Search results for: disaster logistics
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1010

Search results for: disaster logistics

500 Corporate Profitability through Effective Supply Chain Performance

Authors: Tareq N. Issa

Abstract:

The main pressuring challenges of global competition and high returns have forced businesses to shift their strategic competitive advantage from physical distribution management to integrated logistics management, finally moving into supply chain management. Conventionally, corporate profitability is a function of cost, capital employed, revenue and customer service. This article gives an insight into the effect of supply chain management on each of the above variables. It investigates the impact of the changing levels/ effects of these variables on corporate profitability and the means of measuring supply chain financial effectiveness. Information technology tools form the basis for supply chain optimal performance through alignment of supply chain systems in this ever increasing complexity in business decisions.

Keywords: corporate profitability, sypply chain systems, business decisions, competitive advanage

Procedia PDF Downloads 315
499 Developing Improvements to Multi-Hazard Risk Assessments

Authors: A. Fathianpour, M. B. Jelodar, S. Wilkinson

Abstract:

This paper outlines the approaches taken to assess multi-hazard assessments. There is currently confusion in assessing multi-hazard impacts, and so this study aims to determine which of the available options are the most useful. The paper uses an international literature search, and analysis of current multi-hazard assessments and a case study to illustrate the effectiveness of the chosen method. Findings from this study will help those wanting to assess multi-hazards to undertake a straightforward approach. The paper is significant as it helps to interpret the various approaches and concludes with the preferred method. Many people in the world live in hazardous environments and are susceptible to disasters. Unfortunately, when a disaster strikes it is often compounded by additional cascading hazards, thus people would confront more than one hazard simultaneously. Hazards include natural hazards (earthquakes, floods, etc.) or cascading human-made hazards (for example, Natural Hazard Triggering Technological disasters (Natech) such as fire, explosion, toxic release). Multi-hazards have a more destructive impact on urban areas than one hazard alone. In addition, climate change is creating links between different disasters such as causing landslide dams and debris flows leading to more destructive incidents. Much of the prevailing literature deals with only one hazard at a time. However, recently sophisticated multi-hazard assessments have started to appear. Given that multi-hazards occur, it is essential to take multi-hazard risk assessment under consideration. This paper aims to review the multi-hazard assessment methods through articles published to date and categorize the strengths and disadvantages of using these methods in risk assessment. Napier City is selected as a case study to demonstrate the necessity of using multi-hazard risk assessments. In order to assess multi-hazard risk assessments, first, the current multi-hazard risk assessment methods were described. Next, the drawbacks of these multi-hazard risk assessments were outlined. Finally, the improvements to current multi-hazard risk assessments to date were summarised. Generally, the main problem of multi-hazard risk assessment is to make a valid assumption of risk from the interactions of different hazards. Currently, risk assessment studies have started to assess multi-hazard situations, but drawbacks such as uncertainty and lack of data show the necessity for more precise risk assessment. It should be noted that ignoring or partial considering multi-hazards in risk assessment will lead to an overestimate or overlook in resilient and recovery action managements.

Keywords: cascading hazards, disaster assessment, mullti-hazards, risk assessment

Procedia PDF Downloads 93
498 Trajectories of PTSD from 2-3 Years to 5-6 Years among Asian Americans after the World Trade Center Attack

Authors: Winnie Kung, Xinhua Liu, Debbie Huang, Patricia Kim, Keon Kim, Xiaoran Wang, Lawrence Yang

Abstract:

Considerable Asian Americans were exposed to the World Trade Center attack due to the proximity of the site to Chinatown and a sizeable number of South Asians working in the collapsed and damaged buildings nearby. Few studies focused on Asians in examining the disaster’s mental health impact, and even less longitudinal studies were reported beyond the first couple of years after the event. Based on the World Trade Center Health Registry, this study examined the trajectory of PTSD of individuals directly exposed to the attack from 2-3 to 5-6 years after the attack, comparing Asians against the non-Hispanic White group. Participants included 2,431 Asians and 31,455 Whites. Trajectories were delineated into the resilient, chronic, delayed-onset and remitted groups using PTSD checklist cut-off score at 44 at the 2 waves. Logistic regression analyses were conducted to compare the poorer trajectories against the resilient as a reference group, using predictors of baseline sociodemographic, exposure to the disaster, lower respiratory symptoms and previous depression/anxiety disorder diagnosis, and recruitment source as the control variable. Asians had significant lower socioeconomic status in terms of income, education and employment status compared to Whites. Over 3/4 of participants from both races were resilient, though slightly less for Asians than Whites (76.5% vs 79.8%). Asians had a higher proportion with chronic PTSD (8.6% vs 7.4%) and remission (5.9% vs 3.4%) than Whites. A considerable proportion of participants had delayed-onset in both races (9.1% Asians vs 9.4% Whites). The distribution of trajectories differed significantly by race (p<0.0001) with Asians faring poorer. For Asians, in the chronic vs resilient group, significant protective factors included age >65, annual household income >$50,000, and never married vs married/cohabiting; risk factors were direct disaster exposure, job loss due to 9/11, lost someone, and tangible loss; lower respiratory symptoms and previous mental disorder diagnoses. Similar protective and risk factors were noted for the delayed-onset group, except education being protective; and being an immigrant a risk. Between the 2 comparisons, the chronic group was more vulnerable than the delayed-onset as expected. It should also be noted that in both comparisons, Asians’ current employment status had no significant impact on their PTSD trajectory. Comparing between Asians against Whites, the direction of the relationships between the predictors and the PTSD trajectories were mostly the same, although more factors were significant for Whites than for Asians. A few factors showed significant racial difference: Higher risk for lower respiratory symptoms for Whites than Asians, higher risk for pre-9/11 mental disorder diagnosis for Asians than Whites, and immigrant a risk factor for the remitted vs resilient groups for Whites but not for Asians. Over 17% Asians still suffered from PTSD 5-6 years after the WTC attack signified its persistent impact which incurred substantial human, social and economic costs. The more disadvantaged socioeconomic status of Asians rendered them more vulnerable in their mental health trajectories relative to Whites. Together with their well-documented low tendency to seek mental health help, outreach effort to this population is needed to ensure follow-up treatment and prevention.

