Search results for: construction supply chain management
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 15524

Search results for: construction supply chain management

15164 Supply Chain Improvement of the Halal Goat Industry in the Autonomous Region in Muslim Mindanao

Authors: Josephine R. Migalbin

Abstract:

Halal is an Arabic word meaning "lawful" or "permitted". When it comes to food and consumables, Halal is the dietary standard of Muslims. The Autonomous Region in Muslim Mindanao (ARMM) has a comparative advantage when it comes to Halal Industry because it is the only Muslim region in the Philippines and the natural starting point for the establishment of a halal industry in the country. The region has identified goat production not only for domestic consumption but for export market. Goat production is one of its strengths due to cultural compatibility. There is a high demand for goats during Ramadhan and Eid ul-Adha. The study aimed to provide an overview of the ARMM Halal Goat Industry; to map out the specific supply chain of halal goat, and to analyze the performance of the halal goat supply chain in terms of efficiency, flexibility, and overall responsiveness. It also aimed to identify areas for improvement in the supply chain such as behavioural, institutional, and process to provide recommendations for improvement in the supply chain towards efficient and effective production and marketing of halal goats, subsequently improving the plight of the actors in the supply chain. Generally, the raising of goats is characterized by backyard production (92.02%). There are four interrelated factors affecting significantly the production of goats which are breeding prolificacy, prevalence of diseases, feed abundance and pre-weaning mortality rate. The institutional buyers are mostly traders, restaurants/eateries, supermarkets, and meat shops, among others. The municipalities of Midsayap and Pikit in another region and Parang are the major goat sources and the municipalities in ARMM among others. In addition to the major supply centers, Siquijor, an island province in the Visayas is becoming a key source of goats. Goats are usually gathered by traders/middlemen and brought to the public markets. Meat vendors purchase them directly from raisers, slaughtered and sold fresh in wet markets. It was observed that there is increased demand at 2%/year and that supply is not enough to meet the demand. Farm gate price is 2.04 USD to 2.11 USD/kg liveweight. Industry information is shared by three key participants - raisers, traders and buyers. All respondents reported that information is through personal built-upon past experiences and that there is no full disclosure of information among the key participants in the chain. The information flow in the industry is fragmented in nature such that no total industry picture exists. In the last five years, numerous local and foreign agencies had undertaken several initiatives for the development of the halal goat industry in ARMM. The major issues include productivity which is the greatest challenge, difficulties in accessing technical support channels and lack of market linkage and consolidation. To address the various issues and concerns of the various industry players, there is a need to intensify appropriate technology transfer through extension activities, improve marketing channels by grouping producers, strengthen veterinary services and provide capital windows to improve facilities and reduce logistics and transaction costs in the entire supply chain.

Keywords: autonomous region in Muslim Mindanao, halal, halal goat industry, supply chain improvement

Procedia PDF Downloads 335
15163 Food Processing Role in Ensuring Food and Health Security

Authors: Muhammad Haseeb

Abstract:

It is crucial to have a balanced approach to food's energy and nutritional content in a world with limited resources. The preservation of the environment is vital, and both the agrifood-making and food service sectors will be requested to use fewer resources to produce a wider range of existing foods and develop imaginative foods that are physiologically appropriate for a better sense of good health, have long shelf lives and are conveniently transportable. Delivering healthy diets that satisfy consumer expectations from robust and sustainable agrifood systems is necessary in a world that is changing and where natural resources are running out. Across the whole food supply chain, an integrated multi-sectoral approach is needed to alleviate global food and nutrition insecurity.

