7392 A Bi-Objective Model to Address Simultaneous Formulation of Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering has been increasingly addressed within last decades as an approach to improve the project execution costs. Therefore, we have taken the problem into consideration in this paper, aiming to maximize schedules quality robustness, in addition to minimize the relevant costs. In this regard, a bi-objective mathematical model is developed to formulate the problem. Moreover, it is possible to utilize the all-unit discount for materials purchasing. The problem is then solved by the constraint method, and the Pareto front is obtained for a variety of robustness values. The applicability and efficiency of the proposed model is tested by different numerical instances, finally.

Keywords: e-constraint method, material ordering, project management, project scheduling

Procedia PDF Downloads 290
7391 Designing a Model for Preparing Reports on the Automatic Earned Value Management Progress by the Integration of Primavera P6, SQL Database, and Power BI: A Case Study of a Six-Storey Concrete Building in Mashhad, Iran

Authors: Hamed Zolfaghari, Mojtaba Kord

Abstract:

Project planners and controllers are frequently faced with the challenge of inadequate software for the preparation of automatic project progress reports based on actual project information updates. They usually make dashboards in Microsoft Excel, which is local and not applicable online. Another shortcoming is that it is not linked to planning software such as Microsoft Project, which lacks the database required for data storage. This study aimed to propose a model for the preparation of reports on automatic online project progress based on actual project information updates by the integration of Primavera P6, SQL database, and Power BI for a construction project. The designed model could be applicable to project planners and controller agents by enabling them to prepare project reports automatically and immediately after updating the project schedule using actual information. To develop the model, the data were entered into P6, and the information was stored on the SQL database. The proposed model could prepare a wide range of reports, such as earned value management, HR reports, and financial, physical, and risk reports automatically on the Power BI application. Furthermore, the reports could be published and shared online.

Keywords: primavera P6, SQL, Power BI, EVM, integration management

Procedia PDF Downloads 101
7390 Analysis of Risks of Adopting Integrated Project Delivery: Application of Bayesian Theory

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasing attention from construction industry due to its reliability to deliver high-performing buildings. However, unavailable IPD specific insurance concerns the industry participants who are interested in IPD implementation. Even though the risk management capability can be enhanced using shared risk mechanism, some risks may occur when the partners do not commit themselves into the integrated practices in a desired manner. This is because the intense collaboration and close integration can not only create added value but bring new opportunistic behaviors and disputes. The study is aimed to investigate the risks of implementing IPD using Bayesian theory. IPD risk taxonomy is presented to identify all potential risks of implementing IPD and a risk network map is developed to capture the interdependencies between IPD risks. The conditional relations between risk occurrences and the impacts of IPD risks on project performances are evaluated and simulated based on Bayesian theory. The probability of project outcomes is predicted by simulation. In addition, it is found that some risks caused by integration are most possible occurred risks. This study can help the IPD project participants identify critical risks of adopting IPD to improve project performances. In addition, it is helpful to develop IPD specific insurance when the pertinent risks can be identified.

Keywords: Bayesian theory, integrated project delivery, project risks, project performances

Procedia PDF Downloads 292
7389 Designing a Method to Control and Determine the Financial Performance of the Real Cost Sub-System in the Information Management System of Construction Projects

Authors: Alireza Ghaffari, Hassan Saghi

Abstract:

Project management is more complex than managing the day-to-day affairs of an organization. When the project dimensions are broad and multiple projects have to be monitored in different locations, the integrated management becomes even more complicated. One of the main concerns of project managers is the integrated project management, which is mainly rooted in the lack of accurate and accessible information from different projects in various locations. The collection of dispersed information from various parts of the network, their integration and finally the selective reporting of this information is among the goals of integrated information systems. It can help resolve the main problem, which is bridging the information gap between executives and senior managers in the organization. Therefore, the main objective of this study is to design and implement an important subset of a project management information system in order to successfully control the cost of construction projects so that its results can be used to design raw software forms and proposed relationships between different project units for the collection of necessary information.

