Search results for: construction businesses
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4510

Search results for: construction businesses

4450 Labour-saving Construction Using Buildability Framework through Strengthening Designers in Delivering More Buildable Designs

Authors: Muhammad Lawal A., Abdullateef Abdulkarim Jimoh

Abstract:

This study is to appraise the labour-saving construction methods achievable using a buildability framework through an improved design system. Adoption of labour-efficient technology and construction techniques will be necessary to supplement good buildable designs. Increased usage of prefabricated, modular, and standardized construction components, simplicity in the design, and the number of integrated elements all work to advance buildable design. The objectives of the study include `determining a more efficient buildability framework for designers to achieve labour-saving construction’. 20 completed building projects in Birnin Kebbi, Nigeria, is used as a case study to buttress the proposition that `a more buildable design using buildability frame result in labour-saving in construction adopting a Singapore study approach.

Keywords: buildability framework, buildable designs, construction, labour-saving construction

Procedia PDF Downloads 86
4449 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis

Authors: Tharaki S. Hettiarachchi

Abstract:

Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.

Keywords: construction, framework development, project management, sustainability

Procedia PDF Downloads 44
4448 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 452
4447 Achieving Sustainable Rapid Construction Using Lean Principles

Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof

Abstract:

There is the need to take the holistic approach in achieving sustainable construction for a contemporary practice. Sustainable construction is the practice that involved method of human preservation of the environment, whether economically or socially through responsibility, management of resources and maintenance utilizing support. This paper shows the correlation of achieving rapid construction with sustainable concepts using lean principles. Lean principles being used widely in the manufacturing industry, but this research will demonstrate the principles into building construction. Lean principle offers the benefits of stabilizing work flow and elimination of unnecessary work. Therefore, this principle contributes to time and waste reduction. The correlation shows that pulling factor provides the improvement of progress curve and stabilizing the time-quality relation. The finding shows the lean principles offer the elements of rapid construction synchronized with the elements of sustainability.

Keywords: sustainable construction, rapid construction, time reduction, lean construction

Procedia PDF Downloads 228
4446 Causes and Effects of Delays in Construction Projects in Akure, Ondo State, South-West Nigeria

Authors: K.T Alade, A.F Lawal, A.A Omonori

Abstract:

Construction is an everlasting activity across the globe. Likewise, the problem of delay in the construction industry is a global phenomenon. Although there are several reasons that may be responsible for delay during construction, this may vary from place to place and can be reduced to the minimum when identified. This study considered the major causes and effects of delay in the execution of construction projects in Akure, Ondo State, Nigeria. Using literatures, a total number of 30 causes of construction delays were identified. The convenient sampling technique was used to select sixty respondents for a survey. The respondents comprise twenty-two (22) clients, eighteen consultants (18) and twenty (20) contractors. The analyses of the primary data revealed that the three most important causes of delay in construction projects in Akure, Ondo State Nigeria are poor site management and supervision, inadequate contractors experience and client’s financial difficulties. Based on the findings of this study, recommendations were given on how the causes and effects of delay in construction can be mitigated.

Keywords: Akure, causes, construction projects, delay, effects

Procedia PDF Downloads 497
4445 Government Payments to Minority American Producers

Authors: Anil K. Giri, Dipak Subedi, Kathleen Kassel, Ashok Mishra

Abstract:

The United States Department of Agriculture’s programs has been accused of being discriminatory in the past based on the race of the farmer, especially African-American producers. This study examines if there was racial discrimination in payments from the most recent new USDA programs, including those made in response to the pandemic. This study uses the Analysis of Variance (ANOVA) to examine the payments after normalizing them relative to cash receipts to test if discrimination in the number of payments received exists. Three programs investigated in this study are: i) the Coronavirus Food Assistance Program (CFAP), ii) the Market Facilitation Program (MFP), and (iii) the Paycheck Protection Program (PPP). The PPP program was administered by the Small Business Administration, whereas the other two were designed and implemented by the USDA. The PPP made forgivable loans to small businesses and, initially, was heavily criticized for not reaching minority businesses (in general). The Small Business Administration then initiated a second draw of PPP loans, prioritizing minority-owned businesses. This study compares attributes of PPP loans made to African-American farming businesses and other farming businesses in the two draws of the PPP. We find that the number of African-American farming businesses participating in the second draw of PPP loans decreased significantly from the first draw. However, the average amount of PPP loans to African-American farming businesses increased in the second draw. In the first draw, the average cost of jobs reported per loan was higher for African-American farming businesses than for other producers. In the second draw, the average cost of jobs reported per loan was significantly higher for other farming businesses than for African-American businesses. The share of PPP loans forgiven for African-American farming businesses is significantly below the national rate of 89 percent. The rate of forgiveness for PPP loans made to African-American producers is unlikely to increase significantly without policy changes. This can increase financial burdens in the future to farm operations operated by African- Americans. Finally, we conclude that the initial goal of increasing minority participation in PPP loans in the second draw, at least among African-Americans in the agricultural sector, did not meet. CFAP made almost $600 million in direct payments to minority producers, including Black producers. Black or African American producers received more than $52 million in CFAP payments. CFAP payments were proportional to the value of agricultural commodities sold for most minority producers. The 2017 Census of Agriculture showed that the majority of minority producers, including African American producers but excluding Asian producers, raised livestock. CFAP made the highest payments to livestock minority producers.

Keywords: United States department of agriculture (USDA), coronavirus food assistance program (CFAP), paycheck protection program (PPP), African-American producers, minority American producers

Procedia PDF Downloads 84
4444 Hybrid Concrete Construction (HCC) for Sustainable Infrastructure Development in Nigeria

Authors: Muhammad Bello Ibrahim, M. Auwal Zakari, Aliyu Usman

Abstract:

Hybrid concrete construction (HCC) combines all the benefits of pre-casting with the advantages of cast in-situ construction. Merging the two, as a hybrid structure, results in even greater construction speed, value, and the overall economy. Its variety of uses has gained popularity in the United States and in Europe due to its distinctive benefits. However, the increase of its application in some countries (including Nigeria) has been relatively slow. Several researches have shown that hybrid construction offers an ultra-high performance concrete that offers superior strength, durability and aesthetics with design flexibility and within sustainability credentials, based on the available and economically visible technologies. This paper examines and documents the criterion that will help inform the process of deciding whether or not to adopt hybrid concrete construction (HCC) technology rather than more traditional alternatives. It also the present situation of design, construction and research on hybrid structures.

Keywords: hybrid concrete construction, Nigeria, sustainable infrastructure development, design flexibility

Procedia PDF Downloads 539
4443 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 431
4442 Development of Construction Cost Optimization System Using Genetic Algorithm Method

Authors: Hyeon-Seung Kim, Young-Hwan Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

The project budget at the planned stage might be changed by the insufficient government budget or the design change. There are many cases more especially in the case of a project performed for a long period of time. If the actual construction budget is insufficient comparing with the planned budget, the construction schedule should also be changed to match the changed budget. In that case, most project managers change the planned construction schedule by a heuristic approach without a reasonable consideration on the work priority. This study suggests an optimized methodology to modify the construction schedule according to the changed budget. The genetic algorithm was used to optimize the modified construction schedule within the changed budget. And a simulation system of construction cost histogram in accordance with the construction schedule was developed in the BIM (Building Information Modeling) environment.

Keywords: 5D, BIM, GA, cost optimization

Procedia PDF Downloads 580
4441 Internationalization Using Strategic Alliances: A Comparative Study between Family and Non-Family Businesses

Authors: Guadalupe Fuentes-Lombardo, Manuel Carlos Vallejo-Martos, Rubén Fernández-Ortiz, Miriam Cano-Rubio

Abstract:

The different ways in which companies enter foreign markets, exporting their products and direct investment and using strategic alliances or not, are influenced by a series of peculiarities specific to family businesses. In these companies, different systems, such as the family, property, and business overlap; giving them unique and specific characteristics which on occasions can enhance the development of cooperation agreements and in other situations can hinder them. Previous research has shown that these companies are more likely to enter into strategic alliances with certain specific features, and are more reluctant to take part in others in which some of the advantages of the family business are put at risk, such as control of ownership and decision-making over the company by the family, among others. These arguments show that there is a wide range of interesting aspects and peculiarities in the process of internationalization of the family business, although the research objectives of this paper focus on three in particular. Our first objective will be to discover why family businesses decide to establish or not strategic alliances in their internationalization processes in comparison with other companies that are not family owned. Secondly we will be identifying the idiosyncratic aspects of family businesses that favor or hinder the use of strategic alliances as a means of entering foreign markets. Our third and final objective will be to define the types of strategic alliance most commonly used by family businesses and the reasons why they choose these particular forms of alliance rather than others. We chose these research objectives for three main reasons. Firstly because research on this subject shows that alliances are the best way to begin the international expansion process, among other reasons because they provide the partners with different kinds of resources and capacity, so increasing the probability of successful internationalization. Secondly, because family and non-family businesses are often equipped with different types of resources and strategic alliances, offer them the chance to acquire resources less frequently found in family businesses. Thirdly, because the strengths and weaknesses of these companies could affect their decisions whether or not to use strategic alliances in their international expansion process and the success achieved in these alliances. As a result, these companies prefer to enter into cooperation agreements with conditions that do not put their specific status as family companies at risk.

Keywords: family business, internationalization, strategic alliances, olive-oil and wine industry

Procedia PDF Downloads 442
4440 Crowdsourcing as an Open Innovation Tool for Entrepreneurship

Authors: Zeynep Ayfer Bozat

Abstract:

As traditional innovation has already taken its place in managers’ to do lists; managers and companies have started to look for new ways to go beyond the traditional innovation. Because of its cost, traditional innovation became a burden for companies since they only use inner sources. Companies have intended to use outer innovation sources to decrease the innovation costs and Open Innovation has become a new solution for companies at this point. Crowdsourcing is a tool of Open Innovation and it consists of two words: Outsourcing and crowd. Crowdsourcing aims to benefit from the efforts and ideas of a virtual crowd via Internet technologies. In addition to that, crowdsourcing can help entrepreneurs to innovate and grow their businesses. They can crowd source anything they can use to grow their businesses: Ideas, investment, new business, new partners, new solutions, new policies, data, insight, marketing or talent. Therefore, the aim of the study is to be able to show some possible ways for entrepreneurs to benefit from crowdsourcing to expand or foster their businesses. In the study, the term crowdsourcing has been given in details and these possible ways have been searched and given.

Keywords: crowdsourcing, entrepreneurship, innovation, open innovation

Procedia PDF Downloads 282
4439 Information Technology Application for Knowledge Management in Medium-Size Businesses

Authors: S. Thongchai

Abstract:

Result of the study on knowledge management systems in businesses was shown that the most of these businesses provide internet accessibility for their employees in order to study new knowledge via internet, corporate website, electronic mail, and electronic learning system. These business organizations use information technology application for knowledge management because of convenience, time saving, ease of use, accuracy of information and knowledge usefulness. The result indicated prominent improvements for corporate knowledge management systems as the following; 1) administrations must support corporate knowledge management system 2) the goal of corporate knowledge management must be clear 3) corporate culture should facilitate the exchange and sharing of knowledge within the organization 4) cooperation of personnel of all levels must be obtained 5) information technology infrastructure must be provided 6) they must develop the system regularly and constantly.

Keywords: business organizations, information technology application, knowledge management systems, prominent improvements

Procedia PDF Downloads 376
4438 The Eco-Efficient Construction: A Review of Embodied Energy in Building Materials

Authors: Francesca Scalisi, Cesare Sposito

Abstract:

The building construction industry consumes a large amount of resources and energy, both during construction (embodied energy) and during the operational phase (operating energy). This paper presents a review of the literature on low carbon and low embodied energy materials in buildings. The embodied energy comprises the energy consumed during the extraction, processing, transportation, construction, and demolition of building materials. While designing a nearly zero energy building, it is necessary to choose and use materials, components, and technologies that allow to reduce the consumption of energy and also to reduce the emissions in the atmosphere during all the Life Cycle Assessment phases. The appropriate choice of building materials can contribute decisively to reduce the energy consumption of the building sector. The increasing worries for the environmental impact of construction materials are witnessed by a lot of studies. The mentioned worries have brought again the attention towards natural materials. The use of more sustainable construction materials and construction techniques represent a major contribution to the eco-efficiency of the construction industry and thus to a more sustainable development.

