20344 Project Progress Prediction in Software Devlopment Integrating Time Prediction Algorithms and Large Language Modeling

Authors: Dong Wu, Michael Grenn

Abstract:

Managing software projects effectively is crucial for meeting deadlines, ensuring quality, and managing resources well. Traditional methods often struggle with predicting project timelines accurately due to uncertain schedules and complex data. This study addresses these challenges by combining time prediction algorithms with Large Language Models (LLMs). It makes use of real-world software project data to construct and validate a model. The model takes detailed project progress data such as task completion dynamic, team Interaction and development metrics as its input and outputs predictions of project timelines. To evaluate the effectiveness of this model, a comprehensive methodology is employed, involving simulations and practical applications in a variety of real-world software project scenarios. This multifaceted evaluation strategy is designed to validate the model's significant role in enhancing forecast accuracy and elevating overall management efficiency, particularly in complex software project environments. The results indicate that the integration of time prediction algorithms with LLMs has the potential to optimize software project progress management. These quantitative results suggest the effectiveness of the method in practical applications. In conclusion, this study demonstrates that integrating time prediction algorithms with LLMs can significantly improve the predictive accuracy and efficiency of software project management. This offers an advanced project management tool for the industry, with the potential to improve operational efficiency, optimize resource allocation, and ensure timely project completion.

Keywords: software project management, time prediction algorithms, large language models (LLMS), forecast accuracy, project progress prediction

Procedia PDF Downloads 47
20343 Classification of Construction Projects

Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside

Abstract:

To address construction project requirements and specifications, scholars and practitioners need to establish a taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.

Keywords: project classification, project definition rating index (PDRI), risk, project goals alignment

Procedia PDF Downloads 652
20342 The Preparation of 2H-Indazolo [2, 1-b] Phthalazinetriones by One-Pot 4,4ʹ-Bipyridinium Dichloride Ordered Mesoporous Silica

Authors: Aigin Bashti

Abstract:

Preparation of multicomponent reactions (MCRs) via a simple one-pot strategy is considered a novel procedure which has attracted a lot of interest from organic and medicinal chemists. Due to the great importance of phthalazide triones, it was decided to introduce a novel and cost-effective green procedure for the preparation of these derivatives. In this methodology, an efficient 4,4ʹ-Bipyridinium Dichloride Ordered Mesoporous Silica functionalized catalyst (BP-SBA-15) was utilized. The catalyst was characterized by X-ray diffraction analysis (XRD), field emission scanning electron microscopy (FESEM), transmission electron microscopy (TEM), thermo-gravimetric analysis (TGA), and Fourier-transform infrared spectroscopy (FT-IR) analysis. In conclusion, it should be mentioned that this methodology has some advantages, including short reaction time, high yield of the products, recyclable catalyst, green procedure, and facile work-up procedure. The catalyst was successfully utilized for the one-pot preparation of various phthalazinetrione derivatives.

Keywords: dimedone, green procedure, multicomponent reactions, phthalhydrazide

Procedia PDF Downloads 67
20341 Comparison of Computer Software for Swept Path Analysis on Example of Special Paved Areas

Authors: Ivana Cestar, Ivica Stančerić, Saša Ahac, Vesna Dragčević, Tamara Džambas

Abstract:

On special paved areas, such as road intersections, vehicles are usually moving through horizontal curves with smaller radii and occupy considerably greater area compared to open road segments. Planning procedure of these areas is mainly an iterative process that consists of designing project elements, assembling those elements to a design project, and analyzing swept paths for the design vehicle. If applied elements do not fulfill the swept path requirements for the design vehicle, the process must be carried out again. Application of specialized computer software for swept path analysis significantly facilitates planning procedure of special paved areas. There are various software of this kind available on the global market, and each of them has different specifications. In this paper, comparison of two software commonly used in Croatia (Auto TURN and Vehicle Tracking) is presented, their advantages and disadvantages are described, and their applicability on a particular paved area is discussed. In order to reveal which one of the analyszed software is more favorable in terms of swept paths widths, which one includes input parameters that are more relevant for this kind of analysis, and which one is more suitable for the application on a certain special paved area, the analysis shown in this paper was conducted on a number of different intersection types.

