5785 Employing a Flipped Classroom Approach to Support Project-Based Learning

Authors: Kian Jon Chua, Islam Md Raisul

Abstract:

Findings on a research study conducted for a group of year-2 engineering students participating in a flipped classroom (FC) experience that is judiciously incorporated into project-based learning (PBL) module are presented. The chief purpose of the research is to identify whether if the incorporation of flipped classroom approach to project-based learning indeed yields a positive learning experience for engineering students. Results are presented and compared from the two classes of students – one is subjected to a traditional PBL learning mode while the other undergoes a hybrid PBL-FC learning format. Some themes related to active learning, problem-solving ability, teacher as facilitator, and degree of self-efficacy are also discussed. This paper hopes to provide new knowledge and insights relating to the introduction of flipped classroom learning to a project-based engineering module. Some potential study limitations and future directions to address them are also presented.

Keywords: hybrid project-based learning, flipped classroom, problem-solving, active learning

Procedia PDF Downloads 135
5784 Antecedents of MNE Performance and Managing Firm-Specific and Country-Specific Advantages: An Empirical Study of Optoelectronics Industry in Taiwan

Authors: Jyh-Yi Shih, Chie-Bein Chen, Kuang-Yi Lin, Yu-Wei Huang

Abstract:

Because of the trend toward globalization, Taiwanese companies have gradually focused more on overseas market operations. Overseas market performance has gradually increased as a proportion of Taiwanese companies’ total business revenues. Existing international investment theories cannot explain numerous new phenomena in this domain. Opinions are inconsistent, and contradictory positions exist regarding the antecedents of multinational enterprise (MNE) performance. This study applied contemporary internalization theory to establish and extend approaches adopted by previous relevant studies. In the context of the overseas market, the influence that MNE investment in research and development (R&D) and marketing has on enterprise performance was investigated from the firm-specific advantages (FSAs) and country-specific advantages (CSAs) perspectives. CSAs and internationalization speed were addressed as moderators, and hypotheses regarding how internationalization and performance were achieved through MNE overseas market operation were explored to ensure the completeness of the investigation. The list of enterprises was sourced from the Taiwan Economic Journal. After examining the relevant data, the following conclusions were obtained: (a) The relationship between the level of FSAs in R&D and enterprise performance exhibited an S-shaped curve. (b) The relationship between the level of FSAs in marketing and enterprise performance displayed a U-shaped curve. (c) The extent to which potential CFAs were obtained positively moderated the relationship between enterprise investment in R&D to gain FSAs and MNE performance. (d) Internationalization speed positively moderated the relationship between MNEs and enterprise investment in R&D and marketing to gain FSAs.

Keywords: multinational corporation, firm-specific advantages, country-specific advantages, international speed

Procedia PDF Downloads 394
5783 Built-Own-Lease-Transfer (BOLT): “An Alternative Model to Subsidy Schemes in Public Private Partnership Projects”

Authors: Nirali Shukla, Neel Shah

Abstract:

The World Bank Institute (WBI) is undertaking a review of government interventions aimed at facilitating sustainable investment in public private partnerships (PPPs) in various under developed countries. The study presents best practice for applying financial model to make PPPs financially viable. The lessons presented here, if properly implemented, can help countries use limited funds to attract more private investment, get more infrastructure built and, as a result, achieve greater economic growth. The four countries Brazil, Colombia, Mexico, and India in total develop an average of nearly US$50 billion in PPPs per year. There are a range of policies and institutional arrangements governments use to provide subsidies to PPPs. For example, some countries have created dedicated agencies, or ‘funds’, capitalized with money from the national budget to manage and allocate subsidies. Other countries have established well-defined policies for appropriating subsidies on an ad hoc basis through an annual budget process. In this context, subsidies are direct fiscal contributions or grants paid by the government to a project when revenues from user fees are insufficient to cover all capital and operating costs while still providing private investors with a reasonable rate of return. Without subsidies, some infrastructure projects that would provide economic or social gains, but are not financially viable, would go undeveloped. But the Financial model of BOLT (PPP) model described in this study suggests that it is most feasible option rather than going for subsidy schemes for making infrastructure projects financially viable. The major advantage for implementing this model is the government money is saved and can be used for other projects as well as the private investors are getting better rate of return than subsidized schemes.

