Search results for: sustainability project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6868

Search results for: sustainability project

6688 Sustainability Assessment of Municipal Wastewater Treatment

Authors: Yousra Zakaria Ahmed, Ahmed El Gendy, Salah El Haggar

Abstract:

In this paper, our methodology to assess sustainability of wastewater treatment technologies in Egypt is presented. The preliminary list of factors to be considered, as well as their ranking listed. The factors include, but are not limited to pollutants removal efficiency and energy consumption under the environmental dimension, construction cost, operation and maintenance costs and required land area cost under the economic dimension and public acceptance, noise and generating job opportunities for local residents. This methodology is intended to be a user-friendly screening tool to support the decision making process when investigating different wastewater treatment technologies in Egypt. Based on the research work results presented in this paper, it can be generally concluded that the categorization of some of the social and environmental aspects of sustainability is subjective and highly dependent on the local conditions and researchers’ background.

Keywords: sustainability, wastewater treatment, sustainability assessment, Egypt

Procedia PDF Downloads 466
6687 Corporate Sustainability Practices in Asian Countries: Pattern of Disclosure and Impact on Financial Performance

Authors: Santi Gopal Maji, R. A. J. Syngkon

Abstract:

The changing attitude of the corporate enterprises from maximizing economic benefit to corporate sustainability after the publication of Brundtland Report has attracted the interest of researchers to investigate the sustainability practices of firms and its impact on financial performance. To enrich the empirical literature in Asian context, this study examines the disclosure pattern of corporate sustainability and the influence of sustainability reporting on financial performance of firms from four Asian countries (Japan, South Korea, India and Indonesia) that are publishing sustainability report continuously from 2009 to 2016. The study has used content analysis technique based on Global Reporting Framework (3 and 3.1) reporting framework to compute the disclosure score of corporate sustainability and its components. While dichotomous coding system has been employed to compute overall quantitative disclosure score, a four-point scale has been used to access the quality of the disclosure. For analysing the disclosure pattern of corporate sustainability, box plot has been used. Further, Pearson chi-square test has been used to examine whether there is any difference in the proportion of disclosure between the countries. Finally, quantile regression model has been employed to examine the influence of corporate sustainability reporting on the difference locations of the conditional distribution of firm performance. The findings of the study indicate that Japan has occupied first position in terms of disclosure of sustainability information followed by South Korea and India. In case of Indonesia, the quality of disclosure score is considerably less as compared to other three countries. Further, the gap between the quality and quantity of disclosure score is comparatively less in Japan and South Korea as compared to India and Indonesia. The same is evident in respect of the components of sustainability. The results of quantile regression indicate that a positive impact of corporate sustainability becomes stronger at upper quantiles in case of Japan and South Korea. But the study fails to extricate any definite pattern on the impact of corporate sustainability disclosure on the financial performance of firms from Indonesia and India.

Keywords: corporate sustainability, quality and quantity of disclosure, content analysis, quantile regression, Asian countries

Procedia PDF Downloads 169
6686 Sustainable Practices through Organizational Internal Factors among South African Construction Firms

Authors: Oluremi I. Bamgbade, Oluwayomi Babatunde

Abstract:

Governments and nonprofits have been in the support of sustainability as the goal of businesses especially in the construction industry because of its considerable impacts on the environment, economy, and society. However, to measure the degree to which an organisation is being sustainable or pursuing sustainable growth can be difficult as a result of the clear sustainability strategy required to assume their commitment to the goal and competitive advantage. This research investigated the influence of organisational culture and organisational structure in achieving sustainable construction among South African construction firms. A total of 132 consultants from the nine provinces in South Africa participated in the survey. The data collected were initially screened using SPSS (version 21) while Partial Least Squares Structural Equation Modeling (PLS-SEM) algorithm and bootstrap techniques were employed to test the hypothesised paths. The empirical evidence also supported the hypothesised direct effects of organisational culture and organisational structure on sustainable construction. Similarly, the result regarding the relationship between organisational culture and organisational structure was supported. Therefore, construction industry can record a considerable level of construction sustainability and establish suitable cultures and structures within the construction organisations. Drawing upon organisational control theory, these findings supported the view that these organisational internal factors have a strong contingent effect on sustainability adoption in construction project execution. The paper makes theoretical, practical and methodological contributions within the domain of sustainable construction especially in the context of South Africa. Some limitations of the study are indicated, suggesting opportunities for future research.

Keywords: organisational culture, organisational structure, South African construction firms, sustainable construction

Procedia PDF Downloads 258
6685 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 142
6684 Challenges of Strategies for Improving Sustainability in Urban Historical Context in Developing Countries: The Case of Shiraz Bein Al-Haramein

Authors: Amir Hossein Ashari, Sedighe Erfan Manesh

Abstract:

One of the problems in developing countries is renovating the historical context and inducing behaviors appropriate to modern life to such a context. This study was conducted using field and library methods in 2012. Similar cases carried out in Iran and developing countries were compared to unveil the strengths and weaknesses of these projects. At present, in the historical context of Shiraz, the distance between two religious shrines of Shahcheragh (Ahmad ibn Musa) and Astaneh (Sayed Alaa al-Din Hossein), which are significant places in religious, cultural, social, and economic terms, is an area full of historic places called Bein Al-Haramein. Unfortunately, some of these places have been worn out and are not appropriate for common uses. The basic strategy of Bein Al-Haramein was to improve social development of Shiraz, to enhance the vitality and dynamism of the historical context of Bein Al-Haramein and to create tourist attractions in order to boost the city's economic and social stability. To this end, the project includes the huge Bein Al-Haramein Commercial Complex which is under construction now. To construct the complex, officials have decided to demolish places of historical value which can lead to irreparable consequences. Iranian urban design has always been based on three elements of bazaars, mosques and government facilities with bazaars being the organic connector of the other elements. Therefore, the best strategy in the above case is to provide for a commercial connection between the two poles. Although this strategy is included in the project, lack of attention to renovation principles in this area and complete destruction of the context will lead to its irreversible damage and will destroy its cultural and historical identity. In urban planning of this project, some important issues have been neglected including: preserving valuable buildings and special old features of the city, rebuilding worn buildings and context to attract trust and confidence of the people, developing new models according to changes, improving the structural position of old context with minimal degradation, attracting partnerships of residents and protecting their rights and finally using potential facilities of the old context. The best strategy for achieving sustainability in Bein Al-Haramein can be the one used in the distance between Santa Maria Novella and Santa Maria Del Fiore churches in historical context where while protecting the historic context and constructions, old buildings were renovated and given different commercial and service uses making them sustainable and dynamic places. Similarly, in Bein Al-Haramein, renovating old constructions and monuments and giving different commercial and other uses to them can help improve the economic and social sustainability of the area.

Keywords: Bein Al-Haramein, sustainability, historical context, historical context

Procedia PDF Downloads 417
6683 Conflict around the Brownfield Reconversion of the Canadian Forces Base Rockcliffe in Ottawa: A Clash of Ambitions and Visions in Canadian Urban Sustainability

Authors: Kenza Benali

Abstract:

Over the past decade, a number of remarkable projects in urban brownfield reconversion emerged across Canada, including the reconversion of former military bases owned by the Canada Lands Company (CLC) into sustainable communities. However, unlike other developments, the regeneration project of the former Canadian Forces Base Rockcliffe in Ottawa – which was announced as one of the most ambitious Smart growth projects in Canada – faced serious obstacles in terms of social acceptance by the local community, particularly urban minorities composed of Francophones, Indigenous and vulnerable groups who live near or on the Base. This turn of events led to the project being postponed and even reconsidered. Through an analysis of its press coverage, this research aims to understand the causes of this urban conflict which lasted for nearly ten years. The findings reveal that the conflict is not limited to the “standard” issues common to most conflicts related to urban mega-projects in the world – e.g., proximity issues (threads to the quality of the surrounding neighbourhoods; noise, traffic, pollution, New-build gentrification) often associated with NIMBY phenomena. In this case, the local actors questioned the purpose of the project (for whom and for what types of uses is it conceived?), its local implementation (to what extent are the local history and existing environment taken into account?), and the degree of implication of the local population in the decision-making process (with whom is the project built?). Moreover, the interests of the local actors have “jumped scales” and transcend the micro-territorial level of their daily life to take on a national and even international dimension. They defined an alternative view of how this project, considered strategic by his location in the nation’s capital, should be a reference as well as an international showcase of Canadian ambition and achievement in terms of urban sustainability. This vision promoted, actually, a territorial and national identity approach - in which some cultural values are highly significant (respect of social justice, inclusivity, ethnical diversity, cultural heritage, etc.)- as a counterweight to planners’ vision which is criticized as a normative/ universalist logic that ignore the territorial peculiarities.

Keywords: smart growth, brownfield reconversion, sustainable neighborhoods, Canada Lands Company, Canadian Forces Base Rockcliffe, urban conflicts

Procedia PDF Downloads 358
6682 Sustainability as a Criterion in the Reconstruction of Libya’s Public Transport Infrastructure

Authors: Haitam Emhemad, Brian Agnew, David Greenwood

Abstract:

Amongst the many priorities facing Libya following the 2011 uprising is the provision of a transport infrastructure that will meet the nation’s needs and not undermine its prospects for economic prosperity as with many developing economies non-technical issues such as management, planning and financing are the major barriers to the efficient and effective provision of transport infrastructure. This is particularly true in the case of the effective incorporation of sustainability criteria, and the research upon which this paper is based involves the examination of alternative ways of approaching this problem. It is probably fair to say that criteria that relate to sustainability have not, historically, featured strongly in Libya’s approach to the development of its transport infrastructure. However, the current reappraisal of how best to redevelop the country’s transport infrastructure that has been afforded by recent events may offer the opportunity to alter this. The research examines recent case studies from a number of countries to explore ways in which sustainability has been included as a criterion for planning and procurement decisions. There will also be an in-depth investigation into the Libyan planning and legislative context to examine the feasibility of the introduction of such sustainability criteria into the process of planning and procurement of Libya’s transport infrastructure.

Keywords: Libya reconstruction, sustainability criteria, transport infrastructure, public transport

Procedia PDF Downloads 304
6681 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 129
6680 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 432
6679 Sustainability Assessment of a Deconstructed Residential House

Authors: Atiq U. Zaman, Juliet Arnott

Abstract:

This paper analyses the various benefits and barriers of residential deconstruction in the context of environmental performance and circular economy based on a case study project in Christchurch, New Zealand. The case study project “Whole House Deconstruction” which aimed, firstly, to harvest materials from a residential house, secondly, to produce new products using the recovered materials, and thirdly, to organize an exhibition for the local public to promote awareness on resource conservation and sustainable deconstruction practices. Through a systematic deconstruction process, the project recovered around 12 tonnes of various construction materials, most of which would otherwise be disposed of to landfill in the traditional demolition approach. It is estimated that the deconstruction of a similar residential house could potentially prevent around 27,029 kg of carbon emission to the atmosphere by recovering and reusing the building materials. In addition, the project involved local designers to produce 400 artefacts using the recovered materials and to exhibit them to accelerate public awareness. The findings from this study suggest that the deconstruction project has significant environmental benefits, as well as social benefits by involving the local community and unemployed youth as a part of their professional skills development opportunities. However, the project faced a number of economic and institutional challenges. The study concludes that with proper economic models and appropriate institutional support a significant amount of construction and demolition waste can be reduced through a systematic deconstruction process. Traditionally, the greatest benefits from such projects are often ignored and remain unreported to wider audiences as most of the external and environmental costs have not been considered in the traditional linear economy.

Keywords: circular economy, construction and demolition waste, resource recovery, systematic deconstruction, sustainable waste management

Procedia PDF Downloads 149
6678 The Effect of Sustainability Reporting on Company Profitability Using Literature Review Method (Asian Sphere)

Authors: Kesya Terinda Natalie, Marcellina Natasha, Rosinta Ria Panggabean

Abstract:

Purpose: Over the last few years, the company has been implementing sustainability practices to ensure business continuity. However, there are pros and cons regarding the impact of financial reports if companies provide non-financial reports. So this paper aims to prove what the effect of Sustainability Reporting (SR) has on company profitability, as well as things that can be considered as the decision-making of SR disclosure. Methodology: This paper uses the literature review method to describe the results of published articles concerning Sustainability Reporting and Profitability. This study links and analyzes the essence of 50 previous studies related to SR on company profitability, most of which were conducted in Asia. Therefore this research is limited to only 23 studies in Asia. Findings: Sustainability Reporting does not have a significant impact on company profitability because the SR quality of each company varies based on Agency & Legitimacy Theory considerations. Stakeholders are required to focus not only on profitability but also on the long-term of the company. Thus, it is found that SR is used by companies as a sustainable investment, which can improve overall company performance by reducing capital costs and generating positive company value in increasing reputation capital. Value: This paper focuses on how sustainability reporting affects company profitability, as well as things that can be considered as the decision-making of SR disclosure.

Keywords: sustainability reporting, profitability, agency theory, legitimacy theory

Procedia PDF Downloads 50
6677 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 194
6676 Sustainable Tourism from a Multicriteria Analysis Perspective

Authors: Olga Blasco-Blasco, Vicente Liern

Abstract:

The development of tourism since the mid-20th century has raised problems of overcrowding, indiscriminate construction in seaside areas and gentrification. Increasingly, the World Tourism Organisation and public institutions are promoting policies that encourage sustainability. From the perspective of sustainability, three types of tourism can be established: traditional tourism, sustainable tourism and sustainable impact tourism. Measuring sustainability is complex due to its multiple dimensions of different relative importance and diversity in nature. In order to try to answer this problem and to identify the benefits of applying policies that promote sustainable tourism, a decision-making analysis will be carried out through the application of a multicriteria analysis method. The proposal is applied to hotel reservations and to the evaluation and management of tourism sustainability in the Spanish Autonomous Communities.

Keywords: sustainable tourism, multicriteria analysis, flexible optimization, composite indicators

Procedia PDF Downloads 274
6675 Sustainability Model for Rural Telecenter Using Business Intelligence Technique

Authors: Razak Rahmat, Azizah Ahmad, Rafidah Razak, Roshidi Din, Azizi Abas

Abstract:

Telecenter is a place where communities can access computers, the Internet, and other digital technologies to enable them to gather information, create, learn, and communicate with others. However, previous studies found that sustainability issues related to economic, political and institutional, social and technology is one of the major problem faced by the telecenter. Based on that problem, this research is planning to design a possible solution on rural telecenters sustainability with the support of business intelligence (BI). The empirical study will be conducted through the qualitative and quantitative method including interviews and observations with a range of stakeholders including ministry officers, telecenters managers and operators. Result from the data collection will be analyze using the causal modeling approach of SEM SmartPLS for the validity. The expected finding from this research is the Business Intelligent Requirement Model as a guild for sustainability of the rural telecenters.

Keywords: Rural ICT Telecenter(RICTT), business intelligence, sustainability, requirement analysis modal

Procedia PDF Downloads 462
6674 The European Research and Development Project Improved Nuclear Site Characterization for Waste Minimization in Decommissioning under Constrained Environment: Focus on Performance Analysis and Overall Uncertainty

Authors: M. Crozet, D. Roudil, T. Branger, S. Boden, P. Peerani, B. Russell, M. Herranz, L. Aldave de la Heras

Abstract:

The EURATOM work program project INSIDER (Improved Nuclear Site Characterization for Waste minimization in Decommissioning under Constrained Environment) was launched in June 2017. This 4-year project has 18 partners and aims at improving the management of contaminated materials arising from decommissioning and dismantling (D&D) operations by proposing an integrated methodology of characterization. This methodology is based on advanced statistical processing and modelling, coupled with adapted and innovative analytical and measurement methods, with respect to sustainability and economic objectives. In order to achieve these objectives, the approaches will be then applied to common case studies in the form of Inter-laboratory comparisons on matrix representative reference samples and benchmarking. Work Package 6 (WP6) ‘Performance analysis and overall uncertainty’ is in charge of the analysis of the benchmarking on real samples, the organisation of inter-laboratory comparison on synthetic certified reference materials and the establishment of overall uncertainty budget. Assessment of the outcome will be used for providing recommendations and guidance resulting in pre-standardization tests.

Keywords: decommissioning, sampling strategy, research and development, characterization, European project

Procedia PDF Downloads 336
6673 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 184
6672 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 513
6671 The Adaptive Properties of the Strategic Assurance System of the National Economy Sustainability to the Economic Security Threats

Authors: Badri Gechbaia

Abstract:

Adaptive management as a fundamental element of the concept of the assurance of economy`s sustainability to the economic security of the system-synergetic type has been considered. It has been proved that the adaptive sustainable development is a transitional phase from the extensive one and later on from the rapid growth to the sustainable development. It has been determined that the adaptive system of the strategic assurance of the sustainability of the economy to the economic security threats is formed on the principles of the domination in its complex of the subsystems with weightier adaptive characteristics that negate the destructive influence of external and internal environmental factors on the sustainability of the national economy.

Keywords: adaptive management, adaptive properties, economic security, strategic assurance

Procedia PDF Downloads 466
6670 Technology Blending as an Innovative Construction Mechanism in the Global South

Authors: Janet Kaningen, Richard N. Kaningen, Jonas Kaningen

Abstract:

This paper aims to discover the best ways to improve production efficiency, cost efficiency, community cohesion, and long-term sustainability in Ghana's housing delivery. Advanced Construction Technologies (ACTs) are set to become the sustainable mainstay of the construction industry due to the demand for innovative housing solutions. Advances in material science, building component production, and assembly technologies are leading to the development of next-generation materials such as polymeric-fiber-based products, light-metal alloys, and eco-materials. Modular housing construction has become more efficient and cost-effective than traditional building methods and is becoming increasingly popular for commercial, industrial, and residential projects. Effective project management and logistics will be imperative in the future speed and cost of modular construction housing.

Keywords: technology blending, sustainability, housing, Ghana

Procedia PDF Downloads 56
6669 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 194
6668 Quality Management in Construction Project

Authors: Harsh Panchal, Saurabh Amrutkar

Abstract:

Quality management is an essential part of any project that has directly related to the performance of a project. Quality management is depended on multiple factors at different stages in a project, right from time management to construction logistics. A project is a mixture of various components that include iternary management, health and safety, crew productivity, and many more. From the survey conducted, we came to the conclusion that advancement in technology and indigenous approach to any project will result in maximum quality standards and better project performance. In this paper, we discuss various components of the factors above that lead to compromise the quality of a project and how it can be controlled in order to achieve maximum quality assurance using quality planning and total quality management. The paper also focuses on limitations and problems faced in each factor responsible for quality management and to tackle them using techniques and processes based on activities and identifying the sequence, approaching critical path, and duration. The project management concept that deals with the sequence of scope cost time give us an overview regarding the ongoing quality management, in a nutshell, giving us hints to regulate the current procedure for maximum achievable quality. It also deals with the problems faced by engineers that make the mundane work process slow, reducing the quality outcome drastically.

Keywords: management, performance, project, quality

Procedia PDF Downloads 127
6667 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.

Keywords: the urban project, the urban improvement, participation, Constantine

Procedia PDF Downloads 374
6666 Sustainability in Maritime Transport: Impact of Cruise Ships Routing in Coastal Navigation

Authors: Josip Dorigatti, Tina Perić, Gorana Jelić Mrčelić

Abstract:

This paper makes a review of present researches on sustainable development, sustainable maritime transport and presents the problem of sustainability in the cruise ships industry. It deals with cruise ships' routing in coastal navigation and its impact on sustainability from environmental, economical, and social aspects. A review of researches available on maritime sustainability brings to the attention how sustainability from a maritime transport perspective is still not enough analysed and researched as it is the case in other industries. The paper emphasises how the operational part of the cruising industry, in particular cruise ships routing in coastal navigation, is not yet researched nor analysed from the aspect of sustainability. The author, based on his extensive senior officer experience in the cruising industry, makes an overview of cruise ship routing practice. Accordingly, based on present cruise industry trends, challenges are highlighted from the aspect of sustainable cruise ships routing in coastal navigation.

Keywords: sustainable development, maritime transport, cruise shipping, cruise ship routes, coastal navigation

Procedia PDF Downloads 142
6665 Application of Agile Project Management to Construction Projects: Case Study

Authors: Ran Etgar, Sarit Freund

Abstract:

Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.

Keywords: agile project management, construction, information systems, project management

Procedia PDF Downloads 101
6664 A Novel Multi-Attribute Green Decision Making Model for Environmental Supply Chain Sustainability

Authors: Amirhossein Mahlouji

Abstract:

In current business market, the concept of integrating environmental sustainability into long-term as well as routine operations is becoming a prevailing trend. Therefore, several stimuli are helping organization to move toward environmental sustainability. The concept of green supply chain management can help provide a strategic framework to develop a customized sustainability roadmap for each organization. In this regard, this paper is mainly focused on presenting a strategic decision making framework that will assist top level decision-making issues. This decision-making tool is based on literature and practice in the area of environmentally conscious business practices. The goal of this paper will be on the components and parameters of green supply chain management and how they serve as a baseline for the decision framework. Later, the applicability of a multi-input multi-output decision model (MIMO), will be analyzed as the analytical network process, within the green supply chain.

Keywords: Multi-attribute, Green Supply Chain, Environmental, Sustainability

Procedia PDF Downloads 118
6663 Analysis of Minimizing Investment Risks in Power and Energy Business Development by Combining Total Quality Management and International Financing Institutions Project Management Tools

Authors: M. Radunovic

Abstract:

Region of Southeastern Europe has a substantial energy resource potential and is witnessing an increasing rate of power and energy project investments. This comes as a result of countries harmonizing their legal framework and market regulations to conform the ones of European Union, enabling direct private investments. Funding in the power and energy market in this region originates from various resources and investment entities, including commercial and institutional ones. Risk anticipation and assessment is crucial to project success, especially given the long exploitation period of project in power and energy domain, as well as the wide range of stakeholders involved. This paper analyzes the possibility of combined application of tools used in total quality management and international financing institutions for project planning, execution and evaluation, with the goal of anticipating, assessing and minimizing the risks that might occur in the development and execution phase of a power and energy project in the market of southeastern Europe. History of successful project management and investments both in the industry and institutional sector provides sufficient experience, guidance and internationally adopted tools to provide proper project assessment for investments in power and energy. Business environment of southeastern Europe provides immense potential for developing power and engineering projects of various magnitudes, depending on stakeholders’ interest. Diversification on investment sources provides assurance that there is interest and commitment to invest in this market. Global economic and political developments will be intensifying the pace of investments in the upcoming period. The proposed approach accounts for key parameters that contribute to the sustainability and profitability of a project which include technological, educational, social and economic gaps between the southeastern European region and western Europe, market trends in equipment design and production on a global level, environment friendly approach to renewable energy sources as well as conventional power generation systems, and finally the effect of the One Belt One Road Initiative led by People’s Republic of China to the power and energy market of this region in the upcoming period on a long term scale. Analysis will outline the key benefits of the approach as well as the accompanying constraints. Parallel to this it will provide an overview of dominant threats and opportunities in present and future business environment and their influence to the proposed application. Through concrete examples, full potential of this approach will be presented along with necessary improvements that need to be implemented. Number of power and engineering projects being developed in southeastern Europe will be increasing in the upcoming period. Proper risk analysis will lead to minimizing project failures. The proposed successful combination of reliable project planning tools from different investment areas can prove to be beneficial in the future power and engineering investments, and guarantee their sustainability and profitability.

Keywords: capital investments, lean six sigma, logical framework approach, logical framework matrix, one belt one road initiative, project management tools, quality function deployment, Southeastern Europe, total quality management

Procedia PDF Downloads 92
6662 Systems Integrated Approach to Improve the Design and Construction of Green Buildings

Authors: Saleh Hayat

Abstract:

Efficiency, productivity and sustainability are important factors for structure and the application of processes in green building. Various previous studies have addressed efficiency, productivity and sustainability separately. This research study aims to investigate the implications of these three factors taking together. Frequency analysis and the ranking techniques are carried out to explore the connection between these factors. The interconnection matrix has been developed and functional grouping is made based upon data from expert opinion and field professionals. The existence of a relationship, the type of relationship and the scaled impact have been drawn. Additionally, a system diagram has been developed to show the variable correlation. The results of expert opinion show that efficiency, productivity and sustainability have a stronger impact on green buildings.

Keywords: efficiency, green building, productivity, sustainability

Procedia PDF Downloads 109
6661 Sustainability Rating System for Infrastructure Projects in UAE

Authors: Amrutha Venugopal, Rabee Rustum

Abstract:

In spite of huge investments and the vital role infrastructure plays in the economy of UAE, the country has not yet developed an assessment scheme to measure the sustainability of infrastructure projects/development. The aim of this study was to develop a sustainability rating system for infrastructure projects in UAE using weighted indicator scoring. The identification of the list of 66 indicators was done by content analysis. The sources of content analysis were from government guidelines, research literature and sustainability rating system for infrastructure projects namely BCA Greenmark for Infrastructure (Singapore), ISCA (Australia) and Envision (USA). These indicators were shortlisted based on their relevance in the UAE. A mixture of qualitative and quantitative research methods is utilized to find the weightage to be applied to the indicators and to find suggestive measures to improve infrastructure sustainability in this region. Interviews and surveys were conducted with a good mix of experts from the industry. The data collected from the interviews were collated to provide suggestive measures for improving infrastructure sustainability. The collected survey data were analyzed using statistical analysis techniques to find the indicator weighing. The indicators were shortlisted by 75% to minimize the effort and investment into the process. The weighing of the deleted indicators was distributed among the critical clusters identified by Pareto analysis. Finally a simple Microsoft Excel tool was developed as the rating tool by using the calculated weighing for the indicators.

