5919 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan

Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat

Abstract:

This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.

Keywords: cost, overrun, building construction projects, Jordan

Procedia PDF Downloads 71
5918 Development of Work Breakdown Structure for EVMS in South Korea

Authors: Dong-Ho Kim, Su-Sang Lim, Sang-Won Han, Chang-Taek Hyun

Abstract:

In the construction site, the cost and schedules are the most important management elements. Despite efforts to integrated management the cost and schedule, WBS classification is struggling to differ from each other. The cost and schedule can be integrated and can be managed due to the characteristic of the detail system in the case of Korea around the axis of pressure and official fixture system. In this research, the Work Breakdown Structure (WBS) integrating the cost and schedules around in government office construction, WBS which can be used in common was presented in order to analyze the detail system of the public institution construction and improve. As to this method, the efficient administration of not only the link application of the cost and schedule but also construction project is expected.

Keywords: WBS, EVMS, integrated cost and schedule, Korea case

Procedia PDF Downloads 344
5917 A Post-Occupancy Evaluation of the Impact of Indoor Environmental Quality on Health and Well-Being in Office Buildings

Authors: Suyeon Bae, Abimbola Asojo, Denise Guerin, Caren Martin

Abstract:

Post-occupancy evaluations (POEs) have been recognized for documenting occupant well-being and responses to indoor environmental quality (IEQ) factors such as thermal, lighting, and acoustic conditions. Sustainable Post-Occupancy evaluation survey (SPOES) developed by an interdisciplinary team at a Midwest University provides an evidence-based quantitative analysis of occupants’ satisfaction in office, classroom, and residential spaces to help direct attention to successful areas and areas that need improvement in buildings. SPOES is a self-administered and Internet-based questionnaire completed by building occupants. In this study, employees in three different office buildings rated their satisfaction on a Likert-type scale about 12 IEQ criteria including thermal condition, indoor air quality, acoustic quality, daylighting, electric lighting, privacy, view conditions, furnishings, appearance, cleaning and maintenance, vibration and movement, and technology. Employees rated their level of satisfaction on a Likert-type scale from 1 (very dissatisfied) to 7 (very satisfied). They also rate the influence of their physical environment on their perception of their work performance and the impact of their primary workspaces on their health on a scale from 1 (hinders) to 7 (enhances). Building A is a three-story building that includes private and group offices, classrooms, and conference rooms and amounted to 55,000 square-feet for primary workplace (N=75). Building B, a six-story building, consisted of private offices, shared enclosed office, workstations, and open desk areas for employees and amounted to 14,193 square-feet (N=75). Building C is a three-story 56,000 square-feet building that included classrooms, therapy rooms, an outdoor playground, gym, restrooms, and training rooms for clinicians (N=76). The results indicated that 10 IEQs for Building A except acoustic quality and privacy showed statistically significant correlations on the impact of the primary workspace on health. In Building B, 11 IEQs except technology showed statistically significant correlations on the impact of the primary workspace on health. Building C had statistically significant correlations between all 12 IEQ and the employees’ perception of the impact of their primary workspace on their health in two-tailed correlations (P ≤ 0.05). Out of 33 statistically significant correlations, 25 correlations (76%) showed at least moderate relationship (r ≥ 0.35). For the three buildings, daylighting, furnishings, and indoor air quality IEQs ranked highest on the impact on health. IEQs about vibration and movement, view condition, and electric lighting ranked second, followed by IEQs about cleaning and maintenance and appearance. These results imply that 12 IEQs developed in SPOES are highly related to employees’ perception of how their primary workplaces impact their health. The IEQs in this study offer an opportunity for improving occupants’ well-being and the built environment.

