Search results for: Nigerian construction industry
8263 The Environmental Damages Related to Urban Sites
Authors: Kherbache Radhwane
Abstract:
We currently live in the world pressed by technological developments necessary for the construction, where the concept of sustainable development is truly rooted in recent years. Construction or demolitions of buildings necessarily generate environmental pollution, both inside and outside the site. Depending on the size and nature of work and the context surrounding these problems can be more or less important as is the case here in Algeria. They may affect the smooth running of the site. Moreover, there are regulations exist or are under development and should be taken into account by the various players in the act of building. This is, for example, the case of new obligations in terms of sorting and recycling of construction waste. Given this situation, it appears increasingly necessary to integrate the building sites in an effort to better respect the environment and its regulation. Several operations were performed according to this principle. The success of a project is that respects its environment through the involvement of each actor of the operation of the site with a low nuisance. As such, the client assisted by his driver and its operating contractor and the company plays a central role as an initiator of the process. It must ensure the establishment of appropriate means of organizational plans and contract.Keywords: evolution, sustainable development, construction, demolition, building, nuisance, environmental, tailings, construction, regulations
Procedia PDF Downloads 2638262 Enhance Construction Visual As-Built Schedule Management Using BIM Technology
Authors: Shu-Hui Jan, Hui-Ping Tserng, Shih-Ping Ho
Abstract:
Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in
Keywords: building information modeling (BIM), construction schedule management, as-built schedule management, BIM schedule updating mechanism
Procedia PDF Downloads 3748261 The Modified WBS Based on LEED Rating System in Decreasing Energy Consumption and Cost of Buildings
Authors: Mehrab Gholami Zangalani, Siavash Rajabpour
Abstract:
In compliance with the Statistical Centre of Iran (SCI)’s results, construction and housing section in Iran is consuming 40% of energy, which is 5 times more than the world average consumption. By considering the climate in Iran, the solutions in terms of design, construction and exploitation of the buildings by utilizing the LEED rating system (LRS) is presented, regarding to the reasons for the high levels of energy consumption during construction and housing in Iran. As a solution, innovative Work Break Structure (WBS) in accordance with LRS and Iranian construction’s methods is unveiled in this research. Also, by amending laws pertaining to the construction in Iran, the huge amount of energy and cost can be saved. Furthermore, with a scale-up of these results to the scale of big cities such as Tehran (one of the largest metropolitan areas in the middle east) in which the license to build more than two hundred and fifty units each day is issued, the amount of energy and cost that can be saved is estimated.Keywords: costs reduction, energy statistics, leed rating system (LRS), work brake structure (WBS)
Procedia PDF Downloads 5258260 Industrial Assessment of the Exposed Rocks on Peris Anticline Kurdistan Region of Iraq for Cement Industry
Authors: Faroojan Khajeek Sisak Siakian, Aayda Dikran Abdulahad
Abstract:
The Peris Mountain is one of the main mountains in the Iraqi Kurdistan Region, it forms one of the long anticlines trending almost East – West. The exposed formations on the top of the mountain are Bekhme, and Shiranish, with carbonate rocks of different types and thicknesses. We selected the site for sampling to be relevant for a quarry taking into consideration the thickness of the exposed rocks, no overburden, favorable quarrying faces, hardness of the rocks, bedding nature, good extension of the outcrops, and a favorable place for construction of a cement plant. We sampled the exposed rocks on the top of the mountain where a road crosses the mountain, and a total of 15 samples were collected. The distance between sampling intervals was 5 m, and each sample was collected to represent the sampling interval. The samples were subjected to X-ray fluorescence spectroscopy (XRF) to indicate the main oxides percentages in each sample. The acquired results showed the studied rocks can be used in the cement industry.Keywords: limestone, quarry, CaO, MgO, overburden
Procedia PDF Downloads 878259 Structural Analysis on the Composition of Video Game Virtual Spaces
Authors: Qin Luofeng, Shen Siqi
Abstract:
For the 58 years since the first video game came into being, the video game industry is getting through an explosive evolution from then on. Video games exert great influence on society and become a reflection of public life to some extent. Video game virtual spaces are where activities are taking place like real spaces. And that’s the reason why some architects pay attention to video games. However, compared to the researches on the appearance of games, we observe a lack of theoretical comprehensive on the construction of video game virtual spaces. The research method of this paper is to collect literature and conduct theoretical research about the virtual space in video games firstly. And then analogizing the opinions on the space phenomena from the theory of literature and films. Finally, this paper proposes a three-layer framework for the construction of video game virtual spaces: “algorithmic space-narrative space players space”, which correspond to the exterior, expressive, affective parts of the game space. Also, we illustrate each sub-space according to numerous instances of published video games. Hoping this writing could promote the interactive development of video games and architecture.Keywords: video game, virtual space, narrativity, social space, emotional connection
