13985 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U. A. E.

Authors: Firas Mohamad Al-Sabek

Abstract:

The Purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.

Keywords: construction project, total quality management, management commitment, cost, theoretical framework

Procedia PDF Downloads 398
13984 The Robot Physician's (Rp-7) Management and Care in Unstable Oncology Patients

Authors: Alisher Agzamov, Hanan Al Harbi

Abstract:

BACKGROUND: The timely assessment and treatment of ICU Surgical and Medical Oncology patients is important for Oncology surgeons and Medical Oncologists and Intensivists (1). We hypothesized that the use of Robot Physician’s (RP - 7) ICU management and care in ICU can improve ICU physician rapid response to unstable ICU Oncology patients. METHODS: This is a prospective study of 1501 oncology patients using a before-after, cohort-control design to test the effectiveness of RP. We have used RP to make multidisciplinary ICU rounds in the ICU and for Emergency cases. Data concerning several aspects of the RP interaction, including the latency of the response, the problem being treated, the intervention that was ordered, and the type of information gathered using the RP, were documented. The effect of RP on ICU length of stay and cost was assessed. RESULTS: The use of RP was associated with a reduction in latency of attending physician face-to-face response for routine and urgent pages compared to conventional care (RP: 10.2 +/- 3.3 minutes vs conventional: 210 +/- 40 minutes). The response latencies to Oncology Emergency (8.0 +/- 2.8 vs 140 +/- 35 minutes) and for Respiratory Failure (12 +/- 04 vs 110 +/- 45 minutes) were reduced (P < .001), as was the LOS for oncology patients (5 days) and ARDS (10 day). There was an increase in ICU occupancy by 29 % compared with the prerobot era, and there was an ICU cost savings of KD2.2 million attributable to the use of RP. CONCLUSION: The use of RP enabled rapid face-to-face ICU Intensivist - physician response to unstable ICU Oncology patients and resulted in decreased ICU cost and LOS.

Keywords: robot physician, oncology patients, icu management and care, cost and icu occupancy

Procedia PDF Downloads 43
13983 Analysis of Resource Consumption Accounting as a New Approach to Management Accounting

Authors: Yousef Rostami Gharainy

Abstract:

This paper presents resource consumption accounting as an imaginative way to deal with management accounting which concentrates on administrators as the essential clients of the data and gives the best information of conventional management accounting. This system underscores that association's asset reasons costs, accordingly in costing frameworks the emphasis ought to be on assets and utilization of them. Resource consumption accounting consolidates two costing methodologies, action based and German cost accounting method known as GPK. This methodology notwithstanding giving a chance to managers to decide, makes task management accounting as operational. The reason for this article is to clarify the idea of resource consumption accounting, its parts and highlights and use of this strategy in associations. In the first place we deliver to presentation of resource consumption accounting, foundation, reasons for its development and the issues that past costing frameworks confronted it. At that point we give standards and presumptions of this technique; at last we depict the execution of this strategy in associations and its preferences over other costing strategies.

Keywords: resource consumption accounting, management accounting, action based method, German cost accounting method

Procedia PDF Downloads 280
13982 The Impact of Quality Cost on Revenue Sharing in Supply Chain Management

Authors: Fayza M. Obied-Allah

Abstract:

Customer’ needs, quality, and value creation while reducing costs through supply chain management provides challenges and opportunities for companies and researchers. In the light of these challenges, modern ideas must contribute to counter these challenges and exploit opportunities. Perhaps this paper will be one of these contributions. This paper discusses the impact of the quality cost on revenue sharing as a most important incentive to configure business networks. No doubt that the costs directly affect the size of income generated by a business network, so this paper investigates the impact of quality costs on business networks revenue, and their impact on the decision to participate the revenue among the companies in the supply chain. This paper develops the quality cost approach to align with the modern era, the developed model includes five categories besides the well-known four categories (namely prevention costs, appraisal costs, internal failure costs, and external failure costs), a new category has been developed in this research as a new vision of the relationship between quality costs and innovations of industry. This new category is Recycle Cost. This paper is organized into six sections, Section I shows quality costs overview in the supply chain. Section II discusses revenue sharing between the parties in supply chain. Section III investigates the impact of quality costs in revenue sharing decision between partners in supply chain. The fourth section includes survey study and presents statistical results. Section V discusses the results and shows future opportunities for research. Finally, Section VI summarizes the theoretical and practical results of this paper.