Keywords: post-occupancy evaluation, built environment, sustainability, well-being, indoor air quality

Procedia PDF Downloads 262
5916 Study on the Impact of Windows Location on Occupancy Thermal Comfort by Computational Fluid Dynamics (CFD) Simulation

Authors: Farhan E Shafrin, Khandaker Shabbir Ahmed

Abstract:

Natural ventilation strategies continue to be a key alternative to costly mechanical ventilation systems, especially in healthcare facilities, due to increasing energy issues in developing countries, including Bangladesh. Besides, overcrowding and insufficient ventilation strategies remain significant causes of thermal discomfort and hospital infection in Bangladesh. With the proper location of inlet and outlet windows, uniform flow is possible in the occupancy area to achieve thermal comfort. It also determines the airflow pattern of the ward that decreases the movement of the contaminated air. This paper aims to establish a relationship between the location of the windows and the thermal comfort of the occupants in a naturally ventilated hospital ward. It defines the openings and ventilation variables that are interrelated in a way that enhances or limits the health and thermal comfort of occupants. The study conducts a full-scale experiment in one of the naturally ventilated wards in a primary health care hospital in Manikganj, Dhaka. CFD simulation is used to explore the performance of various opening positions in ventilation efficiency and thermal comfort in the study area. The results indicate that the opening located in the hospital ward has a significant impact on the thermal comfort of the occupants and the airflow pattern inside the ward. The findings can contribute to design the naturally ventilated hospital wards by identifying and predicting future solutions when it comes to relationships with the occupants' thermal comforts.

Keywords: CFD simulation, hospital ward, natural ventilation, thermal comfort, window location

Procedia PDF Downloads 176
5915 Towards an Intelligent Ontology Construction Cost Estimation System: Using BIM and New Rules of Measurement Techniques

Authors: F. H. Abanda, B. Kamsu-Foguem, J. H. M. Tah

Abstract:

Construction cost estimation is one of the most important aspects of construction project design. For generations, the process of cost estimating has been manual, time-consuming and error-prone. This has partly led to most cost estimates to be unclear and riddled with inaccuracies that at times lead to over- or under-estimation of construction cost. The development of standard set of measurement rules that are understandable by all those involved in a construction project, have not totally solved the challenges. Emerging Building Information Modelling (BIM) technologies can exploit standard measurement methods to automate cost estimation process and improves accuracies. This requires standard measurement methods to be structured in ontologically and machine readable format; so that BIM software packages can easily read them. Most standard measurement methods are still text-based in textbooks and require manual editing into tables or Spreadsheet during cost estimation. The aim of this study is to explore the development of an ontology based on New Rules of Measurement (NRM) commonly used in the UK for cost estimation. The methodology adopted is Methontology, one of the most widely used ontology engineering methodologies. The challenges in this exploratory study are also reported and recommendations for future studies proposed.

Keywords: BIM, construction projects, cost estimation, NRM, ontology

Procedia PDF Downloads 519
5914 Final Costs of Civil Claims

Authors: Behnam Habibi Dargah

Abstract:

The economics of cost-benefit theory seeks to monitor claims and determine their final price. The cost of litigation is important because it is a measure of the efficiency of the justice system. From an economic point of view, the cost of litigation is considered to be the point of equilibrium of litigation, whereby litigation is regarded as a high-risk investment and is initiated when the costs are less than the probable and expected benefits. Costs are economically separated into private and social costs. Private cost includes material (direct and indirect) and spiritual costs. The social costs of litigation are also subsidized-centric due to the public and governmental nature of litigation and cover both types of bureaucratic bureaucracy and the costs of judicial misconduct. Macroeconomic policy in the economics of justice is the reverse engineering of controlling the social costs of litigation by employing selective litigation and working on the judicial culture to achieve rationality in the monopoly system. Procedures for controlling and managing court costs are also circumscribed to economic patterns in the field. Rational cost allocation model and cost transfer model. The rational allocation model deals with cost-tolerance systems, and the transfer model also considers three models of transferability, including legal, judicial and contractual transferability, which will be described and explored in the present article in a comparative manner.

Keywords: cost of litigation, economics of litigation, private cost, social cost, cost of litigation

Procedia PDF Downloads 97
5913 Economical Working Hours per Workday for a Production Worker under Hazardous Environment

Authors: Mohammed Darwish

Abstract:

Workplace injuries cost organizations significant amount of money. Causes of injuries at workplace are very well documented in the literature and attributed to variety of reasons. One important reason is the long working-hours. The purpose of this paper is to develop a mathematical model that finds the optimal working-hours at workplace. The developed model minimizes the expected total cost which consists of the expected cost incurred due to unsafe conditions of workplace, the other cost is related to the lost production due to work incidents, and the production cost.

