Search results for: aid projects and South-South cooperation
2819 Optimising GIS in Cushioning the Environmental Impact of Infrastructural Projects
Authors: Akerele Akintunde Hareef
Abstract:
GIS is an integrating tool for storing, retrieving, manipulating, and analyzing spatial data. It is a tool which defines an area with respect to features and other relevant thematic delineations. On the other hand, Environmental Impact Assessment in short is both positive and negative impact of an infrastructure on an environment. Impact of infrastructural projects on the environment is an aspect of development that barely get extensive portion of pre-project execution phase and when they do, the effects are most times not implemented to cushion the impact they have on human and the environment. In this research, infrastructural projects like road constructions, water reticulation projects, building constructions, bridge etc. have immense impact on the environment and the people that reside in location of construction. Hence, the need for this research tends to portray the relevance of Environmental Impact assessment in calculating the vulnerability of human and the environment to imbalance necessitated by this infrastructural development and how the use of GIS application can be optimally applied to annul or minimize the effect.Keywords: environmental impact assessment (EIA), geographic information system (GIS), infrastructural projects, environment
Procedia PDF Downloads 5522818 Surveying Apps in Dam Excavation
Authors: Ali Mohammadi
Abstract:
Whenever there is a need to dig the ground, the presence of a surveyor is required to control the map. In projects such as dams and tunnels, these controls are more important because any mistakes can increase the cost. Also, time is great importance in These projects have and one of the ways to reduce the drilling time is to use techniques that can reduce the mapping time in these projects. Nowadays, with the existence of mobile phones, we can design apps that perform calculations and drawing for us on the mobile phone. Also, if we have a device that requires a computer to access its information, by designing an app, we can transfer its information to the mobile phone and use it, so we will not need to go to the office.Keywords: app, tunnel, excavation, dam
Procedia PDF Downloads 672817 Cross- Cultural Cooperation and Innovation: An Exploration of Chinese Foreign Direct Investment in Europe
Authors: Yongsheng Guo, Shuchao Li
Abstract:
This study explores Chinese foreign direct investment (FDI) in Europe and the cross-cultural cooperation between Chinese and European managers. The aim of this research is to shed light on the phenomenon of investments in developed countries from an emerging market and to gain insights into the cooperation process. A grounded theory approach is adopted, and 46 semi-structured interviews were conducted with 10 case companies in Germany and 13 case companies in the UK. Grounded theory models are developed from primary data and interview quotes are used to support the themes. The interviewees perceived differences between the two parties in cultural traits, management concepts, knowledge structure and resource endowment between the two parties. Chinese and European partners can take advantage of different resources and cooperate in innovative ways to improve corporate performance. Moreover, both parties appreciate different ethical and cultural characteristics and complement each other to develop a combined organizational culture. This study proposes an ethical and cultural diversity theory in international management arguing that a team with diversified values and behaviors may be more excited and motivated. This study suggests that “resource complement” and “cross-cultural cooperation” might be an advantage for international investment. Firms are encouraged to open their minds and cooperate with partners with different resources and cultures. The authorities may review the FDI policies to reduce social and political barriers.Keywords: cross-culture, FDI, cooperation, innovation, China, Europe
Procedia PDF Downloads 972816 Risk Management in Construction Projects
Authors: Mustafa Dogru, Ruveyda Komurlu
Abstract:
Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.Keywords: construction projects, construction management, project management, risk management
Procedia PDF Downloads 3192815 Changing the Dynamics of the Regional Water Security in the Mekong River Basin: An Explorative Study Understanding the Cooperation and Conflict from Critical Hydropolitical Perspective
Authors: Richard Grünwald, Wenling Wang, Yan Feng
Abstract:
The presented paper explores the changing dynamics of regional water security in the Mekong River Basin and examines the contemporary water-related challenges from a critical hydropolitical perspective. By drawing on the Lancang-Mekong Cooperation and Conflict Database (LMCCD) recording more than 3000 water-related events within the basin in the last 30 years, we identified several trends changing the dynamics of the regional water security in the Mekong River Basin. Firstly, there is growing politicization of water that is no longer interpreted as abundant. While some scientists blame the rapid basin development, particularly in upstream countries, other researchers consider climate change and cumulative environmental impacts of various water projects as the main culprit for changing the water flow. Secondly, there is an increasing securitization of large-scale hydropower dams with questionable outcomes. Despite hydropower dams raise many controversies, many riparian states push the development at all cost. Such water security dilemma can be especially traced to Laos and Cambodia, which highly invest in the hydropower sector even at the expense of the local environment and good relations with neighbouring countries situated lower on the river. Thirdly, there is a lack of accountable transboundary water governance that will effectively face a looming water crisis. To date, most of the existing cooperation mechanisms are undermined by the geopolitical interests of foreign donors and increasing mistrust to scientific approaches dealing with water insecurity. Our findings are beneficial for the policy-makers and other water experts who want to grasp the broader hydropolitical context in the Mekong River Basin and better understand the new water security threats, including misinterpretation of the hydrological data and legitimization of the pro-development narratives.Keywords: critical hydropolitics, mekong river, politicization of science, water governance, water security
Procedia PDF Downloads 2132814 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan
Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon
Abstract:
Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.Keywords: BTC Model, project time, relationship of time cost, regression
Procedia PDF Downloads 3822813 Factors Constraining the Utilization of Risk Management Strategies in the Execution of Public Construction Projects in North East Nigeria
Authors: S. U. Kunya, S. A. Mohammad
Abstract:
Construction projects in Nigeria are characterized with risks emanating from delays and accompanying cost-overruns. The aim of the study was to identify and assess factors constraining the utilization of risk management strategies in the execution of public construction project in North-East Nigeria. Data was collected with the aid of a well-structured questionnaire administered to three identified projects in the North-east. Data collected were analysed using the severity index. Findings revealed political involvement, selection of inexperienced contractors and lack of coordinated public sector strategy as the most severe factors constraining the utilization of risk management strategies. The study recommended that: formulation of laws to prevent negative political meddling in construction projects; selection of experienced, risk-informed contractors; and comprehensive risk assessment and planning on all public construction projects.Keywords: factors, Nigeria, north-east, public projects, risk management, strategies, utilization
Procedia PDF Downloads 5322812 Competition and Cooperation of Prosumers in Cournot Games with Uncertainty
Authors: Yong-Heng Shi, Peng Hao, Bai-Chen Xie
Abstract:
Solar prosumers are playing increasingly prominent roles in the power system. However, its uncertainty affects the outcomes and functions of the power market, especially in the asymmetric information environment. Therefore, an important issue is how to take effective measures to reduce the impact of uncertainty on market equilibrium. We propose a two-level stochastic differential game model to explore the Cournot decision problem of prosumers. In particular, we study the impact of punishment and cooperation mechanisms on the efficiency of the Cournot game in which prosumers face uncertainty. The results show that under the penalty mechanism of fixed and variable rates, producers and consumers tend to take conservative actions to hedge risks, and the variable rates mechanism is more reasonable. Compared with non-cooperative situations, prosumers can improve the efficiency of the game through cooperation, which we attribute to the superposition of market power and uncertainty reduction. In addition, the market environment of asymmetric information intensifies the role of uncertainty. It reduces social welfare but increases the income of prosumers. For regulators, promoting alliances is an effective measure to realize the integration, optimization, and stable grid connection of producers and consumers.Keywords: Cournot games, power market, uncertainty, prosumer cooperation
Procedia PDF Downloads 1072811 Interface Problems in Construction Projects
Authors: Puti F. Marzuki, Adrianto Oktavianus, Almerinda Regina
Abstract:
Interface problems among interacting parties in Indonesian construction projects have most often led to low productivity and completion delay. In the midst of this country’s needs to accelerate construction of public infrastructure providing connectivity among regions and supporting economic growth as well as better living quality, project delays have to be seriously addressed. This paper identifies potential causes factors of interface problems experienced by construction projects in Indonesia. Data are collected through a survey involving the main actors of six important public infrastructure construction projects including railway, LRT, sports stadiums, apartment, and education building construction projects. Five of these projects adopt the design-build project delivery method and one applies the design-bid-build scheme. Interface problems’ potential causes are categorized into contract, management, technical experience, coordination, financial, and environmental factors. Research results reveal that, especially in railway and LRT projects, potential causes of interface problems are mainly technical and managerial in nature. These relate to complex construction execution in highly congested areas. Meanwhile, coordination cause factors are mainly found in the education building construction project with loan from a foreign donor. All of the six projects have to resolve interface problems caused by incomplete or low-quality contract documents. This research also shows that the design-bid-build delivery method involving more parties in construction projects tends to induce more interface problem cause factors than the design-build scheme.Keywords: cause factors, construction delays, project delivery method, contract documents
Procedia PDF Downloads 2552810 Member States 'Perception of Threat' to Migration Crises as a Determinant Factor of Change in Cooperation: A Comparison between the Yugoslav Migration Crisis and the Syrian Refugees' Crisis
Authors: Diego Caballero Vélez
Abstract:
In 1997 the Schengen Convention was incorporated in the mainstream of EU law by the Amsterdam Treaty. It came into effect in 1999 with the abolition of internal border controls in the EU, a milestone in the European integration project. In the meantime, due to the Yugoslav wars, nearly 700,000 asylum applications were filed in the European countries provoking a major refugee crisis. During this period, the opening of Eastern Europe fostered more cooperation and policy-making at the EU level in migration issues. Currently, a similar migratory crisis is taking place in Europe. The Syrian war has caused the most massive influx of immigrants in Europe since World War II. Nevertheless, the EU is adopting different migration policies from those implemented during the Yugoslav migration crisis. The current crisis has not led to a common European position but national responses have been offered on migration policies and responsibility for border security and asylum-seekers. A lot of factors can explain this change from a cooperation scenario to a no cooperation one, such as the economic crisis, but this research is focused on the premise that 'threat perception' lies at the core of some states grand strategies towards migration and it also influences in multilateral or unilateral responses. Migration rests at the nexus of three dimensions of security, including geopolitical interests, material production, and internal security. According to some scholars, migration policy is an 'integral instrument' of state grand strategy in that context. Political integration at the EU might be altered with the emergence of existential threats. In other words, some areas of the European cooperation can be transformed when a 'critical juncture' occurs, for instance a migration crisis. In that instance, Member states could see migration as a matter of threat that modifies their national interests and willingness to embrace international cooperation. This research will focus on EU Member states´ perceptions of the 90´s migration crisis and the current one. The goal is to evaluate to what extent the perceptions of threat are one of the main factors for explaining the transition from a cooperation scenario to a no-cooperation one in European asylum and security policies. To analyze threat perception in both migration crisis, some relevant Member states are treated as cases of study and a comparative analysis is carried out based on public opinion polls, public and policy discourse in migration, voting practices and deconstruction of the migration policies themselves both at EU level and a national one.Keywords: cooperation, migration crisis, national responses, threat perception
Procedia PDF Downloads 2392809 Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area
Authors: Yousef S. Al-Othman
Abstract:
The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.Keywords: oil and gas, risk management, construction projects, project lead time
Procedia PDF Downloads 1072808 An Introduction to Critical Chain Project Management Methodology
Authors: Ranjini Ramanath, Nanjunda P. Swamy
Abstract:
Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.Keywords: critical chain project management methodology, critical chain, project management, construction management
Procedia PDF Downloads 4232807 Identification of Social Responsibility Factors within Mega Construction Projects
Authors: Ali Alotaibi, Francis Edum-Fotwe, Andrew Price /
Abstract:
Mega construction projects create buildings and major infrastructure to respond to work and life requirements while playing a vital role in promoting any nation’s economy. However, the industry is often criticised for not balancing economic, environmental and social dimensions of their projects, with emphasis typically on one aspect to the detriment of the others. This has resulted in many negative impacts including environmental pollution, waste throughout the project lifecycle, low productivity, and avoidable accidents. The identification of comprehensive Social Responsibility (SR) indicators, which combine social, environmental and economic aspects, is urgently needed. This is particularly the case in the context of the Kingdom of Saudi Arabia (KSA), which often has mega public construction projects. The aim of this paper is to develop a set of wide-ranging SR indicators which encompass social, economic and environmental aspects unique to the KSA. A qualitative approach was applied to explore relevant indicators through a review of the existing literature, international standards and reports. A list of appropriate indicators was developed, and its comprehensiveness was corroborated by interviews with experts on mega construction projects working with SR concepts in the KSA. The findings present 39 indicators and their metrics, covering 10 economic, 12 environmental and 17 social aspects of SR mapped against their references. These indicators are a valuable reference for decision-makers and academics in the KSA to understand factors related to SR in mega construction projects. The indicators are related to mega construction projects within the KSA and require validation in a real case scenario or within a different industry to demonstrate their generalisability.Keywords: social responsibility, construction projects, economic, social, environmental, indicators
Procedia PDF Downloads 1682806 The Role of Institutions in Community Wildlife Conservation in Zimbabwe
Authors: Herbert Ntuli, Edwin Muchapondwa
Abstract:
This study used a sample of 336 households and community level data from 30 communities around the Gonarezhou National Park in Zimbabwe to analyse the association between ability to self-organize or cooperation and institutions on one hand and the relationship between success of biodiversity outcomes and cooperation on the other hand. Using both the ordinary least squares and instrumental variables estimation with heteroskedasticity-based instruments, our results confirmed that sound institutions are indeed an important ingredient for cooperation in the respective communities and cooperation positively and significantly affects biodiversity outcomes. Group size, community level trust, the number of stakeholders and punishment were found to be important variables explaining cooperation. From a policy perspective, our results show that external enforcement of rules and regulations does not necessarily translate into sound ecological outcomes but better outcomes are attainable when punishment is rather endogenized by local communities. This seems to suggest that communities should rather be supported in such a way that robust institutions that are tailor made to suit the needs of local condition will emerge that will in turn facilitate good environmental husbandry. Cooperation, training, benefits, distance from the nearest urban canter, distance from the fence, social capital average age of household head, fence and information sharing were found to be very important variables explaining the success of biodiversity outcomes ceteris paribus. Government programmes should target capacity building in terms of institutional capacity and skills development in order to have a positive impact on biodiversity. Hence, the role of stakeholders (e.g., NGOs) in capacity building and government effort should complement each other to ensure that the necessary resources are mobilized and all communities receive the necessary training and resources.Keywords: institutions, self-organize, common pool resources, wildlife, conservation, Zimbabwe
Procedia PDF Downloads 2812805 Factors Affecting Time Performance in Building Construction Projects
Authors: Ibraheem A. K. Mahameed
Abstract:
The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.Keywords: delay, time performance, construction, building
Procedia PDF Downloads 4702804 Examination of the Impact of Projects Based on Reggio Emilia Approach on the Creative Thinking Skills of Preschool Children: A Qualitative Study
Authors: Arzu Akar Gençer, Mübeccel Gönen
Abstract:
The objective of the study is to investigate the impact of the projects based on Reggio Emilia Approach, on the creative thinking skills of preschool children. The study is carried out with eighteen 6 years old children in a class of a preschool, and entailed the development of projects based on Reggio Emilia approach with the children, for a period of 3 months. The study employs qualitative model. The children were analyzed with reference to the creative thinking aspects (rationality, originality, flexibility, and applicability) of the projects applied. As the projects based on Reggio Emilia approach arose out of the interests and curiosity of the children, and had their roots in the existing class culture, it is possible to conclude that they have an impact on the creativity of the children with reference to the aspects of creative thinking.Keywords: Reggio Emilia approach, project, creativity, preschool children
Procedia PDF Downloads 5812803 Problems in Establishing Alliances to Comply with SDG 17 in the Successful Execution of Environmental Conservation Projects
Authors: Elena Bulmer
Abstract:
The research for this study has found that the formation of alliances for the successful revitalization of the global partnership for sustainable development, as defined by UN Sustainable Development Goal 17, entails considerable difficulty. This study uses for its empirical work marine environmental conservation projects and analyses the potential involvement of nonhuman actors as primordial stakeholders in these types of projects. The idea is to extend the scope of SDG 17 for it to also consider nonhuman subjects in order for it to better achieve its goal. The results of this study may be extrapolated to the business and management fields, which depend on natural resources for the development of their products. In the same way, in these areas, natural resources as nonhuman actors are not present in the stakeholder maps of these projects. Environmental Conservation projects are thus especially interesting to study with regards to their stakeholder context and have been used as the experimental setting for the empirical work of this study. The primordial stakeholders of these projects are not social objects and therefore go beyond the present limits of present stakeholder theory. The study that has been used to analyse this concept is a marine conservation project based in Spain, and to shed light in potential extending the role of the 17th Sustainable Development Goal to include nonhuman beings to be able to better achieve the rest of the SDGs, in this case, SDG 14 whose aim is to promote the conservation and sustainability of the world´s oceans.Keywords: SDG 17, sustainability, stakeholder management, environmental conservation projects
Procedia PDF Downloads 2142802 Partner Selection for Innovation Projects Related to New Product Concept Design
Authors: Odd Jarl Borch, Marina Z. Solesvik
Abstract:
The paper analyses partner selection approaches related to large scale R&D-based innovation projects at the different stages of development. We emphasize innovation projects in the maritime value chain and how partners are selected to improve quality according to high spec customer demands, and to reduce investment costs on new production technology such as advanced offshore service vessels. We elaborate on the differences in innovation approach and especially the role that purposive inflows and outflows of knowledge from external partners may be used to accelerate internal innovation. We present three cases related to different projects in terms of specificity and scope. We explore how the partner selection criteria change over time when the goals move from wide scope to a very specific R&D tasks.Keywords: partner selection, innovation, offshore industry, concept design
Procedia PDF Downloads 5142801 Analysis of Delay Causes in Construction Projects in Saudi Arabia
Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni
Abstract:
This study aims at identifying the risk matrix for delay causes in construction projects in Saudi Arabia from consultants’ viewpoint. A questionnaire survey was undertaken of 51 consultants working on construction projects in the Northern Province of Saudi Arabia. 35 delay causes were identified through a literature review. The study concluded that the top delay causes in construction projects in Saudi Arabia from consultants’ perspective are: bid award for lowest price, changes in material types and specifications during construction, contract management, duration of contract period, fluctuation of prices of materials, frequent changes in design, improper planning, inflationary pressure, lack of adequate manpower, long period of design and time of implementation, payments delay, poor labor productivity, and rework.Keywords: delays, construction, consultants, contributors, risk map
Procedia PDF Downloads 5412800 Major Causes of Delay in Construction Projects
Authors: Y. Gholipour, E. Rezazadeh
Abstract:
Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.Keywords: delay, dam construction, project management, Iran
