5241 Risk Variables and Implications in Nigeria of Publicly Funded Construction Works Cessation

Authors: Nnadi Ezekiel Oluwaseun Ejiofor

Abstract:

The foundation of this study is the identification of risk variables and their implications on abandoned construction projects in Nigeria. The study's particular goals are to pinpoint the risk factors that lead to the abandonment of public building projects in Nigeria. This study used a hybrid research design that included case studies and descriptive survey research methods. Professionals who work directly in the built environment and are employed by Ministries and Departmental Agencies (MDAs), the public sector, or the private sector are the study's target demographic. This study used a descriptive survey and case study research design to gather data. Nigeria is experiencing a high rate of project abandonment due to housing deficit issues. Factors contributing to this include The study reveals factors contributing to public project abandonment in Abuja FCT include poor cashflow 4.96, inconsistent government policies 4.89, lack of accountability, high corruption, incompetent contractors, non-availability of building materials, lack of utilities, wrong materials, infrastructural facilities, poor planning, and undefined contracts. The study reveals that abandoned projects have a huge impact on the construction industry, such as wastage of resources with a mean value of 3.35, distrust of economic growth, 3.28, and so on. The study found a significant relationship between risk factors and public building construction in Abuja through a T-test value of 0.037, rejecting the null hypothesis and indicating a positive correlation.

Keywords: cost, tetfund, construction projects, public university

Procedia PDF Downloads 55
5240 Impact of Exogenous Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

Many of Public Private Partnership (PPP) are developed based on a public project is to be awarded to a private party within a one contractual framework. PPP project risks typically include the development and construction of a new asset as well as its operation. Certainly the most severe consequences of risks through the construction period are price and time overruns. These events are among the most generally used situation in value for money analysis risks. The sources of risk change during the time in PPP project. In traditional procurement, the public sector usually has to cover all prices suffering from these risks. At least there is plenty to suggest that price suffering is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of exogenous risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: public private partnership (PPP), risk, risk pricing, system dynamics (SD)

Procedia PDF Downloads 557
5239 Educational Theatre Making Project: Prior Conditions

Authors: Larisa Akhmylovskaia, Andriana Barysh

Abstract:

The present paper is introducing the translation score developing methodology and methods in the cross-cultural communication. The ideas and examples presented by the authors illustrate the universal character of translation score developing methods under analysis. Personal experience in the international theatre-making projects, opera laboratories, cross-cultural master-classes give more opportunities to single out the conditions, forms, means and principles of translation score developing as well as the translator/interpreter’s functions as cultural liaison for multiethnic collaboration.

Keywords: methodology of translation score developing, pre-production, analysis, production, post-production, ethnic scene theory, theatre anthropology, laboratory, master-class, educational project, academic project, participant observation, super-objective

Procedia PDF Downloads 514
5238 The International Monetary Fund’s Treatment Towards Argentina and Brazil During Financial Negotiations for Their First Adjustment Programs, 1958-64

Authors: Fernanda Conforto de Oliveira

Abstract:

The International Monetary Fund (IMF) has a central role in global financial governance as the world’s leading crisis lender. Its practice of conditional lending – conditioning loans on the implementation of economic policy adjustments – is the primary lever by which the institution interacts with and influences the policy choices of member countries and has been a key topic of interest to scholars and public opinion. However, empirical evidence about the economic and (geo)political determinants of IMF lending behavior remains inconclusive, and no model that explains IMF policies has been identified. This research moves beyond panel analysis to focus on financial negotiations for the first IMF programs in Argentina and Brazil in the early post-war period. It seeks to understand why negotiations achieved distinct objectives: Argentinean officials cooperated and complied with IMF policies, whereas their Brazilian counterparts hesitated. Using qualitative and automated text analysis, this paper analyses the hypothesis about whether a differential IMF treatment could help to explain these distinct outcomes. This paper contributes to historical studies on IMF-Latin America relations and the broader literature in international policy economy about IMF policies.