Keywords: 8-hour workday, mathematical model, optimal working hours, workplace injuries

Procedia PDF Downloads 129
5912 Design Criteria for an Internal Information Technology Cost Allocation to Support Business Information Technology Alignment

Authors: Andrea Schnabl, Mario Bernhart

Abstract:

The controlling instrument of an internal cost allocation (IT chargeback) is commonly used to make IT costs transparent and controllable. Information Technology (IT) became, especially for information industries, a central competitive factor. Consequently, the focus is not on minimizing IT costs but on the strategic aligned application of IT. Hence, an internal IT cost allocation should be designed to enhance the business-IT alignment (strategic alignment of IT) in order to support the effective application of IT from a company’s point of view. To identify design criteria for an internal cost allocation to support business alignment a case study analysis at a typical medium-sized firm in information industry is performed. Documents, Key Performance Indicators, and cost accounting data over a period of 10 years are analyzed and interviews are performed. The derived design criteria are evaluated by 6 heads of IT departments from 6 different companies, which have an internal IT cost allocation at use. By applying these design criteria an internal cost allocation serves not only for cost controlling but also as an instrument in strategic IT management.

Keywords: accounting for IT services, Business IT Alignment, internal cost allocation, IT controlling, IT governance, strategic IT management

Procedia PDF Downloads 135
5911 Stochastic Frontier Application for Evaluating Cost Inefficiencies in Organic Saffron

Authors: Pawan Kumar Sharma, Sudhakar Dwivedi, R. K. Arora

Abstract:

Saffron is one of the most precious spices grown on the earth and is cultivated in a very limited area in few countries of the world. It has also been grown as a niche crop in Kishtwar district of Jammu region of Jammu and Kashmir State of India. This paper attempts to examine the presence of cost inefficiencies in saffron production and the associated socio-economic characteristics of saffron growers in the mentioned area. Although the numbers of inputs used in cultivation of saffron were limited, still cost inefficiencies were present in its production. The net present value (NPV), internal rate of return (IRR) and profitability index (PI) of investment in five years of saffron production were INR 1120803, 95.67 % and 3.52 respectively. The estimated coefficients of saffron stochastic cost function for saffron bulbs, human labour, animal labour, manure and saffron output were positive. The saffron growers having non-farm income were more cost inefficient as compared to farmers who did not have sources of income other than farming by 0.04 %. The maximum value of cost efficiency for saffron grower was 1.69 with mean value of 1.12. The majority of farmers have low cost inefficiencies, as the highest frequency of occurrence of the predicted cost efficiency was below 1.06.

Keywords: saffron, internal rate of return, cost efficiency, stochastic frontier model

Procedia PDF Downloads 120
5910 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia

Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid

Abstract:

The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.

Keywords: building, contractor, cost increase, cost overrun

Procedia PDF Downloads 126
5909 Rotection of Old Grant Communal Properties of Minorities in Cantonment of Pakistan: Issues and Problems

Authors: Nayer Fardows, Zarash Nayer, Sarah Nayer Jaffar, Daud Nayer

Abstract:

This paper analyses the issues related to communal properties of minorities in the cantonment area of Pakistan allotted in the mid-eighteenth centuries by the British Government to facilitate soldiers. These properties were old grants on which churches, institutes, hospitals, and residences were built. The ownership of these properties remained with British Government, but after the creation of Pakistan, changes by putting Government of Pakistan as the landlord of the property disturbed the inheritors as they remained as, holder of occupancy. The government of Pakistan issued a policy in 1997 to convert the status of old grant properties to regular lease. However, heavy taxes and high court’s decisions made it difficult to solve the issue. The study was conducted on six old grant properties of Edwardes College Peshawar cantonment situated in Khyber Pakhtunkhwa, Pakistan. The paper is descriptive research with a qualitative approach collecting data through government rules, acts, ordinance and decisions of the high courts. The result leads to three aspects; 1) holder of occupancy status of old grant properties in cantonment is similar as allotment of other properties by the government, 2) imposition of heavy taxes on conversion of property from old grant to regular lease restricted inheritors to further construct or transfer, 3) imposition of higher courts ban on conversion of communal properties contradict government policy of conversion. The paper recommends the Government of Pakistan a solution to maintain the status quo for communal properties that fall within the old grant.