Procedia PDF Downloads 2668258 Counterfeit Drugs Prevention in Pharmaceutical Industry with RFID: A Framework Based On Literature Review
Authors: Zeeshan Hamid, Asher Ramish
Abstract:
The purpose of this paper is to focus on security and safety issues facing by pharmaceutical industry globally when counterfeit drugs are in question. Hence, there is an intense need to secure and authenticate pharmaceutical products in the emerging counterfeit product market. This paper will elaborate the application of radio frequency identification (RFID) in pharmaceutical industry and to identify its key benefits for patient’s care. The benefits are: help to co-ordinate the stream of supplies, accuracy in chains of supplies, maintaining trustworthy information, to manage the operations in appropriate and timely manners and finally deliver the genuine drug to patient. It is discussed that how RFID supported supply chain information sharing (SCIS) helps to combat against counterfeit drugs. And a solution how to tag pharmaceutical products; since, some products prevent RFID implementation in this industry. In this paper, a proposed model for pharma industry distribution suggested to combat against the counterfeit drugs when they are in supply chain.Keywords: supply chain, RFID, pharmaceutical industry, counterfeit drugs, patients care
Procedia PDF Downloads 3118257 Management Strategies for Risk Events in Construction Industries during Economic Situation and COVID-19 Pandemic in Nigeria
Authors: Ezeabasili Chibuike Patrick
Abstract:
The complex situation of construction industries in Nigeria and the risk of failures involved includes cost overrun, time overrun, Corruption, Government influence, Subcontractor challenges, Political influence and Instability, Cultural differences, Human resources deficiencies, cash flow Challenges, foreign exchange issues, inadequate design, Safety, low productivity, late payment, Quality control issues, project management issues, Environmental issues, Force majeure Competition amongst others has made the industry prone to risk and failures. Good project management remains effective in improving decision-making, which minimizes these risk events. This study was done to address these project risks and good decision-making to avert them. A mixed-method approach to research was used to do this study. Data collected by questionnaires and interviews on thirty-two (32) construction professionals was used in analyses to aid the knowledge and management of risks that were identified. The study revealed that there is no good risk management expertise in Nigeria. Also, that the economic/political situation and the recent COVID-19 pandemic has added to the risk and poor management strategies. The contingency theory and cost has therefore surfaced to be the most strategic management method used to reduce these risk issues and they seem to be very effective.Keywords: strategies, risk management, contingency theory, Nigeria
Procedia PDF Downloads 1288256 Determination of the Optimal Content of Commercial Superplasticizer Additives in Cements with Calcined Clay
Authors: Amanda R. Teixeira, João H. S. Rego, Gabriel F. S. Brito, Fabricio M. Silva
Abstract:
The use of superplasticizer additives has provided several advances for the civil construction industry, enabling gains in the rheological behavior and mechanical properties of cementitious matrices. These compounds act at the solid-liquid interface of colloidal suspensions of cement pastes, preventing agglomeration of the particles. Although the use in the concrete industry is wide, the mechanisms of dispersion of concrete admixtures composed of polycarboxylate in cement with supplementary cementitious materials have ample opportunity to be investigated, providing the attainment of increasingly compatible and efficient cement-addition-additive systems. The cements used in the research are Portland Cement CPV and two cements Portland Cement Composite (CPIV) with calcined clay contents of 20% and 28% and three commercial additives based on polycarboxylate. The performance of the additives and obtaining the optimal content was determined by the Marsh Cone test and spread by Mini-Slump.Keywords: calcined clay, composite cements, superplasticizer additives, polycarboxylate
Procedia PDF Downloads 1048255 An Integrated Emergency Management System for the Tourism Industry in Oman
Authors: Majda Al Salti
Abstract:
Tourism industry is considered globally as one of the leading industries due to its noticeable contribution to countries' gross domestic product (GDP) and job creation. However, tourism is vulnerable to crisis and disaster that requires its preparedness. With its limited capabilities, there is a need to improve links and the understanding between the tourism industry and the emergency services, thus facilitating future emergency response to any potential incident. This study aims to develop the concept of an integrated emergency management system for the tourism industry. The study used face-to-face semi-structured interviews to evaluate the level of crisis and disaster preparedness of the tourism industry in Oman. The findings suggested that there is a lack of understanding of crisis and disaster management, and hence preparedness level among Oman Tourism Authorities appears to be under-expectation. Therefore, a clear need for tourism sector inter- and intra-integration and collaboration is important in the pre-disaster stage. The need for such integrations can help the tourism industry in Oman to prepare for future incidents as well as identifying its requirements in time of crisis for effective response.Keywords: tourism, emergency services, crisis, disaster
Procedia PDF Downloads 1178254 Gender Diversity Practices in Talent Management: An Exploratory Study in the Space Industry in Luxembourg
Authors: K. Usanova
Abstract:
This study contributes to the conceptual and empirical understanding of how gender diversity management (GDM) is integrated into talent management (TM). Following the grounded theory, we interviewed 40 HR managers and talents from the space industry in Luxembourg. We provide a nuanced picture of what attitude on the GDM in TM organizations have, what strategies and practices they conduct, and how they differ from each other. Based on these differences, we developed three types of GDM integration to TM and explained the talents’ view on this issue. To the author's best knowledge, this study is the first empirical investigation of GDM in TM in the space industry that integrates both the TM executives' and TM receivers' views on gender equality in TM.Keywords: gender diversity management, high-technology industry, human resource management, talent management
Procedia PDF Downloads 1328253 Aesthetics of Colours, Symbols, and Spectacles in the 2021 National Festival of Arts and Culture, Ekiti State, Nigeria
Authors: Bade-Afuye Toyin Beatrice
Abstract:
Nigeria, as a multi-cultural nation, boasts of many festivals, many of which are found in the six geo-political zones of the country. One of the major festivals that bring together the Nigerian citizens as one entity is the National Festival of Arts and Culture (NAFEST), organized by the National Council for Arts and Culture (NCAC). The festival is celebrated yearly in ways that are unique to Nigerians and culture enthusiasts locally and abroad. The festival has equally boosted the Nigerian economy through tourism promotion and culture preservation. This study shall adopt the cultural identity theory. The theory will be used to examine the festival as a platform that showcases culture, which represents the totality of the ways and lives of the Nigerian people. To achieve this, the researcher shall gather data as a participant-observer during the festival, which featured elements such as costume, make-up, dance, drama, children's theatre, fashion parade, local cuisines, local games, music, props, acrobatic displays, trade fair among others. These elements are the cultural aesthetics of the festival, thereby creating spectacles and colours in unique styles by each of the 36 states of the federation and the FCT Abuja. The study particularly examines the 2021 edition of NAFEST hosted by the Ekiti State Government. The study reveals that the festival is a unique multi-ethnic event that brings together Nigerians and their kinsmen in the diaspora. NAFEST has equally provided a good opportunity to showcase the rich cultural heritage of the Ekiti people and the economic values of their products and materials. The paper, therefore, concludes that the National Festival of Arts and Culture has over the years promoted national unity and social integration among Nigerians.Keywords: colours, culture, spectacle, NAFEST
Procedia PDF Downloads 1058252 Investigating the Factors Leading to Utilization of Facebook and Twitter/X Sites by Youths at Elections Evening in Nigeria: A Case Study of 2023 General Elections
Authors: Abdullahi Garba Abu, Muhammad Bello Sada, Aminu Abubakar
Abstract:
Facebook and Twitter/X platforms are preferred and largely patronized by Youths in Nigeria. The simplicity and popularity of Facebook and Twitter/X have made them preferred social networking sites for Youths to handle or execute different political activities in favor of their chosen candidates or political parties. This is largely related to their interest in using the platform for the purposes of participation in 2023 political activities and general elections. The two Social Networking Sites were used to vigorously pursue party activities on the eve of the 2023 general elections. Youths engaged the two platforms in campaigning for their candidates and political parties and succeeded in reaching a wide audience, shared the policies and manifestos of their parties, engaged with supporters and even posted advertising campaigns for specific demographics. However, the utilization of Facebook and Twitter /X platforms during the 2023 elections was largely seen in two lights: positive and negative lights/intentions. Therefore, this research investigates the motivating factors for which largely Nigerian Youths engage Facebook and Twitter platforms in political activities, with reference to the 2023 general elections. The research uses a survey method through which it reaches out to respondents from all six geo-politial zones. The research found that Nigerian Youths utilize the two social media sites to campaign for politicians voluntarily based on their belief in the capabilities of the candidates. It also found out that Youths were lured into using Facebook and Twitter/X sites to campaign through tribal, religious, and ethnic factors. More so, the research found out that eagerness to share political materials in support of candidates made Youths in Nigeria share unverifiable content on Facebook and Twitter sites.Keywords: Facebook, Twitter/X, Nigerian youths, 2023 elections
Procedia PDF Downloads 588251 Acoustic and Thermal Insulating Materials Based on Natural Fibres Used in Floor Construction
Authors: Jitka Hroudova, Jiri Zach
Abstract:
The majority of contemporary insulation materials commonly used in the building industry is made from non-renewable raw materials; furthermore, their production often brings high energy costs. A long-term trend as far as sustainable development is concerned has been the reduction of energy and material demands of building material production. One of the solutions is the possibility of using easily renewable natural raw material sources which are considerably more ecological and their production is mostly less energy-consuming compared to the production of normal insulations (mineral wool, polystyrene). The paper describes the results of research focused on the development of thermal and acoustic insulation materials based on natural fibres intended for floor constructions. Given the characteristic open porosity of natural fibre materials, the hygrothermal behaviour of the developed materials was studied. Especially the influence of relative humidity and temperature on thermal insulation properties was observed.Keywords: Green thermal and acoustic insulating materials, natural fibres, technical hemp, flax, floor construction
