Search results for: Floods Plan
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 510

Search results for: Floods Plan

510 Urban Floods and Importance of Them in Cities Security Planning (Case Study: Dominant Watershed on Zavvareh City)

Authors: Jalil Emadi, Masoud Nasri, Ali Najafi, Yousef Moradi Shahgharyeh

Abstract:

Development of cities and villages, agricultural farms and industrial regions in abutment and/or in the course of streams and rivers or in prone flood lands has been caused more notations in hydrology problems and city planning topics. In order to protection of cities against of flood damages, embankment construction is a desired and scientific method. The cities that located in arid zones may damage by floods periodically. Zavvareh city in Ardestan township(Isfahan province) with 7704 people located in Ardestan plain that has been damaged by floods that have flowed from dominant mountainous watersheds in past years with regard to return period. In this study, according to flowed floods toward Zavvareh city, was attempt to plan suitable hydraulic structures such as canals, bridges and collectors in order to collection, conduction and depletion of city surface runoff.

Keywords: Flood, flood way, executive consideration, embankment, surface runoff network, Zavvareh.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1569
509 Usage of Military Continuity Management System for Flooding Solution

Authors: J. Palecek, R. Hajkova, A. Oulehlova, H. Malachova

Abstract:

Increase of emergency incidents and crisis situations requires proactive crisis management of authorities and for its solution. Application Business Continuity Management helps the crisis management authorities to quickly and responsibly respond to threats. It also helps effectively and efficiently planning powers and resources. The main goal of this article is describing Military Continuity Management System (MCMS) based on the principles of Business Continuity Management System (BCMS) for dealing with floods in the territory of the selected municipalities. There are explained steps of loading, running and evaluating activities in the software application MCMS. Software MCMS provides complete control over the tasks, contribute a comprehensive and responsible approach solutions to solution floods in the municipality.

Keywords: Business Continuity Management, Floods Plan, Flood Activity, Level of Flood Activity.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1387
508 Design of Bayesian MDS Sampling Plan Based on the Process Capability Index

Authors: Davood Shishebori, Mohammad Saber Fallah Nezhad, Sina Seifi

Abstract:

In this paper, a variable multiple dependent state (MDS) sampling plan is developed based on the process capability index using Bayesian approach. The optimal parameters of the developed sampling plan with respect to constraints related to the risk of consumer and producer are presented. Two comparison studies have been done. First, the methods of double sampling model, sampling plan for resubmitted lots and repetitive group sampling (RGS) plan are elaborated and average sample numbers of the developed MDS plan and other classical methods are compared. A comparison study between the developed MDS plan based on Bayesian approach and the exact probability distribution is carried out.

Keywords: MDS sampling plan, RGS plan, sampling plan for resubmitted lots, process capability index, average sample number, Bayesian approach.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 964
507 Forecasting of Flash Floods over Wadi Watier –Sinai Peninsula Using the Weather Research and Forecasting (WRF) Model

Authors: Moustafa S. El-Sammany

Abstract:

Flash floods are considered natural disasters that can cause casualties and demolishing of infra structures. The problem is that flash floods, particularly in arid and semi arid zones, take place in very short time. So, it is important to forecast flash floods earlier to its events with a lead time up to 48 hours to give early warning alert to avoid or minimize disasters. The flash flood took place over Wadi Watier - Sinai Peninsula, in October 24th, 2008, has been simulated, investigated and analyzed using the state of the art regional weather model. The Weather Research and Forecast (WRF) model, which is a reliable short term forecasting tool for precipitation events, has been utilized over the study area. The model results have been calibrated with the real data, for the same date and time, of the rainfall measurements recorded at Sorah gauging station. The WRF model forecasted total rainfall of 11.6 mm while the real measured one was 10.8 mm. The calibration shows significant consistency between WRF model and real measurements results.

