Search results for: retention challenges in project management
17873 A Study of the Challenges in Adoption of Renewable Energy in Nigeria
Authors: Farouq Sule Garo, Yahaya Yusuf
Abstract:
The purpose of this study is to investigate why there is a general lack of successful adoption of sustainable energy in Nigeria. This is particularly important given the current global campaign for net-zero emissions. The 26th United Nations Conference of the Parties (COP26), held in 2021, was hosted by the UK, in Glasgow, where, amongst other things, countries including Nigeria agreed to a zero emissions pact. There is, therefore, an obligation on the part of Nigeria for transition from fossil fuel-based economy to a sustainable net-zero emissions economy. The adoption of renewable energy is fundamental to achieving this ambitious target if decarbonisation of economic activities were to become a reality. Nigeria has an abundance of sources of renewable energy and yet there has been poor uptake and where attempts have been made to develop and harness renewable energy resources, there has been limited success. It is not entirely clear why this is the case. When analysts allude to corruption as the reason for failure for successful adoption of renewable energy or project implementation, it is arguable that corruption alone cannot explain the situation. Therefore, there is the need for a thorough investigation into the underlying issues surrounding poor uptake of renewable energy in Nigeria. This pilot study, drawing upon stakeholders’ theory, adopts a multi-stakeholder’ perspectives to investigate the influence and impacts of economic, political, technological, social factors in adoption of renewable energy in Nigeria. The research will also investigate how these factors shape (or fail to shape) strategies for achieving successful adoption of renewable energy in the country. A qualitative research methodology has been adopted given the nature of the research requiring in-depth studies in specific settings rather than a general population survey. There will be a number of interviews and each interview will allow thorough probing of sources. This, in addition to the six interviews that have already been conducted, primarily focused on economic dimensions of the challenges in adoption of renewable energy. The six participants in these initial interviews were all connected to the Katsina Wind Farm Project that was conceived and built with the view to diversifying Nigeria's energy mix and capitalise on the vast wind energy resources in the northern region. The findings from the six interviews provide insights into how the economic factors impacts on the wind farm project. Some key drivers have been identified, including strong governmental support and the recognition of the need for energy diversification. These drivers have played crucial roles in initiating and advancing the Katsina Wind Farm Project. In addition, the initial analysis has highlighted various challenges encountered during the project's implementation, including financial, regulatory, and environmental aspects. These challenges provide valuable lessons that can inform strategies to mitigate risks and improve future wind energy projects.Keywords: challenges in adoption of renewable energy, economic factors, net-zero emission, political factors
Procedia PDF Downloads 3817872 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria
Authors: Shazali Abdulahi
Abstract:
Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.Keywords: effetive communication, ineffective communication, stakeholders, project delivery
Procedia PDF Downloads 5017871 The Promotion of a Risk Culture: a Descriptive Study of Ghanaian Banks
Authors: Gerhard Grebe, Johan Marx
Abstract:
The aim of the study is to assess the state of operational risk management and the adoption of an appropriate risk culture in Ghanaian banks. The Bank of Ghana (BoG) joined the Basel Consultative Group (BCG) of the Basel Committee on Bank Supervision (BCBS) in 2021 and is proceeding with the implementation of the Basel III international regulatory framework for banks. The BoG’s Directive about risk management encourages, inter alia, the creation of an appropriate risk culture by Ghanaian banks. However, it is not evident how the risk management staff of Ghanaian banks experience the risk culture and the implementation of operational risk management in the banks where they are employed. Ghana is a developing economy, and it is addressing challenges with its organisational culture. According to Transparency International, successive Ghanaian governments claim to be fighting corruption, but little success has been achieved so far. This points to a possible lack of accountability, transparency, and integrity in the environment in which Ghanaian banks operate and which could influence their risk culture negatively. Purposive sampling was used for the survey, and the questionnaire was completed byGhanaian bank personnel who specializesin operational risk management, risk governance, and compliance, bank supervision, risk analyses, as well as the implementation of the operational risk management requirements of the Basel regulatory frameworks. The respondents indicated that they are fostering a risk culture and implementing monitoring and reporting procedures; the three lines of defence (3LOD); compliance; internal auditing; disclosure of operational risk information; and receiving guidance from the bank supervisor in an attempt to improve their operational risk management practices. However, the respondents reported the following challenges with staff members who are not inside the risk management departments(in order of priority), namelydemonstrating a risk culture, training and development; communication; reporting and disclosure; roles and responsibilities; performance appraisal; and technological and environmental barriers. Recommendations to address these challenges are providedKeywords: ghana, operational risk, risk culture, risk management