Keywords: international monetary fund, international history, financial history, Latin American economic history, natural language processing, sentiment analysis

Procedia PDF Downloads 63
5237 Professional Stakeholders Perspectives on Community Participation in Transit-Oriented Development Projects: A Johannesburg Case Study

Authors: Kofi Quartey, Kola Ijasan

Abstract:

Achieving densification around transit-oriented development projects has proven the most ideal way of facilitating urban sprawl whilst increasing the mobility of the majority of the urban populations, making parts of the city that were inaccessible, accessible. Johannesburg has undertaken TOD vision, which was initially called the corridors of freedom. The TOD, in line with the Sustainable Development Goal 11, seeks to establish inclusive, sustainable cities and, in line with the Joburg Growth Development Strategy, aims to create an equitable world-class African city. Equity and inclusivity should occur from the onset of planning and implementation of TOD projects through meaningful community participation. Stakeholder engagement literature from various disciplinary backgrounds has documented dissatisfaction of communities regarding the lack of meaningful participation in government-led development initiatives. The views of other project stakeholders such as project policy planners and project implementors and their challenges in undertaking community participation are, however, not taken into account in such instances, leaving room for a biased perspective. Document analysis was undertaken to determine what is expected of the Project stakeholders according to policy and whether they carried out their duties) seven interviews were also conducted with city entities and community representatives to determine their experiences and challenges with community participation in the various TOD projects attributed to the CoF vision. The findings of the study indicated that stakeholder engagement processes were best described as an ‘educative process’; where local communities were limited to being informed from the onset rather than having an active involvement in the planning processes. Most community members felt they were being informed and educated as to what was going to happen in spite of having their views and opinions collected – primarily due to project deadlines and budget constraints, as was confirmed by professional stakeholders. Some community members exhibited reluctance to change due to feelings of having projects being imposed on them, and the implications of the projects on their properties and lifestyles. It is recommended that community participation should remain a participatory and engaging process that creates an exchange of knowledge and understanding in the form of a dialogue between communities and project stakeholders until a consensus is reached.

Keywords: stakeholder engagement, transit oriented development, community participation, Johannesburg

Procedia PDF Downloads 127
5236 Application of Balance Score Card (BSc) in Education: Case of the International University

Authors: Hieu Nguyen

Abstract:

Performance management is the concern of any organizations in the context of increasing demand and fierce competition between education institution. This paper draws together the performance management concepts and focuses specifically to Balance Scorecard in the context of education. The study employs semi-structured in-depth interview to explore the measurement items for each of the sub-objectives in the four perspectives. Each of the perspectives’ explored measurement items will then be discussed the role and influence of them towards the perspective and how to improve the measurements to have improved performance management. Finally, the measurements will be put together as a suggested balanced scorecard framework in the case of International University.

Keywords: performance management, education institution, balance scorecard, measurement items, four perspectives, international univeristy

Procedia PDF Downloads 411
5235 Innovations in the Organization of Adaptation Program for International Students in Russia Based on Human Capital Approach

Authors: Kalinina Anastasiya, Pevnaya Mariya

Abstract:

The authors present the results of research of educational and cultural habitat of international students at Ural Federal University, revealing problem zones in the organization of adaptation program in 2014-2015 as well as innovations in adaptation program for 2015-2016. The research is based on U-curve theory of culture shock and theory of human capital. The authors provide also the first results for all stakeholders of practically implemented pilot adaptation program for foreign students which was based on the human capital approach.

Keywords: adaptation, human capital, international students, student volunteering, social community, youth politics

Procedia PDF Downloads 348
5234 Matlab Method for Exclusive-or Nodes in Fuzzy GERT Networks

Authors: Roland Lachmayer, Mahtab Afsari

Abstract:

Research is the cornerstone for advancement of human communities. So that it is one of the indexes for evaluating advancement of countries. Research projects are usually cost and time-consuming and do not end in result in short term. Project scheduling is one of the integral parts of project management. The present article offers a new method by using C# and Matlab software to solve Fuzzy GERT networks for Exclusive-OR kind of nodes to schedule the network. In this article we concentrate on flowcharts that we used in Matlab to show how we apply Matlab to schedule Exclusive-OR nodes.