Keywords: health, food, nutrition, supply chain

Procedia PDF Downloads 24
15162 Heading for Modern Construction Management: Recommendation for Employers

Authors: Robin Becker, Maike Eilers, Nane Roetmann, Manfred Helmus

Abstract:

The shortage of junior staff in the construction industry is a problem that will be further exacerbated in the coming years by the retirement of the baby-boom generations (1955-1969) from employment. In addition, the current working conditions in the field of construction management are not attractive for young professionals. A survey of students revealed a desire for an increase in flexibility and an improved work-life balance in everyday working life. Students of civil engineering and architecture are basically interested in a career in construction management but have reservations due to the image of the profession and the current working conditions. A survey among experts from the construction industry shows that the profession can become more attractive. This report provides recommendations for action in the form of working modules to improve the working conditions of employees. If these are taken into account, graduates can be attracted to the profession of construction management, and existing staff can be retained more effectively. The aim of this report is to show incentives for employers to respond to the wishes and needs of their current and future employees to the extent that can be implemented.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 83
15161 Circular Economy: Development of Quantitative Material Wastage Management Plan for Effective Waste Reduction in Building Construction Industry

Authors: Kwok Tak Kit

Abstract:

Combating climate change is becoming a hot topic in various sectors. Building construction and infrastructure sectors contributed a significant proportion of waste and GHGs emissions in the economy of different countries and cities. Many types of research had conducted and discussed the topic of waste management and waste management being a macro-level control is well developed in the building and construction industry. However, there is little research and studies on the micro-level of waste management, “building construction material wastage management,” and fewer reviews about regulatory control in the building construction sector. In this paper, we will focus on the potentialities and importance of material wastage management and review the deficiencies of the current standard to take into account the reduction of material wastage in a systematic and quantitative approach.

Keywords: quantitative measurement, material wastage management plan, waste management, uncalculated waste, circular economy

Procedia PDF Downloads 154
15160 How Information Sharing Can Improve Organizational Performance?

Authors: Syed Abdul Rehman Khan

Abstract:

In today’s world, information sharing plays a vital role in successful operations of supply chain; and boost to the profitability of the organizations (end-to-end supply chains). Many researches have been completed over the role of information sharing in supply chain. In this research article, we will investigate the ‘how information sharing can boost profitability & productivity of the organization; for this purpose, we have developed one conceptual model and check to that model through collected data from companies. We sent questionnaire to 369 companies; and will filled form received from 172 firms and the response rate was almost 47%. For the data analysis, we have used Regression in (SPSS software) In the research findings, our all hypothesis has been accepted significantly and due to the information sharing between suppliers and manufacturers ‘quality of material and timely delivery’ increase and also ‘collaboration & trust’ will become more stronger and these all factors will lead to the company’s profitability directly and in-directly. But unfortunately, companies could not avail the all fruitful benefits of information sharing due to the fear of ‘compromise confidentiality or leakage of information’.

Keywords: collaboration, information sharing, risk factor, timely delivery

Procedia PDF Downloads 418
15159 Critical Success Factor of Exporting Thailand’s Ginger to Japan

Authors: Phutthiwat Waiyawuththanapoom, Pimploi Tirastittam, Manop Tirastittam

Abstract:

Thailand is the agriculture country which mainly exports the agriculture product to the other countries in so many ways which are fresh vegetable, chilled vegetable or frozen vegetable. The gross export for Thailand’s vegetable is 30-40 billion baht per year, and the growth rate is about 15-20 percent per year. Ginger is one of the main vegetable product that Thailand export to Japan because Thailand’s Ginger has a good quality and be able to supply Japan’s demand with a reasonable price. This research paper is aimed to study the factors which affect the efficiency of the supply chain process of Thailand’s ginger to Japan. There are 5 factors which related to the exporting Thailand’s ginger to Japan which are quality, price, equipment and supply standard, custom process and distribution pattern. The result of the research showed that the factor which reached the 'very good' significant level is quality of Thailand’s ginger with the score of 4.86. The other 5 factors are in the 'good' significant level. So the most important factor for Thai ginger farmer to concern is the quality of the product.