Keywords: embodied energy, embodied carbon, life cycle assessment, architecture, sustainability, material construction

Procedia PDF Downloads 331
4437 Methodology of Construction Equipment Optimization for Earthwork

Authors: Jaehyun Choi, Hyunjung Kim, Namho Kim

Abstract:

Earthwork is one of the critical civil construction operations that require large-quantities of resources due to its intensive dependency upon construction equipment. Therefore, efficient construction equipment management can highly contribute to productivity improvements and cost savings. Earthwork operation utilizes various combinations of construction equipment in order to meet project requirements such as time and cost. Identification of site condition and construction methods should be performed in advance in order to develop a proper execution plan. The factors to be considered include capacity of equipment assigned, the method of construction, the size of the site, and the surrounding condition. In addition, optimal combination of various construction equipment should be selected. However, in real world practice, equipment utilization plan is performed based on experience and intuition of management. The researchers evaluated the efficiency of various alternatives of construction equipment combinations by utilizing the process simulation model, validated the model from a case study project, and presented a methodology to find optimized plan among alternatives.

Keywords: earthwork operation, construction equipment, process simulation, optimization

Procedia PDF Downloads 414
4436 Important of Innovation for Entrepreneurs

Authors: Eetedal Alanjem, Majedah Alnajem

Abstract:

The importance of innovation in entrepreneurship can be seen in the invention of new ways to produce products or improved solutions. A service industry can expand with new or improved types of services to fulfill the ever changing needs of their clients. Manufacturers can come up with new products from raw materials and by-products. Innovation is vital for the durability of any business. Innovation usually begins with a need. Small businesses are generally directly involved in their communities and they know exactly what the communities need and strive to come up with solutions to fulfill those needs. They seize the opportunity to innovate to ease communal problems and make lives more comfortable. And then, these solutions keep getting better, easier and more useful as entrepreneurs and their small businesses come up with improved formulas and solutions. Keeping abreast with current trends and demands is an important factor for entrepreneurs to fuel their creativity and innovation. Manufacturers are constantly innovating to produce more without sacrificing quality. Small businesses should make innovation as a fundamental part of their organisational development since innovation creates business success. Entrepreneurs must not see just one solution to a need. They should come up with ideas for multiple solutions. It is imperative for small businesses to encourage growth of innovation among their employees. Competition is another factor that elevates the importance of innovation in entrepreneurship. It motivates entrepreneurs to come up with better, improved products and services than their competitors for a higher share of the market. In this paper will go in-depth for each factor and will discuss some of cases studies to know how innovation it’s important for entrepreneurs by facts & lessons?

Keywords: innovation, entrepreneurship, creativity, organisational development

Procedia PDF Downloads 407
4435 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 164
4434 Abating the Barriers to the Deployment of RFID for Construction Project Delivery in South Africa

Authors: Matthew O. Ikuabe, Ayodeji E. Oke, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The use of technological innovations have been touted to be beneficial in the delivery of construction projects. Particularly, Radio Frequency Identification (RFID) technology is widely regarded to be of immense advantage for the management of construction projects. This study focused on evaluating the barriers to the use of Radio Frequency Identification (RFID) technology for the delivery of construction projects. Using Gauteng Provincein South Africa as the study area, questionnaire was used in eliciting responses from construction professionals, which made up the population of the study. Retrieved data was analysed using Mean Item Score and One-Sample t-test. Findings from the study showed that the most significant barriers to the deployment of RFID for construction project delivery are high cost and lack of awareness. Conclusively, the study made recommendations that would aid in the abatement of the barriers to the use of RFID technology for construction project delivery.