Keywords: PTSD, Asian Americans, World Trade Center Attack, racial differences

Procedia PDF Downloads 244
497 Evaluating the Logistic Performance Capability of Regeneration Processes

Authors: Thorben Kuprat, Julian Becker, Jonas Mayer, Peter Nyhuis

Abstract:

For years now, it has been recognized that logistic performance capability contributes enormously to a production enterprise’s competitiveness and as such is a critical control lever. In doing so, the orientation on customer wishes (e.g. delivery dates) represents a key parameter not only in the value-adding production but also in product regeneration. Since production and regeneration processes have different characteristics, production planning and control measures cannot be directly transferred to regeneration processes. As part of a special research project, the Institute of Production Systems and Logistics Hannover is focused on increasing the logistic performance capability of regeneration processes for complex capital goods. The aim is to ensure logistic targets are met by implementing a model specifically designed to align the capacities and load in regeneration processes.

Keywords: capacity planning, complex capital goods, logistic performance, regeneration process

Procedia PDF Downloads 467
496 Multi-Objective Optimization of an Aerodynamic Feeding System Using Genetic Algorithm

Authors: Jan Busch, Peter Nyhuis

Abstract:

Considering the challenges of short product life cycles and growing variant diversity, cost minimization and manufacturing flexibility increasingly gain importance to maintain a competitive edge in today’s global and dynamic markets. In this context, an aerodynamic part feeding system for high-speed industrial assembly applications has been developed at the Institute of Production Systems and Logistics (IFA), Leibniz Universitaet Hannover. The aerodynamic part feeding system outperforms conventional systems with respect to its process safety, reliability, and operating speed. In this paper, a multi-objective optimisation of the aerodynamic feeding system regarding the orientation rate, the feeding velocity and the required nozzle pressure is presented.

Keywords: aerodynamic feeding system, genetic algorithm, multi-objective optimization, workpiece orientation

Procedia PDF Downloads 560
495 Influence of Various Disaster Scenarios Assumption to the Advance Creation of Wide-Area Evacuation Plan Confronting Natural Disasters

Authors: Nemat Mohammadi, Yuki Nakayama

Abstract:

After occurring Great East Japan earthquake and as a consequence the invasion of an extremely large Tsunami to the city, obligated many local governments to take into account certainly these kinds of issues. Poor preparation of local governments to deal with such kinds of disasters at that time and consequently lack of assistance delivery for local residents caused thousands of civilian casualties as well as billion dollars of economic damages. Those local governments who are responsible for governing such coastal areas, have to consider some countermeasures to deal with these natural disasters, prepare a comprehensive evacuation plan and contrive some feasible emergency plans for the purpose of victims’ reduction as much as possible. Under this evacuation plan, the local government should contemplate more about the traffic congestion during wide-area evacuation operation and estimate the minimum essential time to evacuate the whole city completely. This challenge will become more complicated for the government when the people who are affected by disasters are not only limited to the normal informed citizens but also some pregnant women, physically handicapped persons, old age citizens and foreigners or tourists who are not familiar with that conditions as well as local language are involved. The important issue to deal with this challenge is that how to inform these people to take a proper action right away noticing the Tsunami is coming. After overcoming this problem, next significant challenge is even more considerable. Next challenge is to evacuate the whole residents in a short period of time from the threated area to the safer shelters. In fact, most of the citizens will use their own vehicles to evacuate to the designed shelters and some of them will use the shuttle buses which are provided by local governments. The problem will arise when all residents want to escape from the threated area simultaneously and consequently creating a traffic jam on evacuation routes which will cause to prolong the evacuation time. Hence, this research mostly aims to calculate the minimum essential time to evacuate each region inside the threated area and find the evacuation start point for each region separately. This result will help the local government to visualize the situations and conditions during disasters and assist them to reduce the possible traffic jam on evacuation routes and consequently suggesting a comprehensive wide-area evacuation plan during natural disasters.

Keywords: BPR formula, disaster scenarios, evacuation completion time, wide-area evacuation

Procedia PDF Downloads 195
494 The Willingness to Pay of People in Taiwan for Flood Protection Standard of Regions

Authors: Takahiro Katayama, Hsueh-Sheng Chang

Abstract:

Due to the global climate change, it has increased the extreme rainfall that led to serious floods around the world. In recent years, urbanization and population growth also tend to increase the number of impervious surfaces, resulting in significant loss of life and property during floods especially for the urban areas of Taiwan. In the past, the primary governmental response to floods was structural flood control and the only flood protection standards in use were the design standards. However, these design standards of flood control facilities are generally calculated based on current hydrological conditions. In the face of future extreme events, there is a high possibility to surpass existing design standards and cause damages directly and indirectly to the public. To cope with the frequent occurrence of floods in recent years, it has been pointed out that there is a need for a different standard called FPSR (Flood Protection Standard of Regions) in Taiwan. FPSR is mainly used for disaster reduction and used to ensure that hydraulic facilities draining regional flood immediately under specific return period. FPSR could convey a level of flood risk which is useful for land use planning and reflect the disaster situations that a region can bear. However, little has been reported on FPSR and its impacts to the public in Taiwan. Hence, this study proposes a quantity procedure to evaluate the FPSR. This study aimed to examine FPSR of the region and public perceptions of and knowledge about FPSR, as well as the public’s WTP (willingness to pay) for FPSR. The research is conducted via literature review and questionnaire method. Firstly, this study will review the domestic and international research on the FPSR, and provide the theoretical framework of FPSR. Secondly, CVM (Contingent Value Method) has been employed to conduct this survey and using double-bounded dichotomous choice, close-ended format elicits households WTP for raising the protection level to understand the social costs. The samplings of this study are citizens living in Taichung city, Taiwan and 700 samplings were chosen in this study. In the end, this research will continue working on surveys, finding out which factors determining WTP, and provide some recommendations for adaption policies for floods in the future.