Keywords: critical success factor, export, ginger, supply chain

Procedia PDF Downloads 369
15158 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 447
15157 A Polynomial Approach for a Graphical-based Integrated Production and Transport Scheduling with Capacity Restrictions

Authors: M. Ndeley

Abstract:

The performance of global manufacturing supply chains depends on the interaction of production and transport processes. Currently, the scheduling of these processes is done separately without considering mutual requirements, which leads to no optimal solutions. An integrated scheduling of both processes enables the improvement of supply chain performance. The integrated production and transport scheduling problem (PTSP) is NP-hard, so that heuristic methods are necessary to efficiently solve large problem instances as in the case of global manufacturing supply chains. This paper presents a heuristic scheduling approach which handles the integration of flexible production processes with intermodal transport, incorporating flexible land transport. The method is based on a graph that allows a reformulation of the PTSP as a shortest path problem for each job, which can be solved in polynomial time. The proposed method is applied to a supply chain scenario with a manufacturing facility in South Africa and shipments of finished product to customers within the Country. The obtained results show that the approach is suitable for the scheduling of large-scale problems and can be flexibly adapted to different scenarios.

Keywords: production and transport scheduling problem, graph based scheduling, integrated scheduling

Procedia PDF Downloads 475
15156 Using Soft Systems Methodology in the Healthcare Industry of Mauritius

Authors: Arun Kumar, Neelesh Haulder

Abstract:

This paper identifies and resolves some key issues relating to a specific aspect within the supply chain logistics of the public health care industry in the Republic of Mauritius. The analysis and the proposed solution are performed using soft systems methodology (SSM). Through the application of this relevant systematic approach at problem solving, the aim is to obtain an in-depth analysis of the problem, incorporating every possible world view of the problem and consequently to obtain a well explored solution aimed at implementing relevant changes within the current supply chain logistics of the health care industry, with the purpose of tackling the key identified issues.

Keywords: soft systems methodology, CATWOE, healthcare, logistics

Procedia PDF Downloads 519
15155 External Networking for Innovation in Construction Industry in Malaysia

Authors: Megat Zuhairy, Megat Tajuddin, Hadijah Iberahim, Noraini Ismail

Abstract:

This paper aims to discuss the impact of external networking on innovation and organizational performance in the construction industry. In Malaysia, the construction industry is known to be one of the industries that contribute significantly towards her economic growth. The construction industry is described as a fragmented and complex product system as construction projects implementation requires involvement of varying combination of large and small organizations across the supply chain spectrum. The innovation and performance of Malaysian construction industry are reported to be at underachieving and efforts for its improvement have inspired this study initiative. External networking among industry players is capable in bringing them to work together as a team, reducing the adversarial relationships among them for innovation effort and greater performance. The instrument in measuring innovation and organizational performance specific to the construction industry was developed by adapting measures introduced by several scholars in these fields. Contractors and consulting companies were the sampling frames of this study representing the construction industry in Malaysia. The population lists were developed from the lists provided by CIDB, BEM, BOA and BQSM. The samples were selected based on a stratified sampling method to gauge representation of the different groups in the population. Regression analysis was performed in this quantitative study to assess relationships amongst variables. The results revealed that principally, external networking is significant in influencing both innovation and organizational performance. Nevertheless, external networking with different industry players has a different impact on innovation and organizational performance. The study revealed that external networking with project players is significant on project performance but not on innovation. On the other hand, external networking with government agencies, academic institutions and professional bodies is significant in influencing innovation but not on organizational performance.

Keywords: innovation, external networking, organizational performance, construction industry

Procedia PDF Downloads 306
15154 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 360
15153 Talent Management through Integration of Talent Value Chain and Human Capital Analytics Approaches

Authors: Wuttigrai Ngamsirijit

Abstract:

Talent management in today’s modern organizations has become data-driven due to a demand for objective human resource decision making and development of analytics technologies. HR managers have been faced with some obstacles in exploiting data and information to obtain their effective talent management decisions. These include process-based data and records; insufficient human capital-related measures and metrics; lack of capabilities in data modeling in strategic manners; and, time consuming to add up numbers and make decisions. This paper proposes a framework of talent management through integration of talent value chain and human capital analytics approaches. It encompasses key data, measures, and metrics regarding strategic talent management decisions along the organizational and talent value chain. Moreover, specific predictive and prescriptive models incorporating these data and information are recommended to help managers in understanding the state of talent, gaps in managing talent and the organization, and the ways to develop optimized talent strategies.    