Keywords: quality cost, recycle cost, revenue sharing, supply chain management

Procedia PDF Downloads 415
13981 Clarification of the Essential of Life Cycle Cost upon Decision-Making Process: An Empirical Study in Building Projects

Authors: Ayedh Alqahtani, Andrew Whyte

Abstract:

Life Cycle Cost (LCC) is one of the goals and key pillars of the construction management science because it comprises many of the functions and processes necessary, which assist organisations and agencies to achieve their goals. It has therefore become important to design and control assets during their whole life cycle, from the design and planning phase through to disposal phase. LCCA is aimed to improve the decision making system in the ownership of assets by taking into account all the cost elements including to the asset throughout its life. Current application of LCC approach is impractical during misunderstanding of the advantages of LCC. This main objective of this research is to show a different relationship between capital cost and long-term running costs. One hundred and thirty eight actual building projects in United Kingdom (UK) were used in order to achieve and measure the above-mentioned objective of the study. The result shown that LCC is one of the most significant tools should be considered on the decision making process.

Keywords: building projects, capital cost, life cycle cost, maintenance costs, operation costs

Procedia PDF Downloads 523
13980 A Comparative Analysis of Solid Waste Treatment Technologies on Cost and Environmental Basis

Authors: Nesli Aydin

Abstract:

Waste management decision making in developing countries has moved towards being more pragmatic, transparent, sustainable and comprehensive. Turkey is required to make its waste related legislation compatible with European Legislation as it is a candidate country of the European Union. Improper Turkish practices such as open burning and open dumping practices must be abandoned urgently, and robust waste management systems have to be structured. The determination of an optimum waste management system in any region requires a comprehensive analysis in which many criteria are taken into account by stakeholders. In conducting this sort of analysis, there are two main criteria which are evaluated by waste management analysts; economic viability and environmentally friendliness. From an analytical point of view, a central characteristic of sustainable development is an economic-ecological integration. It is predicted that building a robust waste management system will need significant effort and cooperation between the stakeholders in developing countries such as Turkey. In this regard, this study aims to provide data regarding the cost and environmental burdens of waste treatment technologies such as an incinerator, an autoclave (with different capacities), a hydroclave and a microwave coupled with updated information on calculation methods, and a framework for comparing any proposed scenario performances on a cost and environmental basis.

Keywords: decision making, economic viability, environmentally friendliness, waste management systems

Procedia PDF Downloads 280
13979 The Impact of Bim Technology on the Whole Process Cost Management of Civil Engineering Projects in Kenya

Authors: Nsimbe Allan

Abstract:

The study examines the impact of Building Information Modeling (BIM) on the cost management of engineering projects, focusing specifically on the Mombasa Port Area Development Project. The objective of this research venture is to determine the mechanisms through which Building Information Modeling (BIM) facilitates stakeholder collaboration, reduces construction-related expenses, and enhances the precision of cost estimation. Furthermore, the study investigates barriers to execution, assesses the impact on the project's transparency, and suggests approaches to maximize resource utilization. The study, selected for its practical significance and intricate nature, conducted a Systematic Literature Review (SLR) using credible databases, including ScienceDirect and IEEE Xplore. To constitute the diverse sample, 69 individuals, including project managers, cost estimators, and BIM administrators, were selected via stratified random sampling. The data were obtained using a mixed-methods approach, which prioritized ethical considerations. SPSS and Microsoft Excel were applied to the analysis. The research emphasizes the crucial role that project managers, architects, and engineers play in the decision-making process (47% of respondents). Furthermore, a significant improvement in cost estimation accuracy was reported by 70% of the participants. It was found that the implementation of BIM resulted in enhanced project visibility, which in turn optimized resource allocation and facilitated the process of budgeting. In brief, the study highlights the positive impacts of Building Information Modeling (BIM) on collaborative decision-making and cost estimation, addresses challenges related to implementation, and provides solutions for the efficient assimilation and understanding of BIM principles.

Keywords: cost management, resource utilization, stakeholder collaboration, project transparency

Procedia PDF Downloads 28
13978 Cost Based Analysis of Risk Stratification Tool for Prediction and Management of High Risk Choledocholithiasis Patients

Authors: Shreya Saxena

Abstract:

Background: Choledocholithiasis is a common complication of gallstone disease. Risk scoring systems exist to guide the need for further imaging or endoscopy in managing choledocholithiasis. We completed an audit to review the American Society for Gastrointestinal Endoscopy (ASGE) scoring system for prediction and management of choledocholithiasis against the current practice at a tertiary hospital to assess its utility in resource optimisation. We have now conducted a cost focused sub-analysis on patients categorized high-risk for choledocholithiasis according to the guidelines to determine any associated cost benefits. Method: Data collection from our prior audit was used to retrospectively identify thirteen patients considered high-risk for choledocholithiasis. Their ongoing management was mapped against the guidelines. Individual costs for the key investigations were obtained from our hospital financial data. Total cost for the different management pathways identified in clinical practice were calculated and compared against predicted costs associated with recommendations in the guidelines. We excluded the cost of laparoscopic cholecystectomy and considered a set figure for per day hospital admission related expenses. Results: Based on our previous audit data, we identified a77% positive predictive value for the ASGE risk stratification tool to determine patients at high-risk of choledocholithiasis. 47% (6/13) had an magnetic resonance cholangiopancreatography (MRCP) prior to endoscopic retrograde cholangiopancreatography (ERCP), whilst 53% (7/13) went straight for ERCP. The average length of stay in the hospital was 7 days, with an additional day and cost of £328.00 (£117 for ERCP) for patients awaiting an MRCP prior to ERCP. Per day hospital admission was valued at £838.69. When calculating total cost, we assumed all patients had admission bloods and ultrasound done as the gold standard. In doing an MRCP prior to ERCP, there was a 130% increase in cost incurred (£580.04 vs £252.04) per patient. When also considering hospital admission and the average length of stay, it was an additional £1166.69 per patient. We then calculated the exact costs incurred by the department, over a three-month period, for all patients, for key investigations or procedures done in the management of choledocholithiasis. This was compared to an estimate cost derived from the recommended pathways in the ASGE guidelines. Overall, 81% (£2048.45) saving was associated with following the guidelines compared to clinical practice. Conclusion: MRCP is the most expensive test associated with the diagnosis and management of choledocholithiasis. The ASGE guidelines recommend endoscopy without an MRCP in patients stratified as high-risk for choledocholithiasis. Our audit that focused on assessing the utility of the ASGE risk scoring system showed it to be relatively reliable for identifying high-risk patients. Our cost analysis has shown significant cost savings per patient and when considering the average length of stay associated with direct endoscopy rather than an additional MRCP. Part of this is also because of an increased average length of stay associated with waiting for an MRCP. The above data supports the ASGE guidelines for the management of high-risk for choledocholithiasis patients from a cost perspective. The only caveat is our small data set that may impact the validity of our average length of hospital stay figures and hence total cost calculations.

Keywords: cost-analysis, choledocholithiasis, risk stratification tool, general surgery

Procedia PDF Downloads 74
13977 A Cost-Evaluation Study on the Use of Negative Pressure Wound Therapy with Instillation for Salvage of Infected Implant-Based Breast Reconstructions

Authors: S. Haque, M. Kanapathy, E. Bollen, I. Younis, A. Mosahebi

Abstract:

Background: Implant loss due to infection is the most devastating complication of implant-based breast reconstruction. The use of negative pressure wound therapy with instillation (NPWTi) for salvage of infected implant-based breast reconstructions has shown promising results to allow early reinsertion of a new implant as an alternative to current management of delayed reinsertion. This study compares the cost implication of NPWTi against current management of delayed reinsertion of infected breast implants. Methods: 20 cases of an infected breast implant treated with NPWTi (V.A.C. VERAFLO™ Therapy) followed by early re-insertion of a new implant were compared with 20 cases who had delayed reinsertion (non-NPWTi). Average cost per person was calculated using total operative expenses, cost of inpatient stay, cost of investigations, cost of antibiotics, and cost of outpatient visits. Results: Treatment with NPWTi allowed for earlier re-insertion of a new implant (NPWTi: 9.04 ± 2.92 days vs. non-NPWTi: 236.25 ± 123.89 days). The average cost per patient for NPWTi and non-NPWTi was £14,343.13 ± £2,786.70 and £8,920.31 ± £3,005.73 respectively. All patients treated with NPWTi had one admission and spent 11.9 ± 4.1days as an inpatient while non-NPWTi patients had 2.1 ± 0.3 admissions with total length of inpatient stay of 7.1 ± 5.8days. Patients treated with NPWTi had more surgeries (NPWTi: 3.35 ± 0.81 vs. non-NPWTi: 2.2 ± 0.41), however 3 non-NPWTi cases required flap reconstruction. Patients treated with NPWTi had fewer total outpatient visits (NPWTi: 12 ± 6 vs. non-NPWTi: 14.2 ± 6.3). Conclusion: Patients treated with NPWTi incurred higher average cost per patient, longer inpatient stay, and more procedures; however, had early re-insertion of new implants and fewer admissions and outpatient visits. A further study on patient-reported outcome is essential to compare cost against patient benefit.

