Procedia PDF Downloads 1948885 Application of Agile Project Management to Construction Projects: Case Study
Authors: Ran Etgar, Sarit Freund
Abstract:
Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.Keywords: agile project management, construction, information systems, project management
Procedia PDF Downloads 1308884 Conceptualising Project Complexity in Ghana’s Construction Industry: A Qualitative Study
Authors: Kwasi Dartey-Baah, Mias De Klerk
Abstract:
Project complexity has been cited as one of the essential areas of project management. It can be observed from environmental, social, technological, and organisational viewpoints, and its handling is critical to project success. Conceptualised in varied industries, this paper seeks to ascertain the meaning and understanding of project complexity within the Ghanaian construction industry based on the three dimensions of complexities (faith, fact, and interaction) using experts' opinions. Taking the form of a focus group discussion, the paper sought to gain an in-depth understanding of project complexity issues in Ghana’s construction industry. The method use obtained data from experts (a purposely selected group) comprising project leaders and project management academics. The findings indicated that the experts broadly agreed with the complexity items but offered varied reasons for their agreement. In the composite assessment of the complexity dimensions of (faith, fact, and interaction), it emerged that there was some agreement with the complexity dimensions of fact and interaction within Ghana’s construction industry. On the other hand, with the dimension for complexity by faith, it was noted that the experts in Ghana’s construction construed complexity by faith, not as the absence of evidence but the evidence that hinges on at least a member of the project team. It is expected that other researches on project complexity will focus on other industries to enhance the knowledge of the same within the field of project management.Keywords: project complexity, complexity by faith, complexity by fact, complexity by interaction, construction industry, Ghana
Procedia PDF Downloads 1588883 Project Knowledge Harvesting: The Case of Improving Project Performance through Project Knowledge Sharing Framework
Authors: Eng Rima Al-Awadhi, Abdul Jaleel Tharayil
Abstract:
In a project-centric organization like KOC, managing the knowledge of the project is of critical importance to the success of the project and the organization. However, due to the very nature and complexity involved, each project engagement generates a lot of 'learnings' that need to be factored into while new projects are initiated and thus avoid repeating the same mistake. But, many a time these learnings are localized and remains as ‘tacit knowledge’ leading to scope re-work, schedule overrun, adjustment orders, concession requests and claims. While KOC follows an asset based organization structure, with a multi-cultural and multi-ethnic workforce and larger chunk of the work is carried out through complex, long term project engagement, diffusion of ‘learnings’ across assets while dealing with the natural entropy of the organization is of great significance. Considering the relatively higher number of mega projects, it's important that the issues raised during the project life cycle are centrally harvested, analyzed and the ‘learnings’ from these issues are shared, absorbed and are in-turn utilized to enhance and refine the existing process and practices, leading to improve the project performance. One of the many factors contributing to the successful completion of a project on time is the reduction in the number of variations or concessions triggered during the project life cycle. The project process integrated knowledge sharing framework discusses the knowledge harvesting methodology adopted, the challenges faced, learnings acquired and its impact on project performance. The framework facilitates the proactive identification of issues that may have an impact on the overall quality of the project and improve performance.Keywords: knowledge harvesting, project integrated knowledge sharing, performance improvement, knowledge management, lessons learn
Procedia PDF Downloads 3968882 The Mechanism of Upgrading and Urban Development in the Egyptian City: Case Study of Damietta
Authors: Lina Fayed Amin
Abstract:
The research studied, in the beginning, the related urban concepts such as the urban, development, urban development. As it also deals with the upgrading, urban upgrading, community participation and the role of local administration in development and upgrading projects. Then it studies some regional upgrading & urban development projects in Egypt followed by international projects, and the analysis the strategies followed in dealing with these projects. Afterwards, we state the regional aspects of both Damietta governorate & city, dealing with its potentials & development constraints. Followed by studying the upgrading and urban development projects strategies in reflection to the city’s crucial problems, and the constraints that faced the upgrading & development project. Then, it studied the implementation of the project’s strategies & it provided the financial resources needed for the development project in Damietta city. Followed by the studying of the urban and human development projects in the upgrading of Damietta city, as well as analyzing the different projects &analyzing the results of these projects on the aspects of the city’s needs. Then the research analysis in comparison the upgrading and urban development project in Damietta and the regional upgrading and development projects in Egypt. As well as the comparison between the upgrading and urban development project and the international projects in some Arabic and foreign countries in relation to the goals, problems, obstacles, the community participation, the finance resources and the results. Finally, it reviews the results and recommendations that were reached as a result of studying the similar urban upgrading projects in Egypt and in some Arabic and foreign countries. Followed by the analytical analysis of the upgrading and urban development in EgyptKeywords: Damietta city, urban development, upgrading mechanisms, urban upgrading