Keywords: financial performance, cost subsystem, PMIS, project management

Procedia PDF Downloads 102
7388 Complex Network Analysis of Seismicity and Applications to Short-Term Earthquake Forecasting

Authors: Kahlil Fredrick Cui, Marissa Pastor

Abstract:

Earthquakes are complex phenomena, exhibiting complex correlations in space, time, and magnitude. Recently, the concept of complex networks has been used to shed light on the statistical and dynamical characteristics of regional seismicity. In this work, we study the relationships and interactions of seismic regions in Chile, Japan, and the Philippines through weighted and directed complex network analysis. Geographical areas are digitized into cells of fixed dimensions which in turn become the nodes of the network when an earthquake has occurred therein. Nodes are linked if a correlation exists between them as determined and measured by a correlation metric. The networks are found to be scale-free, exhibiting power-law behavior in the distributions of their different centrality measures: the in- and out-degree and the in- and out-strength. The evidence is also found of preferential interaction between seismically active regions through their degree-degree correlations suggesting that seismicity is dictated by the activity of a few active regions. The importance of a seismic region to the overall seismicity is measured using a generalized centrality metric taken to be an indicator of its activity or passivity. The spatial distribution of earthquake activity indicates the areas where strong earthquakes have occurred in the past while the passivity distribution points toward the likely locations an earthquake would occur whenever another one happens elsewhere. Finally, we propose a method that would project the location of the next possible earthquake using the generalized centralities coupled with correlations calculated between the latest earthquakes and a geographical point in the future.

Keywords: complex networks, correlations, earthquake, hazard assessment

Procedia PDF Downloads 206
7387 The Effectiveness of Prefabricated Vertical Drains for Accelerating Consolidation of Tunis Soft Soil

Authors: Marwa Ben Khalifa, Zeineb Ben Salem, Wissem Frikha

Abstract:

The purpose of the present work is to study the consolidation behavior of highly compressible Tunis soft soil “TSS” by means of prefabricated vertical drains (PVD’s) associated to preloading based on laboratory and field investigations. In the first hand, the field performance of PVD’s on the layer of Tunis soft soil was analysed based on the case study of the construction of embankments of “Radès la Goulette” bridge project. PVD’s Geosynthetics drains types were installed with triangular grid pattern until 10 m depth associated with step-by-step surcharge. The monitoring of the soil settlement during preloading stage for Radès La Goulette Bridge project was provided by an instrumentation composed by various type of tassometer installed in the soil. The distribution of water pressure was monitored through piezocone penetration. In the second hand, a laboratory reduced tests are performed on TSS subjected also to preloading and improved with PVD's Mebradrain 88 (Mb88) type. A specific test apparatus was designed and manufactured to study the consolidation. Two series of consolidation tests were performed on TSS specimens. The first series included consolidation tests for soil improved by one central drain. In thesecond series, a triangular mesh of three geodrains was used. The evolution of degree of consolidation and measured settlements versus time derived from laboratory tests and field data were presented and discussed. The obtained results have shown that PVD’s have considerably accelerated the consolidation of Tunis soft soil by shortening the drainage path. The model with mesh of three drains gives results more comparative to field one. A longer consolidation time is observed for the cell improved by a single central drain. A comparison with theoretical analysis, basically that of Barron (1948) and Carillo (1942), was presented. It’s found that these theories overestimate the degree of consolidation in the presence of PVD.

