1975 Review in Role of Geotextile on Soil Improvement

Authors: Sandra Ghavam Shirazi, Mohsen Ramezan Shirazi, Mohammadreza Golhashem

Abstract:

Nowadays by development of construction in modern world new techniques are introduced to civil engineering. As for geotechnical problems and demands of soil improvement, engineers are searching for decisive methods to ensure the safety of projects. As a popular material Geotextiles are used in almost every aspect of civil engineering. There is a vast variety of geotextiles and each kind has their own unique characteristics therefor to select the proper geotextile for a specific project their properties must be carefully examined. This review gathers and evaluates different parameters of geotextiles that are used in geotechnical field.

Keywords: geotextile, soft soils, fabric, stabilization, fiber

Procedia PDF Downloads 407
1974 Poor Medical Waste Management (MWM) Practices and Its Risks to Human Health and the Environment

Authors: Babanyara Y. Y., Ibrahim D. B., Garba T., Bogoro A. G., Abubakar, M. Y.

Abstract:

Medical care is vital for our life, health, and well-being. However, the waste generated from medical activities can be hazardous, toxic, and even lethal because of their high potential for diseases transmission. The hazardous and toxic parts of waste from healthcare establishments comprising infectious, medical, and radioactive material as well as sharps constitute a grave risks to mankind and the environment, if these are not properly treated/disposed or are allowed to be mixed with other municipal waste. In Nigeria, practical information on this aspect is inadequate and research on the public health implications of poor management of medical wastes is few and limited in scope. Findings drawn from Literature particularly in the third world countries highlights financial problems, lack of awareness of risks involved in MWM, lack of appropriate legislation and lack of specialized MWM staff. The paper recommends how MWM practices can be improved in medical facilities.

Keywords: environmental pollution, infectious, management, medical waste, public health

Procedia PDF Downloads 310
1973 Study of Environmental Impact

Authors: Houmame Benbouali

Abstract:

The risks, in general, exist in any project; one can hardly carry out a project without taking risks. The hydraulic works are rather complex projects in their design, realization and exploitation, and are often subjected at the multiple risks being able to influence with their good performance, and can have an negative impact on their environment. The present study was carried out to quote the impacts caused by purification plant STEP Chlef on the environment, it aims has studies the environmental impacts during construction and when designing this STEP, it is divided into two parts: The first part results from a research task bibliographer which contain three chapters (-cleansing of water worn-general information on water worn-proceed of purification of waste water). The second part is an experimental part which is divided into four chapters (detailed state initial-description of the station of purification-evaluation of the impacts of the project analyzes measurements and recommendations).

Keywords: treatment plant, waste water, waste water treatment, environmental impact

Procedia PDF Downloads 511
1972 Estimation of Effective Radiation Dose Following Computed Tomography Urography at Aminu Kano Teaching Hospital, Kano Nigeria

Authors: Idris Garba, Aisha Rabiu Abdullahi, Mansur Yahuza, Akintade Dare

Abstract:

Background: CT urography (CTU) is efficient radiological examination for the evaluation of the urinary system disorders. However, patients are exposed to a significant radiation dose which is in a way associated with increased cancer risks. Objectives: To determine Computed Tomography Dose Index following CTU, and to evaluate organs equivalent doses. Materials and Methods: A prospective cohort study was carried at a tertiary institution located in Kano northwestern. Ethical clearance was sought and obtained from the research ethics board of the institution. Demographic, scan parameters and CT radiation dose data were obtained from patients that had CTU procedure. Effective dose, organ equivalent doses, and cancer risks were estimated using SPSS statistical software version 16 and CT dose calculator software. Result: A total of 56 patients were included in the study, consisting of 29 males and 27 females. The common indication for CTU examination was found to be renal cyst seen commonly among young adults (15-44yrs). CT radiation dose values in DLP, CTDI and effective dose for CTU were 2320 mGy cm, CTDIw 9.67 mGy and 35.04 mSv respectively. The probability of cancer risks was estimated to be 600 per a million CTU examinations. Conclusion: In this study, the radiation dose for CTU is considered significantly high, with increase in cancer risks probability. Wide radiation dose variations between patient doses suggest that optimization is not fulfilled yet. Patient radiation dose estimate should be taken into consideration when imaging protocols are established for CT urography.

Keywords: CT urography, cancer risks, effective dose, radiation exposure

Procedia PDF Downloads 345
1971 Numerical Evaluation of the Degradation of Shear Modulus and Damping Evolution of Soils in the Eastern Region of Algiers Using Geophysical and Geotechnical Tests

Authors: Mohamed Khiatine, Ramdane Bahar

Abstract:

The research performed during the last years has revealed that the seismic response of the soilis significantly non linear and hysteresis to the deformationsitundergoes during earthquakes and notably during violent shaking. This nonlinear behavior of soils can be characterized by curves showing the evolution of shearmodulus and damping versus distortion. Also, in this context, geotechnical seismic engineering problems often require the characterization of dynamic soil properties over a wide range of deformation. This determination of dynamic soil properties is key to predict the seismic response of soils for important civil engineering structures. This communication discusses a numerical analysis method for evaluating the nonlinear dynamic properties of soils in Algeriausing the FLAC2D software and the database resulting from geophysical and geotechnical studies when laboratory dynamic tests are not available. The nonlinear model proposed by Ramberg-Osgood and limited by the Mohr-coulomb criterion is used.