Procedia PDF Downloads 4442799 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects
Authors: Ali Fazeli Moslehabadi
Abstract:
One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques
Procedia PDF Downloads 1572798 Defence Diplomacy and Collective Security in Africa: Case of Rwanda Defence Forces
Authors: Emmanuel Mugiraneza
Abstract:
Rwanda uses defence diplomacy to pursue international collective security through different mechanisms. This paper shows that with an intent of promoting international collective security, Rwanda has constituted its defense diplomacy policy in three standpoints. First, Rwanda has formed strategic cooperation alliances with state actors, regional and international Organizations that enables her to participate in and promote international collective peace, security and cooperation. Secondary, Rwanda uses defence diplomacy to foster cooperation in to pre-empt, minimize and neutralize potential triggers that would lead to the outbreak of international conflict. Thirdly, Rwanda implements defence diplomacy policy strategy through internationally recognized operational and tactical standards while dispelling hostilities, assisting the friendly nation’s forces and or building and maintaining public confidence and trust in the areas where Rwanda Defence Force deploys for peacekeeping missions in Sudan, South Sudan, Central African Republic and Mozambique for a counterterrorism mission.Keywords: defence diplomacy, collective security, Rwanda, Peacekeeping
Procedia PDF Downloads 1232797 The Importance of Adopting Sustainable Practices in Power Projects
Authors: Sikander Ali Abbassi, Wazir Muhmmad Laghari, Bashir Ahmed Laghari
Abstract:
Attaining sustainable development is one of the greatest challenges facing Pakistan today. A challenge that can only be met by developing and deploying confidence among the people. Transparency in project activities at all stages and other measures will also enhance its social and economic growth. Adopting sustainable practices and sensible policies, we mean that project activity should be economically viable, socially acceptable and environment friendly. In order to achieve this objective, there must be a continued commitment to encourage and ensure the public participation in development of power projects. Since Pakistan is an energy deficient country, it has to initiate power projects on a large scale in the near future. Therefore, it is the need of the hour to tackle these projects in a sustainable way, so that it can be benefited to the maximum possible level and have the least adverse effects on people and the environment. In order to get desirable results, careful planning, efficient implementation, standardized operational practices and community participation are the key parameters which ensure the positive impacts on economy, prosperity and the well being of our people. This paper pinpoints the potential environmental hazards due to project activity and emphasizes to adopt sustainable approaches in power projects.Keywords: environmental hazards, sustainable practices, environment friendly, power projects
Procedia PDF Downloads 3892796 Risk Prioritization in Tunneling Construction Projects
Authors: David Nantes, George Gilbert
Abstract:
There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects
Procedia PDF Downloads 922795 Feasibility Studies in Public Construction Projects in South Africa: Barriers and Implications
Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke
Abstract:
The practice of feasibility studies plays a huge role in the success of construction projects. Feasibility studies according to several research should be the reason for embarking on any project. However, it has been discovered that in South Africa (SA), feasibility studies are mainly done in the private sector construction but skipped in the construction of most public projects. Hence, this study aims to evaluate the barriers to feasibility studies practice in public projects and the implications. A survey design was adopted. A total number of One hundred and fifty (150) questionnaires were administered to Quantity Surveyors, Construction managers, Construction project managers, Project managers, Architects and Civil and Structural engineers in Guateng Province, SA and ninety (90) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that political interference and corruption are the most significant barriers to feasibility studies practice in the public construction projects in SA, while late project completion, poor quality infrastructure are among the implication of not conducting feasibility studies in SA public projects. Therefore, the study recommends the development of a framework for public projects execution that will reduce the interference of the political class in the country, that way the risk of late project completion and poor quality infrastructure will be mitigated.Keywords: arriers, feasibility studies, public construction, South Africa.