Keywords: tunis soft soil, prefabricated vertical drains, acceleration of consolidation, dissipation of excess pore water pressures, radès bridge project, barron and carillo’s theories

Procedia PDF Downloads 118
7386 Network Coding with Buffer Scheme in Multicast for Broadband Wireless Network

Authors: Gunasekaran Raja, Ramkumar Jayaraman, Rajakumar Arul, Kottilingam Kottursamy

Abstract:

Broadband Wireless Network (BWN) is the promising technology nowadays due to the increased number of smartphones. Buffering scheme using network coding considers the reliability and proper degree distribution in Worldwide interoperability for Microwave Access (WiMAX) multi-hop network. Using network coding, a secure way of transmission is performed which helps in improving throughput and reduces the packet loss in the multicast network. At the outset, improved network coding is proposed in multicast wireless mesh network. Considering the problem of performance overhead, degree distribution makes a decision while performing buffer in the encoding / decoding process. Consequently, BuS (Buffer Scheme) based on network coding is proposed in the multi-hop network. Here the encoding process introduces buffer for temporary storage to transmit packets with proper degree distribution. The simulation results depend on the number of packets received in the encoding/decoding with proper degree distribution using buffering scheme.

Keywords: encoding and decoding, buffer, network coding, degree distribution, broadband wireless networks, multicast

Procedia PDF Downloads 395
7385 An Integrated Mixed-Integer Programming Model to Address Concurrent Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering can provide more flexibility to the project scheduling problem, as the project execution costs can be enhanced. Hence, the issue has been taken into account in this paper. To do so, a mixed-integer mathematical model is developed which considers the aforementioned flexibility, in addition to the materials quantity discount and space availability restrictions. Moreover, the activities duration has been treated as decision variables. Finally, the efficiency of the proposed model is tested by different instances. Additionally, the influence of the aforementioned parameters is investigated on the model performance.

Keywords: material ordering, project scheduling, quantity discount, space availability

Procedia PDF Downloads 361
7384 The Mathematics of Fractal Art: Using a Derived Cubic Method and the Julia Programming Language to Make Fractal Zoom Videos

Authors: Darsh N. Patel, Eric Olson

Abstract:

Fractals can be found everywhere, whether it be the shape of a leaf or a system of blood vessels. Fractals are used to help study and understand different physical and mathematical processes; however, their artistic nature is also beautiful to simply explore. This project explores fractals generated by a cubically convergent extension to Newton's method. With this iteration as a starting point, a complex plane spanning from -2 to 2 is created with a color wheel mapped onto it. Next, the polynomial whose roots the fractal will generate from is established. From the Fundamental Theorem of Algebra, it is known that any polynomial has as many roots (counted by multiplicity) as its degree. When generating the fractals, each root will receive its own color. The complex plane can then be colored to indicate the basins of attraction that converge to each root. From a computational point of view, this project’s code identifies which points converge to which roots and then obtains fractal images. A zoom path into the fractal was implemented to easily visualize the self-similar structure. This path was obtained by selecting keyframes at different magnifications through which a path is then interpolated. Using parallel processing, many images were generated and condensed into a video. This project illustrates how practical techniques used for scientific visualization can also have an artistic side.

Keywords: fractals, cubic method, Julia programming language, basin of attraction

Procedia PDF Downloads 249
7383 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion

Authors: Mamoon Mousa Atout

Abstract:

Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.

Keywords: construction management, project objectives, resource planing and scheduling, project completion

Procedia PDF Downloads 395
7382 Study of Microstructure of Weldment Obtained by Submerged Arc Welding (SAW) on IS 2062 Grade B Mild Steel Plate at Zero Degree Celsius

Authors: Ajay Biswas, Swapan Bhaumik, Abhijit Bhowmik

Abstract:

Present experiment has been carried out to study the microstructure of weldment obtained by submerged arc welding on mild steel plate at zero degree Celsius. To study this, bead on plate welding is done by submerged arc welding on the sample plate of heavy duty mild steel of designation IS 2062 grade B, fitted on the special fixture ensuring the plate temperature at zero degree Celsius. Sixteen numbers of such samples are welded by varying the most influencing parameters viz. travel speed, voltage, wire feed rate and electrode stick-out at four different levels. Taguchi’s design of experiment is applied by selecting Taguchi's L16 orthogonal array to restrict the number of experimental runs. Cross sectioned samples are polished and etched to view the weldment. Finally, different zone of the weldment is observed by optical microscope. From the type of microstructure of weldment it is concluded that submerged arc welding is feasible at zero degree Celsius on mild steel plate.