Keywords: degradation, shear modulus, damping, ramberg-osgood, numerical analysis.

Procedia PDF Downloads 106
1970 Modeling Salam Contract for Profit and Loss Sharing

Authors: Dchieche Amina, Aboulaich Rajae

Abstract:

Profit and loss sharing suggests an equitable sharing of risks and profits between the parts involved in a financial transaction. Salam is a contract in which advance payment is made for goods to be delivered at a future date. The purpose of this work is to price a new contract for profit and loss sharing based on Salam contract, using Khiyar Al Ghabn which is an agreement of choice in case of misrepresent facts.

Keywords: Islamic finance, shariah compliance, profi t and loss sharing, derivatives, risks, hedging, salam contract

Procedia PDF Downloads 332
1969 Leveraging Power BI for Advanced Geotechnical Data Analysis and Visualization in Mining Projects

Authors: Elaheh Talebi, Fariba Yavari, Lucy Philip, Lesley Town

Abstract:

The mining industry generates vast amounts of data, necessitating robust data management systems and advanced analytics tools to achieve better decision-making processes in the development of mining production and maintaining safety. This paper highlights the advantages of Power BI, a powerful intelligence tool, over traditional Excel-based approaches for effectively managing and harnessing mining data. Power BI enables professionals to connect and integrate multiple data sources, ensuring real-time access to up-to-date information. Its interactive visualizations and dashboards offer an intuitive interface for exploring and analyzing geotechnical data. Advanced analytics is a collection of data analysis techniques to improve decision-making. Leveraging some of the most complex techniques in data science, advanced analytics is used to do everything from detecting data errors and ensuring data accuracy to directing the development of future project phases. However, while Power BI is a robust tool, specific visualizations required by geotechnical engineers may have limitations. This paper studies the capability to use Python or R programming within the Power BI dashboard to enable advanced analytics, additional functionalities, and customized visualizations. This dashboard provides comprehensive tools for analyzing and visualizing key geotechnical data metrics, including spatial representation on maps, field and lab test results, and subsurface rock and soil characteristics. Advanced visualizations like borehole logs and Stereonet were implemented using Python programming within the Power BI dashboard, enhancing the understanding and communication of geotechnical information. Moreover, the dashboard's flexibility allows for the incorporation of additional data and visualizations based on the project scope and available data, such as pit design, rock fall analyses, rock mass characterization, and drone data. This further enhances the dashboard's usefulness in future projects, including operation, development, closure, and rehabilitation phases. Additionally, this helps in minimizing the necessity of utilizing multiple software programs in projects. This geotechnical dashboard in Power BI serves as a user-friendly solution for analyzing, visualizing, and communicating both new and historical geotechnical data, aiding in informed decision-making and efficient project management throughout various project stages. Its ability to generate dynamic reports and share them with clients in a collaborative manner further enhances decision-making processes and facilitates effective communication within geotechnical projects in the mining industry.

Keywords: geotechnical data analysis, power BI, visualization, decision-making, mining industry

Procedia PDF Downloads 92
1968 Cost and Benefits of Collocation in the Use of Biogas to Reduce Vulnerabilities and Risks

Authors: Janaina Camile Pasqual Lofhagen, David Savarese, Veronika Vazhnik

Abstract:

The urgency of the climate crisis requires both innovation and practicality. The energy transition framework allows industry to deliver resilient cities, enhance adaptability to change, pursue energy objectives such as growth or efficiencies, and increase renewable energy. This paper investigates a real-world application perspective for the use of biogas in Brazil and the U.S.. It will examine interventions to provide a foundation of infrastructure, as well as the tangible benefits for policy-makers crafting law and providing incentives.

Keywords: resilience, vulnerability, risks, biogas, sustainability.

Procedia PDF Downloads 105
1967 Data Science in Military Decision-Making: A Semi-Systematic Literature Review

Authors: H. W. Meerveld, R. H. A. Lindelauf

Abstract:

In contemporary warfare, data science is crucial for the military in achieving information superiority. Yet, to the authors’ knowledge, no extensive literature survey on data science in military decision-making has been conducted so far. In this study, 156 peer-reviewed articles were analysed through an integrative, semi-systematic literature review to gain an overview of the topic. The study examined to what extent literature is focussed on the opportunities or risks of data science in military decision-making, differentiated per level of war (i.e. strategic, operational, and tactical level). A relatively large focus on the risks of data science was observed in social science literature, implying that political and military policymakers are disproportionally influenced by a pessimistic view on the application of data science in the military domain. The perceived risks of data science are, however, hardly addressed in formal science literature. This means that the concerns on the military application of data science are not addressed to the audience that can actually develop and enhance data science models and algorithms. Cross-disciplinary research on both the opportunities and risks of military data science can address the observed research gaps. Considering the levels of war, relatively low attention for the operational level compared to the other two levels was observed, suggesting a research gap with reference to military operational data science. Opportunities for military data science mostly arise at the tactical level. On the contrary, studies examining strategic issues mostly emphasise the risks of military data science. Consequently, domain-specific requirements for military strategic data science applications are hardly expressed. Lacking such applications may ultimately lead to a suboptimal strategic decision in today’s warfare.