Keywords: climate change, CVM (Contingent Value Method), FPSR (Flood Protection Standard of Regions), urban flooding

Procedia PDF Downloads 226
493 Ethical Leadership and Employee Creative Behaviour: A Case Study of a State-Owned Enterprise in South Africa

Authors: Krishna Kistan Govender, Alex Masianoga

Abstract:

The aim of this explanatory study was to critically understand how ethical leadership impacts employee creative behaviour, as well as the creative behaviour dimensions, in a South African transport and logistics SOE. A quantitative study was conducted using a pre-developed questionnaire, and data for 160 middle and executive managers was analysed through structural equation modelling and multiple regression techniques conducted with the Smart PLS statistical software. All five hypothesized relationships were supported, and it was confirmed that ethical leadership has a significant positive influence on employee creative behaviour, as well as on each of the creative behaviour dimensions, namely: idea exploration, idea generation, idea championing, and idea implementation.

Keywords: ethical leaders, employee creative behaviour, state-owned enterprises, South Africa

Procedia PDF Downloads 99
492 Recent Trends in Transportable First Response Healthcare Architecture

Authors: Stephen Verderber

Abstract:

The World Health Organization (WHO) calls for research and development on ecologically sustainable, resilient structures capable of effectively responding to disaster events globally, in response to climate change, politically based diasporas, earthquakes, and other adverse events upending the rhythms of everyday life globally. By 2050, nearly 80% of the world’s population will reside in coastal zones, and this, coupled with the increasingly dire impacts of climate change, constitute a recipe for further chaos and disruption, and in light of these events, architects have yet to rise up to meet the challenge. In the arena of healthcare, rapidly deployable clinics and field hospitals can provide immediate assistance in medically underserved disaster strike zones. Transportable facilities offer multiple advantages over conventional, fixed-site hospitals, as lightweight, comparatively unencumbered alternatives. These attributes have been proven repeatedly in 20th century vehicular and tent-based structures deployed in frontline combat theaters and in prior natural disasters. Prefab transportable clinics and trauma centers recently responded adroitly to medical emergencies in the aftermath of the Haitian (2010) and Ecuadorian (2016) earthquakes, and in North American post-hurricane relief efforts (2017) while architects continue to be castigated by their engineer colleagues as chronically poor first responders. Architecturally based portable structures for healthcare currently include Redeployable Health Centers (RHCs), Redeployable Trauma Centers (RTCs), and Permanent Modular Installations (PMIs). Five tectonic variants within this typology have recently been operationalized in the field: 1. Vehicular-based Nomadics: Prefab modules installed on a truck chassis with interior compartments dropped in prior to final assembly. Alternately, a two-component apparatus is preferred, with a truck cab pulling a modular medical unit, with independent transiting component; 2. Tent and Pneumatic Systems: Tent/yurt precursors and inflatable systems lightweight and responsive to topographically challenging terrain and diverse climates; 3. Containerized Systems: The standard modular intermodal-shipping container affords structural strength, resiliency in difficult transiting conditions, and can be densely close-packed and these can be custom-built or hold flat-pack systems; 4. Flat-Packs and Pop-Up Systems: These kit-of-part assemblies are shipped in standardized or specially-designed ISO containers; and 5. Hybrid Systems: These consist of composite facilities representing a synthesis of mobile vehicular components and/or tent or shipping containers, fused with conventional or pneumatically activated tent systems. Hybrids are advantageous in many installation contexts from an aesthetic, fabrication, and transiting perspective. Advantages/disadvantages of various modular systems are comparatively examined, followed by presentation of a compendium of 80 evidence (research)-based planning and design considerations addressing site/context, transiting and commissioning, triage, decontamination/intake, diagnostic and treatment, facility tectonics, and administration/total environment. The benefits of offsite pre-manufactured fabrication are examined, as is anticipated growth in international demand for transportable healthcare facilities to meet the challenges posed by accelerating global climate change and global conflicts. This investigation into rapid response facilities for pre and post-disaster zones is drawn from a recent book by the author, the first on architecture on this topic (Innovations in Transportable Healthcare Architecture).

Keywords: disaster mitigation, rapid response healthcare architecture, offsite prefabrication

Procedia PDF Downloads 103
491 Analyzing Social and Political Constraints in Development Aid Projects in Post Conflict Region of SWAT, Pakistan

Authors: Faizan Sultan

Abstract:

Non-government organizations (NGOs) in Pakistan have the potential to deliver services such as health, education, and rural development through targeting the most vulnerable communities of society. Having this significant importance, NGOs are facing numerous challenges in service delivery. So, there is a need to identify the challenges NGOs face in community development, particularly post-conflict development. The current study has analyzed the social and political constraints in development projects in the post-conflict region of the Swat district of Khyber Pakhtunkhwa. The objectives of this study are “What are the social and political constraints faced by the nongovernmental organizations in the implementation of development aid Projects in post-conflict development of Swat and to examine the challenges in coordination mechanism between government departments, NGOs, and community in reconstruction activities”. This research is based upon both the quantitative and qualitative data that is being gathered from the NGO representatives, government officials, and community members who were involved in post-conflict development interventions in the Swat region. A purposive sampling technique was used to select respondents from the community members/activists (25 in number) and government and NGO officials (10 in number). Based on analysis against our objectives, NGOs have faced numerous constraints such as Insecurity, Negative Perceptions about NGOs, restrictions on women's mobility, government policies and regulations, lack of coordination and networking, trust deficit, and political interference while implementing their project interventions. These findings concluded that constraints have affected project implementation to a greater extent, including women's participation, involvement of marginalized populations, and equal distribution of resources. In the Swat region, NGOs cannot openly discuss sensitive projects such as human rights, gender-based projects, or women empowerment as these issues are very sensitive to the local community due to their cultural values. The community may not allow their females to go outside their homes as this region is a male-dominated society. Similarly, lack of communication and poor networking for the arrangements of the project meetings were also the major constraints.

