6227 Research on Architectural Steel Structure Design Based on BIM

Authors: Tianyu Gao

Abstract:

Digital architectures use computer-aided design, programming, simulation, and imaging to create virtual forms and physical structures. Today's customers want to know more about their buildings. They want an automatic thermostat to learn their behavior and contact them, such as the doors and windows they want to open with a mobile app. Therefore, the architectural display form is more closely related to the customer's experience. Based on the purpose of building informationization, this paper studies the steel structure design based on BIM. Taking the Zigan office building in Hangzhou as an example, it is divided into four parts, namely, the digital design modulus of the steel structure, the node analysis of the steel structure, the digital production and construction of the steel structure. Through the application of BIM software, the architectural design can be synergized, and the building components can be informationized. Not only can the architectural design be feedback in the early stage, but also the stability of the construction can be guaranteed. In this way, the monitoring of the entire life cycle of the building and the meeting of customer needs can be realized.

Keywords: digital architectures, BIM, steel structure, architectural design

Procedia PDF Downloads 195
6226 Integral Abutment Bridge: A Study on Types, Importance, Limitations and Design Guidelines

Authors: Babitha Elizabeth Philip

Abstract:

This paper aims to study in general about bridges without expansion joints. Integral Abutment Bridges (IAB) fall into this category of bridges. They are having a continuous deck and also the girders are integrated into the abutments. They are most cost effective system in terms of construction, maintenance, and longevity. The main advantage of IAB is that it is corrosion resistant since water is not allowed to pass through the structure. The other attractions of integral bridges are its simple and rapid construction, smooth and uninterrupted deck which provides a safe ride. Also damages to the abutments can be avoided to a great extent due to better load distribution at the bridge ends. Damages due to improper drainage are not seen in IAB because of its properly drained approach slabs thus eliminating the possibility of erosion of the abutment backfill and freeze and thaw damage resulting from saturated backfill.

Keywords: continuous bridge, integral abutment bridge, joint bridge, life cycle cost, soil interaction

Procedia PDF Downloads 453
6225 When Creativity Is the Solution: How to Transform Makkah into a Creative City

Authors: Saeed Al Amoudy

Abstract:

During the last decade, the rapidly growing prestige of so-called Creative Cities has inspired many other cities seeking to enhance their attractiveness, creativity, and success. However, the concept of a creative city seems to be an elusive one because it reflects a set of distinct ideologies which apply distinct ideas of creativity to physical and economic urban development. The main aim of this study is to investigate the ways in which the theoretical concept of the creative city can be usefully and practically employed to develop the urban services and global identity of Makkah, Saudi Arabia. This is a challenging prospect since no research on creative cities in the Middle East has previously been conducted. The city of Makkah and its holy sites is known as the focus of religious devotion for one and half billion Muslims around the globe, with millions travelling there on annual pilgrimage. The ideas of three of the key authors who have addressed relevant aspects of the concept of the creative city, Landry, Howkins and Florida, were explored in depth for the purpose of identifying the model which would be best suited to Makkah’s identity as a sacred city. Of these, it was the approach of Landry and others whose work was originally focused on finding creative solutions to the problems faced by cities which proved most suitable for the context of Makkah. The development strategies of five case studies of Creative Cities situated in different parts of the world, namely Vancouver, Yokohama, Glasgow, Barcelona, and Sydney, were also examined. Inspired by their diverse experiences, a model, referred to by the acronym CREATIVE, was developed by bringing together the key elements which seemed to ,account for the success of these five creative cities: Concept, Resources, Events, Attractiveness, Technology, Involvement, Vision and Enthusiasm. Expert opinion was sought on the model by presenting this for discussion at five international conferences. This model was used to guide both the process of data collection via interviews, documentation and field notes, and for analysing this, revealing that Makkah has great potential to become a Creative City. The results suggested that implementation of the CREATIVE model in Makkah would help produce creative solutions to address the problems that the city currently faces due to the growing number of pilgrims every year.

Keywords: creative city, city imaging, Makkah, sacred city

Procedia PDF Downloads 396
6224 Biotechnological Methods for the Grouting of the Tunneling Space

Authors: V. Ivanov, J. Chu, V. Stabnikov

Abstract:

Different biotechnological methods for the production of construction materials and for the performance of construction processes in situ are developing within a new scientific discipline of Construction Biotechnology. The aim of this research was to develop and test new biotechnologies and biotechnological grouts for the minimization of the hydraulic conductivity of the fractured rocks and porous soil. This problem is essential to minimize flow rate of groundwater into the construction sites, the tunneling space before and after excavation, inside levies, as well as to stop water seepage from the aquaculture ponds, agricultural channels, radioactive waste or toxic chemicals storage sites, from the landfills or from the soil-polluted sites. The conventional fine or ultrafine cement grouts or chemical grouts have such restrictions as high cost, viscosity, sometime toxicity but the biogrouts, which are based on microbial or enzymatic activities and some not expensive inorganic reagents, could be more suitable in many cases because of lower cost and low or zero toxicity. Due to these advantages, development of biotechnologies for biogrouting is going exponentially. However, most popular at present biogrout, which is based on activity of urease- producing bacteria initiating crystallization of calcium carbonate from calcium salt has such disadvantages as production of toxic ammonium/ammonia and development of high pH. Therefore, the aim of our studies was development and testing of new biogrouts that are environmentally friendly and have low cost suitable for large scale geotechnical, construction, and environmental applications. New microbial biotechnologies have been studied and tested in the sand columns, fissured rock samples, in 1 m3 tank with sand, and in the pack of stone sheets that were the models of the porous soil and fractured rocks. Several biotechnological methods showed positive results: 1) biogrouting using sequential desaturation of sand by injection of denitrifying bacteria and medium following with biocementation using urease-producing bacteria, urea and calcium salt decreased hydraulic conductivity of sand to 2×10-7 ms-1 after 17 days of treatment and consumed almost three times less reagents than conventional calcium-and urea-based biogrouting; 2) biogrouting using slime-producing bacteria decreased hydraulic conductivity of sand to 1x10-6 ms-1 after 15 days of treatment; 3) biogrouting of the rocks with the width of the fissures 65×10-6 m using calcium bicarbonate solution, that was produced from CaCO3 and CO2 under 30 bars pressure, decreased hydraulic conductivity of the fissured rocks to 2×10-7 ms-1 after 5 days of treatment. These bioclogging technologies could have a lot of advantages over conventional construction materials and processes and can be used in geotechnical engineering, agriculture and aquaculture, and for the environmental protection.