Keywords: data science, decision-making, information superiority, literature review, military

Procedia PDF Downloads 167
1966 Contracting Strategies to Foster Industrial Symbiosis Implementation

Authors: Robin Molinier

Abstract:

Industrial symbiosis (I.S) deals with the exchange of waste materials, fatal energy and utilities as resources for production. While it brings environmental benefits from resource conservation its economic profitability is one of the main barriers to its implementation. I.S involves several actors with their own objectives and resources so that each actor must be satisfied by ex-ante arrangements to commit toward investments and transactions. Regarding I.S Transaction cost economics helps to identify hybrid forms of governance for transactions governance due to I.S projects specificities induced by the need for customization (asset specificity, non-homogeneity). Thus we propose a framework to analyze the best contractual practices tailored to address I.S specific risks that we identified as threefold (load profiles and quality mismatch, value fluctuations). Schemes from cooperative game theory and contracting management are integrated to analyze value flows between actors. Contractual guidelines are then proposed to address the identified risks and to split the value for a set of I.S archetypes drawn from actual experiences.

Keywords: contracts, economics, industrial symbiosis, risks

Procedia PDF Downloads 209
1965 Analysis of Risk-Based Disaster Planning in Local Communities

Authors: R. A. Temah, L. A. Nkengla-Asi

Abstract:

Planning for future disasters sets the stage for a variety of activities that may trigger multiple recurring operations and expose the community to opportunities to minimize risks. Local communities are increasingly embracing the necessity for planning based on local risks, but are also significantly challenged to effectively plan and response to disasters. This research examines basic risk-based disaster planning model and compares it with advanced risk-based planning that introduces the identification and alignment of varieties of local capabilities within and out of the local community that can be pivotal to facilitate the management of local risks and cascading effects prior to a disaster. A critical review shows that the identification and alignment of capabilities can potentially enhance risk-based disaster planning. A tailored holistic approach to risk based disaster planning is pivotal to enhance collective action and a reduction in disaster collective cost.

Keywords: capabilities, disaster planning, hazards, local community, risk-based

Procedia PDF Downloads 206
1964 Risk Factors Affecting Construction Project Cost in Oman

Authors: Omar Amoudi, Latifa Al Brashdi

Abstract:

Construction projects are always subject to risks and uncertainties due to its unique and dynamic nature, outdoor work environment, the wide range of skills employed, various parties involved in addition to situation of construction business environment at large. Altogether, these risks and uncertainties affect projects objectives and lead to cost overruns, delay, and poor quality. Construction projects in Oman often experience cost overruns and delay. Managing these risks and reducing their impacts on construction cost requires firstly identifying these risks, and then analyzing their severity on project cost to obtain deep understanding about these risks. This in turn will assist construction managers in managing and tacking these risks. This paper aims to investigate the main risk factors that affect construction projects cost in the Sultanate of Oman. In order to achieve the main aim, literature review was carried out to identify the main risk factors affecting construction cost. Thirty-three risk factors were identified from the literature. Then, a questionnaire survey was designed and distributed among construction professionals (i.e., client, contractor and consultant) to obtain their opinion toward the probability of occurrence for each risk factor and its possible impact on construction project cost. The collected data was analyzed based on qualitative aspects and in several ways. The severity of each risk factor was obtained by multiplying the probability occurrence of a risk factor with its impact. The findings of this study reveal that the most significant risk factors that have high severity impact on construction project cost are: Change of Oil Price, Delay of Materials and Equipment Delivery, Changes in Laws and Regulations, Improper Budgeting, and Contingencies, Lack of Skilled Workforce and Personnel, Delays Caused by Contractor, Delays of Owner Payments, Delays Caused by Client, and Funding Risk. The results can be used as a basis for construction managers to make informed decisions and produce risk response procedures and strategies to tackle these risks and reduce their negative impacts on construction project cost.

Keywords: construction cost, construction projects, Oman, risk factors, risk management

Procedia PDF Downloads 345
1963 Modeling of Geotechnical Data Using GIS and Matlab for Eastern Ahmedabad City, Gujarat

Authors: Rahul Patel, S. P. Dave, M. V Shah

Abstract:

Ahmedabad is a rapidly growing city in western India that is experiencing significant urbanization and industrialization. With projections indicating that it will become a metropolitan city in the near future, various construction activities are taking place, making soil testing a crucial requirement before construction can commence. To achieve this, construction companies and contractors need to periodically conduct soil testing. This study focuses on the process of creating a spatial database that is digitally formatted and integrated with geotechnical data and a Geographic Information System (GIS). Building a comprehensive geotechnical Geo-database involves three essential steps. Firstly, borehole data is collected from reputable sources. Secondly, the accuracy and redundancy of the data are verified. Finally, the geotechnical information is standardized and organized for integration into the database. Once the Geo-database is complete, it is integrated with GIS. This integration allows users to visualize, analyze, and interpret geotechnical information spatially. Using a Topographic to Raster interpolation process in GIS, estimated values are assigned to all locations based on sampled geotechnical data values. The study area was contoured for SPT N-Values, Soil Classification, Φ-Values, and Bearing Capacity (T/m2). Various interpolation techniques were cross-validated to ensure information accuracy. The GIS map generated by this study enables the calculation of SPT N-Values, Φ-Values, and bearing capacities for different footing widths and various depths. This approach highlights the potential of GIS in providing an efficient solution to complex phenomena that would otherwise be tedious to achieve through other means. Not only does GIS offer greater accuracy, but it also generates valuable information that can be used as input for correlation analysis. Furthermore, this system serves as a decision support tool for geotechnical engineers. The information generated by this study can be utilized by engineers to make informed decisions during construction activities. For instance, they can use the data to optimize foundation designs and improve site selection. In conclusion, the rapid growth experienced by Ahmedabad requires extensive construction activities, necessitating soil testing. This study focused on the process of creating a comprehensive geotechnical database integrated with GIS. The database was developed by collecting borehole data from reputable sources, verifying its accuracy and redundancy, and organizing the information for integration. The GIS map generated by this study is an efficient solution that offers greater accuracy and generates valuable information that can be used as input for correlation analysis. It also serves as a decision support tool for geotechnical engineers, allowing them to make informed decisions during construction activities.

Keywords: arcGIS, borehole data, geographic information system (GIS), geo-database, interpolation, SPT N-value, soil classification, φ-value, bearing capacity

Procedia PDF Downloads 68
1962 Stabilization of Spent Engine Oil Contaminated Lateritic Soil Admixed with Cement Kiln Dust for Use as Road Construction Materials

Authors: Johnson Rotimi Oluremi, A. Adedayo Adegbola, A. Samson Adediran, O. Solomon Oladapo

Abstract:

Spent engine oil contains heavy metals and polycyclic aromatic hydrocarbons which contribute to chronic health hazards, poor soil aeration, immobilisation of nutrients and lowering of pH in soil. It affects geotechnical properties of lateritic soil thereby constituting geotechnical and foundation problems. This study is therefore based on the stabilization of spent engine oil (SEO) contaminated lateritic soil using cement kiln dust (CKD) as a mean of restoring it to its pristine state. Geotechnical tests which include sieve analysis, atterberg limit, compaction, California bearing ratio and unconfined compressive strength tests were carried out on the natural, SEO contaminated and CKD stabilized SEO contaminated lateritic soil samples. The natural soil classified as A-2-7 (2) by AASHTO classification and GC according to the Unified Soil Classification System changed to A-4 non-plastic soil due to SEO contaminated even under the influence of CKD it remained unchanged. However, the maximum dry density (MDD) of the SEO contaminated soil increased while the optimum moisture content (OMC) behaved vice versa with the increase in the percentages of CKD. Similarly, the bearing strength of the stabilized SEO contaminated soil measured by California Bearing Ratio (CBR) increased with percentage increment in CKD. In conclusion, spent engine oil has a detrimental effect on the geotechnical properties of the lateritic soil sample but which can be remediated using 10% CKD as a stand alone admixture in stabilizing spent engine oil contaminated soil.

Keywords: spent engine oil, lateritic soil, cement kiln dust, stabilization, compaction, unconfined compressive strength

Procedia PDF Downloads 389
1961 Perception of Risks of the Telecommunication Towers in Malaysia: A Qualitative Inquiry

Authors: Y. Kamarulzaman, A. Madun, F. D. Yusop, N. Abdullah, N. K. Hoong

Abstract:

In 2011, the Malaysian Government has initiated a nationwide project called 1BestariNet which will adopt the using of technology in teaching and learning, resulting in the construction of telecommunication towers inside the public schools’ premise. Using qualitative approach, this study investigated public perception of risks associated with the project, particularly the telecommunication towers. Data collection involved observation and in-depth interviews with 22 individuals consist of a segment of public that was anxious about the risks of radio frequency electromagnetic field (RFEMF) which include two employees of telecommunication companies (telcos) and five employees of Government agencies. Observation of the location of the towers at 10 public schools, a public forum, and media reports provide valuable information in our analysis. The study finds that the main concern is related to the health risks. This study also shows that it is not easy for the Government to manage public perception mainly because it involves public trust. We find that risk perception is related with public trust, as well as the perceived benefits and level of knowledge. Efficient communication and continuous engagement with the local communities help to build and maintain public trust, reduce public fear and anxiety, hence mitigating the risk perception among the public.