Keywords: research projects, fuzzy GERT, fuzzy CPM, CPM, α-cuts, scheduling

Procedia PDF Downloads 398
5233 Humanitarian Aid and National Sovereignty: The Case of Kosovo

Authors: Nick Papanikolaou

Abstract:

In modern world politics, International relations are very complex not only in their construction but also in their interpretation the ex-Yugoslavian(western Balkans) countries, due to the establishment of independent states, have also risen pending geopolitical and territorial issues such as the Kosovo dispute widely known as an active frozen conflict. Science of anthropology and its subfield of anthropology of conflict can suggest a sustainable plan of communities coexistence and abolishment of fondamentalism. The 1244 Security Council Resolution provides a framework of implementation of a transitional international joint international armed presence for ensuring control and stability in the territory. The changing international relations landscape and the rise of the integration of the Western Balkans in the European Union have brought the question of Kosovo and all the till now internationally controlled system of governance to a dead end. A new solution that will ensure a sustainable future needs to be applied in order to solve this case in a way that rights of both albanians and Serbians will be equally respected and both populations will coexist peacefully. What this presentation aims for is to present a plan for the peaceful coexistence and sovreignty of habitants of Kosovo in a whole new way of governance.

Keywords: sovereignty, Kosovo, Western Balkans, anthropology of conflict

Procedia PDF Downloads 70
5232 Web-GIS Technology: A Tool for Farm-to-Market Road Project Profiling and Proposal Prioritization of the Philippines’ Department of Agriculture

Authors: Elbert S. Moyon, Edsel Matt O. Morales, Jaymer M. Jayoma, Kent C. Espejon, Jayson C. Dollete, Mark Phil B. Pacot

Abstract:

This research paper focuses on the potential of using Web-GIS technology in prioritizing farm-to-market road projects by the Philippines’ Department of Agriculture (DA). The study aimed to explore the benefits of Web-GIS in addressing the limitations faced by the DA in terms of Farm to Market Road profiling and project prioritization, which include a lack of access to updated data, limited spatial analysis capabilities, and difficulties in sharing information between stakeholders. The research methodology involves a comprehensive literature review and a case study of a Web-GIS application developed for the DA, which was used to profile and prioritize farm-to-market road projects in the Philippines. The results showed that the Web-GIS technology provides the DA with an effective tool for analyzing and visualizing data, which can help in profiling and prioritizing road projects based on various criteria such as economic, social, and environmental impacts. The study also showed that Web-GIS technology could help in reducing the time and effort required for road project prioritization and improve communication between stakeholders.

Keywords: GIS, web application, farm-to-market road, FMR prioritization, Django, GeoServer

Procedia PDF Downloads 83
5231 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 219
5230 A Method to Identify the Critical Delay Factors for Building Maintenance Projects of Institutional Buildings: Case Study of Eastern India

Authors: Shankha Pratim Bhattacharya

Abstract:

In general building repair and renovation projects are minor in nature. It requires less attention as the primary cost involvement is relatively small. Although the building repair and maintenance projects look simple, it involves much complexity during execution. Many of the present research indicate that few uncertain situations are usually linked with maintenance projects. Those may not be read properly in the planning stage of the projects, and finally, lead to time overrun. Building repair and maintenance become essential and periodical after commissioning of the building. In Institutional buildings, the regular maintenance projects also include addition –alteration, modification activities. Increase in the student admission, new departments, and sections, new laboratories and workshops, up gradation of existing laboratories are very common in the institutional buildings in the developing nations like India. The project becomes very critical because it undergoes space problem, architectural design issues, structural modification, etc. One of the prime factors in the institutional building maintenance and modification project is the time constraint. Mostly it required being executed a specific non-work time period. The present research considered only the institutional buildings of the Eastern part of India to analyse the repair and maintenance project delay. A general survey was conducted among the technical institutes to find the causes and corresponding nature of construction delay factors. Five technical institutes are considered in the present study with repair, renovation, modification and extension type of projects. Construction delay factors are categorically subdivided into four groups namely, material, manpower (works), Contract and Site. The survey data are collected for the nature of delay responsible for a specific project and the absolute amount of delay through proposed and actual duration of work. In the first stage of the paper, a relative importance index (RII) is proposed for the delay factors. The occurrence of the delay factors is also judged by its frequency-severity nature. Finally, the delay factors are then rated and linked with the type of work. In the second stage, a regression analysis is executed to establish an empirical relationship between the actual time of a project and the percentage of delay. It also indicates the impact of the factors for delay responsibility. Ultimately, the present paper makes an effort to identify the critical delay factors for the repair and renovation type project in the Eastern Indian Institutional building.