Keywords: decision making, human capital analytics, talent management, talent value chain

Procedia PDF Downloads 188
15152 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 244
15151 Electronic Data Interchange (EDI) in the Supply Chain: Impact on Customer Satisfaction

Authors: Hicham Amine, Abdelouahab Mesnaoui

Abstract:

Electronic data interchange EDI is the computer-to-computer exchange of structured business information. This information typically takes the form of standardized electronic business documents, such as invoices, purchase orders, bills of lading, and so on. The purpose of this study is to identify the impact EDI might have on supply chain and typically on customer satisfaction keeping in mind the constraints the organization might face. This study included 139 subject matter experts (SMEs) who participated by responding to a survey that was distributed. 85% responded that they are extremely for the implementation while 10% were neutral and 5% were against the implementation. From the quality assurance department, we have got 75% from the clients agreed to move on with the change whereas 10% stayed neutral and finally 15% were against the change. From the legal department where 80% of the answers were for the implementation and 10% of the participants stayed neutral whereas the last 10% were against it. The survey consisted of 40% male and 60% female (sex-ratio (F/M=1,5), who had chosen to participate. Our survey also contained 3 categories in terms of technical background where 80% are from technical background and 15% were from nontechnical background and 5% had some average technical background. This study examines the impact of EDI on customer satisfaction which is the primary hypothesis and justifies the importance of the implementation which enhances the customer satisfaction.

Keywords: electronic data interchange, supply chain, subject matter experts, customer satisfaction

Procedia PDF Downloads 340
15150 Application of Agile Project Management to Construction Projects: Case Study

Authors: Ran Etgar, Sarit Freund

Abstract:

Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.

Keywords: agile project management, construction, information systems, project management

Procedia PDF Downloads 130
15149 Imbalance on the Croatian Housing Market in the Aftermath of an Economic Crisis

Authors: Tamara Slišković, Tomislav Sekur

Abstract:

This manuscript examines factors that affect demand and supply of the housing market in Croatia. The period from the beginning of this century, until 2008, was characterized by a strong expansion of construction, housing and real estate market in general. Demand for residential units was expanding, and this was supported by favorable lending conditions of banks. Indicators on the supply side, such as the number of newly built houses and the construction volume index were also increasing. Rapid growth of demand, along with the somewhat slower supply growth, led to the situation in which new apartments were sold before the completion of residential buildings. This resulted in a rise of housing price which was indication of a clear link between the housing prices with the supply and demand in the housing market. However, after 2008 general economic conditions in Croatia worsened and demand for housing has fallen dramatically, while supply descended at much slower pace. Given that there is a gap between supply and demand, it can be concluded that the housing market in Croatia is in imbalance. Such trend is accompanied by a relatively small decrease in housing price. The final result of such movements is the large number of unsold housing units at relatively high price levels. For this reason, it can be argued that housing prices are sticky and that, consequently, the price level in the aftermath of a crisis does not correspond to the discrepancy between supply and demand on the Croatian housing market. The degree of rigidity of the housing price can be determined by inclusion of the housing price as the explanatory variable in the housing demand function. Other independent variables are demographic variable (e.g. the number of households), the interest rate on housing loans, households' disposable income and rent. The equilibrium price is reached when the demand for housing equals its supply, and the speed of adjustment of actual prices to equilibrium prices reveals the extent to which the prices are rigid. The latter requires inclusion of the housing prices with time lag as an independent variable in estimating demand function. We also observe the supply side of the housing market, in order to explain to what extent housing prices explain the movement of new construction activity, and other variables that describe the supply. In this context, we test whether new construction on the Croatian market is dependent on current prices or prices with a time lag. Number of dwellings is used to approximate new construction (flow variable), while the housing prices (current or lagged), quantity of dwellings in the previous period (stock variable) and a series of costs related to new construction are independent variables. We conclude that the key reason for the imbalance in the Croatian housing market should be sought in the relative relationship of price elasticities of supply and demand.