Keywords: risk perception, risk communication, trust, telecommunication tower, radio frequency electromagnetic field (RFEMF)

Procedia PDF Downloads 320
1960 Study of the Stability of the Slope Open-Pit Mines: Case of the Mine of Phosphates – Tebessa, Algeria

Authors: Mohamed Fredj, Abdallah Hafsaoui, Radouane Nakache

Abstract:

The study of the stability of the mining works in rock masses fractured is the major concern of the operating engineer. For geotechnical works in mines and quarries, it there is not today's general methodology for analysis and the quantification of the risks relating to the dangers inherent in these concrete types (falling boulders, landslides, etc.). The reasons for this are uncertainty, which weighs on available data or lack of knowledge of the values of the parameters required for this analysis type. Stability calculations must be based on reliable knowledge of the distribution of discontinuities that dissect the Rocky massif and the resistance to shear of the intact rock and discontinuities. This study is aimed to study the stability of slope of mine (Kef Sennoun - Tebessa, Algeria). The problem is analyzed using a numerical model based on the finite elements (software Plaxis 3D).

Keywords: stability, discontinuities, finite elements, rock mass, open-pit mine

Procedia PDF Downloads 321
1959 Research on the Risks of Railroad Receiving and Dispatching Trains Operators: Natural Language Processing Risk Text Mining

Authors: Yangze Lan, Ruihua Xv, Feng Zhou, Yijia Shan, Longhao Zhang, Qinghui Xv

Abstract:

Receiving and dispatching trains is an important part of railroad organization, and the risky evaluation of operating personnel is still reflected by scores, lacking further excavation of wrong answers and operating accidents. With natural language processing (NLP) technology, this study extracts the keywords and key phrases of 40 relevant risk events about receiving and dispatching trains and reclassifies the risk events into 8 categories, such as train approach and signal risks, dispatching command risks, and so on. Based on the historical risk data of personnel, the K-Means clustering method is used to classify the risk level of personnel. The result indicates that the high-risk operating personnel need to strengthen the training of train receiving and dispatching operations towards essential trains and abnormal situations.

Keywords: receiving and dispatching trains, natural language processing, risk evaluation, K-means clustering

Procedia PDF Downloads 91
1958 Climate Related Financial Risk on Automobile Industry and the Impact to the Financial Institutions

Authors: Mahalakshmi Vivekanandan S.

Abstract:

As per the recent changes happening in the global policies, climate-related changes and the impact it causes across every sector are viewed as green swan events – in essence, climate-related changes can often happen and lead to risk and a lot of uncertainty, but needs to be mitigated instead of considering them as black swan events. This brings about a question on how this risk can be computed so that the financial institutions can plan to mitigate it. Climate-related changes impact all risk types – credit risk, market risk, operational risk, liquidity risk, reputational risk and other risk types. And the models required to compute this has to consider the different industrial needs of the counterparty, as well as the factors that are contributing to this – be it in the form of different risk drivers, or the different transmission channels or the different approaches and the granular form of data availability. This brings out the suggestion that the climate-related changes, though it affects Pillar I risks, will be a Pillar II risk. This has to be modeled specifically based on the financial institution’s actual exposure to different industries instead of generalizing the risk charge. And this will have to be considered as the additional capital to be met by the financial institution in addition to their Pillar I risks, as well as the existing Pillar II risks. In this paper, the author presents a risk assessment framework to model and assess climate change risks - for both credit and market risks. This framework helps in assessing the different scenarios and how the different transition risks affect the risk associated with the different parties. This research paper delves into the topic of the increase in the concentration of greenhouse gases that in turn cause global warming. It then considers the various scenarios of having the different risk drivers impacting the Credit and market risk of an institution by understanding the transmission channels and also considering the transition risk. The paper then focuses on the industry that’s fast seeing a disruption: the automobile industry. The paper uses the framework to show how the climate changes and the change to the relevant policies have impacted the entire financial institution. Appropriate statistical models for forecasting, anomaly detection and scenario modeling are built to demonstrate how the framework can be used by the relevant agencies to understand their financial risks. The paper also focuses on the climate risk calculation for the Pillar II Capital calculations and how it will make sense for the bank to maintain this in addition to their regular Pillar I and Pillar II capital.

Keywords: capital calculation, climate risk, credit risk, pillar ii risk, scenario modeling

Procedia PDF Downloads 140
1957 Analysis of Risks in Financing Agriculture a Case of Agricultural Cooperatives in Benue State, Nigeria

Authors: Odey Moses Ogah, Felix Terhemba Ikyereve

Abstract:

The study was carried out to analyzed risks in financing agriculture by agricultural cooperatives in Benue State, Nigeria. The study made use of research questionnaires for data collection. A multistage sampling technique was used to select a sample of 210 respondents from 21 agricultural cooperatives. Both descriptive and inferential statistics were employed in data analysis. Loan defaulting (66.7%) and reduction in savings by members (51.4%) were the major causes of risks faced by agricultural cooperatives in financing agriculture in the study area. Other causes include adverse changes in commodity prices (48.6%), disaster (45.7%), among others. It was found that risks adversely influence the profitability and competition of agricultural cooperatives (82.9%). Multiple regression analysis results showed that the coefficient of multiple determinations was 0.67, implying that the explanatory variables included in the model accounted for 67% of the variation in the level of profitability of agricultural cooperatives. The number of loans, average amount of loan and the interest rate were significant and important determinants of profitability of the cooperatives. The majority of the respondents (88.6%) made use of loan guarantors as a strategy of managing loan default/no repayment. It was found that the majority (70%) of the respondents were faced with the challenge of lack of insurance cover. The study recommends that agricultural cooperative officials should be encouraged to undergo formal training and education to easily acquire administrative skills in the management of agricultural loans; Farmer's loan size should be increased and released on time to enable them to use it effectively. Policies that enhance insuring farm activities should be put in place to discourage farmers from risk aversion.