Keywords: national disaster management authority, millennium development goals, provincial disaster management authority, provincial reconstruction, rehabilitation and settlement authority

Procedia PDF Downloads 44
490 Capacity Building and Training of Health Personals for Disaster Preparedness in North East India

Authors: U. K. Tamuli

Abstract:

Introduction: North East India is graced with natural beauty and hazards. This area is prone to major earthquakes, floods, landslides, accidents, terrorist activities etc. Academy of Trauma (AOT), an NGO of Doctors, conducts training programs, mock drills, field trials amongst the doctors and paramedics in North East India. The present study is to evaluate the efficacy of such training in terms of sensitivity, awareness, and delivery systems of the products. Here the health care delivery system for disaster management is inadequate. Clear guideline of mass casualty management is unavailable. AOT has initiated steps to increase the awareness and handling of mass casualty management to improve the emergency health care delivery system. Method: AOT has conducted training programmes on emergency health management, mass casualty management and hospital preparedness amongst 800 doctors and 1200 paramedics in twenty-two districts of Assam in Northeast India. The training module consists of lectures, hands-on workshop using manikins, mock drills, distribution of manuals, emergency management exercises, periodic exchange of experience and debriefings. AOT evaluates the impact of these trainings by conducting pre and post tests of delegates, trainer’s evaluation, delegate’s satisfaction and confidence level and their suggestions. Results: The module, training, hands-on workshops, mock drills were highly appreciated. There is significant improvement in scores on the post-training tests. The confidence level of the participants has risen to deal with emergency medical situation Conclusion: These kinds of trainings increase the awareness of the medical members to handle mass casualties in different situations. One such training actually sensitises the delegates. Repetition of such training, TOT (Training-of-Trainers) programs, and individual efforts of delegates are extremely important for sustenance and success of health care delivery service during disasters in the developing countries. Further collaboration, assistance, networking, suggestions from established global agencies in this field will be highly appreciated.

Keywords: capacity building, North East India, non-governmental organization, trauma

Procedia PDF Downloads 266
489 A Location Routing Model for the Logistic System in the Mining Collection Centers of the Northern Region of Boyacá-Colombia

Authors: Erika Ruíz, Luis Amaya, Diego Carreño

Abstract:

The main objective of this study is to design a mathematical model for the logistics of mining collection centers in the northern region of the department of Boyacá (Colombia), determining the structure that facilitates the flow of products along the supply chain. In order to achieve this, it is necessary to define a suitable design of the distribution network, taking into account the products, customer’s characteristics and the availability of information. Likewise, some other aspects must be defined, such as number and capacity of collection centers to establish, routes that must be taken to deliver products to the customers, among others. This research will use one of the operation research problems, which is used in the design of distribution networks known as Location Routing Problem (LRP).

Keywords: location routing problem, logistic, mining collection, model

Procedia PDF Downloads 202
488 Lessons Learned through a Bicultural Approach to Tsunami Education in Aotearoa New Zealand

Authors: Lucy H. Kaiser, Kate Boersen

Abstract:

Kura Kaupapa Māori (kura) and bilingual schools are primary schools in Aotearoa/New Zealand which operate fully or partially under Māori custom and have curricula developed to include Te Reo Māori and Tikanga Māori (Māori language and cultural practices). These schools were established to support Māori children and their families through reinforcing cultural identity by enabling Māori language and culture to flourish in the field of education. Māori kaupapa (values), Mātauranga Māori (Māori knowledge) and Te Reo are crucial considerations for the development of educational resources developed for kura, bilingual and mainstream schools. The inclusion of hazard risk in education has become an important issue in New Zealand due to the vulnerability of communities to a plethora of different hazards. Māori have an extensive knowledge of their local area and the history of hazards which is often not appropriately recognised within mainstream hazard education resources. Researchers from the Joint Centre for Disaster Research, Massey University and East Coast LAB (Life at the Boundary) in Napier were funded to collaboratively develop a toolkit of tsunami risk reduction activities with schools located in Hawke’s Bay’s tsunami evacuation zones. A Māori-led bicultural approach to developing and running the education activities was taken, focusing on creating culturally and locally relevant materials for students and schools as well as giving students a proactive role in making their communities better prepared for a tsunami event. The community-based participatory research is Māori-centred, framed by qualitative and Kaupapa Maori research methodologies and utilizes a range of data collection methods including interviews, focus groups and surveys. Māori participants, stakeholders and the researchers collaborated through the duration of the project to ensure the programme would align with the wider school curricula and kaupapa values. The education programme applied a tuakana/teina, Māori teaching and learning approach in which high school aged students (tuakana) developed tsunami preparedness activities to run with primary school students (teina). At the end of the education programme, high school students were asked to reflect on their participation, what they had learned and what they had enjoyed during the activities. This paper draws on lessons learned throughout this research project. As an exemplar, retaining a bicultural and bilingual perspective resulted in a more inclusive project as there was variability across the students’ levels of confidence using Te Reo and Māori knowledge and cultural frameworks. Providing a range of different learning and experiential activities including waiata (Māori songs), pūrākau (traditional stories) and games was important to ensure students had the opportunity to participate and contribute using a range of different approaches that were appropriate to their individual learning needs. Inclusion of teachers in facilitation also proved beneficial in assisting classroom behavioral management. Lessons were framed by the tikanga and kawa (protocols) of the school to maintain cultural safety for the researchers and the students. Finally, the tuakana/teina component of the education activities became the crux of the programme, demonstrating a path for Rangatahi to support their whānau and communities through facilitating disaster preparedness, risk reduction and resilience.