Keywords: Croatian housing market, economic crisis, housing prices, supply imbalance, demand imbalance

Procedia PDF Downloads 275
15148 Timber Urbanism: Assessing the Carbon Footprint of Mass-Timber, Steel, and Concrete Structural Prototypes for Peri-Urban Densification in the Hudson Valley’s Urban Fringe

Authors: Eleni Stefania Kalapoda

Abstract:

The current fossil-fuel based urbanization pattern and the estimated human population growth are increasing the environmental footprint on our planet’s precious resources. To mitigate the estimated skyrocketing in greenhouse gas emissions associated with the construction of new cities and infrastructure over the next 50 years, we need a radical rethink in our approach to construction to deliver a net zero built environment. This paper assesses the carbon footprint of a mass-timber, a steel, and a concrete structural alternative for peri-urban densification in the Hudson Valley's urban fringe, along with examining the updated policy and the building code adjustments that support synergies between timber construction in city making and sustainable management of timber forests. By quantifying the carbon footprint of a structural prototype for four different material assemblies—a concrete (post-tensioned), a mass timber, a steel (composite), and a hybrid (timber/steel/concrete) assembly applicable to the three updated building typologies of the IBC 2021 (Type IV-A, Type IV-B, Type IV-C) that range between a nine to eighteen-story structure alternative—and scaling-up that structural prototype to the size of a neighborhood district, the paper presents a quantitative and a qualitative approach for a forest-based construction economy as well as a resilient and a more just supply chain framework that ensures the wellbeing of both the forest and its inhabitants.

Keywords: mass-timber innovation, concrete structure, carbon footprint, densification

Procedia PDF Downloads 109
15147 Framework for the Modeling of the Supply Chain Collaborative Planning Process

Authors: D. Pérez, M. M. E. Alemany

Abstract:

In this work a Framework to model the Supply Chain (SC) Collaborative Planning (CP) Process is proposed, and particularly its Decisional view. The main Framework contributions with regards to previous related works are the following, 1) the consideration of not only the Decision view, the most important one due to the Process type, but other additional three views which are the Physical, Organisation and Information ones, closely related and complementing the Decision View, 2) the joint consideration of two interdependence types, the Temporal (among Decision Centres belonging to different Decision Levels) and Spatial (among Decision Centres belonging to the same Decision Level) to support the distributed Decision-Making process in SC where several decision Centres interact among them in a collaborative manner.

Keywords: collaborative planning, decision view, distributed decision-making, framework

Procedia PDF Downloads 468
15146 AHP and TOPSIS Methods for Supplier Selection Problem in Medical Devices Company

Authors: Sevde D. Karayel, Ediz Atmaca

Abstract:

Supplier selection subject is vital because of development competitiveness and performance of firms which have right, rapid and with low cost procurement. Considering the fact that competition between firms is no longer on their supply chains, hence it is very clear that performance of the firms’ not only depend on their own success but also success of all departments in supply chain. For this purpose, firms want to work with suppliers which are cost effective, flexible in terms of demand and high quality level for customer satisfaction. However, diversification and redundancy of their expectations from suppliers, supplier selection problems need to be solved as a hard problem. In this study, supplier selection problem is discussed for critical piece, which is using almost all production of products in and has troubles with lead time from supplier, in a firm that produces medical devices. Analyzing policy in the current situation of the firm in the supplier selection indicates that supplier selection is made based on the purchasing department experience and other authorized persons’ general judgments. Because selection do not make based on the analytical methods, it is caused disruptions in production, lateness and extra cost. To solve the problem, AHP and TOPSIS which are multi-criteria decision making techniques, which are effective, easy to implement and can analyze many criteria simultaneously, are used to make a selection among alternative suppliers.

Keywords: AHP-TOPSIS methods, multi-criteria decision making, supplier selection problem, supply chain management

Procedia PDF Downloads 264
15145 Understanding Stock-Out of Pharmaceuticals in Timor-Leste: A Case Study in Identifying Factors Impacting on Pharmaceutical Quantification in Timor-Leste

Authors: Lourenco Camnahas, Eileen Willis, Greg Fisher, Jessie Gunson, Pascale Dettwiller, Charlene Thornton

Abstract:

Stock-out of pharmaceuticals is a common issue at all level of health services in Timor-Leste, a small post-conflict country. This lead to the research questions: what are the current methods used to quantify pharmaceutical supplies; what factors contribute to the on-going pharmaceutical stock-out? The study examined factors that influence the pharmaceutical supply chain system. Methodology: Privett and Goncalvez dependency model has been adopted for the design of the qualitative interviews. The model examines pharmaceutical supply chain management at three management levels: management of individual pharmaceutical items, health facilities, and health systems. The interviews were conducted in order to collect information on inventory management, logistics management information system (LMIS) and the provision of pharmaceuticals. Andersen' behavioural model for healthcare utilization also informed the interview schedule, specifically factors linked to environment (healthcare system and external environment) and the population (enabling factors). Forty health professionals (bureaucrats, clinicians) and six senior officers from a United Nations Agency, a global multilateral agency and a local non-governmental organization were interviewed on their perceptions of factors (healthcare system/supply chain and wider environment) impacting on stock out. Additionally, policy documents for the entire healthcare system, along with population data were collected. Findings: An analysis using Pozzebon’s critical interpretation identified a range of difficulties within the system from poor coordination to failure to adhere to policy guidelines along with major difficulties with inventory management, quantification, forecasting, and budgetary constraints. Weak logistics management information system, lack of capacity in inventory management, monitoring and supervision are additional organizational factors that also contributed to the issue. There were various methods of quantification of pharmaceuticals applied in the government sector, and non-governmental organizations. Lack of reliable data is one of the major problems in the pharmaceutical provision. Global Fund has the best quantification methods fed by consumption data and malaria cases. There are other issues that worsen stock-out: political intervention, work ethic and basic infrastructure such as unreliable internet connectivity. Major issues impacting on pharmaceutical quantification have been identified. However, current data collection identified limitations within the Andersen model; specifically, a failure to take account of predictors in the healthcare system and the environment (culture/politics/social. The next step is to (a) compare models used by three non-governmental agencies with the government model; (b) to run the Andersen explanatory model for pharmaceutical expenditure for 2 to 5 drug items used by these three development partners in order to see how it correlates with the present model in terms of quantification and forecasting the needs; (c) to repeat objectives (a) and (b) using the government model; (d) to draw a conclusion about the strength.

Keywords: inventory management, pharmaceutical forecasting and quantification, pharmaceutical stock-out, pharmaceutical supply chain management

Procedia PDF Downloads 250
15144 Managing Projects in Practice. A Perspective of Stakeholder Management in Managing Stakeholders within the UK Construction Projects

Authors: Faraz Ali Memon

Abstract:

Stakeholders are a vital part of any organisation. It includes working on the demands of different stakeholders within the projects. However, the reality of construction projects is slightly different when it comes to practice. The UK construction projects have a history of failing to complete projects on time and within the budget. The purpose of this qualitative study is to enhance knowledge of stakeholder engagement. Semi-structured interviews will be carried out using a purposive sampling technique. It includes interviewing and getting knowledge from industry practitioners from top UK construction firms on how to manage stakeholders effectively. The findings from this study will help in understanding stakeholders' impact and how the engagement of stakeholders can affect construction projects. The conclusions of this study add value to the existing body of knowledge on stakeholder management, especially in the UK, where academic studies on construction projects are few. As a contribution, this study will provide a practical guide for the practitioners to engage stakeholders within the scope of the project. In addition, this study is limited to UK construction projects. Therefore, the outcome may not be generalised to other developing and underdeveloped countries.

Keywords: stakeholders, UK construction, project management, cost and time

Procedia PDF Downloads 107
15143 Blueprinting of a Normalized Supply Chain Processes: Results in Implementing Normalized Software Systems

Authors: Bassam Istanbouli

Abstract:

With the technology evolving every day and with the increase in global competition, industries are always under the pressure to be the best. They need to provide good quality products at competitive prices, when and how the customer wants them.  In order to achieve this level of service, products and their respective supply chain processes need to be flexible and evolvable; otherwise changes will be extremely expensive, slow and with many combinatorial effects. Those combinatorial effects impact the whole organizational structure, from a management, financial, documentation, logistics and specially the information system Enterprise Requirement Planning (ERP) perspective. By applying the normalized system concept/theory to segments of the supply chain, we believe minimal effects, especially at the time of launching an organization global software project. The purpose of this paper is to point out that if an organization wants to develop a software from scratch or implement an existing ERP software for their business needs and if their business processes are normalized and modular then most probably this will yield to a normalized and modular software system that can be easily modified when the business evolves. Another important goal of this paper is to increase the awareness regarding the design of the business processes in a software implementation project. If the blueprints created are normalized then the software developers and configurators will use those modular blueprints to map them into modular software. This paper only prepares the ground for further studies;  the above concept will be supported by going through the steps of developing, configuring and/or implementing a software system for an organization by using two methods: The Software Development Lifecycle method (SDLC) and the Accelerated SAP implementation method (ASAP). Both methods start with the customer requirements, then blue printing of its business processes and finally mapping those processes into a software system.  Since those requirements and processes are the starting point of the implementation process, then normalizing those processes will end up in a normalizing software.

Keywords: blueprint, ERP, modular, normalized

Procedia PDF Downloads 140
15142 Food Traceability System: Current State and Future Needs of the Nigerian Poultry and Poultry Product Supply Chain

Authors: Hadiza Kabir Bako, Munir Abba Dandago

Abstract:

The fright of food-borne diseases as a result of animal health across the globe is creating the need for origin confirmation, safety of food and method of identification of food produce within the supply chain. In this paper, we investigated two commercial and one backyard poultry farm; live poultry, poultry meat and egg. We propose various implementation options for the poultry traceability system with respect to trace and track, and food recall and withdrawal requirements. With the intention that farmers, Investors or Regulatory agencies would find it useful for the Nigerian poultry sector and we highlight the future needs and challenges that lie ahead in the two most significant system of poultry production in Nigeria: the commercial poultry and backyard breeding.

Keywords: farm, food safety, food traceability, poultry

Procedia PDF Downloads 194
15141 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 231
15140 Delay Studies in Construction: Synthesis, Critical Evaluation, and the Way Forward

Authors: Abdullah Alsehaimi

Abstract:

Over decades, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite such consensus, most of the previous studies fall short in providing clear recommendations demonstrating how project management practice could be improved. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular delay causes. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated via alternative research approaches, i.e. action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management.

Keywords: construction delay, action research, constructive research, industrial engineering

Procedia PDF Downloads 425
15139 Adoption of Noise and Vibration Management Tools for Major Infrastructure Projects in Sydney, Australia

Authors: Adrian Morris, Rodney Phillips, Mattia Tabacchi

Abstract:

Minimizing construction noise and vibration impacts is a key challenge for major infrastructure projects in urban environments. Before commencing construction works, Construction Noise and Vibration Management Plan (CNVMP) and Construction Noise and Vibration Impact Statements (CNVIS) are required to be prepared and submitted to the relevant government authorities for review and approval. However, the assessment of potential impacts from work activities at pre-approval stage may be inaccurate as works methodology and scheduling are yet to be determined. In response, noise and vibration management tools have been developed to refine and supplement the CNVIS as works progress. These tools have been successfully implemented in major infrastructure projects allowing contractors to plan and assess construction works in a cost effective and timely manner. As a result, noise and vibration management tools have been incorporated into management plans and are increasingly required by regulators.

Keywords: noise management, environmental noise, infrastructure projects, construction, vibration, cost effective

Procedia PDF Downloads 132
15138 Field Management Solutions Supporting Foreman Executive Tasks

Authors: Maroua Sbiti, Karim Beddiar, Djaoued Beladjine, Romuald Perrault

Abstract:

Productivity is decreasing in construction compared to the manufacturing industry. It seems that the sector is suffering from organizational problems and have low maturity regarding technological advances. High international competition due to the growing context of globalization, complex projects, and shorter deadlines increases these challenges. Field employees are more exposed to coordination problems than design officers. Execution collaboration is then a major issue that can threaten the cost, time, and quality completion of a project. Initially, this paper will try to identify field professional requirements as to address building management process weaknesses such as the unreliability of scheduling, the fickleness of monitoring and inspection processes, the inaccuracy of project’s indicators, inconsistency of building documents and the random logistic management. Subsequently, we will focus our attention on providing solutions to improve scheduling, inspection, and hours tracking processes using emerging lean tools and field mobility applications that bring new perspectives in terms of cooperation. They have shown a great ability to connect various field teams and make informations visual and accessible to planify accurately and eliminate at the source the potential defects. In addition to software as a service use, the adoption of the human resource module of the Enterprise Resource Planning system can allow a meticulous time accounting and thus make the faster decision making. The next step is to integrate external data sources received from or destined to design engineers, logisticians, and suppliers in a holistic system. Creating a monolithic system that consolidates planning, quality, procurement, and resources management modules should be our ultimate target to build the construction industry supply chain.

Keywords: lean, last planner system, field mobility applications, construction productivity

Procedia PDF Downloads 117
15137 Kuehne + Nagel's PharmaChain: IoT-Enabled Product Monitoring Using Radio Frequency Identification

Authors: Rebecca Angeles

Abstract:

This case study features the Kuehne + Nagel PharmaChain solution for ‘cold chain’ pharmaceutical and biologic product shipments with IOT-enabled features for shipment temperature and location tracking. Using the case study method and content analysis, this research project investigates the application of the structurational model of technology theory introduced by Orlikowski in order to interpret the firm’s entry and participation in the IOT-impelled marketplace.

Keywords: Internet of Things (IOT), radio frequency identification (RFID), structurational model of technology (Orlikowski), supply chain management

Procedia PDF Downloads 232
15136 Advance Hybrid Manufacturing Supply Chain System to Get Benefits of Push and Pull Systems

Authors: Akhtar Nawaz, Sahar Noor, Iftikhar Hussain

Abstract:

This paper considers advanced hybrid manufacturing planning both push and pull system in which each customer order has a due date by demand forecast and customer orders. We present a tool for model for tool development that requires an absolute due dates and customer orders in a manufacturing supply chain. It is vital for the manufacturing companies to face the problem of variations in demands, increase in varieties by maintaining safety stock and to minimize components obsolescence and uselessness. High inventory cost and low delivery lead time is expected in push type of system and on contrary high delivery lead time and low inventory cost is predicted in the pull type. For this tool for model we need an MRP system for the push and pull environment and control of inventories in push parts and lead time in the pull part. To retain process data quickly, completely and to improve responsiveness and minimize inventory cost, a tool is required to deal with the high product variance and short cycle parts. In practice, planning and scheduling are interrelated and should be solved simultaneously with supply chain to ensure that the due dates of customer orders are met. The proposed tool for model considers alternative process plans for job types, with precedence constraints for job operations. Such a tool for model has not been treated in the literature. To solve the model, tool was developed, so a new technique was required to deal with the issue of high product variance and short life cycles in assemble to order.

Keywords: hybrid manufacturing system, supply chain system, make to order, make to stock, assemble to order

Procedia PDF Downloads 564
15135 Predictive Modelling Approach to Identify Spare Parts Inventory Obsolescence

Authors: Madhu Babu Cherukuri, Tamoghna Ghosh

Abstract:

Factory supply chain management spends billions of dollars every year to procure and manage equipment spare parts. Due to technology -and processes changes some of these spares become obsolete/dead inventory. Factories have huge dead inventory worth millions of dollars accumulating over time. This is due to lack of a scientific methodology to identify them and send the inventory back to the suppliers on a timely basis. The standard approach followed across industries to deal with this is: if a part is not used for a set pre-defined period of time it is declared dead. This leads to accumulation of dead parts over time and these parts cannot be sold back to the suppliers as it is too late as per contract agreement. Our main idea is the time period for identifying a part as dead cannot be a fixed pre-defined duration across all parts. Rather, it should depend on various properties of the part like historical consumption pattern, type of part, how many machines it is being used in, whether it- is a preventive maintenance part etc. We have designed a predictive algorithm which predicts part obsolescence well in advance with reasonable accuracy and which can help save millions.

Keywords: obsolete inventory, machine learning, big data, supply chain analytics, dead inventory

Procedia PDF Downloads 319