Keywords: biocementation, bioclogging, biogrouting, fractured rocks, porous soil, tunneling space

Procedia PDF Downloads 208
6223 Recommendation of Semi Permanent Buildings for Tsunami Prone Areas

Authors: Fitri Nugraheni, Adwitya Bhaskara, N. Faried Hanafi

Abstract:

Coastal is one area that can be a place to live. Various buildings can be built in the area around the beach. Many Indonesians use beaches as housing and work, but we know that coastal areas are identical to tsunami and wind. Costs incurred due to permanent damage caused by tsunamis and wind disasters in Indonesia can be minimized by replacing permanent buildings into semi-permanent buildings. Semi-permanent buildings can be realized by using cold-formed steel as a building. Thus, the purpose of this research is to provide efficient semi-permanent building recommendations for residents around the coast. The research is done by first designing the building model by using sketch-up software, then the validation phase is done in consultation with the expert consultant of cold form steel structure. Based on the results of the interview there are several revisions on several sides of the building by adding some bracing rods on the roof, walls and floor frame. The result of this research is recommendation of semi-permanent building model, where the nature of the building; easy to disassemble and install (knockdown), tsunami-friendly (continue the tsunami load), cost and time efficient (using cold-formed-steel and prefabricated GRC), zero waste, does not require many workers (less labor). The recommended building design concept also keeps the architecture side in mind thus it remains a comfortable occupancy for the residents.

Keywords: construction method, cold-formed steel, efficiency, semi-permanent building, tsunami

Procedia PDF Downloads 285
6222 Suitability of Class F Flyash for Construction Industry: An Indian Scenario

Authors: M. N. Akhtar, J. N. Akhtar

Abstract:

The present study evaluates the properties of class F fly ash as a replacement of natural materials in civil engineering construction industry. The low-lime flash similar to class F is the prime variety generated in India, although it has significantly smaller volumes of high-lime fly ash as compared to class C. The chemical and physical characterization of the sample is carried out with the number of experimental approaches in order to investigate all relevant features present in the samples. For chemical analysis, elementary quantitative results from point analysis and scanning electron microscopy (SEM)/dispersive spectroscopy (EDS) techniques were used to identify the element images of different fractions. The physical properties found very close to the range of common soils. Furthermore, the fly ash-based bricks were prepared by the same sample of class F fly ash and the results of compressive strength similar to that of Standard Clay Brick Grade 1 available in the local market of India.

Keywords: fly ash, class F, class C, chemical, physical, SEM, EDS

Procedia PDF Downloads 181
6221 Recycling of Sewage Sludge Ash (SSA) as Construction Material

Authors: Z. Chen, C. S. Poon

Abstract:

In Hong Kong, about 1,000 tonnes of sewage sludge were produced every day in 2014 representing a major fraction of the total solid municipal waste. Traditionally, sewage sludge is disposed of at landfills. This disposal method causes environmental issues and uses up precious space in landfills which are becoming saturated one by one. To tackle the disposal problem, Hong Kong government has just built a sewage sludge incinerator. Through incineration the volume of waste can be reduced up to 90% by converting sewage sludge into ash. Whilst sewage sludge ash (SSA) still needs to be disposed of at landfills, research has been conducted at the Hong Kong Polytechnic University on using SSA to substitute cement for the production of construction materials. Results demonstrated that SSA contained many open and isolated pores and thus can reduce the cement dilution effect resulting in only slight decrease in the flexural and compressive strengths of cement mortar. The incorporation of SSA in cement mortar can be up to 20% of the binder, without too much worry about adverse effect on strength development of mortar. There was some enhancement in strength using ground SSA in comparison to the original SSA. The original SSA shortened the relative initial setting time of cement paste but ground SSA caused slight delay in the setting of cement paste. The research also found that increasing the percentage of SSA lead to decreasing workability of cement mortar with the same water/binder ratio, and ground SSA was beneficial to workability although grinding increased the surface area of SSA. This paper summarizes the major findings of the research.