Keywords: Early warning system, Flash floods forecasting, WadiWatier, WRF model.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1912
506 Self-Help Adaptation to Flooding in Low-Income Settlements in Chiang Mai, Thailand

Authors: Nachawit Tikul

Abstract:

This study aimed to determine low-income housing adaptations for flooding, which causes living problems and housing damage, and the results from improvement. Three low-income settlements in Chiang Mai which experienced different flood types, i.e. flash floods in Samukeepattana, drainage floods in Bansanku, and river floods in Kampangam, were chosen for the study. Almost all of the residents improved their houses to protect the property from flood damage by changing building materials to flood damage resistant materials for walls, floors, and other parts of the structure that were below the base of annual flood elevation. They could only build some parts of their own homes, so hiring skilled workers or contractors was still important. Building materials which have no need for any special tools and are easy to access and use for construction, as well as low cost, are selected for construction. The residents in the three slums faced living problems for only a short time and were able to cope with them. This may be due to the location of the three slums near the city where assistance is readily available. But the housing and the existence in the slums can endure only the regular floods and residence still have problems in unusual floods, which have been experienced 1-2 times during the past 10 years. The residents accept the need for evacuations and prepare for them. When faced with extreme floods, residence have evacuated to the nearest safe place such as schools and public building, and come back to repair the houses after the flood. These are the distinguishing characteristics of low-income living which can withstand serious situations due to the simple lifestyle. Therefore, preparation of living areas for use during severe floods and encouraging production of affordable flood resistant materials should be areas of concern when formulating disaster assistance policies for low income people.

Keywords: Flooding, low-income settlement, housing, adaptation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1071
505 Challenges of Implementing Urban Master Plans: The Lahore Experience

Authors: Rizwan Hameed, Obaidullah Nadeem

Abstract:

Master plan is a tool to guide and manage the growth of cities in a planned manner. The soul of a master plan lies in its implementation framework. If not implemented, people are trapped in a mess of urban problems and laissez-faire development having serious long term repercussions. Unfortunately, Master Plans prepared for several major cities of Pakistan could not be fully implemented due to host of reasons and Lahore is no exception. Being the second largest city of Pakistan with a population of over 7 million people, Lahore holds the distinction that the first ever Master Plan in the country was prepared for this city in 1966. Recently in 2004, a new plan titled `Integrated Master Plan for Lahore-2021- has been approved for implementation. This paper provides a comprehensive account of the weaknesses and constraints in the plan preparation process and implementation strategies of Master Plans prepared for Lahore. It also critically reviews the new Master Plan particularly with respect to the proposed implementation framework. The paper discusses the prospects and pre-conditions for successful implementation of the new Plan in the light of historic analysis, interviews with stakeholders and the new institutional context under the devolution plan.

Keywords: City District Government, Implementation of plan, Lahore Development Authority, Master Planning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 7175
504 Protection Plan of Medium Voltage Distribution Network in Tunisia

Authors: S. Chebbi, A. Meddeb

Abstract:

The distribution networks are often exposed to harmful incidents which can halt the electricity supply of the customer. In this context, we studied a real case of a critical zone of the Tunisian network which is currently characterized by the dysfunction of its plan of protection. In this paper, we were interested in the harmonization of the protection plan settings in order to ensure a perfect selectivity and a better continuity of service on the whole of the network.

Keywords: Distribution network Gabes-Tunisia, NEPLAN©DACH, protection plan settings, selectivity.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2925
503 Transferring Route Plan over Time

Authors: Barıs Kocer, Ahmet Arslan

Abstract:

Travelling salesman problem (TSP) is a combinational optimization problem and solution approaches have been applied many real world problems. Pure TSP assumes the cities to visit are fixed in time and thus solutions are created to find shortest path according to these point. But some of the points are canceled to visit in time. If the problem is not time crucial it is not important to determine new routing plan but if the points are changing rapidly and time is necessary do decide a new route plan a new approach should be applied in such cases. We developed a route plan transfer method based on transfer learning and we achieved high performance against determining a new model from scratch in every change.

Keywords: genetic algorithms, transfer learning, travellingsalesman problem

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1228
502 “Friction Surfaces” of Airport Emergency Plan

Authors: Jakub Kraus, Vladimír Plos, Peter Vittek

Abstract:

This article focuses on the issue of airport emergency plans, which are documents describing reactions to events with impact on aviation safety or aviation security. The article specifically focuses on the use and creation of emergency plans, where could be found a number of disagreements between different stakeholders, for which the airport emergency plan applies. Those are the friction surfaces of interfaces, which is necessary to identify and ensure them smooth process to avoid dangerous situations or delay.