Procedia PDF Downloads 3338250 Formalizing a Procedure for Generating Uncertain Resource Availability Assumptions Based on Real Time Logistic Data Capturing with Auto-ID Systems for Reactive Scheduling
Authors: Lars Laußat, Manfred Helmus, Kamil Szczesny, Markus König
Abstract:
As one result of the project “Reactive Construction Project Scheduling using Real Time Construction Logistic Data and Simulation”, a procedure for using data about uncertain resource availability assumptions in reactive scheduling processes has been developed. Prediction data about resource availability is generated in a formalized way using real-time monitoring data e.g. from auto-ID systems on the construction site and in the supply chains. The paper focuses on the formalization of the procedure for monitoring construction logistic processes, for the detection of disturbance and for generating of new and uncertain scheduling assumptions for the reactive resource constrained simulation procedure that is and will be further described in other papers.Keywords: auto-ID, construction logistic, fuzzy, monitoring, RFID, scheduling
Procedia PDF Downloads 5128249 Mapping the Metamorphosis of the Nigerian Female: A Womanist Approach to the Novels of Chimamanda Ngozi Adichie
Authors: Vidhya R
Abstract:
The claim of feminists that women are made and not born is neither to set women on par with men nor to discriminate one from the other, but to establish and reiterate the fact that both the sexes have to understand, recognize and appreciate each other’s ability and responsibility thus to contribute to the peaceful co-existence of both, leading to the creation of a better and brave new world, which is neither patriarchal nor matriarchal. But history has repeatedly recorded the relegation of women to the secondary position consummated through the highly biased cultural, ritualistic and customary practices across the globe. In Africa, bracing herself against many odds through generations, the African woman who has been facing multiple jeopardy promulgated by racial, cultural, economic and gender discrimination has slowly started moving from the margins towards the center. The African woman was able to undertake the journey from the margins to the center bravely only because of her grit, grace, courage, confidence, and spirituality. This journey has resulted in the metamorphosis of the African woman’s psyche. Economic independence fortified with education has empowered the African woman. The various stages of metamorphosis are well delineated in the works of the contemporary Nigerian writer Chimamanda Ngozi Adichie. The objective of this research paper is to study the above said metamorphosis, the female protagonists undergo in Adichie’s novels. The approaches on which the study is based on are the Africana Womanist theory propounded by Clenora Hudson –Weems and African feminism of Carole Boyce Davies. The findings of this study lead towards establishing the proposition that the emergence and evolution of the Nigerian woman has resulted in the birth of a new breed of women – the Emphatic Female, manifested in the power packed portrayal of the female protagonists of Purple Hibiscus, Half of a Yellow Sun and Americanah by Chimamanda Ngozi Adichie.Keywords: Africana womanism, African feminism, chimamanda ngozi adichie, metamorphosis, the emphatic female
Procedia PDF Downloads 3518248 Study on the Factors that Causes the Malaysian Oil and Gas Equipment (OGSE) Companies being under-Developing
Authors: Low Khee Wai
Abstract:
Lossing of opportunity by Malaysian Oil and Gas Services Equipment (OGSE) companies can be a major issue in developing and sustain Malaysia’s own Oil & Gas Industry. Despite the rapid growth of Oil & Gas industry in Malaysia for the past 40 years, Malaysia still not developing sufficient OGSE companies in order to support its own Oil & Gas Industry. In examining the scenario, this study aims to identify the factors causing the under-developing of OGSE companies in Malaysia. Conceptual Review method were used to analyse the factors that cause the under-development of Malaysia OGSE. The 4 factors identified were Time, Cost, Human Resource and Stakeholder Management. This survey explained the phenomena and the challenge of the industry and translated into the factors that cause the under-developing of OGSE companies in Malaysia. Finally, it should bring awareness to the government, authorities, and stakeholder in order to improve the ecology of Oil & Gas Industry in Malaysia.Keywords: oil & gas in Malaysia, Malaysia local oil & gas services equipment (OGSE), oil & gas project management, project performance
Procedia PDF Downloads 1308247 Factors Affecting Green Supply Chain Management of Lampang Ceramics Industry
Authors: Nattida Wannaruk, Wasawat Nakkiew
Abstract:
This research aims to study the factors that affect the performance of green supply chain management in the Lampang ceramics industry. The data investigation of this research was questionnaires which were gathered from 20 factories in the Lampang ceramics industry. The research factors are divided into five major groups which are green design, green purchasing, green manufacturing, green logistics and reverse logistics. The questionnaire has consisted of four parts that related to factors green supply chain management and general information of the Lampang ceramics industry. Then, the data were analyzed using descriptive statistic and priority of each factor by using the analytic hierarchy process (AHP). The understanding of factors affecting the green supply chain management of Lampang ceramics industry was indicated in the summary result along with each factor weight. The result of this research could be contributed to the development of indicators or performance evaluation in the future.Keywords: Lampang ceramics industry, green supply chain management, analysis hierarchy process (AHP), factors affecting