Procedia PDF Downloads 892794 An Exploratory Study on Challenges of Public Private Partnership Projects in Oman
Authors: Omar Amoudi, Mariya Khalid
Abstract:
The limitation of the public funds for the infrastructure projects and with the deterioration of international oil prices and the negative consequences on the economies of oil producing and exporting countries, Oman has encouraged the partnership between the public and private sectors. As the private sector has a role in planning, financing, designing, operating and the maintenance of the public services. There is no doubt that, the adoption of Public Private Partnership (PPP) strategy faces many challenges which might affect the project seriously if it is not overcome in earlier time. These challenges depend on the level of understanding of the strategy, the roles and regulations and the availability of resources as well. This research aims at identifying the challenges facing the PPP infrastructure projects in Oman based on the similar previous studies supported by questionnaire survey and semi structured interviews. It also seeks to discuss the rationale for adoption in Oman and uncover the current status of PPP strategy. The identified challenges were ranked according to the importance index of each challenge. After analysis of data, it has observed that, the main challenges facing PPPs projects in Oman are high participation cost, high projects cost and regulation changes. The PPP strategy has to be adopted well and with a high level of experience in order to ensure a successful implementation of PPP projects in Oman.Keywords: public private partnership (PPP), challenges, infrastructure, Oman
Procedia PDF Downloads 3032793 A New Mathematical Model for Scheduling Preventive Maintenance and Renewal Projects of Multi-Unit Systems; Application to Railway Track
Authors: Farzad Pargar
Abstract:
We introduce the preventive maintenance and renewal scheduling problem for a multi-unit system over a finite and discretized time horizon. Given the latest possible time for carrying out the next maintenance and renewal projects after the previous ones and considering several common set-up costs, the introduced scheduling model tries to minimize the cost of projects by grouping them and simultaneously finding the optimal balance between doing maintenance and renewal. We present a 0-1 pure integer linear programming that determines which projects should be performed together on which location and in which period (e.g., week or month). We consider railway track as a case for our study and test the performance of the proposed model on a set of test problems. The experimental results show that the proposed approach performs well.Keywords: maintenance, renewal, scheduling, mathematical programming model
Procedia PDF Downloads 6872792 An Assessment on the Effect of Participation of Rural Woman on Sustainable Rural Water Supply in Yemen
Authors: Afrah Saad Mohsen Al-Mahfadi
Abstract:
In rural areas of developing countries, participation of all stakeholders in water supply projects is an important step towards further development. As most of the beneficiaries are women, it is important that they should be involved to achieve successful and sustainable water supply projects. Women are responsible for the management of water both inside and outside home, and often spend more than six-hours a day fetching drinking water from distant water sources. The problem is that rural women play a role of little importance in the water supply projects’ phases in rural Yemen. Therefore, this research aimed at analyzing the different reasons of their lack of participation in projects and in what way a full participation -if achieved- could contribute to sustainable water supply projects in the rural mountainous areas in Yemen. Four water supply projects were selected as a case study in Al-Della'a Alaala sub-district in the Al-Mahweet governorate, two of them were implemented by the Social Fund and Development (SFD), while others were implemented by the General Authority for Rural Water Supply Projects (GARWSSP). Furthermore, the successful Al-Galba project, which is located in Badan district in Ibb governorate, was selected for comparison. The rural women's active participation in water projects have potential consequences including continuity and maintenance improvement, equipment security, and improvement in the overall health and education status of these areas. The majority of respondents taking part in GARWSSP projects estimated that there is no reason to involve women in the project activities. In the comparison project - in which a woman worked as a supervisor and implemented the project – all respondents indicated that the participation of women is vital for sustainability. Therefore, the results of this research are intended to stimulate rural women's participation in the mountainous areas of Yemen.Keywords: assessment, rural woman, sustainability, water management
Procedia PDF Downloads 6902791 An Explorative Study of the Application of Project Management in German Research Projects
Authors: Marcel Randermann, Roland Jochem
Abstract:
Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.Keywords: academics, project management methods, research and science projects, scientist's mindset
Procedia PDF Downloads 1982790 Impact of Trade Cooperation of BRICS Countries on Economic Growth
Authors: Svetlana Gusarova
Abstract:
The essential role in the recent development of world economy has led to the developing countries, notably to BRICS countries (Brazil, Russia, India, China, South Africa). Over the next 50 years the BRICS countries are expected to be the engines of global trade and economic growth. Trade cooperation of BRICS countries can enhance their economic development. BRICS countries were among Top 10 world exporters of office and telecom equipment, of textiles, of clothing, of iron and steel, of chemicals, of agricultural products, of automotive products, of fuel and mining products. China was one of the main trading partners of all BRICS countries, maintaining close relationship with all BRICS countries in the development of trade. Author analyzed trade complementarity of BRICS countries and revealed the high level of complementarity of their trade flows in connection with availability of specialization in different types of goods. The correlation and regression analysis of communication of Intra-BRICS merchandise turnover and their GDP (PPP) revealed very strong impact on the development of their economies.Keywords: BRICS countries, trade cooperation, complementarity, regression analysis
Procedia PDF Downloads 281