Search results for: public project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 10354

Search results for: public project

9874 Stakeholder Management for Successful Software Projects

Authors: Kassem Saleh

Abstract:

An alarming number of software projects fail to deliver the required functionalities within the provided budget and timeframe and with the required qualities. Some of the main reasons for this problem include bad stakeholder management, poor communications and informal change management. Informal processes to identify, engage and control stakeholders lead to these reasons. Recently, to emphasize its importance, the Project Management Institute (PMI) updated the Project Management Body of Knowledge (PMBoK) to explicitly include the stakeholder management knowledge area. This knowledge area consists of four processes to identify stakeholders, plan stakeholder management, and manage and control stakeholder engagement. The use of appropriate techniques for stakeholder management in software projects will definitely lead to higher quality and successful software. In this paper, we describe some of the proven techniques that can be used during the execution of the four processes for stakeholder management. Development of collaboration tools for automating these processes are recommended and need to be integrated in available software project management tools.

Keywords: project management, stakeholder management, software development, project management body of knowledge

Procedia PDF Downloads 318
9873 Mechanisms for Strategic Adoption of Innovation Procurement

Authors: Carolina B. A. Morais, Antonio Bob Santos

Abstract:

In order to determine how innovation procurement can strengthen public efficiency and foster the modernization of public services, while at the same time promoting the opening of new private markets, this paper aims to present the two key instruments for the practice of innovation procurement at a European, national, and regional level – Pre-Commercial Procurement (PCP), and Public Procurement of Innovative Solutions (PPI). Thus, it starts with a theoretical framework on the emergence of this topic in the European Innovation Policy (Section 2), then continues with the identification and systematization of the main mechanisms for its effective adoption, both on the demand and supply side of the market (Section 3), as well as to expose and describe methods and tools for positioning innovation at the heart of public entities. The innovative projects best distinguished by the European Commission for their good practices in innovation procurement are identified, and the main methodology for the development and management of innovation procurement – Forward Commitment Procurement (FCP) – is applied to them in a pioneering way (Section 4). The relevance of innovation in public procurement is systematized and reflected upon in Section 5.

Keywords: innovation procurement, innovation policy, innovation, pubic procurement

Procedia PDF Downloads 125
9872 Smart Sustainable University Campus: Aspects on Efficient Space Utilization at National Taiwan University of Science and Technology

Authors: Wei-Hwa Chiang, Yu-Ching Cheng, Pei-Hsien Kao, Yu-Chi Lai

Abstract:

A smart sustainable university campus is multi-dimensional. The success requires intensive inter-disciplinary coordination among all users and the expert group and long-term optimization. This paper reported the design and realization process of the dense and campus NTUST campus where space sharing is essential. Two-phase web-based interviews with students were conducted regarding where they study between classes as well as how they move within the campus. Efficient and active utilization of public and semi-public spaces, in particular, the ones near the ground, were progressively designed and realized where lobbies, corridors, reading rooms, and classrooms not in use were considered. Most of the spaces were equipped with smart monitoring and controls in terms of access, lighting, ceiling fans, air condition, and energy use. Mobile device apps were developed regarding the management of the spaces while information about energy use, environmental quality, and the smart sustainable campus project itself were provided to stimulate the awareness of sustainability and active participation in optimizing the campus.

Keywords: smart, sustainability, campus, space utilization

Procedia PDF Downloads 163
9871 Efficient GIS Based Public Health System for Disease Prevention

Authors: K. M. G. T. R. Waidyarathna, S. M. Vidanagamachchi

Abstract:

Public Health System exists in Sri Lanka has a satisfactory complete information flow when compared to other systems in developing countries. The availability of a good health information system contributed immensely to achieve health indices that are in line with the developed countries like US and UK. The health information flow at the moment is completely paper based. In Sri Lanka, the fields like banking, accounting and engineering have incorporated information and communication technology to the same extent that can be observed in any other country. The field of medicine has behind those fields throughout the world mainly due to its complexity, issues like privacy, confidentially and lack of people with knowledge in both fields of Information Technology (IT) and Medicine. Sri Lanka’s situation is much worse and the gap is rapidly increasing with huge IT initiatives by private-public partnerships in all other countries. The major goal of the framework is to support minimizing the spreading diseases. To achieve that a web based framework should be implemented for this application domain with web mapping. The aim of this GIS based public health system is a secure, flexible, easy to maintain environment for creating and maintaining public health records and easy to interact with relevant parties.