Keywords: Airport emergency plan, aviation safety, aviation security, comprehensive management system, friction surfaces of airport emergency plan, interfaces of processes.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1898
501 Flood-Induced River Disruption: Geomorphic Imprints and Topographic Effects in Kelantan River Catchment from Kemubu to Kuala Besar, Kelantan, Malaysia

Authors: Mohamad Muqtada Ali Khan, Nor Ashikin Shaari, Donny Adriansyah Bin Nazaruddin, Hafzan Eva Bt Mansoor

Abstract:

Floods play a key role in landform evolution of an area. This process is likely to alter the topography of the earth’s surface. The present study area, Kota Bharu is very prone to floods extends from upstream of Kelantan River near Kemubu to the downstream area near Kuala Besar. These flood events which occur every year in the study area exhibit a strong bearing on river morphological set-up. In the present study, three satellite imageries of different time periods have been used to manifest the post-flood landform changes. The pre-processing of the images such as subset, geometric corrections and atmospheric corrections were carried-out using ENVI 4.5 followed by the analysis processes. Twenty sets of cross sections were plotted using software Erdas 9.2, ERDAS and ArcGis 10 for the all three images. The results show a significant change in the length of the cross section which suggest that the geomorphological processes play a key role in carving and shaping the river banks during the floods. 

Keywords: Flood Induced, Geomorphic imprints, Kelantan river, Malaysia.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2359
500 Emergency Response Plan Establishment and Computerization through the Analysis of the Disasters Occurring on Long-Span Bridges by Type

Authors: Sungnam Hong, Sun-Kyu Park, Dooyong Cho, Jinwoong Choi

Abstract:

In this paper, a strategy for long-span bridge disaster response was developed, divided into risk analysis, business impact analysis, and emergency response plan. At the risk analysis stage, the critical risk was estimated. The critical risk was “car accident."The critical process by critical-risk classification was assessed at the business impact analysis stage. The critical process was the task related to the road conditions and traffic safety. Based on the results of the precedent analysis, an emergency response plan was established. By making the order of the standard operating procedures clear, an effective plan for dealing with disaster was formulated. Finally, a prototype software was developed based on the research findings. This study laid the foundation of an information-technology-based disaster response guideline and is significant in that it computerized the disaster response plan to improve the plan-s accessibility.

Keywords: Emergency response; Long-span bridge; Disaster management; Standard operating procedure; Ubiquitous.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1784
499 Production Plan and Technological Variants Optimization by Goal Programming Methods

Authors: Tunjo Perić, Franjo Bratić

Abstract:

In this paper, the goal programming methodology for solving multiple objective problem of the technological variants and production plan optimization has been applied. The optimization criteria are determined and the multiple objective linear programming model for solving a problem of the technological variants and production plan optimization is formed and solved. Then the obtained results are analysed. The obtained results point out to the possibility of efficient application of the goal programming methodology in solving the problem of the technological variants and production plan optimization. The paper points out on the advantages of the application of the goal programming methodology compare to the Surrogat Worth Trade-off method in solving this problem.

Keywords: Goal programming, multi objective programming, production plan, SWT method, technological variants.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1866
498 Study on Disaster Prevention Plan for an Electronic Industry in Thailand

Authors: S. Pullteap, M. Pathomsuriyaporn

Abstract:

In this article, a study of employee’s opinion to the factors that affect to the flood preventive and the corrective action plan in an electronic industry at the Sharp Manufacturing (Thailand) Co., Ltd. has been investigated. The surveys data of 175 workers and supervisors have, however, been selected for data analysis. The results is shown that the employees emphasize about the needs in a subsidy at the time of disaster at high levels of 77.8%, as the plan focusing on flood prevention of the rehabilitation equipment is valued at the intermediate level, which is 79.8%. Demonstration of the hypothesis has found that the different education levels has thus been affected to the needs factor at the flood disaster time. Moreover, most respondents give priority to flood disaster risk management factor. Consequently, we found that the flood prevention plan is valued at high level, especially on information monitoring, which is 93.4% for the supervisor item. The respondents largely assume that the flood will have impacts on the industry, up to 80%, thus to focus on flood management plans is enormous.