Keywords: PPP, BOLT, subsidy schemes, financial model

Procedia PDF Downloads 765
5782 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 444
5781 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 157
5780 An Approach to Specify Software Requirements in Semantic Form

Authors: Deepa Vijay, Chellammal Surianarayanan, Gopinath Ganapathy

Abstract:

Requirements of a software project serve as a guideline for the entire project team which enable the team towards producing the right outcome. As requirements are the key in deciding the success of the project, it should be specified in an unambiguous manner. Also, the requirements should be complete and consistent. It should be interpreted in the same way by the entire software project team as the customer interprets. Specifying requirements in textual manner is common in software development. This leads to poor understanding of the requirements which results in more errors and degraded quality. There are some literatures which focus on semantic way of specifying functional requirement which ensure the consistency and completeness of requirements. Alternately in the work, a method is proposed to map the syntactic requirements with corresponding semantics in the form of ontologies. This improves the understanding of requirements, prevents errors and improves quality.

Keywords: functional requirement, ontology, requirements management, semantics

Procedia PDF Downloads 364
5779 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 104
5778 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness

Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami

Abstract:

A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.

Keywords: construction, critical success factors, performance, stakeholders, team effectiveness

Procedia PDF Downloads 127
5777 Relevance of the Tokyo Trial: A Comparative Perspective

Authors: Nalanda Roy

Abstract:

The project will offer a fresh and critical perspective into the Tokyo Trial judgment led by the Indian Jurist Dr. Radha Binod Pal. The project will focus on the Third World Approach to International Law (TWAIL) methodology to examine the relevance of international law from the post-colonial perspectives. The project will analyze Pal’s dissenting arguments from a new and comparative perspective, apply for work from other disciplines, and create an understanding of the significance of the historic judgment considering its contemporary relevance, and fill in the gaps that exist in the call for global justice.

Keywords: Tokyo trial, third world, judgment, international law

Procedia PDF Downloads 91
5776 Extraction of Grapefruit Essential Oil from Grapefruit Peels

Authors: Adithya Subramanian, S. Ananthan, T. Prasanth, S. P. Selvabharathi

Abstract:

This project involves extraction of grapefruit essential oil from grapefruit peels using various oils like castor oil, gingelly oil, olive oil as carrier oils. The main aim of this project is to extract the oil which has numerous medicinal uses. The extraction can be performed by two methods. Project involves extraction of the oil with various carrier oil in a view to reduce the cost of production and the physical properties of the extracted oil are examined.

Keywords: essential oil, carrier oil, medicinal uses, cost of production

Procedia PDF Downloads 436
5775 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 363
5774 Efficacy of Remote Sensing Application in Monitoring the Effectiveness of Afforestation Project in Northern Nigeria

Authors: T. Garba, Y. Y. Babanyara, K. G. Ilellah, M. A. Modibbo, T. O. Quddus, M. J. Sani

Abstract:

After the United Nation Convention on Desertification (UNCD) in 1977 which was preceded by extensive, regional, and local studies, and consultations with numerous scientists, decision-makers, and relevant institutions. Global Plan of Action to Combat Desertification (PACD) was formulated, endorsed by member Countries. The role of implementing PACD was vested with Governments of countries affected by desertification. The Federal Government of Nigeria as a signatory and World Bank funded and implement afforestation project aimed at combating desertification between 1988 and 1999. This research, therefore, applied remote sensing techniques to assess the effectiveness of the project. To achieve that a small portion of about 143,609 hectares was curved out from the project area. Normalized Difference of the Vegetative Index (NDVI) and Land Use Land Cover were derived from Landsat TM 1986, Landsat ETM 1999 and Nigeria Sat 1, 2007 of the project area. The findings show that there was an increase in cultivated area due to the project from 1986 through 1999 and 2007. This is further buttressed by the three NDVI imageries due to their high positive pixel value from 0.04 in 1986 to 0.22 in 1999 and to 0.32 in 2007 These signifies the gradual physical development of Afforestation project in the area. In addition, it was also verified by histograms of changes in vegetation which indicated an increased vegetative cover from 60,192 in 1986, to 102,476 in 1999 and then to 88,343 in 2007. The study concluded that Remote Sensing approach has actually confirmed that the project was indeed successful and effective.