Keywords: breast reconstruction, cost evaluation, infection, negative pressure wound therapy

Procedia PDF Downloads 93
13976 Studying the Effects of Conditional Conservatism and Lack of Information Asymmetry on the Cost of Capital of the Accepted Companies in Tehran Stock Exchange

Authors: Fayaz Moosavi, Saeid Moradyfard

Abstract:

One of the methods in avoiding management fraud and increasing the quality of financial information, is the notification of qualitative features of financial information, including conservatism characteristic. Although taking a conservatism approach, while boosting the quality of financial information, is able to reduce the informational risk and the cost of capital stock of commercial department, by presenting an improper image about the situation of the commercial department, raises the risk of failure in returning the main and capital interest, and consequently the cost of capital of the commercial department. In order to know if conservatism finally leads to the increase or decrease of the cost of capital or does not have any influence on it, information regarding accepted companies in Tehran stock exchange is utilized by application of pooling method from 2007 to 2012 and it included 124 companies. The results of the study revealed that there is an opposite and meaningful relationship between conditional conservatism and the cost of capital of the company. In other words, if bad and unsuitable news and signs are reflected sooner than good news in accounting profit, the cost of capital of the company increases. In addition, there is a positive and meaningful relationship between the cost of capital and lack of information asymmetry.

Keywords: conditional conservatism, lack of information asymmetry, the cost of capital, stock exchange

Procedia PDF Downloads 231
13975 Integrated Clean Development Mechanism and Risk Management Approach for Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Clean development mechanism (CDM) can act as an effective instrument for mitigating climate change. This mechanism can effectively reduce the emission of CO2 and other green house gases (GHG). Construction of a mega infrastructure project like underground corridor construction for metro rail operation involves in consumption of substantial quantity of concrete which consumes huge quantity of energy consuming materials like cement and steel. This paper is an attempt to develop an integrated clean development mechanism and risk management approach for sustainable development for an underground corridor metro rail project in India during its construction phase. It was observed that about 35% reduction in CO2 emission can be obtained by adding fly ash as a part replacement of cement. The reduced emission quantity of CO2 which is of the quantum of about 21,646.36 MT would result in cost savings of approximately INR 8.5 million (USD 1,29,878).But construction and operation of such infrastructure projects of the present era are subject to huge risks and uncertainties throughout all the phases of the project, thus reducing the probability of successful completion of the project within stipulated time and cost frame. Thus, an integrated approach of combining CDM with risk management would enable the metro rail authorities to develop a sustainable risk mitigation measure framework to ensure more cost and energy savings and lesser time and cost over-run.

Keywords: clean development mechanism (CDM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 450
13974 Role of Senior Management in Implementing Lean Manufacturing Practices: A Study of Manufacturing Companies of Pakistan

Authors: Saima Yaqoob

Abstract:

Due to advancement in technologies and cutting cost competition, especially in manufacturing business, organizations are now becoming more focused toward achieving exceptional quality standards with low manufacturing cost. In this concern, many process improvement strategies are becoming popular in the way of increasing productivity and output. Lean manufacturing principles are among one of them, increasingly used for improving productivity by reducing wastages. Many success factors are involved in lean implementation. But, the role of senior management is most important in developing the lean culture in an organization. Purpose of this study is to investigate the perception of executive level management related to the successful implementation of lean practices and its comparison with the existing practices in the organization. In order to collect data, survey questionnaire comprised of eight statements rendering the critical success factors were sent to the top management of fifty (50) automotive manufacturing companies of Karachi. After analyzing their feedbacks, the trend of lean manufacturing principles and the commitment of senior management toward its implementation was identified in the manufacturing industries of Karachi, Pakistan.

Keywords: lean manufacturing, process improvement, senior management, perception, involvement, waste reduction

Procedia PDF Downloads 165
13973 Activity-Based Costing of Medical Intensive Care Unit 240

Authors: Suppawan Lertpongpakpoom, Anongnat Boonrat, Kunya BoontummoSuppawan

Abstract:

This descriptive cost analysis aimed to analyze the unit cost of patients in medical intensive care unit. Purposive sampling was used to select 20 nurses, 6 practical nurses, 5 nurses aid and select samples 30 patients. Data were collected from both primary source (activity and average time of nursing care) and secondary source Z bill of payment and patient record). Instruments were cost recording form, activity observation form, and service recording form. Content validity of all instruments were evaluated by three experts (CVI = 0.87). Descriptive statistics was employed for data analysis. The results of the Activity-Based Costing Analysis showed that total activity cost of 4 service types for the patients was 14,776.92 Bath. The highest cost was nursing record was 5,674.78 Bath, followed direct nursing activity was 5,176.18 Bath, medical treatment was 1,976.6 Bath. The lowest cost was management activity was 1,003.64 Bath per visit. The result suggested that Activity-Base Costing Analysis could be applied to give better understanding of cost structure, enabling better consideration wasted expense and non-value-added activity, and improvement of effective utilization.