Procedia PDF Downloads 3318246 Current Status of Industry 4.0 in Material Handling Automation and In-house Logistics
Authors: Orestis Κ. Efthymiou, Stavros T. Ponis
Abstract:
In the last decade, a new industrial revolution seems to be emerging, supported -once again- by the rapid advancements of Information Technology in the areas of Machine-to-Machine (M2M) communication permitting large numbers of intelligent devices, e.g. sensors to communicate with each other and take decisions without any or minimum indirect human intervention. The advent of these technologies have triggered the emergence of a new category of hybrid (cyber-physical) manufacturing systems, combining advanced manufacturing techniques with innovative M2M applications based on the Internet of Things (IoT), under the umbrella term Industry 4.0. Even though the topic of Industry 4.0 has attracted much attention during the last few years, the attempts of providing a systematic literature review of the subject are scarce. In this paper, we present the authors’ initial study of the field with a special focus on the use and applications of Industry 4.0 principles in material handling automations and in-house logistics. Research shows that despite the vivid discussion and attractiveness of the subject, there are still many challenges and issues that have to be addressed before Industry 4.0 becomes standardized and widely applicable.Keywords: Industry 4.0, internet of things, manufacturing systems, material handling, logistics
Procedia PDF Downloads 1268245 Effect of Inventory Management on Financial Performance: Evidence from Nigerian Conglomerate Companies
Authors: Adamu Danlami Ahmed
Abstract:
Inventory management is the determinant of effective and efficient work for any manager. This study looked at the relationship between inventory management and financial performance. The population of the study comprises all conglomerate quoted companies in the Nigerian Stock Exchange market as at 31st December 2010. The scope of the study covered the period from 2010 to 2014. Descriptive, Pearson correlation and multiple regressions are used to analyze the data. It was found that inventory management is significantly related to the profitability of the company. This entails that an efficient management of the inventory cycle will enhance the profitability of the company. Also, lack of proper management of it will hinder the financial performance of organizations. Based on the results, it was recommended that a conglomerate company should try to see that inventories are kept to a minimum, as well as make sure the proper checks are maintained to make sure only needed inventories are in the store. As well as to keep track of the movement of goods, in order to avoid unnecessary delay of finished and work in progress (WIP) goods in the store and warehouse.Keywords: finished goods, work in progress, financial performance, inventory
Procedia PDF Downloads 2318244 Risk Prioritization in Tunneling Construction Projects
Authors: David Nantes, George Gilbert
Abstract:
There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects
Procedia PDF Downloads 918243 Company-Independent Standardization of Timber Construction to Promote Urban Redensification of Housing Stock
Authors: Andreas Schweiger, Matthias Gnigler, Elisabeth Wieder, Michael Grobbauer
Abstract:
Especially in the alpine region, available areas for new residential development are limited. One possible solution is to exploit the potential of existing settlements. Urban redensification, especially the addition of floors to existing buildings, requires efficient, lightweight constructions with short construction times. This topic is being addressed in the five-year Alpine Building Centre. The focus of this cooperation between Salzburg University of Applied Sciences and RSA GH Studio iSPACE is on transdisciplinary research in the fields of building and energy technology, building envelopes and geoinformation, as well as the transfer of research results to industry. One development objective is a system of wood panel system construction with a high degree of prefabrication to optimize the construction quality, the construction time and the applicability for small and medium-sized enterprises. The system serves as a reliable working basis for mastering the complex building task of redensification. The technical solution is the development of an open system in timber frame and solid wood construction, which is suitable for a maximum two-story addition of residential buildings. The applicability of the system is mainly influenced by the existing building stock. Therefore, timber frame and solid timber construction are combined where necessary to bridge large spans of the existing structure while keeping the dead weight as low as possible. Escape routes are usually constructed in reinforced concrete and are located outside the system boundary. Thus, within the framework of the legal and normative requirements of timber construction, a hybrid construction method for redensification created. Component structure, load-bearing structure and detail constructions are developed in accordance with the relevant requirements. The results are directly applicable in individual cases, with the exception of the required verifications. In order to verify the practical suitability of the developed system, stakeholder workshops are held on the one hand, and the system is applied in the planning of a two-storey extension on the other hand. A company-independent construction standard offers the possibility of cooperation and bundling of capacities in order to be able to handle larger construction volumes in collaboration with several companies. Numerous further developments can take place on the basis of the system, which is