Keywords: British Government, communal properties, cantonment, old grant, institutions

Procedia PDF Downloads 116
5908 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 394
5907 The Impacts of Cost Stickiness on the Profitability of Indonesian Firms

Authors: Dezie L. Warganegara, Dewi Tamara

Abstract:

The objectives of this study are to investigate the existence of the sticky cost behaviour of firms listed in the Indonesia Stock Exchange (IDX) and to find an evidence on the effects of sticky operating expenses (SG&A expenses) on profitability of firms. For the first objective, this study found that the sticky cost behaviour does exist. For the second objective, this study finds that the stickier the operating expenses the less future profitability of the firms. This study concludes that sticky cost affects negatively to the performance and, therefore, firms should include flexibility in designing the cost structure of their firms.

Keywords: sticky costs, Indonesia Stock Exchange (IDX), profitability, operating expenses, SG&A

Procedia PDF Downloads 288
5906 Impact of Wind Energy on Cost and Balancing Reserves

Authors: Anil Khanal, Ali Osareh, Gary Lebby

Abstract:

Wind energy offers a significant advantage such as no fuel costs and no emissions from generation. However, wind energy sources are variable and non-dispatchable. The utility grid is able to accommodate the variability of wind in smaller proportion along with the daily load. However, at high penetration levels, the variability can severely impact the utility reserve requirements and the cost associated with it. In this paper, the impact of wind energy is evaluated in detail in formulating the total utility cost. The objective is to minimize the overall cost of generation while ensuring the proper management of the load. Overall cost includes the curtailment cost, reserve cost and the reliability cost as well as any other penalty imposed by the regulatory authority. Different levels of wind penetrations are explored and the cost impacts are evaluated. As the penetration level increases significantly, the reliability becomes a critical question to be answered. Here, we increase the penetration from the wind yet keep the reliability factor within the acceptable limit provided by NERC. This paper uses an economic dispatch (ED) model to incorporate wind generation into the power grid. Power system costs are analyzed at various wind penetration levels using Linear Programming. The goal of this study shows how the increases in wind generation will affect power system economics.

Keywords: wind power generation, wind power penetration, cost analysis, economic dispatch (ED) model

Procedia PDF Downloads 545
5905 The Relationship of the Marketing Mix, Brand Image and Consumer Behavior of the Low-Cost Airline Service

Authors: Bundit Pungnirund

Abstract:

This research aimed to investigate the relationship between attitude towards marketing mix, brand image and consumer behavior of the passengers of low-cost airlines service. This study employed by quantitative research and the questionnaire was used to collect the data from 400 sampled of the passengers who have ever used the low-cost airline services based in Bangkok, Thailand. The descriptive statistics and Pearson’s correlation analysis were used to analyze data. The research results revealed that the attitude of the marketing mix of the low-cost airline services including product, price, place, promotion and process had related to the consumer behavior on the aspects of duration of service and frequency of service. While, the brand image of the low cost airline including the characteristics of organization, service quality and company identity had related to the consumer behavior on duration of service, frequency of service and cost of service at the significant statistically acceptable levels.

Keywords: brand image, consumer behavior, low-cost airline, marketing mix

Procedia PDF Downloads 271
5904 Activity-Based Costing in the Hospitality Industry: A Case Study in a Hotel

Authors: Bita Mashayekhi, Mohammad Ara

Abstract:

The purpose of this study is to provide some empirical evidence about implementing Activity-Based Costing (ABC) in the hospitality industry in Iran. For this purpose, we consider the Tabriz International Hotel as our sample hotel and then gather the relevant data from its cost accounting system in 2012. Then, we use ABC as our costing method and compare the cost of each service unit with that cost which had been extracted for the traditional costing method. The results show a different cost per unit for two methods. Also, because of its more precise and detailed provided information, an ABC system facilitates the decision-making process for managers on decisions related to profitability analysis, budgeting, pricing, and so on.

