6260 Construction Quality Perception of Construction Professionals and Their Expectations from a Quality Improvement Technique in Pakistan

Authors: Muhammad Yousaf Sadiq

Abstract:

The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. An quantitative survey based approach was adopted in this constructive study. A questionnaire-based survey was conducted for the assessment of construction Quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals of the leading construction organizations/companies of Pakistan construction industry were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. The quality perception was found to be project-scope-oriented and considered as an excess cost for a construction project. Any quality improvement technique was expected to maximize the profit for the employer, by improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

Keywords: construction quality, expectation, improvement, perception

Procedia PDF Downloads 445
6259 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 310
6258 Rapid Algorithm for GPS Signal Acquisition

Authors: Fabricio Costa Silva, Samuel Xavier de Souza

Abstract:

A Global Positioning System (GPS) receiver is responsible to determine position, velocity and timing information by using satellite information. To get this information are necessary to combine an incoming and a locally generated signal. The procedure called acquisition need to found two information, the frequency and phase of the incoming signal. This is very time consuming, so there are several techniques to reduces the computational complexity, but each of then put projects issues in conflict. I this papers we present a method that can reduce the computational complexity by reducing the search space and paralleling the search.

Keywords: GPS, acquisition, complexity, parallelism

Procedia PDF Downloads 506
6257 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 129
6256 Simulating the Interaction of Strategy Development and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Every organization develops a strategy that needs to be implemented and is undertaken through project delivery. In essence, project requirements should exactly replicate an organization’s strategy. In reality this does not happen, and behavioral factors deviate the project delivery from the strategic objectives. This occurs as project stakeholders can have competing objectives. Resultantly, requirements that are implemented through projects are less aligned to the strategy. This paper develops a game theoretic model to simulate why such deviations occur. That explains the difference between strategy development and implementation.

Keywords: strategy, simulation, project management, game theory

Procedia PDF Downloads 108
6255 Rapid Parallel Algorithm for GPS Signal Acquisition

Authors: Fabricio Costa Silva, Samuel Xavier de Souza

Abstract:

A Global Positioning System (GPS) receiver is responsible to determine position, velocity and timing information by using satellite information. To get this information's are necessary to combine an incoming and a locally generated signal. The procedure called acquisition need to found two information, the frequency and phase of the incoming signal. This is very time consuming, so there are several techniques to reduces the computational complexity, but each of then put projects issues in conflict. I this papers we present a method that can reduce the computational complexity by reducing the search space and paralleling the search.

Keywords: GPS, acquisition, low complexity, parallelism

Procedia PDF Downloads 458
6254 Contractual Complexity and Contract Parties' Opportunistic Behavior in Construction Projects: In a Contractual Function View

Authors: Mengxia Jin, Yongqiang Chen, Wenqian Wang, Yu Wang

Abstract:

The complexity and specificity of construction projects have made common opportunism phenomenon, and contractual governance for opportunism has been a topic of considerable ongoing research. Based on TCE, the research distinguishes control and coordination as different functions of the contract to investigate their complexity separately. And in a nuanced way, the dimensionality of contractual control is examined. Through the analysis of motivation and capability of strong or weak form opportunism, the framework focuses on the relationship between the complexity of above contractual dimensions and different types of opportunistic behavior and attempts to verify the possible explanatory mechanism. The explanatory power of the research model is evaluated in the light of empirical evidence from questionnaires. We collect data from Chinese companies in the construction industry, and the data collection is still in progress. The findings will speak to the debate surrounding the effects of contract complexity on opportunistic behavior. This nuanced research will derive implications for research on the role of contractual mechanisms in dealing with inter-organizational opportunism and offer suggestions for curbing contract parties’ opportunistic behavior in construction projects.

Keywords: contractual complexity, contractual control, contractual coordinatio, opportunistic behavior

Procedia PDF Downloads 361
6253 Machine Learning Approach to Project Control Threshold Reliability Evaluation

Authors: Y. Kim, H. Lee, M. Park, B. Lee

Abstract:

Planning is understood as the determination of what has to be performed, how, in which sequence, when, what resources are needed, and their cost within the organization before execution. In most construction project, it is evident that the inherent nature of planning is dynamic, and initial planning is subject to be changed due to various uncertain conditions of construction project. Planners take a continuous revision process during the course of a project and until the very end of project. However, current practice lacks reliable, systematic tool for setting variance thresholds to determine when and what corrective actions to be taken. Rather it is heavily dependent on the level of experience and knowledge of the planner. Thus, this paper introduces a machine learning approach to evaluate project control threshold reliability incorporating project-specific data and presents a method to automate the process. The results have shown that the model improves the efficiency and accuracy of the monitoring process as an early warning.