Keywords: Submerged Arc Welding, zero degree Celsius, Taguchi’s design of experiment, microstructure of weldment

Procedia PDF Downloads 437
7381 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan

Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat

Abstract:

This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.

Keywords: cost, overrun, building construction projects, Jordan

Procedia PDF Downloads 98
7380 Modeling Metrics for Monitoring Software Project Performance Based on the GQM Model

Authors: Mariayee Doraisamy, Suhaimi bin Ibrahim, Mohd Naz’ri Mahrin

Abstract:

There are several methods to monitor software projects and the objective for monitoring is to ensure that the software projects are developed and delivered successfully. A performance measurement is a method that is closely associated with monitoring and it can be scrutinized by looking at two important attributes which are efficiency and effectiveness both of which are factors that are important for the success of a software project. Consequently, a successful steering is achieved by monitoring and controlling a software project via the performance measurement criteria and metrics. Hence, this paper is aimed at identifying the performance measurement criteria and the metrics for monitoring the performance of a software project by using the Goal Question Metrics (GQM) approach. The GQM approach is utilized to ensure that the identified metrics are reliable and useful. These identified metrics are useful guidelines for project managers to monitor the performance of their software projects.

Keywords: component, software project performance, goal question metrics, performance measurement criteria, metrics

Procedia PDF Downloads 344
7379 Empirical Study of Correlation between the Cost Performance Index Stability and the Project Cost Forecast Accuracy in Construction Projects

Authors: Amin AminiKhafri, James M. Dawson-Edwards, Ryan M. Simpson, Simaan M. AbouRizk

Abstract:

Earned value management (EVM) has been introduced as an integrated method to combine schedule, budget, and work breakdown structure (WBS). EVM provides various indices to demonstrate project performance including the cost performance index (CPI). CPI is also used to forecast final project cost at completion based on the cost performance during the project execution. Knowing the final project cost during execution can initiate corrective actions, which can enhance project outputs. CPI, however, is not constant during the project, and calculating the final project cost using a variable index is an inaccurate and challenging task for practitioners. Since CPI is based on the cumulative progress values and because of the learning curve effect, CPI variation dampens and stabilizes as project progress. Although various definitions for the CPI stability have been proposed in literature, many scholars have agreed upon the definition that considers a project as stable if the CPI at 20% completion varies less than 0.1 from the final CPI. While 20% completion point is recognized as the stability point for military development projects, construction projects stability have not been studied. In the current study, an empirical study was first conducted using construction project data to determine the stability point for construction projects. Early findings have demonstrated that a majority of construction projects stabilize towards completion (i.e., after 70% completion point). To investigate the effect of CPI stability on cost forecast accuracy, the correlation between CPI stability and project cost at completion forecast accuracy was also investigated. It was determined that as projects progress closer towards completion, variation of the CPI decreases and final project cost forecast accuracy increases. Most projects were found to have 90% accuracy in the final cost forecast at 70% completion point, which is inlined with findings from the CPI stability findings. It can be concluded that early stabilization of the project CPI results in more accurate cost at completion forecasts.

Keywords: cost performance index, earned value management, empirical study, final project cost

Procedia PDF Downloads 153
7378 Collaborative Research between Malaysian and Australian Universities on Learning Analytics: Challenges and Strategies

Authors: Z. Tasir, S. N. Kew, D. West, Z. Abdullah, D. Toohey

Abstract:

Research on Learning Analytics is progressively developing in the higher education field by concentrating on the process of students' learning. Therefore, a research project between Malaysian and Australian Universities was initiated in 2015 to look at the use of Learning Analytics to support the development of teaching practice. The focal point of this article is to discuss and share the experiences of Malaysian and Australian universities in the process of developing the collaborative research on Learning Analytics. Three aspects of this will be discussed: 1) Establishing an international research project and team members, 2) cross-cultural understandings, and 3) ways of working in relation to the practicalities of the project. This article is intended to benefit other researchers by highlighting the challenges as well as the strategies used in this project to ensure such collaborative research succeeds.

