4623 Escalation of Commitment and Turnover in Top Management Teams
Authors: Dmitriy V. Chulkov
Abstract:
Escalation of commitment is defined as continuation of a project after receiving negative information about it. While literature in management and psychology identified various factors contributing to escalation behavior, this phenomenon has received little analysis in economics, potentially due to the apparent irrationality of escalation. In this study, we present an economic model of escalation with asymmetric information in a principal-agent setup where the agents are responsible for a project selection decision and discover the outcome of the project before the principal. Our theoretical model complements the existing literature on several accounts. First, we link the incentive to escalate commitment to a project with the turnover decision by the manager. When a manager learns the outcome of the project and stops it that reveals that a mistake was made. There is an incentive to continue failing projects and avoid admitting the mistake. This incentive is enhanced when the agent may voluntarily resign from the firm before the outcome of the failing project is revealed, and thus not bear the full extent of reputation damage due to project failure. As long as some successful managers leave the firm for extraneous reasons, outside firms find it difficult to link failing projects with certainty to managers that left a firm. Second, we demonstrate that non-CEO managers have reputation concerns separate from those of the CEO, and thus may escalate commitment to projects they oversee, when such escalation can attenuate damage to reputation from impending project failure. Such incentive for escalation will be present for non-CEO managers if the CEO delegates responsibility for a project to a non-CEO executive. If reputation matters for promotion to the CEO, the incentive for a rising executive to escalate in order to protect reputation is distinct from that of a CEO. Third, our theoretical model is supported by empirical analysis of changes in the firm’s operations measured by the presence of discontinued operations at the time of turnover among the top four members of the top management team. Discontinued operations are indicative of termination of failing projects at a firm. The empirical results demonstrate that in a large dataset of over three thousand publicly traded U.S. firms for a period from 1993 to 2014 turnover by top executives significantly increases the likelihood that the firm discontinues operations. Furthermore, the type of turnover matters as this effect is strongest when at least one non-CEO member of the top management team leaves the firm and when the CEO departure is due to a voluntary resignation and not to a retirement or illness. Empirical results are consistent with the predictions of the theoretical model and suggest that escalation of commitment is primarily observed in decisions by non-CEO members of the top management team.Keywords: discontinued operations, escalation of commitment, executive turnover, top management teams
Procedia PDF Downloads 3654622 Construction Quality Perception of Construction Professionals and Their Expectations from a Quality Improvement Technique in Pakistan
Authors: Muhammad Yousaf Sadiq
Abstract:
The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. An quantitative survey based approach was adopted in this constructive study. A questionnaire-based survey was conducted for the assessment of construction Quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals of the leading construction organizations/companies of Pakistan construction industry were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. The quality perception was found to be project-scope-oriented and considered as an excess cost for a construction project. Any quality improvement technique was expected to maximize the profit for the employer, by improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.Keywords: construction quality, expectation, improvement, perception
Procedia PDF Downloads 4754621 Africa and the Gas Supply Crisis to European Countries under the Russian-Ukrainian War: A Study on the Nigerian-Algerian Gas Pipeline project Importance
Authors: Mohammed Lamine Benaouda
Abstract:
This paper seeks to shed light on the African continent role with the crisis of natural gas supplies to European countries, which resulted from the repercussions of the Russian-Ukrainian war, by examining the case of re-launching the Trans-Saharan Gas Pipeline project Nigeria-Algeria, and clarifying the strategic importance This project is mutually beneficial in the long run. The paper relied on the analytical and statistical method in order to find out the the impact that the project represents on the huge needs of the European gas market on the one hand, and monitoring the various economic gains for Algeria and Nigeria on the other hand, in addition, the comparative approach to assess the possible effects of the success and feasibility of the project economy for all its beneficiaries. The paper founds that the complexity has multiplied in the global energy market in general and the European one in particular, following what the world witnessed from the repercussions of the Russian-Ukrainian war, as well as the extreme importance of the poles of African countries in the arena of the international struggle over resources, which allows them a margin From maneuvering and regional and global influence in various fields. With regard to the research outcoms and the future scope, the researcher believes that the African continent, in light of international competition and conflict, as well as what the world is witnessing in terms of restoring balances of power in the current international system, will play very important roles, especially with its enormous natural and human capabilities, which enable it to Weighting future conflicts over energy and spheres of influence.Keywords: algeria, nigeria, west africa, ECOWAS, gas supplies, russia, ukrain