Keywords: machine learning, project control, project progress monitoring, schedule

Procedia PDF Downloads 225
6252 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: construction project, critical path, fuzzy network project, planning

Procedia PDF Downloads 111
6251 Analysis of Supply Chain Complexity Sub-Dimensions for Garment Industry

Authors: Niyanta Mehra, Aakriti Khurania, Kshitij Rastogi, S. K. Garg

Abstract:

There is plenty of literature available that accounts for complexity management in a supply chain. A major fraction of this literature considers a large number of parameters in order to devise management techniques. However, multiple such parameters do not directly affect the result, and incorporating these can make the analyses overly complicated. Most of the causes of supply chain inefficiencies are due to the interconnectedness and interdependencies in the structure, processes, and environment of the supply chains. The level of complexity varies across industries in terms of intensity and ease of management. After a review of the literature related to complexities in supply chains, the paper attempts to build a framework to study the relative significance of these complexities. This paper aims to identify critical complexities for the garment industry. Understanding and controlling these complexities open avenues for better supply chain management and also assist decision-makers in the garment industry in formulating risk mitigation strategies.

Keywords: complexity dimensions, garment industry, supply chain complexity, supply chain management

Procedia PDF Downloads 122
6250 Performance Complexity Measurement of Tightening Equipment Based on Kolmogorov Entropy

Authors: Guoliang Fan, Aiping Li, Xuemei Liu, Liyun Xu

Abstract:

The performance of the tightening equipment will decline with the working process in manufacturing system. The main manifestations are the randomness and discretization degree increasing of the tightening performance. To evaluate the degradation tendency of the tightening performance accurately, a complexity measurement approach based on Kolmogorov entropy is presented. At first, the states of performance index are divided for calibrating the discrete degree. Then the complexity measurement model based on Kolmogorov entropy is built. The model describes the performance degradation tendency of tightening equipment quantitatively. At last, a study case is applied for verifying the efficiency and validity of the approach. The research achievement shows that the presented complexity measurement can effectively evaluate the degradation tendency of the tightening equipment. It can provide theoretical basis for preventive maintenance and life prediction of equipment.

Keywords: complexity measurement, Kolmogorov entropy, manufacturing system, performance evaluation, tightening equipment

Procedia PDF Downloads 238
6249 Dilemmas of HRM in a Project-Oriented Organisation

Authors: Katarzyna Piwowar-Sulej

Abstract:

The functioning of a project-oriented organisation creates new and different, from the traditional ones, conditions for human resources management. In the analysed case HRM is primarily characterized by a double-track nature – on the one hand within the framework of permanent structures (departments) and, on the other, within the area of particular projects. The purpose of the article is to present the dilemmas associated with the development of selected HRM areas in project-oriented organisations. Theoretical discussion was supplemented by the results of empirical research.

Keywords: human resources management, tracks of HRM, project, project-oriented organisation

Procedia PDF Downloads 243
6248 Analysis of Particle Reinforced Metal Matrix Composite Crankshaft

Authors: R. S. Vikaash, S. Vinodh, T. S. Sai Prashanth

Abstract:

Six sigma is a defect reduction strategy enabling modern organizations to achieve business prosperity. The practitioners are in need to select best six sigma project among the available alternatives to achieve customer satisfaction. In this circumstance, this article presents a study in which six sigma project selection is formulated as Multi-Criteria Decision-Making(MCDM) problem and the best project has been found using AHP. Five main governing criteria and 14 sub criteria are being formulated. The decision maker’s inputs were gathered and computations were performed. The project with the high values from the set of projects is selected as the best project. Based on calculations, Project “P1”is found to be the best and further deployment actions have been undertaken in the organization.

Keywords: six Sigma, project selection, MCDM, analytic hierarchy process, business prosperity

Procedia PDF Downloads 322
6247 An Introduction to Critical Chain Project Management Methodology

Authors: Ranjini Ramanath, Nanjunda P. Swamy

Abstract:

Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.