Keywords: software comparison, special paved areas, swept path analysis, swept path input parameters

Procedia PDF Downloads 295
20340 Seismic Retrofit of Rectangular Columns Using Fiber Reinforced Polymers

Authors: E. L. Elghazy, A. M. Sanad, M. G. Ghoneim

Abstract:

Over the past two decades research has shown that fiber reinforced polymers can be efficiently, economically and safely used for strengthening and rehabilitation of reinforced concrete (RC) structures. Designing FRP confined concrete columns requires reliable analytical tools that predict the level of performance and ductility enhancement. A numerical procedure is developed aiming at determining the type and thickness of FRP jacket needed to achieve a certain level of ductility enhancement. The procedure starts with defining the stress strain curve, which is used to obtain moment curvature relationship then displacement ductility ratio of reinforced concrete cross-sections subjected to bending moment and axial force. Three sets of published experimental tests were used to validate the numerical procedure. Comparisons between predicted results obtained by using the proposed procedure and actual results of experimental tests proved the reliability of the proposed procedure.

Keywords: columns, confinement, ductility, FRP, numerical

Procedia PDF Downloads 423
20339 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 622
20338 Innovative Food Production and Food Consumption Entrepreneurship: a Recipe for Delivering Global Sustainable Goals in South Africa

Authors: Faith Samkange, Juliet Chipumuro, Henry Wanyama

Abstract:

Business development and entrepreneurship constitute a major part of economic and human development for many countries within the Southern Africa Development Communities (SADC). While a marked increase in entrepreneurship activity has been registered, more than 70% of these business enterprises are still failing particularly in their conceptual years. One of the major reasons for this failure is that project process trends have tended to be fragmented and linear in approach while focusing primarily on isolated articulation of development aspects such as marketing, operations, accounting and human resources management with limited integration. Given the complexity of environmental, economic and human development issues in the SADC region, a multi-disciplinary, transformative, systematic and coordinated approach towards entrepreneurship development may be a more useful approach. This paper develops a proposed conceptual framework for an innovative and sustainable food production and food consumption Agritech entrepreneurship project in the Eastern Cape Province of South Africa based on a systematic review of existing literature. A thematic analysis of the literature reviewed is applied to develop this theoretical contribution to knowledge. The conceptual framework will be tested in a research driven intervention project designed to improve the quality of life for marginalized indigenous African communities by addressing poverty alleviation, unemployment and gender inequality as stipulated in the global sustainable development goals by the United Nations in 2018.

Keywords: innovative entrepreneurship, sustainability, food production and consumption, marginalised communities, poverty alleviation

Procedia PDF Downloads 101
20337 Professional Stakeholders Perspectives on Community Participation in Transit-Oriented Development Projects: A Johannesburg Case Study

Authors: Kofi Quartey, Kola Ijasan

Abstract:

Achieving densification around transit-oriented development projects has proven the most ideal way of facilitating urban sprawl whilst increasing the mobility of the majority of the urban populations, making parts of the city that were inaccessible, accessible. Johannesburg has undertaken TOD vision, which was initially called the corridors of freedom. The TOD, in line with the Sustainable Development Goal 11, seeks to establish inclusive, sustainable cities and, in line with the Joburg Growth Development Strategy, aims to create an equitable world-class African city. Equity and inclusivity should occur from the onset of planning and implementation of TOD projects through meaningful community participation. Stakeholder engagement literature from various disciplinary backgrounds has documented dissatisfaction of communities regarding the lack of meaningful participation in government-led development initiatives. The views of other project stakeholders such as project policy planners and project implementors and their challenges in undertaking community participation are, however, not taken into account in such instances, leaving room for a biased perspective. Document analysis was undertaken to determine what is expected of the Project stakeholders according to policy and whether they carried out their duties) seven interviews were also conducted with city entities and community representatives to determine their experiences and challenges with community participation in the various TOD projects attributed to the CoF vision. The findings of the study indicated that stakeholder engagement processes were best described as an ‘educative process’; where local communities were limited to being informed from the onset rather than having an active involvement in the planning processes. Most community members felt they were being informed and educated as to what was going to happen in spite of having their views and opinions collected – primarily due to project deadlines and budget constraints, as was confirmed by professional stakeholders. Some community members exhibited reluctance to change due to feelings of having projects being imposed on them, and the implications of the projects on their properties and lifestyles. It is recommended that community participation should remain a participatory and engaging process that creates an exchange of knowledge and understanding in the form of a dialogue between communities and project stakeholders until a consensus is reached.