Keywords: activity-based costing, medical intensive care, nursing care, cost analysis

Procedia PDF Downloads 373
13972 Perception of TQM Implementation and Perceived Cost of Poor Quality: A Case Study of Local Automotive Company’s Supplier

Authors: Fakhruddin Esa, Yusri Yusof

Abstract:

The confirmatory of Total Quality Management (TQM) implementation is most vital in quality management. This paper focuses on employees' perceptions towards TQM implementation in a local automotive company supplier. The objectives of this study are first and foremost to determine the perception of TQM implementation among the staff, and secondly to ascertain the correlation between the variables, and lastly to identify the relative influence of the 10 TQM variables on the cost of poor quality (COPQ). The TQM implementation is perceived to be moderate. All correlation is found to be significant and five variables having positively moderate to high correlation. Out of 10 variables, quality system improvement, reward and recognition and customer focus influence the perceived COPQ. This study extended a discussion on these three variables contribution to TQM in general and the human resource development in the organization. A significant recommendation to lowering costs of internal error, such as trouble shooting and scraps are also discussed. Certain components of further research that would add value to this study have also been suggested and perhaps could be implemented at policy-level initiatives.

Keywords: cost of poor quality (COPQ), correlation, total quality management (TQM), variables

Procedia PDF Downloads 188
13971 A Study of Farming Earthworms Commercial with Organic Waste

Authors: Phrutsaya Piyanusorn

Abstract:

This study aimed to study the artificial barriers and potential restrictions. Aspects of farming, marketing and cost oriented commercial farming earthworms with organic waste. To promote the use of waste recycling and reduce the amount of organic waste that must be disposed. And to create added value this research focuses on qualitative and quantitative research. By earthworm farms surveyed collected insights to analyse the strengths, weaknesses, including problems, conditions and limitations. To get more updates, which covers the cost of marketing and farm management.

Keywords: farmin earthworms, commercial, organic waste, marketing management

Procedia PDF Downloads 297
13970 Optimal Replacement Period for a One-Unit System with Double Repair Cost Limits

Authors: Min-Tsai Lai, Taqwa Hariguna

Abstract:

This paper presents a periodical replacement model for a system, considering the concept of single and cumulative repair cost limits simultaneously. The failures are divided into two types. Minor failure can be corrected by minimal repair and serious failure makes the system breakdown completely. When a minor failure occurs, if the repair cost is less than a single repair cost limit L1 and the accumulated repair cost is less than a cumulative repair cost limit L2, then minimal repair is executed, otherwise, the system is preventively replaced. The system is also replaced at time T or at serious failure. The optimal period T minimizing the long-run expected cost per unit time is verified to be finite and unique under some specific conditions.

Keywords: repair-cost limit, cumulative repair-cost limit, minimal repair, periodical replacement policy

Procedia PDF Downloads 336
13969 The Effects of Cost-Sharing Contracts on the Costs and Operations of E-Commerce Supply Chains

Authors: Sahani Rathnasiri, Pritee Ray, Sardar M. N. Isalm, Carlos A. Vega-Mejia

Abstract:

This study develops a cooperative game theory-based cost-sharing contract model for a business to consumer (B2C) e-commerce supply chain to minimize the overall supply chain costs and the individual costs within an information asymmetry scenario. The objective of this study is to address the issues of strategic interactions among the key players of the e-commerce supply chain operation, which impedes the optimal operational outcomes. Game theory has been included in the field of supply chain management to resolve strategic decision-making issues; however, most of the studies are limited only to two-echelons of the supply chains. Multi-echelon supply chain optimizations based on game-theoretic models are less explored in the previous literature. This study adopts a cooperative game model to focus on the common payoff of operations and addresses the issues of information asymmetry and coordination of a three-echelon e-commerce supply chain. The cost-sharing contract model integrates operational features such as production, inventory management and distribution with the contract related constraints. The outcomes of the model highlight the importance of maintaining lower operational costs by all players to obtain benefits from the cost-sharing contract. Further, the cost-sharing contract ensures true cost revelation, and hence eliminates the information asymmetry issues among the players. Comparing the results of the contract model with the de-centralized e-commerce supply chain operation further emphasizes that the cost-sharing contract derives Pareto-improved outcomes and minimizes the costs of overall e-commerce supply chain operation.

Keywords: cooperative game theory, cost-sharing contract, e-commerce supply chain, information asymmetry

Procedia PDF Downloads 96
13968 Faults in the Projects, Deviation in the Cost

Authors: S. Ahmed, P. Dlask, B. Hasan

Abstract:

There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.