Keywords: DHIS2, GIS, public health, Sri Lanka

Procedia PDF Downloads 571
9870 The Influence of Beta Shape Parameters in Project Planning

Authors: Αlexios Kotsakis, Stefanos Katsavounis, Dimitra Alexiou

Abstract:

Networks can be utilized to represent project planning problems, using nodes for activities and arcs to indicate precedence relationship between them. For fixed activity duration, a simple algorithm calculates the amount of time required to complete a project, followed by the activities that comprise the critical path. Program Evaluation and Review Technique (PERT) generalizes the above model by incorporating uncertainty, allowing activity durations to be random variables, producing nevertheless a relatively crude solution in planning problems. In this paper, based on the findings of the relevant literature, which strongly suggests that a Beta distribution can be employed to model earthmoving activities, we utilize Monte Carlo simulation, to estimate the project completion time distribution and measure the influence of skewness, an element inherent in activities of modern technical projects. We also extract the activity criticality index, with an ultimate goal to produce more accurate planning estimations.

Keywords: beta distribution, PERT, Monte Carlo simulation, skewness, project completion time distribution

Procedia PDF Downloads 152
9869 Problems concerning Legal Regulation of Electronic Governance in Georgia

Authors: Giga Phartenadze

Abstract:

In the legal framework of regulation of electronic governance, those norms are considered which include measures for improvement of functions of public institutions and a complex of actions for raising their standard such as websites of public institutions, online services, some forms of internet interactions and higher level of internet services. An important legal basis for electronic governance in Georgia is Georgian Law about Electronic Communications which defines legal and economic basis for utilizing electronic communication systems in Georgia. As for single electronic basis for e-governance regulation, it can be said that it does not exist at all. The official websites of public institutions do not have standards for proactive spreading of information. At the same time, there is no common legal norm which would make all public institutions have an official website for public relations, accountability, publicity, and raising information quality. Electronic governance in Georgia needs comprehensive legal regulation. Public administration in electronic form is on the initial stage of development. Currently existing legal basis has a low quality for public institutions and officials as well as citizens and business. Services of e-involvement and e-consultation have also low quality. So far there is no established legal framework for e-governance. Therefore, a single legislative system of e-governance should be created which will help develop effective, comprehensive and multi component electronic systems in the country (central, regional, local levels). Such comprehensive legal framework will provide relevant technological, institutional, and informational conditions.

Keywords: law, e-government, public administration, Georgia

Procedia PDF Downloads 328
9868 Application of Simulation of Discrete Events in Resource Management of Massive Concreting

Authors: Mohammad Amin Hamedirad, Seyed Javad Vaziri Kang Olyaei

Abstract:

Project planning and control are one of the most critical issues in the management of construction projects. Traditional methods of project planning and control, such as the critical path method or Gantt chart, are not widely used for planning projects with discrete and repetitive activities, and one of the problems of project managers is planning the implementation process and optimal allocation of its resources. Massive concreting projects is also a project with discrete and repetitive activities. This study uses the concept of simulating discrete events to manage resources, which includes finding the optimal number of resources considering various limitations such as limitations of machinery, equipment, human resources and even technical, time and implementation limitations using analysis of resource consumption rate, project completion time and critical points analysis of the implementation process. For this purpose, the concept of discrete-event simulation has been used to model different stages of implementation. After reviewing the various scenarios, the optimal number of allocations for each resource is finally determined to reach the maximum utilization rate and also to reduce the project completion time or reduce its cost according to the existing constraints. The results showed that with the optimal allocation of resources, the project completion time could be reduced by 90%, and the resulting costs can be reduced by up to 49%. Thus, allocating the optimal number of project resources using this method will reduce its time and cost.

Keywords: simulation, massive concreting, discrete event simulation, resource management

Procedia PDF Downloads 150
9867 The Covid-19 Pandemic: Transmission, Misinformation, and Implications on Public Health

Authors: Jonathan De Rothewelle

Abstract:

A pandemic, such as that of COVID-19, can be a time of panic and stress; concerns about health supersede others such as work and leisure. With such concern comes the seeking of crucial information— information that, during a global health crisis, could mean the difference between life and death. Whether newspapers, cable news, or radio, media plays an important role in the transmission of medical information to the general public. Moreover, the news media in particular must uphold its obligation to the public to only disseminate factual, useful information. The circulation of misinformation, whether explicit or implicit, may profoundly impact global health. Using a discursive analytic framework founded in linguistics, the images and headlines of top coverage of COVID-19 from the most influential media outlets will be examined. Micro-analyses reveal what may be interpreted as evidence of sensationalism, which may be argued to a form of misinformation, and ultimately a departure from ethical media. Withdrawal from responsible reporting and publishing, expressly in times of epidemic, may cause further confusion and panic.