Keywords: academic research project, collaborative research, cross-cultural understanding, international research project

Procedia PDF Downloads 240
7377 Knowledge Management Challenges within Traditional Procurement System

Authors: M. Takhtravanchi, C. Pathirage

Abstract:

In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; the ignoring of which would be detrimental to project performance. This issue is more prominent in projects undertaken through the traditional procurement system, as this system does not incentives project members for integration. Thus, disputes exist between the design and construction phases based on the poor management of knowledge between those two phases. This paper aims to highlight the challenges of the knowledge management that exists within the traditional procurement system. Expert interviews were conducted and challenges were identified and analysed by the Interpretive Structural Modelling (ISM) approach in order to summarise the relationships among them. Two identified key challenges are the Culture of an Organisation and Knowledge Management Policies. A knowledge of the challenges and their relationships will help project manager and stakeholders to have a better understanding of the importance of knowledge management.

Keywords: challenges, construction industry, knowledge management, traditional procurement system

Procedia PDF Downloads 424
7376 Teacher Training in Saudi Arabia: A Blend of Old and New

Authors: Ivan Kuzio

Abstract:

The GIZ/TTC project is the first of its kind in the Middle East, which allows the development of a teaching training programme to degree level based on modern methodologies. The graduates from this college are part of the Saudization programme and will, over the next four years be part of and eventually run the new Colleges of Excellence. The new Colleges of Excellence are being developed to create a local vocationally trained workforce and will run initially alongside the current Colleges of Technology.

Keywords: blended learning, pedagogy, training, key competencies, social skills, cognitive development

Procedia PDF Downloads 304
7375 Decision Making during the Project Management Life Cycle of Infrastructure Projects

Authors: Karrar Raoof Kareem Kamoona, Enas Fathi Taher AlHares, Zeynep Isik

Abstract:

The various disciplines in the construction industry and the co-existence of the people in the various disciplines are what builds well-developed, closely-knit interpersonal skills at various hierarchical levels thus leading to a varied way of leadership. The varied decision making aspects during the lifecycle of a project include: autocratic, participatory and last but not least, free-rein. We can classify some of the decision makers in the construction industry in a hierarchical manner as follows: project executive, project manager, superintendent, office engineer and finally the field engineer. This survey looked at how decisions are made during the construction period by the key stakeholders in the project. From the paper it is evident that the three decision making aspects can be used at different times or at times together in order to bring out the best leadership decision. A blend of different leadership styles should be used to enhance the success rate during the project lifecycle.

Keywords: leadership style, construction, decision-making, built environment

Procedia PDF Downloads 354
7374 Cross-Cultural Analysis of the Impact of Project Atmosphere on Project Success and Failure

Authors: Omer Livvarcin, Mary Kay Park, Michael Miles

Abstract:

The current literature includes a few studies that mention the impact of relations between teams, the business environment, and experiences from previous projects. There is, however, limited research that treats the phenomenon of project atmosphere (PA) as a whole. This is especially true of research identifying parameters and sub-parameters, which allow project management (PM) teams to build a project culture that ultimately imbues project success. This study’s findings identify a number of key project atmosphere parameters and sub-parameters that affect project management success. One key parameter identified in the study is a cluster related to cultural concurrence, including artifacts such as policies and mores, values, perceptions, and assumptions. A second cluster centers on motivational concurrence, including such elements as project goals and team-member expectations, moods, morale, motivation, and organizational support. A third parameter cluster relates to experiential concurrence, with a focus on project and organizational memory, previous internal PM experience, and external environmental PM history and experience). A final cluster of parameters is comprised of those falling in the area of relational concurrence, including inter/intragroup relationships, role conflicts, and trust. International and intercultural project management data was collected and analyzed from the following countries: Canada, China, Nigeria, South Korea and Turkey. The cross-cultural nature of the data set suggests increased confidence that the findings will be generalizable across cultures and thus applicable for future international project management success. The intent of the identification of project atmosphere as a critical project management element is that a clear understanding of the dynamics of its sub-parameters upon projects may significantly improve the odds of success of future international and intercultural projects.