Keywords: cement replacement, construction material, sewage sludge ash, waste recycling

Procedia PDF Downloads 391
6220 An Empirical Analysis on the Evolution Characteristics and Textual Content of Campus Football Policy in China

Authors: Shangjun Zou, Zhiyuan Wang, Songhui You

Abstract:

Introduction In recent years, the Chinese government has issued several policies to promote the institutional reform and innovation of the development of campus football, but many problems have been exposed in the process of policy implementation. Therefore, this paper attempts to conduct an empirical analysis of the campus football policy texts to reveal the dynamic development of the microsystem in the process of policy evolution. Methods The selected policy contents are coded by constructing a two-dimensional analysis framework of campus football policy tool-policy objective. Specifically, the X dimension consists of three oriented policy tools: environment, supply and demand, while the Y dimension is divided into six aspects of policy objectives, including institution, competition, player teaching, coach training, resource guarantee and popularization. And the distribution differences of textual analysis units on X and Y dimensions are tested by using SPSS22.0 so as to evaluate the characteristics and development trend of campus football policy on respective subjects. Results 1) In the policy evolution process of campus football stepping into the 2.0 Era, there were no significant differences in the frequency distribution of policy tools(p=0.582) and policy objectives(p=0.603). The collaborative governance of multiple participants has become the primary trend, and the guiding role of Chinese Football Association has gradually become prominent. 2) There were significant differences in the distribution of policy tools before the evolution at a 95% confidence level(p=0.041). With environmental tools always maintaining the dominant position, the overall synergy of policy tools increased slightly. 3) There were significant differences in the distribution of policy objectives after the evolution at a 90% confidence level(p=0.069). The competition system of policy objective has not received enough attention while the construction of institution and resource guarantee system has been strengthened. Conclusion The upgraded version of campus football should adhere to the education concept of health first, promote the coordinated development of youth cultural learning and football skills, and strive to achieve more solid popularization, more scientific institution, more comprehensive resource guarantee and adequate integration. At the same time, it is necessary to strengthen the collaborative allocation of policy tools and reasonable planning of policy objectives so as to promote the high quality and sustainable development of campus football in the New Era. Endnote The policy texts selected in this paper are “Implementation Opinions on Accelerating the Development of Youth Campus Football” and “Action Plans for the Construction of Eight Systems of National Youth Campus Football”, which were promulgated on August 13, 2015 and September 25, 2020 respectively.

Keywords: campus football, content analysis, evolution characteristics, policy objective, policy tool

Procedia PDF Downloads 190
6219 Investigation of Compressive Strength of Slag-Based Geopolymer Concrete Incorporated with Rice Husk Ash Using 12M Alkaline Activator

Authors: Festus A. Olutoge, Ahmed A. Akintunde, Anuoluwapo S. Kolade, Aaron A. Chadee, Jovanca Smith

Abstract:

Geopolymer concrete's (GPC) compressive strength was investigated. The GPC was incorporated with rice husk ash (RHA) and ground granulated blast furnace slag (GGBFS), which may have potential in the construction industry to replace Portland limestone cement (PLC) concrete. The sustainable construction binders used were GGBFS and RHA, and a solution of sodium hydroxide (NaOH) and sodium silicate gel (Na₂SiO₃) was used as the 12-molar alkaline activator. Five GPC mixes comprising fine aggregates, coarse aggregates, GGBS, and RHA, and the alkaline solution in the ratio 2: 2.5: 1: 0.5, respectively, were prepared to achieve grade 40 concrete, and PLC was wholly substituted with GGBFS and RHA in the ratios of 0:100, 25:75, 50:50, 75:25, and 100:0. A control mix was also prepared which comprised of 100% water and 100% PLC as the cementitious material. The GPC mixes were thermally cured at 60-80ºC in an oven for approximately 24hrs. After curing for 7 and 28 days, the compressive strength test results of the hardened GPC samples showed that GPC-Mix #3, comprising 50% GGBFS and 50% RHA, was the most efficient geopolymer mix. The mix had compressive strengths of 35.71MPa and 47.26MPa, 19.87% and 8.69% higher than the PLC concrete samples, which had 29.79MPa and 43.48MPa after 7 and 28 days, respectively. Therefore, geopolymer concrete containing GGBFS incorporated with RHA is an efficient method of decreasing the use of PLC in conventional concrete production and reducing the high amounts of CO₂ emitted into the atmosphere in the construction industry.

Keywords: alkaline solution, cementitious material, geopolymer concrete, ground granulated blast furnace slag, rice husk ash

Procedia PDF Downloads 107
6218 Multi-Criteria Evolutionary Algorithm to Develop Efficient Schedules for Complex Maintenance Problems

Authors: Sven Tackenberg, Sönke Duckwitz, Andreas Petz, Christopher M. Schlick

Abstract:

This paper introduces an extension to the well-established Resource-Constrained Project Scheduling Problem (RCPSP) to apply it to complex maintenance problems. The problem is to assign technicians to a team which has to process several tasks with multi-level skill requirements during a work shift. Here, several alternative activities for a task allow both, the temporal shift of activities or the reallocation of technicians and tools. As a result, switches from one valid work process variant to another can be considered and may be selected by the developed evolutionary algorithm based on the present skill level of technicians or the available tools. An additional complication of the observed scheduling problem is that the locations of the construction sites are only temporarily accessible during a day. Due to intensive rail traffic, the available time slots for maintenance and repair works are extremely short and are often distributed throughout the day. To identify efficient working periods, a first concept of a Bayesian network is introduced and is integrated into the extended RCPSP with pre-emptive and non-pre-emptive tasks. Thereby, the Bayesian network is used to calculate the probability of a maintenance task to be processed during a specific period of the shift. Focusing on the domain of maintenance of the railway infrastructure in metropolitan areas as the most unproductive implementation process at construction site, the paper illustrates how the extended RCPSP can be applied for maintenance planning support. A multi-criteria evolutionary algorithm with a problem representation is introduced which is capable of revising technician-task allocations, whereas the duration of the task may be stochastic. The approach uses a novel activity list representation to ensure easily describable and modifiable elements which can be converted into detailed shift schedules. Thereby, the main objective is to develop a shift plan which maximizes the utilization of each technician due to a minimization of the waiting times caused by rail traffic. The results of the already implemented core algorithm illustrate a fast convergence towards an optimal team composition for a shift, an efficient sequence of tasks and a high probability of the subsequent implementation due to the stochastic durations of the tasks. In the paper, the algorithm for the extended RCPSP is analyzed in experimental evaluation using real-world example problems with various size, resource complexity, tightness and so forth.

Keywords: maintenance management, scheduling, resource constrained project scheduling problem, genetic algorithms

Procedia PDF Downloads 231
6217 Creating a New Agenda for Foreign Direct Investment: Intersectoral Competition and Knowledge Management Issues in Trinidad and Tobago's Construction Industry

Authors: Shelly-Ann Gajadhar

Abstract:

Over the last twenty years, the traditional economic motivations of foreign direct investment have been amalgamated with geopolitical motivations. This is evidenced by the extensive ratification of bilateral investment treaties (BIT) globally and the emergence of state-owned multinational companies (SOMNCs) that directly compete with local domestic enterprises (LDE). This paper investigates the impact that Chinese SOMNCs have on LDEs within Trinidad and Tobago’s construction sector and, determines whether knowledge transfer occurs. The paper employed semi-structured interviews of industry experts and concluded that LDEs predominantly experience adverse spillovers, inclusive of a long-term competition effect, with no technology transfer occurring.

Keywords: foreign direct investment, bilateral investment treaties, knowledge transfer, international business, Caribbean

Procedia PDF Downloads 252
6216 Discourse Analysis of the Concept of Citizenship in Textbooks in Iran

Authors: Jafar Ahmadi

Abstract:

This research has been done as a discourse analysis of the concept of citizenship in textbooks in Iran. The purpose of this study is to identify the dominant citizenship discourse in textbooks in the content of textbooks. The research method in this research is qualitative and qualitative content analysis. The statistical sample was selected in a purposeful manner and according to the research topic of books related to Persian literature, religious education and social education. The selected theoretical framework of this research is the three theories of citizenship (pre-modern, modern and postmodern). For each of these discourses, components and indicators have been extracted that are the basis of data analysis. The research findings show that the dominant citizenship discourse on the content of Iranian textbooks is pre-modern discourse and is the basis of this type of religious citizenship discourse. Finally, the findings show that the government uses the institution of education to reproduce its power.

Keywords: citizenship, textbooks, discourse analysis, religious citizenship, representation

Procedia PDF Downloads 198
6215 The Impact of Floods and Typhoons on Housing Welfare: Case Study of Thua Thien Hue Province, Vietnam

Authors: Seyeon Lee, Suyeon Lee, Julia Rogers

Abstract:

This research investigates and records post-flood and typhoon conditions of low income housing in the Thua Thien Hue Province, Vietnam; area prone to extreme flooding in Central Vietnam. The cost of rebuilding houses after flood and typhoon has been always a burden for low income households. These costs often lead to the elimination of essential construction practices for disaster resistance. Despite relief efforts from international non-profit organizations and Vietnam government, the impacts of flood and typhoon damages to residential construction has been reoccurring to the same neighborhood annually. Notwithstanding its importance, this topic has not been systematically investigated. The study is limited to assistance provided to low income households documenting existing conditions of low income homes impacted by post flood and typhoon conditions in the Thua Thien Hue Province. The research identifies leading causes of the building failure from the natural disasters. Relief efforts and progress made since the last typhoon is documented. The quality of construction and repairs are assessed based on Home Builders Guide to Coastal Construction by Federal Emergency Management Agency. Focus group discussions and individual interviews with local residents from four different communities were conducted to get incites on repair effort by the non-profit organizations and Vietnam government, and their needs post flood and typhoon. The findings from the field study informed that many of the local people are now aware of the importance of improving housing conditions as one of the key coping strategies to withstand flood and typhoon events as it makes housing and community more resilient to future events. While there has been a remarkable improvement of housing and infrastructure with the support from the local government as well as the non-profit organizations, many households in the study areas are found to still live in weak and fragile housing conditions without gaining access to the aid to repair and strengthen the houses. Given that the major immediate recovery action taken by the local people tends to focus on repairing damaged houses, and on this ground, low-income households spend a considerable amount of their income on housing repair, providing proper and applicable construction practices will not only improve the housing condition, but also contribute to reducing poverty in Vietnam.

Keywords: disaster coping mechanism, housing welfare, low-income housing, recovery reduction

Procedia PDF Downloads 271
6214 Flexible Development and Calculation of Contract Logistics Services

Authors: T. Spiegel, J. Siegmann, C. F. Durach

Abstract:

Challenges resulting from an international and dynamic business environment are increasingly being passed on from manufacturing companies to external service providers. Especially providers of complex, customer-specific industry services have to cope with continuously changing requirements. This is particularly true for contract logistics service providers. They are forced to develop efficient and highly flexible structures and strategies to meet their customer’s needs. One core element they have to focus on is the reorganization of their service development and sales process. Based on an action research approach, this study develops and tests a concept to streamline tender management for contract logistics service providers. The concept of modularized service architecture is deployed in order to derive a practice-oriented approach for the modularization of complex service portfolios and the design of customized quotes. These findings are evaluated regarding their applicability in other service sectors and practical recommendations are given.

