Search results for: underground buildings
1845 Influence of Coatings on Energy Conservation in Construction Industry
Authors: Nancy Sakr, Mohamed Abou-Zeid
Abstract:
World energy consumption has increased rapidly in the past few years. Due to population growth, total energy consumption is increasing; a large amount of energy is wasted on the cooling and heating processes in buildings. However, using thermal heating management can minimize costs, heat consumption and create a management system for the heat insulation for buildings. This concept is being implemented through different approaches. Based on analysis and research, there is evidence in the energy consumption before and after testing and applying construction approaches for thermal heating management in building units. This investigation addresses the evaluation of the influence of external coatings on energy consumption. Coatings are considered one of the smart effective available approaches for energy efficiency. Unfortunately, this approach is not widely applied in the construction industry. It needs more data to prove effectiveness and credibility between people to use it as a smart thermal insulation approach. Two precedents have been analyzed in order to monitor buildings’ heat exposure, and how the buildings will be affected by thermal insulation materials. Data sheets from chemical companies which produce similar coatings are compared with the usual products and the protective thermal products.Keywords: energy consumption, building envelope, thermal insulation, protective coatings
Procedia PDF Downloads 1441844 Integrated Passive Cooling Systems for Tropical Residential Buildings: A Review through the Lens of Latent Heat Assessment
Authors: O. Eso, M. Mohammadi, J. Darkwa, J. Calautit
Abstract:
Residential buildings are responsible for 22% of the global end-use energy demand and 17% of global CO₂ emissions. Tropical climates particularly present higher latent heat gains, leading to more cooling loads. However, the cooling processes are all based on conventional mechanical air conditioning systems which are energy and carbon intensive technologies. Passive cooling systems have in the past been considered as alternative technologies for minimizing energy consumption in buildings. Nevertheless, replacing mechanical cooling systems with passive ones will require a careful assessment of the passive cooling system heat transfer to determine if suitable to outperform their conventional counterparts. This is because internal heat gains, indoor-outdoor heat transfer, and heat transfer through envelope affects the performance of passive cooling systems. While many studies have investigated sensible heat transfer in passive cooling systems, not many studies have focused on their latent heat transfer capabilities. Furthermore, combining heat prevention, heat modulation and heat dissipation to passively cool indoor spaces in the tropical climates is critical to achieve thermal comfort. Since passive cooling systems use only one of these three approaches at a time, integrating more than one passive cooling system for effective indoor latent heat removal while still saving energy is studied. This study is a systematic review of recently published peer review journals on integrated passive cooling systems for tropical residential buildings. The missing links in the experimental and numerical studies with regards to latent heat reduction interventions are presented. Energy simulation studies of integrated passive cooling systems in tropical residential buildings are also discussed. The review has shown that comfortable indoor environment is attainable when two or more passive cooling systems are integrated in tropical residential buildings. Improvement occurs in the heat transfer rate and cooling performance of the passive cooling systems when thermal energy storage systems like phase change materials are included. Integrating passive cooling systems in tropical residential buildings can reduce energy consumption by 6-87% while achieving up to 17.55% reduction in indoor heat flux. The review has highlighted a lack of numerical studies regarding passive cooling system performance in tropical savannah climates. In addition, detailed studies are required to establish suitable latent heat transfer rate in passive cooling ventilation devices under this climate category. This should be considered in subsequent studies. The conclusions and outcomes of this study will help researchers understand the overall energy performance of integrated passive cooling systems in tropical climates and help them identify and design suitable climate specific options for residential buildings.Keywords: energy savings, latent heat, passive cooling systems, residential buildings, tropical residential buildings
Procedia PDF Downloads 1491843 A Case Study of Building Behavior Damaged during 26th Oct, 2015 Earthquake in Northern Areas of Pakistan
Authors: Rahmat Ali, Amjad Naseer, Abid A. Shah
Abstract:
This paper is an attempt to presents the performance of building observed during 26th Oct, 2015 earthquake in District Swat and Shangla region. Most of the buildings in the earthquake hit areas were built with Rubble stone masonry, dress Stone Masonry, brick masonry with and without RC column, Brick masonry with RC beams and column, Block Masonry with and without RC column. It was found that most of the buildings were built without proper supervision and without following any codes. A majority of load bearing masonry walls were highly affected during the earthquake. The load bearing walls built with rubble stone masonry were collapsed resulting huge damages and loss of property and life. Load bearing bricks masonry walls were also affected in most of the region. In some residential buildings the bricks were crushed in a single brick walls. Severe cracks were also found in double brick masonry walls. In RC frame structure beams and columns were also seriously affected. A majority of building structures were non-engineered. Some buildings designed by unskilled local consultants were also affected during the earthquake. Several architectural and structural mistakes were also found in various buildings designed by local consultant. It was found that the structures were collapsed prematurely either because of unskillful labor and using substandard materials or avoiding delicate repair, maintenance, and health monitoring activities because of lack of available sophisticated technology in our country.Keywords: cracks, collapse, earthquake, masonry, repair