Keywords: critical chain project management methodology, critical chain, project management, construction management

Procedia PDF Downloads 397
6246 A Study on How to Improve PMBOK (Project Management Body of Knowledge) Guidelines Performance by Simulation

Authors: Fatemeh Jaferi, Moslem Parsa, Seyed Mehdi Sajadi

Abstract:

The project-oriented organizations are more appropriate for sustainable environments. Any effective project-oriented organization should institutionalize its project management processes in such a manner to yield the greatest possible profits. The aim of this paper is to study the relationship between the project management PMBOK guideline (Project Management Body of Knowledge) and simulation technology in project-oriented organizations. The methodology involves using five steps for applying these two tools aimed at enhancing project management processes in the Lorestan Gas Corporation, as one of the project-oriented organization. Results show the implementation of such management approach leads to a 5% performance improvement and using PMBOK can be instrumental in effective delay management. The implementation of the aforementioned improvement package was effective in improving the efficiency of organizational processes; in terms of optimizing the resource utilization that has manifested itself in resource losses and cost reductions.

Keywords: project-orientation, processes, PMBOK, optimization, organization, management

Procedia PDF Downloads 374
6245 Role of Leadership in Project Management

Authors: Miriam Filipová, Peter Balco

Abstract:

At present, in Slovak and Czech Republic, the education within the field of Project Management is carried out either within the higher education or via commercial entities, whilst the most used contents are the commonly used methodologies of project management. Obtaining a diploma after completing a university degree or a training certificate does not automatically mean the success of the project or the success of the project manager. The importance of leadership and soft skills in project management is either not included at all within the training of project managers, or it is only partially reflected. From the methodology perspective, the most important things during the preparation and management of the projects are preparation of the project plan, resource planning, and project realization in accordance with the chosen methodology. However, the key element on which the success of the project depends on are the people – whether they are team members on the supplier's side, the stakeholders, or the end users. This research focuses on the real needs of working project managers, on the development of their strengths, expertise, skills, and knowledge regarding leadership and soft skills. At the same time, it looks into identifying the elements that they consider to be key to the success of the projects they have managed and successfully delivered. The result of this research is the input for creating recommendations for a comprehensive education of project managers in the field of leadership and soft skills.

Keywords: project management, leadership, soft skills, education, academic degree, certificates, skills, talents, knowledge

Procedia PDF Downloads 134
6244 Models, Resources and Activities of Project Scheduling Problems

Authors: Jorge A. Ruiz-Vanoye, Ocotlán Díaz-Parra, Alejandro Fuentes-Penna, José J. Hernández-Flores, Edith Olaco Garcia

Abstract:

The Project Scheduling Problem (PSP) is a generic name given to a whole class of problems in which the best form, time, resources and costs for project scheduling are necessary. The PSP is an application area related to the project management. This paper aims at being a guide to understand PSP by presenting a survey of the general parameters of PSP: the Resources (those elements that realize the activities of a project), and the Activities (set of operations or own tasks of a person or organization); the mathematical models of the main variants of PSP and the algorithms used to solve the variants of the PSP. The project scheduling is an important task in project management. This paper contains mathematical models, resources, activities, and algorithms of project scheduling problems. The project scheduling problem has attracted researchers of the automotive industry, steel manufacturer, medical research, pharmaceutical research, telecommunication, industry, aviation industry, development of the software, manufacturing management, innovation and technology management, construction industry, government project management, financial services, machine scheduling, transportation management, and others. The project managers need to finish a project with the minimum cost and the maximum quality.

Keywords: PSP, Combinatorial Optimization Problems, Project Management; Manufacturing Management, Technology Management.

Procedia PDF Downloads 391
6243 The Egyptian eGovernment Journey

Authors: Ali Abdelsattar Elshabrawy

Abstract:

The Egyptian government is struggling to build it's eGovernment project. They succeeded to build the Egyptian digital portal, which contain links for number of services provided by different ministries. For achieving such success, their are requirements necessary to build such a project such as: internet dissemination, IT literacy, Strategy, disqualification of paper based services. This paper is going to clarify the main obstacles to the Egyptian eGovernment project from both the supply and demand sides. Also will clarify the most critical requirements in this phase of the project lifecycle. This paper should be in great value for the project team and also for many other developing countries that share the same obstacles.