Keywords: Activity-Based Costing (ABC), activity, cost driver, hospitality industry

Procedia PDF Downloads 277
5903 Influence of Radio Frequency Identification Technology at Cost of Supply Chain as a Driver for the Generation of Competitive Advantage

Authors: Mona Baniahmadi, Saied Haghanifar

Abstract:

Radio Frequency Identification (RFID) is regarded as a promising technology for the optimization of supply chain processes since it improves manufacturing and retail operations from forecasting demand for planning, managing inventory, and distribution. This study precisely aims at learning to know the RFID technology and at explaining how it can concretely be used for supply chain management and how it can help improving it in the case of Hejrat Company which is located in Iran and works on the distribution of medical drugs and cosmetics. This study uses some statistical analysis to calculate the expected benefits of an integrated RFID system on supply chain obtained through competitive advantages increases with decreasing cost factor. The study investigates how the cost of storage process, labor cost, the cost of missing goods, inventory management optimization, on-time delivery, order cost, lost sales and supply process optimization affect the performance of the integrated RFID supply chain regarding cost factors and provides a competitive advantage.

Keywords: cost, competitive advantage, radio frequency identification, supply chain

Procedia PDF Downloads 247
5902 Off-Farm Work and Cost Efficiency in Staple Food Production among Small-Scale Farmers in North Central Nigeria

Authors: C. E. Ogbanje, S. A. N. D. Chidebelu, N. J. Nweze

Abstract:

The study evaluated off-farm work and cost efficiency in staple food production among small-scale farmers in North Central Nigeria. Multistage sampling technique was used to select 360 respondents (participants and non-participants in off-farm work). Primary data obtained were analysed using stochastic cost frontier and test of means’ difference. Capital input was lower for participants (N2,596.58) than non-participants (N11,099.14). Gamma (γ) was statistically significant. Farm size significantly (p<0.01) increased cost outlay for participants and non-participants. Average input prices of enterprises one and two significantly (p<0.01) increased cost. Sex, household size, credit obtained, formal education, farming experience, and farm income significantly (p<0.05) reduced cost inefficiency for non-participants. Average cost efficiency was 11%. Farm capital was wasted. Participants’ substitution of capital for labour did not put them at a disadvantage. Extension agents should encourage farmers to obtain financial relief from off-farm work but not to the extent of endangering farm cost efficiency.

Keywords: cost efficiency, mean difference, North Central Nigeria, off-farm work, participants and non-participants, small-scale farmers

Procedia PDF Downloads 339
5901 An Efficient Resource Management Algorithm for Mobility Management in Wireless Mesh Networks

Authors: Mallikarjuna Rao Yamarthy, Subramanyam Makam Venkata, Satya Prasad Kodati

Abstract:

The main objective of the proposed work is to reduce the overall network traffic incurred by mobility management, packet delivery cost and to increase the resource utilization. The proposed algorithm, An Efficient Resource Management Algorithm (ERMA) for mobility management in wireless mesh networks, relies on pointer based mobility management scheme. Whenever a mesh client moves from one mesh router to another, the pointer is set up dynamically between the previous mesh router and current mesh router based on the distance constraints. The algorithm evaluated for signaling cost, data delivery cost and total communication cost performance metrics. The proposed algorithm is demonstrated for both internet sessions and intranet sessions. The proposed algorithm yields significantly better performance in terms of signaling cost, data delivery cost, and total communication cost.

Keywords: data delivery cost, mobility management, pointer forwarding, resource management, wireless mesh networks

Procedia PDF Downloads 331
5900 Construction Unit Rate Factor Modelling Using Neural Networks

Authors: Balimu Mwiya, Mundia Muya, Chabota Kaliba, Peter Mukalula

Abstract:

Factors affecting construction unit cost vary depending on a country’s political, economic, social and technological inclinations. Factors affecting construction costs have been studied from various perspectives. Analysis of cost factors requires an appreciation of a country’s practices. Identified cost factors provide an indication of a country’s construction economic strata. The purpose of this paper is to identify the essential factors that affect unit cost estimation and their breakdown using artificial neural networks. Twenty-five (25) identified cost factors in road construction were subjected to a questionnaire survey and employing SPSS factor analysis the factors were reduced to eight. The 8 factors were analysed using the neural network (NN) to determine the proportionate breakdown of the cost factors in a given construction unit rate. NN predicted that political environment accounted 44% of the unit rate followed by contractor capacity at 22% and financial delays, project feasibility, overhead and profit each at 11%. Project location, material availability and corruption perception index had minimal impact on the unit cost from the training data provided. Quantified cost factors can be incorporated in unit cost estimation models (UCEM) to produce more accurate estimates. This can create improvements in the cost estimation of infrastructure projects and establish a benchmark standard to assist the process of alignment of work practises and training of new staff, permitting the on-going development of best practises in cost estimation to become more effective.

Keywords: construction cost factors, neural networks, roadworks, Zambian construction industry

Procedia PDF Downloads 336
5899 Investigation and Analysis of Residential Building Energy End-Use Profile in Hot and Humid Area with Reference to Zhuhai City in China

Authors: Qingqing Feng, S. Thomas Ng, Frank Xu

Abstract:

Energy consumption in domestic sector has been increasing rapidly in China all along these years. Confronted with environmental challenges, the international society has made a concerted effort by setting the Paris Agreement, the Sustainable Development Goals, and the New Urban Agenda. Thus it’s very important for China to put forward reasonable countermeasures to boost building energy conservation which necessitates looking into the actuality of residential energy end-use profile and its influence factors. In this study, questionnaire surveys have been conducted in Zhuhai city in China, a typical city in hot summer warm winter climate zone. The data solicited mainly include the occupancy schedule, building’s information, residents’ information, household energy uses, the type, quantity and use patterns of appliances and occupants’ satisfaction. Over 200 valid samples have been collected through face-to-face interviews. Descriptive analysis, clustering analysis, correlation analysis and sensitivity analysis were then conducted on the dataset to understand the energy end-use profile. The findings identify: 1) several typical clusters of occupancy patterns and appliances utilization patterns; 2) the top three sensitive factors influencing energy consumption; 3) the correlations between satisfaction and energy consumption. For China with many different climates zones, it’s difficult to find a silver bullet on energy conservation. The aim of this paper is to provide a theoretical basis for multi-stakeholders including policy makers, residents, and academic communities to formulate reasonable energy saving blueprints for hot and humid urban residential buildings in China.

Keywords: residential building, energy end-use profile, questionnaire survey, sustainability

Procedia PDF Downloads 97
5898 Effect of Cloud Computing on Enterprises

Authors: Amir Rashid

Abstract:

Today is the world of innovations where everyone is looking for a change. Organizations are now looking toward virtualization in order to minimize their computing cost. Cloud Computing has also introduced itself by the means of reducing computing cost. It offers different approach to make computing better by improving utilization and reducing infrastructure and administrative costs. Cloud Computing is basically the amalgamation of Utility Computing and SaaS (Software as a Service). Cloud Computing is quite new to organizations as it is still at its deploying stage. Due to this reason, organizations are not confident whether to adopt it or not. This thesis investigates the problem for organization concerning the security and cost issues. Benefits and drawbacks are being highlighted which organizations can have or suffer in order to adopt Cloud Computing. In Conclusion, Cloud Computing is a better option available for small and medium organizations with a comparison to large companies both in terms of data security and cost.

Keywords: cloud computing, security, cost, elasticity, PaaS, IaaS, SaaS

Procedia PDF Downloads 307
5897 Simulating Human Behavior in (Un)Built Environments: Using an Actor Profiling Method

Authors: Hadas Sopher, Davide Schaumann, Yehuda E. Kalay

Abstract:

This paper addresses the shortcomings of architectural computation tools in representing human behavior in built environments, prior to construction and occupancy of those environments. Evaluating whether a design fits the needs of its future users is currently done solely post construction, or is based on the knowledge and intuition of the designer. This issue is of high importance when designing complex buildings such as hospitals, where the quality of treatment as well as patient and staff satisfaction are of major concern. Existing computational pre-occupancy human behavior evaluation methods are geared mainly to test ergonomic issues, such as wheelchair accessibility, emergency egress, etc. As such, they rely on Agent Based Modeling (ABM) techniques, which emphasize the individual user. Yet we know that most human activities are social, and involve a number of actors working together, which ABM methods cannot handle. Therefore, we present an event-based model that manages the interaction between multiple Actors, Spaces, and Activities, to describe dynamically how people use spaces. This approach requires expanding the computational representation of Actors beyond their physical description, to include psychological, social, cultural, and other parameters. The model presented in this paper includes cognitive abilities and rules that describe the response of actors to their physical and social surroundings, based on the actors’ internal status. The model has been applied in a simulation of hospital wards, and showed adaptability to a wide variety of situated behaviors and interactions.