Keywords: delay factor, institutional building, maintenance, relative importance index, regression analysis, repair

Procedia PDF Downloads 250
5229 Price Compensation Mechanism with Unmet Demand for Public-Private Partnership Projects

Authors: Zhuo Feng, Ying Gao

Abstract:

Public-private partnership (PPP), as an innovative way to provide infrastructures by the private sector, is being widely used throughout the world. Compared with the traditional mode, PPP emerges largely for merits of relieving public budget constraint and improving infrastructure supply efficiency by involving private funds. However, PPP projects are characterized by large scale, high investment, long payback period, and long concession period. These characteristics make PPP projects full of risks. One of the most important risks faced by the private sector is demand risk because many factors affect the real demand. If the real demand is far lower than the forecasting demand, the private sector will be got into big trouble because operating revenue is the main means for the private sector to recoup the investment and obtain profit. Therefore, it is important to study how the government compensates the private sector when the demand risk occurs in order to achieve Pareto-improvement. This research focuses on price compensation mechanism, an ex-post compensation mechanism, and analyzes, by mathematical modeling, the impact of price compensation mechanism on payoff of the private sector and consumer surplus for PPP toll road projects. This research first investigates whether or not price compensation mechanisms can obtain Pareto-improvement and, if so, then explores boundary conditions for this mechanism. The research results show that price compensation mechanism can realize Pareto-improvement under certain conditions. Especially, to make the price compensation mechanism accomplish Pareto-improvement, renegotiation costs of the government and the private sector should be lower than a certain threshold which is determined by marginal operating cost and distortionary cost of the tax. In addition, the compensation percentage should match with the price cut of the private investor when demand drops. This research aims to provide theoretical support for the government when determining compensation scope under the price compensation mechanism. Moreover, some policy implications can also be drawn from the analysis for better risk-sharing and sustainability of PPP projects.

Keywords: infrastructure, price compensation mechanism, public-private partnership, renegotiation

Procedia PDF Downloads 179
5228 Renegotiating International Contract Clauses: The Case of Investment Environment Changes in Egypt

Authors: Marwa Zein

Abstract:

The long-term of the contract is one of the major features that distinguish international trade and investment contracts from other internal contracts. This is due to the nature of the contract and the huge works required to be performed from one hand or the desire of the parties to achieve stability in their transactions. However, long-term contracts might expose them to certain events and circumstances that impact the capability of the parties to execute their obligations pursuant to these contracts. During the year 2016, the Egyptian government has taken series of economic decisions which greatly impacted the economic and investment environment. Consequently, many contracts have encountered many problems in their execution due to such changes that greatly influence the performance of their obligation, a matter that necessitated the renegotiation of the conditions of these contracts on the basis of the unpredicted changes that could be listed under the Force Majeure Clause. The principle of fair and equitable treatment in investment placed on an obligation on the Egyptian government to consider the renegotiation of contract clauses based on the new conditions. This paper will discuss the idea of renegotiating international trade and investment contracts in Egypt with reference to the changes the economic environment has witnessed lately.

Keywords: change of circumstances, international contracts, investment contracts, renegotiation

Procedia PDF Downloads 197
5227 The Role of Robotization in Reshoring: An Overview of the Implications on International Trade

Authors: Thinh Huu Nguyen, Shahab Sharfaei, Jindřich Soukup

Abstract:

In the pursuit of reducing production costs, offshoring has been a major trend throughout global value chains for many decades. However, with the rise of advanced technologies, new opportunities to automate their production are changing the motivation of multinational firms to go offshore. Instead, many firms are working to relocate their offshored activities from developing economies back to their home countries. This phenomenon, known as reshoring, has recently garnered much attention as it becomes clear that automation in advanced countries might have major implications not only on their own economies but also through international trade on the economy of low-income countries, including their labor market outcomes and their comparative advantages. Thus, while using robots to substitute human labor may lower the relative costs of producing at home, it has the potential to decrease employment and demand for exports from developing economies through reshoring. In this paper, we investigate the recent literature to provide a further understanding of the relationships between robotization and the reshoring of production. Moreover, we analyze the impact of robot adoption on international trade in both developed and emerging markets. Finally, we identify the research gaps and provide avenues for future research in international economics. This study is a part of the project funded by the Internal Grant Agency (IGA) of the Faculty of Business Administration, Prague University of Economics and Business.