Keywords: construction projects, building, cost, estimating costs, delay, overrun

Procedia PDF Downloads 265
13967 Utilizing IoT for Waste Collection: A Review of Technologies for Eco-Friendly Waste Management

Authors: Fatemehsadat Mousaviabarbekouh

Abstract:

Population growth and changing consumption patterns have led to waste management becoming a significant global challenge. With projections indicating that nearly 67% of the Earth's population will live in megacities by 2050, there is a pressing need for smart solutions to address citizens' demands. Waste collection, facilitated by the Internet of Things (IoT), offers an efficient and cost-effective approach. This study aims to review the utilization of IoT for waste collection and explore technologies that promote eco-friendly waste management. The research focuses on information and communication technologies (ICTs), including spatial, identification, acquisition, and data communication technologies. Additionally, the study examines various energy harvesting technologies to further reduce costs. The findings indicate that the application of these technologies can lead to significant cost savings, energy efficiency, and ultimately reshape the future of waste management.

Keywords: waste collection, IoT, smart cities, eco-friendly, information and communication technologies, energy harvesting

Procedia PDF Downloads 70
13966 Flexibility Cost and Its Application for Construction Projects

Authors: Rashmi Shahu

Abstract:

Flexibility is becoming a more widely accepted aspect of project management. Although contingency theory in project management states that the unknowns are controllable, complexity theory believes that the best way to handle the unknowns would be to have a flexible approach rather than rigidity. Designing a flexible system is a method of managing uncertainty. The present research work aims to evaluate flexibility in the initial design phase of projects taking examples of construction projects. Flexibility in the initial design phase is modeled in order to know the advantage in future. The comparison between the extra cost of flexibility in the initial design phase and the discount that can be achieved in future due to this premium will help the developers in making strategic decisions. This research uses a methodology for valuing flexibility by developing a mathematical formula for predicting future saving of cost. Two case studies were considered in this research to validate the mathematical formula. This research explains three case studies of an educational institution 28 years old for explaining the concept and giving benefits of flexible design for modification/renovation work of building.

Keywords: flexibility, future saving, flexibility cost, construction projects

Procedia PDF Downloads 330
13965 Enhancing Project Success: A Case Study of Investment Strategies and Planning Practices in Rwanda’s Housing Projects Managed by Rwanda Social Security Board

Authors: Amina Umulisa

Abstract:

Background: Despite efforts to enhance profitability and project planning, Rwanda has experienced a decline in project success rates, notably in housing projects managed by the Rwanda Social Security Board (RSSB). This study aims to assess the impact of investment strategies and project planning practices on the performance of pension funds projects in Rwanda, focusing on housing projects by RSSB. Methods: Using descriptive and correlational research designs, this study surveyed 109 randomly selected respondents from a pool of 148 workers. Data analysis was conducted using descriptive and inferential statistics in STATA version 18. Results: Findings revealed that 54% of respondents acknowledged the importance of personnel generation. Additionally, 61% agreed with the effectiveness of training programs, and 79% supported the cost of human resource utilization. In terms of project management practices, 65.7% could determine when a project needed adjustments, 65.7% agreed with the approved budget, and 73% supported forecasted expenses. Furthermore, 68% agreed with order placement, 76.0% with using the right materials, and 64.4% with defining project scope. The study found significant associations between order placement and project quality outcomes (r=0.711, P-value <0.001), as well as with time management (Pearson was 0.701 and sing was 0.00) and cost management (r=0.885, P-value <0.001). Moreover, project time targets were found to significantly affect quality management (Pearson was 0.798, sing was 0.000), time management, and cost management (r=0.740, P-value <0.001). Conclusion: The findings highlight the positive association between the project implementation stage and quality management, indicating effective project planning practices among senior staff. However, there is a need to enhance project team collaboration and coordination to improve the performance of constructed houses.

Keywords: project success rates, investment strategies, training programs, cost management

Procedia PDF Downloads 17
13964 Supply Chain Management in the Oil Industry: Challenges and Opportunities

Authors: Mehmood Faisal

Abstract:

In this globalization era, the supply chain management has acquired strategic importance in diverse business environments. In the current highly competitive business environment, the success of any business considerably depends on the efficiency of the supply chain. The importance of petroleum industry cannot be avoided in the global market; however, supply chain management in the petroleum industry is facing various challenges, particularly in the logistics area. These logistical challenges have a main influence on the cost of crude oil; therefore, the opportunities to save cost in logistics still do exist. The large oil producing companies are undertaking future contracts through 'swaps or options' practice that saves their millions of dollars. The objective of this paper is to throw light on the supply chain challenges and opportunities in the oil industry and on swap practices which are widely employed by large oil producing companies around the world, such as Chevron Corporation, Saudi Arabian Oil Company, BP and Exxon Mobil.