Keywords: agent based modeling, architectural design evaluation, event modeling, human behavior simulation, spatial cognition

Procedia PDF Downloads 227
5896 An Approach to Make Low-Cost Self-Compacting Geo-Polymer Concrete

Authors: Ankit Chakraborty, Raj Shah, Prayas Variya

Abstract:

Self-compacting geo-polymer concrete is a blended version of self-compacting concrete developed in Japan by Okamura. H. in 1986 and geo-polymer concrete proposed by Davidovits in 1999. This method is eco-friendly as there is low CO₂ emission and reduces labor cost due to its self-compacting property and zero percent cement content. We are making an approach to reduce concreting cost and make concreting eco-friendly by replacing cement fully and sand by a certain amount of industrial waste. It will reduce overall concreting cost due to its self-compatibility and replacement of materials, forms eco-friendly concreting technique and gives better fresh property and hardened property results compared to self-compacting concrete and geo-polymer concrete.

Keywords: geopolymer concrete, low cost concreting, low carbon emission, self compactability

Procedia PDF Downloads 208
5895 Cost Effectiveness of Transcatheter Aortic Valve Replacement vs Surgical Aortic Valve Replacement in a Low-Middle Income Country

Authors: Vasuki Rayapati, Bhanu Duggal

Abstract:

Trans catheter aortic valve replacement (TAVR) is the recommended treatment over surgical aortic valve replacement (SAVR) for high-risk groups, patients >75 years of age with severe symptomatic Aortic stenosis (AS). In high income countries TAVR is more cost effective because of – i) Reduction in total length of stay including less number of days in ICU ii) Non-procedural costs like cost of general anaesthesia are higher for SAVR. In India, there are two kinds of hospitals – Public and Private. Most patients visit public sector hospitals than private sector hospitals. In a LMIC like India, especially in the Public health sector cost of TAVR is prohibitive. In a small study from three (public) hospitals in India, it was envisaged that cost of TAVR should decrease at least by 2/3 to be a cost effective option in Public health sector for severe AS.

Keywords: cost effectiveness, TAVR vs SAVR, LMIC, HTA

Procedia PDF Downloads 79
5894 Automated Resin Transfer Moulding of Carbon Phenolic Composites

Authors: Zhenyu Du, Ed Collings, James Meredith

Abstract:

The high cost of composite materials versus conventional materials remains a major barrier to uptake in the transport sector. This is exacerbated by a shortage of skilled labour which makes the labour content of a hand laid composite component (~40 % of total cost) an obvious target for reduction. Automation is a method to remove labour cost and improve quality. This work focuses on the challenges and benefits to automating the manufacturing process from raw fibre to trimmed component. It will detail the experimental work required to complete an automation cell, the control strategy used to integrate all machines and the final benefits in terms of throughput and cost.

Keywords: automation, low cost technologies, processing and manufacturing technologies, resin transfer moulding

Procedia PDF Downloads 265
5893 Application of Costing System in the Small and Medium Sized Enterprises (SME) in Turkey

Authors: Hamide Özyürek, Metin Yılmaz

Abstract:

Standard processes, similar and limited production lines, the production of high direct costs will be more accurate than the use of parts of the traditional cost systems in the literature. However, direct costs, overhead expenses, in turn, decreases the burden of increasingly sophisticated production facilities, a situation that led the researchers to look for the cost of traditional systems of alternative techniques. Variety cost management approaches for example Total quality management (TQM), just-in-time (JIT), benchmarking, kaizen costing, targeting cost, life cycle costs (LLC), activity-based costing (ABC) value engineering have been introduced. Management and cost applications have changed over the past decade and will continue to change. Modern cost systems can provide relevant and accurate cost information. These methods provide the decisions about customer, product and process improvement. The aim of study is to describe and explain the adoption and application of costing systems in SME. This purpose reports on a survey conducted during 2014 small and medium sized enterprises (SME) in Ankara. The survey results were evaluated using SPSS package program.