Keywords: barriers, construction, project delivery, RFID

Procedia PDF Downloads 192
4433 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects

Authors: Preeda Sansakorn, Min An

Abstract:

In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.

Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects

Procedia PDF Downloads 473
4432 An Assessment of the Factors Affecting Green Building Technology (GBT) Adoption

Authors: Nuruddeen Usman, Usman Mohammed Gidado

Abstract:

A construction and post construction activity in buildings contributes to environmental degradation, because of the generation of solid waste during construction to the production of carbon dioxide by the occupants during utilization. These problems were caused as a result of lack of adopting green building technology during and after construction. However, this study aims at conceptualizing the factors that are affecting the adoption of green building technology with a view to suggest better ways for its successful adoption in the construction industry through developing a green building technology model. Thus, the research findings show that: Economic, social, cultural, and technological progresses are the factors affecting Green Building Technology Adoption. Therefore, identifying these factors and developing the model might help in the successful adoption of green building technology.

Keywords: green building technology, construction, post construction, degradation

Procedia PDF Downloads 641
4431 Investigations into Transition from Traditional Construction to Industrial Construction in Afghanistan

Authors: A. Latif Karimi

Abstract:

Since 2001, construction works, especially the construction of new homes and residential buildings, witnessed a dramatic boom across Afghanistan. More so, the construction industry and house builders are relied upon as important players in the country’s job market, economy and infrastructural development schemes. However, a lack of innovation, quality assurance mechanism, substandard construction and market dominance by traditional methods push all the parties in house building sector to shift for more advanced construction techniques and mass production technologies to meet the rising demands for proper accommodation. Meanwhile, rapid population growth and urbanization are widening the gap between the demand and supply of new and modern houses in urban areas like Kabul, Herat, etc. This paper investigates about current condition of construction practices in house building projects, the associated challenges, and the outcomes of transition to more reasonable and sustainable building methods. It is obvious, the introduction and use of Modern Methods of Construction (MMC) can help construction industry and house builders in Afghanistan to tackle the challenges and meet the desired standards for modern houses. This paper focuses on prefabrication, a popular MMC that is becoming more common, improving in quality and available in a variety of budgets. It is revealed that this method is the way forward to improving house building practices as it has been proven to reduce construction time, minimize waste and improve environmental performance of construction developments.

Keywords: modern houses, traditional construction, modern methods of construction, prefabrication, sustainable building

Procedia PDF Downloads 274
4430 The Impact of Corporate Social Responsibility on Tertiary Institutions in Bauchi State Nigeria

Authors: Aliyu Aminu Baba, Mustapha Makama

Abstract:

Tertiary institutions are citadel of learning and societal orientation. Due to the huge investment of various government to tertiary institutions, these institutions are solely financed by the government alone. As stakeholders of society, corporations have to have to intervene and provide corporate social responsibility. The study intends to investigate the role of Entrepreneurs in incorporating social Responsibility. Tertiary institutions are citadel of learning and societal orientation. Due to the huge investment of various government to tertiary institutions, the study intends to investigate the role of businesses and Entrepreneurs, which could be among the important contributions of businesses and Entrepreneurs on corporate social Responsibility to Tertiary Institutions in Bauchi State. Corporate social responsibility is vital in enhancing the infrastructural development of the tertiary institution as almost all individuals and corporate bodies benefit from this tertiary institutions. The study intends to examine the impact of corporate social responsibility to tertiary institutions and entrepreneurs in Bauchi state Nigeria. Questionnaires would be distributed to tertiary institutions and entrepreneurs in the Bauchi metropolis. The data collected will be analyzed with the help of SPSS version 23. The main objective is to investigate the role of businesses and Entrepreneurs, which could be among the important contributions of businesses and entrepreneurs on corporate social Responsibility to Tertiary Institutions in Bauchi State.