Keywords: contract logistics, modularization, service development, tender management

Procedia PDF Downloads 409
6213 Sustainable Strategies for Post-Disaster Shelters: Case Study-Based Review and Future Prospects

Authors: Fangwen Ni, Hongpeng Xu

Abstract:

When disasters occur, it is important to provide temporary shelters to protect victims from their environment and to comfort them with privacy and dignity. However, the commonly used shelters like tents and shanties can not ensure a comfortable condition. Furthermore, the demand for more energy and less pollution has become a major challenge. Focusing on the sustainable of temporary shelters, this study intends to clarify the essential role of temporary shelters before the reconstruction work is done. The paper also identifies the main problems from three aspects including spatial layout, thermal comfort and utilization of passive technology. Moreover, it expounds the passive strategies of ecological design by case study and simulation. It is found that the living condition of shelters can be improved from the perspective of architectural space, ventilation theory and construction techniques. Regardless of being temporary, these shelters are crucial elements in emergency situations and should be taken more seriously.

Keywords: architectural space, construction technique, sustainable strategy, temporary shelter

Procedia PDF Downloads 270
6212 A Case Study of Bee Algorithm for Ready Mixed Concrete Problem

Authors: Wuthichai Wongthatsanekorn, Nuntana Matheekrieangkrai

Abstract:

This research proposes Bee Algorithm (BA) to optimize Ready Mixed Concrete (RMC) truck scheduling problem from single batch plant to multiple construction sites. This problem is considered as an NP-hard constrained combinatorial optimization problem. This paper provides the details of the RMC dispatching process and its related constraints. BA was then developed to minimize total waiting time of RMC trucks while satisfying all constraints. The performance of BA is then evaluated on two benchmark problems (3 and 5construction sites) according to previous researchers. The simulation results of BA are compared in term of efficiency and accuracy with Genetic Algorithm (GA) and all problems show that BA approach outperforms GA in term of efficiency and accuracy to obtain optimal solution. Hence, BA approach could be practically implemented to obtain the best schedule.

Keywords: bee colony optimization, ready mixed concrete problem, ruck scheduling, multiple construction sites

Procedia PDF Downloads 385
6211 Effect of Sodium Hydroxide on Geotechnical Properties of Soft Soil in Kathmandu Valley

Authors: Bal Deep Sharma, Suresh Ray Yadav

Abstract:

Local soils are often chosen due to their widespread availability and low cost. However, these soils typically have poor durability, which can lead to significant limitations in their use for construction. To address this issue, various soil stabilization techniques have been developed and used over the years. This study investigates the viability of employing the mineral polymerization (MIP) technique to stabilize black soils, intending to enhance their suitability for construction applications. This technique involves the microstructural transformation of certain clay minerals into solid and stable compounds exhibiting characteristics similar to hydroxy sodalite, feldspathoid, or zeolite. This transformation occurs through the action of an alkaline reactant at atmospheric pressure and low temperature. The soil sample was characterized using grain size distribution, Atterberg limit test, organic content test, and pH-value tests. The unconfined compressive strength of the soil specimens, prepared with varying percentages of sodium hydroxide as an additive and sand as a filler by weight, was determined at the optimum moisture content. The unconfined compressive strength of the specimens was tested under three different conditions: dry, wet, and cycling. The maximum unconfined compressive strengths were 77.568 kg/cm², 38.85 kg/cm², and 56.3 kg/cm² for the dry, wet, and cycling specimens, respectively, while the unconfined compressive strength of the untreated soil was 7.38 kg/cm². The minimum unconfined compressive strength of the wet and cycling specimens was greater than that of the untreated soil. Based on these findings, it can be concluded that these soils can be effectively used as construction material after treatment with sodium hydroxide.

Keywords: soil stabilization technique, soft soil treatment, sodium hydroxide, unconfined compressive strength

Procedia PDF Downloads 80
6210 Method for Predicting the Deformation of a Swelling Clay of the Region of N’Gaous (Batna, in Algeria)

Authors: Ferrah F., Baheddi M.

Abstract:

This study relates to how water content in some clay soils affects their structure by increasing or decreasing the volume. These cyclic phenomena of swelling-shrinkage cause parasitic stresses in structures and at the foundation. These stresses create damage in buildings, highways, pavements, airports and structures lightly loaded. This study was conducted on soil from a site near the hospital of N'gaous (Batna), whose soil is at the origin of cracks in the filler walls of the hospital. After a few years of exploitation, and according to the findings of experts in subdivision of construction and urbanism (SUCH), cracks appeared just after the heavy rains that the region experienced in 1987. Our study shows the need to become aware of the importance of damages occasioned by swellings by adopting construction techniques to solve this problem. The study is to determine a methodology to take into account the effects of swelling in calculating long-term foundations.