Keywords: modern costing systems, managerial accounting, cost accounting, costing

Procedia PDF Downloads 536
5892 Aircraft Line Maintenance Equipped with Decision Support System

Authors: B. Sudarsan Baskar, S. Pooja Pragati, S. Raj Kumar

Abstract:

The cost effectiveness in aircraft maintenance is of high privilege in the recent days. The cost effectiveness can be effectively made when line maintenance activities are incorporated at airports during Turn around time (TAT). The present work outcomes the shortcomings that affect the dispatching of the aircrafts, aiming at high fleet operability and low maintenance cost. The operational and cost constraints have been discussed and a suggestive alternative mechanism is proposed. The possible allocation of all deferred maintenance tasks to a set of all deferred maintenance tasks to a set of suitable airport resources have termed as alternative and is discussed in this paper from the data’s collected from the kingfisher airlines.

Keywords: decision support system, aircraft maintenance planning, maintenance-cost, RUL(remaining useful life), logistics, supply chain management

Procedia PDF Downloads 469
5891 Apply Commitment Method in Power System to Minimize the Fuel Cost

Authors: Mohamed Shaban, Adel Yahya

Abstract:

The goal of this paper study is to schedule the power generation units to minimize fuel consumption cost based on a model that solves unit commitment problems. This can be done by utilizing forward dynamic programming method to determine the most economic scheduling of generating units. The model was applied to a power station, which consists of four generating units. The obtained results show that the applications of forward dynamic programming method offer a substantial reduction in fuel consumption cost. The fuel consumption cost has been reduced from $116,326 to $102,181 within a 24-hour period. This means saving about 12.16 % of fuel consumption cost. The study emphasizes the importance of applying modeling schedule programs to the operation of power generation units. As a consequence less consumption of fuel, less loss of power and less pollution

Keywords: unit commitment, forward dynamic, fuel cost, programming, generation scheduling, operation cost, power system, generating units

Procedia PDF Downloads 571
5890 Empirical Study of Correlation between the Cost Performance Index Stability and the Project Cost Forecast Accuracy in Construction Projects

Authors: Amin AminiKhafri, James M. Dawson-Edwards, Ryan M. Simpson, Simaan M. AbouRizk

Abstract:

Earned value management (EVM) has been introduced as an integrated method to combine schedule, budget, and work breakdown structure (WBS). EVM provides various indices to demonstrate project performance including the cost performance index (CPI). CPI is also used to forecast final project cost at completion based on the cost performance during the project execution. Knowing the final project cost during execution can initiate corrective actions, which can enhance project outputs. CPI, however, is not constant during the project, and calculating the final project cost using a variable index is an inaccurate and challenging task for practitioners. Since CPI is based on the cumulative progress values and because of the learning curve effect, CPI variation dampens and stabilizes as project progress. Although various definitions for the CPI stability have been proposed in literature, many scholars have agreed upon the definition that considers a project as stable if the CPI at 20% completion varies less than 0.1 from the final CPI. While 20% completion point is recognized as the stability point for military development projects, construction projects stability have not been studied. In the current study, an empirical study was first conducted using construction project data to determine the stability point for construction projects. Early findings have demonstrated that a majority of construction projects stabilize towards completion (i.e., after 70% completion point). To investigate the effect of CPI stability on cost forecast accuracy, the correlation between CPI stability and project cost at completion forecast accuracy was also investigated. It was determined that as projects progress closer towards completion, variation of the CPI decreases and final project cost forecast accuracy increases. Most projects were found to have 90% accuracy in the final cost forecast at 70% completion point, which is inlined with findings from the CPI stability findings. It can be concluded that early stabilization of the project CPI results in more accurate cost at completion forecasts.

Keywords: cost performance index, earned value management, empirical study, final project cost

Procedia PDF Downloads 132