Keywords: corporate social responsibility, tertiary, institutions, profitability

Procedia PDF Downloads 214
4429 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 388
4428 The Impact of Tax Policies on Small Business Growth in Developing Countries: A Case Study of Montserrado Mount County, Republic of Liberia

Authors: Lemuel David

Abstract:

This study aims to investigate The Impact of Tax Policies on Small Business Growth in Developing Countries: A Case Study of Montserrado Mount County, Republic of Liberia. Businesses in Liberia are crucial for job creation and the economic empowerment of its citizens, especially in Grand Cape Mount County where they provide 95% of all jobs and support local capital formation. However, many businesses face challenges that lead to premature closure, including tax-related issues such as multiple taxations and high tax burdens. This research aims to examine the effects of various taxation on business survival in Grand Cape Mount County. The study employed a survey research design with a population of 50 and a sample size of 74. Data was collected using a self-administered questionnaire and analyzed quantitatively with simple percentages, and the research hypotheses were tested with ANOVA. The study findings revealed that multiple taxations hurts business survival, and the relationship between business size and its ability to pay taxes is significant. Therefore, the study recommends that the government of Liberia should create uniform tax policies that support business development in Grand Cape Mount County, and consider the size of businesses when formulating tax policies.

Keywords: multiple taxations, businesses, mortality, growth

Procedia PDF Downloads 61
4427 Managing Projects in Practice. A Perspective of Stakeholder Management in Managing Stakeholders within the UK Construction Projects

Authors: Faraz Ali Memon

Abstract:

Stakeholders are a vital part of any organisation. It includes working on the demands of different stakeholders within the projects. However, the reality of construction projects is slightly different when it comes to practice. The UK construction projects have a history of failing to complete projects on time and within the budget. The purpose of this qualitative study is to enhance knowledge of stakeholder engagement. Semi-structured interviews will be carried out using a purposive sampling technique. It includes interviewing and getting knowledge from industry practitioners from top UK construction firms on how to manage stakeholders effectively. The findings from this study will help in understanding stakeholders' impact and how the engagement of stakeholders can affect construction projects. The conclusions of this study add value to the existing body of knowledge on stakeholder management, especially in the UK, where academic studies on construction projects are few. As a contribution, this study will provide a practical guide for the practitioners to engage stakeholders within the scope of the project. In addition, this study is limited to UK construction projects. Therefore, the outcome may not be generalised to other developing and underdeveloped countries.

Keywords: stakeholders, UK construction, project management, cost and time

Procedia PDF Downloads 85
4426 Lean Construction Techniques in Construction Projects of Pakistan

Authors: Aftab Hameed Memon, Shadab Noor, Muhammad Akram Akhund

Abstract:

Lean construction is a philosophy adopted in the construction industry to increase the value of a project by reducing waste and improving construction productivity. Lean emphasizes on maximizing the value of a project with less expenditure. Globally, lean philosophy has received wider popularity in construction sector. Lean construction has supported the practitioners with several tools and techniques to implement at various stages of a construction project. Following the global trends, this study has investigated the lean practice in Pakistan. The level of implementation of different lean tools and techniques altogether with potential benefits experienced by its implementation in construction projects of Pakistan is analyzed. To achieve the targets, the opinion was sought by the practitioners involved in handling construction projects representing four stakeholders that are a client, consultant, contractors and material suppliers through a structured questionnaire. A total of 34 completed questionnaires were collected and then statistically analyzed. The findings of the analysis have highlighted that pull approach, work standardization, just in time, increase visualization tools, integrated project delivery method and fail-safe for quality are common lean techniques implemented in the local construction industry. While reduction in waste, client’s satisfaction, improved communication, visual control and proper task management are major benefits of the lean construction application.