Keywords: infrastructure, rating system, suggestive measures, sustainability, UAE

Procedia PDF Downloads 277
6660 The Internationalization of Capital Market Influencing Debt Sustainability's Impact on the Growth of the Nigerian Economy

Authors: Godwin Chigozie Okpara, Eugine Iheanacho

Abstract:

The paper set out to assess the sustainability of debt in the Nigerian economy. Precisely, it sought to determine the level of debt sustainability and its impact on the growth of the economy; whether internationalization of capital market has positively influenced debt sustainability’s impact on economic growth; and to ascertain the direction of causality between external debt sustainability and the growth of GDP. In the light of these objectives, ratio analysis was employed for the determination of debt sustainability. Our findings revealed that the periods 1986 – 1994 and 1999 – 2004 were periods of severe unsustainable borrowing. The unit root test showed that the variables of the growth model were integrated of order one, I(1) and the cointegration test provided evidence for long run stability. Considering the dawn of internationalization of capital market, the researcher employed the structural break approach using Chow Breakpoint test on the vector error correction model (VECM). The result of VECM showed that debt sustainability, measured by debt to GDP ratio exerts negative and significant impact on the growth of the economy while debt burden measured by debt-export ratio and debt service export ratio are negative though insignificant on the growth of GDP. The Cho test result indicated that internationalization of capital market has no significant effect on the debt overhang impact on the growth of the Economy. The granger causality test indicates a feedback effect from economic growth to debt sustainability growth indicators. On the bases of these findings, the researchers made some necessary recommendations which if followed religiously will go a long way to ameliorating debt burdens and engendering economic growth.

Keywords: debt sustainability, internalization, capital market, cointegration, chow test

Procedia PDF Downloads 398
6659 Effect of Sustainability Accounting Disclosure on Financial Performance of Listed Brewery Firms in Nigeria

Authors: Patricia Chinyere Oranefo

Abstract:

This study examined the effect of sustainability accounting disclosure on financial performance of listed Brewery firms in Nigeria. The dearth of empirical evidence and literature on “governance disclosure” as one of the explanatory variables of sustainability accounting reporting were the major motivation for this study. The main objective was to ascertain the effect of sustainability accounting disclosure on financial performance of listed Brewery firms in Nigeria. An ex–post facto research design approach was adopted for the study. The population of this study comprises of five (5) Brewery firms quoted on the floor of the Nigeria exchange group (NSX) and the sample size of four (4) listed firms was drawn using purposive sampling method. Secondary data were carefully sourced from the financial statement/annual reports and sustainability reports from 2012 to 2021 of the Brewery firms quoted on the Nigeria exchange group (NSX). Panel regression analysis by aid of E-views 10.0 software was used to test for statistical significance of the effect of sustainability accounting disclosure on financial performance of listed Brewery firms in Nigeria. The results showed that economic sustainability disclosure indexes do not significantly affect return on asset of listed Brewery firms in Nigeria. The findings further revealed that environmental sustainability disclosure indexes do not significantly affect return on equity of listed Brewery firms in Nigeria. More so, results showed that Social Sustainability disclosure indexes significantly affect Net Profit Margin of listed Brewery firms in Nigeria. Finally, the result established also that governance sustainability disclosure indexes do not significantly affect Earnings per share of listed Brewery firms in Nigeria. Consequent upon the findings, this study recommended among others; that managers of Brewers in Nigeria should improve and sustain full disclosure practices on economic, environmental, social and governance disclosures following the guidelines of the Global Reporting Index (GRI) as they are capable of exerting significant effect on financial performance of firms in Nigeria.

Keywords: sustainability, accounting, disclosure, financial performance

Procedia PDF Downloads 30