Procedia PDF Downloads 4248881 An Argument for Agile, Lean, and Hybrid Project Management in Museum Conservation Practice: A Qualitative Evaluation of the Morris Collection Conservation Project at the Sainsbury Centre for Visual Arts
Authors: Maria Ledinskaya
Abstract:
This paper is part case study and part literature review. It seeks to introduce Agile, Lean, and Hybrid project management concepts from business, software development, and manufacturing fields to museum conservation by looking at their practical application on a recent conservation project at the Sainsbury Centre for Visual Arts. The author outlines the advantages of leaner and more agile conservation practices in today’s faster, less certain, and more budget-conscious museum climate where traditional project structures are no longer as relevant or effective. The Morris Collection Conservation Project was carried out in 2019-2021 in Norwich, UK, and concerned the remedial conservation of around 150 Abstract Constructivist artworks bequeathed to the Sainsbury Centre by private collectors Michael and Joyce Morris. It was a medium-sized conservation project of moderate complexity, planned and delivered in an environment with multiple known unknowns – unresearched collection, unknown conditions and materials, unconfirmed budget. The project was later impacted by the COVID-19 pandemic, introducing indeterminate lockdowns, budget cuts, staff changes, and the need to accommodate social distancing and remote communications. The author, then a staff conservator at the Sainsbury Centre who acted as project manager on the Morris Project, presents an incremental, iterative, and value-based approach to managing a conservation project in an uncertain environment. The paper examines the project from the point of view of Traditional, Agile, Lean, and Hybrid project management. The author argues that most academic writing on project management in conservation has focussed on a Traditional plan-driven approach – also known as Waterfall project management – which has significant drawbacks in today’s museum environment due to its over-reliance on prediction-based planning and its low tolerance to change. In the last 20 years, alternative Agile, Lean and Hybrid approaches to project management have been widely adopted in software development, manufacturing, and other industries, although their recognition in the museum sector has been slow. Using examples from the Morris Project, the author introduces key principles and tools of Agile, Lean, and Hybrid project management and presents a series of arguments on the effectiveness of these alternative methodologies in museum conservation, including the ethical and practical challenges to their implementation. These project management approaches are discussed in the context of consequentialist, relativist, and utilitarian developments in contemporary conservation ethics. Although not intentionally planned as such, the Morris Project had a number of Agile and Lean features which were instrumental to its successful delivery. These key features are identified as distributed decision-making, a co-located cross-disciplinary team, servant leadership, focus on value-added work, flexible planning done in shorter sprint cycles, light documentation, and emphasis on reducing procedural, financial, and logistical waste. Overall, the author’s findings point in favour of a hybrid model, which combines traditional and alternative project processes and tools to suit the specific needs of the project.Keywords: agile project management, conservation, hybrid project management, lean project management, waterfall project management
Procedia PDF Downloads 718880 Cultural Identity in Environmental Protection Areas of Nova Friburgo: Heritage, Tourism, and Traditions
Authors: Camila Dazzi, Crisitiane Passos de Mattos, Thiago Leite
Abstract:
The paper discusses the cultural identity of the communities located in Environmental Protection Area (APAs), in the mountainous region of Rio de Janeiro, constituted almost entirely by descendants of Swiss immigrants who arrived in Brazil in the nineteenth century. The communication is the result of an extension project named "Cultural Identity in Environmental Protection Areas of Nova Friburgo." The objectives of this project were framed in the identification of local history, cultural demonstrations, crafts, religious events, festivals, the "know-how" and traditions. While an extension project, developed by students and teachers of a Bachelor of Tourism Management program, the work provided a more practical action: awareness the communities that inhabit the APAs on the possible implementation of the cultural community-based tourism, a sustainable alternative for economic development, involving local people as propagators of local culture, and tourism as a way of valuing and safeguarding of Intangible Heritage.Keywords: tourism and cultural heritage, tourism and cultural impacts, tourism and cultural change, cultural identity
Procedia PDF Downloads 5438879 The Concept of an Agile Enterprise Research Model
Authors: Maja Sajdak
Abstract:
The aim of this paper is to present the concept of an agile enterprise model and to initiate discussion on the research assumptions of the model presented. The implementation of the research project "The agility of enterprises in the process of adapting to the environment and its changes" began in August 2014 and is planned to last three years. The article has the form of a work-in-progress paper which aims to verify and initiate a debate over the proposed research model. In the literature there are very few publications relating to research into agility; it can be concluded that the most controversial issue in this regard is the method of measuring agility. In previous studies the operationalization of agility was often fragmentary, focusing only on selected areas of agility, for example manufacturing, or analysing only selected sectors. As a result the measures created to date can only be treated as contributory to the development of precise measurement tools. This research project aims to fill a cognitive gap in the literature with regard to the conceptualization and operationalization of an agile company. Thus, the original contribution of the author of this project is the construction of a theoretical model that integrates manufacturing agility (consisting mainly in adaptation to the environment) and strategic agility (based on proactive measures). The author of this research project is primarily interested in the attributes of an agile enterprise which indicate that the company is able to rapidly adapt to changing circumstances and behave pro-actively.Keywords: agile company, acuity, entrepreneurship, flexibility, research model, strategic leadership
Procedia PDF Downloads 3438878 Resolution Method for Unforeseen Ground Condition Problem Case in Coal Fired Steam Power Plant Project Location Adipala, Indonesia
Authors: Andi Fallahi, Bona Ryan Situmeang
Abstract:
The Construction Industry is notoriously risky. Much of the preparatory paperwork that precedes construction project can be viewed as the formulation of risk allocation between the owner and the Contractor. The Owner is taking the risk that his project will not get built on the schedule that it will not get built for what he has budgeted and that it will not be of the quality he expected. The Contractor Face a multitude of risk. One of them is an unforeseen condition at the construction site. The Owner usually has the upper hand here if the unforeseen condition occurred. Site data contained in Ground Investigation report is often of significant contractual importance in disputes related to the unforeseen ground condition. A ground investigation can never fully disclose all the details of the underground condition (Risk of an unknown ground condition can never be 100% eliminated). Adipala Coal Fired Steam Power Plant (CSFPP) 1 x 660 project is one of the large CSFPP project in Indonesia based on Engineering, Procurement, and Construction (EPC) Contract. Unforeseen Ground Condition it’s responsible by the Contractor has stipulated in the clausal of Contract. In the implementation, there’s indicated unforeseen ground condition at Circulating Water Pump House (CWPH) area which caused the Contractor should be changed the Method of Work that give big impact against Time of Completion and Cost Project. This paper tries to analyze the best way for allocating the risk between The Owner and The Contractor. All parties that allocating of sharing risk fairly can ultimately save time and money for all parties, and get the job done on schedule for the least overall cost.Keywords: unforeseen ground condition, coal fired steam power plant, circulating water pump house, Indonesia
Procedia PDF Downloads 3288877 Reducing Falls in Memory Care through Implementation of the Stopping Elderly Accidents, Deaths, and Injuries Program
Authors: Cory B. Lord
Abstract:
Falls among the elderly population has become an area of concern in healthcare today. The negative impacts of falls lead to increased morbidity, mortality, and financial burdens for both patients and healthcare systems. Falls in the United States is reported at an annual rate of 36 million in those aged 65 and older. Each year, one out of four people in this age group will suffer a fall, with 20% of these falls causing injury. The setting for this Doctor of Nursing Practice (DNP) project was a memory care unit in an assisted living community, as these facilities house cognitively impaired older adults. These communities lack fall prevention programs; therefore, the need exists to add to the body of knowledge to positively impact this population. The objective of this project was to reduce fall rates through the implementation of the Center for Disease Control and Prevention (CDC) STEADI (stopping elderly accidents, deaths, and injuries) program. The DNP project performed was a quality improvement pilot study with a pre and post-test design. This program was implemented in the memory care setting over 12 weeks. The project included an educational session for staff and a fall risk assessment with appropriate resident referrals. The three aims of the DNP project were to reduce fall rates among the elderly aged 65 and older who reside in the memory care unit, increase staff knowledge of STEADI fall prevention measures after an educational session, and assess the willingness of memory care unit staff to adopt an evidence-based a fall prevention program. The Donabedian model was used as a guiding conceptual framework for this quality improvement pilot study. The fall rate data for 12 months before the intervention was evaluated and compared to post-intervention fall rates. The educational session comprised of a pre and post-test to assess staff knowledge of the fall prevention program and the willingness of staff to adopt the fall prevention program. The overarching goal was to reduce falls in the elderly population who live in memory care units. The results of the study showed, on average that the fall rate during the implementation period of STEADI (μ=6.79) was significantly lower when compared to the prior 12 months (μ= 9.50) (p=0.02, α = 0.05). The mean staff knowledge scores improved from pretest (μ=77.74%) to post-test (μ=87.42%) (p=0.00, α= 0.05) after the education session. The results of the willingness to adopt a fall prevention program were scored at 100%. In summation, implementing the STEADI fall prevention program can assist in reducing fall rates for residents aged 65 and older who reside in a memory care setting.Keywords: dementia, elderly, falls, STEADI
Procedia PDF Downloads 129