Procedia PDF Downloads 11917870 Mapping New Technologies for Sustainability along the Fashion Supply Chain
Authors: Hilde Heim
Abstract:
The textile industry is known for its swift adoption of innovations in fashion technology (Fash-Tech). The industry is also known for its harmful effects on the environment. Opportunely, Fash-Tech is expected to facilitate the turn towards more sustainable practice. However, although several technologies have the potential for advancing sustainable practice, many industry players, whether large or small, are confused and misinformed about Fash-Tech adoption, application, and impact. Through a visual poster presentation, this project aims to map global fashion innovations along the supply chain from fibre production to waste management, thus providing a clearer picture of numbers, scale, and adoption. While the project aims to identify Fash-Tech effectiveness in reaching sustainability goals, it also identifies areas of congestion as well as insufficiency in the accessibility of Fash-Tech. This project intends to help inform future decisions in business, investment, and policy for the advancement of sustainable practice.Keywords: fashion technology, sustainability, supply chain, enterprise management
Procedia PDF Downloads 24017869 Development of an Interagency Crime Management System for Nigeria’s Law Enforcement Agencies
Authors: Muhammad Abba Jallo, Fred Fudah Moveh
Abstract:
This study addresses the challenges faced by Nigerian law enforcement agencies due to the lack of an integrated crime management system. While various agencies use ICT-based systems, the absence of interoperability creates barriers to effective collaboration and information sharing. The research proposes the development of an Interagency Crime Management System (ICMS), which integrates the Crime Management Systems (CMS) of different agencies through an Application Program Interface (API). The system is designed to allow all law enforcement agencies to input data using a standardized format, improving crime tracking, reporting, and management across Nigeria. This paper details the design and implementation process, highlighting the benefits of enhanced collaboration for crime management.Keywords: crime management, Nigeria, law enforcement, ICT
Procedia PDF Downloads 1817868 Effect of Hydraulic Residence Time on Aromatic Petrochemical Wastewater Treatment Using Pilot-Scale Submerged Membrane Bioreactor
Authors: Fatemeh Yousefi, Narges Fallah, Mohsen Kian, Mehrzad Pakzadeh
Abstract:
The petrochemical complex releases wastewater, which is rich in organic pollutants and could not be treated easily. Treatment of the wastewater from a petrochemical industry has been investigated using a submerged membrane bioreactor (MBR). For this purpose, a pilot-scale submerged MBR with a flat-sheet ultrafiltration membrane was used for treatment of petrochemical wastewater according to Bandar Imam Petrochemical complex (BIPC) Aromatic plant. The testing system ran continuously (24-h) over 6 months. Trials on different membrane fluxes and hydraulic retention time (HRT) were conducted and the performance evaluation of the system was done. During the 167 days operation of the MBR at hydraulic retention time (HRT) of 18, 12, 6, and 3 and at an infinite sludge retention time (SRT), the MBR effluent quality consistently met the requirement for discharge to the environment. A fluxes of 6.51 and 13.02 L m-2 h-1 (LMH) was sustainable and HRT of 6 and 12 h corresponding to these fluxes were applicable. Membrane permeability could be fully recovered after cleaning. In addition, there was no foaming issue in the process. It was concluded that it was feasible to treat the wastewater using submersed MBR technology.Keywords: membrane bioreactor (MBR), petrochemical wastewater, COD removal, biological treatment
Procedia PDF Downloads 51717867 The Potential Effect of Biochar Application on Microbial Activities and Availability of Mineral Nitrogen in Arable Soil Stressed by Drought
Authors: Helena Dvořáčková, Jakub Elbl, Irina Mikajlo, Antonín Kintl, Jaroslav Hynšt, Olga Urbánková, Jaroslav Záhora
Abstract:
Application of biochar to arable soils represents a new approach to restore soil health and quality. Many studies reported the positive effect of biochar application on soil fertility and development of soil microbial community. Moreover biochar may affect the soil water retention, but this effect has not been sufficiently described yet. Therefore this study deals with the influence of biochar application on: microbial activities in soil, availability of mineral nitrogen in soil for microorganisms, mineral nitrogen retention and plant production. To demonstrate the effect of biochar addition on the above parameters, the pot experiment was realized. As a model crop, Lactuca sativa L. was used and cultivated from December 10th 2014 till March 22th 2015 in climate chamber in thoroughly homogenized arable soil with and without addition of biochar. Five variants of experiment (V1–V5) with different regime of irrigation were prepared. Variants V1–V2 were fertilized by mineral nitrogen, V3–V4 by biochar and V5 was a control. The significant differences were found only in plant production and mineral nitrogen retention. The highest content of mineral nitrogen in soil was detected in V1 and V2, about 250 % in comparison with the other variants. The positive effect of biochar application on soil fertility, mineral nitrogen availability was not found. On the other hand results of plant production indicate the possible positive effect of biochar application on soil water retention.Keywords: arable soil, biochar, drought, mineral nitrogen
Procedia PDF Downloads 42217866 Redefining Success Beyond Borders: A Deep Dive into Effective Methods to Boost Morale Among Virtual Workers for Exponential Project Performance
Authors: Florence Ibeh, David Oyewmi Oyekunle, David Boohene
Abstract:
The continuous advancement of information technology has completely transformed how businesses and organizations operate on a global scale. The widespread availability of virtual communication tools enables individuals to opt for remote work. While remote employment offers various benefits, such as facilitating corporate growth and enhancing customer support, it also presents distinct challenges. Therefore, investigating the intricacies of virtual team morale is crucial for ensuring the achievement of project objectives. For this study, content analysis of pre-existing secondary data was employed to examine the phenomenon. Essential elements vital for improving the success of projects within virtual teams were identified. These factors include technology adoption, creating a distraction-free work environment, effective leadership, trust-building, clear communication channels, well-defined task allocation, active team participation, and motivation. Furthermore, the study established a substantial correlation between morale levels and the participation and productivity of virtual team members. Higher levels of morale were associated with optimal performance among virtual teams. The study determined that the key factors for enhancing project performance in virtual teams are the adoption of technology, a focused environment, effective leadership, trust, communication, well-defined tasks, collaborative teamwork, and motivation. Additionally, the study discovered that modifying the optimal strategies employed by in-office teams can enhance the diminished morale prevalent in remote teams to sustain a high level of team morale for virtual teams. The findings of this study are highly significant in the dynamic field of project management. Currently, there is limited information regarding strategies that address challenges arising from external factors in virtual teams, such as ambient noise and disruptions caused by family members. The findings underscore the significance of selecting appropriate communication technologies, delineating distinct roles and responsibilities for virtual team members, and nurturing a culture of accountability and trust. Promoting seamless collaboration and instilling motivation among virtual team members are deemed highly effective in augmenting employee engagement and performance within virtual team setting.Keywords: virtual teams, morale, project performance, distract-free environment, technology adaptation
Procedia PDF Downloads 9417865 Sub-Optimum Safety Performance of a Construction Project: A Multilevel Exploration
Authors: Tas Yong Koh, Steve Rowlinson, Yuzhong Shen
Abstract:
In construction safety management, safety climate has long been linked to workers' safety behaviors and performance. For this reason, safety climate concept and tools have been used as heuristics to diagnose a range of safety-related issues by some progressive contractors in Hong Kong and elsewhere. However, as a diagnostic tool, safety climate tends to treat the different components of the climate construct in a linear fashion. Safety management in construction projects, in reality, is a multi-faceted and multilevel phenomenon that resembles a complex system. Hence, understanding safety management in construction projects requires not only the understanding of safety climate but also the organizational-systemic nature of the phenomenon. Our involvement, diagnoses, and interpretations of a range of safety climate-related issues which culminated in the project’s sub-optimum safety performance in an infrastructure construction project have brought about such revelation. In this study, a range of data types had been collected from various hierarchies of the project site organization. These include the frontline workers and supervisors from the main and sub-contractors, and the client supervisory personnel. Data collection was performed through the administration of safety climate questionnaire, interviews, observation, and document study. The findings collectively indicate that what had emerged in parallel of the seemingly linear climate-based exploration is the exposition of the organization-systemic nature of the phenomenon. The results indicate the negative impacts of climate perceptions mismatch, insufficient work planning, and risk management, mixed safety leadership, workforce negative attributes, lapsed safety enforcement and resources shortages collectively give rise to the project sub-optimum safety performance. From the dynamic causation and multilevel perspective, the analyses show that the individual, group, and organizational levels issues are interrelated and these interrelationships are linked to negative safety climate. Hence the adoption of both perspectives has enabled a fuller understanding of the phenomenon of safety management that point to the need for an organizational-systemic intervention strategy. The core message points to the fact that intervention at an individual level will only meet with limited success if the risks embedded in the higher levels in group and project organization are not addressed. The findings can be used to guide the effective development of safety infrastructure by linking different levels of systems in a construction project organization.Keywords: construction safety management, dynamic causation, multilevel analysis, safety climate
Procedia PDF Downloads 17417864 Transit Network Design Problem Issues and Challenges
Authors: Mahmoud Owais
Abstract:
Public Transit (P.T) is very important means to reduce traffic congestion, to improve urban environmental conditions and consequently affects people social lives. Planning, designing and management of P.T are the key issues for offering a competitive mode that can compete with the private transportation. These transportation planning, designing and management issues are addressed in the Transit Network Design Problem (TNDP). It deals with a complete hierarchy of decision making process. It includes strategic, tactical and operational decisions. The main body of TNDP is two stages, namely; route design stage and frequency setting. The TNDP is extensively studied in the last five decades; however the research gate is still widely open due to its many practical and modeling challenges. In this paper, a comprehensive background is given to illustrate the issues and challenges related to the TNDP to help in directing the incoming researches towards the untouched areas of the problem.Keywords: frequency setting, network design, transit planning, urban planning