Keywords: public health, pandemic, public education, media

Procedia PDF Downloads 156
9866 The Role of Public Management Development in Enhancing Public Service Delivery in the South African Local Government

Authors: Andrew Enaifoghe

Abstract:

The study examined the role of public management development in enhancing public service delivery in the South African local government. The study believes that the ultimate empowerment of the third tier sphere of governments in South Africa remains the instrument required to enhance both national and continental development. This over the year has been overwhelmed with problems and imbalance related to ethical practice, accountability and the functional local government system and the machinery itself. The study finds that imbalances are being strengthened by a lack of understanding and unanimity as to what a public management development in a democratic system is and how it should work to achieve the dividends of democracy in delivering public goods. Studies indicated that the magnitudes are widespread corruption and misrepresentations of government priorities; both of which weaken the ability of governments to enhance broad-based economic growth and social well-being of the people. This study addressed the problem of public management and accountable local government. The study indicates the need for citizens’ participation in the decision-making process in delivering public service in South Africa and how its accountability mechanism supports good governance. The study concludes that good and ethical watersheds in South Africa have since reached such proportions that social pressure, the pressure from the government and various institutions have to re-consider where they stand regarding ethics, ethical behaviour, accountability and professionalism in delivering public goods to the people at the local municipal government.

Keywords: accountability, development, democratic system, South Africa

Procedia PDF Downloads 133
9865 Public Health Informatics: Potential and Challenges for Better Life in Rural Communities

Authors: Shishir Kumar, Chhaya Gangwal, Seema Raj

Abstract:

Public health informatics (PHI) which has seen successful implementation in the developed world, become the buzzword in the developing countries in providing improved healthcare with enhanced access. In rural areas especially, where a huge gap exists between demand and supply of healthcare facilities, PHI is being seen as a major solution. There are factors such as growing network infrastructure and the technological adoption by the health fraternity which provide support to these claims. Public health informatics has opportunities in healthcare by providing opportunities to diagnose patients, provide intra-operative assistance and consultation from a remote site. It also has certain barriers in the awareness, adaptation, network infrastructure, funding and policy related areas. There are certain medico-legal aspects involving all the stakeholders which need to be standardized to enable a working system. This paper aims to analyze the potential and challenges of public health informatics services in rural communities.

Keywords: PHI, e-health, public health, health informatics

Procedia PDF Downloads 383
9864 Public Policy Making Process in Developing Countries: Case Study of Turkish Health System

Authors: Hakan Akin

Abstract:

The aim of this study was to examine the policy making process in Turkish Health System. This policy making process will be examined through public policy change theories. Since political actors played in the formulation of public policies also explains the type of policy change, this actors will be inspected in the supranational and national basis. Also the transformation of public policy in the Turkish health care system will be analysed under the concepts of New right ideology, neo-liberalism, neo-conservatism and governance. And after this analyse, the outputs and outcomes of this transformation will be discussed in the context of developing countries.

Keywords: policy transfer, policy diffusion, policy convergence, new right, governance

Procedia PDF Downloads 484
9863 Stage-Gate Based Integrated Project Management Methodology for New Product Development

Authors: Mert Kıranç, Ekrem Duman, Murat Özbilen

Abstract:

In order to achieve new product development (NPD) activities on time and within budgetary constraints, the NPD managers need a well-designed methodology. This study intends to create an integrated project management methodology for the ones who focus on new product development projects. In the scope of the study, four different management systems are combined. These systems are called as 'Schedule-oriented Stage-Gate Method, Risk Management, Change Management and Earned Value Management'. New product development term is quite common in many different industries such as defense industry, construction, health care/dental, higher education, fast moving consumer goods, white goods, electronic devices, marketing and advertising and software development. All product manufacturers run against each other’s for introducing a new product to the market. In order to achieve to produce a more competitive product in the market, an optimum project management methodology is chosen, and this methodology is adapted to company culture. The right methodology helps the company to present perfect product to the customers at the right time. The benefits of proposed methodology are discussed as an application by a company. As a result, how the integrated methodology improves the efficiency and how it achieves the success of the project are unfolded.