Keywords: project management, project atmosphere, cultural concurrence, motivational concurrence, relational concurrence

Procedia PDF Downloads 311
7373 Walking the Tightrope: Balancing Project Governance, Complexity, and Servant Leadership for Megaproject Success

Authors: Muhammad Shoaib Iqbal, Shih Ping Ho

Abstract:

Megaprojects are large-scale, complex ventures with significant financial investments, numerous stakeholders, and extended timelines, requiring meticulous management for successful completion. This study explores the interplay between project governance, project complexity, and servant leadership and their combined effects on project success, specifically within the context of Pakistani megaprojects. The primary objectives are to examine the direct impact of project governance on project success, understand the negative influence of project complexity, assess the positive role of servant leadership, explore the moderating effect of servant leadership on the relationship between governance and success, and investigate how servant leadership mitigates the adverse effects of complexity. Using a quantitative approach, survey data were collected from project managers and team members involved in Pakistani megaprojects. Using a Comprehensive empirical model, 257 Valid responses were analyzed. Multiple regression analysis tested the hypothesized relationships and interaction effects using PLS-SEM. Findings reveal that project governance significantly enhances project success, emphasizing the need for robust governance structures. Conversely, project complexity negatively impacts success, highlighting the challenges of managing complex projects. Servant leadership significantly boosts project success by prioritizing team support and empowerment. Although the interaction between governance and servant leadership is not significant, suggesting no significant change in project success, servant leadership significantly mitigates the negative effects of project complexity, enhancing team resilience and adaptability. These results underscore the necessity for a balanced approach integrating strong governance with flexible, supportive leadership. The study offers valuable insights for practitioners, recommending adaptive governance frameworks and promoting servant leadership to improve the management and success rates of megaprojects. This research contributes to the broader understanding of effective project management practices in complex environments.

Keywords: project governance, project complexity, servant leadership, project success, megaprojects, Pakistan

Procedia PDF Downloads 16
7372 Promoting Innovation Pedagogy in a Capacity Building Project in Indonesia

Authors: Juha Kettunen

Abstract:

This study presents a project that tests and adjusts active European learning and teaching methods in Indonesian universities to increase their external impact on enterprises and other organizations; it also assesses the implementation of the Erasmus+ projects funded by the European Union. The project is based on the approach of innovation pedagogy that responds to regional development needs and integrates applied research and development projects into education to create capabilities for students to participate in development work after graduation. The assessment of the Erasmus+ project resulted in many improvements that can be made to achieve higher quality and innovativeness. The results of this study are useful for those who want to improve the applied research and development projects of higher education institutions.

Keywords: higher education, innovations, social network, project management

Procedia PDF Downloads 279
7371 The Project Management for Quality Services in Special Education Schools

Authors: Aysegul Salikutluk, Zehra Altinay, Gokmen Dagli, Fahriye Altinay

Abstract:

The aim of the study is to reveal the performance of special education schools as regards the service quality and management within the school culture. The project management and school climate are the fundamental elements for the quality in organisations. Having strategic plans, activities and funded projects improve service quality and satisfaction for the families who have children with disabilities. The research has qualitative nature, self-reports were used to examine the perceptions of teachers upon project management and school climate for service quality. The results show that special education schools' teachers are aware of essence of school climate and flow of communication for service quality and project management.