Keywords: school safety, indigenous, disaster preparedness, children, education, tsunami

Procedia PDF Downloads 109
487 Evaluation of Batch Splitting in the Context of Load Scattering

Authors: S. Wesebaum, S. Willeke

Abstract:

Production companies are faced with an increasingly turbulent business environment, which demands very high production volumes- and delivery date flexibility. If a decoupling by storage stages is not possible (e.g. at a contract manufacturing company) or undesirable from a logistical point of view, load scattering effects the production processes. ‘Load’ characterizes timing and quantity incidence of production orders (e.g. in work content hours) to workstations in the production, which results in specific capacity requirements. Insufficient coordination between load (demand capacity) and capacity supply results in heavy load scattering, which can be described by deviations and uncertainties in the input behavior of a capacity unit. In order to respond to fluctuating loads, companies try to implement consistent and realizable input behavior using the capacity supply available. For example, a uniform and high level of equipment capacity utilization keeps production costs down. In contrast, strong load scattering at workstations leads to performance loss or disproportionately fluctuating WIP, whereby the logistics objectives are affected negatively. Options for reducing load scattering are e.g. shifting the start and end dates of orders, batch splitting and outsourcing of operations or shifting to other workstations. This leads to an adjustment of load to capacity supply, and thus to a reduction of load scattering. If the adaptation of load to capacity cannot be satisfied completely, possibly flexible capacity must be used to ensure that the performance of a workstation does not decrease for a given load. Where the use of flexible capacities normally raises costs, an adjustment of load to capacity supply reduces load scattering and, in consequence, costs. In the literature you mostly find qualitative statements for describing load scattering. Quantitative evaluation methods that describe load mathematically are rare. In this article the authors discuss existing approaches for calculating load scattering and their various disadvantages such as lack of opportunity for normalization. These approaches are the basis for the development of our mathematical quantification approach for describing load scattering that compensates the disadvantages of the current quantification approaches. After presenting our mathematical quantification approach, the method of batch splitting will be described. Batch splitting allows the adaptation of load to capacity to reduce load scattering. After describing the method, it will be explicitly analyzed in the context of the logistic curve theory by Nyhuis using the stretch factor α1 in order to evaluate the impact of the method of batch splitting on load scattering and on logistic curves. The conclusion of this article will be to show how the methods and approaches presented can help companies in a turbulent environment to quantify the occurring work load scattering accurately and apply an efficient method for adjusting work load to capacity supply. In this way, the achievements of the logistical objectives are increased without causing additional costs.

Keywords: batch splitting, production logistics, production planning and control, quantification, load scattering

Procedia PDF Downloads 382
486 Reducing Flood Risk through Value Capture and Risk Communication: A Case Study in Cocody-Abidjan

Authors: Dedjo Yao Simon, Takahiro Saito, Norikazu Inuzuka, Ikuo Sugiyama

Abstract:

Abidjan city (Republic of Ivory Coast) is an emerging megacity and an urban coastal area where the number of floods reported is on a rapid increase due to climate change and unplanned urbanization. However, comprehensive disaster mitigation plans, policies, and financial resources are still lacking as the population ignores the extent and location of the flood zones; making them unprepared to mitigate the damages. Considering the existing condition, this paper aims to discuss an approach for flood risk reduction in Cocody Commune through value capture strategy and flood risk communication. Using geospatial techniques and hydrological simulation, we start our study by delineating flood zones and depths under several return periods in the study area. Then, through a questionnaire a field survey is conducted in order to validate the flood maps, to estimate the flood risk and to collect some sample of the opinion of residents on how the flood risk information disclosure could affect the values of property located inside and outside the flood zones. The results indicate that the study area is highly vulnerable to 5-year floods and more, which can cause serious harm to human lives and to properties as demonstrated by the extent of the 5-year flood of 2014. Also, it is revealed there is a high probability that the values of property located within flood zones could decline, and the values of surrounding property in the safe area could increase when risk information disclosure commences. However in order to raise public awareness of flood disaster and to prevent future housing promotion in high-risk prospective areas, flood risk information should be disseminated through the establishment of an early warning system. In order to reduce the effect of risk information disclosure and to protect the values of property within the high-risk zone, we propose that property tax increments in flood free zones should be captured and be utilized for infrastructure development and to maintain the early warning system that will benefit people living in flood prone areas. Through this case study, it is shown that combination of value capture strategy and risk communication could be an effective tool to educate citizen and to invest in flood risk reduction in emerging countries.

Keywords: Cocody-Abidjan, flood, geospatial techniques, risk communication, value capture

Procedia PDF Downloads 248
485 Existence of Financial Service Authority Prior to 2045

Authors: Syafril Hendrik Hutabarat, Hartiwiningsih, Pujiyono Suwadi

Abstract:

The Financial Service Authority (FSA) was formed as a response to the 1997 monetary crisis and the 2008 financial crisis so that it was more defensive in nature while developments in information and communication technology have required state policies to be more offensive to keep up with times. Reconstruction of Authorities of the FSA's Investigator is intended to keep the agency worthy to be part of an integrated criminal justice system in Indonesia which has implications for expanding its authority in line with efforts to protect and increase the welfare of the people. The results show that internal synergy between sub-sectors in the financial services sector is not optimised, some are even left behind so that the FSA is not truly an authority in the financial services sector. This research method is empirical. The goal of synergy must begin with internal synergy which has its moment when Indonesia gets a demographic bonus in the 2030s and becomes an international logistics hub supported by the national financial services sector.