Keywords: logistics, oil industry, swap practice, supply chain management

Procedia PDF Downloads 129
13963 Integrating Building Information Modeling into Facilities Management Operations

Authors: Mojtaba Valinejadshoubi, Azin Shakibabarough, Ashutosh Bagchi

Abstract:

Facilities such as residential buildings, office buildings, and hospitals house large density of occupants. Therefore, a low-cost facility management program (FMP) should be used to provide a satisfactory built environment for these occupants. Facility management (FM) has been recently used in building projects as a critical task. It has been effective in reducing operation and maintenance cost of these facilities. Issues of information integration and visualization capabilities are critical for reducing the complexity and cost of FM. Building information modeling (BIM) can be used as a strong visual modeling tool and database in FM. The main objective of this study is to examine the applicability of BIM in the FM process during a building’s operational phase. For this purpose, a seven-storey office building is modeled Autodesk Revit software. Authors integrated the cloud-based environment using a visual programming tool, Dynamo, for the purpose of having a real-time cloud-based communication between the facility managers and the participants involved in the project. An appropriate and effective integrated data source and visual model such as BIM can reduce a building’s operational and maintenance costs by managing the building life cycle properly.

Keywords: building information modeling, facility management, operational phase, building life cycle

Procedia PDF Downloads 128
13962 Essentiality of Core Strategic Vision in Continuous Cost Reduction Management

Authors: Lai Ving Kam

Abstract:

Many markets are maturing, consumer buying powers are weakening and customer preferences change rapidly. To survive, many adopt fast paced continuous cost reduction and competitive pricing to remain relevance. Marketers desire to push for more sales to increase revenues have intensified competitions at time cannibalize the product and market. The amazing technologies changes have created both hope and despair to the industries. The pressure to constantly reduce cost, on the one hand, create and market new products in cheaper prices and shorter life cycles, on the other has become a continuous endeavour. The twin trends appear irreconcilable. Can core strategic vision provides and adapts new directions in continuous cost reduction? This study investigates core strategic vision able to meet this need, for firms to survive and stay profitable. Under current uncertainty market, are firms falling back on their core strategic visions to take them out of the unfavourable positions?

Keywords: core strategy vision, continuous cost reduction, fashionable products industry, competitive pricing

Procedia PDF Downloads 294
13961 Factors Affecting Cost Efficiency of Municipal Waste Services in Tuscan Municipalities: An Empirical Investigation by Accounting for Different Management

Authors: María Molinos-Senante, Giulia Romano

Abstract:

This paper aims at investigating the effect of ownership in the efficiency assessment of municipal solid waste management. In doing so, the Data Envelopment Analysis meta-frontier approach integrating unsorted waste as undesirable output was applied. Three different clusters of municipalities have been created on the basis of the ownership type of municipal waste operators. In the second stage of analysis, the paper investigates factors affecting efficiency, in order to provide an outlook of levers to be used by policy and decision makers to improve efficiency, taking into account different management models in force. Results show that public waste management firms have better performance than mixed and private ones since their efficiency scores are significantly larger. Moreover, it has been demonstrated that the efficiency of waste management firms is statistically influenced by the age of population, population served, municipal size, population density and tourism rate. It evidences the importance of economies of scale on the cost efficiency of waste management. This issue is relevant for policymakers to define and implement policies aimed to improve the long-term sustainability of waste management in municipalities.

Keywords: data envelopment analysis, efficiency, municipal solid waste, ownership, undesirable output

Procedia PDF Downloads 126
13960 Matrix Completion with Heterogeneous Cost

Authors: Ilqar Ramazanli

Abstract:

The matrix completion problem has been studied broadly under many underlying conditions. The problem has been explored under adaptive or non-adaptive, exact or estimation, single-phase or multi-phase, and many other categories. In most of these cases, the observation cost of each entry is uniform and has the same cost across the columns. However, in many real-life scenarios, we could expect elements from distinct columns or distinct positions to have a different cost. In this paper, we explore this generalization under adaptive conditions. We approach the problem under two different cost models. The first one is that entries from different columns have different observation costs, but within the same column, each entry has a uniform cost. The second one is any two entry has different observation cost, despite being the same or different columns. We provide complexity analysis of our algorithms and provide tightness guarantees.

Keywords: matroid optimization, matrix completion, linear algebra, algorithms

Procedia PDF Downloads 73
13959 Productive Efficiency in Asean Banking

Authors: Suhartono Suhartono

Abstract:

Issue of cost efficiency is then becoming pivotal point because public expect cost of banking operation reducing and benefited of consumers. This study examines the determinants of cost efficiency of banks operating in 8 member countries of the Association of Southeast Asian Nations (ASEAN). This study uses economics theory approach to examine the existence of economies of scale in the ASEAN Banking market especially on its impact on cost efficiency. We apply concept of average cost (AC) as a proxy for the cost efficiency. We find that economies of scale is existing in the banking market indicating scale and scope economies should be considered in the industrial policy. The stronger capital position is also positive to efficiency means stronger capitalized banks are more efficient. Bank that remunerates better tend to be more efficient as result economic capital effect.