Procedia PDF Downloads 38317863 The Successful in Construction Project via Effectiveness of Project Team
Authors: Zarabizan Zakaria, Hayati Zainal
Abstract:
The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.Keywords: project team, leadership, construction project, project successful
Procedia PDF Downloads 17417862 Shaping and Improving the Human Resource Management in Small and Medium Enterprises in Poland
Authors: Małgorzata Smolarek
Abstract:
One of the barriers to the development of small and medium-sized enterprises (SME) are difficulties connected with management of human resources. The first part of article defines the specifics of staff management in small and medium enterprises. The practical part presents results of own studies in the area of diagnosis of the state of the human resources management in small and medium-sized enterprises in Poland. It takes into account its impact on the functioning of SME in a variable environment. This part presents findings of empirical studies, which enabled verification of the hypotheses and formulation of conclusions. The findings presented in this paper were obtained during the implementation of the project entitled 'Tendencies and challenges in strategic managing SME in Silesian Voivodeship.' The aim of the studies was to diagnose the state of strategic management and human resources management taking into account its impact on the functioning of small and medium enterprises operating in Silesian Voivodeship in Poland and to indicate improvement areas of the model under diagnosis. One of the specific objectives of the studies was to diagnose the state of the process of strategic management of human resources and to identify fundamental problems. In this area, the main hypothesis was formulated: The enterprises analysed do not have comprehensive strategies for management of human resources. The survey was conducted by questionnaire. Main Research Results: Human resource management in SMEs is characterized by simplicity of procedures, and the lack of sophisticated tools and its specificity depends on the size of the company. The process of human resources management in SME has to be adjusted to the structure of an organisation, result from its objectives, so that an organisation can fully implement its strategic plans and achieve success and competitive advantage on the market. A guarantee of success is an accurately developed policy of human resources management based on earlier analyses of the existing procedures and possessed human resources.Keywords: human resources management, human resources policy, personnel strategy, small and medium enterprises
Procedia PDF Downloads 24017861 A Case Study: Community Forestry in Nepal: Achievements and Challenges
Authors: Bhmika Raiu
Abstract:
The community forestry programme in Nepal officially started in the late 1970s. Since then concerning movement has been evolving to involve local communities in the management and utilization of forests. The policy of the government was originally intended to meet the basic forest products required by the communities through active participation in forest development and management. Later, it was expanded to include the mobilization and empowerment of the members of community forest user groups in the development of their local communities. It was observed that the trend of forest degradation has decreased since the handing over of national forests to local communities, but a number of unintended social anomalies have also cropped up. Such anomalies essentially constitute of the inequity and unfairness in the local and national level and in terms of long-term sustainability of forest resources. This paper provides an overview of various issues of community forestry, especially focusing on the major achievements made in community forestry. It calls for rethinking the community forestry programme in order to face the present day challenges of linking community forestry with livelihood promotion, good governance, and sustainable forest management. It also lays out strategies for reforms in community forestry.Keywords: community forest, livelihood promotion, challenges, achievements
Procedia PDF Downloads 37617860 Urban Governance in Major Development Projects: Challenges, Issues and Constraints - Case of Constantine
Authors: Chouabbia Khedidja, Lazri Youcef, Mouhoubi Nedjima
Abstract:
In optics and in ambition to break into the ranks of international metropolis cities, Constantine, a regional metropolis of eastern Algeria, is facing multiple challenges shared between the response to the urban crisis plaguing the city and the creation of territorial attractiveness in the metropolisation process. This ambition cannot be achieve in conditions of poor governance and lack of cooperation especially between the actors involved in major development projects, these last qualified by change and hope carriers to make the city more attractive and pleasant. Thus, governance or good governance has become not only a necessity but also a challenge for the city of Constantine. Through this example of Constantine. We will analyze the challenges facing a metropolis amongst other urban governance and the constraints that affect the smooth running of major development projects when governance is missing or inoperative.Keywords: urban governance, metropolis, big development project, actors, constantine
Procedia PDF Downloads 45517859 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options
Authors: Babak H. Tabrizi, Seyed Farid Ghaderi
Abstract:
On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.Keywords: discount strategies, material purchasing, project planning, project scheduling
Procedia PDF Downloads 26017858 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns
Authors: Saidu Ibrahim, Winston M. W. Shakantu
Abstract:
The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.Keywords: conceptual framework, cost overrun, material waste, project stags
Procedia PDF Downloads 29617857 Evaluating Seismic Earth Pressure Effects on Building Lateral Stability: Sensitivity to Retention Height Differences and Sloped Site Conditions
Authors: Rod Davis, Sara Saminfar
Abstract:
Earthquakes can induce dynamic earth pressures on retaining walls, which are in addition to the static earth pressures. This raises questions about how to effectively combine the seismic lateral earth pressure with other loads on buildings, including static lateral earth pressure. When basement walls retain soil with differing exterior grades on opposite sides, the seismic increment of active earth pressure should be considered. Additionally, buildings situated on sloped sites with stepped retention may experience unique dynamic effects due to soil-structure interactions, potentially amplifying the lateral pressures exerted on the retaining walls and influencing the building's response during seismic events. To account for the dynamic effects of the retained soil on the building's responses, it is essential to interconnect the building structure with the surrounding soil to facilitate their interaction as the embedded structure and the surrounding soil move together during an earthquake. Consequently, a finite element model of the building is developed, with the rigid retaining walls and restrained to the floor diaphragms. This paper aims to explore the dynamic effects of retained soil on the lateral stability of buildings and the sensitivity of the building's responses to differences in the retained heights on opposite sides of the building basement. Furthermore, the results are compared with those from a sloped site to evaluate the impact of stepped retention on dynamic soil pressure. These findings will help establish a minimum threshold for differences in retained heights on opposite sides of a building that necessitates the inclusion of dynamic soil pressure in the building's lateral stability analysis.Keywords: dynamic earth pressures, soil-structure interaction, stepped retention, building retention
Procedia PDF Downloads 717856 Sustainable Transboundary Water Management: Challenges and Good Practices of Cooperation in International River Basin Districts
Authors: Aleksandra Ibragimow, Moritz Albrecht, Eerika Albrecht
Abstract:
Close international cooperation between all countries within a river basin has become one of the key aspects of sustainable cross-border water management. This is due to the fact that water does not stop at administrative or political boundaries. Therefore, the preferred mode to protect and manage transnational water bodies is close cooperation between all countries and stakeholders within the natural hydrological unit of the river basin. However, past practices have demonstrated that combining interests of different countries and stakeholders with differing political systems and management approaches to environmental issues upstream as well as downstream can be challenging. The study focuses on particular problems and challenges of water management in international river basin districts by the example of the International Oder River Basin District. The Oder River is one of the largest cross-border rivers of the Baltic Sea basin passing through Poland, Germany, and the Czech Republic. Attention is directed towards the activities and the actions that were carried out during the Districts' first management cycle of transnational river basin management (2009-2015). The results show that actions of individual countries have been focused on the National Water Management Plans while a common appointment about identified supra-regional water management problems has not been solved, and conducted actions can be considered as preliminary and merely a basis for future management. This present state raises the question whether the achievement of main objectives of Water Framework Directive (2000/60/EC) can be a realistic task.Keywords: International River Basin Districts, water management, water frameworkdirective, water management plans
Procedia PDF Downloads 31417855 Customer Churn Analysis in Telecommunication Industry Using Data Mining Approach
Authors: Burcu Oralhan, Zeki Oralhan, Nilsun Sariyer, Kumru Uyar
Abstract:
Data mining has been becoming more and more important and a wide range of applications in recent years. Data mining is the process of find hidden and unknown patterns in big data. One of the applied fields of data mining is Customer Relationship Management. Understanding the relationships between products and customers is crucial for every business. Customer Relationship Management is an approach to focus on customer relationship development, retention and increase on customer satisfaction. In this study, we made an application of a data mining methods in telecommunication customer relationship management side. This study aims to determine the customers profile who likely to leave the system, develop marketing strategies, and customized campaigns for customers. Data are clustered by applying classification techniques for used to determine the churners. As a result of this study, we will obtain knowledge from international telecommunication industry. We will contribute to the understanding and development of this subject in Customer Relationship Management.Keywords: customer churn analysis, customer relationship management, data mining, telecommunication industry
Procedia PDF Downloads 31617854 Analysis of Generated Biogas from Anaerobic Digestion of Piggery Dung
Authors: Babatope Alabadan, Adeyinka Adesanya, I. E. Afangideh
Abstract:
The use of energy is paramount to human existence. Every activity globally revolves round it. Over the years, different sources of energy (petroleum fuels predominantly) have been utilized. Animal waste treatment on the farm is a phenomenon that has called for rapt research attention. Generated wastes on farm pollute the environment in diverse ways. Waste-to-bioenergy treatments can provide livestock operators with multiple value-added, renewable energy products. The objective of this work is to generate methane (CH4) gas from the anaerobic digestion of piggery dung. A retention time of 15 and 30 days and a mesophilic temperature range were selected. The generated biogas composition was methane (CH4), carbondioxide (CO2), hydrogen sulphide (H2S) and ammonia (NH3) using gas chromatography method. At 15 days retention time, 60% of (CH4) was collected while CO2 and traces of H2S and NH3 accounted for 40%. At 30 days retention time, 75% of CH4, 20% of CO2 was collected while traces of H2S and NH3 amounted to 5%. For on and off farm uses, biogas can be upgraded to biomethane by removing the CO2, NH3 and H2S. This product (CH4) can meet heating and power needs or serve as transportation fuelsKeywords: anaerobic digestion, biogas, methane, piggery dung
Procedia PDF Downloads 34317853 A Feasibility Study of Crowdsourcing Data Collection for Facility Maintenance Management
Authors: Mohamed Bin Alhaj, Hexu Liu, Mohammed Sulaiman, Osama Abudayyeh
Abstract:
An effective facility maintenance management (FMM) system plays a crucial role in improving the quality of services and maintaining the facility in good condition. Current FMM heavily relies on the quality of the data collection function of the FMM systems, at times resulting in inefficient FMM decision-making. The new technology-based crowdsourcing provides great potential to improve the current FMM practices, especially in terms of timeliness and quality of data. This research aims to investigate the feasibility of using new technology-driven crowdsourcing for FMM and highlight its opportunities and challenges. A survey was carried out to understand the human, data, system, geospatial, and automation characteristics of crowdsourcing for an educational campus FMM via social networks. The survey results were analyzed to reveal the challenges and recommendations for the implementation of crowdsourcing for FMM. This research contributes to the body of knowledge by synthesizing the challenges and opportunities of using crowdsourcing for facility maintenance and providing a road map for applying crowdsourcing technology in FMM. In future work, a conceptual framework will be proposed to support data-driven FMM using social networks.Keywords: crowdsourcing, facility maintenance management, social networks
Procedia PDF Downloads 17117852 Identifying Project Delay Factors in the Australian Construction Industry
Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar
Abstract:
Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.Keywords: construction, delay factors, time delay, australian construction industry
Procedia PDF Downloads 17317851 Enhancing Quality Management Systems through Automated Controls and Neural Networks
Authors: Shara Toibayeva, Irbulat Utepbergenov, Lyazzat Issabekova, Aidana Bodesova
Abstract:
The article discusses the importance of quality assessment as a strategic tool in business and emphasizes the significance of the effectiveness of quality management systems (QMS) for enterprises. The evaluation of these systems takes into account the specificity of quality indicators, the multilevel nature of the system, and the need for optimal selection of the number of indicators and evaluation of the system state, which is critical for making rational management decisions. Methods and models of automated enterprise quality management are proposed, including an intelligent automated quality management system integrated with the Management Information and Control System. These systems make it possible to automate the implementation and support of QMS, increasing the validity, efficiency, and effectiveness of management decisions by automating the functions performed by decision makers and personnel. The paper also emphasizes the use of recurrent neural networks to improve automated quality management. Recurrent neural networks (RNNs) are used to analyze and process sequences of data, which is particularly useful in the context of document quality assessment and non-conformance detection in quality management systems. These networks are able to account for temporal dependencies and complex relationships between different data elements, which improves the accuracy and efficiency of automated decisions. The project was supported by a grant from the Ministry of Education and Science of the Republic of Kazakhstan under the Zhas Galym project No. AR 13268939, dedicated to research and development of digital technologies to ensure consistency of QMS regulatory documents.Keywords: automated control system, quality management, document structure, formal language
Procedia PDF Downloads 3817850 Patient Progression at Discharge: A Communication, Coordination, and Accountability Gap among Hospital Teams
Authors: Nana Benma Osei
Abstract:
Patient discharge can be a hectic process. Patients are sometimes sent to the wrong location or forgotten in lounges in the waiting room. This ends up compromising patient care because the delay in picking the patients can affect how they adhere to medication. Patients may fail to take their medication, and this will lead to negative outcomes. The situation highlights the demands of modern-day healthcare, and the use of technology can help in reducing such challenges and in enhancing the patient’s experience, leading to greater satisfaction with the care provided. The paper contains the proposed changes to a healthcare facility by introducing the clinical decision support system, which will be needed to improve coordination and communication during patient discharge. This will be done under Kurt Lewin’s Change Management Model, which recognizes the different phases in the change process. A pilot program is proposed initially before the program can be implemented in the entire organization. This allows for the identification of challenges and ways of managing them. The paper anticipates some of the possible challenges that may arise during implementation, and a multi-disciplinary approach is considered the most effective. Opposition to the change is likely to arise because staff members may lack information on how the changes will affect them and the skills they will need to learn to use the new system. Training will occur before the technology can be implemented. Every member will go for training, and adequate time is allocated for training purposes. A comparison of data will determine whether the project has succeeded.Keywords: patient discharge, clinical decision support system, communication, collaboration