Keywords: reconstruction, authorities, FSA investigators, synergy, demography

Procedia PDF Downloads 60
484 Spatial Analysis of the Socio-Environmental Vulnerability in Medium-Sized Cities: Case Study of Municipality of Caraguatatuba SP-Brazil

Authors: Katia C. Bortoletto, Maria Isabel C. de Freitas, Rodrigo B. N. de Oliveira

Abstract:

The environmental vulnerability studies are essential for priority actions to the reduction of disasters risk. The aim of this study is to analyze the socio-environmental vulnerability obtained through a Census survey, followed by both a statistical analysis (PCA/SPSS/IBM) and a spatial analysis by GIS (ArcGis/ESRI), taking as a case study the Municipality of Caraguatatuba-SP, Brazil. In the municipal development plan analysis the emphasis was given to the Special Zone of Social Interest (ZEIS), the Urban Expansion Zone (ZEU) and the Environmental Protection Zone (ZPA). For the mapping of the social and environmental vulnerabilities of the study area the exposure of people (criticality) and of the place (support capacity) facing disaster risk were obtained from the 2010 Census from the Brazilian Institute of Geography and Statistics (IBGE). Considering the criticality, the variables of greater influence were related to literate persons responsible for the household and literate persons with 5 or more years of age; persons with 60 years or more of age and income of the person responsible for the household. In the Support Capacity analysis, the predominant influence was on the good household infrastructure in districts with low population density and also the presence of neighborhoods with little urban infrastructure and inadequate housing. The results of the comparative analysis show that the areas with high and very high vulnerability classes cover the classes of the ZEIS and the ZPA, whose zoning includes: Areas occupied by low-income population, presence of children and young people, irregular occupations and land suitable to urbanization but underutilized. The presence of zones of urban sprawl (ZEU) in areas of high to very high socio-environmental vulnerability reflects the inadequate use of the urban land in relation to the spatial distribution of the population and the territorial infrastructure, which favors the increase of disaster risk. It can be concluded that the study allowed observing the convergence between the vulnerability analysis and the classified areas in urban zoning. The occupation of areas unsuitable for housing due to its characteristics of risk was confirmed, thus concluding that the methodologies applied are agile instruments to subsidize actions to the reduction disasters risk.

Keywords: socio-environmental vulnerability, urban zoning, reduction disasters risk, methodologies

Procedia PDF Downloads 288
483 The Impact of Floods and Typhoons on Housing Welfare: Case Study of Thua Thien Hue Province, Vietnam

Authors: Seyeon Lee, Suyeon Lee, Julia Rogers

Abstract:

This research investigates and records post-flood and typhoon conditions of low income housing in the Thua Thien Hue Province, Vietnam; area prone to extreme flooding in Central Vietnam. The cost of rebuilding houses after flood and typhoon has been always a burden for low income households. These costs often lead to the elimination of essential construction practices for disaster resistance. Despite relief efforts from international non-profit organizations and Vietnam government, the impacts of flood and typhoon damages to residential construction has been reoccurring to the same neighborhood annually. Notwithstanding its importance, this topic has not been systematically investigated. The study is limited to assistance provided to low income households documenting existing conditions of low income homes impacted by post flood and typhoon conditions in the Thua Thien Hue Province. The research identifies leading causes of the building failure from the natural disasters. Relief efforts and progress made since the last typhoon is documented. The quality of construction and repairs are assessed based on Home Builders Guide to Coastal Construction by Federal Emergency Management Agency. Focus group discussions and individual interviews with local residents from four different communities were conducted to get incites on repair effort by the non-profit organizations and Vietnam government, and their needs post flood and typhoon. The findings from the field study informed that many of the local people are now aware of the importance of improving housing conditions as one of the key coping strategies to withstand flood and typhoon events as it makes housing and community more resilient to future events. While there has been a remarkable improvement of housing and infrastructure with the support from the local government as well as the non-profit organizations, many households in the study areas are found to still live in weak and fragile housing conditions without gaining access to the aid to repair and strengthen the houses. Given that the major immediate recovery action taken by the local people tends to focus on repairing damaged houses, and on this ground, low-income households spend a considerable amount of their income on housing repair, providing proper and applicable construction practices will not only improve the housing condition, but also contribute to reducing poverty in Vietnam.

Keywords: disaster coping mechanism, housing welfare, low-income housing, recovery reduction

Procedia PDF Downloads 259
482 A Review on Concrete Structures in Fire

Authors: S. Iffat, B. Bose

Abstract:

Concrete as a construction material is versatile because it displays high degree of fire-resistance. Concrete’s inherent ability to combat one of the most devastating disaster that a structure can endure in its lifetime, can be attributed to its constituent materials which make it inert and have relatively poor thermal conductivity. However, concrete structures must be designed for fire effects. Structural components should be able to withstand dead and live loads without undergoing collapse. The properties of high-strength concrete must be weighed against concerns about its fire resistance and susceptibility to spalling at elevated temperatures. In this paper, the causes, effects and some remedy of deterioration in concrete due to fire hazard will be discussed. Some cost effective solutions to produce a fire resistant concrete will be conversed through this paper.

Keywords: concrete, fire, spalling, temperature, compressive strength, density

Procedia PDF Downloads 423
481 A Review of Security Attacks and Intrusion Detection Schemes in Wireless Sensor Networks: A Survey

Authors: Maleh Yassine, Ezzati Abdellah

Abstract:

Wireless Sensor Networks (WSNs) are currently used in different industrial and consumer applications, such as earth monitoring, health related applications, natural disaster prevention, and many other areas. Security is one of the major aspects of wireless sensor networks due to the resource limitations of sensor nodes. However, these networks are facing several threats that affect their functioning and their life. In this paper we present security attacks in wireless sensor networks, and we focus on a review and analysis of the recent Intrusion Detection schemes in WSNs.