Keywords: the egyptian egovernment project lifecycle, supply side barriers, demand side barriers, egovernment project requirements

Procedia PDF Downloads 125
6242 A Case Study of Al-Shifa: A Healthcare Information System in Oman

Authors: Khamis Al-Gharbi, Said M. Gattoufi, Ali H. Al-Badi, Ali Al-Hashmi

Abstract:

The case study presents the progression of a project management of Al-Shifa, a healthcare information system in Oman. The case study describes the evolution of the implementation of a healthcare information system tailored to meet the needs of the healthcare units under the supervision of the Ministry of Health (MOH) in Oman. A focus group methodology was used for collecting the relevant information from the main project's stakeholders. In addition reports about the project made available for the researchers. The case analysis is made based on the Project Management approach developed by the Project Management Institute (PMI). The main finding that there was no formal project management approach adopted by the MOH for the development and implementation of the herewith mentioned healthcare information system project. Furthermore, the project had suffered a scope creep in terms of features, cost and time-schedule. The recommendations of the authors, for the rescue of the project from its current dilemma, consist of technological, administrative and human resources development actions.

Keywords: project management, information system, healthcare, Al-Shifa, Oman

Procedia PDF Downloads 363
6241 Identifying Chaotic Architecture: Origins of Nonlinear Design Theory

Authors: Mohammadsadegh Zanganehfar

Abstract:

Since the modernism, movement, and appearance of modern architecture, an aggressive desire for a general design theory in the theoretical works of architects in the form of books and essays emerges. Since Robert Venturi and Denise Scott Brown’s published complexity and contradiction in architecture in 1966, the discourse of complexity and volumetric composition has been an important and controversial issue in the discipline. Ever since various theories and essays were involved in this discourse, this paper attempt to identify chaos theory as a scientific model of complexity and its relation to architecture design theory by conducting a qualitative analysis and multidisciplinary critical approach through architecture and basic sciences resources. As a result, we identify chaotic architecture as the correlation of chaos theory and architecture as an independent nonlinear design theory with specific characteristics and properties.

Keywords: architecture complexity, chaos theory, fractals, nonlinear dynamic systems, nonlinear ontology

Procedia PDF Downloads 346
6240 A Subband BSS Structure with Reduced Complexity and Fast Convergence

Authors: Salah Al-Din I. Badran, Samad Ahmadi, Ismail Shahin

Abstract:

A blind source separation method is proposed; in this method, we use a non-uniform filter bank and a novel normalisation. This method provides a reduced computational complexity and increased convergence speed comparing to the full-band algorithm. Recently, adaptive sub-band scheme has been recommended to solve two problems: reduction of computational complexity and increase the convergence speed of the adaptive algorithm for correlated input signals. In this work, the reduction in computational complexity is achieved with the use of adaptive filters of orders less than the full-band adaptive filters, which operate at a sampling rate lower than the sampling rate of the input signal. The decomposed signals by analysis bank filter are less correlated in each subband than the input signal at full bandwidth, and can promote better rates of convergence.

Keywords: blind source separation, computational complexity, subband, convergence speed, mixture

Procedia PDF Downloads 554
6239 GIS Based Project Management Information System for Infrastructure Projects

Authors: Riki Panchal, Debasis Sarkar

Abstract:

This paper describes the work done for the GIS-based project management for different infrastructure projects. It is a review paper which gives the idea of the trends in the construction project management and various models adopted for the betterment of the project planning and execution. Traditional scheduling and progress control techniques such as bar charts and the critical path method fail to provide information pertaining to the spatial aspects of a construction project. An integrated system was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. Hence, it is suggested to work on the common platform from where all the data can be shared and analyzed.

Keywords: GIS, project management, integrated model, infrastructure project

Procedia PDF Downloads 485
6238 A Model Approach of Good Practice Based on the Project Management Body of Knowledge® Guide in the Project Owner

Authors: Claudia Marcela Munoz Gonzalez, Diego Fernando Hernandez Losada, Hugo Alberto Herrera Fonseca

Abstract:

The project owner's role in the public-private investment consists of controlling and verifying the correct execution of the project's objectives and resources. Likewise, it is a discipline little explored in the academic field, whereby this work wishes to contribute with a model of good practices based on the project management methodology proposed by the Project Management Body of Knowledge® Guide. In the same way, highlight what are the controls that an integral project owner should take into account in its exercise and application, through the stages in which its contract runs. This proposal aims to structure its practice and integrate its functions according to a project management methodology. In addition, these practices will be applied in a case study of projects in the agricultural sector, particularly in the construction of irrigation district in Cundinamarca, Colombia.