Keywords: Flood prevention plan, flood event, electronic industrial plant, disaster, risk management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1801
497 Regular Data Broadcasting Plan with Grouping in Wireless Mobile Environment

Authors: John T. Tsiligaridis

Abstract:

The broadcast problem including the plan design is considered. The data are inserted and numbered at predefined order into customized size relations. The server ability to create a full, regular Broadcast Plan (RBP) with single and multiple channels after some data transformations is examined. The Regular Geometric Algorithm (RGA) prepares a RBP and enables the users to catch their items avoiding energy waste of their devices. Moreover, the Grouping Dimensioning Algorithm (GDA) based on integrated relations can guarantee the discrimination of services with a minimum number of channels. This last property among the selfmonitoring, self-organizing, can be offered by servers today providing also channel availability and less energy consumption by using smaller number of channels. Simulation results are provided.

Keywords: Broadcast, broadcast plan, mobile computing, wireless networks, scheduling.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1406
496 Future Housing Energy Efficiency Associated with the Auckland Unitary Plan

Authors: Bin Su

Abstract:

The draft Auckland Unitary Plan outlines the future land used for new housing and businesses with Auckland population growth over the next thirty years. According to Auckland Unitary Plan, over the next 30 years, the population of Auckland is projected to increase by one million, and up to 70% of total new dwellings occur within the existing urban area. Intensification will not only increase the number of median or higher density houses such as terrace house, apartment building, etc. within the existing urban area but also change mean housing design data that can impact building thermal performance under the local climate. Based on mean energy consumption and building design data, and their relationships of a number of Auckland sample houses, this study is to estimate the future mean housing energy consumption associated with the change of mean housing design data and evaluate housing energy efficiency with the Auckland Unitary Plan.

Keywords: Auckland Unitary Plan, Building thermal design, Housing design, Housing energy efficiency.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2021
495 A Support System to Consult Remote another Doctor on Assessment and/or Medical Treatment Plan when a Doctor has a Patient not in His/Her Major

Authors: T. Gotoh, T. Takayama, M. Ishiki, T. Ikeda

Abstract:

Recently, majors of doctors are divided into terribly lots of detailed areas. However, it is actually not a rare case that a doctor has a patient who is not in his/her major. He/She must judge an assessment and make a medical treatment plan for this patient. According to our investigation, conventional approaches such as image diagnosis cooperation are insufficient. This paper proposes an 'Assessment / Medical Treatment Plan Consulting System'. We have implemented a pilot system based on our proposition. Its effectiveness is clarified by an evaluation.

Keywords: Application, computational intelligence and telecommunications, medicine, intelligent systems.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1682
494 Particle Image Velocimetry for Measuring Water Flow Velocity

Authors: King Kuok Kuok, Po Chan Chiu

Abstract:

Floods are natural phenomena, which may turn into disasters causing widespread damage, health problems and even deaths. Nowadays, floods had become more serious and more frequent due to climatic changes. During flooding, discharge measurement still can be taken by standing on the bridge across the river using portable measurement instrument. However, it is too dangerous to get near to the river especially during high flood. Therefore, this study employs Particle Image Velocimetry (PIV) as a tool to measure the surface flow velocity. PIV is a image processing technique to track the movement of water from one point to another. The PIV codes are developed using Matlab. In this study, 18 ping pong balls were scattered over the surface of the drain and images were taken with a digital SLR camera. The images obtained were analyzed using the PIV code. Results show that PIV is able to produce the flow velocity through analyzing the series of images captured.

Keywords: Particle Image Velocimetry, flow velocity, surface flow.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2788
493 Acceptance Single Sampling Plan with Fuzzy Parameter with The Using of Poisson Distribution

Authors: Ezzatallah Baloui Jamkhaneh, Bahram Sadeghpour-Gildeh, Gholamhossein Yari

Abstract:

This purpose of this paper is to present the acceptance single sampling plan when the fraction of nonconforming items is a fuzzy number and being modeled based on the fuzzy Poisson distribution. We have shown that the operating characteristic (oc) curves of the plan is like a band having a high and low bounds whose width depends on the ambiguity proportion parameter in the lot when that sample size and acceptance numbers is fixed. Finally we completed discuss opinion by a numerical example. And then we compared the oc bands of using of binomial with the oc bands of using of Poisson distribution.