Keywords: wireless sensor networks, security attack, denial of service, IDS, cluster-based model, signature based IDS, hybrid IDS

Procedia PDF Downloads 362
480 Using Real Truck Tours Feedback for Address Geocoding Correction

Authors: Dalicia Bouallouche, Jean-Baptiste Vioix, Stéphane Millot, Eric Busvelle

Abstract:

When researchers or logistics software developers deal with vehicle routing optimization, they mainly focus on minimizing the total travelled distance or the total time spent in the tours by the trucks, and maximizing the number of visited customers. They assume that the upstream real data given to carry the optimization of a transporter tours is free from errors, like customers’ real constraints, customers’ addresses and their GPS-coordinates. However, in real transporter situations, upstream data is often of bad quality because of address geocoding errors and the irrelevance of received addresses from the EDI (Electronic Data Interchange). In fact, geocoders are not exempt from errors and could give impertinent GPS-coordinates. Also, even with a good geocoding, an inaccurate address can lead to a bad geocoding. For instance, when the geocoder has trouble with geocoding an address, it returns those of the center of the city. As well, an obvious geocoding issue is that the mappings used by the geocoders are not regularly updated. Thus, new buildings could not exist on maps until the next update. Even so, trying to optimize tours with impertinent customers GPS-coordinates, which are the most important and basic input data to take into account for solving a vehicle routing problem, is not really useful and will lead to a bad and incoherent solution tours because the locations of the customers used for the optimization are very different from their real positions. Our work is supported by a logistics software editor Tedies and a transport company Upsilon. We work with Upsilon's truck routes data to carry our experiments. In fact, these trucks are equipped with TOMTOM GPSs that continuously save their tours data (positions, speeds, tachograph-information, etc.). We, then, retrieve these data to extract the real truck routes to work with. The aim of this work is to use the experience of the driver and the feedback of the real truck tours to validate GPS-coordinates of well geocoded addresses, and bring a correction to the badly geocoded addresses. Thereby, when a vehicle makes its tour, for each visited customer, the vehicle might have trouble with finding this customer’s address at most once. In other words, the vehicle would be wrong at most once for each customer’s address. Our method significantly improves the quality of the geocoding. Hence, we achieve to automatically correct an average of 70% of GPS-coordinates of a tour addresses. The rest of the GPS-coordinates are corrected in a manual way by giving the user indications to help him to correct them. This study shows the importance of taking into account the feedback of the trucks to gradually correct address geocoding errors. Indeed, the accuracy of customer’s address and its GPS-coordinates play a major role in tours optimization. Unfortunately, address writing errors are very frequent. This feedback is naturally and usually taken into account by transporters (by asking drivers, calling customers…), to learn about their tours and bring corrections to the upcoming tours. Hence, we develop a method to do a big part of that automatically.

Keywords: driver experience feedback, geocoding correction, real truck tours

Procedia PDF Downloads 659
479 Major Incident Tier System in the Emergency Department: An Approach

Authors: Catherine Bernard, Paul Ransom

Abstract:

Recent events have prompted emergency planners to re-evaluate their emergency response to major incidents and mass casualties. At the Royal Sussex County Hospital, we have adopted a tiered system comprised of three levels, anticipating an increasing P1, P2 or P3 load. This will aid planning in the golden period between Major Incident ‘Standby,’ and ‘Declared’. Each tier offers step-by-step instructions on appropriate patient movement within and out of the department, as well as suggestions for overflow areas and additional staffing levels. This system can be adapted to individual hospitals and provides concise instructions to be followed in a potentially overwhelming situation.

Keywords: disaster planning, emergency preparedness, major incident planning, mass casualty event

Procedia PDF Downloads 356
478 A Lifeline Vulnerability Study of Constantine, Algeria

Authors: Mounir Ait Belkacem, Mehdi Boukri, Omar Amellal, Nacim Yousfi, Abderrahmane Kibboua, Med Naboussi Farsi, Mounir Naili

Abstract:

The North of Algeria is located in a seismic zone, then earthquakes are probably the most likely natural disaster that would lead to major lifeline disruption. The adequate operation of lifelines is vital for the economic development of regions under moderate to high seismic activity. After an earthquake, the proper operation of all vital systems is necessary, for instance hospitals for medical attention of the wounded and highways for communication and assistance for victims.In this work we apply the knowledge of pipeline vulnerability to the water supply system, sanitary sewer pipelines (waste water), and telephone in Constantine (Algeria).

Keywords: lifeline, earthquake, vulnerability, pipelines

Procedia PDF Downloads 545
477 The Impact of Milk Transport on Its Quality

Authors: Urszula Malaga-Toboła, Marek Gugała, Rafał Kornas, Robert Rusinek, Marek Gancarz

Abstract:

The work focused on presenting the elements that determine the quality of fresh milk in the context of the quality of its transport. The quality of the raw material depends on the quality of transport. Milk transport involves many activities in which, apart from the temperature and sterility of the means of transport, it is important not to expose the raw material to shocks. Recently, there have been changes in the milk supply chain, thus affecting the logistics processes between its links. Based on the conducted research and analyses, it was found that the condition of the road surface on which milk is transported affects its quality. For the T1 milk transport route- gravel roads of very poor and poor quality, the lowest number of bacteria and the highest number of somatic cells, fat content, and temperature of the transported milk were obtained. A well-organized integrated transport system is a real need for most companies today. The analysis showed significant differences in the quality of milk delivered to the dairy.

Keywords: fresh milk, transport, milk quality, dairy

Procedia PDF Downloads 66
476 Proposal for an Inspection Tool for Damaged Structures after Disasters

Authors: Karim Akkouche, Amine Nekmouche, Leyla Bouzid

Abstract:

This study focuses on the development of a multifunctional Expert System (ES) called post-seismic damage inspection tool (PSDIT), a powerful tool which allows the evaluation, the processing, and the archiving of the collected data stock after earthquakes. PSDIT can be operated by two user types; an ordinary user (ingineer, expert, or architect) for the damage visual inspection and an administrative user for updating the knowledge and / or for adding or removing the ordinary user. The knowledge acquisition is driven by a hierarchical knowledge model, the Information from investigation reports and those acquired through feedback from expert / engineer questionnaires are part.