Procedia PDF Downloads 804620 DHL CSI Solution Design Project
Authors: Mohammed Al-Yamani, Yaser Miaji
Abstract:
DHL Customer Solutions and Innovation Department (CSI) have been experiencing difficulties while comparing quotes for different customers in different years. Currently, the employees are processing data by opening several loaded Excel files where the quotes are and manually copying values to another Excel Workbook where the comparison is made. This project consists of developing a new and effective database for DHL CSI department so that information is stored altogether on the same catalog. That being said, we have been assigned to find an efficient algorithm that can deal with the different formats of the Excel Workbooks to copy and store the express customer rates for core products (DOX, WPX, IMP) for comparisons purposes.Keywords: DHL, solution design, ORACLE, EXCEL
Procedia PDF Downloads 4104619 Mapping New Technologies for Sustainability along the Fashion Supply Chain
Authors: Hilde Heim
Abstract:
The textile industry is known for its swift adoption of innovations in fashion technology (Fash-Tech). The industry is also known for its harmful effects on the environment. Opportunely, Fash-Tech is expected to facilitate the turn towards more sustainable practice. However, although several technologies have the potential for advancing sustainable practice, many industry players, whether large or small, are confused and misinformed about Fash-Tech adoption, application, and impact. Through a visual poster presentation, this project aims to map global fashion innovations along the supply chain from fibre production to waste management, thus providing a clearer picture of numbers, scale, and adoption. While the project aims to identify Fash-Tech effectiveness in reaching sustainability goals, it also identifies areas of congestion as well as insufficiency in the accessibility of Fash-Tech. This project intends to help inform future decisions in business, investment, and policy for the advancement of sustainable practice.Keywords: fashion technology, sustainability, supply chain, enterprise management
Procedia PDF Downloads 2414618 Contractors Perspective on Causes of Delays in Power Transmission Projects
Authors: Goutom K. Pall
Abstract:
At the very heart of the power system, power transmission (PT) acts as an essential link between power generation and distribution. Timely completion of PT infrastructures is therefore crucial to support the development of power system as a whole. Yet despite the importance, studies on PT infrastructure development projects are embryonic and, hence, PT projects undergoing widespread delays worldwide. These delay factors are idiosyncratic and identifying the critical delay factors is essential if the PT industry professionals are to complete their projects efficiently and within the expected timeframes. This study identifies and categorizes 46 causes of PT project delay under ten major groups using six sector expert’s recommendations studied by a preliminary questionnaire survey. Based on the experts’ strong recommendations, two new groups are introduced in the final questionnaire survey: sector specific factors (SSF) and general factors (GF). SSF pertain to delay factors applicable only to the PT projects, while GF represents less biased samples with shared responsibilities of all project parties involved in a project. The study then uses 112 data samples from the contractors to rank the delay factors using relative importance index (RII). The results reveal that SSF, GF and external factors are the most critical groups, while the highest ranked delay factors include the right of way (RoW) problems of transmission lines (TL), delay in payments, frequent changes in TL routes, poor communication and coordination among the project parties and accessibility to TL tower locations. Finally, recommendations are made to minimize the identified delay. The findings are expected to be of substantial benefit to professionals in minimizing time overrun in PT projects implementation, as well as power generation, power distribution, and non-power linear construction projects worldwide.Keywords: delay, project delay, power transmission projects, time-overruns
Procedia PDF Downloads 1784617 Identification of Factors Influencing Costs in Green Projects
Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi
Abstract:
Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.Keywords: green project, factors influencing cost, hard cost, soft cost
Procedia PDF Downloads 3454616 Proposal of Solidification/Stabilisation Process of Chosen Hazardous Waste by Cementation
Authors: Bozena Dohnalkova
Abstract:
This paper presents a part of the project solving which is dedicated to the identification of the hazardous waste with the most critical production within the Czech Republic with the aim to study and find the optimal composition of the cement matrix that will ensure maximum content disposal of chosen hazardous waste. In the first stage of project solving – which represents this paper – a specific hazardous waste was chosen, its properties were identified and suitable solidification agents were chosen. Consequently solidification formulas and testing methodology was proposed.Keywords: cementation, solidification, waste, binder
Procedia PDF Downloads 3934615 Project Management Practices and Operational Challenges in Conflict Areas: Case Study Kewot Woreda North Shewa Zone, Amhara Region, Ethiopia
Authors: Rahel Birhane Eshetu
Abstract:
This research investigates the complex landscape of project management practices and operational challenges in conflict-affected areas, with a specific focus on Kewot Woreda in the North Shewa Zone of the Amhara region in Ethiopia. The study aims to identify essential project management methodologies, the significant operational hurdles faced, and the adaptive strategies employed by project managers in these challenging environments. Utilizing a mixed-methods approach, the research combines qualitative and quantitative data collection. Initially, a comprehensive literature review was conducted to establish a theoretical framework. This was followed by the administration of questionnaires to gather empirical data, which was then analyzed using statistical software. This sequential approach ensures a robust understanding of the context and challenges faced by project managers. The findings reveal that project managers in conflict zones encounter a range of escalating challenges. Initially, they must contend with immediate security threats and the presence of displaced populations, which significantly disrupt project initiation and execution. As projects progress, additional challenges arise, including limited access to essential resources and environmental disruptions such as natural disasters. These factors exacerbate the operational difficulties that project managers must navigate. In response to these challenges, the study highlights the necessity for project managers to implement formal project plans while simultaneously adopting adaptive strategies that evolve over time. Key adaptive strategies identified include flexible risk management frameworks, change management practices, and enhanced stakeholder engagement approaches. These strategies are crucial for maintaining project momentum and ensuring that objectives are met despite the unpredictable nature of conflict environments. The research emphasizes that structured scope management, clear documentation, and thorough requirements analysis are vital components for effectively navigating the complexities inherent in conflict-affected regions. However, the ongoing threats and logistical barriers necessitate a continuous adjustment to project management methodologies. This adaptability is not only essential for the immediate success of projects but also for fostering long-term resilience within the community. Concluding, the study offers actionable recommendations aimed at improving project management practices in conflict zones. These include the adoption of adaptive frameworks specifically tailored to the unique conditions of conflict environments and targeted training for project managers. Such training should focus on equipping managers with the skills to better address the dynamic challenges presented by conflict situations. The insights gained from this research contribute significantly to the broader field of project management, providing a practical guide for practitioners operating in high-risk areas. By emphasizing sustainable and resilient project outcomes, this study underscores the importance of adaptive management strategies in ensuring the success of projects in conflict-affected regions. The findings serve not only to enhance the understanding of project management practices in Kewot Woreda but also to inform future research and practice in similar contexts, ultimately aiming to promote stability and development in areas beset by conflict.Keywords: project management practices, operational challenges, conflict zones, adaptive strategies
Procedia PDF Downloads 154614 The Importance of Entrepreneurship Certificate Education Programs in Creating Entrepreneurship, Cukurova University Sample
Authors: B. Karmutoglu, E. Guzel, Y. Halefoglu
Abstract:
The aim of this study was to determine the basic trends of the students and instructors who participated in the courses of entrepreneurship certificate education in universities. In this study, it is tried to determine whether the level of education and occupational groups are meaningful in creating entrepreneurship, taking into consideration the legal regulations, supports, researches and development targets issued in this respect. For this reason, this project started 2015 and opened five courses in 2015, thirteen courses in 2016, and eleven courses in 2017. The total numbers of course and participants have been 30 and 510 respectively. Comparisons were made according to the faculties of 510 participants. In this comparison, it was observed that outward-oriented, self-confidence, breakthrough, risk-taking and entrepreneurship tendencies of engineering faculty students were very high. In the second place, entrepreneurial desires of the students of vocational high schools came to the forefront. This project supported by Cukurova University and The Scientific And Technological Research Council Of Turkey(TÜBİTAK) 1601 programming.Keywords: entrepreneurship, training, certificate, project
Procedia PDF Downloads 1744613 Safeguarding the Cloud: The Crucial Role of Technical Project Managers in Security Management for Cloud Environments
Authors: Samuel Owoade, Zainab Idowu, Idris Ajibade, Abel Uzoka
Abstract:
Cloud computing adoption continues to soar, with 83% of enterprise workloads estimated to be in the cloud by 2022. However, this rapid migration raises security concerns, needing strong security management solutions to safeguard sensitive data and essential applications. This paper investigates the critical role of technical project managers in orchestrating security management initiatives for cloud environments, evaluating their responsibilities, challenges, and best practices for assuring the resilience and integrity of cloud infrastructures. Drawing from a comprehensive review of industry reports and interviews with cloud security experts, this research highlights the multifaceted landscape of security management in cloud environments. Despite the rapid adoption of cloud services, only 25% of organizations have matured their cloud security practices, indicating a pressing need for effective management strategies. This paper proposes a strategy framework adapted to the demands of technical project managers, outlining the important components of effective cloud security management. Notably, 76% of firms identify misconfiguration as a major source of cloud security incidents, underlining the significance of proactive risk assessment and constant monitoring. Furthermore, the study emphasizes the importance of