Keywords: project, project management, management methodology, new product development, risk management, change management, earned value, stage-gate

Procedia PDF Downloads 320
9862 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 251
9861 From Mathematics Project-Based Learning to Commercial Product Using Geometer’s Sketchpad (GSP)

Authors: Krongthong Khairiree

Abstract:

The purpose of this research study is to explore mathematics project-based learning approach and the use of technology in the context of school mathematics in Thailand. Data of the study were collected from 6 sample secondary schools and the students were 6-14 years old. Research findings show that through mathematics project-based learning approach and the use of GSP, students were able to make mathematics learning fun and challenging. Based on the students’ interviews they revealed that, with GSP, they were able to visualize and create graphical representations, which will enable them to develop their mathematical thinking skills, concepts and understanding. The students had fun in creating variety of graphs of functions which they can not do by drawing on graph paper. In addition, there are evidences to show the students’ abilities in connecting mathematics to real life outside the classroom and commercial products, such as weaving, patterning of broomstick, and ceramics design.

Keywords: mathematics, project-based learning, Geometer’s Sketchpad (GSP), commercial products

Procedia PDF Downloads 341
9860 Potential of Visualization and Information Modeling on Productivity Improvement and Cost Saving: A Case Study of a Multi-Residential Construction Project

Authors: Sara Rankohi, Lloyd Waugh

Abstract:

Construction sites are information saturated. Digitalization is hitting construction sites to meet the incredible demand of knowledge sharing and information documentations. From flying drones, 3D Lasers scanners, pocket mobile applications, to augmented reality glasses and smart helmet, visualization technologies help real-time information imposed straight onto construction professional’s field of vision. Although these technologies are very applicable and can have the direct impact on project cost and productivity, experience shows that only a minority of construction professionals quickly adapt themselves to benefit from them in practice. The majority of construction managers still tend to apply traditional construction management methods. This paper investigates a) current applications of visualization technologies in construction projects management, b) the direct effect of these technologies on productivity improvement and cost saving of a multi-residential building project via a case study on Mac Taggart Senior Care project located in Edmonton, Alberta. The research shows the imaged based technologies have a direct impact on improving project productivity and cost savings.

Keywords: image-based technologies, project management, cost, productivity improvement

Procedia PDF Downloads 366
9859 Study on the Key Stakeholders' Perception and Establishment of Sustainability Goals in the Green Building Projects: The Case of Malaysia

Authors: Nor Kalsum M. Isa, Mohd Yazid M. Yunos, Anuar Alias, Mazdi Marzuki, Kamarul Ismail, Mohd H. Ibrahim

Abstract:

Green building is an emerging concept with the ultimate target to achieve sustainable development by integrating sustainability goals and principles into project development. Basically, a green building is a building that is designed, constructed and operated to boost environmental, economic, health and productivity performance over conventional buildings. The buildings have been proven to be successful in contributing towards sustainability and project success. The purpose of this study was to determine the benefits of sustainability application in building projects, looking towards project success from the perspective of Malaysian key project stakeholders. The study also aimed to explore the establishment of sustainability goals in the green building projects in Malaysia. The Triple Bottom Line (TBL) Concept of Sustainability was used as the foundation theoretical framework. Surveys, interviews and multiple case study methods were employed. A sample of 188 Malaysian building project stakeholders was selected for questionnaire surveys, and 15 stakeholders from three award-winning green building projects in Malaysia were involved in the interviews. The study found that the majority of the respondents were less aware that the sustainability integration in the building project can significantly affect cost reduction, schedule effectiveness and stakeholders’ satisfaction with the performance of buildings as at the same level as the quality performance. Of the four sustainability goals, the environmental aspect was given more priority than others in the development of the green building projects.

Keywords: green building, sustainability, project stakeholders, Malaysia

Procedia PDF Downloads 569
9858 Public Health Infrastructure Resilience in the Face of Natural Disasters in Rwanda

Authors: Jessy Rugeyo, William Donner

Abstract:

This research delves into the resilience of Rwanda's public health infrastructure amidst natural disasters, a critical issue given that the Northern Province alone has witnessed no fewer than 1500 cases of disaster ranging from floods and landslides in the last five years, with more than 200 people killed and thousands of homes destroyed, according to MINEMA. In an era where climate change escalates the frequency and intensity of such disasters, fortifying the resilience of public health systems is paramount. This study offers a comprehensive analysis of the existing state of Rwanda's public health infrastructure and its ability to manage such crises. Employing a mix of literature review, case studies, and policy analysis, the study discerns key vulnerabilities and brings to light the intricacies of disaster management in Rwanda. Case studies centered around past natural disasters in Rwanda provide critical insights into the strengths and weaknesses of the existing disaster response mechanisms. A thorough critique of related disaster management and public health infrastructure policies reveals areas of commendable practice, along with gaps calling for policy enhancements. Findings guide the proposition of targeted strategies to bolster the resilience of Rwanda's public health infrastructure. This research serves as a significant contribution to the domains of disaster studies and public health, offering valuable insights for policymakers, public health and disaster management professionals in Rwanda and similar contexts. It presents actionable recommendations for improvement, underscoring the potential for enhancing Rwanda's disaster management capacity. By advocating for the strengthening of public health infrastructure resilience, the research highlights the potential for improved public health outcomes following natural disasters, thereby showcasing significant implications for public health and disaster management in the country, particularly in the face of a changing climate.