Keywords: afforestation, desertification, landsat, vegetative index, remote sensing

Procedia PDF Downloads 316
5773 Evaluation of the Electric Vehicle Impact in Distribution System

Authors: Sania Maghsodloo, Sirus Mohammadi

Abstract:

Electric Vehicle (EV) technology is expected to take a major share in the light-vehicle market in the coming decades. Transportation electrification has become an important issue in recent decades and the large scale deployment of EVs has yet to be achieved. The smart coordination of EV demand addresses an improvement in the flexibility of power systems and reduces the costs of power system investment. The uncertainty in EV drivers’ behaviour is one of the main problems to solve to obtain an optimal integration of EVs into power systems Charging of EVs will put an extra burden on the distribution grid and in some cases adjustments will need to be made. The stochastic process of the driving pattern is done to make the outcome of the project more realistic. Based on the stochastic data, the optimization of charging plans is made.

Keywords: electric vehicles (PEVs), smart grid, Monticello, distribution system

Procedia PDF Downloads 552
5772 Energy Conservation Strategies of Buildings in Hot, Arid Region: Al-Khobar, Saudi Arabia

Authors: M. H. Shwehdi, S. Raja Mohammad

Abstract:

Recently energy savings have become more pronounced as a result of the world financial crises as well the unstable oil prices. Certainly all entities needs to adapt Energy Conservation and Management Strategies due to high monthly consumption of their spread locations and advancements of its telecom systems. These system improvements necessitate the establishment of more exchange centers as well provide energy savings. This paper investigates the impact of HVAC System Characteristics, Operational Strategies, the impact of Envelope Thermal Characteristics, and energy conservation measures. These are classified under three types of measures i.e. Zero-Investment; Low-Investment and High-Investment Energy Conservation Measures. The study shows that the Energy Conservation Measures (ECMs) pertaining to the HVAC system characteristics and operation represent the highest potential for energy reduction, attention should be given to window thermal and solar radiation characteristics when large window areas are used. The type of glazing system needs to be carefully considered in the early design phase of future buildings. Paper will present the thermal optimization of different size centers in the two hot-dry and hot-humid Saudi Arabian city of Al Khobar, East province.

Keywords: energy conservation, optimization, thermal design, intermittent operation, exchange centers, hot-humid climate, Saudi Arabia

Procedia PDF Downloads 451
5771 Advancing Sustainable Development in the Construction Industry: A Theoretical Framework for Integrating Sustainable Project Management

Authors: Francis Kwesi Bondinuba, Seidu Abdullah, Nelly Bondinuba

Abstract:

Purpose: The study proposes a theoretical framework for integrating sustainable project management in the construction sector, addressing the need for sustainable development practices. Methodology: The study adopts a theoretical approach by reviewing existing literature on sustainable development and project management in the construction industry. It analyses various concepts, theories, and frameworks to develop a comprehensive theoretical framework for integrating sustainable project management. Findings: The study emphasizes the importance of incorporating sustainable development practices into construction project management, focusing on collaboration, stakeholder engagement, and continuous improvement to achieve environmental conservation, social responsibility, and economic viability. Conclusion: Sustainable Project Management (SPM) in Ghana's construction industry is challenging due to lack of awareness, regulatory frameworks, financial constraints, and skill shortages, despite its benefits in promoting social inclusivity, job creation, and environmental resilience. Recommendation: The construction industry in Ghana should adopt a comprehensive approach involving local communities, government bodies, and environmental organizations. It should utilize green materials and technologies and effectively manage waste. Originality: This study presents a theoretical framework for sustainable project management in construction. It emphasizes collaboration and stakeholder engagement for long-term sustainable outcomes and considers environmental, social, and economic aspects.

Keywords: construction industry, theoretical framework, integration, project management, sustainable development

Procedia PDF Downloads 32
5770 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 217
5769 Kiira EV Project Transition from Student to Professional Team through Project-Based Skills Development

Authors: Doreen Orishaba, Paul Isaac Musasizi, Richard Madanda, Sandy Stevens Tickodri-Togboa

Abstract:

The world of academia tends to be a very insular place. Consequently, scholars who successfully completed their undergraduate and graduate studies are unpleasantly surprised at how challenging the transition to corporate life can get. This is a global trend even as the students who juggle work with attending some of the most demanding and best graduate programs may not easily adjust to and confirm to the professionalism required for corporate management of the industry. This paper explores the trends in the transition of Kiira EV Project from a predominantly student team to a professional team of a national pride program through mentorship and apprenticeship. The core disciplines within the Kiira EV Project include Electrical and Electronics Engineering, Mechanical Engineering, and Industrial Design.