under open license. The construction system will support planners and contractors from design to execution. In this context, open means publicly published and freely usable and modifiable for own use as long as the authorship and deviations are mentioned. The companies are provided with a system manual, which contains the system description and an application manual. This manual will facilitate the selection of the correct component cross-sections for the specific construction projects by means of all component and detail specifications. This presentation highlights the initial situation, the motivation, the approach, but especially the technical solution as well as the possibilities for the application. After an explanation of the objectives and working methods, the component and detail specifications are presented as work results and their application.Keywords: redensification, SME, urban development, wood building system
Procedia PDF Downloads 1098242 Research on Eco-Sustainable Recycling of Industrial Wastes
Authors: Liliana Crăc, Nicolae Giorgi, Gheorghe Fometescu
Abstract:
In Romania, billions of tonnes of wastes are generated yearly, an important amount being stored within industrial dumps that covers high soil areas and affects the environment quality, especially of ground and surface waters. Landfill represents in Romania the most important way for wastes removal, over 75% being generated every year, the costs with the dumps construction being considerable. In most of the cases, the wastes generated mainly by the energy industry, oil exploitation and metallurgy, are still considered wastes with NO-use, and their removal and neutralization represent for transport, handling and storing, high non-productive expenses which raise the cost of the useful products obtained. The paper presents a recycling idea of three types of wastes in order to use them for building materials manufacturing, by promoting ECOWASTES LIFE+ project, whose aim is to demonstrate that the recycling of waste from energy industry (coal combustion waste), petroleum extraction (drilling mud) and metallurgy (steelmaking slag) is technically feasible.Keywords: fly ash, drilled solid wastes, metallurgical slag, recycling, building materials
Procedia PDF Downloads 3108241 Bridge Construction and Type of Bridges and Their Construction Methods
Authors: Mokhtar Nikgoo
Abstract:
Definition of bridge: A bridge is a structure that allows people to pass through the communication road with two points. There are many different types of bridges, each of which is designed to perform a specific function. This article introduces the concept, history, components, uses, types, construction methods, selected factors, damage factors and principles of bridge maintenance. A bridge is a structure to cross a passage such as a water, valley or road without blocking another path underneath. This structure makes it possible to pass obstacles that are difficult or impossible to pass. There are different designs for bridge construction, each of which is used for a particular function and condition. In the old definition, a bridge is an arch over a river, valley, or any type of passage that makes traffic possible. But today, in the topic of urban management, the bridge is considered as a structure to cross physical barriers, so that while using space (not just the surface of the earth), it can facilitate the passage and access to places. The useful life of bridges may be between 30 and 80 years depending on the location and the materials used. But with proper maintenance and improvement, their life may last for hundreds of years.Keywords: bridge, road construction, surveying, transportation
Procedia PDF Downloads 5098240 Modeling the Relation between Discretionary Accrual Earnings Management, International Financial Reporting Standards and Corporate Governance
Authors: Ikechukwu Ndu
Abstract:
This study examines the econometric modeling of the relation between discretionary accrual earnings management, International Financial Reporting Standards (IFRS), and certain corporate governance factors with regard to listed Nigerian non-financial firms. Although discretionary accrual earnings management is a well-known and global problem that has an adverse impact on users of the financial statements, its relationship with IFRS and corporate governance is neither adequately researched nor properly systematically investigated in Nigeria. The dearth of research in the relation between discretionary accrual earnings management, IFRS and corporate governance in Nigeria has made it difficult for academics, practitioners, government setting bodies, regulators and international bodies to achieve a clearer understanding of how discretionary accrual earnings management relates to IFRS and certain corporate governance characteristics. This is the first study to the author’s best knowledge to date that makes interesting research contributions that significantly add to the literature of discretionary accrual earnings management and its relation with corporate governance and IFRS pertaining to the Nigerian context. A comprehensive review is undertaken of the literature of discretionary total accrual earnings management, IFRS, and certain corporate governance characteristics as well as the data, models, methodologies, and different estimators used in the study. Secondary financial statement, IFRS, and corporate governance data are sourced from Bloomberg database and published financial statements of Nigerian non-financial firms for the period 2004 to 2016. The methodology uses both the total and working capital accrual basis. This study has a number of interesting preliminary findings. First, there is a negative relationship between the level of discretionary accrual earnings management and the adoption of IFRS. However, this relationship does not appear to be statistically significant. Second, there is a significant negative relationship between the size of the board of directors