Keywords: .disaster, damaged structures, damage assessment, expert system

Procedia PDF Downloads 65
475 Modeling Intention to Use 3PL Services: An Application of the Theory of Planned Behavior

Authors: Nasrin Akter, Prem Chhetri, Shams Rahman

Abstract:

The present study tested Ajzen’s Theory of Planned Behavior (TPB) model to explain the formation of business customers’ intention to use 3PL services in Bangladesh. The findings show that the TPB model has a good fit to the data. Based on theoretical support and suggested modification indices, a refined TPB model was developed afterwards which provides a better predictive power for intention. Consistent with the theory, the results of a structural equation analysis revealed that the intention to use 3PL services is predicted by attitude and subjective norms but not by perceived behavioral control. Further investigation indicated that the paths between (attitude and intention) and (subjective norms and intention) did not statistically differ between 3PL user and non-user. Findings of this research provide an evidence base to formulate business strategies to increase the use of 3PL services in Bangladesh to enhance productivity and to gain economic efficiency.

Keywords: Bangladesh, intention, third-party logistics, Theory of Planned Behavior

Procedia PDF Downloads 567
474 Quality versus Excellence: The Importance of Employees Knowing the Difference

Authors: Chris Nelson

Abstract:

Quality and excellence are qualitative topics that are usually addressed based on knowledge and past experience from leadership and those in charge of the organization. The significance of this study is to highlight the differences and similarities between these two mindsets and how an operational staff can most appropriately use them in the workplace. Quality and excellence are two words that are talked about a lot in the manufacturing world. Buzzwords such as operational excellence, quality controls, and efficiencies are discussed in the boardroom as well on the shop floor. These terms are used quite frequently and with good reasons. When a person visits their favorite local restaurant, They go because 1) they like the food and 2) the people are some of the greatest individuals to be around. With that in mind, they know they always put out quality food. They do not always go because the quality of the food is far superior than other restaurants. But the quality of ingredients always meets their expectations. When they compare them to the term excellence, they are disappointed. The food never looks like the pictures on the menu. But when have you ever been to a restaurant where the food looks the same as on the menu? For them, when evaluating which buzzword to use as a guiding star, its simple: excellence. The corporation can accomplish these goals by operating at a standard that far exceeds customer’s wants and needs.

Keywords: industrial engineering, innovation, management and technology, logistics and scheduling, six sigma

Procedia PDF Downloads 185
473 Familiarity with Flood and Engineering Solutions to Control It

Authors: Hamid Fallah

Abstract:

Undoubtedly, flood is known as a natural disaster, and in practice, flood is considered the most terrible natural disaster in the world both in terms of loss of life and financial losses. From 1988 to 1997, about 390,000 people were killed by natural disasters in the world, 58% of which were related to floods, 26% due to earthquakes, and 16% due to storms and other disasters. The total damages in these 10 years were about 700 billion dollars, which were 33, 29, 28% related to floods, storms and earthquakes, respectively. In this regard, the worrisome point has been the increasing trend of flood deaths and damages in the world in recent decades. The increase in population and assets in flood plains, changes in hydro systems and the destructive effects of human activities have been the main reasons for this increase. During rain and snow, some of the water is absorbed by the soil and plants. A percentage evaporates and the rest flows and is called runoff. Floods occur when the soil and plants cannot absorb the rainfall, and as a result, the natural river channel does not have the capacity to pass the generated runoff. On average, almost 30% of precipitation is converted into runoff, which increases with snow melting. Floods that occur differently create an area called flood plain around the river. River floods are often caused by heavy rains, which in some cases are accompanied by snow melt. A flood that flows in a river without warning or with little warning is called a flash flood. The casualties of these rapid floods that occur in small watersheds are generally more than the casualties of large river floods. Coastal areas are also subject to flooding caused by waves caused by strong storms on the surface of the oceans or waves caused by underground earthquakes. Floods not only cause damage to property and endanger the lives of humans and animals, but also leave other effects. Runoff caused by heavy rains causes soil erosion in the upstream and sedimentation problems in the downstream. The habitats of fish and other animals are often destroyed by floods. The high speed of the current increases the damage. Long-term floods stop traffic and prevent drainage and economic use of land. The supports of bridges, river banks, sewage outlets and other structures are damaged, and there is a disruption in shipping and hydropower generation. The economic losses of floods in the world are estimated at tens of billions of dollars annually.

Keywords: flood, hydrological engineering, gis, dam, small hydropower, suitablity

Procedia PDF Downloads 49
472 Post Earthquake Volunteer Learning That Build up Caring Learning Communities

Authors: Naoki Okamura

Abstract:

From a perspective of moral education, this study has examined the experiences of a group of college students who volunteered in disaster areas after the magnitude 9.0 Earthquake, which struck the Northeastern region of Japan in March, 2011. The research, utilizing the method of grounded theory, has uncovered that most of the students have gone through positive changes in their development of moral and social characters, such as attaining deeper sense of empathy and caring personalities. The study expresses, in identifying the nature of those transformations, that the importance of volunteer work should strongly be recognized by the colleges and universities in Japan, in fulfilling their public responsibility of creating and building learning communities that are responsible and caring.

Keywords: moral development, moral education, service learning, volunteer learning

Procedia PDF Downloads 307
471 Technology Blending as an Innovative Construction Mechanism in the Global South

Authors: Janet Kaningen, Richard N. Kaningen, Jonas Kaningen

Abstract:

This paper aims to discover the best ways to improve production efficiency, cost efficiency, community cohesion, and long-term sustainability in Ghana's housing delivery. Advanced Construction Technologies (ACTs) are set to become the sustainable mainstay of the construction industry due to the demand for innovative housing solutions. Advances in material science, building component production, and assembly technologies are leading to the development of next-generation materials such as polymeric-fiber-based products, light-metal alloys, and eco-materials. Modular housing construction has become more efficient and cost-effective than traditional building methods and is becoming increasingly popular for commercial, industrial, and residential projects. Effective project management and logistics will be imperative in the future speed and cost of modular construction housing.

Keywords: technology blending, sustainability, housing, Ghana

Procedia PDF Downloads 70