Keywords: mentorship, apprenticeship, professional, development

Procedia PDF Downloads 416
5768 Implementation of Social Network Analysis to Analyze the Dependency between Construction Bid Packages

Authors: Kawalpreet Kaur, Panagiotis Mitropoulos

Abstract:

The division of the project scope into work packages is the most important step in the preconstruction phase of construction projects. The work division determines the scope and complexity of each bid package, resulting in dependencies between project participants performing these work packages. The coordination between project participants is necessary because of these dependencies. Excessive dependencies between the bid packages create coordination difficulties, leading to delays, added costs, and contractual friction among project participants. However, the literature on construction provides limited knowledge regarding work structuring approaches, issues, and challenges. Manufacturing industry literature provides a systematic approach to defining the project scope into work packages, and the implementation of social network analysis (SNA) in manufacturing is an effective approach to defining and analyzing the divided scope of work at the dependencies level. This paper presents a case study of implementing a similar approach using SNA in construction bid packages. The study uses SNA to analyze the scope of bid packages and determine the dependency between scope elements. The method successfully identifies the bid package with the maximum interaction with other trade contractors and the scope elements that are crucial for project performance. The analysis provided graphical and quantitative information on bid package dependencies. The study can be helpful in performing an analysis to determine the dependencies between bid packages and their scope elements and how these scope elements are critical for project performance. The study illustrates the potential use of SNA as a systematic approach to analyzing bid package dependencies in construction projects, which can guide the division of crucial scope elements to minimize negative impacts on project performance.

Keywords: work structuring, bid packages, work breakdown, project participants

Procedia PDF Downloads 78
5767 Project Production Control (PPC) Implementation for an Offshore Facilities Construction Project

Authors: Muhammad Hakim Bin Mat Tasir, Erwan Shahfizad Hasidan, Hamidah Makmor Bakry, M. Hafiz B. Izhar

Abstract:

Every key performance indicator used to monitor a project’s construction progress emphasizes trade productivity or specific commodity run-down curves. Examples include the productivity of welding by the number of joints completed per day, quantity of NDT (Non-Destructive Tests) inspection per day, etc. This perspective is based on progress and productivity; however, it does not enable a system perspective of how we produce. This paper uses a project production system perspective by which projects are a collection of production systems comprising the interconnected network of processes and operations that represent all the work activities to execute a project from start to finish. Furthermore, it also uses the 5 Levels of production system optimization as a frame. The goal of the paper is to describe the application of Project Production Control (PPC) to control and improve the performance of several production processes associated with the fabrication and assembly of a Central Processing Platform (CPP) Jacket, part of an offshore mega project. More specifically, the fabrication and assembly of buoyancy tanks as they were identified as part of the critical path and required the highest demand for capacity. In total, seven buoyancy tanks were built, with a total estimated weight of 2,200 metric tons. These huge buoyancy tanks were designed to be reversed launching and self-upending of the jacket, easily retractable, and reusable for the next project, ensuring sustainability. Results showed that an effective application of PPC not only positively impacted construction progress and productivity but also exposed sources of detrimental variability as the focus of continuous improvement practices. This approach augmented conventional project management practices, and the results had a high impact on construction scheduling, planning, and control.

Keywords: offshore, construction, project management, sustainability

Procedia PDF Downloads 59
5766 Big Data in Construction Project Management: The Colombian Northeast Case

Authors: Sergio Zabala-Vargas, Miguel Jiménez-Barrera, Luz VArgas-Sánchez

Abstract:

In recent years, information related to project management in organizations has been increasing exponentially. Performance data, management statistics, indicator results have forced the collection, analysis, traceability, and dissemination of project managers to be essential. In this sense, there are current trends to facilitate efficient decision-making in emerging technology projects, such as: Machine Learning, Data Analytics, Data Mining, and Big Data. The latter is the most interesting in this project. This research is part of the thematic line Construction methods and project management. Many authors present the relevance that the use of emerging technologies, such as Big Data, has taken in recent years in project management in the construction sector. The main focus is the optimization of time, scope, budget, and in general mitigating risks. This research was developed in the northeastern region of Colombia-South America. The first phase was aimed at diagnosing the use of emerging technologies (Big-Data) in the construction sector. In Colombia, the construction sector represents more than 50% of the productive system, and more than 2 million people participate in this economic segment. The quantitative approach was used. A survey was applied to a sample of 91 companies in the construction sector. Preliminary results indicate that the use of Big Data and other emerging technologies is very low and also that there is interest in modernizing project management. There is evidence of a correlation between the interest in using new data management technologies and the incorporation of Building Information Modeling BIM. The next phase of the research will allow the generation of guidelines and strategies for the incorporation of technological tools in the construction sector in Colombia.

Keywords: big data, building information modeling, tecnology, project manamegent

Procedia PDF Downloads 128
5765 From Biowaste to Biobased Products: Life Cycle Assessment of VALUEWASTE Solution

Authors: Andrés Lara Guillén, José M. Soriano Disla, Gemma Castejón Martínez, David Fernández-Gutiérrez

Abstract:

The worldwide population is exponentially increasing, which causes a rising demand for food, energy and non-renewable resources. These demands must be attended to from a circular economy point of view. Under this approach, the obtention of strategic products from biowaste is crucial for the society to keep the current lifestyle reducing the environmental and social issues linked to the lineal economy. This is the main objective of the VALUEWASTE project. VALUEWASTE is about valorizing urban biowaste into proteins for food and feed and biofertilizers, closing the loop of this waste stream. In order to achieve this objective, the project validates three value chains, which begin with the anaerobic digestion of the biowaste. From the anaerobic digestion, three by-products are obtained: i) methane that is used by microorganisms, which will be transformed into microbial proteins; ii) digestate that is used by black soldier fly, producing insect proteins; and iii) a nutrient-rich effluent, which will be transformed into biofertilizers. VALUEWASTE is an innovative solution, which combines different technologies to valorize entirely the biowaste. However, it is also required to demonstrate that the solution is greener than other traditional technologies (baseline systems). On one hand, the proteins from microorganisms and insects will be compared with other reference protein production systems (gluten, whey and soybean). On the other hand, the biofertilizers will be compared to the production of mineral fertilizers (ammonium sulphate and synthetic struvite). Therefore, the aim of this study is to provide that biowaste valorization can reduce the environmental impacts linked to both traditional proteins manufacturing processes and mineral fertilizers, not only at a pilot-scale but also at an industrial one. In the present study, both baseline system and VALUEWASTE solution are evaluated through the Environmental Life Cycle Assessment (E-LCA). The E-LCA is based on the standards ISO 14040 and 14044. The Environmental Footprint methodology was the one used in this study to evaluate the environmental impacts. The results for the baseline cases show that the food proteins coming from whey have the highest environmental impact on ecosystems compared to the other proteins sources: 7.5 and 15.9 folds higher than soybean and gluten, respectively. Comparing feed soybean and gluten, soybean has an environmental impact on human health 195.1 folds higher. In the case of biofertilizers, synthetic struvite has higher impacts than ammonium sulfate: 15.3 (ecosystems) and 11.8 (human health) fold, respectively. The results shown in the present study will be used as a reference to demonstrate the better environmental performance of the bio-based products obtained through the VALUEWASTE solution. Other originalities that the E-LCA performed in the VALUEWASTE project provides are the diverse direct implications on investment and policies. On one hand, better environmental performance will serve to remove the barriers linked to these kinds of technologies, boosting the investment that is backed by the E-LCA. On the other hand, it will be a germ to design new policies fostering these types of solutions to achieve two of the key targets of the European Community: being self-sustainable and carbon neutral.

Keywords: anaerobic digestion, biofertilizers, circular economy, nutrients recovery

Procedia PDF Downloads 88
5764 The Appropriate Patent System to Promote Economic Growth in Afghanistan

Authors: Mohammad Reza Fooladi

Abstract:

The patent system which fits with industrial and economic situation in the country, by strengthening research and development, technology transfer and increasing foreign investment can provide economic and industrial growth of the countries. However, the extent and manner of support should be commensurate with the country's conditions and comply with significant rules to have a positive effect on research and development, technology transfer and the amount of foreign investment. The present article tries to while reviewing the state of effectiveness of the patent system on economic growth, to illustrate the characteristics of the patent system fits Afghanistan and according to this matter provide the necessary recommendations about the improvement of laws and regulations related to the patent in Afghanistan.