and discretionary accrual earnings management. Third, CEO Separation of roles does not constrain earnings management, indicating the need to preserve relationships, personal connections, and maintain bonded friendships between the CEO, Chairman, and executive directors. Fourth, there is a significant negative relationship between discretionary accrual earnings management and the use of a Big Four firm as an auditor. Fifth, including shareholders in the audit committee, leads to a reduction in discretionary accrual earnings management. Sixth, the debt and return on assets (ROA) variables are significant and positively related to discretionary accrual earnings management. Finally, the company size variable indicated by the log of assets is surprisingly not found to be statistically significant and indicates that all Nigerian companies irrespective of size engage in discretionary accrual management. In conclusion, this study provides key insights that enable a better understanding of the relationship between discretionary accrual earnings management, IFRS, and corporate governance in the Nigerian context. It is expected that the results of this study will be of interest to academics, practitioners, regulators, governments, international bodies and other parties involved in policy setting and economic development in areas of financial reporting, securities regulation, accounting harmonization, and corporate governance.Keywords: discretionary accrual earnings management, earnings manipulation, IFRS, corporate governance
Procedia PDF Downloads 1428239 Clients’ Priorities in Delivery of Green Projects: South African Perspective
Authors: C. Mothobiso, D. Root
Abstract:
Purpose: This study attempts to identify the clients’ main priorities when delivering green projects. The aim is to compare if the clients have the same interest that are similar in delivery of convectional buildings as compared to green buildings. The main purpose is to find why other clients are investing in green buildings while others are reluctant and adopting green building at a slow pace. Design/methodology/approach: A sample of construction professional accredited by the Green Building Council of South Africa (GBCSA) was sent a questionnaire to participate in the research. Since GBSCSA accredited professionals have knowledge and experience about the green buildings, they are chosen as the sample. The research is qualitative because it evaluates the perceptions and knowledge around the subject matter. Research limitations: The research focuses only on the South African construction clients. Findings: Findings reveal that private clients invest more on green buildings as compared to government and parastatal entities. Private clients prioritise on maximising returns on investments and they mainly invest on buildings that save energies and have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building project as compared to government and Parastatals clients. Shortage of expertise and managerial skill leads to low adaptation of green buildings in the government and parastatal projects. Other factors, which seem to disintegrate the adoption of green buildings, are the readiness of supply chain within the industry and inappropriate procurements strategies adopted by clients. The evaluation of the clients’ priorities will enable the design team to come up with innovative ways to approach the design process so that clients’ priorities and needs are identified and met. Practical implications: The findings are indicating that clients’ needs and priorities have a huge impact on the delivery of the project in terms of time, quality and cost of the project.Keywords: construction clients, design team, green construction and project deliver
Procedia PDF Downloads 2698238 A Review on the Necessities of Green Building in Bangladesh and Its Construction Process
Authors: Syeda Afsana Azad
Abstract:
Climate change, due to the release of greenhouse gases into the atmosphere has been recognized as one of the biggest threats to the present world. The condition of the earth is getting worse day by day due to climate change. Bangladesh is considered to be one of the most vulnerable countries to climate change due to large population, sharp urbanization, etc. Construction of green building is a very good solution to reduce the greenhouse effect. Green building technology refers to that kind of structures which are environmentally friendly and resource-efficient throughout a building’s service life. This technology can provide at least 50% energy saving opportunity to the nation. The necessity of the construction of structures in an environment-friendly way is increasing now. This study shows the scenario of rapid population growth, urbanization, necessity of green building in Bangladesh and also discusses the construction process of green building. As the present climate condition of Bangladesh is not friendly, construction of green building is very much needed. To battle climate change, it is mandatory to construct green building.Keywords: Bangladesh, climate change, green building, green house effect
Procedia PDF Downloads 3758237 The Sectoral Differences in the Use of Construction Incentive
Authors: Qiuwen Ma, Sai On Cheung
Abstract:
Incentive contracting has been developed to push the agent team for extra effort. Generally, there are three types of incentive arrangement, namely incentive/penalty for super performance/underperformance, risk/reward sharing and future business opportunities. It is found that there are significant differences in the use of incentive arrangement in private and public projects. In Hong Kong, very few public projects have used future business as incentivizer whereas private developers often signal repeated business coupled with heavy penalty. This study was conducted to identify various attributes affecting the use of I/D in both private and public engineering sectors of Hong Kong. The diverging preferences were unveiled with reference to a literature review and semi-structured interviews with industry experts. The findings reveal the public/private sectors would consider the implementation issues regarding the various performance targets. The most deterministic factor for the public sector is about accountability. The private sector is in general skeptical about the need to provide extra for the contractors for what they have already contracted to perform.Keywords: construction incentive, public/private projects, semi-structured interview, hong kong