Keywords: agriculture, analysis, cooperative, finance, risks

Procedia PDF Downloads 113
1956 Interpretation and Prediction of Geotechnical Soil Parameters Using Ensemble Machine Learning

Authors: Goudjil kamel, Boukhatem Ghania, Jlailia Djihene

Abstract:

This paper delves into the development of a sophisticated desktop application designed to calculate soil bearing capacity and predict limit pressure. Drawing from an extensive review of existing methodologies, the study meticulously examines various approaches employed in soil bearing capacity calculations, elucidating their theoretical foundations and practical applications. Furthermore, the study explores the burgeoning intersection of artificial intelligence (AI) and geotechnical engineering, underscoring the transformative potential of AI- driven solutions in enhancing predictive accuracy and efficiency.Central to the research is the utilization of cutting-edge machine learning techniques, including Artificial Neural Networks (ANN), XGBoost, and Random Forest, for predictive modeling. Through comprehensive experimentation and rigorous analysis, the efficacy and performance of each method are rigorously evaluated, with XGBoost emerging as the preeminent algorithm, showcasing superior predictive capabilities compared to its counterparts. The study culminates in a nuanced understanding of the intricate dynamics at play in geotechnical analysis, offering valuable insights into optimizing soil bearing capacity calculations and limit pressure predictions. By harnessing the power of advanced computational techniques and AI-driven algorithms, the paper presents a paradigm shift in the realm of geotechnical engineering, promising enhanced precision and reliability in civil engineering projects.

Keywords: limit pressure of soil, xgboost, random forest, bearing capacity

Procedia PDF Downloads 22
1955 Study of Treatment Plant of The City Chlef Study of Environmental Impact

Authors: Houmame Benbouali, Aboubakr Gribi

Abstract:

The risks, in general, exist in any project, one can hardly carry out a project without taking risks. The hydraulic works are rather complex projects in their design, realization and exploitation and are often subjected at the multiple risks being able to influence with their good performance and can have a negative impact on their environment. The present study was carried out to quote the impacts caused by purification plant STEP Chlef on the environment, it aims has studied the environmental impacts during construction and when designing this STEP, it is divided into two parts: The first part results from a research task bibliographer which contain three chapters (- cleansing of water-worn- general information on water worn-proceed of purification of waste water). The second part is an experimental part which is divided into four chapters (detailed state initial description of the station of purification-evaluation of the impacts of the project analyzes measurements and recommendations).

Keywords: treatment plant, waste water, waste water treatment, Chlef

Procedia PDF Downloads 334
1954 Risk Assessment Results in Biogas Production from Agriculture Biomass

Authors: Sandija Zeverte-Rivza, Irina Pilvere, Baiba Rivza

Abstract:

The use of renewable energy sources incl. biogas has become topical in accordance with the increasing demand for energy, decrease of fossil energy resources and the efforts to reduce greenhouse gas emissions as well as to increase energy independence from the territories where fossil energy resources are available. As the technologies of biogas production from agricultural biomass develop, risk assessment and risk management become necessary for farms producing such a renewable energy. The need for risk assessments has become particularly topical when discussions on changing the biogas policy in the EU take place, which may influence the development of the sector in the future, as well as the operation of existing biogas facilities and their income level. The current article describes results of the risk assessment for farms producing biomass from agriculture biomass in Latvia, the risk assessment system included 24 risks, that affect the whole biogas production process and the obtained results showed the high significance of political and production risks.

Keywords: biogas production, risks, risk assessment, biosystems engineering

Procedia PDF Downloads 415
1953 Spatial Variability of Soil Pollution and Health Risks Due to Long-Term Wastewater Irrigation in Egypt

Authors: Mohamed Eladham Fadl M. E. Fadl

Abstract:

In Egypt, wastewater has been used for irrigation in areas with fresh water scarcity. However, continuous applications may cause potential risks. Thus, the current study aims at screening the impacts of long-term wastewater irrigation on soil pollution and human health due to the exposure of heavy metals. Soils of nine sites in Al-Qalyubiyah Governorate, Egypt were sampled and analyzed for different properties. Wastewater resulted in a build-up of metals in soils. The pollution index (PI) showed the order of Cd > Pb > Ni > Zn. The integrated pollution index of Nemerow’s (IPIN) exceeded the safe limit of 0.7. The enrichment factor (EF) surpassed 1.0 value proving anthropogenic effects. The geo-accumulation index (Igeo) indicated that Pb, Ni, and Zn-induced none to moderate pollution, while high threats were associated with Cd. The calculated hazard index proved a potential health risk for humans, particularly children. It is recommended to perform a treatment to the wastewater used in irrigation to avoid such threats.