Keywords: automation, robotization, reshoring, international trade

Procedia PDF Downloads 109
5226 Risk Assessment on Construction Management with “Fuzzy Logy“

Authors: Mehrdad Abkenari, Orod Zarrinkafsh, Mohsen Ramezan Shirazi

Abstract:

Construction projects initiate in complicated dynamic environments and, due to the close relationships between project parameters and the unknown outer environment, they are faced with several uncertainties and risks. Success in time, cost and quality in large scale construction projects is uncertain in consequence of technological constraints, large number of stakeholders, too much time required, great capital requirements and poor definition of the extent and scope of the project. Projects that are faced with such environments and uncertainties can be well managed through utilization of the concept of risk management in project’s life cycle. Although the concept of risk is dependent on the opinion and idea of management, it suggests the risks of not achieving the project objectives as well. Furthermore, project’s risk analysis discusses the risks of development of inappropriate reactions. Since evaluation and prioritization of construction projects has been a difficult task, the network structure is considered to be an appropriate approach to analyze complex systems; therefore, we have used this structure for analyzing and modeling the issue. On the other hand, we face inadequacy of data in deterministic circumstances, and additionally the expert’s opinions are usually mathematically vague and are introduced in the form of linguistic variables instead of numerical expression. Owing to the fact that fuzzy logic is used for expressing the vagueness and uncertainty, formulation of expert’s opinion in the form of fuzzy numbers can be an appropriate approach. In other words, the evaluation and prioritization of construction projects on the basis of risk factors in real world is a complicated issue with lots of ambiguous qualitative characteristics. In this study, evaluated and prioritization the risk parameters and factors with fuzzy logy method by combination of three method DEMATEL (Decision Making Trial and Evaluation), ANP (Analytic Network Process) and TOPSIS (Technique for Order-Preference by Similarity Ideal Solution) on Construction Management.

Keywords: fuzzy logy, risk, prioritization, assessment

Procedia PDF Downloads 594
5225 Isotype and Logical Positivism: A Critical Understanding through Intersemiotic Translation

Authors: Satya Girish Goparaju, Sushmita Pareek

Abstract:

This paper examines two sets of pictograms published in Neurath’s books Basic by Isotype and International Pictorial Language in order to investigate the reasons for pictorial language having become an end in itself despite its potential to be relevant, especially in the 21st century digital age of heightened interlingual engagement. ISOTYPE was developed by Otto Neurath to be an ‘international language’ (pictorial) in the late 1920s. It was derived from the philosophy of logical positivism (of the Vienna Circle), which believed that language can be reduced to sets of direct experiences as bare symbols, devoid of the emotive and expressive functions. In his book International Picture Language, Neurath noted that any language is less clear-cut in one or the other way, and hence the pictorial language was justified. However, Isotype, as an ambitious version of logical positivism in practice distanced itself from the semiotic theories of language, and therefore his pictograms were defined as an independent set of signs rather than signs as a part of the language. This paper attempts to investigate intersemiotic translation in the form of Isotypes and trace the effects of logical positivism on Neurath’s concept of isotypes; the ‘international language’.

Keywords: intersemiotic translation, isotype, logical positivism, Otto Neurath, translation studies

Procedia PDF Downloads 250
5224 A Proposed Framework for Better Managing Small Group Projects on an Undergraduate Foundation Programme at an International University Campus

Authors: Sweta Rout-Hoolash

Abstract:

Each year, selected students from around 20 countries begin their degrees at Middlesex University with the International Foundation Program (IFP), developing the skills required for academic study at a UK university. The IFP runs for 30 learning/teaching weeks at Middlesex University Mauritius Branch Campus, which is an international campus of UK’s Middlesex University. Successful IFP students join their degree courses already settled into life at their chosen campus (London, Dubai, Mauritius or Malta) and confident that they understand what is required for degree study. Although part of the School of Science and Technology, in Mauritius it prepares students for undergraduate level across all Schools represented on campus – including disciplines such as Accounting, Business, Computing, Law, Media and Psychology. The researcher has critically reviewed the framework and resources in the curriculum for a particular six week period of IFP study (dedicated group work phase). Despite working together closely for 24 weeks, IFP students approach the final 6 week small group work project phase with mainly inhibitive feelings. It was observed that students did not engage effectively in the group work exercise. Additionally, groups who seemed to be working well did not necessarily produce results reflecting effective collaboration, nor individual members’ results which were better than prior efforts. The researcher identified scope for change and innovation in the IFP curriculum and how group work is introduced and facilitated. The study explores the challenges of groupwork in the context of the Mauritius campus, though it is clear that the implications of the project are not restricted to one campus only. The presentation offers a reflective review on the previous structure put in place for the management of small group assessed projects on the programme from both the student and tutor perspective. The focus of the research perspective is the student voice, by taking into consideration past and present IFP students’ experiences as written in their learning journals. Further, it proposes the introduction of a revised framework to help students take greater ownership of the group work process in order to engage more effectively with the learning outcomes of this crucial phase of the programme. The study has critically reviewed recent and seminal literature on how to achieve greater student ownership during this phase especially under an environment of assessed multicultural group work. The presentation proposes several new approaches for encouraging students to take more control of the collaboration process. Detailed consideration is given to how the proposed changes impact on the work of other stakeholders, or partners to student learning. Clear proposals are laid out for evaluation of the different approaches intended to be implemented during the upcoming academic year (student voice through their own submitted reflections, focus group interviews and through the assessment results). The proposals presented are all realistic and have the potential to transform students’ learning. Furthermore, the study has engaged with the UK Professional Standards Framework for teaching and supporting learning in higher education, and demonstrates practice at the level of ‘fellow’ of the Higher Education Academy (HEA).

Keywords: collaborative peer learning, enhancing learning experiences, group work assessment, learning communities, multicultural diverse classrooms, studying abroad

Procedia PDF Downloads 327
5223 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 134
5222 Key Drivers Motivating Prospective International Students to Study Abroad and Their Attitude to University Rankings

Authors: Dasha Karzunina, Laura Bridgestock

Abstract:

Our oral presentation will be based on our qualitative and quantitative findings into motivations and challenges faced by international and UK students when choosing a university abroad. The insight was gathered through a series of over 60 focus groups held with prospective university students all over the world, including masters and PhD applicants. We spoke to students face-to-face in Latin America, North American, India, China, South East Asia and the major European cities. A survey was carried out alongside, to gather additional insight on their priorities and attitudes to universities’ reputation, collecting over 1,800 responses. The session’s aims are to break down some of the myths about the perspectives of international students and inform university leaders interested in recruiting more highly talented students from abroad and those currently working with international students. As a provider of one of the most demanded resources in higher education, QS World University Rankings, we specialize in understanding universities’ performance, their institutional brand and the impact of rankings on student recruitment. We therefore feel we are well placed to carry out and present this research. We hope for our findings to act as a bridge between bright students and their future universities abroad. We intend for our session to be interactive and so are happy to go into more depth on any of the destinations we visited, depending on what the audience is most interested in and which questions we receive.

Keywords: international student recruitment, market research, rankings, study abroad

Procedia PDF Downloads 236
5221 Analyzing the Programme for International Student Assessment (PISA) Results in Uzbekistan: Insights from Organisation for Economic Co-operation and Development (OECD) Assessments

Authors: Nukarova Marjona Kayimovna

Abstract:

This article examines Uzbekistan's participation in the Programme for International Student Assessment (PISA) 2022, as the country took part in the assessment for the first time. The analysis delves into the initial results and performance metrics reported by the Organisation for Economic Co-operation and Development (OECD). By exploring Uzbekistan's data, the article highlights key findings, trends, and areas of strength and improvement. The aim is to provide a comprehensive understanding of how Uzbekistan's education system compares on the international stage and to offer insights into potential implications for future educational policies and reforms.

Keywords: PISA, OECD, data analysis of Uzbekistan, results, critical thinking.