Keywords: Statistical quality control, acceptance single sampling, fuzzy number.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1942
492 Gender Perspective Considerations in Disasters like Earthquakes and Floods of Pakistan

Authors: Muhammad Naseem Baig, Razia Sharif

Abstract:

From past many decades human beings are suffering from plethora of natural disasters. Occurrence of disasters is a frequent process; it changes conceptual myths as more and more advancement are made. Although we are living in technological era but in developing countries like Pakistan disasters are shaped by socially constructed roles. The need is to understand the most vulnerable group of society i.e. females; their issues are complex in nature because of undermined gender status in the society. There is a need to identify maximum issues regarding females and to enhance the achievement of millennium development goals (MDGs). Gender issues are of great concern all around the globe including Pakistan. Here female visibility in society is low, and also during disasters, the failure to understand the reality that concentrates on double burden including productive and reproductive care. Women have to contribute a lot in society so we need to make them more disaster resilient. For this non-structural measures like awareness, trainings and education must be carried out. In rural and in urban settings in any disaster like earthquake or flood, elements like gender perspective, their age, physical health, demographic issues contribute towards vulnerability. In Pakistan the gender issues in disasters were of less concern before 2005 earthquake and 2010 floods. Significant achievements are made after 2010 floods when gender and child cell was created to provide all facilities to women and girls. The aim of the study is to highlight all necessary facilities in a disaster to build coping mechanism in females from basic rights till advance level including education.

Keywords: Disaster resilient, Gender cell, Millennium development.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2683
491 Urban-Rural Balance, Regional Coordination and Land Transfer in China

Authors: Ling Zheng, Yaping Wei, Kang Cao, Songpo Shi, Jinxing Wang

Abstract:

It-s difficult for China-s current land transfer institutions limited to county-wide to solve the contradiction between urban-rural development and construction land shortage. On the basis of analyzing China-s construction land transfer system, and evaluation toward Transfer of development rights (TDR) practices in Anhui and Chongqing, the passage proposes: (1) we should establish a multi-level land indicators trade market under the guidance of regional spatial objectives, and allow land transfer paid across cities and counties within a specific area following the regulation of both government and market; (2) it would be better to combine organically the policy ntentions of land plan, regional plan, urban plan and economic plan, and link them with land indicators transfer to promote a wider range of urban-rural balance and regional coordination.

Keywords: China's land institutions, transfer of development rights, urban-rural balance, regional coordination.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1622
490 Renewal Plan for the Old Part of Chittagong: A Case Study of Firingi Bazar

Authors: A. T. M. Shahjahan, M. D. Kamrul Islam, Saikat Mitra, Kutub Uddin Chisty

Abstract:

Due to rapid pressured of population growth, city has started to lose its old tradition. City becomes congested with uncomfortably living. Urban renewal refers orderly development of settlements as well as land redevelopment. For this paper Chittagong city has been selected as study area. It had a great tradition but it has been losing its concord. Land use pattern of this place is also haphazard due to lack of planning intervention. Renewal plan is needed to ascertain suitable redevelopment and to recommend on preservation of city heritage structure. The goal of this study is to prepare a renewal plan using local planning approach. Social impact methods have been used to achieve this goal. Both primary and secondary data are used to achieve the goal. This study may find out a complete solution for healthy living in old Part of city. This study will help to preserve its tradition and makes urban lives more livable.

Keywords: Renewal Plan, Social Impact.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2893
489 A Quantitative Model for Determining the Area of the “Core and Structural System Elements” of Tall Office Buildings

Authors: Görkem Arslan Kılınç

Abstract:

Due to the high construction, operation, and maintenance costs of tall buildings, quantification of the area in the plan layout which provides a financial return is an important design criterion. The area of the “core and the structural system elements” does not provide financial return but must exist in the plan layout. Some characteristic items of tall office buildings affect the size of these areas. From this point of view, 15 tall office buildings were systematically investigated. The typical office floor plans of these buildings were re-produced digitally. The area of the “core and the structural system elements” in each building and the characteristic items of each building were calculated. These characteristic items are the size of the long and short plan edge, plan length/width ratio, size of the core long and short edge, core length/width ratio, core area, slenderness, building height, number of floors, and floor height. These items were analyzed by correlation and regression analyses. Results of this paper put forward that; characteristic items which affect the area of "core and structural system elements" are plan long and short edge size, core short edge size, building height, and the number of floors. A one-unit increase in plan short side size increases the area of the "core and structural system elements" in the plan by 12,378 m2. An increase in core short edge size increases the area of the core and structural system elements in the plan by 25,650 m2. Subsequent studies can be conducted by expanding the sample of the study and considering the geographical location of the building.

Keywords: Core area, correlation analysis, floor area, regression analysis, space efficiency, tall office buildings.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 411
488 Assessing Organizational Resilience Capacity to Flooding: Index Development and Application to Greek Small and Medium-Sized Enterprises

Authors: A. Skouloudis, K. Evangelinos, W. Leal-Filho, P. Vouros, I. Nikolaou, T. Tsalis

Abstract:

In this study a composite index of factors linked to the resilience capacity of small and medium-sized enterprises (SMEs) to flooding is proposed and tested. A sample of SMEs located in flood-prone areas (n = 391) was administered a structured questionnaire pertaining to cognitive, managerial and contextual factors that affect the ability to prepare, withstand, and recover from flooding events. Through the proposed index, a bottom-up, self-assessment approach is set forth that could assist in standardizing such assessments with an overarching aim of reducing the vulnerability of SMEs to floods. This is achieved by examining critical internal and external parameters affecting SMEs’ resilience capacity which is particularly important taking into account the limited resources these enterprises tend to have at their disposal and that they can generate single points of failure in dense supply chain networks.

Keywords: Floods, SMEs, organizational resilience capacity, index development, Greece.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 383
487 Flood Hazard Mapping in Dikrong Basin of Arunachal Pradesh (India)

Authors: Aditi Bhadra, Sutapa Choudhury, Daita Kar

Abstract:

Flood zoning studies have become more efficient in recent years because of the availability of advanced computational facilities and use of Geographic Information Systems (GIS). In the present study, flood inundated areas were mapped using GIS for the Dikrong river basin of Arunachal Pradesh, India, corresponding to different return periods (2, 5, 25, 50, and 100 years). Further, the developed inundation maps corresponding to 25, 50, and 100 year return period floods were compared to corresponding maps developed by conventional methods as reported in the Brahmaputra Board Master Plan for Dikrong basin. It was found that, the average deviation of modelled flood inundation areas from reported map inundation areas is below 5% (4.52%). Therefore, it can be said that the modelled flood inundation areas matched satisfactorily with reported map inundation areas. Hence, GIS techniques were proved to be successful in extracting the flood inundation extent in a time and cost effective manner for the remotely located hilly basin of Dikrong, where conducting conventional surveys is very difficult.

Keywords: Flood hazard mapping, GIS, inundation area, return period.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2943
486 Disaster Preparedness for Academic Libraries in Malaysia: An Exploratory Study

Authors: Siti Juryiah Mohd Khalid, Norazlina Dol

Abstract:

Academic libraries in Malaysia are still not prepared for disaster even though several occasions have been reported. The study sets out to assess the current status of preparedness in disaster management among Malaysian academic libraries in the State of Selangor and the Federal Territory of Kuala Lumpur. To obtain a base level of knowledge on disaster preparedness of current practices, a questionnaire was distributed to chief librarians or their assignees in charge of disaster or emergency preparedness at 40 academic libraries and 34 responses were received. The study revolved around the current status of preparedness, on various issues including existence of disaster preparedness plan among academic libraries in Malaysia, disaster experiences by the academic libraries, funding, risk assessment activities and involvement of library staff in disaster management. Frequency and percentage tables were used in the analysis of the data collected. Some of the academic libraries under study have experienced one form of disaster or the other. Most of the academic libraries do not have a written disaster preparedness plan. The risk assessments and staff involvement in disaster preparedness by these libraries were generally adequate.