Keywords: stakeholder engagement, transit oriented development, community participation, Johannesburg

Procedia PDF Downloads 102
20336 Governance of Energy Transitions in Developing States

Authors: Robert Lindner

Abstract:

In recent years a multitude of international efforts, including the United Nations’ aspirational 2030 Agenda for Sustainable Development, provided a new momentum to facilitate energy access and rural electrification projects to combat energy poverty in developing states in Asia. Rural electrification projects promise to facilitate other sustainable development aims, such as the empowerment of local communities through the creation of economic opportunities or increased disaster resilience. This study applies a multi-governance research framework to study the cases of the ongoing energy system transition in Myanmar and Cambodia. It explores what impact the international aid community, especially multilateral development banks and international development agencies, has on the governance of the transitions and how diverging aid donor interest shape policy making and project planning. The study is based on policy analysis and expert interviews, as well as extensive field research. It critically examines the current development trajectories and the strategies of the stakeholders involved. It concludes that institutional and technological competition between donors, as well as a lack of transparency and inclusion in the project planning and implementation phases, contributes to insufficient coordination in national energy policy making and project implementation at the local level. The study further discusses possible alternative approaches that might help to promote the spread of sustainable energy technologies.

Keywords: energy governance, developing countries, multi-level governance, energy transitions

Procedia PDF Downloads 80
20335 Hybrid Project Management Model Based on Lean and Agile Approach

Authors: Fatima-Zahra Eddoug, Jamal Benhra, Rajaa Benabbou

Abstract:

Several project management models exist in the literature and the most used ones are the hybrids for their multiple advantages. Our objective in this paper is to analyze the existing models, which are based on the Lean and Agile approaches and to propose a novel framework with the convenient tools that will allow efficient management of a general project. To create the desired framework, we were based essentially on 7 existing models. Only the Scrum tool among the agile tools was identified by several authors to be appropriate for project management. In contrast, multiple lean tools were proposed in different phases of the project.

Keywords: agility, hybrid project management, lean, scrum

Procedia PDF Downloads 109
20334 Variable Selection in a Data Envelopment Analysis Model by Multiple Proportions Comparison

Authors: Jirawan Jitthavech, Vichit Lorchirachoonkul

Abstract:

A statistical procedure using multiple comparisons test for proportions is proposed for variable selection in a data envelopment analysis (DEA) model. The test statistic in the multiple comparisons is the proportion of efficient decision making units (DMUs) in a DEA model. Three methods of multiple comparisons test for proportions: multiple Z tests with Bonferroni correction, multiple tests in 2Xc crosstabulation and the Marascuilo procedure, are used in the proposed statistical procedure of iteratively eliminating the variables in a backward manner. Two simulation populations of moderately and lowly correlated variables are used to compare the results of the statistical procedure using three methods of multiple comparisons test for proportions with the hypothesis testing of the efficiency contribution measure. From the simulation results, it can be concluded that the proposed statistical procedure using multiple Z tests for proportions with Bonferroni correction clearly outperforms the proposed statistical procedure using the remaining two methods of multiple comparisons and the hypothesis testing of the efficiency contribution measure.