Procedia PDF Downloads 11
5220 Decent Work Agenda in the Philippines: A Capacity Assessment

Authors: Dianne Lyneth Alavado

Abstract:

At the turn of the millennium, development paradigms in the international scene revolved around one goal: elimination of global poverty without comprising human rights. One measure which achieved high endorsement and visibility in the world of work is the Decent Work Agenda (DWA) championed by the United Nation’s (UN) specialized agency for work, the International Labour Organization (ILO). The DWA has been thoroughly promoted and recommended as an ingredient of development planning and a poverty reduction strategy, particularly in developing countries such as the Philippines. The global imperative of economic growth is measurable not only in the numbers raked in by countries in terms of expanding economy but also by the development and realization of the full capacities of their people. Decent work (DW), as an outcome and not just a development approach, promises poverty eradication by means of providing both quantity and quality work that is accompanied by rights, representation, and protection. As a party to these international pacts, the Philippines is expected to heed the call towards a world free from poverty through well-endorsed measures such as the DWA with the aid of multilateral and donor organizations such as the ILO. This study aims to assess the capacity and readiness of the Philippines to achieve the goals of the DWA. This is a qualitative research using the sociological and juridical lens in the desk analysis of existing Philippine laws, policies, and programs vis-à-vis decent work indicators set forth by the ILO. Interview with experts on the Philippine labor situation is conducted for further validation. The paper identifies gaps within the Philippine legal system and its collection of laws, acts, presidential decrees, department orders and other policy instruments aimed towards achieving the goals of the DWA. Among the major findings of this paper are: the predisposition of Philippine labor laws towards the formal sector; the need for alternative solutions for the informal sector veering away from the usual dole-outs and livelihood projects; the needs for evaluation of policies and programs that are usually self-evaluated; the minimal reach of the labour inspectorate which ensures decent work; and the lack of substantial penalty for non-compliance with labor laws. The paper concludes with policy implications and recommendations towards addressing the potholes on the road to Decent Work.

Keywords: decent work agenda, labor laws, millennium development goals, poverty eradication, sustainable development goal

Procedia PDF Downloads 274
5219 Education for Sustainability Using PBL on an Engineering Course at the National University of Colombia

Authors: Hernán G. Cortés-Mora, José I. Péna-Reyes, Alfonso Herrera-Jiménez

Abstract:

This article describes the implementation experience of Project-Based Learning (PBL) in an engineering course of the Universidad Nacional de Colombia, with the aim of strengthening student skills necessary for the exercise of their profession under a sustainability framework. Firstly, we present a literature review on the education for sustainability field, emphasizing the skills and knowledge areas required for its development, as well as the commitment of the Faculty of Engineering of the Universidad Nacional de Colombia, and other engineering faculties of the country, regarding education for sustainability. This article covers the general aspects of the course, describes how students team were formed, and how their experience was during the first semester of 2017. During this period two groups of students decided to develop their course project aiming to solve a problem regarding a Non-Governmental Organization (NGO) that works with head-of-household mothers in a low-income neighborhood in Bogota (Colombia). Subsequently, we show how sustainability is involved in the course, how tools are provided to students, and how activities are developed as to strengthen their abilities, which allows them to incorporate sustainability in their projects while also working on the methodology used to develop said projects. Finally, we introduce the results obtained by the students who sent the prototypes of their projects to the community they were working on and the conclusions reached by them regarding the course experience.

Keywords: sustainability, project-based learning, engineering education, higher education for sustainability

Procedia PDF Downloads 351
5218 Water Safety Strategies by Service: A Study of Implementation Studies

Authors: Prince Amartey

Abstract:

Water is critical to public health, quality of life, environmental preservation, economic activity, and long-term growth. In this environment, it is critical to ensure the ongoing improvement of all processes and practices that contribute to the quality and safety of water. Water safety plans (WSPs) developed by water companies are an essential public policy instrument for achieving these objectives. This manuscript examines international evidence of water safety planning adoption and implementation and reports on the current situation in Portugal as part of the necessary adaptation of the national legal framework to the publication of the Directive on water quality for human consumption. The goal is to take lessons from various successful WSP projects throughout the world while writing new legislation in Ghana and elsewhere. According to the findings, four crucial aspects and key factors of success in establishing and implementing WSPs exist commitment from leadership, technical proficiency, administration, and cooperation among agencies.