technical project managers in facilitating cross-functional collaboration, bridging the gap between cybersecurity professionals, cloud architects, compliance officers, and IT operations teams. With 68% of firms seeing difficulties integrating security policies into their cloud systems, effective communication and collaboration are critical to success. Case studies from industry leaders illustrate the practical use of security management projects in cloud settings. These examples demonstrate the importance of technical project managers in using their expertise to address obstacles and generate meaningful outcomes, with 92% of firms reporting improved security practices after implementing proactive security management tactics. In conclusion, this research underscores the critical role of technical project managers in safeguarding cloud environments against evolving threats. By embracing their role as guardians of the cloud realm, project managers can mitigate risks, optimize resource utilization, and uphold the trust and integrity of cloud infrastructures in an era of digital transformation.Keywords: cloud security, security management, technical project management, cybersecurity, cloud infrastructure, risk management, compliance
Procedia PDF Downloads 514612 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal
Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai
Abstract:
Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.Keywords: material management, construction site, inventory, construction project
Procedia PDF Downloads 684611 The Fadama Initiative: Implications for Human Security and Sustainable Development in Nigeria
Authors: Albert T. Akume, Yahya M. Abdullahi
Abstract:
The impact of poverty on individual and society is grave, hence the efforts by the government to eradicate or alleviate. In Nigeria the various efforts to reduce rural poverty by empowering them and making the process of their development self-sustaining have ended dismally. That notwithstanding, government determination to conquer poverty has not diminish as in the early 1990s the government with financial collaboration from the World Bank and African Development Bank introduced the fadama project. It is against this backdrop that this paper uses the documentary and analytical research methods to examine the implication the fadama development project has for community capacity development and human security in Nigeria. From the analysis it was discovered the fadama project improved household income of fadama farmers, community empowerment, participatory development planning and support for demand driven productive investment in farm and non-farm activities including community infrastructures. Despite this impressive result the fadama project is challenged by conflict especially in northern Nigeria and late delivery of necessary farm consumables that aid improved productivity. It was therefore recommended that the government should strengthen her various state security institutions to proactively mitigate conflicts and to ensure that farm consumables and other support services reach farmers timely.Keywords: capacity development, empowerment, fadama, human security, poverty reduction, theory of change, sustainable development
Procedia PDF Downloads 4964610 To Handle Data-Driven Software Development Projects Effectively
Authors: Shahnewaz Khan
Abstract:
Machine learning (ML) techniques are often used in projects for creating data-driven applications. These tasks typically demand additional research and analysis. The proper technique and strategy must be chosen to ensure the success of data-driven projects. Otherwise, even exerting a lot of effort, the necessary development might not always be possible. In this post, an effort to examine the workflow of data-driven software development projects and its implementation process in order to describe how to manage a project successfully. Which will assist in minimizing the added workload.Keywords: data, data-driven projects, data science, NLP, software project
Procedia PDF Downloads 834609 Lean Construction Techniques in Construction Projects of Pakistan
Authors: Aftab Hameed Memon, Shadab Noor, Muhammad Akram Akhund
Abstract:
Lean construction is a philosophy adopted in the construction industry to increase the value of a project by reducing waste and improving construction productivity. Lean emphasizes on maximizing the value of a project with less expenditure. Globally, lean philosophy has received wider popularity in construction sector. Lean construction has supported the practitioners with several tools and techniques to implement at various stages of a construction project. Following the global trends, this study has investigated the lean practice in Pakistan. The level of implementation of different lean tools and techniques altogether with potential benefits experienced by its implementation in construction projects of Pakistan is analyzed. To achieve the targets, the opinion was sought by the practitioners involved in handling construction projects representing four stakeholders that are a client, consultant, contractors and material suppliers through a structured questionnaire. A total of 34 completed questionnaires were collected and then statistically analyzed. The findings of the analysis have highlighted that pull approach, work standardization, just in time, increase visualization tools, integrated project delivery method and fail-safe for quality are common lean techniques implemented in the local construction industry. While reduction in waste, client’s satisfaction, improved communication, visual control and proper task management are major benefits of the lean construction application.Keywords: lean construction, lean tools and techniques, lean benefits, waste reduction, Pakistan
Procedia PDF Downloads 2874608 Evaluation and Selection of Contractors in Construction Projects with a View Supply Chain Management and Utilization of Promthee
Authors: Sara Najiazarpour, Mahsa Najiazarpour
Abstract:
There are many problems in contracting projects and their performance. At each project stage and due to different reasons, these problems affect cost, time and overall project quality. Hence, in order to increase the efficiency and performance in all levels of the chain and with supply chain management approach, there will be a coordination from the beginning of a project (contractor selection) to the end of project (handover of project). Contractor selection is the foremost part of construction projects which in this multi-criteria decision-making, the best contractor is determined by expert judgment, different variables and their priorities. In this paper for selecting the best contractor, numerous criteria were collected by asking from adept experts and then among them, 16 criteria with highest frequency were considered for questionnaire. This questionnaire was distributed between experts. Cronbach's alpha coefficient was obtained as 72%. Then based on Borda's function 12 important criteria was selected which was categorized in four main criteria and related sub-criteria as follow: Environmental factors and physical equipment: procurement and materials (supplier), company's machines, contractor’s proposed cost estimate - financial capacity: bank turnover and company's assets, the income of tax declaration in last year, Ability to compensate for losses or delays - past performance- records and technical expertise: experts and key personnel, the past technical backgrounds and experiences, employer satisfaction of previous contracts, the number of similar projects was done - standards: rank and field of expertise which company is qualified for and its validity, availability and number of permitted projects done. Then with PROMTHEE method, the criteria were normalized and monitored, finally the best alternative was selected. In this research, qualitative criteria of each company is became a quantitative criteria. Finally, information of some companies was evaluated and the best contractor was selected based on all criteria and their priorities.Keywords: contractor evaluation and selection, project development, supply chain management, PROMTHEE method
Procedia PDF Downloads 724607 Digital Memory plus City Cultural Heritage: The Peking Memory Project Experience
Authors: Huiling Feng, Xiaoshuang Jia, Jihong Liang, Li Niu
Abstract:
Beijing, formerly romanized as Peking, is the capital of the People's Republic of China and the world's second most populous city proper and most populous capital city. Beijing is a noted historical and cultural whose city history dates back three millennia which is extremely rich in terms of cultural heritage. In 2012, a digital memory project led by Humanistic Beijing Studies Center in Renmin University of China started with the goal to build a total digital collection of knowledge assets about Beijing and represent Beijing memories in new fresh ways. The title of the entire project is ‘Peking Memory Project(PMP)’. The main goal is for safeguarding the documentary heritage and intellectual memory of Beijing, more specifically speaking, from the perspective of historical humanities and public participation, PMP will comprehensively applied digital technologies like digital capture, digital storage, digital process, digital presentation and digital communication to transform different kinds of cultural heritage of Beijing into digital formats that can be stored, re-organized and shared. These digital memories can be interpreted with a new perspective, be organized with a new theme, be presented in a new way and be utilized with a new need. Taking social memory as theoretical basis and digital technologies as tools, PMP is framed with ‘Two Sites and A Repository’. Two sites mean the special website(s) characterized by ‘professional’ and an interactive website characterized by ‘crowdsourcing’. A Repository means the storage pool used for safety long-time preservation of the digital memories. The work of PMP has ultimately helped to highlight the important role in safeguarding the documentary heritage and intellectual memory of Beijing.Keywords: digital memory, cultural heritage, digital technologies, peking memory project
Procedia PDF Downloads 1764606 Anthropometric Analysis for the Design of Workstations in the Interior Spaces of the Manufacturing Industry in Tijuana, Mexico
Authors: J. A. López, J. E. Olguín, C. W. Camargo, G. A. Quijano, R. Martínez
Abstract:
This paper presents an anthropometric study conducted to 300 employees in a maquiladora industry that belongs to the cluster of medical products as part of a research project to pretend simulate workplace conditions under which operators conduct their activities. This project is relevant because traditionally performed a study to design ergonomic workspaces according to anthropometric profile of users, however, this paper demonstrates the importance of making decisions when the infrastructure cannot be adapted for economic whichever put emphasis on user activity.Keywords: anthropometry, biomechanics, design, ergonomics, productivity
Procedia PDF Downloads 4544605 An Overview of the SIAFIM Connected Resources
Authors: Tiberiu Boros, Angela Ionita, Maria Visan
Abstract:
Wildfires are one of the frequent and uncontrollable phenomena that currently affect large areas of the world where the climate, geographic and social conditions make it impossible to prevent and control such events. In this paper we introduce the ground concepts that lie behind the SIAFIM (Satellite Image Analysis for Fire Monitoring) project in order to create a context and we introduce a set of newly created tools that are external to the project but inherently in interventions and complex decision making based on geospatial information and spatial data infrastructures.Keywords: wildfire, forest fire, natural language processing, mobile applications, communication, GPS
Procedia PDF Downloads 5814604 Warfield Spying Robot Using LoRa
Authors: Madhavi T., Sireesha Sakhamuri, Hema Sri A., Harika K.