Keywords: disability, education, service quality, project management

Procedia PDF Downloads 261
7370 The Causes and Effects of Housing Project Abandonment in Malaysia

Authors: Abdul Aziz Abdullah, Anuar Alias, Khor Hooi Ting, Guan Ngah Mei

Abstract:

One of the major sectors which contribute significant growth to socio-economic development is the construction and development industry. This industry is most badly hurt during the 1997 and 2008 economic crisis thus causing many government and private projects to be deferred and abandoned. The purpose of this study is to examine the causes and effects of housing project abandonment in Malaysia. This objective is achieved through rigorous review of literatures and documents related to housing and abandoned housing project. The finding revealed there are several causes of housing project abandonment. The significant causes are: economic recession, inadequacy of finance, poor marketing and sales strategies, technical problems faced during construction, problems caused by compensations demanded by squatters for resettlement, insolvency of contractor, cost overrun and currency fluctuation amongst others. However the alarming effect of housing project is: house buyers of abandoned project have the monthly payment although the house is delivered to house buy. In other case house buyers have to entangle in many legal action with the financial institution. This finding provides the various ministries in the Government some insights on real causes and effects of abandoned project. Perhaps this finding can enhance the current solution the Ministry of Housing Local Government on addressing the prevailing issue of reviving existing abandoned project in the country.

Keywords: abandoned project, abandonment, housing project, ministry of housing and local government, causes and effect

Procedia PDF Downloads 532
7369 Shipboard Power Plant Design as Senior Design Project

Authors: Hesham Shaalan

Abstract:

Senior design projects teach students many important skills. One of the major goals is to prepare students to apply effective problem-solving techniques to a problem that represents a real-world situation. This includes the ability to define the problem, compare alternative solutions, identify the best solution, and design the system. This paper describes the design of a shipboard power plant as a senior project in the Marine Engineering program at the U.S. Merchant Marine Academy. The design project was supervised by faculty members who guided a multidisciplinary group of seniors. The research project was sponsored by the Office of Naval Research. Each group of seniors focused on one of the main design aspects of the project, including the electric power system, nuclear power plant, ship hull design, and economics.

Keywords: senior design project, shipboard power system, engineering education, marine engineering

Procedia PDF Downloads 71
7368 Challenges Associated with Recruitment of Professional Doctorate Degree Holders into Ghanaian Universities

Authors: Joseph E. Cobbinah, Abigail A. Aryeh-Adjei

Abstract:

Over the years, entry into the academia in any Ghanaian university requires an advanced research degree, more preferably traditional doctorate (PhD or DPhil). It is however argued that PhD is more research intensive, so since university teaching involves a lot of research, those having traditional doctorate have good research background to teach in a university and are thus recruited as lecturers. However, in the last ten years, a reasonable number of academics enter Ghanaian universities with professional doctorate degrees, which hitherto was considered to be only suitable for industry, because it gives individuals with just basic research skills needed for professional practice, unlike the traditional PhD which is research intensive degree. Currently, there are a reasonable number of professional doctorate degree holders with qualifications like DBA, EdD, PsychD, DPharm, EngD, among others in various departments in many Ghanaian universities. Maybe, because such degree holders also use the title Dr, some university authorities put them at par with their counterparts with traditional doctorate, although some lecturers with PhD seem to look down upon those with traditional doctorate degrees and this has created some tension amongst those academics. This makes their promotions and holding of university academic positions very problematic in some ways. This paper therefore seeks to investigate the types of professional doctorate degree holders working as lecturers in some selected universities in Ghana and the challenges associated with their recruitment, acceptability and proper integration into universities’ teaching and learning. The paper adopted qualitative research methodology. In all, respondents from three state-owned and privately owned universities were involved in the study. Administrators, lecturers, heads of departments and deans of faculty were interviewed to assess the challenges associated with the recruitment of professional doctorate degree holders and any problems they face in the departments they work. It became evident that, although some lecturers enter the academia with professional doctorate degrees, their counterparts seem not to give them the recognition and respect they deserve. Although there is little or no evidence that professional doctorate degree holders are under performing, recruiting professional doctorate degree holders does not only become a challenge, but also their progression into the university’s promotion ladder become very slow compared to their counterparts with traditional PhD degrees.