Procedia PDF Downloads 10117849 The Effect of Artificial Intelligence on Construction Development
Authors: Shady Gamal Aziz Shehata
Abstract:
Difficulty in defining construction quality arises due to perception based on the nature and requirements of the market, the different partners themselves and the results they want. Quantitative research was used in this constructivist research. A case-based study was conducted to assess the structures of positive attitudes and expectations in the context of quality improvement. A survey based on expert opinions was analyzed among construction organizations/companies operating in the construction industry in Pakistan. The financial strength, management structure and construction experience of the construction companies formed the basis of their selection. A good concept is visible at the project level and is seen as the most valuable part of the construction project. Each quality improvement technique was expected to increase the user's profits by improving the efficiency of the construction project. The Survey is useful for construction professionals to evaluate current construction concepts and expectations for the application of quality improvement techniques in construction projects.Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety construction quality, expectation, improvement, perception
Procedia PDF Downloads 5617848 Exploring the Relationship between the Adoption of Environmental Processes, Policies, Techniques and Environmental Operational Performance
Authors: Renata Konadu
Abstract:
Over the last two decades, the concept of environmental management and its related issues have received increased attention in global discourse and on management research agenda due to climate change and other environmental challenges. To abate and avert these challenges, diverse environmental policies, strategies and practices have been adopted by businesses and economies as a whole. Extant literature has placed much emphasis on whether improved environmental operational performance improves firm performance. However, there is a huge gap in the literature with regards to whether the adoption of environmental management practices and policies has a direct relationship with environmental operational performance (EOP). The current paper is intended to provide a comprehensive perspective of how different aspects of environmental management can relate to firms EOP. Using a panel regression analysis of 149 large listed firms in the UK, the study found evidence of both negative and positive statistically significant link between some Environmental Policies (EP), Environmental Processes (EPR), Environmental Management Systems (EMS) and EOP. The findings suggest that in terms of relating EP, EPR and EMS to Greenhouse Gases (GHGs) emissions for instance, the latter should be viewed separately in Scopes 1, 2 and 3 as developed by GHG protocol. The results have useful implication for policy makers and managers when designing strategies and policies to reduce negative environmental impacts.Keywords: environmental management, environmental operational performance, GHGs, large listed firms
Procedia PDF Downloads 25217847 Using Systems Theory and Collective Impact Approaches to Increase the Retention and Success of University Student Stem Majors
Authors: Araceli Martínez Ortiz
Abstract:
An educational research effort is analyzed using systems theory to document the power of collective impact when addressing multiple factors contributing towards the retention of students majoring in science, technology, engineering and mathematics (STEM) academic programs. This research promotes understanding on how networked communities may work effectively toward a shared vision and mutually aligned activities that result in sustained, large scale change. The actions of a team of researchers in their third year of collaboration are presented to describe a model that positively aligns work efforts resulting in greater total gains. The goals of the multiple programs managed by the funded program team are to: 1) expand the number of students who choose to study a STEM field of study; 2) promote student collaborative learning; 3) support faculty understanding of the funds of knowledge of diverse students and 4) establish innovative and robust STEM education research that will lead to the development of nationally replicable, scalable models for broadening participation in STEM. The impacts of this research effort are measured through quantitative statistical analysis of the changes in second-year STEM undergraduate student retention rates and representation rates of women, Hispanics and African American STEM majors.Keywords: collaborative impact, diversity, student retention, systems theory, STEM education
Procedia PDF Downloads 26417846 Introducing Standardized Nursing Language in Reporting Nursing Care in Resource-Limited Care Environments: An Exploratory Study
Authors: Naomi Mutea, Jossete Jones
Abstract:
The project aimed at exploring the views and perceptions of nurse leaders and educators regarding use of International Classification for Nursing Practice (ICNP) in an informal approach which involved face to face discussions, after which a decision would be made on whether to proceed and propose introduction of ICNP project in Kenya as a pilot project which would mean all nurses would use a standard approach to reporting and documenting nursing care. In addition the project was to determine the best approaches/methods that can be used to introduce ICNP in the Kenyan nursing education and practice environment using the findings of the pilot project. Further four cardex reports were reviewed to establish if nurses on the bedside used a standardized language in documenting and reporting care processes. The cardex reports showed that nurses do not use ICNP or any other standardized language. The results of the discussions revealed that this would be a challenge due to several challenges experienced in conducting nursing research in resource-limited environments. The following questions were asked during the informal discussions with the educators/leaders: •What is currently being taught in terms of standardized nursing language? •Are you familiar with ICNP? •Do you view it advantageous to have a standardized language? •What is the greatest need at the moment in terms of curriculum development for BSN regarding use of standardized nursing language? •If you had a wish to change something in your curriculum, what would that be?Keywords: nursing, standardized language, ICNP, resource-limited care environments
Procedia PDF Downloads 41617845 An Effective Approach to Knowledge Capture in Whole Life Costing in Constructions Project
Authors: Ndibarafinia Young Tobin, Simon Burnett
Abstract:
In spite of the benefits of implementing whole life costing technique as a valuable approach for comparing alternative building designs allowing operational cost benefits to be evaluated against any initial cost increases and also as part of procurement in the construction industry, its adoption has been relatively slow due to the lack of tangible evidence, ‘know-how’ skills and knowledge of the practice, i.e. the lack of professionals in many establishments with knowledge and training on the use of whole life costing technique, this situation is compounded by the absence of available data on whole life costing from relevant projects, lack of data collection mechanisms and so on. This has proved to be very challenging to those who showed some willingness to employ the technique in a construction project. The knowledge generated from a project can be considered as best practices learned on how to carry out tasks in a more efficient way, or some negative lessons learned which have led to losses and slowed down the progress of the project and performance. Knowledge management in whole life costing practice can enhance whole life costing analysis execution in a construction project, as lessons learned from one project can be carried on to future projects, resulting in continuous improvement, providing knowledge that can be used in the operation and maintenance phases of an assets life span. Purpose: The purpose of this paper is to report an effective approach which can be utilised in capturing knowledge in whole life costing practice in a construction project. Design/methodology/approach: An extensive literature review was first conducted on the concept of knowledge management and whole life costing. This was followed by a semi-structured interview to explore the existing and good practice knowledge management in whole life costing practice in a construction project. The data gathered from the semi-structured interview was analyzed using content analysis and used to structure an effective knowledge capturing approach. Findings: From the results obtained in the study, it shows that the practice of project review is the common method used in the capturing of knowledge and should be undertaken in an organized and accurate manner, and results should be presented in the form of instructions or in a checklist format, forming short and precise insights. The approach developed advised that irrespective of how effective the approach to knowledge capture, the absence of an environment for sharing knowledge, would render the approach ineffective. Open culture and resources are critical for providing a knowledge sharing setting, and leadership has to sustain whole life costing knowledge capture, giving full support for its implementation. The knowledge capturing approach has been evaluated by practitioners who are experts in the area of whole life costing practice. The results have indicated that the approach to knowledge capture is suitable and efficient.Keywords: whole life costing, knowledge capture, project review, construction industry, knowledge management
Procedia PDF Downloads 25917844 Towards an Intelligent Ontology Construction Cost Estimation System: Using BIM and New Rules of Measurement Techniques
Authors: F. H. Abanda, B. Kamsu-Foguem, J. H. M. Tah
Abstract:
Construction cost estimation is one of the most important aspects of construction project design. For generations, the process of cost estimating has been manual, time-consuming and error-prone. This has partly led to most cost estimates to be unclear and riddled with inaccuracies that at times lead to over- or under-estimation of construction cost. The development of standard set of measurement rules that are understandable by all those involved in a construction project, have not totally solved the challenges. Emerging Building Information Modelling (BIM) technologies can exploit standard measurement methods to automate cost estimation process and improves accuracies. This requires standard measurement methods to be structured in ontologically and machine readable format; so that BIM software packages can easily read them. Most standard measurement methods are still text-based in textbooks and require manual editing into tables or Spreadsheet during cost estimation. The aim of this study is to explore the development of an ontology based on New Rules of Measurement (NRM) commonly used in the UK for cost estimation. The methodology adopted is Methontology, one of the most widely used ontology engineering methodologies. The challenges in this exploratory study are also reported and recommendations for future studies proposed.Keywords: BIM, construction projects, cost estimation, NRM, ontology
Procedia PDF Downloads 549