Keywords: Bonferroni correction, efficient DMUs, Marascuilo procedure, Pastor et al. method, 2xc crosstabulation

Procedia PDF Downloads 281
20333 The Lawfulness of the Determination of a Criminal Suspect as a New Pre-Trial's Object

Authors: Muhammad Tanziel Aziezi

Abstract:

In Indonesia, pre-trial (in Indonesia called ‘praperadilan’) is a mechanism that is regulated on Criminal Procedure Code as a form of oversight and check and balance on the process at the stage of inquiry, investigation, and prosecution, so that actions taken by the State (in this case, the police and prosecutor) is carried out in accordance with its authority and not violate human rights. Article 77 of the Criminal Procedure Code has been set that the object may be filed pretrial is just about the lawfulness of the arrest, the lawfulness of the detention, and the legitimacy of stopping investigation and prosecution. However, since the beginning of 2015, there was a further object which is then entered as a pre-trial object, namely the lawfulness of the determination of a criminal suspect. This is because the determination of the suspect is considered as one of the forceful measures that could restrict the rights of a person, so the implementation should have oversight and checks and balances by the courts. This paper will discuss the development of the pre-trial on the lawfulness of the determination of a criminal suspect as a new judicial mechanism as the protection of human rights in Indonesia.

Keywords: criminal procedure law, pre-trial, lawfulness of determination of a criminal suspect, check and balance by the court

Procedia PDF Downloads 313
20332 Department of Social Development/Japan International Cooperation Agency's Journey from South African Community to Southern African Region

Authors: Daisuke Sagiya, Ren Kamioka

Abstract:

South Africa has ratified the United Nations Convention on the Rights of Persons with Disabilities (UNCRPD) on 30th November 2007. In line with this, the Department of Social Development (DSD) revised the White Paper on the Rights of Persons with Disabilities (WPRPD), and the Cabinet approved it on 9th December 2015. The South African government is striving towards the elimination of poverty and inequality in line with UNCRPD and WPRPD. However, there are minimal programmes and services that have been provided to persons with disabilities in the rural community. In order to address current discriminative practices, disunity and limited self-representation in rural community, DSD in cooperation with the Japan International Cooperation Agency (JICA) is implementing the 'Project for the Promotion of Empowerment of Persons with Disabilities and Disability Mainstreaming' from May 2016 to May 2020. The project is targeting rural community as the project sites, namely 1) Collins Chabane municipality, Vhembe district, Limpopo and 2) Maluti-a-Phofung municipality, Thabo Mofutsanyana district, Free State. The project aims at developing good practices on Community-Based Inclusive Development (CBID) at the project sites which will be documented as a guideline and applied in other provinces in South Africa and neighbouring countries (Lesotho, Swaziland, Botswana, Namibia, Zimbabwe, and Mozambique). In cooperation with provincial and district DSD and local government, the project is currently implementing various community activities, for example: Establishment of Self-Help Group (SHG) of persons with disabilities and Peer Counselling in the villages, and will conduct Disability Equality Training (DET) and accessibility workshop in order to enhance the CBID in the project sites. In order to universalise good practices on CBID, the authors will explain lessons learned from the project by utilising the theories of disability and development studies and community psychology such as social model of disability, twin-track approach, empowerment theory, sense of community, helper therapy principle, etc. And the authors conclude that in order to realise social participation of persons with disabilities in rural community, CBID is a strong tool and persons with disabilities must play central roles in all spheres of CBID activities.

Keywords: community-based inclusive development, disability mainstreaming, empowerment of persons with disabilities, self-help group

Procedia PDF Downloads 206
20331 Empirical Study for the Project and the Project Management Dimensions Comparison between SMEs and Large Companies

Authors: Amina Oukennou, Zitouni Beidouri, Otmane Bouksour

Abstract:

Small to Medium-sized enterprises are a very important component of the economy. They are present in the whole industries all over the world. They are considered as the engine for future growth in the economy. Project management is an economical international factor impacting all types of enterprises including the SMEs. This paper has the aim of measuring the weight of using projects and project management in Moroccan SMEs in comparison with the large companies. The study is based on interviews with experts: project managers, managers, directors, and consultants. They were asked questions measuring the weight of using projects, the level of using project management, and the resources employed. Eighteen Moroccan companies from a range of industries and sizes were consulted. All the companies consider projects as a key element in their strategy. Most of them affirm the great usefulness of the approach 'project', especially for the external activities. The main differences lie in the duration and the size of used projects. Despite the commonly shared idea about the importance of the project management, the interviewed persons believe that the project management knowledge has the same importance or less than the technical knowledge. All the companies affirm the need for a simpler version of project management. The content varies from one company to another.