Keywords: public health infrastructure, disaster resilience, natural disaster, disaster management, emergency preparedness, health policy

Procedia PDF Downloads 96
9857 'Pacta Sunt Servanda': Which Form of Contract to Use in the Construction Industry

Authors: Ahmed Stifi, Sascha Gentes

Abstract:

The contract in its simplest definition is an agreement involving parties with a number of documents which may be as little as a marriage contract involving two parties or as big as a contract of construction and operation of a nuclear power plant involving companies and stakeholders with hundreds or even thousands of documents. All parties in the construction industry, not only the contract experts, agree that the success of a project is linked primarily to the form of contract regulating the relationship between stakeholders of the project. Therefore it is essential for the construction industry to study, analyze and improve its contracts forms continuously. However, it should be mentioned that different contract forms are developed to suit the construction evolution in term of its machinery, materials and construction process. There exist some similarities in some clauses and variations in many of these forms depending upon the type of project, the kind of clients and more importantly the laws and regulations governing the transaction in the country where the project is carried out. This paper will discuss the most important forms of construction contracts starting from national level, intended to the contract form in Germany and moving on to the international level introducing FIDIC contracts and its different forms, some newly developed contracts forms namely the integrated form of agreement, the new engineering contract and the project alliance agreement. The result of the study shows that many of the contract’s paragraphs are similar and the main difference comes in the approach of the relationship between the parties. Is it based on co-operation and mutual trust, or in some cases a load of responsibility for a particular party which increases the problems and disputes that affects the success of the project negatively. Thus we can say that the form of the contract, that plays an essential role in the approach of the project management, which is ultimately the key factor for the success of the project. So we advise to use a form of contract, which enhance the mutual trust between the project parties, contribute to support the cooperation between them, distribute responsibility and risks on an equitable basis and build on the principle “win-win". In additional to the conventional role of the contract it should integrate all parties into one team to achieve the target value of the project.

Keywords: contract, FIDIC, integrated form of agreement, new engineering contract, project alliance agreemen

Procedia PDF Downloads 381
9856 Interaction between University Art Gallery and the Community through Public Art Exhibitions

Authors: Qiao Mao

Abstract:

Starting from the theoretical viewpoints of relational aesthetics, this study explores the relationship between the university art gallery and the communities, taking Art Scattering Program in the Name of Trees of the Art Gallery of National Taiwan Normal University (NTNU) as a case. The researcher uses observational and interview methods to obtain research materials to explore how university art galleries interact with communities through public art exhibitions and strengthen the relatively weak relationships with community residents. The researcher also observes how community residents can change their opinions about the university gallery by participating in public art exhibitions. The results show that the university art gallery can effectively establish the interaction with the community residents and repair the relationship with them through such programs as "collection-sharing," "teacher-student co-creation," "artist stationing," and "education promotion activities," playing an active role in promoting interpersonal communication, sustaining the natural environment development and improving community public space.

Keywords: university art gallery, public art, relational aesthetics, communities, interaction

Procedia PDF Downloads 93
9855 Public Policy and Morality Principles as Grounds for Refusal of Trademarks: A Comparative Study of Islamic Shari’a and Common Law

Authors: Nawaf Alyaseen

Abstract:

This paper provides a comparative analysis of the Islamic and Western public policy and morality principles governing trademarks. The aim of this paper is to explore public policy and morality principles that affect trademark registration and protection under Shari'a by using Kuwaiti law as a case study. The findings provide a better understanding of trademark recognition from the perspective of Shari'a and the requirements demanded by Islamic Shari'a, especially of those who deal with strict Shari'a jurisdiction countries. In addition, this understanding is required for corporations or legislators that wish to take into consideration Muslim consumers. The conclusion suggests that trademarks in Western and Islamic systems are controlled by a number of public policy and morality rules that have a direct effect on the registration and protection of trademarks. Regardless of the fact that there are many commonalities between the two systems, there are still fundamental differences.