Keywords: Academic libraries, disaster preparedness plan, disaster management, emergency plan.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3269
485 Determining Optimal Production Plan by Revised Surrogate Worth Trade-off Method

Authors: Tunjo Peric, Zoran Babic

Abstract:

The authors of this work indicate by means of a concrete example that it is possible to apply efficaciously the method of multiple criteria programming in dealing with the problem of determining the optimal production plan for a certain period of time. The work presents: (1) the selection of optimization criteria, (2) the setting of the problem of determining an optimal production plan, (3) the setting of the model of multiple criteria programming in finding a solution to a given problem, (4) the revised surrogate trade-off method, (5) generalized multicriteria model for solving production planning problem and problem of choosing technological variants in the metal manufacturing industry. In the final part of this work the authors reflect on the application of the method of multiple criteria programming while determining the optimal production plan in manufacturing enterprises.

Keywords: multi-criteria programming, production planning, technological variant, Surrogate Worth Trade-off Method.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1816
484 Beyond Possibilities: Re- Reading Republican Ankara

Authors: Zelal Çinar

Abstract:

This paper aims to expose the effects of the ideological program of Turkish Republic on city planning, through the first plan of Ankara. As the new capital, Ankara was planned to be the ‘showcase’ of modern Turkey. It was to represent all new ideologies and the country’s cultural similarities with the west. At the same time it was to underline the national identity and independence of Turkish republic. To this end, a new plan for the capital was designed by German city planner Carl Christopher Lörcher. Diametrically opposed with the existing fabric of the city, this plan was built on the basis of papers and plans, on ideological aims. On the contrary, this paper argues that the city is a machine of possibilities, rather than a clear, materialized system.

Keywords: Architecture, ideology, modernization, urban planning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1762
483 Fragility Assessment for Torsionally Asymmetric Buildings in Plan

Authors: S. Feli, S. Tavousi Tafreshi, A. Ghasemi

Abstract:

The present paper aims at evaluating the response of three-dimensional buildings with in-plan stiffness irregularities that have been subjected to two-way excitation ground motion records simultaneously. This study is broadly-based fragility assessment with greater emphasis on structural response at in-plan flexible and stiff sides. To this end, three type of three-dimensional 5-story steel building structures with stiffness eccentricities, were subjected to extensive nonlinear incremental dynamic analyses (IDA) utilizing Ibarra-Krawinkler deterioration models. Fragility assessment was implemented for different configurations of braces to investigate the losses in buildings with center of resisting (CR) eccentricities.

Keywords: Ibarra Krawinkler, fragility assessment, flexible and stiff side, center of resisting.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1480
482 Educational Plan and Program of the Subject Maintenance of Electric Power Equipment

Authors: Rade Ciric, Sasa Mandic

Abstract:

Students of Higher Education Technical School of Professional Studies in Novi Sad follow the subject ‘Maintenance of Electric Power Equipment’ at the Electrotechnical Department. This paper presents educational plan and program of the subject Maintenance of Electric Power Equipment. The course deals with the problems of preventive and investing maintenance of transformer stations (TS), performing and maintenance of grounding of TS and pillars, as well as tracing and detection the location of the cables failure. There is a special elaborated subject concerning the safe work conditions for the electrician during network maintenance, as well as the basics of making and keeping technical documentation of the equipment.

Keywords: Educational plan and program, electric power equipment, maintenance, technical documentation, safe work.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1326
481 Efficient Numerical Model for Studying Bridge Pier Collapse in Floods

Authors: Thanut Kallaka, Ching-Jong Wang

Abstract:

High level and high velocity flood flows are potentially harmful to bridge piers as evidenced in many toppled piers, and among them the single-column piers were considered as the most vulnerable. The flood flow characteristic parameters including drag coefficient, scouring and vortex shedding are built into a pier-flood interaction model to investigate structural safety against flood hazards considering the effects of local scouring, hydrodynamic forces, and vortex induced resonance vibrations. By extracting the pier-flood simulation results embedded in a neural networks code, two cases of pier toppling occurred in typhoon days were reexamined: (1) a bridge overcome by flash flood near a mountain side; (2) a bridge washed off in flood across a wide channel near the estuary. The modeling procedures and simulations are capable of identifying the probable causes for the tumbled bridge piers during heavy floods, which include the excessive pier bending moments and resonance in structural vibrations.

Keywords: Bridge piers, Neural networks, Scour depth, Structural safety, Vortex shedding

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2212