Abstract:
Today as technological advancements are taking place, these advancements are being used by the armed forces to reduce the risk of their losses and to defeat their enemies. The development of sophisticated technology relies mostly on the use of high- tech weapons or machinery. Robotics is one of the hot spheres of the modern age in which nations concentrate on the state of war and peace for military purposes. They have been in use for demining and rescue operations for some time now but are being propelled by using them for combat and spy missions. This project focuses on creating a LoRa-based spying robot with a wireless IP camera attached to it that can rising the human target. This robot transmits the signal via an IP camera to the base station. One of this project’s major applications can be analyzed using a PC that can be used to control the robot’s movement. The robot sends the signal through the LoRa transceiver at the base station to the LoRa transceiver mounted on the robot. With this function, the, robot can relay videos in real- time along with anti-collision capabilities and the enemies in the war zone cannot recognize them. More importantly, this project focuses on increasing communication using LoRa.Keywords: lora, IP cam, metal detector, laser shoot
Procedia PDF Downloads 1114603 Preventing Violent Extremism through Augmenting Community Resilience and Empowering Community Members in Swat
Authors: Dr. Muhammad Idris Idris, Dr. Said Saeed Saeed
Abstract:
Terrorism is the chronic issue of the hour. It is the disciplined practice of vicious activities like assassinating, slaughtering, mutilating, and frightening of the innocents to attain religious, fiscal, and political goals and to question the authority of the government. Leaders of the world promised to transform the planet by empowering community members and building community resilience (CR) against terrorism. This study concentrates to explore building community resilience against terrorism and empowering community members and implement strategies for strengthening community resilience. For data collection a mixed methods methodology will be used. Means, STD deviation, Pearson correlation, and thematic analysis will be employed to analyze the gathered data. The findings of the study will be interpreted and recommendations will be furnished accordingly. Study results will be disseminated to all concerned through conferences and seminar sessions. It is predicted that after the completion, the project team will be in a robust position to start writing the report that concentrates on strengthening community resilience, which is the crucial goal of this project. The publication will contribute effectively to all stakeholders and society, particularly to the lower rungs of social order. Moreover, it is expected that this project will contribute to future research in the domain of community resilience. This project will also reveal the remarkable potential of archival research on community resilience.Keywords: Violent Extremism, community Role, community resilience, community empowerment, Leadership role
Procedia PDF Downloads 1454602 safeRoute: Information Safety System for Professional Road Driving
Authors: Francisco Toledo-Castillo, Pilar Peiró-Torres, María Josefa Sospedra-Baeza, Sergio Hidalgo-Fuentes
Abstract:
The communication presented is about tasks that are been developed in the research project “safeRoute”, “Information safety system for professional road driving” (IPT-2012-110-370000). This R&D project was proposed by the consortium formed by Fagor Electronica la SEU 3 and the University of Valencia to the Ministry of Economy and Competitiveness, which approved it inside the INNPACTO subprogramme grants. Through this type of calls, the Ministry promote the innovative capacity of the Spanish companies and turn on the mechanism for competing internationally. With this kind of calls, private investments for technological and industrial development join their R & D resources with public entities to implement innovative project that could have an international exposure. Thus INNPACTO subprogramme promotes the creation of research projects with public-private partnerships that create exploitable final products. The “safeRoute” Project pretends develop a tool to help to make more safety the travels of commercial transport vehicles of goods and passengers. To achieve its objectives, the project is focused in three main lines of research: vehicle safety, the safety of the roads that they are using, and the safety which drivers do their job, their behaviour while they are driving. To improve safety, the project gives information about these three factors to all people that are involved in the safety of the professional transport. These three factors have influence to the occurrence of traffic accidents, thanks to the information provided and treated about these factors, we can achieve a significant reduction in occupational accidents in the transport sector. SafeRoute provide information about routes, vehicles, and driver behaviours, and in this manner pretends provide to transport companies a tool which could result in a safer driving results and could reduce their costs related to traffic accidents of their vehicles, in that way, this tool could help them to be more competitive, and give a more reliable service. This paper will focus mainly on the information about routes that drivers use to travel in their professional work, and how the researchers of this project have catalogued and evaluated these routes, and finally how that information will be provided to users.Keywords: driver support systems, professional drivers, road safety, safeRoute
Procedia PDF Downloads 4034601 Sustainable Renovation of Cultural Buildings Case Study: Red Bay National Historic Site, Canada
Authors: Richard Briginshaw, Hana Alaojeli, Javaria Ahmad, Hamza Gaffar, Nourtan Murad
Abstract:
Sustainable renovations to cultural buildings and sites require a high level of competency in the sometimes conflicting areas of social/historical demands, environmental concerns, and the programmatic and technical requirements of the project. A detailed analysis of the existing site, building and client program are critical to reveal both challenges and opportunities. This forms the starting point for the design process – empirical explorations that search for a balanced and inspired architectural solution to the project. The Red Bay National Historic Site on the Labrador Coast of eastern Canada is a challenging project to explore and resolve these ideas. Originally the site of a 16ᵗʰ century whaling station occupied by Basque sailors from France and Spain, visitors now experience this history at the interpretive center, along with the unique geography, climate, local culture and vernacular architecture of the area. Working with our client, Parks Canada, the project called for significant alterations and expansion to the existing facility due to an increase in the number of annual visitors. Sustainable aspects of the design are focused on sensitive site development, passive energy strategies such as building orientation and building envelope efficiency, active renewable energy systems, carefully considered material selections, water efficiency, and interiors that respond to human comfort and a unique visitor experience.Keywords: sustainability, renovations and expansion, cultural project, architectural design, green building