Keywords: trademark, public policy and morality, Islamic sharia, western legal systems

Procedia PDF Downloads 83
9854 The Impact of Public Open Space System on Housing Price in Chicago

Authors: Si Chen, Le Zhang, Xian He

Abstract:

The research explored the influences of public open space system on housing price through hedonic models, in order to support better open space plans and economic policies. We have three initial hypotheses: 1) public open space system has an overall positive influence on surrounding housing prices. 2) Different public open space types have different levels of influence on motivating surrounding housing prices. 3) Walking and driving accessibilities from property to public open spaces have different statistical relation with housing prices. Cook County, Illinois, was chosen to be a study area since data availability, sufficient open space types, and long-term open space preservation strategies. We considered the housing attributes, driving and walking accessibility scores from houses to nearby public open spaces, and driving accessibility scores to hospitals as influential features and used real housing sales price in 2010 as a dependent variable in the built hedonic model. Through ordinary least squares (OLS) regression analysis, General Moran’s I analysis and geographically weighted regression analysis, we observed the statistical relations between public open spaces and housing sale prices in the three built hedonic models and confirmed all three hypotheses.

Keywords: hedonic model, public open space, housing sale price, regression analysis, accessibility score

Procedia PDF Downloads 138
9853 Improving Cost and Time Control of Construction Projects Management Practices in Nigeria

Authors: Mustapha Yakubu, Ahmed Usman, Hashim Ambursa

Abstract:

This paper presents the findings of a research which sought to investigate techniques used to improve cost and time control of construction projects management practice in Nigeria. However, there is limited research on issues surrounding the practical usage of these techniques. Data were collected through a questionnaire distributed to construction experts through a survey conducted on the 100 construction organisations and 50 construction consultancy firms in the Nigeria aimed at identifying common project cost and time control practices and factors inhibiting effective project control in practice. The study reveals that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Keywords: construction project, cost control, Nigeria, time control

Procedia PDF Downloads 319
9852 Global Learning Supports Global Readiness with Projects with Purpose

Authors: Brian Bilich

Abstract:

A typical global learning program is a two-week project based, culturally immersive and academically relevant experience built around a project with purpose and catered to student and business groups. Global Learning in Continuing Education at Austin Community College promotes global readiness through projects with purpose with special attention given to balancing learning, hospitality and travel. A recent project involved CommunityFirst! Village; a 51-acre planned community which provides affordable, permanent housing for men and women coming out of chronic homelessness. Global Learning students collaborated with residents and staff at the Community First! Village on a project to produce two-dimensional remodeling plans of residents’ tiny homes with a focus on but not limited to design improvements on elements related to accessibility, increased usability of living and storage space and esthetic upgrades to boost psychological and emotional appeal. The goal of project-based learning in the context of global learning in Continuing Educaiton at Austin Community Collegen general is two fold. One, in rapid fashion we develop a project which gives the learner a hands-on opportunity to exercise soft and technical skills, like creativity and communication and analytical thinking. Two, by basing projects on global social conflict issues, the project of purpose promotes the development of empathy for other people and fosters a sense of corporate social responsibility in future generations of business leadership. In the example provide above the project informed the student group on the topic of chronic homelessness and promoted awareness and empathy for this underserved segment of the community. Project-based global learning based on projects with purpose has the potential to cultivate global readiness by developing empathy and strengthening emotional intelligence for future generations.

Keywords: project-based learning, global learning, global readiness, globalization, international exchange, collaboration

Procedia PDF Downloads 70
9851 BLS-2/BSL-3 Laboratory for Diagnosis of Pathogens on the Colombia-Ecuador Border Region: A Post-COVID Commitment to Public Health

Authors: Anderson Rocha-Buelvas, Jaqueline Mena Huertas, Edith Burbano Rosero, Arsenio Hidalgo Troya, Mauricio Casas Cruz

Abstract:

COVID-19 is a disruptive pandemic for the public health and economic system of whole countries, including Colombia. Nariño Department is the southwest of the country and draws attention to being on the border with Ecuador, constantly facing demographic transition affecting infections between countries. In Nariño, the early routine diagnosis of SARS-CoV-2, which can be handled at BSL-2, has affected the transmission dynamics of COVID-19. However, new emerging and re-emerging viruses with biological flexibility classified as a Risk Group 3 agent can take advantage of epidemiological opportunities, generating the need to increase clinical diagnosis, mainly in border regions between countries. The overall objective of this project was to assure the quality of the analytical process in the diagnosis of high biological risk pathogens in Nariño by building a laboratory that includes biosafety level (BSL)-2 and (BSL)-3 containment zones. The delimitation of zones was carried out according to the Verification Tool of the National Health Institute of Colombia and following the standard requirements for the competence of testing and calibration laboratories of the International Organization for Standardization. This is achieved by harmonization of methods and equipment for effective and durable diagnostics of the large-scale spread of highly pathogenic microorganisms, employing negative-pressure containment systems and UV Systems in accordance with a finely controlled electrical system and PCR systems as new diagnostic tools. That increases laboratory capacity. Protection in BSL-3 zones will separate the handling of potentially infectious aerosols within the laboratory from the community and the environment. It will also allow the handling and inactivation of samples with suspected pathogens and the extraction of molecular material from them, allowing research with pathogens with high risks, such as SARS-CoV-2, Influenza, and syncytial virus, and malaria, among others. The diagnosis of these pathogens will be articulated across the spectrum of basic, applied, and translational research that could receive about 60 daily samples. It is expected that this project will be articulated with the health policies of neighboring countries to increase research capacity.