Keywords: clay, swelling, shrinkage, swelling pressure, compressibility

Procedia PDF Downloads 31
6209 The Concept of Birthday: A Theoretical, Historical, and Social Overview, in Judaism and Other Cultures

Authors: Orly Redlich

Abstract:

In the age of social distance, which has been added to an individual and competitive worldview, it has become important to find a way to promote closeness and personal touch. The sense of social belonging and the existence of positive interaction with others have recently become a considerable necessity. Therefore, this theoretical paper will review one of the familiar and common concepts among different cultures around the world – birthday. This paper has a theoretical contribution that deepens the understanding of the birthday concept. Birthday rituals are historical and universal events, which noted since the prehistoric eras. In ancient history, birthday rituals were solely reserved for kings and nobility members, but over the years, birthday celebrations have evolved into a worldwide tradition. Some of the familiar birthday customs and symbols are currently common among most cultures, while some cultures have adopted for themselves unique birthday customs, which characterized their values and traditions. The birthday concept has a unique significance in Judaism as well, historically, religiously, and socially: It is considered as a lucky day and a private holiday for the celebrant. Therefore, the present paper reviews diverse birthday customs around the world in different cultures, including Judaism, and marks important birthdays throughout history. The paper also describes how the concept of birthday appears over the years in songs, novels, and art, and presents quotes from distinguished sages. The theoretical review suggests that birthday has a special meaning as a time-mark in the cycle of life, and as a socialization means in human development. Moreover, the birthday serves as a symbol of belonging and group cohesiveness, a day in which the celebrant's sense of belonging and sense of importance are strengthened and nurtured. Thus, the reappearance of these elements in a family or group interaction during the birthday ceremony allows the celebrant to absorb positive impressions about himself. In view of the extensive theoretical review, it seems that the unique importance of birthdays can serve as the foundation for intervention programs that may affect the participants’ sense of belonging and empowerment. In the group aspect, perhaps it can also yield therapeutic factors within a group. Concrete recommendations are presented at the end of the paper.

Keywords: birthday, universal events, positive interaction, group cohesiveness, rituals

Procedia PDF Downloads 141
6208 Predicting Costs in Construction Projects with Machine Learning: A Detailed Study Based on Activity-Level Data

Authors: Soheila Sadeghi

Abstract:

Construction projects are complex and often subject to significant cost overruns due to the multifaceted nature of the activities involved. Accurate cost estimation is crucial for effective budget planning and resource allocation. Traditional methods for predicting overruns often rely on expert judgment or analysis of historical data, which can be time-consuming, subjective, and may fail to consider important factors. However, with the increasing availability of data from construction projects, machine learning techniques can be leveraged to improve the accuracy of overrun predictions. This study applied machine learning algorithms to enhance the prediction of cost overruns in a case study of a construction project. The methodology involved the development and evaluation of two machine learning models: Random Forest and Neural Networks. Random Forest can handle high-dimensional data, capture complex relationships, and provide feature importance estimates. Neural Networks, particularly Deep Neural Networks (DNNs), are capable of automatically learning and modeling complex, non-linear relationships between input features and the target variable. These models can adapt to new data, reduce human bias, and uncover hidden patterns in the dataset. The findings of this study demonstrate that both Random Forest and Neural Networks can significantly improve the accuracy of cost overrun predictions compared to traditional methods. The Random Forest model also identified key cost drivers and risk factors, such as changes in the scope of work and delays in material delivery, which can inform better project risk management. However, the study acknowledges several limitations. First, the findings are based on a single construction project, which may limit the generalizability of the results to other projects or contexts. Second, the dataset, although comprehensive, may not capture all relevant factors influencing cost overruns, such as external economic conditions or political factors. Third, the study focuses primarily on cost overruns, while schedule overruns are not explicitly addressed. Future research should explore the application of machine learning techniques to a broader range of projects, incorporate additional data sources, and investigate the prediction of both cost and schedule overruns simultaneously.

Keywords: cost prediction, machine learning, project management, random forest, neural networks

Procedia PDF Downloads 56
6207 The Research about Environmental Assessment Index of Brownfield Redevelopment in Taiwan - A Case Study on Formosa Chemicals and Fibre Corporation, Changhua Branch

Authors: Yang, Min-chih, Shih-Jen Feng, Bo-Tsang Li

Abstract:

The concept of “Brownfield” has been developed for nearly 35 years since it was put forward in 《Comprehensive Environmental Response, Compensation, and Liability Act, CERCLA》of USA in 1980 for solving the problem of soil contamination of those old industrial lands, and later, many countries have put forward relevant policies and researches continuously. But the related concept in Taiwan, a country has developed its industry for 60 years, is still in its infancy. This leads to the slow development of Brownfield related research and policy in Taiwan. When it comes to build the foundation of Brownfield development, we have to depend on the related experience and research of other countries. They are four aspects about Brownfield: 1. Contaminated Land; 2. Derelict Land; 3. Vacant Land; 4. Previously Development Land. This study will focus on and deeply investigate the Vacant land and contaminated land.

Keywords: brownfield, industrial land, redevelopment, assessment index

Procedia PDF Downloads 465
6206 Public Participation and Decision-Making towards Planning Legislation: A Case for GCC Countries

Authors: Saad Saeed Althiabi

Abstract:

There is great progress in formulating and executing legislative policies in GCC, however, the public participation in formulating and in major decision making still remains weak. Drawing attention on the international law of public participation in construction and natural resource management, this paper aims in creating a feasible legislative framework for extensive public participation in the industries such as construction and oil and gas decision-making that GCC can implement. This paper would address the conflicts associated with the management and creation of legislation and ensuring public participation for the creation of a practical framework. A feasible legislative framework must take into account the various factors that shape the effectiveness of participation and the elements that promote the objectives of participation. It is premised on the ground that viewing to international prescriptions might help to reveal gaps in domestic laws, as well as alternatives to overcome them.

Keywords: legislative policies, public participation, planning legislation, GCC countries, international law

Procedia PDF Downloads 534
6205 Introduction of Dams Impacts on Downstream Wetlands: Case Study in Ahwar Delta in Yemen

Authors: Afrah Saad Mohsen Al-Mahfadi

Abstract:

The construction of dams can provide various ecosystem services, but it can also lead to ecological changes such as habitat loss and coastal degradation. Yemen faces multiple risks, including water crises and inadequate environmental policies, which are particularly detrimental to coastal zones like the Ahwar Delta in Abyan. This study aims to examine the impacts of dam construction on downstream wetlands and propose sustainable management approaches. Research Aim: The main objective of this study is to assess the different impacts of dam construction on downstream wetlands, specifically focusing on the Ahwar Delta in Yemen. Methodology: The study utilizes a literature review approach to gather relevant information on dam impacts and adaptation measures. Interviews with decision-making stakeholders and local community members are conducted to gain insights into the specific challenges faced in the Ahwar Delta. Additionally, sensing data, such as Arc-GIS and precipitation data from 1981 to 2020, are analyzed to examine changes in hydrological dynamics. Questions Addressed: This study addresses the following questions: What are the impacts of dam construction on downstream wetlands in the Ahwar delta? How can environmental management planning activities be implemented to minimize these impacts? Findings: The results indicate several future issues arising from dam construction in the coastal areas, including land loss due to rising sea levels and increased salinity in drinking water wells. Climate change has led to a decrease in rainfall rates, impacting vegetation and increasing sedimentation and erosion. Downstream areas with dams exhibit lower sediment levels and slower flowing habitats compared to those without dams. Theoretical Importance: The findings of this study provide valuable insights into the ecological impacts of dam construction on downstream wetlands. Understanding these dynamics can inform decision-makers about the need for adaptation measures and their potential benefits in improving coastal biodiversity under dam impacts. Data Collection and Analysis Procedures: The study collects data through a literature review, interviews, and sensing technology. The literature review helps identify relevant studies on dam impacts and adaptation measures. Interviews with stakeholders and local community members provide firsthand information on the specific challenges faced in the Ahwar Delta. Sensing data, such as Arc-GIS and precipitation data, are analyzed to understand changes in hydrological dynamics over time. Conclusion: The study concludes that while the situation can worsen due to dam construction, practical adaptation measures can help mitigate the impacts. Recommendations include improving water management, developing integrated coastal zone planning, raising awareness among stakeholders, improving health and education, and implementing emergency projects to combat climate change.

Keywords: dam impact, delta wetland, hydrology, Yemen

Procedia PDF Downloads 69
6204 A Machine Learning Approach for Efficient Resource Management in Construction Projects

Authors: Soheila Sadeghi

Abstract:

Construction projects are complex and often subject to significant cost overruns due to the multifaceted nature of the activities involved. Accurate cost estimation is crucial for effective budget planning and resource allocation. Traditional methods for predicting overruns often rely on expert judgment or analysis of historical data, which can be time-consuming, subjective, and may fail to consider important factors. However, with the increasing availability of data from construction projects, machine learning techniques can be leveraged to improve the accuracy of overrun predictions. This study applied machine learning algorithms to enhance the prediction of cost overruns in a case study of a construction project. The methodology involved the development and evaluation of two machine learning models: Random Forest and Neural Networks. Random Forest can handle high-dimensional data, capture complex relationships, and provide feature importance estimates. Neural Networks, particularly Deep Neural Networks (DNNs), are capable of automatically learning and modeling complex, non-linear relationships between input features and the target variable. These models can adapt to new data, reduce human bias, and uncover hidden patterns in the dataset. The findings of this study demonstrate that both Random Forest and Neural Networks can significantly improve the accuracy of cost overrun predictions compared to traditional methods. The Random Forest model also identified key cost drivers and risk factors, such as changes in the scope of work and delays in material delivery, which can inform better project risk management. However, the study acknowledges several limitations. First, the findings are based on a single construction project, which may limit the generalizability of the results to other projects or contexts. Second, the dataset, although comprehensive, may not capture all relevant factors influencing cost overruns, such as external economic conditions or political factors. Third, the study focuses primarily on cost overruns, while schedule overruns are not explicitly addressed. Future research should explore the application of machine learning techniques to a broader range of projects, incorporate additional data sources, and investigate the prediction of both cost and schedule overruns simultaneously.

Keywords: resource allocation, machine learning, optimization, data-driven decision-making, project management

Procedia PDF Downloads 40
6203 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: causes of construction project delays, construction industry, construction management, power distance

Procedia PDF Downloads 213
6202 Exploring Weld Rejection Rate Limits and Tracers Effects in Construction Projects

Authors: Abdalaziz M. Alsalhabi, Loai M. Alowa

Abstract:

This paper investigates Weld Rejection Rate (WRR) limits and tracer effects in construction projects, with a specific focus on a Gas Plant Project, a mega-project held by Saudi Aramco (SA) in Saudi Arabia. The study included a comprehensive examination of various factors impacting WRR limits. It commenced by comparing the Company practices with ASME standards, followed by an in-depth analysis of both weekly and cumulative projects' historical WRR data, evaluation of Radiographic Testing (RT) reports for rejected welds, and proposal of mitigation methods to eliminate future rejections. Additionally, the study revealed the causes of fluctuation in WRR data and benchmarked with the industry practices. Furthermore, a case study was conducted to explore the impact of tracers on WRR, providing insights into their influence on the welding process. This paper aims to achieve three primary objectives. Firstly, it seeks to validate the existing practices of WRR limits and advocate for their inclusion within relevant International Industry Standards. Secondly, it aims to validate the effectiveness of the WRR formula that incorporates tracer effects, ensuring its reliability in assessing weld quality. Lastly, this study aims to identify opportunities for process improvement in WRR control, with the ultimate goal of enhancing project processes and ensuring the integrity, safety, and efficiency of constructed assets.

Keywords: weld rejection rate, weld repair rate in joint and linear basis, tracers effects, construction projects

Procedia PDF Downloads 41
6201 A Literature Review of Servant Leadership and Criticism of Advanced Research

Authors: So-Jung Kim, Kyoung-Seok Kim, Yeong-Gyeong Choi

Abstract:

Although there are many theories and discussion of leadership, the necessity of having a new leadership paradigm was emphasized. The existing leadership characteristic of instruction and control revealed its limitations. Market competition becomes fierce and economic recession never ends worldwide. Of the leadership theories, servant leadership was introduced recently and is in line with the environmental changes of the organization. Servant leadership is a combination of two words, 'servant' and 'leader' and can be defined as the role of the leader who focuses on doing voluntary work for others with altruistic ethics, makes members, customers, and local communities a priority, and makes a commitment to satisfying their needs. This leadership received attention as one field of leadership in the late 1990s and secured its legitimacy. This study discusses the existing research trends of leadership, the concept, behavior characteristics, and lower dimensions of servant leadership, compares servant leadership with the existing leadership researches and diagnoses if servant leadership is a useful concept for further leadership researches. Finally, this study criticizes the limitations in the existing researches on servant leadership.

Keywords: leadership philosophy, leadership theory, servant leadership, traditional leadership

Procedia PDF Downloads 363
6200 The Nexus between Counter Terrorism and Human Rights with a Perspective on Cyber Terrorism

Authors: Allan Munyao Mukuki

Abstract:

The nexus between terrorism and human rights has become a big challenge in the fight against terrorism globally. This is hinged on the fact that terrorism and human rights are interrelated to the extent that, when the former starts, the latter is violated. This direct linkage was recognised in the Vienna Declaration and Programme of Action as adopted by the World Conference on Human Rights in Vienna on 25 June 1993 which agreed that acts of terrorism in all its forms and manifestations are aimed at the destruction of human rights. Hence, terrorism constitutes an assault on our most basic human rights. To this end, the first part of this paper will focus on the nexus between terrorism and human rights and endeavors to draw a co-relation between these two concepts. The second part thereafter will analyse the emerging concept of cyber-terrorism and how it takes place. Further, an analysis of cyber counter-terrorism balanced as against human rights will also be undertaken. This will be done through the analysis of the concept of ‘securitisation’ of human rights as well as the need to create a balance between counterterrorism efforts as against the protection of human rights at all costs. The paper will then concludes with recommendations on how to balance counter-terrorism and human rights in the modern age.

Keywords: balance, counter-terrorism, cyber-terrorism, human rights, security, violation

Procedia PDF Downloads 403
6199 On the Framework of Contemporary Intelligent Mathematics Underpinning Intelligent Science, Autonomous AI, and Cognitive Computers

Authors: Yingxu Wang, Jianhua Lu, Jun Peng, Jiawei Zhang

Abstract:

The fundamental demand in contemporary intelligent science towards Autonomous AI (AI*) is the creation of unprecedented formal means of Intelligent Mathematics (IM). It is discovered that natural intelligence is inductively created rather than exhaustively trained. Therefore, IM is a family of algebraic and denotational mathematics encompassing Inference Algebra, Real-Time Process Algebra, Concept Algebra, Semantic Algebra, Visual Frame Algebra, etc., developed in our labs. IM plays indispensable roles in training-free AI* theories and systems beyond traditional empirical data-driven technologies. A set of applications of IM-driven AI* systems will be demonstrated in contemporary intelligence science, AI*, and cognitive computers.

Keywords: intelligence mathematics, foundations of intelligent science, autonomous AI, cognitive computers, inference algebra, real-time process algebra, concept algebra, semantic algebra, applications

Procedia PDF Downloads 61
6198 Non-Chronological Approach in Crane Girder and Composite Steel Beam Installation: Case Study

Authors: Govindaraj Ramanathan

Abstract:

The time delay and the structural stability are major issues in big size projects due to several factors. Improper planning and poor coordination lead to delay in construction, which sometimes result in reworking or rebuilding. This definitely increases the cost and time of project. This situation stresses the structural engineers to plan out of the limits of contemporary technology utilizing non-chronological approach with creative ideas. One of the strategies to solve this issue is through structural integrity solutions in a cost-effective way. We have faced several problems in a project worth 470 million USD, and one such issue is crane girder installation with composite steel beams. We have applied structural integrity approach with the proper and revised planning schedule to solve the problem efficiently with minimal expenses.

Keywords: construction management, delay, non-chronological approach, composite beam, structural integrity

Procedia PDF Downloads 237