Procedia PDF Downloads 1684600 Application of Strategic Management Tools
Authors: Abenezer Nigussie
Abstract:
Strategic control practice is a critical exercise, as it provides a sturdy influence towards firms or production partners to achieve the full implementation of effective predetermined plans. The importance of strategic control in a company is often measured by observing the relationship between strategic management and organizational performance. The conventional philosophy of strategic control in academia and the industry places significant emphasis on the ability to plan and execute initiatives. In contrast, the same emphasis on strategic management has received less attention in the housing industry. Although the pressures of project performance can often obscure the wider social, economic, and professional context in which strategic management is undertaken, it is these broad contextual areas that make strategic control a vital issue for construction businesses. Rapidly changing social and technological issues are creating an informed environment that will appear very different in the coming decades from what is experienced in today’s companies. Construction project activity is not adequately led by strategic management tools; projects are mostly executed through simple plans and schedules. The issues that this thesis addresses and solves involve the successful accompaniment of the construction project process through these strategic management tools. The second important aspect is an evaluation of project activity, which is mostly done through simple economic and technical valuation. However, during this research, effective strategic management tools are evaluated and suggested for the assessment of project activities. The research introduces a study of the current strategic management practices of construction companies and also presents the concept of strategic management and the areas that companies need to address to compete in the global market. A summary of an industry survey is documented along with the historical research that prompted the investigation of these topics with a focus on the implementation of tools. Strategic management is a concept that concerns making decisions and taking corrective actions to achieve the future goals and objectives of a company. The objective of this paper is to review the practice of strategic management in construction companies. Questionnaires were distributed to major construction companies listed under categories of each project capable of specifying the complete expression of strategic management tools. Findings of the research showed that the majority of development companies practice strategic management tools in the process and implementation of each tool.Keywords: strategic management, management, analysis, project management
Procedia PDF Downloads 674599 The European Research and Development Project Improved Nuclear Site Characterization for Waste Minimization in Decommissioning under Constrained Environment: Focus on Performance Analysis and Overall Uncertainty
Authors: M. Crozet, D. Roudil, T. Branger, S. Boden, P. Peerani, B. Russell, M. Herranz, L. Aldave de la Heras
Abstract:
The EURATOM work program project INSIDER (Improved Nuclear Site Characterization for Waste minimization in Decommissioning under Constrained Environment) was launched in June 2017. This 4-year project has 18 partners and aims at improving the management of contaminated materials arising from decommissioning and dismantling (D&D) operations by proposing an integrated methodology of characterization. This methodology is based on advanced statistical processing and modelling, coupled with adapted and innovative analytical and measurement methods, with respect to sustainability and economic objectives. In order to achieve these objectives, the approaches will be then applied to common case studies in the form of Inter-laboratory comparisons on matrix representative reference samples and benchmarking. Work Package 6 (WP6) ‘Performance analysis and overall uncertainty’ is in charge of the analysis of the benchmarking on real samples, the organisation of inter-laboratory comparison on synthetic certified reference materials and the establishment of overall uncertainty budget. Assessment of the outcome will be used for providing recommendations and guidance resulting in pre-standardization tests.Keywords: decommissioning, sampling strategy, research and development, characterization, European project
Procedia PDF Downloads 3644598 Cellular Mobile Telecommunication GSM Radio Base Station Network Planning
Authors: Saeed Alzahrani, Yaser Miaji
Abstract:
The project involves the design and simulation of a Mobile Cellular Telecommunication Network using the software tool CelPlanner. The design is mainly concerned with Global System for Mobile Communications . The design and simulation of the network is done for a small part of the area allocated for us in the terrain area of Shreveport city .The project is concerned with designing a network that is cost effective and which also efficiently meets the required Grade of Service (GOS) AND Quality of Service (QOS).The expected outcome of this project is the design of a network that gives a good coverage for the area allocated to us with minimum co-channel interference and adjacent channel interference. The Handover and Traffic Handling Capacity should also be taken into consideration and should be good for the given area . The Traffic Handling Capacity of the network in a way decides whether the designed network is good or bad . The design also takes into consideration the topographical and morphological information.Keywords: mobile communication, GSM, radio base station, network planning
Procedia PDF Downloads 4384597 The Effect of Artificial Intelligence on Construction Development
Authors: Shady Gamal Aziz Shehata
Abstract:
Difficulty in defining construction quality arises due to perception based on the nature and requirements of the market, the different partners themselves and the results they want. Quantitative research was used in this constructivist research. A case-based study was conducted to assess the structures of positive attitudes and expectations in the context of quality improvement. A survey based on expert opinions was analyzed among construction organizations/companies operating in the construction industry in Pakistan. The financial strength, management structure and construction experience of the construction companies formed the basis of their selection. A good concept is visible at the project level and is seen as the most valuable part of the construction project. Each quality improvement technique was expected to increase the user's profits by improving the efficiency of the construction project. The Survey is useful for construction professionals to evaluate current construction concepts and expectations for the application of quality improvement techniques in construction projects.Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety construction quality, expectation, improvement, perception
Procedia PDF Downloads 594596 Study of Treatment Plant of The City Chlef Study of Environmental Impact
Authors: Houmame Benbouali, Aboubakr Gribi
Abstract:
The risks, in general, exist in any project, one can hardly carry out a project without taking risks. The hydraulic works are rather complex projects in their design, realization and exploitation and are often subjected at the multiple risks being able to influence with their good performance and can have a negative impact on their environment. The present study was carried out to quote the impacts caused by purification plant STEP Chlef on the environment, it aims has studied the environmental impacts during construction and when designing this STEP, it is divided into two parts: The first part results from a research task bibliographer which contain three chapters (- cleansing of water-worn- general information on water worn-proceed of purification of waste water). The second part is an experimental part which is divided into four chapters (detailed state initial description of the station of purification-evaluation of the impacts of the project analyzes measurements and recommendations).Keywords: treatment plant, waste water, waste water treatment, Chlef
Procedia PDF Downloads 3344595 A Case Study on Problems Originated from Critical Path Method Application in a Governmental Construction Project
Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali
Abstract:
In public construction projects, determining the contract period in the award phase is one of the most important factors. The contract period establishes the baseline for creating the cash flow curve and progress payment planning in the post-award phase. If overestimated, project duration causes losses for both the owner and the contractor. Therefore, it is essential to base construction project duration on reliable forecasting. In Turkey, schedules are usually built using the bar chart (Gantt) schedule, especially for governmental construction agencies. The usage of these schedules is limited for bidding purposes. Although the bar-chart schedule is useful in some cases, it lacks logical connections between activities; it would be harder to obtain the activities that have more effects than others on the project's total duration, especially in large complex projects. In this study, a construction schedule is prepared with Critical Path Method (CPM) that addresses the above-mentioned discrepancies. CPM is a simple and effective method that displays project time and critical paths, showing results of forward and backward calculations with considering the logic relationships between activities; it is a powerful tool for planning and managing all kinds of construction projects and is a very convenient method for the construction industry. CPM provides a much more useful and precise approach than traditional bar-chart diagrams that form the basis of construction planning and control. CPM has two main application utilities in the construction field; the first one is obtaining project duration, which is called an as-planned schedule that includes as-planned activity durations with relationships between subsequent activities. Another utility is during the project execution; each activity is tracked, and their durations are recorded in order to obtain as-built schedule, which is named as a black box of the project. The latter is more useful for delay analysis, and conflict resolutions. These features of CPM have been popular around the world. However, it has not been yet extensively used in Turkey. In this study, a real construction project is investigated as a case study; CPM-based scheduling is used for establishing both of as-built and as-planned schedules. Problems that emerged during the construction phase are identified and categorized. Subsequently, solutions are suggested. Two scenarios were considered. In the first scenario, project progress was monitored based as CPM was used to track and manage progress; this was carried out based on real-time data. In the second scenario, project progress was supposedly tracked based on the assumption that the Gantt chart was used. The S-curves of the two scenarios are plotted and interpreted. Comparing the results, possible faults of the latter scenario are highlighted, and solutions are suggested. The importance of CPM implementation has been emphasized and it has been proposed to make it mandatory for preparation of construction schedule based on CPM for public construction projects contracts.Keywords: as-built, case-study, critical path method, Turkish government sector projects
Procedia PDF Downloads 1194594 Combining Work and Study: A Solution for Stronger University-Industry Linkage
Authors: Payam Najafi, Behnam Ebrahimi, Hamid Montazerolghaem, Safoura Akbari-Alavijeh, Rasoul Tarkesh Esfahani
Abstract:
The combination of work and study has been recently gained lots of attention due to the crucial demand of industries to skillfully trained youth. Nevertheless, the distance between university and industry makes this combination challenging. According to the OECD (2012), in most countries, there is a limited link between students’ field of study and their area of work while studying. On the other hand, high unemployment rates among the specialized workforce, which is common in developing countries, highlights the need to strengthen this relationship. Innovative Center of Isfahan Chamber of Commerce has defined a project called 'POUYESH', which helps students to find related work opportunities to their field of study as well as supporting industries to supply their needed workforce. The present research is sought to explore the effect of the running project as a model of combining work and study on the university-industry linkage.Keywords: work and study, university-industry linkage, POUYESH project, field of study
Procedia PDF Downloads 184