Procedia PDF Downloads 4921842 The Design of Multiple Detection Parallel Combined Spread Spectrum Communication System
Authors: Lixin Tian, Wei Xue
Abstract:
Many jobs in society go underground, such as mine mining, tunnel construction and subways, which are vital to the development of society. Once accidents occur in these places, the interruption of traditional wired communication is not conducive to the development of rescue work. In order to realize the positioning, early warning and command functions of underground personnel and improve rescue efficiency, it is necessary to develop and design an emergency ground communication system. It is easy to be subjected to narrowband interference when performing conventional underground communication. Spreading communication can be used for this problem. However, general spread spectrum methods such as direct spread communication are inefficient, so it is proposed to use parallel combined spread spectrum (PCSS) communication to improve efficiency. The PCSS communication not only has the anti-interference ability and the good concealment of the traditional spread spectrum system, but also has a relatively high frequency band utilization rate and a strong information transmission capability. So, this technology has been widely used in practice. This paper presents a PCSS communication model-multiple detection parallel combined spread spectrum (MDPCSS) communication system. In this paper, the principle of MDPCSS communication system is described, that is, the sequence at the transmitting end is processed in blocks and cyclically shifted to facilitate multiple detection at the receiving end. The block diagrams of the transmitter and receiver of the MDPCSS communication system are introduced. At the same time, the calculation formula of the system bit error rate (BER) is introduced, and the simulation and analysis of the BER of the system are completed. By comparing with the common parallel PCSS communication, we can draw a conclusion that it is indeed possible to reduce the BER and improve the system performance. Furthermore, the influence of different pseudo-code lengths selected on the system BER is simulated and analyzed, and the conclusion is that the larger the pseudo-code length is, the smaller the system error rate is.Keywords: cyclic shift, multiple detection, parallel combined spread spectrum, PN code
Procedia PDF Downloads 1371841 Uncertainty in Building Energy Performance Analysis at Different Stages of the Building’s Lifecycle
Authors: Elham Delzendeh, Song Wu, Mustafa Al-Adhami, Rima Alaaeddine
Abstract:
Over the last 15 years, prediction of energy consumption has become a common practice and necessity at different stages of the building’s lifecycle, particularly, at the design and post-occupancy stages for planning and maintenance purposes. This is due to the ever-growing response of governments to address sustainability and reduction of CO₂ emission in the building sector. However, there is a level of uncertainty in the estimation of energy consumption in buildings. The accuracy of energy consumption predictions is directly related to the precision of the initial inputs used in the energy assessment process. In this study, multiple cases of large non-residential buildings at design, construction, and post-occupancy stages are investigated. The energy consumption process and inputs, and the actual and predicted energy consumption of the cases are analysed. The findings of this study have pointed out and evidenced various parameters that cause uncertainty in the prediction of energy consumption in buildings such as modelling, location data, and occupant behaviour. In addition, unavailability and insufficiency of energy-consumption-related inputs at different stages of the building’s lifecycle are classified and categorized. Understanding the roots of uncertainty in building energy analysis will help energy modellers and energy simulation software developers reach more accurate energy consumption predictions in buildings.Keywords: building lifecycle, efficiency, energy analysis, energy performance, uncertainty
Procedia PDF Downloads 1371840 Risk Assessment in Construction of K-Span Buildings in United Arab Emirates (UAE)
Authors: Imtiaz Ali, Imam Mansoor
Abstract:
Investigations as a part of the academic study were undertaken to identify and evaluate the significant risks associated with the construction of K-span buildings in the region of UAE. Primary field data was collected through questionnaires obtaining specific open and close-ended questions from carefully selected construction firms, civil engineers and, construction manager regarding risks associated to K-span building construction. Historical data available for other regions of the same construction technique was available which was compared for identifying various non-critical and critical risk parameters by comparative evaluation techniques to come up with important risks and potential sources for their control and minimization in K-Span buildings that is increasing in the region. The associated risks have been determined with their Relative Importance Index (RII) values of which Risk involved in Change of Design required by Owners carries the highest value (RII=0.79) whereas, Delayed Payment by Owner to Contractor is one of the least (RII=0.42) value. The overall findings suggest that most relative risks as quantified originate or associated with the contractors. It may be concluded that project proponents undertaking K-span projects in planning and budgeting the cost and delays should take into account of risks on high account if changes in design are also required any delays in the material by the supplier would then be a major risk in K-span project delay. Since projects are, less costly, so owners have limited budgets, then they hire small contractors, which are not highly competent contractors. So study suggests that owner should be aware of these types of risks associated with the construction of K-span buildings in order to make it cost effective.Keywords: k-span buildings, k-span construction, risk management, relative improvement index (RII)
Procedia PDF Downloads 3751839 Uses for Closed Coal Mines: Construction of Underground Pumped Storage Hydropower Plants
Authors: Javier Menéndez, Jorge Loredo
Abstract:
Large scale energy storage systems (LSESS) such as pumped-storage hydro-power (PSH) are required in the current energy transition towards a low carbon economy by using green energies that produce low levels of greenhouse gas (GHG) emissions. Coal mines are currently being closed in the European Union and their underground facilities may be used to build PSH plants. However, the development of this projects requires the excavation of a network of tunnels and a large cavern that would be used as a powerhouse to install the Francis turbine and motor-generator. The technical feasibility to excavate the powerhouse cavern has been analyzed in the North of Spain. Three-dimensional numerical models have been conducted to analyze the stability considering shale and sandstone rock mass. Total displacements and thickness of plastic zones were examined considering different support systems. Systematic grouted rock bolts and fibre reinforced shotcrete were applied at the cavern walls and roof. The results obtained show that the construction of the powerhouse is feasible applying proper support systems.Keywords: closed mines, mine water, numerical model, pumped-storage, renewable energies
Procedia PDF Downloads 961838 A Case Study on Post-Occupancy Evaluation of User Satisfaction in Higher Educational Buildings
Authors: Yuanhong Zhao, Qingping Yang, Andrew Fox, Tao Zhang
Abstract:
Post-occupancy evaluation (POE) is a systematic approach to assess the actual building performance after the building has been occupied for some time. In this paper, a structured POE assessment was conducted using the building use survey (BUS) methodology in two higher educational buildings in the United Kingdom. This study aims to help close the building performance gap, provide optimized building operation suggestions, and to improve occupants’ satisfaction level. In this research, the questionnaire survey investigated the influences of environmental factors on user satisfaction from the main aspects of building overall design, thermal comfort, perceived control, indoor environment quality for noise, lighting, ventilation, and other non-environmental factors, such as the background information about age, sex, time in buildings, workgroup size, and so on. The results indicate that the occupant satisfaction level with the main aspects of building overall design, indoor environment quality, and thermal comfort in summer and winter on both two buildings, which is lower than the benchmark data. The feedback of this POE assessment has been reported to the building management team to allow managers to develop high-performance building operation plans. Finally, this research provided improvement suggestions to the building operation system to narrow down the performance gap and improve the user work experience satisfaction and productivity level.Keywords: building performance assessment systems, higher educational buildings, post-occupancy evaluation, user satisfaction
Procedia PDF Downloads 1521837 A Plan of Smart Management for Groundwater Resources
Authors: Jennifer Chen, Pei Y. Hsu, Yu W. Chen
Abstract:
Groundwater resources play a vital role in regional water supply because over 1/3 of total demand is satisfied by groundwater resources. Because over-pumpage might cause environmental impact such as land subsidence, a sustainable management of groundwater resource is required. In this study, a blueprint of smart management for groundwater resource is proposed and planned. The framework of the smart management can be divided into two major parts, hardware and software parts. First, an internet of groundwater (IoG) which is inspired by the internet of thing (IoT) is proposed to observe the migration of groundwater usage and the associated response, groundwater levels. Second, algorithms based on data mining and signal analysis are proposed to achieve the goal of providing highly efficient management of groundwater. The entire blueprint is a 4-year plan and this year is the first year. We have finished the installation of 50 flow meters and 17 observation wells. An underground hydrological model is proposed to determine the associated drawdown caused by the measured pumpages. Besides, an alternative to the flow meter is also proposed to decrease the installation cost of IoG. An accelerometer and 3G remote transmission are proposed to detect the on and off of groundwater pumpage.Keywords: groundwater management, internet of groundwater, underground hydrological model, alternative of flow meter
Procedia PDF Downloads 3791836 An Investigation on Climate Responsive Design Strategies of Apartment Buildings in Athens of the Period 1920-1960s
Authors: Angeliki Chronopoulou, Eleni Alexandrou
Abstract:
This paper thoroughly investigates residential buildings of the period 1920 – 1960 in Athens and evaluates their bioclimatic response and energy performance. A methodology adapted to the specific context of the city is proposed and applied in order to assess and extract results related to the climate analysis of the city of Athens, the general/architectural design and construction characteristics of the apartment buildings constructed during the period 1920 – 1960, the bioclimatic strategies applied on them, and the achieved thermal comfort based on questionnaires answered by their users. The results of the current study indicate that the residential architecture of that period in the city of Athens is adapted to an extend to the local climate with various climate responsive strategies. As an outcome of the analysis, the most frequently applied depending on the period of construction are presented. For this reason, the examined period is divided into 3 sub – periods: 1st period 1920s – 1930s (late neoclassicism & eclecticism), 2nd period 1930s – 1940s (modernism), 3rd period 1940s – 1960s (postwar modernism).Keywords: Athens, climatic design strategies, residential buildings, middle war and post war architecture, thermal comfort
Procedia PDF Downloads 1021835 Feasibility of Two Positive-Energy Schools in a Hot-Humid Tropical Climate: A Methodological Approach
Authors: Shashwat, Sandra G. L. Persiani, Yew Wah Wong, Pramod S. Kamath, Avinash H. Anantharam, Hui Ling Aw, Yann Grynberg
Abstract:
Achieving zero-energy targets in existing buildings is known to be a difficult task, hence targets are addressed at new buildings almost exclusively. Although these ultra-efficient case-studies remain essential to develop future technologies and drive the concepts of Zero-energy, the immediate need to cut the consumption of the existing building stock remains unaddressed. This work aims to present a reliable and straightforward methodology for assessing the potential of energy-efficient upgrading in existing buildings. Public Singaporean school buildings, characterized by low energy use intensity and large roof areas, were identified as potential objects for conversion to highly-efficient buildings with a positive energy balance. A first study phase included the development of a detailed energy model for two case studies (a primary and a secondary school), based on the architectural drawings provided, site-visits and calibrated using measured end-use power consumption of different spaces. The energy model was used to demonstrate compliances or predict energy consumption of proposed changes in the two buildings. As complete energy monitoring is difficult and substantially time-consuming, short-term energy data was collected in the schools by taking spot measurements of power, voltage, and current for all the blocks of school. The figures revealed that the bulk of the consumption is attributed in decreasing order of magnitude to air-conditioning, plug loads, and lighting. In a second study-phase, a number of energy-efficient technologies and strategies were evaluated through energy-modeling to identify the alternatives giving the highest energy saving potential, achieving a reduction in energy use intensity down to 19.71 kWh/m²/y and 28.46 kWh/m²/y for the primary and the secondary schools respectively. This exercise of field evaluation and computer simulation of energy saving potential aims at a preliminary assessment of the positive-energy feasibility enabling future implementation of the technologies on the buildings studied, in anticipation of a broader and more widespread adoption in Singaporean schools.Keywords: energy simulation, school building, tropical climate, zero energy buildings, positive energy
Procedia PDF Downloads 1481834 Integration of PV Systems in Residential Buildings: A Solution for Supporting Electrical Grid in Kuwait
Authors: Nabil A. Ahmed, Nasser A. N. Mhaisen
Abstract:
The paper presents a solution to enhance the power quality and to reduce the peak load demand in Kuwait electric grid as a solution to the shortage of electricity production. Technical, environmental and economic feasibility study of utilizing integrated grid-connected photovoltaic (PV) system in residential buildings for supplying 7.1% of electrical power consumption in Kuwait is carried out using RETScreen software. A 10 KWp on-grid PV power generation system spread on the rooftop of the residential buildings is adopted and investigated and the complete system performance is simulated using PSIM software. Taking into account the international prices of electricity and natural gas, the proposed solution is investigated and tested for four different types of installation systems in terms of power generation and costs which includes horizontal installation, 25º tilted angle, single axis tracking and dual axis tracking. Results shows that the 25º tilted angle fixed mounted system is the most efficient type. The payback period as a tool of benefit analysis of the proposed system is calculated and it found to be 2.55 years.Keywords: photovoltaics, residential buildings, electrical grid, production capacity, on-grid, power generation
Procedia PDF Downloads 4941833 Considering the Relationship between Architecture and Philosophy: Toyo Ito’s Conceptual Architecture
Authors: Serap Durmus
Abstract:
The aim of this paper is to exemplify the relation of architecture and philosophy over the Japanese architect Toyo Ito’s conceptual architecture. The study is practiced in ‘Architecture and Philosophy Readings’ elective course with 22 sophomore architecture students in Karadeniz Technical University Department of Architecture. It is planned as a workshop, which discusses the design philosophy of Toyo Ito’s buildings and the reflections of concept in his intellectual architecture. So, the paper contains Toyo Ito’s philosophy, his discourses and buildings and also thinking similarities with philosopher Gilles Deleuze. Thus, the workshop of course is about architecture and philosophy relationship. With this aspect, a holistic graphic representation is aimed for Toyo Ito who thinks that everything composes a whole. As a result, it can be said that architect and philosopher interaction in architecture and philosophy relation supports creative thinking. Conceptual architecture of Toyo Ito has philosophical roots and his philosophy can be read over his buildings and can be represent totally via a holistic pattern.Keywords: architecture, conceptual architecture, Gilles Deleuze, philosophy, Toyo Ito
Procedia PDF Downloads 5701832 Ilorin Traditional Architecture as a Good Example of a Green Building Design
Authors: Olutola Funmilayo Adekeye
Abstract:
Tradition African practice of architecture can be said to be deeply rooted in Green Architecture in concept, design and execution. A study into the ancient building techniques in Ilorin Emirate depicts prominent (eco-centric approach of) Green Architecture principles. In the Pre-colonial era before the introduction of modern architecture and Western building materials, the Nigeria traditional communities built their houses to meet their cultural, religious and social needs using mainly indigenous building materials such as mud (Amo), cowdung (Boto), straws (koriko), palm fronts (Imo-Ope) to mention a few. This research attempts to identify the various techniques of applying the traditional African principles of Green Architecture to Ilorin traditional buildings. It will examine and assess some case studies to understand the extent to which Green architecture principles have been applied to traditional building designs that are still preserved today in Ilorin, Nigeria. Furthermore, this study intends to answer many questions, which can be summarized into two basic questions which are: (1) What aspects of what today are recognized as important green architecture principles have been applied to Ilorin traditional buildings? (2) To what extent have the principles of green architecture applied to Ilorin traditional buildings been ways of demonstrating a cultural attachment to the earth as an expression of the African sense of human being as one with nature?Keywords: green architecture, Ilorin, traditional buildings, design principles, ecocentric, application
Procedia PDF Downloads 5481831 Evaluation of the Sustainability of Greek Vernacular Architecture in Different Climate Zones: Architectural Typology and Building Physics
Authors: Christina Kalogirou
Abstract:
Investigating the integration of bioclimatic design into vernacular architecture could lead to interesting results regarding the preservation of cultural heritage while enhancing the energy efficiency of historic buildings. Furthermore, these recognized principles and systems of bioclimatic design in vernacular settlements could be applied to modern architecture and thus to new buildings in such areas. This study introduces an approach to categorizing distinct technologies and design principles of bioclimatic design based on a thoughtful approach to various climatic zones and environment in Greece (mountainous areas, islands and lowlands). For this purpose, various types of dwellings are evaluated for their response to climate, regarding the layout of the buildings (orientation, floor plans’ shape, semi-open spaces), the site planning, the openings (size, position, protection), the building envelope (walls: construction materials-thickness, roof construction detailing) and the migratory living pattern according to seasonal needs. As a result, various passive design principles (that could be adapted to current architectural practice in such areas, in order to optimize the relationship between site, building, climate and energy efficiency) are proposed.Keywords: bioclimatic design, buildings physics, climatic zones, energy efficiency, vernacular architecture
Procedia PDF Downloads 3871830 Experiencing Daylight in Architectural Spaces: A Case Study of Public Buildings in the Context of Karachi, Pakistan
Authors: Safia Asif, Saadia Bano
Abstract:
In a world with rapidly depleting resources, using artificial lighting during daytime is an act of human ignorance. Imitated light is the major source of energy consumption in public buildings. Despite, the fact that substantial working hours of these buildings usually persist in natural daylight time; there is a trend of isolated, un-fenestrated and a-contextual interiors majorly dependent on active energy sources. On the contrary, if direct and un-controlled sunlight is allowed inside the building, it will create visual and thermal discomfort. Controlled daylighting with appropriate design mechanisms is one of the important aspects of achieving thermal and visual comfort. The natural sunlight can be utilized intelligently with the help of architectural thermal controlling mechanisms to achieve a healthy and productive environment. This paper is an attempt to investigate and analyze the importance of daylighting with reference to energy efficiency and thermal comfort. For this purpose, three public buildings including two educational institutions and one general post office are selected, as case-studies in the context of Karachi, Pakistan. Various parameters of visual and thermal comfort are analyzed which includes orientation, ceiling heights, overall building profile along with daylight controlling mechanisms in terms of penetration, distribution, protection, and control. In the later part of the research, a questionnaire survey is also conducted to evaluate the user experience in terms of adequate daylighting and thermal comfort.Keywords: daylight, public buildings, sustainable architecture, visual and thermal comfort
Procedia PDF Downloads 2101829 Reinvestment of the Urban Context in Historic Cities: The Case Study of El Sheikh Kandil Street, Rosetta, Egypt
Authors: Riham A. Ragheb, Ingy M. Naguib
Abstract:
Conservation and urban investment are a prerequisite to improve the quality of life. Since the historic street is a part of the economic system, it should be able to play an important role in the city development by upgrading all services, public open spaces and reuse of historical buildings and sites. Furthermore, historical conservation enriches the political, economic, social, cultural and functional aspects of the site. Rosetta has been selected as an area of study because it has a unique character due to its possession of a variety of monuments and historical buildings. The aim of this research is to analyze the existing situation of an historic street named El Sheikh Kandil, to be able to identify the potentials and problems. The paper gives a proposal for the redesign and reinvestment of the street and the reuse for the historical buildings to serve the community, users and visitors. Then, it concludes with recommendations to improve quality of life through the rehabilitation of the historical buildings and strengthening of the cultural and historical identity of the street. Rosetta city can benefit from these development proposals by preserving and revitalizing its unique character which leads to tourism development and benefits from the new investments.Keywords: adaptive reuse, heritage street, historic investment, restoration, urban design
Procedia PDF Downloads 1781828 Energy Efficient Buildings in Tehran by Reviewing High-Tech Methods and Vernacular Architecture Principles
Authors: Shima Naderi, Abbas Abbaszadeh Shahri
Abstract:
Energy resources are reachable and affordable in Iran, thus surplus access to fossil fuels besides high level of economic growth leads to serious environmental critical such as pollutants and greenhouse gases in the atmosphere, increase in average degrease and lack of water sources specially in Tehran as a capital city of Iran. As building sector consumes a huge portion of energy, taking actions towards alternative sources of energy as well as conserving non-renewable energy resources and architectural energy saving methods are the fundamental basis for achieving sustainability`s goals. This study tries to explore implantation of both high technologies and traditional issues for reduction of energy demands in buildings of Tehran and introduce some factors and instructions for achieving this purpose. Green and energy efficient buildings such as ZEBs make it possible to preserve natural resources for the next generations by reducing pollution and increasing ecosystem self-recovery. However ZEB is not widely spread in Iran because of its low economic efficiency, it is not viable for a private entrepreneur without the governmental supports. Therefore executing of Architectural Energy Efficiency can be a better option. It is necessary to experience a substructure expansion with respect to traditional residential building style. Renewable energies and passive design which are the substantial part of the history of architecture in Iran can be regenerated and employed as an essential part of designing energy efficient buildings.Keywords: architectural energy efficiency, passive design, renewable energies, zero energy buildings
Procedia PDF Downloads 3601827 On the Stability Exact Analysis of Tall Buildings with Outrigger System
Authors: Mahrooz Abed, Amir R. Masoodi
Abstract:
Many structural lateral systems are used in tall buildings such as rigid frames, braced frames, shear walls, tubular structures and core structures. Some efficient structures for drift control and base moment reduction in tall buildings is outrigger and belt truss systems. When adopting outrigger beams in building design, their location should be in an optimum position for an economical design. A range of different strategies has been employed to identify the optimum locations of these outrigger beams under wind load. However, there is an absence of scientific research or case studies dealing with optimum outrigger location using buckling analysis. In this paper, one outrigger system is considered at the middle of height of structure. The optimum location of outrigger will be found based on the buckling load limitation. The core of structure is modeled by a clamped tapered beam. The exact stiffness matrix of tapered beam is formulated based on the Euler-Bernoulli theory. Finally, based on the buckling load of structure, the optimal location of outrigger will be found.Keywords: tall buildings, outrigger system, buckling load, second-order effects, Euler-Bernoulli beam theory
Procedia PDF Downloads 3961826 Analysis of Experimentally Designed Soundproof Gypsum Partition Wall's Sections in Terms of Structural Engineering
Authors: Abdulkerim Ilgun, Ahmad Javid Zia
Abstract:
In developing countries, the urban populations are increasing rapidly and with this increment the residential areas are experiencing major problems. Construction of high-rise buildings in confined spaces is one of the most practical solutions for this problem. However, by living in high-rise buildings and sharing common residential areas, residents will face many problems. Irritating sound problem which is known as noise is one of the major problems mentioned above. The second most important problem is the weight of the high-rise buildings which makes the structure more vulnerable to earthquakes. To decrease earthquake loads it’s very important to decrease the weight of the buildings. To solve the problem of noise and keep the building weight at minimum level, experimentally designed soundproof gypsum partition wall which has optimum thickness has been used in high-rise story building and the results have been compared with ordinary brick partition walls. In this compression the effect of weights of soundproof gypsum walls and ordinary brick walls in accordance to structural engineering have been investigated.Keywords: cellubor, gypsum board, gypsum partition walls, light partition walls, noise, sound
Procedia PDF Downloads 3071825 Research on Natural Lighting Design of Atriums Based on Energy-Saving Aim
Authors: Fan Yu
Abstract:
An atrium is a place for natural climate exchanging of indoor and outdoor space of buildings, which plays an active role in the overall energy conservation, climate control and environmental purification of buildings. Its greatest contribution is serving as a natural light collector and distributor to solve the problem of natural lighting in large and deep spaces. However, in real situations, the atrium space often results in energy consumption due to improper design in considering its big size and large amount use of glass. Based on the purpose of energy conservation of buildings, this paper emphasizes the significance of natural lighting of atriums. Through literature research, case analysis and other methods, four factors, namely: the light transmittance through the top of the atrium, the geometric proportion of the atrium space, the size and position of windows and the material of the surface of walls in the atrium, were studied, and the influence of different architectural compositions on the natural light distribution of the atrium is discussed. Relying on the analysis of relevant cases, it is proposed that when designing the natural lighting of the atrium, the height and width of the atrium should be paid attention to, the atrium walls are required being rough surfaces and the atrium top-level windows need to be minimized in order to introduce more natural light into the buildings and achieve the purpose of energy conservation.Keywords: energy conservation, atrium, natural lighting, architectural design
Procedia PDF Downloads 1911824 Reduction of Differential Column Shortening in Tall Buildings
Authors: Hansoo Kim, Seunghak Shin
Abstract:
The differential column shortening in tall buildings can be reduced by improving material and structural characteristics of the structural systems. This paper proposes structural methods to reduce differential column shortening in reinforced concrete tall buildings; connecting columns with rigidly jointed horizontal members, using outriggers, and placing additional reinforcement at the columns. The rigidly connected horizontal members including outriggers reduce the differential shortening between adjacent vertical members. The axial stiffness of columns with greater shortening can be effectively increased by placing additional reinforcement at the columns, thus the differential column shortening can be reduced in the design stage. The optimum distribution of additional reinforcement can be determined by applying a gradient based optimization technique.Keywords: column shortening, long-term behavior, optimization, tall building
Procedia PDF Downloads 2491823 Adaptable Buildings for More Sustainable Housing: Energy Life Cycle Analysis
Authors: Rafael Santos Fischer, Aloísio Leoni Schmid, Amanda Dalla-Bonna
Abstract:
The life cycle analysis and the energy life cycle analysis are useful design support tools when sustainability becomes imperative. The final phase of buildings life cycle is probably the least known, on which less knowledge is available. In the Brazilian building industry, the lifespan of a building design rarely is treated as a definite design parameter. There is rather a common sense attitude to take any building demands as permanent, and to take for granted that buildings solutions are durable and solid. Housing, being a permanent issue in any society, presents a real challenge to the choice of a design lifespan. In Brazilian history, there was a contrast of the native solutions of collective, non-durable houses built by several nomadic tribes, and the stone and masonry buildings introduced by the sedentary Portuguese conquerors. Durable buildings are commonly associated with welfare. However, social dynamics makes traditional families of both parents and children be just one of several possible arrangements. In addition, a more liberal attitude towards family leads to an increase in the number of people living in alternative arrangements. Japan is an example of country where houses have been made intentionally ephemeral since the half of 20th century. The present article presents the development of a flexible housing design solution on the basis of the Design Science Research approach. A comparison in terms of energy life cycle shows how flexibility and dematerialization may point at a feasible future for housing policies in Brazil.Keywords: adaptability, adaptable building, embodied energy, life cyclce analysis, social housing