Keywords: patent, economic growth, technology transfer, Afghanistan

Procedia PDF Downloads 411
5763 A New Suburb Renovation Concept

Authors: Anu Soikkelii, Laura Sorri

Abstract:

Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects. The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.

Keywords: energy efficiency, prefabrication, renovation concept, suburbs, sustainability, user-orientated

Procedia PDF Downloads 334
5762 The Use of Project to Enhance Learning Domains Stated by National Qualifications Framework: TQF

Authors: Duangkamol Thitivesa

Abstract:

This paper explores the use of project work in a content-based instruction in a Rajabhat University, Thailand. The use of project is to promote kinds of learning expected of student teachers as stated by Thailand Quality Framework: TQF. The kinds of learning are grouped into five domains: Ethical and moral development, knowledge, cognitive skill, interpersonal skills and responsibility, and analytical and communication skills. The content taught in class is used to lead the student teachers to relate their previously-acquired linguistic knowledge to meaningful realizations of the language system in passages of immediate relevance to their professional interests, teaching methods in particular. Two research questions are formulate to guide this study: 1) To what degree are the five domains of learning expected of student teachers after the use of project in a content class?, and 2) What is the academic achievement of the students’ writing skills, as part of the learning domains stated by TQF, against the 70% attainment target after the use of project to enhance the skill? The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of a summative achievement test, student writing works, an observation checklist, and project diary. The scores in the summative achievement test were analyzed by mean score, standard deviation, and t-test. Project diary serves as students’ record of the language acquired during the project. List of structures and vocabulary noted in the diary has shown students’ ability to attend to, recognize, and focus on meaningful patterns of language forms.

Keywords: Thailand quality framework, project Work, writing skill, summative

Procedia PDF Downloads 150
5761 3rd Generation Modular Execution: A Global Breakthrough in Modular Facility Construction System

Authors: Sean Bryner S. Rey, Eric Tanjutco

Abstract:

Modular execution strategies are performed to address the various challenges of any projects and are implemented on each project phase that covers Engineering, Procurement, Fabrication and Construction. It was until the recent years that the intent to surpass mechanical modularization approach were conceptualized to give solution to much greater demands of project components such as site location and adverse weather condition, material sourcing, construction schedule, safety risks and overall plot layout and allocation. The intent of this paper is to introduce the 3rd Generation Modular Execution with an overview of its advantages on project execution and will give emphasis on Engineering, Construction, Operation and Maintenance. Most importantly, the paper will present the key differentiator of 3rd Gen modular execution against other conventional project execution and the merits it bears for the industry.

Keywords: 3rd generation modular, process block, construction, operation & maintenance

Procedia PDF Downloads 475
5760 From Customer Innovations to Manufactured Products: A Project Outlook

Authors: M. Holle, M. Roth, M. R. Gürtler, U. Lindemann

Abstract:

This paper gives insights into the research project "InnoCyFer" (in the form of an outlook) which is funded by the German Federal Ministry of Economics and Technology. Enabling the integrated customer individual product design as well as flexible manufacturing of these products are the main objectives of the project. To achieve this, a web-based open innovation-platform containing an integrated Toolkit will be developed. This toolkit enables the active integration of the customer’s creativity and potentials of innovation in the product development process. Furthermore, the project will show the chances and possibilities of customer individualized products by building and examining the continuous process from innovation through the customers to the flexible manufacturing of individual products.