Keywords: medical laboratory science, SARS-CoV-2, public health surveillance, Colombia

Procedia PDF Downloads 96
9850 Public Transportation Demand and Policy in Kabul, Afghanistan

Authors: Ahmad Samim Ranjbar, Shoshi Mizokami

Abstract:

Kabul is the heart of political, commercial, cultural, educational and social life in Afghanistan and the Kabul fifth fastest growing city in the world, since 2001 with the establishment of new government Lack of adequate employment opportunities and basic utility services in remote provinces have prompted people to move to Kabul and other urban areas. From 2001 to the present, a rapid increase in population, and also less income of the people most of residence tend to use public transport, especially buses, however there is no proper bus system exist in Kabul city, because of wars, from 1992 to 2001 Kabul suffered damage and destruction of its transportation facilities including pavements, sidewalks, traffic circles, drainage systems, traffic signs and signals, trolleybuses and almost all of the public transit buses (e.g. Millie bus). This research is a primary and very important phase into Kabul city transportation and especially an initial and important step toward using large bus in Kabul city, which the main purpose of this research is to find the demand of Kabul city residence for public transport (Large Bus) and compare it with the actual supply from government. Finding of this research shows that the demand of Kabul city residence for the public transport (Large Bus) exceed the supply from the government, means that current public transportation (Large Bus) is not sufficient to serve people of Kabul city, it is mentionable that according to this research there is no need to build a new road or exclusive way for bus, this research propose to government for investment on the public transportation and exceed the number of large buses to can handle the current demand for public transport.

Keywords: transportation, planning, public transport, large bus, Kabul, Afghanistan

Procedia PDF Downloads 302
9849 A Risk-Based Approach to Construction Management

Authors: Chloe E. Edwards, Yasaman Shahtaheri

Abstract:

Risk management plays a fundamental role in project planning and delivery. The purpose of incorporating risk management into project management practices is to identify and address uncertainties related to key project-related activities. The uncertainties, known as risk events, can relate to project deliverables that are quantifiable and are often measured by impact to project schedule, cost, or environmental impact. Risk management should be incorporated as an iterative practice throughout the planning, execution, and commissioning phases of a project. This paper specifically examines how risk management contributes to effective project planning and delivery through a case study of a transportation project. This case study focused solely on impacts to project schedule regarding three milestones: readiness for delivery, readiness for testing and commissioning, and completion of the facility. The case study followed the ISO 31000: Risk Management – Guidelines. The key factors that are outlined by these guidelines include understanding the scope and context of the project, conducting a risk assessment including identification, analysis, and evaluation, and lastly, risk treatment through mitigation measures. This process requires continuous consultation with subject matter experts and monitoring to iteratively update the risks accordingly. The risk identification process led to a total of fourteen risks related to design, permitting, construction, and commissioning. The analysis involved running 1,000 Monte Carlo simulations through @RISK 8.0 Industrial software to determine potential milestone completion dates based on the project baseline schedule. These dates include the best case, most likely case, and worst case to provide an estimated delay for each milestone. Evaluation of these results provided insight into which risks were the highest contributors to the projected milestone completion dates. Based on the analysis results, the risk management team was able to provide recommendations for mitigation measures to reduce the likelihood of risks occurring. The risk management team also provided recommendations for managing the identified risks and project activities moving forward to meet the most likely or best-case milestone completion dates.