Keywords: controls, construction of irrigation district, PMBOK®, project owner

Procedia PDF Downloads 430
6237 Infrastructure Project Management and Implementation: A Case Study Of the Mokolo-Crocodile Water Augmentation Project in South Africa

Authors: Elkington Sibusiso Mnguni

Abstract:

The Mokolo-Crocodile Water Augmentation Project (MCWAP) is located in the Limpopo Province in the northern-western part of South Africa. Its purpose is to increase water supply by 30 million cubic meters per year to meet current and future demand for users, including power stations, mining houses, and the local municipality in the Lephalale area. This paper documents the planning and implementation aspects of the MCWAP infrastructure project. The study will add to the body of knowledge with respect to bulk water infrastructure development in water-scarce regions. The method used to gather and collate relevant data and information was the desktop study. The key finding was that the project was successfully completed in 2015 using conventional project management and construction methods. The project is currently being operated and maintained by the National Department of Water and Sanitation.

Keywords: construction, contract management, infrastructure project, project management

Procedia PDF Downloads 272
6236 Perception of Value Creation in the Project-Based Organization: Results of an Exploratory Study

Authors: Sara El Hadri, Hemmi Mohamed

Abstract:

The issues of value creation and project-based organization have been examined separately by several studies, but few studies have combined value creation and project-based organization. To this end, this study seeks to provide an answer to the question of how project-based organizations perceive the notion of value and value creation. Opting for an exploratory analysis, a qualitative study was carried out within an industrial company organized on a project basis. The results of this study show that the concepts of value and value creation remain, from the point of view of the various players, vast and refer, in the majority of cases, to the notion of performance.

Keywords: exploratory analysis, project-based organization, value creation, organisational value

Procedia PDF Downloads 7
6235 Incentivize Contracting Partners of Public Projects

Authors: Sai On Cheung, Qiuwen Ma, Fong Chung Lee

Abstract:

Due to increased project complexity and technological advancement in the last decade, the designers and contractors are expected to put more efforts to achieve project goals. To render extra efforts from the agents, incentivization has become one of the primary strategies for the client. Despite increased academia interest in the design of incentive strategies, there is still a need for discussion about the underlying motivations and favourable conditions to make incentives effective. Therefore, this study focuses on the effects of motivations and favourable conditions for the use of incentives in public projects. Questionnaire survey is used as the data collection tool. The questionnaire survey was piloted through interviews with professionals from Hong Kong public sector. A total of 100 responses were collected for this survey. Accountability and organizational effectiveness were found to be the prime objectives of incentives installed by public clients. Furthermore, a list of favourable conditions for incentivization and its consequent effects on cost, schedule, risk and public opinions were identified. To conclude, this study analyses the means and ends of the use of incentives in public projects in Hong Kong.

Keywords: incentives, public accountability, project effectiveness, public opinions

Procedia PDF Downloads 36
6234 Classification of Construction Projects

Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside

Abstract:

To address construction project requirements and specifications, scholars and practitioners need to establish a taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.

Keywords: project classification, project definition rating index (PDRI), risk, project goals alignment

Procedia PDF Downloads 653
6233 Team Cognitive Heterogeneity and Strategic Decision-Making Flexibility: The Role of Transactive Memory System and Task Complexity

Authors: Rui Xing, Baolin Ye, Nan Zhou, Guohong Wang

Abstract:

Drawing upon a perspective of cognitive interaction, this study explores the relationship between team cognitive heterogeneity and team strategic decision-making flexibility, treating the transactive memory system as a mediator and task complexity as a moderator. The hypotheses were tested in linear regression models by using data gathered from 67 strategic decision-making teams in the new-energy vehicle industry. It is found that team cognitive heterogeneity has a positive impact on strategic decision-making flexibility through the mediation of specialization and coordination of the transactive memory system, which is positively moderated by task complexity.

Keywords: strategic decision-making flexibility, team cognitive heterogeneity, transactive memory system, task complexity

Procedia PDF Downloads 45
6232 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 623
6231 Agile Project Management: A Real Application in a Multi-Project Research and Development Center

Authors: Aysegul Sarac

Abstract:

The aim of this study is to analyze the impacts of integrating agile development principles and practices, in particular to reduce project lead time in a multi-project environment. We analyze Arçelik Washing Machine R&D Center in which multiple projects are conducted by shared resources. In the first part of the study, we illustrate the current waterfall model system by using a value stream map. We define all activities starting from the first idea of the project to the customer and measure process time and lead time of projects. In the second part of the study we estimate potential improvements and select a set of these improvements to integrate agile principles. We aim to develop a future state map and analyze the impacts of integrating lean principles on project lead time. The main contribution of this study is that we analyze and integrate agile product development principles in a real multi-project system.

Keywords: agile project management, multi project system, project lead time, product development

Procedia PDF Downloads 278