Keywords: project dimension, project management, small to medium-sized entreprise, Morocco

Procedia PDF Downloads 285
20330 Project Management Agile Model Based on Project Management Body of Knowledge Guideline

Authors: Mehrzad Abdi Khalife, Iraj Mahdavi

Abstract:

This paper presents the agile model for project management process. For project management process, the Project Management Body of Knowledge (PMBOK) guideline has been selected as platform. Combination of computational science and artificial intelligent methodology has been added to the guideline to transfer the standard to agile project management process. The model is the combination of practical standard, computational science and artificial intelligent. In this model, we present communication model and protocols to keep process agile. Here, we illustrate the collaboration man and machine in project management area with artificial intelligent approach.

Keywords: artificial intelligent, conceptual model, man-machine collaboration, project management, standard

Procedia PDF Downloads 312
20329 Identification of Factors Influencing Costs in Green Projects

Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi

Abstract:

Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.

Keywords: green project, factors influencing cost, hard cost, soft cost

Procedia PDF Downloads 317
20328 Design of a Professional Development Framework in Teaching and Learning for Engineering Educators

Authors: Orla McConnell, Cormac MacMahon, Jen Harvey

Abstract:

Ireland’s national professional development framework for those who teach in higher education, aims to provide guidance and leadership in the planning, developing and engaging in professional development practices. A series of pilot projects have been initiated to help explore the framework’s likely utility and acceptance by educators and their institutions. These projects require engagement with staff in the interpretation and adaption of the framework within their working contexts. The purpose of this paper is to outline the development of one such project with engineering educators at three Institutes of Technology seeking designation as a technological university. The initiative aims to gain traction in the acceptance of the framework with the engineering education community by linking core and discipline-specific teaching and learning competencies with professional development activities most valued by engineering educators. Informed by three strands of literature: professional development in higher education; engineering education; and teaching and learning training provisions, the project begins with a survey of all those involved in teaching and learning in engineering across the three institutes. Based on engagement with key stakeholders, subsequent qualitative research informs the contextualization of the national framework for discipline-specific and institutional piloting. The paper concludes by exploring engineering educator perceptions of the national framework’s utility based on their engagement with the pilot process. Feedback from the pilot indicates that there is a significant gap between the professional development needs of engineering educators and the current professional development provision in teaching and learning.

Keywords: engineering education, pilot, professional development, teaching and learning

Procedia PDF Downloads 308
20327 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria

Authors: Shazali Abdulahi

Abstract:

Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.

Keywords: effetive communication, ineffective communication, stakeholders, project delivery

Procedia PDF Downloads 21
20326 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries

Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi

Abstract:

Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.

Keywords: physical progress, time progress, financial progress, delays, critical path

Procedia PDF Downloads 348
20325 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector

Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan

Abstract:

Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.

Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making

Procedia PDF Downloads 308
20324 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: project team, leadership, construction project, project successful

Procedia PDF Downloads 147
20323 Connecting the Dots: Bridging Academia and National Community Partnerships When Delivering Healthy Relationships Programming

Authors: Nicole Vlasman, Karamjeet Dhillon

Abstract:

Over the past four years, the Healthy Relationships Program has been delivered in community organizations and schools across Canada. More than 240 groups have been facilitated in collaboration with 33 organizations. As a result, 2157 youth have been engaged in the programming. The purpose and scope of the Healthy Relationships Program are to offer sustainable, evidence-based skills through small group implementation to prevent violence and promote positive, healthy relationships in youth. The program development has included extensive networking at regional and national levels. The Healthy Relationships Program is currently being implemented, adapted, and researched within the Resilience and Inclusion through Strengthening and Enhancing Relationships (RISE-R) project. Alongside the project’s research objectives, the RISE-R team has worked to virtually share the ongoing findings of the project through a slow ontology approach. Slow ontology is a practice integrated into project systems and structures whereby slowing the pace and volume of outputs offers creative opportunities. Creative production reveals different layers of success and complements the project, the building blocks for sustainability. As a result of integrating a slow ontology approach, the RISE-R team has developed a Geographic Information System (GIS) that documents local landscapes through a Story Map feature, and more specifically, video installations. Video installations capture the cartography of space and place within the context of singular diverse community spaces (case studies). By documenting spaces via human connections, the project captures narratives, which further enhance the voices and faces of the community within the larger project scope. This GIS project aims to create a visual and interactive flow of information that complements the project's mixed-method research approach. Conclusively, creative project development in the form of a geographic information system can provide learning and engagement opportunities at many levels (i.e., within community organizations and educational spaces or with the general public). In each of these disconnected spaces, fragmented stories are connected through a visual display of project outputs. A slow ontology practice within the context of the RISE-R project documents activities on the fringes and within internal structures; primarily through documenting project successes as further contributions to the Centre for School Mental Health framework (philosophy, recruitment techniques, allocation of resources and time, and a shared commitment to evidence-based products).