Keywords: professional doctorate, academia, lecturers, Ghanaian universities, orate

Procedia PDF Downloads 301
7367 Overview of the CRM Market in Tunisia

Authors: Mohamed Amine Bouraoui

Abstract:

The aim of this paper is to realize the importance of a CRM approach, to detect the degree of awareness of Tunisian managers of this importance and analyse the degree of integration of CRM in the Tunisian companies. Initially, we focus on the definition and components of CRM, then we focus on the level of integration of CRM within Tunisian enterprises.

Keywords: CRM, operational tools, analytical tools, Tunisian company

Procedia PDF Downloads 414
7366 Training Program for Kindergarden Teachers on Learning through Project Approach

Authors: Dian Hartiningsih, Miranda Diponegoro, Evita Eddie Singgih

Abstract:

In facing the 21st century, children need to be prepared in reaching their optimum development level which encompasses all aspect of growth and to achieve the learning goals which include not only knowledge and skill, but also disposition and feeling. Teachers as the forefront of education need to be equipped with the understanding and skill of a learning method which can prepare the children to face this 21st century challenge. Project approach is an approach which utilizes active learning which is beneficial for the children. Subject to this research are kindergarten teachers at Dwi Matra Kindergarten and Kirana Preschool. This research is a quantitative research using before and after study design. The result suggest that through preliminary training program on learning with project approach, the kindergarten teachers ability to explain project approach including understanding, benefit and stages of project approach have increased significantly, the teachers ability to design learning with project approach have also improved significantly. The result of learning design that the teachers had made shows a remarkable result for the first stage of the project approach; however the second and third design result was not as optimal. Challenges faced in the research will be elaborated further in the research discussion.

Keywords: project approach, teacher training, learning method, kindergarten

Procedia PDF Downloads 327
7365 Project Management at University: Towards an Evaluation Process around Cooperative Learning

Authors: J. L. Andrade-Pineda, J.M. León-Blanco, M. Calle, P. L. González-R

Abstract:

The enrollment in current Master's degree programs usually pursues gaining the expertise required in real-life workplaces. The experience we present here concerns the learning process of "Project Management Methodology (PMM)", around a cooperative/collaborative mechanism aimed at affording students measurable learning goals and providing the teacher with the ability of focusing on the weaknesses detected. We have designed a mixed summative/formative evaluation, which assures curriculum engage while enriches the comprehension of PMM key concepts. In this experience we converted the students into active actors in the evaluation process itself and we endowed ourselves as teachers with a flexible process in which along with qualifications (score), other attitudinal feedback arises. Despite the high level of self-affirmation on their discussion within the interactive assessment sessions, they ultimately have exhibited a great ability to review and correct the wrong reasoning when that was the case.

Keywords: cooperative-collaborative learning, educational management, formative-summative assessment, leadership training

Procedia PDF Downloads 165
7364 The Effect of Contextual Factors on Degree of Trust in Kuwaiti Business Organization

Authors: Ali Muhammad

Abstract:

The study investigates the effect of a number of contextual on the degree of trust within Kuwaiti business organizations. The model used in this study suggests that degree of trust within the organization is determined by four contextual variables, namely, centralization, formalization, role ambiguity, and procedural justice. Organizational trust refers to employee’ positive assumptions in regard to the goal and behaviors of other members in the organization according to organizational duties, relationships, experiences, and interrelatedness. According to the norm of reciprocity, individuals with high perceived organizational justice will be compelled to react positively to the organization in the form of higher degree of trust. The duty to exchange kindness for kindness. Based on the exchange theory, this research proposes that procedural justice, role clarity, and voice in the organization will lead to the perception of an organization’s discretionary positive treatment of employees and, in return enhances their trust in the organization. Survey data were collected from a sample of 206 employees working in Kuwaiti business organizations. Results of multiple regression analysis revealed that both organizational justice and formalization have positive effects on organizational trust. Furthermore, results indicate that lower degree of role ambiguity leads to higher degree of organizational trust. On the other hand, centralization was not found to have a significant effect on organizational trust. Implications of the findings and directions for future research are discussed.

Keywords: centralization, formalization, organizational justice, organizational trust, role ambiguity

Procedia PDF Downloads 183
7363 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 275