Keywords: safe drinking, risk, policy, implementation

Procedia PDF Downloads 84
5217 Progress and Challenges of Smart Cities in India: An Exploratory Study

Authors: Sushil K. Sharma, Jeff Zhang, Saeed Tabar

Abstract:

Worldwide, several governments are utilizing the Internet of Things (IoT) and other information and communication technologies (ICTs) to create smart city infrastructures to improve both the quality of government services and citizen welfare. Over 700 cities from around the world have already started implementing their smart city projects. Smart City utilizes the network of connected things, or the Internet of Things (IoT), that interconnects devices and various components across city infrastructure, making them work together seamlessly to enhance the quality, performance, and interactivity of urban services, optimize resources, and reduce costs. Without developing smart cities, the accelerating growth of cities, and their disproportionate consumption of physical and social resources are unsustainable. In 2016, the Indian Government released a list of 100 cities with the intention of kick-starting the process of developing them into 'smart cities’ as part of the Smart Cities Mission. This study reports the progress and challenges of Smart City projects in India. The data were collected through the city/state government websites, media reports, and focus group discussions/interviews. The preliminary results indicate that smart city projects are not only behind in their implementation and scope but also lacks the sincerity for its implementation.

Keywords: smart city, smart government, Internet of Things, digital government

Procedia PDF Downloads 182
5216 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria

Authors: Nuruddeen Usman, Mohammad Sani

Abstract:

The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.

Keywords: construction size, contracting system, direct labour, effect

Procedia PDF Downloads 457
5215 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects

Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima

Abstract:

Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.

Keywords: continuous improvement, critical success factors (csf), lean thinking, project management

Procedia PDF Downloads 364
5214 Execution of Joinery in Large Scale Projects: Middle East Region as a Case Study

Authors: Arsany Philip Fawzy

Abstract:

This study is going to address the hurdles of project management in the joinery field. It is widely divided into two sections; the first one will shed light on how to execute large-scale projects with a specific focus on the middle east region. It will also raise major obstacles that may face the joinery team from the site clearance and the coordination between the joinery team and the construction team. The second section is going to technically analyze the commercial side of the joinery and how to control the main cost of the project to avoid financial problems. It will also suggest empirical solutions to monitor the cost impact (e.g., Variation of contract quantity and claims).

Keywords: clearance, quality, cost, variation, claim

Procedia PDF Downloads 103
5213 Corporate Social Responsibility: An Ethical or a Legal Framework?

Authors: Pouira Askary

Abstract:

Indeed, in our globalized world which is facing with various international crises, the transnational corporations and other business enterprises have the capacity to foster economic well-being, development, technological improvement and wealth, as well as causing adverse impacts on human rights. The UN Human Rights Council declared that although the primary responsibility to protect human rights lie with the State but the transnational corporations and other business enterprises have also a responsibility to respect and protect human rights in the framework of corporate social responsibility. In 2011, the Human Rights Council endorsed the Guiding Principles on Business and Human Rights, a set of guidelines that define the key duties and responsibilities of States and business enterprises with regard to business-related human rights abuses. In UN’s view, the Guiding Principles do not create new legal obligations but constitute a clarification of the implications of existing standards, including under international human rights law. In 2014 the UN Human Rights Council decided to establish a working group on transnational corporations and other business enterprises whose mandate shall be to elaborate an international legally binding instrument to regulate, in international human rights law, the activities of transnational corporations and other business enterprises. Extremely difficult task for the working group to codify a legally binding document to regulate the behavior of corporations on the basis of the norms of international law! Concentration of this paper is on the origins of those human rights applicable on business enterprises. The research will discuss that the social and ethical roots of the CSR are much more institutionalized and elaborated than the legal roots. Therefore, the first step is to determine whether and to what extent corporations, do have an ethical responsibility to respect human rights and if so, by which means this ethical and social responsibility is convertible to legal commitments.

Keywords: CSR, ethics, international law, human rights, development, sustainable business

Procedia PDF Downloads 386
5212 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price

Procedia PDF Downloads 565