Keywords: cost efficiency, ASEAN, economies of scale, issue of cost

Procedia PDF Downloads 339
13958 Effectiveness of Management Transfer Programs for Managing Irrigation Resources in Developing Countries: A Case Study of Farmer- and Agency-Managed Schemes from Nepal

Authors: Tirtha Raj Dhakal, Brian Davidson, Bob Farquharson

Abstract:

Irrigation management transfer has been taken as the important policy instrument for effective irrigation resource management in many developing countries. The change in governance of the irrigation schemes for its day-to-day operation and maintenance has been centered in recent Nepalese irrigation policies also. However, both farmer- and agency-managed irrigation schemes in Nepal are performing well below than expected. This study tries to link the present concerns of poor performance of both forms of schemes with the institutions for its operation and management. Two types of surveys, management and farm surveys; were conducted as a case study in the command area of Narayani Lift Irrigation Project (agency-managed) and Khageri Irrigation System (farmer-managed) of Chitwan District. The farm survey from head, middle and tail regions of both schemes revealed that unequal water distribution exists in these regions in both schemes with greater percentage of farmers experiencing this situation in agency managed scheme. In both schemes, the cost recovery rate was very low, even below five percent in Lift System indicating poor operation and maintenance of the schemes. Also, the institution on practice in both schemes is unable to create any incentives for farmers’ willingness to pay as well as for its economical use in the farm. Thus, outcomes from the study showed that only the management transfer programs may not achieve the goal of efficient irrigation resource management. This may suggest water professionals to rethink about the irrigation policies for refining institutional framework irrespective of the governance of schemes for improved cost recovery and better water distribution throughout the irrigation schemes.

Keywords: cost recovery, governance, institution, irrigation management transfer, willingness to pay

Procedia PDF Downloads 261
13957 Integrated Evaluation of Green Design and Green Manufacturing Processes Using a Mathematical Model

Authors: Yuan-Jye Tseng, Shin-Han Lin

Abstract:

In this research, a mathematical model for integrated evaluation of green design and green manufacturing processes is presented. To design a product, there can be alternative options to design the detailed components to fulfill the same product requirement. In the design alternative cases, the components of the product can be designed with different materials and detailed specifications. If several design alternative cases are proposed, the different materials and specifications can affect the manufacturing processes. In this paper, a new concept for integrating green design and green manufacturing processes is presented. A green design can be determined based the manufacturing processes of the designed product by evaluating the green criteria including energy usage and environmental impact, in addition to the traditional criteria of manufacturing cost. With this concept, a mathematical model is developed to find the green design and the associated green manufacturing processes. In the mathematical model, the cost items include material cost, manufacturing cost, and green related cost. The green related cost items include energy cost and environmental cost. The objective is to find the decisions of green design and green manufacturing processes to achieve the minimized total cost. In practical applications, the decision-making can be made to select a good green design case and its green manufacturing processes. In this presentation, an example product is illustrated. It shows that the model is practical and useful for integrated evaluation of green design and green manufacturing processes.

Keywords: supply chain management, green supply chain, green design, green manufacturing, mathematical model

Procedia PDF Downloads 773
13956 Evolution of Approaches to Cost Calculation in the Conditions of the Modern Russian Economy

Authors: Elena Tkachenko, Vladimir Kokh, Alina Osipenko, Vladislav Surkov

Abstract:

The modern period of development of Russian economy is fraught with a number of problems related to limitations in the use of traditional planning and financial management tools. Restrictions in the use of foreign software when performing an order of the Russian Government, on the one hand, and sanctions limiting the support of the major ERP and MRP II systems in the Russian Federation, on the other hand, entail the necessity to appeal to the basics of developing budgeting and analysis systems for industrial enterprises. Thus, cost calculation theory becomes the theoretical foundation for the development of industrial cost management systems. Based on the foregoing, it would be fair to make an assumption that the development of a working managerial accounting model on an industrial enterprise using an automated enterprise resource management system should rest upon the concept of the inevitability of alterations of business processes. On the other hand, optimized business processes make the architecture of financial analytics more transparent and permit the use of all the benefits of data cubes. The metrics and indicator slices provide online assessment of the state of key business processes at a given moment of time, which improves the quality of managerial decisions considerably. Therefore, the bilateral sanctions situation boosted the development of corporate business analytics and took industrial companies to the next level of understanding of business processes.

Keywords: cost culculation, ERP, OLAP, modern Russian economy

Procedia PDF Downloads 194