Keywords: customer individual product design, innovation networks, open innovation, open innovation platform, toolkit

Procedia PDF Downloads 314
5759 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 507
5758 A Cooperative, Autonomous, and Continuously Operating Drone System Offered to Railway and Bridge Industry: The Business Model Behind

Authors: Paolo Guzzini, Emad Samuel M. Ebeid

Abstract:

Bridges and Railways are critical infrastructures. Ensuring safety for transports using such assets is a primary goal as it directly impacts the lives of people. By the way, improving safety could require increased investments in O&M, and therefore optimizing resource usage for asset maintenance becomes crucial. Drones4Safety (D4S), a European project funded under the H2020 Research and Innovation Action (RIA) program, aims to increase the safety of the European civil transport by building a system that relies on 3 main pillars: • Drones operating autonomously in swarm mode; • Drones able to recharge themselves using inductive phenomena produced by transmission lines in the nearby of bridges and railways assets to be inspected; • Data acquired that are analyzed with AI-empowered algorithms for defect detection This paper describes the business model behind this disruptive project. The Business Model is structured in 2 parts: • The first part is focused on the design of the business model Canvas, to explain the value provided by the Drone4safety project; • The second part aims at defining a detailed financial analysis, with the target of calculating the IRR (Internal Return rate) and the NPV (Net Present Value) of the investment in a 7 years plan (2 years to run the project + 5 years post-implementation). As to the financial analysis 2 different points of view are assumed: • Point of view of the Drones4safety company in charge of designing, producing, and selling the new system; • Point of view of the Utility company that will adopt the new system in its O&M practices; Assuming the point of view of the Drones4safety company 3 scenarios were considered: • Selling the drones > revenues will be produced by the drones’ sales; • Renting the drones > revenues will be produced by the rental of the drones (with a time-based model); • Selling the data acquisition service > revenues will be produced by the sales of pictures acquired by drones; Assuming the point of view of a utility adopting the D4S system, a 4th scenario was analyzed taking into account the decremental costs related to the change of operation and maintenance practices. The paper will show, for both companies, what are the key parameters affecting most of the business model and which are the sustainable scenarios.

Keywords: a swarm of drones, AI, bridges, railways, drones4safety company, utility companies

Procedia PDF Downloads 140
5757 The Regulation of Vaccine-Related Intellectual Property Rights in Light of the Areas of Divergence between the Agreement on Trade-Related Aspects of Intellectual Property Rights and Investment Treaties in the Kingdom of Saudi Arabia and Australia

Authors: Abdulrahman Fahim M. Alsulami

Abstract:

The current research seeks to explore the regulation of vaccine-related IP rights in light of the areas of divergence between the Trade-Related Aspects of Intellectual Property Rights (TRIPS) Agreement and investment treaties. The study is conducted in the context of the COVID-19 pandemic; therefore, it seems natural that a specific chapter is devoted to the examination of vaccine arrangements related to vaccine supplies. The chapter starts with the examination of a typical vaccine from the perspective of IP rights. It presents the distinctive features of vaccines as pharmaceutical products and investments, reviews the basics of their patent protection, reviews vaccines’ components, and discusses IPR protection of different components of vaccines. The subsection that focuses on vaccine development and licensing reviews vaccine development stages investigates differences between vaccine licensing in different countries and presents barriers to vaccine licensing. The third subsection, at the same time, introduces the existing arrangements related to COVID-19 vaccine supplies, including COVAX arrangements, international organizations’ assistance, and direct negotiations between governments and vaccine manufacturers.

Keywords: bilateral investment treaties, COVID-19 vaccine, IP rights, TRIPs agreement

Procedia PDF Downloads 183
5756 Kebbi State University of Science and Technology, Aliero, Kebbi State

Authors: Ugbajah Maryjane

Abstract:

The study examined the production of grass cutter and the constraints in Anambra state, Nigeria. Specifically, it described socio-economic characteristics of the respondents, determinants of net farm income and constraints to grass cutter production. Multistage and random sampling methods were used to select 50 respondents for this study. Primary data were collected by means of structured questionnaire. Non-parametric and parametric statistical tools including frequency percentage mean ranking counts, cost and returns and returns and multiple regression were deployed for data analysis. Majority 84% produce on small scale, 64 % had formal education 68% had 3-4 years of farming experience hence small scaled production were common. The income (returns) on investment was used as index of profitability, gross margin (#5,972,280), net farm income (#5,327,055.2) net return on investment (2.5) and return on investment 3.1. Net farm income was significantly influence by stock size and years of farming experience. Grass cutter farmers production problem would be ameliorated by the expression of extension education awareness campaigns to discourage unhealthy practices such as indiscriminant bush burning, use of toxic chemicals as baits, and provision of credits to the farmers.

Keywords: socio-economic factors, profitability, awareness, toxic chemicals, credits

Procedia PDF Downloads 415