Procedia PDF Downloads 1018236 Polystyrene Paste as a Substitute for a Portland Cement: A Solution to the Nigerian Dilemma
Authors: Lanre Oluwafemi Akinyemi
Abstract:
The reduction of limestone to cement in Nigeria is expensive and requires huge amounts of energy. This significantly affects the cost of cement. Concrete is heavy: a cubic foot of it weighs about 150 lbs. and a cubic yard is about 4000 lbs. Thus a ready-mix truck with 9 cubic yards is carrying 36,000 lbs excluding the weight of the truck itself, thereby accumulating cost for also manufacturers. Therein lies the need to find a substitute for cement by using the polystyrene paste that benefits both the manufactures and the consumers. Polystyrene Paste Constructional Cement (PPCC), a patented material obtained by dissolving Waste EPS in volatile organic solvent, has recently been identified as a suitable binder/cement for construction and building material production. This paper illustrates the procedures of a test experiment undertaken to determine the splitting tensile strength of PPCC mortar compared to that of OPC (Ordinary Portland Cement). Expanded polystyrene was dissolved in gasoline to form a paste referred to as Polystyrene Paste Constructional Cement (PPCC). Mortars of mix ratios 1:4, 1:5, 1:6, 1:7 (PPCC: fine aggregate) batched by volume were used to produce 50mm x 100mm cylindrical PPCC mortar splitting tensile strength specimens. The control experiment was done by creating another series of cylindrical OPC mortar splitting tensile strength specimens following the same mix ratio used earlier. The PPCC cylindrical splitting tensile strength specimens were left to air-set, and the ones made with Ordinary Portland Cement (OPC) were demoded after 24 hours and cured in water. The cylindrical PPCC splitting tensile strength specimens were tested at 28 days and compared with those of the Ordinary Portland cement splitting tensile strength specimens. The result shows that hence for this two mixes, PPCC exhibits a better binding property than the OPC. With this my new invention I recommend the use of PPCC as a substitute for a Portland cement.Keywords: polystyrene paste, Portland cement, construction, mortar
Procedia PDF Downloads 1568235 Crystalline Silica Exposure in Tunnelling: Identifying Barriers to Safe Practices
Authors: Frederick Anlimah, Vinod Gopaldasani, Catherine MacPhail, Brian Davies
Abstract:
The construction industry, particularly tunnel construction, exposes workers to respirable crystalline silica (RCS), which can cause incurable illnesses such as silicosis and lung cancer. Despite various control measures, exposures remain inadequately controlled. This research aimed to identify the barriers and challenges hindering the implementation of effective controls and the adoption of safe work practices to protect workers from RCS exposure in tunnelling. A mixed-method approach was employed for this research. Tunnel construction workers were observed, surveyed and interviewed to gauge their knowledge and attitudes and understand their challenges in reducing RCS exposure. The preliminary analysis of the data reveals a diverse array of sociotechnical factors interacting to influence RCS exposure. It is noteworthy that participants consistently emphasised the project as the most exemplary one they have been involved in, although there is room for improvement. While there is a commendable level of knowledge about RCS exposure and control in tunnelling, there is a striking lack of perceived satisfaction regarding dust control. Several factors were identified as interacting to prevent the effective management of dust. These include perceived time pressure, absence of on-tool dust controls, low risk perceptions among workers, and inadequate enforcement of controls. Moreover, participants highlighted communication and heat-related challenges as hindrances to the continuous wear of respirators. This research highlights the need for a paradigm shift in tunnel construction to address the barriers associated with RCS exposure reduction. It emphasises the importance of collaboration among various stakeholders, advocating for more effective controls and enforcement strategies and enhanced worker education through knowledge sharing.Keywords: respirable crystalline silica, dust control, worker practices, exposure prevention, silicosis
Procedia PDF Downloads 658234 Reinforced Concrete Design Construction Issues and Earthquake Failure-Damage Responses
Authors: Hasan Husnu Korkmaz, Serra Zerrin Korkmaz
Abstract:
Earthquakes are the natural disasters that threat several countries. Turkey is situated on a very active earthquake zone. During the recent earthquakes, thousands of people died due to failure of reinforced concrete structures. Although Turkey has a very sufficient earthquake code, the design and construction mistakes were repeated for old structures. Lack of the control mechanism during the construction process may be the most important reason of failure. The quality of the concrete and poor detailing of steel or reinforcement is the most important headings. In this paper, the reasons of failure of reinforced concrete structures were summarized with relevant photos. The paper is beneficial for civil engineers as well as architect who are in the process of construction and design of structures in earthquake zones.Keywords: earthquake, reinforced concrete structure, failure, material
Procedia PDF Downloads 362