Keywords: lean construction, lean tools and techniques, lean benefits, waste reduction, Pakistan

Procedia PDF Downloads 280
4425 Planning of Construction Material Flow Using Hybrid Simulation Modeling

Authors: A. M. Naraghi, V. Gonzalez, M. O'Sullivan, C. G. Walker, M. Poshdar, F. Ying, M. Abdelmegid

Abstract:

Discrete Event Simulation (DES) and Agent Based Simulation (ABS) are two simulation approaches that have been proposed to support decision-making in the construction industry. Despite the wide use of these simulation approaches in the construction field, their applications for production and material planning is still limited. This is largely due to the dynamic and complex nature of construction material supply chain systems. Moreover, managing the flow of construction material is not well integrated with site logistics in traditional construction planning methods. This paper presents a hybrid of DES and ABS to simulate on-site and off-site material supply processes. DES is applied to determine the best production scenarios with information of on-site production systems, while ABS is used to optimize the supply chain network. A case study of a construction piling project in New Zealand is presented illustrating the potential benefits of using the proposed hybrid simulation model in construction material flow planning. The hybrid model presented can be used to evaluate the impact of different decisions on construction supply chain management.

Keywords: construction supply-chain management, simulation modeling, decision-support tools, hybrid simulation

Procedia PDF Downloads 195
4424 Stress Variation of Underground Building Structure during Top-Down Construction

Authors: Soo-yeon Seo, Seol-ki Kim, Su-jin Jung

Abstract:

In the construction of a building, it is necessary to minimize construction period and secure enough work space for stacking of materials during the construction especially in city area. In this manner, various top-down construction methods have been developed and widely used in Korea. This paper investigates the stress variation of underground structure of a building constructed by using SPS (Strut as Permanent System) known as a top-down method in Korea through an analytical approach. Various types of earth pressure distribution related to ground condition were considered in the structural analysis of an example structure at each step of the excavation. From the analysis, the most high member force acting on beams was found when the ground type was medium sandy soil and a stress concentration was found in corner area.

Keywords: construction of building, top-down construction method, earth pressure distribution, member force, stress concentration

Procedia PDF Downloads 290
4423 A Review of the Major Factors of Cost Overrun in Construction Projects

Authors: Hassan Abdelgadir

Abstract:

Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.

Keywords: construction projects, cost overruns, construction company, factors effect costoverruns

Procedia PDF Downloads 55
4422 Environmental Issues in Construction Projects in India

Authors: Gurbir Singh Khaira, Anmoldeep Singh Kang

Abstract:

Exposures to environmental pollution remain a major source of health risk throughout the world, though risks are generally higher in developing countries, where poverty, lack of investment in modern technology and weak environmental legislation combine to cause high pollution levels. This paper will tell us about the environment is threatened severely by so many problems, some of which are caused by the activities of Construction Projects. The research reveals major environmental impacts of building construction projects to include environmental pollution, resource depletion and habitat destruction causing Destruction of ecosystem, Desertification, Soil Erosion and increasing Material Wastage. Construction is considered as one of the main sources of environmental pollution in the world, the level of knowledge and awareness of project participants, especially project managers, with regards to environmental impacts of construction processes needs to be enhanced. It was found that ‘Transportation Resource’, ‘Noise Pollution’, and ‘Dust Generation with Construction Machinery’ are the greatest environmental impacts in INDIA respectively. The results of this study are useful for construction managers and other participants in construction sites to become aware of construction processes impacts on the environment.

Keywords: construction projects, environmental impacts, material waste age, awareness

Procedia PDF Downloads 363
4421 Labor Productivity in the Construction Industry: Factors Influencing the Spanish Construction Labor Productivity

Authors: G. Robles, A. Stifi, José L. Ponz-Tienda, S. Gentes

Abstract:

This research paper aims to identify, analyze and rank factors affecting labor productivity in Spain with respect to their relative importance. Using a selected set of 35 factors, a structured questionnaire survey was utilized as the method to collect data from companies. Target population is comprised by a random representative sample of practitioners related with the Spanish construction industry. Findings reveal the top five ranked factors are as follows: (1) shortage or late supply of materials; (2) clarity of the drawings and project documents; (3) clear and daily task assignment; (4) tools or equipment shortages; (5) level of skill and experience of laborers. Additionally, this research also pretends to provide simple and comprehensive recommendations so that they could be implemented by construction managers for an effective management of construction labor forces.

Keywords: construction management, factors, improvement, labor productivity, lean construction

Procedia PDF Downloads 283