Keywords: pollution, health risks, heavy metals, effluent, irrigation, GIS techniques

Procedia PDF Downloads 338
1952 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 92
1951 Cyber Security and Risk Assessment of the e-Banking Services

Authors: Aisha F. Bushager

Abstract:

Today we are more exposed than ever to cyber threats and attacks at personal, community, organizational, national, and international levels. More aspects of our lives are operating on computer networks simply because we are living in the fifth domain, which is called the Cyberspace. One of the most sensitive areas that are vulnerable to cyber threats and attacks is the Electronic Banking (e-Banking) area, where the banking sector is providing online banking services to its clients. To be able to obtain the clients trust and encourage them to practice e-Banking, also, to maintain the services provided by the banks and ensure safety, cyber security and risks control should be given a high priority in the e-banking area. The aim of the study is to carry out risk assessment on the e-banking services and determine the cyber threats, cyber attacks, and vulnerabilities that are facing the e-banking area specifically in the Kingdom of Bahrain. To collect relevant data, structured interviews were taken place with e-banking experts in different banks. Then, collected data where used as in input to the risk management framework provided by the National Institute of Standards and Technology (NIST), which was the model used in the study to assess the risks associated with e-banking services. The findings of the study showed that the cyber threats are commonly human errors, technical software or hardware failure, and hackers, on the other hand, the most common attacks facing the e-banking sector were phishing, malware attacks, and denial-of-service. The risks associated with the e-banking services were around the moderate level, however, more controls and countermeasures must be applied to maintain the moderate level of risks. The results of the study will help banks discover their vulnerabilities and maintain their online services, in addition, it will enhance the cyber security and contribute to the management and control of risks that are facing the e-banking sector.

Keywords: cyber security, e-banking, risk assessment, threats identification

Procedia PDF Downloads 350
1950 Design of Dry Chemical Fire Extinguisher Inspection Equipment in Order to Reduce Ergonomic Risks for Fire Extinguisher Inspectors

Authors: Sitrapee Changmuenwai, Sudaratana Wongweragiat

Abstract:

It is important that a dry chemical fire extinguisher must be inspected for its readiness. For each inspection, the inspectors need to turn the fire extinguisher tank upside down to let the chemical inside the tank move and prevent solidification, which would make the tank not ready for usage when needed. Each tank weighs approximately 16 kg. The inspectors have to turn each tank upside down twice (2 minutes/round). They need to put the tanks over their shoulder close to their ear in order to hear the chemical flow inside the tank or use their hands to feel it. The survey and questionnaire 'The Questionnaire Know Body', which includes neck, left shoulder, upper and lower right arms suggest that all 12 security staffs have the same fatigues. The current dry chemical fire extinguisher inspection affects various ergonomic health problems. Rapid Entire Body Assessment (REBA) is used for evaluation of posture risks so that the working postures may be redesigned or corrected. The dry chemical fire extinguisher inspection equipment has been developed to reduce ergonomic health risks for the inspectors. A REBA analysis has been performed again, and the risk score has been decreased from 13 to 3. In addition, feedbacks from the first trial of the developed equipment show that there are demands to increase the installation in order to reduce the ergonomic health risks.

Keywords: dry chemical fire extinguisher inspection equipment, ergonomic, REBA, rapid entire body assessment

Procedia PDF Downloads 121
1949 Substation Automation, Digitization, Cyber Risk and Chain Risk Management Reliability

Authors: Serzhan Ashirov, Dana Nour, Rafat Rob, Khaled Alotaibi

Abstract:

There has been a fast growth in the introduction and use of communications, information, monitoring, and sensing technologies. The new technologies are making their way to the Industrial Control Systems as embedded in products, software applications, IT services, or commissioned to enable integration and automation of increasingly global supply chains. As a result, the lines that separated the physical, digital, and cyber world have diminished due to the vast implementation of the new, disruptive digital technologies. The variety and increased use of these technologies introduce many cybersecurity risks affecting cyber-resilience of the supply chain, both in terms of the product or service delivered to a customer and members of the supply chain operation. US department of energy considers supply chain in the IR4 space to be the weakest link in cybersecurity. The IR4 identified the digitization of the field devices, followed by digitalization that eventually moved through the digital transformation space with little care for the new introduced cybersecurity risks. This paper will examine the best methodologies for securing the electrical substations from cybersecurity attacks due to supply chain risks, and due to digitization effort. SCADA systems are the most vulnerable part of the power system infrastructure due to digitization and due to the weakness and vulnerabilities in the supply chain security. The paper will discuss in details how create a secure supply chain methodology, secure substations, and mitigate the risks due to digitization

Keywords: cybersecurity, supply chain methodology, secure substation, digitization

Procedia PDF Downloads 64
1948 Prescribed Organization of Nursing Work and Psychosocial Risks: A Cross-Sectional Study

Authors: Katerine Moraes dos Satons, Gisele Massante Peixoto Tracera, Regina Célia Gollner Zeitoune

Abstract:

To analyze the psychosocial risks related to the organization of nursing work in outpatient clinics of university hospitals. Cross-sectional epidemiological study developed in 11 outpatient units linked to the three public universities of the city of Rio de Janeiro, Brazil. Participants were 388 nursing professionals who worked in patient care at the time of the research. Data were collected from July to December 2018, using a self-applicable instrument. A questionnaire was used for sociodemographic, occupational and health characterization, and the Work Organization Scale. The bivariate analyses were performed using the odds ratio (OR), with a confidence interval of 95%, significance level of 5%. The organization of nursing work received an assessment of medium psychosocial risk by the professionals participating in the research, demanding interventions in the short and medium term. There was no association between sociodemographic, occupational and health characteristics and the organization of outpatient work. Interventional measures should be performed in the psychosocial risk factors presented in this research, with a view to improving the work environment, so that the importance of maintaining satisfactory material conditions is considered, as well as the adequate quantity of human resources. In addition, it aims to expand the spaces of nursing participation in decision- making, strengthening its autonomy as a profession.

Keywords: occupational risks, nursing, nursing team, worker’s health, psychosocial risks

Procedia PDF Downloads 96
1947 Risk-taking and Avoidance Decisions in Pandemic Agriculture in Georgia

Authors: Nino Damenia

Abstract:

The paper discusses the risks arising in agriculture in Georgia, the possibilities of their acceptance and prevention, the threat created by the pandemic crisis, and the state programs for overcoming them. The share of agriculture in the country's GDP is 8.3%. Over the past five years, Georgia has imported $ 5.9 billion worth of agri-food products. Despite these figures, agriculture has become an important sector for the Georgian government since 2012, as evidenced by the more than 1.5 billion GEL spent from the 2012-2020 budget for agricultural development. Any field of agriculture, be it poultry, livestock, cereals, fruits, or vegetables, is very sensitive to various climatic and viral risks. Avoiding these risks requires additional investment. It is noteworthy that small farms are mainly affected by the risks, while relatively large farms face fewer problems because they are relatively prepared to face the problems and can avoid them more easily. An example of viral risk in the article is the export of hazelnuts, which has quite a lot of potential. Due to the spoilage of the crop caused by Brown Marmorated Stink Bug (BMSB), hazelnut exports have declined considerably over the years. If the volume of hazelnuts exported in 2016 was 179 378 thousand USD, due to the deficit caused by Brown Marmorated Stink Bug (BMSB) in 2018, it became 57 124 thousand USD. And after the situation was relatively settled, hazelnut seedlings were poisoned. By 2020, this figure improved to 91,088 thousand US dollars. The development of the agricultural sector and the reduction of risks require technological development, investor interest, and even more state support to enable more small farms to have the potential for greater production and sustainable development. The aim of the study is to identify the risks arising in the agricultural sector of Georgia before and after the pandemic, to evaluate them, compare them with the agriculture of some European countries, and to develop the necessary recommendations to avoid the emerging risks. The research uses methods of analysis and synthesis, observation, induction, deduction, and analysis of statistics. The paper is based on both Georgian and foreign scientific research, as well as state-published documentation on agricultural assistance programs. The research is based on the analysis of data published by the European Statistics Office, the National Statistics Office of Georgia, and many other organizations. The results of the study and the recommendations will help reduce the risks in agriculture in Georgia and, in general, to identify the existing potential and the development of the sector as a whole.

Keywords: risk, agriculture, pandemi, brown marmorated stink bug (BMSB)

Procedia PDF Downloads 120
1946 Comparing Field Displacement History with Numerical Results to Estimate Geotechnical Parameters: Case Study of Arash-Esfandiar-Niayesh under Passing Tunnel, 2.5 Traffic Lane Tunnel, Tehran, Iran

Authors: A. Golshani, M. Gharizade Varnusefaderani, S. Majidian

Abstract:

Underground structures are of those structures that have uncertainty in design procedures. That is due to the complexity of soil condition around. Under passing tunnels are also such affected structures. Despite geotechnical site investigations, lots of uncertainties exist in soil properties due to unknown events. As results, it possibly causes conflicting settlements in numerical analysis with recorded values in the project. This paper aims to report a case study on a specific under passing tunnel constructed by New Austrian Tunnelling Method in Iran. The intended tunnel has an overburden of about 11.3m, the height of 12.2m and, the width of 14.4m with 2.5 traffic lane. The numerical modeling was developed by a 2D finite element program (PLAXIS Version 8). Comparing displacement histories at the ground surface during the entire installation of initial lining, the estimated surface settlement was about four times the field recorded one, which indicates that some local unknown events affect that value. Also, the displacement ratios were in a big difference between the numerical and field data. Consequently, running several numerical back analyses using laboratory and field tests data, the geotechnical parameters were accurately revised to match with the obtained monitoring data. Finally, it was found that usually the values of soil parameters are conservatively low-estimated up to 40 percent by typical engineering judgment. Additionally, it could be attributed to inappropriate constitutive models applied for the specific soil condition.

Keywords: NATM, surface displacement history, numerical back-analysis, geotechnical parameters