Keywords: construction management, monte carlo simulation, project delivery, risk assessment, transportation engineering

Procedia PDF Downloads 112
9848 Conceptual Modeling of the Relationship between Project Management Practices and Knowledge Absorptive Capacity Using Interpretive Structural Modeling Method

Authors: Seyed Abdolreza Mosavi, Alireza Babakhan, Elham Sadat Hoseinifard

Abstract:

Knowledge-based firms need to design mechanisms for continuous absorptive and creation of knowledge in order to ensure their survival in the competitive arena and to follow the path of development. Considering the project-oriented nature of product development activities in knowledge-based firms on the one hand and the importance of analyzing the factors affecting knowledge absorptive capacity in these firms on the other, the purpose of this study is to identify and classify the factors affecting project management practices on absorptive knowledge capacity. For this purpose, we have studied and reviewed the theoretical literature in the field of project management and absorptive knowledge capacity so as to clarify its dimensions and indexes. Then, using the ISM method, the relationship between them has been studied. To collect data, 21 questionnaires were distributed in project-oriented knowledge-based companies. The results of the ISM method analysis provide a model for the relationship between project management activities and knowledge absorptive capacity, which includes knowledge acquisition capacity, scope management, time management, cost management, quality management, human resource management, communications management, procurement management, risk management, stakeholders management and integration management. Having conducted the MICMAC analysis, we divided the variables into three groups of independent, relational and dependent variables and came up with no variables to be included in the group of autonomous variables.

Keywords: knowledge absorptive capacity, project management practices, knowledge-based firms, interpretive structural modeling

Procedia PDF Downloads 201
9847 Demand of Media and Information for the Public Relation Media for Local Learning Resource Salaya, Nakhon Pathom

Authors: Patsara Sirikamonsin, Sathapath Kilaso

Abstract:

This research aims to study the media and information demand for public relations in Salaya, Nakhonpathom. The research objectives are: 1. to research on conflicts of communication and seeking solutions and improvements of media information in Salaya, Nakhonpathom; 2. to study about opinions and demand for media information to reach out the improvements of people communications among Salaya, Nakhonpathom; 3. to explore the factors related to relationship and behaviors on obtaining media information for public relations among Salaya, Nakhonpathom. The research is conducted by questionnaire which is interpreted by statistical analysis concluding with analysis, frequency, percentage, average and standard deviations. The research results demonstrate: 1. The conflicts of communications among Salaya, Nakhonpathom are lacking equipment and technological knowledge and public relations. 2. Most people have demand on media improvements for vastly broadcasting public relations in order to nourish the social values. This research intentionally is to create the infographic media which are easily accessible, uncomplicated and popular, in the present.

Keywords: media and information, the public relation printed media, local learning resource

Procedia PDF Downloads 164
9846 Public Accountability, a Challenge to Sustainable Development: A Case Study of Uganda

Authors: Nassali Celine Lindah

Abstract:

The study sought to find out how public accountability is a challenge to sustainable development in Uganda. The study was guided by the following set of objectives included establishing the challenges of Public accountability, the importance of accountability in Uganda, and the possible solutions to the problems identified in the study. In order to ensure proper accountability there should be proper control of resources, specifically the control of both public revenue and expenditures. Stakeholders should also be involved in the accountability process. Accountability can reduce corruption and other abuses, assure compliance with standards and procedures, and improve performance and organizational learning. The study involved qualitative and quantitative data collection techniques. A sample of 20 respondents from various districts/towns was used using both technical staff and non-technical staff members. The study utilized secondary and primary data, which was obtained using interviews and observations. The study reached a conclusion that the major challenges of Public accountability in Uganda are poor leadership, poor resource management, unethical behavior by the government officials and political involvement, among others. The study also recommended that the policymakers should design relevant guidelines/policies to help promote the process of public accountability in Uganda like prosecution and convictions, strengthen public expenditure management benchmarking and performance measurements, among others.

Keywords: accountability, sustainability, government activities, government sector

Procedia PDF Downloads 142
9845 Connecting Students and Faculty Research Efforts through the Research and Projects Portal

Authors: Havish Nalapareddy, Mark V. Albert, Ranak Bansal, Avi Udash, Lin Lin

Abstract:

Students engage in many course projects during their degree programs. However, impactful projects often need a time frame longer than a single semester. Ideally, projects are documented and structured to be readily accessible to future students who may choose to continue the project, with features that emphasize the local community, university, or course structure. The Research and Project Portal (RAPP) is a place where students can post both their completed and ongoing projects with all the resources and tools used. This portal allows students to see what other students have done in the past, in the same university environment, related to their domain of interest. Computer science instructors or students selecting projects can use this portal to assign or choose an incomplete project. Additionally, this portal allows non-computer science faculty and industry collaborators to document their project ideas for students in courses to prototype directly, rather than directly soliciting the help of instructors in engaging students. RAPP serves as a platform linking students across classes and faculty both in and out of computer science courses on joint projects to encourage long-term project efforts across semesters or years.

Keywords: education, technology, research, academic portal

Procedia PDF Downloads 141