Procedia PDF Downloads 5891822 Adopting Precast Insulated Concrete Panels for Building Envelope in Hot Climate Zones
Authors: Mohammed Sherzad
Abstract:
The absorbedness of solar radiation within the concrete building is higher than other buildings type, especially in hot climate zones. However, one of the primary issues of architects and the owners in hot climate zones is the building’s exterior plastered and painted finishing which is commonly used are fading and peeling adding a high cost on maintenance. Case studies of different exterior finishing’ treatments used in vernacular and contemporary dwellings in the United Arab Emirates were surveyed. The traditional plastered façade treatment was more sustainable than new buildings. In addition, using precast concrete insulated sandwich panels with the exposed colored aggregate surface in contemporary designed dwellings sustained the extensive heat reducing the overall cost of maintenance and contributed aesthetically to the buildings’ envelope in addition to its thermal insulation property.Keywords: precast concrete panels, façade treatment, hot climate
Procedia PDF Downloads 1321821 Evaluation of Geomechanical and Geometrical Parameters’ Effects on Hydro-Mechanical Estimation of Water Inflow into Underground Excavations
Authors: M. Mazraehli, F. Mehrabani, S. Zare
Abstract:
In general, mechanical and hydraulic processes are not independent of each other in jointed rock masses. Therefore, the study on hydro-mechanical coupling of geomaterials should be a center of attention in rock mechanics. Rocks in their nature contain discontinuities whose presence extremely influences mechanical and hydraulic characteristics of the medium. Assuming this effect, experimental investigations on intact rock cannot help to identify jointed rock mass behavior. Hence, numerical methods are being used for this purpose. In this paper, water inflow into a tunnel under significant water table has been estimated using hydro-mechanical discrete element method (HM-DEM). Besides, effects of geomechanical and geometrical parameters including constitutive model, friction angle, joint spacing, dip of joint sets, and stress factor on the estimated inflow rate have been studied. Results demonstrate that inflow rates are not identical for different constitutive models. Also, inflow rate reduces with increased spacing and stress factor.Keywords: distinct element method, fluid flow, hydro-mechanical coupling, jointed rock mass, underground excavations
Procedia PDF Downloads 1661820 The Shadowy History of Berlin Underground: 1939-45/Der Schattenmann: Tagebuchaufzeichnungen 1938-1945
Authors: Christine Wiesenthal
Abstract:
This paper asks how to read a particularly vexed and complicated life writing text. For over half a century, the wartime journals of Ruth Andreas Friedrich (1901-1977) circulated as among a handful of more or less authoritative and “authentic” first-hand accounts of German resistance under Hitler. A professional journalist, Andreas Friedrich is remembered today largely through her publications at the war’s end, which appeared in English as Berlin Underground (published by Henry Holt in 1947), just before their publication in Germany as Der Schattenmann “The Shadow Man” (also in 1947). A British edition by the now obscure Latimer House Limited (London) followed in 1948; it is based closely on but is not identical to, the Henry Holt American edition, which in turn differs significantly from its German counterpart. Both Berlin Underground and Der Schattenmann figure Andreas-Friedrich as a key figure in an anti-fascist cell that operated in Berlin under the code name “Uncle Emil,” and provide a riveting account of political terror, opportunism, and dissent under the Nazi regime. Recent scholars have, however, begun to raise fascinating and controversial questions about Andreas-Friedrich’s own writing/reconstruction process in compiling the journals and about her highly selective curatorial role and claims. The apparent absence of any surviving original manuscript for Andreas-Friedrich’s journals amplifies the questions around them. Crucially, so too does the role of the translator of the English editions of Berlin Underground, the enigmatic June Barrows Mussey, a subject that has thus far gone virtually unnoticed and which this paper will focus on. Mussey, a prolific American translator, simultaneously cultivated a career as a professional magician, publishing a number of books on that subject under the alias Henry Hay. While the record indicates that Mussey attempted to compartmentalize his professional life, research into the publishing and translation history of Berlin Underground suggests that the two roles converge in the fact of the translator’s invisibility, by effacing the traces of his own hand and leaving unmarked his own significant textual interventions, Mussey, in effect, edited, abridged, and altered Andreas Friedrich’s journals for the second time. In fact, it could be said that while the fictitious “Uncle Emil” is positioned as “the shadow man” of the German edition, Mussey himself also emerges as precisely that in the English rendering of the journals. The implications of Mussey’s translation of Andreas Friedrich’s journals are one of the most important un-examined gaps in the shadowy publishing history of Berlin Underground, a history full of “tricks” (Mussey’s words) and illusions of transparency. Based largely on archival research of unpublished materials and methods of close reading and comparative analysis, this study will seek to convey some preliminary insights and exploratory work and frame questions toward what is ultimately envisioned as an experimental project in poetic historiography. As this work is still in the early stages, it would be especially welcome to have the opportunity provided by this conference to connect with a community of life writing colleagues who might help think through some of the challenges and possibilities that lie ahead.Keywords: women’s wartime diaries, translation studies, auto/biographical theory, politics of life writing
Procedia PDF Downloads 541819 Applications of Engineering Geology in Hydro Power Tunnel Projects in Himalayan Geological Regime
Authors: Rameh Chauhan
Abstract:
Tunnel construction in Himalayan rock is a challenging task due to fragile nature of the strata. Tunnel excavation carried out from lower Himalayas to high Himalayas in different metamorphic rock. Therefore application of engineering geology plays a vital role during various stage of the tunneling projects. Engineering geology is defined as application of geology to construction of civil structures through engineering practice. It is applied to the design, construction and performance aspects of engineering structure on the surface or sub-surface like dam, underground and surface power house, cut slopes, tunnels and underground storage cavern for nuclear material. But this paper emphasized mostly on underground structures like big caverns of Power house, desilting chambers, and tunnels of various sizes. Construction of these structures in the fragile rock conditions of Himalayan geology from Western Himalayas to Eastern Himalayas necessitated the application of the engineering geology on the micro-scale base for the stability, performance, and longevity of the civil structures. Number of hydropower projects have been constructed, some of them are under construction and under investigation stage. These projects are located in various parts of Himalayas under various seismic-tectonic zones. Tunneling works are involved in these projects. This paper represents the various engineering geological practices adopted in investigation and construction stage of various projects based on experiences gained during past construction histories in Himalayan geology of young mountains in very fragile geological conditions. Highlighting and sharing of use of these techniques on various platforms will definitely enhance the knowledge for carrying out the construction of various projects for the development of society. Construction of the tunnels, surface, and sub-surface caverns, dams, highway, metro, highway tunnels are all based on engineering geological parameters in combinations with other engineering considerations.Keywords: cavern-power house, desilting chambers and tunnels, seismic-tectonic-zones, earthquake-prone zones based on intensities
Procedia PDF Downloads 2231818 Adapting Built Heritage to Address Climate Change: A Perspective from the Maltese Islands
Authors: Nadia Theuma
Abstract:
Climate change is a reality that has started to leave an impact on the physical environment as well as on the built environment, in particular built heritage. This paper explores the argument that climate change is also a trigger which can lead to identifying a number of creative solutions that can transform built heritage into sustainable buildings. Using the Maltese Islands, and in particular the city of Valletta which is also a World Heritage Site, this paper illustrates some of the innovative solutions that are being developed to make heritage buildings more sustainable and in doing so, mitigating the negative impacts of climate change. The paper looks in detail at the most notable initiatives being developed, their implementation and application, which at times is not easy considering the restrictions within protected built heritage areas and the positive impacts that they will have on visitor experience and overall sustainability of the Maltese tourism product. The paper will conclude by outlining how these solutions can be adapted to buildings with similar climatic conditions.Keywords: built heritage, creative solutions, climate change, Maltese Islands
Procedia PDF Downloads 2901817 Evaluating the Effect of Modern Technologies and Technics to Supply Energy of Buildings Using New Energies
Authors: Ali Reza Ghaffari, Hassan Saghi
Abstract:
Given the limitation of fossil resources to supply energy to buildings, recent years have seen a revival of interest in new technologies that produce the energy using new forms of energy in many developed countries. In this research, first the potentials of new energies in Iran are discussed and then based on case studies undertaken in a building in Tehran, the effects of utilizing new solar energy technology for supplying the energy of buildings are investigated. Then, by analyzing the data recorded over a four-year period, the technical performance of this system is investigated. According to the experimental operation plan, this system requires an auxiliary heating circuit for continuous operation over a year. Also, in the economic analysis, real conditions are considered and the results are recorded based on long-term data. Considering the purchase and commissioning building, supplementary energy consumption, etc. a comparison is drawn between the costs of using a solar water heater in a residential unit with the energy costs of a similar unit equipped with a conventional gas water heater. Given the current price of energy, using a solar water heater in the country will not economical, but considering the global energy prices, this system will have a return on investment after 4.5 years. It also produces 81% less pollution and saves about $21.5 on environmental pollution cleanup.Keywords: energy supply, new energies, new technologies, buildings
Procedia PDF Downloads 1621816 Water Saving in Electricity Generation System Considering Natural Gas Limitation
Authors: Mehdi Ganjkhani, Sobhan Badakhshan, Seyedvahid Hosseini
Abstract:
Power plants exploit striking proportion of underground water consumption. Correspondingly, natural gas-fired power plants need less water than the other conventional power plants. Therefore, shifting unit commitment planning toward these power plants would help to save water consumption. This paper discusses the impacts of water consumption limitation on natural gas consumption and vice versa as a short-term water consumption management solution. To do so, conventional unit commitment problem is extended by adding water consumption and natural gas constraints to the previous constrains. The paper presents the impact of water saving on natural gas demands as well as natural gas shortage on water demand. Correspondingly, the additional cost of electricity production according to the aforementioned constraints is evaluated. Finally, a test system is applied to investigate potentials and impacts of water saving and natural gas shortage. Different scenarios are conducted and the results are presented. The results of the study illustrate that in order to use less water for power production it needs to use more natural gas. Meanwhile, natural gas shortage causes to utilize more amount of water in aggregate.Keywords: electric energy generation system, underground water sources, unit commitment, water consumption saving, natural gas
Procedia PDF Downloads 190