Keywords: community programming, geographic information system, project development, project management, qualitative, slow ontology

Procedia PDF Downloads 133
20322 CMMI Key Process Areas and FDD Practices

Authors: Rituraj Deka, Nomi Baruah

Abstract:

The development of information technology during the past few years resulted in designing of more and more complex software. The outsourcing of software development makes a higher requirement for the management of software development project. Various software enterprises follow various paths in their pursuit of excellence, applying various principles, methods and techniques along the way. The new research is proving that CMMI and Agile methodologies can benefit from using both methods within organizations with the potential to dramatically improve business performance. The paper describes a mapping between CMMI key process areas (KPAs) and Feature-Driven Development (FDD) communication perspective, so as to increase the understanding of how improvements can be made in the software development process.

Keywords: Agile, CMMI, FDD, KPAs

Procedia PDF Downloads 432
20321 A Knowledge-Based Development of Risk Management Approaches for Construction Projects

Authors: Masoud Ghahvechi Pour

Abstract:

Risk management is a systematic and regular process of identifying, analyzing and responding to risks throughout the project's life cycle in order to achieve the optimal level of elimination, reduction or control of risk. The purpose of project risk management is to increase the probability and effect of positive events and reduce the probability and effect of unpleasant events on the project. Risk management is one of the most fundamental parts of project management, so that unmanaged or untransmitted risks can be one of the primary factors of failure in a project. Effective risk management does not apply to risk regression, which is apparently the cheapest option of the activity. However, the main problem with this option is the economic sensitivity, because what is potentially profitable is by definition risky, and what does not pose a risk is economically interesting and does not bring tangible benefits. Therefore, in relation to the implemented project, effective risk management is finding a "middle ground" in its management, which includes, on the one hand, protection against risk from a negative direction by means of accurate identification and classification of risk, which leads to analysis And it becomes a comprehensive analysis. On the other hand, management using all mathematical and analytical tools should be based on checking the maximum benefits of these decisions. Detailed analysis, taking into account all aspects of the company, including stakeholder analysis, will allow us to add what will become tangible benefits for our project in the future to effective risk management. Identifying the risk of the project is based on the theory that which type of risk may affect the project, and also refers to specific parameters and estimating the probability of their occurrence in the project. These conditions can be divided into three groups: certainty, uncertainty, and risk, which in turn support three types of investment: risk preference, risk neutrality, specific risk deviation, and its measurement. The result of risk identification and project analysis is a list of events that indicate the cause and probability of an event, and a final assessment of its impact on the environment.

Keywords: risk, management, knowledge, risk management

Procedia PDF Downloads 32
20320 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 234
20319 Layouting Phase II of New Priok Using Adaptive Port Planning Frameworks

Authors: Mustarakh Gelfi, Tiedo Vellinga, Poonam Taneja, Delon Hamonangan

Abstract:

The development of New Priok/Kalibaru as an expansion terminal of the old port has been being done by IPC (Indonesia Port Cooperation) together with the subsidiary company, Port Developer (PT Pengembangan Pelabuhan Indonesia). As stated in the master plan, from 2 phases that had been proposed, phase I has shown its form and even Container Terminal I has been operated in 2016. It was planned principally, the development will be divided into Phase I (2013-2018) consist of 3 container terminals and 2 product terminals and Phase II (2018-2023) consist of 4 container terminals. In fact, the master plan has to be changed due to some major uncertainties which were escaped in prediction. This study is focused on the design scenario of phase II (2035- onwards) to deal with future uncertainty. The outcome is the robust design of phase II of the Kalibaru Terminal taking into account the future changes. Flexibility has to be a major goal in such a large infrastructure project like New Priok in order to deal and manage future uncertainty. The phasing of project needs to be adapted and re-look frequently before being irrelevant to future challenges. One of the frameworks that have been developed by an expert in port planning is Adaptive Port Planning (APP) with scenario-based planning. The idea behind APP framework is the adaptation that might be needed at any moment as an answer to a challenge. It is a continuous procedure that basically aims to increase the lifespan of waterborne transport infrastructure by increasing flexibility in the planning, contracting and design phases. Other methods used in this study are brainstorming with the port authority, desk study, interview and site visit to the real project. The result of the study is expected to be the insight for the port authority of Tanjung Priok over the future look and how it will impact the design of the port. There will be guidelines to do the design in an uncertain environment as well. Solutions of flexibility can be divided into: 1 - Physical solutions, all the items related hard infrastructure in the projects. The common things in this type of solution are using modularity, standardization, multi-functional, shorter and longer design lifetime, reusability, etc. 2 - Non-physical solutions, usually related to the planning processes, decision making and management of the projects. To conclude, APP framework seems quite robust to deal with the problem of designing phase II of New Priok Project for such a long period.

Keywords: Indonesia port, port's design, port planning, scenario-based planning

Procedia PDF Downloads 213
20318 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 394
20317 Development of In Situ Permeability Test Using Constant Discharge Method for Sandy Soils

Authors: A. Rifa’i, Y. Takeshita, M. Komatsu

Abstract:

The post-rain puddles problem that occurs in the first yard of Prambanan Temple are often disturbing visitor activity. A poodle layer and a drainage system has ever built to avoid such a problem, but puddles still didn’t stop appearing after rain. Permeability parameter needs to be determined by using more simple procedure to find exact method of solution. The instrument modelling were proposed according to the development of field permeability testing instrument. This experiment used proposed Constant Discharge method. Constant Discharge method used a tube poured with constant water flow. The procedure were carried out from unsaturated until saturated soil condition. Volumetric water content (θ) were being monitored by soil moisture measurement device. The results were relationship between k and θ which drawn by numerical approach Van Genutchen model. Parameters θr optimum value obtained from the test was at very dry soil. Coefficient of permeability with a density of 19.8 kN/m3 for unsaturated conditions was in range of 3 x 10-6 cm/sec (Sr= 68 %) until 9.98 x 10-4 cm/sec (Sr= 82 %). The equipment and testing procedure developed in this research was quite effective, simple and easy to be implemented on determining field soil permeability coefficient value of sandy soil. Using constant discharge method in proposed permeability test, value of permeability coefficient under unsaturated condition can be obtained without establish soil water characteristic curve.

Keywords: constant discharge method, in situ permeability test, sandy soil, unsaturated conditions

Procedia PDF Downloads 352
20316 Natural Dyes in Schools. Development of Techniques From Early Childhood as a Tool for Art, Design and Sustainability

Authors: Luciana Marrone

Abstract:

Natural dyes are a great resource for today's artists and designers providing endless possibilities for design and sustainability. This research and development project focuses on the idea of making these dyeing or painting methodologies reach the widest possible range of students. The main objective is to inform and train, free of charge, teachers and students from different academic institutions, at different levels, kindergarten, primary, secondary, tertiary and university. In this research and dissemination project, in the first instance, institutions from Argentina, Chile, Uruguay, Mexico, Spain, Italy, Colombia, Paraguay, Venezuela, Brazil and Australia joined the project, reaching the grassroots of education from the very beginning. Natural dyes will become part of everyday life for more people, achieving their own colors for art, textiles or any other application. The knowledge of the techniques and resources of the student a fundamental tool, sustainable and opens endless possibilities even in places or homes with few economic resources, thus achieving that natural dyes are not only part of the world of designers but also that they are incorporated from the basics and can thus become a resource applicable in different areas even in places with few economic or development possibilities.

Keywords: art, education, natural dyes, sustainability, textile design.

Procedia PDF Downloads 62
20315 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry