3820 Multi-Criteria Bid/No Bid Decision Support Framework for General Contractors: A Case of Pakistan

Authors: Nida Iftikhar, Jamaluddin Thaheem, Bilal Iftikhar

Abstract:

In the construction industry, adequate and effective decision-making can mean the difference between success and failure. Bidding is the most important element of the construction business since it is a mean by which contractors obtain work. This is probably the only option for any contractor firm to sustain in the market and achieve its objective of earning the profits by winning tenders. The capability to select most appropriate ventures not only defines the success and wellbeing of contractor firms but also their survival and sustainability in the industry. The construction practitioners are usually on their own when it comes to deciding on bidding for a project or not. Usually, experience-based solutions are offered where a lot of subjectivity is involved. This research has been opted considering the local construction industry of Pakistan in order to examine the critical success factors from contractors’ perspective while making bidding decisions, listing and evaluating critical factors in order of their importance, categorization of these factors into decision support & decision oppose groups and to develop a framework to help contractors in the decision-making process. Literature review, questionnaires, and structured interviews are used for identification and quantification of factors affecting bid/no bid decision-making. Statistical methods of ranking analysis and analytical hierarchy process of multi-criteria decision-making method are used for analysis. It is found that profitability, need for work and financial health of client are the most decisive factors in bid/no bid decision-making while project size, project type, fulfilling the tender conditions imposed by the client and relationship, identity & reputation of the client are least impact factors in bid/no bid decision-making. Further, to verify the developed framework, case studies have been conducted to evaluate the bid/no bid decision-making in building procurement. This is the first of its nature study in the context of the local construction industry and recommends using a holistic decision-making framework for such business-critical deliberations.

Keywords: bidding, bid decision-making, construction procurement, contractor

Procedia PDF Downloads 155
3819 E-Procurement Adoption and Effective Service Delivery in the Uganda Coffee Industry

Authors: Taus Muganda

Abstract:

This research explores the intricate relationship between e-procurement adoption and effective service delivery in the Uganda Coffee Industry, focusing on the processes involved, key actors, and the impact of digital transformation. The study is guided by three prominent theories, Actor-Network Theory, Resource-Based View Theory, and Institutional Theory to comprehensively explore the dynamics of e-procurement in the context of the coffee sector. The primary aim of this project is to examine the e-procurement adoption process and its role in enhancing service delivery within the Uganda Coffee Industry. The research questions guiding this inquiry are: firstly, whether e-procurement adoption and implementation contribute to achieving quality service delivery; and secondly, how e-procurement adoption can be effectively realized within the Uganda Coffee Industry. To address these questions, the study has laid out specific objectives. Firstly, it seeks to investigate the impact of e-procurement on effective service delivery, analysing how the integration of digital processes influences the overall quality of services provided in the coffee industry. Secondly, it aims to critically analyse the measures required to achieve effective delivery outcomes through the adoption and implementation of e-procurement, assessing the strategies that can maximize the benefits of digital transformation. Furthermore, the research endeavours to identify and examine the key actor’s instrumental in achieving effective service delivery within the Uganda Coffee Industry. By utilizing Actor-Network Theory, the study will elucidate the network of relationships and collaborations among actors involved in the e-procurement process. The research contributes to addressing a critical gap in the sector. Despite coffee being the leading export crop in Uganda, constituting 16% of total exports, there is a recognized need for digital transformation, specifically in the realm of e-procurement, to enhance the productivity of producers and contribute to the economic growth of the country. The study aims to provide insights into transforming the Uganda Coffee Industry by focusing on improving the e-procurement services delivered to actors in the coffee sector. The three forms of e-procurement investigated in this research—E-Sourcing, E-Payment, and E-Invoicing—serve as focal points in understanding the multifaceted dimensions of digital integration within the Uganda Coffee Industry. This research endeavours to offer practical recommendations for policymakers, industry stakeholders, and the UCDA to strategically leverage e-procurement for the benefit of the entire coffee value chain.

Keywords: e-procurement, effective service delivery, actors, actor-network theory, resource-based view theory, institutional theory, e-invocing, e-payment, e-sourcing

Procedia PDF Downloads 18
3818 Managing the Cloud Procurement Process: Findings from a Case Study

Authors: Andreas Jede, Frank Teuteberg

Abstract:

Cloud computing (CC) has already gained overall appreciation in research and practice. Whereas the willingness to integrate cloud services in various IT environments is still unbroken, the previous CC procurement processes run mostly in an unorganized and non-standardized way. In practice, a sufficiently specific, yet applicable business process for the important acquisition phase is often lacking. And research does not appropriately remedy this deficiency yet. Therefore, this paper introduces a field-tested approach for CC procurement. Based on an extensive literature review and augmented by expert interviews, we designed a model that is validated and further refined through an in-depth real-life case study. For the detailed process description, we apply the event-driven process chain notation (EPC). The gained valuable insights into the case study may help CC research to shift to a more socio-technical area. For practice, next to giving useful organizational instructions we will provide extended checklists and lessons learned.

Keywords: cloud procurement process, IT-organization, event-driven process chain, in-depth case study

Procedia PDF Downloads 358
3817 Public Procurement and Innovation: A Municipal Approach

Authors: M. Moso-Diez, J. L. Moragues-Oregi, K. Simon-Elorz

Abstract:

Innovation procurement is designed to steer the development of solutions towards concrete public sector needs as a driver for innovation from the demand side (in public services as well as in market opportunities for companies), is horizontally emerging as a new policy instrument. In 2014 the new EU public procurement directives 2014/24/EC and 2014/25/EC reinforced the support for Public Procurement for Innovation, dedicating funding instruments that can be used across all areas supported by Horizon 2020, and targeting potential buyers of innovative solutions: groups of public procurers with similar needs. Under this programme, new policy adapters and networks emerge, aiming to embed innovation criteria into new procurement processes. As these initiatives are in process, research related to is scarce. We argue that Innovation Public Procurement can arise as an innovative policy instrument to public procurement in different policy domains, in spite of existing institutional and cultural barriers (legal guarantee versus innovation). The presentation combines insights from public procurement to supply management chain management in a sustainability and innovation policy arena, as a means of providing understanding of: (1) the circumstances that emerge; (2) the relationship between public and private actors; and (3) the emerging capacities in the definition of the agenda. The policy adopters are the contracting authorities that mainly are at municipal level where they interact with the supply management chain, interconnecting sustainability and climate measures with other policy priorities such as innovation and urban planning; and through the Competitive Dialogue procedure. We found that geography and territory affect both the level of municipal budget (due to municipal income per capita) and its institutional competencies (due to demographic reasons). In spite of the relevance of institutional determinants for public procurement, other factors play an important role such as human factors as well as both public policy and private intervention. The experience is a ‘city project’ (Bilbao) in the field of brownfield decontamination. Brownfield sites typically refer to abandoned or underused industrial and commercial properties—such as old process plants, mining sites, and landfills—that are available but contain low levels of environmental contaminants that may complicate reuse or redevelopment of the land. This article concludes that Innovation Public Procurement in sustainability and climate issues should be further developed both as a policy instrument and as a policy research line that could enable further relevant changes in public procurement as well as in climate innovation.

Keywords: innovation, city projects, public policy, public procurement

Procedia PDF Downloads 281
3816 Basic Research on Applying Temporary Work Engineering at the Design Phase

Authors: Jin Woong Lee, Kyuman Cho, Taehoon Kim

Abstract:

The application of constructability is increasingly required not only in the construction phase but also in the whole project stage. In particular, the proper application of construction experience and knowledge during the design phase enables the minimization of inefficiencies such as design changes and improvements in constructability during the construction phase. In order to apply knowledge effectively, engineering technology efforts should be implemented with design progress. Among many engineering technologies, engineering for temporary works, including facilities, equipment, and other related construction methods, is important to improve constructability. Therefore, as basic research, this study investigates the applicability of temporary work engineering during the design phase in the building construction industry. As a result, application of temporary work engineering has a greater impact on construction cost reduction and constructability improvement. In contrast to the existing design-bid-build method, the turn-key and CM (construct management) procurement methods currently being implemented in Korea are expected to have a significant impact on the direction of temporary work engineering. To introduce temporary work engineering, expert/professional organization training is first required, and a lack of client awareness should be preferentially improved. The results of this study are expected to be useful as reference material for the development of more effective temporary work engineering tasks and work processes in the future.

Keywords: Temporary Work Engineering, Design Phase, Constructability, Building Construction

Procedia PDF Downloads 357
3815 Clients’ Priorities in Design and Delivery of Green Projects: South African Perspective

Authors: Charles Mothobiso

Abstract:

This study attempts to identify the client’s main priority when delivering green projects. The aim is to compare whether clients’ interests are similar when delivering conventional buildings as compared to green buildings. Private clients invest more in green buildings as compared to government and parastatal entities. Private clients prioritize on maximizing a return on investment and they mainly invest in energy-saving buildings that have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building projects as compared to government and parastatal clients. A shortage of expertise and managerial skill leads to the low adaptation of green buildings in government and parastatal projects. Other factors that seem to prevent the adoption of green buildings are the preparedness of the supply chain within the industry and inappropriate procurement strategies adopted by clients.

Keywords: construction clients, design team, green buildings, procurement

Procedia PDF Downloads 263
3814 Utilization of Multi-Criteria Evaluation in Forensic Engineering and the Expertise outside Wall Subsystem

Authors: Tomas Barnak, Libor Matejka

Abstract:

The aim of this study is to create a standard application using multi-criteria evaluation in the field of forensic engineering. This situation can occur in the professional assessment in several cases such as when it is necessary to consider more criteria variant of the structural subsystems, more variants according to several criteria based on a court claim, which requires expert advice. A problematic situation arises when it is necessary to clearly determine the ranking of the options according to established criteria, and reduce subjective evaluation. For the procurement in the field of construction which is based on the prepared text of the law not only economic criteria but also technical, technological and environmental criteria will be determined. This fact substantially changes the style of evaluation of individual bids. For the above-mentioned needs of procurement, the unification of expert’s decisions and the use of multi-criteria assessment seem to be a reasonable option. In the case of experimental verification when using multi-criteria evaluation of alternatives construction subsystem the economic, technical, technological and environmental criteria will be compared. The core of the solution is to compare a selected number of set criteria, application methods and evaluation weighting based on the weighted values assigned to each of the criteria to use multi-criteria evaluation methods. The sequence of individual variations is determined by the evaluation of the importance of the values of corresponding criteria concerning expertise in the problematic of outside wall constructional subsystems.

Keywords: criteria, expertise, multi-criteria evaluation, outside wall subsystems

Procedia PDF Downloads 295
3813 Driving Green Public Procurement – A Framework for a Supporting Structure for Public Authorities Based on Good Practices in Europe

Authors: Pia Moschall, Kathrin Sackmann

Abstract:

Considering a purchasing volume of around two trillion Euros per year, which equals about 14% of the European Union’s gross domestic product, European public authorities have significant market power. Making use of this market power by prioritizing the procurement of green products and services offers a great potential to contribute to the Green New Deal. The market demand that is created by Green Public Procurement (GPP) sets incentives for European producers to design and develop Green Products and Eco-Innovations. However, most procurement still does not consider environmental criteria. The goal of the work is to encourage the adaptation of GPP in the European Union. To this end, the drivers for the adaptation were investigated over different case studies. The paper analyzes good-practice cases from European authorities from 2010 to 2020 that were provided by the European Commission. This analysis was guided by Philipp Mayring’s method of qualitative content analysis, whereby the inductively formed categories led to the identification of nine major drivers. The most important ones are ‘use of official guidelines and standards, ‘political support and requirements as well as ‘market research and involvement.’ Further, the paper discusses mutual dependencies between several drivers and how to exploit them. A supporting infrastructure was identified as a crucial factor for the successful adaption of green public procurement. In the next step, the work aims to examine on which administrative level the single drivers can be implemented most effectively. Practical implications of this research are recommendations on how to create a supporting structure on a municipal, federal and national level, including training for the responsible staff, support tools, as well as guidelines and standards for involved stakeholders.

Keywords: content analysis, green public procurement, public authorities, sustainable procurement

Procedia PDF Downloads 121
3812 Measuring the Level of Knowledge of Construction Contracts Procedures: A Case Study of Botswana

Authors: Babulayi B. Wilson

Abstract:

Unsatisfactory performance of construction projects in both the industrialised and developing countries indicate that there could be several defects in construction projects phases. Notwithstanding the fact that some project defects are often conceived at the initiation phase of construction projects, insufficient knowledge of contract procedures has been identified as one of the major sources of construction disputes. Contract procedures are a set of rules that outlines the primary obligations and liabilities of parties involved in the implementation of a construction project. Engineering professional bodies often codify contract procedures into standard forms of contract such as the Institution of Civil Engineers (ICE, UK) and Association of Consulting Engineers (ACE, UK) and keep them under constant review by updating any clause to reflect any change in case law or relevant piece of legislation. Even so, it is the responsibility of a professional body or conditions of contract draftsperson to introduce contract-specific clauses that may be necessary for business efficacy but not covered in the chosen standard conditions of contract. In Botswana, the use of clients’ drafted and/or un-adapted for environment of use international forms of contract in conjunction with client-drafted pricing schedules is common. The product of the latter often impact negatively upon contractors’ claims and payments, in that, tender rates and prices can only be deemed to be sufficient if the chosen conditions of contract compliment the pricing schedule (use of standardised procurement documents). In addition, client drafted and the use of borrowed forms of contract such as FIDIC often conflict with domicile law resulting in costly disputes on the part of the client. It is upon the preceding text that the object of the research is to measure the level of knowledge of contract procedures amongst key stakeholders in the Botswana construction industry by requesting a representative sample from the industry and academia to respond to tutorial questions prepared from two commonly used forms of contract for civil works, that is, FIDIC (International Form of Contract) and ICE (UK). The questions were prepared under the following captions: (a) preparation of tender documents (b) obligations of the parties (c) contract administration; and (d) claims, variations, and valuation of variations. After ascertaining that the level of knowledge of contract procedures is insufficient among most practitioners in the Botswana construction industry, major procurement entities, and engineering institutions of learning; a guide to drafting a condition of a construction contract was developed and then validated through seminars and workshops. In the present, the effectiveness of the guide is not yet measured but feedback from seminars and workshops conducted indicates an appreciation of the guide by the majority of major construction industry stakeholders.

Keywords: contract procedures, conditions of contract, professional practice, construction law, forms of contract

Procedia PDF Downloads 157
3811 Purpose in Procurement: Much Discussed, Less Conceptualized – An Exploratory Study of CPO Perceptions Based on the Gioia Methodology

Authors: Laurin Zemmrich, Nicolai Stickler

Abstract:

With the ongoing debate over how to incorporate sustainability, resilience, and value creation into business strategies, many procurement departments are put under pressure by governments, consumers, non-governmental organizations, and other stakeholders to disclose more information about their supply chains. According to practitioners and experts, procurement benefits the supply chain by increasing transparency and accountability, recruiting new suppliers, and supporting sustainable and ethical sourcing strategies. While most procurement departments establish these objectives, the bulk of activities are not carried out or are not regularly monitored. With the full potential of targeted sourcing still to be realized, procurement executives, in particular, are seeking for short-term cost-cutting impacts to appease external shareholders. We overcome this limitation by using an abductive approach to research and integrating empirical data from a Gioia methodology study design with relevant literature. Our analysis demonstrates that the procurement department has six essential levers aligned with sustainability, resilience, and value creation objectives and contributes to developing a new intra- and interorganizational purpose within the supply chain. Three enablers are identified as having a value-creating effect on supply chain interactions. Additionally, we discovered two impacts that alter the power balance between buyers and suppliers during transactions and have a cost-cutting or cost-avoiding effect. While cost-cutting, cost-avoidance, and dependency-reduction impacts are desirable, redistributing power may also have negative consequences. The article establishes a first strategy framework for evaluating the influence of the procurement department on supply chain transactions, allowing managers to understand better and apply the sourcing function inside a supply chain and embed it throughout the business.

Keywords: supply chain management, resilience, sustainability, value creation, purpose

Procedia PDF Downloads 86
3810 Sustainable Engineering: Synergy of BIM and Environmental Assessment Tools in Hong Kong Construction Industry

Authors: Kwok Tak Kit

Abstract:

The construction industry plays an important role in environmental and carbon emissions as it consumes a huge amount of natural resources and energy. Sustainable engineering involves the process of planning, design, procurement, construction and delivery in which the whole building and construction process resulting from building and construction can be effectively and sustainability managed to achieve the use of natural resources. Implementation of sustainable technology development and innovation, adoption of the advanced construction process and facilitate the facilities management to implement the energy and waste control more accurately and effectively. Study and research in the relationship of BIM and environment assessment tools lack a clear discussion. In this paper, we will focus on the synergy of BIM technology and sustainable engineering in the AEC industry and outline the key factors which enhance the use of advanced innovation, technology and method and define the role of stakeholders to achieve zero-carbon emission toward the Paris Agreement to limit global warming to well below 2ᵒC above pre-industrial levels. A case study of the adoption of Building Information Modeling (BIM) and environmental assessment tools in Hong Kong will be discussed in this paper.

Keywords: sustainability, sustainable engineering, BIM, LEED

Procedia PDF Downloads 119
3809 Examining the Relationship Between Green Procurement Practices and Firm’s Performance in Ghana

Authors: Alexander Otchere Fianko, Clement Yeboah, Evans Oteng

Abstract:

Prior research concludes that Green Procurement Practices positively drive Organisational Performance. Nonetheless, the nexus and conditions under which Green Procurement Practices contribute to a Firm’s Performance are less understood. The purpose of this quantitative relational study was to examine the relationship between Green Procurement Practices and 500 Firms’ Performances in Ghana. The researchers further seek to draw insights from the resource-based view to conceptualize Green Procurement Practices and Environmental Commitment as resource capabilities to enhance Firm Performance. The researchers used insights from the contingent resource-based view to examine Green Leadership Orientation conditions under which Green Procurement Practices contribute to Firm Performance through Environmental Commitment Capabilities. The study’s conceptual framework was tested on primary data from some firms in the Ghanaian market. PROCESS Macro was used to test the study’s hypotheses. Beyond that, Environmental Commitment Capabilities mediated the association between Green Procurement Practices and the Firm’s Performance. The study further seeks to find out whether Green Leadership Orientation positively moderates the indirect relationship between Green Procurement Practices and Firm Performance through Environmental Commitment Capabilities. While conventional wisdom suggests that improved Green Procurement Practices help improve a Firm’s Performance, this study tested this presumed relationship between Green Procurement Practices and Firm Performance and provides theoretical arguments and empirical evidence to justify how Environmental Commitment Capabilities uniquely and in synergy with Green Leadership Orientation transform this relationship. The study results indicated a positive correlation between Green Procurement Practices and Firm Performance. This result suggests that firms that prioritize environmental sustainability and demonstrate a strong commitment to environmentally responsible practices tend to experience better overall performance. This includes financial gains, operational efficiency, enhanced reputation, and improved relationships with stakeholders. The study's findings inform policy formulation in Ghana related to environmental regulations, incentives, and support mechanisms. Policymakers can use the insights to design policies that encourage and reward firms for their Green Procurement Practices, thereby fostering a more sustainable and environmentally responsible business environment. The findings from such research can influence the design and development of educational programs in Ghana, specifically in fields related to sustainability, environmental management, and corporate social responsibility (CSR). Institutions may consider integrating environmental and sustainability topics into their business and management courses to create awareness and promote responsible practices among future business professionals. Also, the study results can also promote the adoption of environmental accounting practices in Ghana. By recognizing and measuring the environmental impacts and costs associated with business activities, firms can better understand the financial implications of their Green Procurement Practices and develop strategies for improved performance.

Keywords: environmental commitment, firm’s performance, green procurement practice, green leadership orientation

Procedia PDF Downloads 49
3808 The Potential Role of Industrialized Building Systems in Malaysian Sustainable Construction: Awareness and Barriers

Authors: Aawag Mohsen Al-Awag, Wesam Salah Alaloul, M. S. Liew

Abstract:

Industrialized building system (IBS) is a method of construction with concentrated practices consisting of techniques, products, and a set of linked elements which operate collectively to accomplish objectives. The Industrialised Building System (IBS) has been recognised as a viable method for improving overall construction performance in terms of quality, cost, safety and health, waste reduction, and productivity. The Malaysian construction industry is considered one of the contributors to the development of the country. The acceptance level of IBS is still below government expectations. Thus, the Malaysian government has been continuously encouraging the industry to use and implement IBS. Conventional systems have several drawbacks, including project delays, low economic efficiency, excess inventory, and poor product quality. When it comes to implementing IBS, construction companies still face several obstacles and problems, notably in terms of contractual and procurement concerns, which leads to the low adoption of IBS in Malaysia. There are barriers to the acceptance of IBS technology, focused on awareness of historical failure and risks connected to IBS practices to provide enhanced performance. Therefore, the transformation from the existing conventional building systems to the industrialized building systems (IBS) is needed more than ever. The flexibility of IBS in Malaysia’s construction industry is very low due to numerous shortcomings and obstacles. Due to its environmental, economic, and social benefits, IBS could play a significant role in the Malaysian construction industry in the future. This paper concentrates on the potential role of IBS in sustainable construction practices in Malaysia. It also highlights the awareness, barriers, advantages, and disadvantages of IBS in the construction sector. The study concludes with recommendations for Malaysian construction stakeholders to encourage and increase the utilization of industrialised building systems.

Keywords: construction industry, industrialized building system, barriers, advantages and disadvantages, construction, sustainability, Malaysia

Procedia PDF Downloads 66
3807 Fertilizer Procurement and Distribution in Nigeria: Assessing Policy against Implementation

Authors: Jacob Msughter Gwa, Rhys Williams

Abstract:

It is widely known that food security is a major concern in Sub-Saharan Africa. In many regions, including Nigeria, this is due to an agriculture-old problem of soil erosion beyond replacement levels. It seems that the use of fertilizer would be an immediate solution as it can boost agricultural productivity, and low agricultural productivity is attributed to the low use of fertilizers in Nigeria. The Government of Nigeria has been addressing the challenges of food shortage but with limited success. The utilisation of a practical and efficient subsidy programme in addressing this issue seems to be needed. However, the problem of procurement and distribution changes from one stage of subsidy to another. This paper looks at the difference between the ideal and the actual implementation of agricultural fertilizer policies in Nigeria, as it currently runs the risk of meeting required standards on paper but missing the desired real outcomes, and recognises the need to close the gap between the paper work and the realities on the ground.

Keywords: agricultural productivity, fertilizer distribution, fertilizer procurement, Nigeria

Procedia PDF Downloads 320
3806 Anti-Graft Instruments and Their Role in Curbing Corruption: Integrity Pact and Its Impact on Indian Procurement

Authors: Jot Prakash Kaur

Abstract:

The paper aims to showcase that with the introduction of anti-graft instruments and willingness of the governments towards their implementation, a significant change can be witnessed in the anti-corruption landscape of any country. Since the past decade anti-graft instruments have been introduced by several international non-governmental organizations with the vision of curbing corruption. Transparency International’s ‘Integrity Pact’ has been one such initiative. Integrity Pact has been described as a tool for preventing corruption in public contracting. Integrity Pact has found its relevance in a developing country like India where public procurement constitutes 25-30 percent of Gross Domestic Product. Corruption in public procurement has been a cause of concern even though India has in place a whole architecture of rules and regulations governing public procurement. Integrity Pact was first adopted by a leading Oil and Gas government company in 2006. Till May 2015, over ninety organizations had adopted Integrity Pact, of which majority of them are central government units. The methodology undertaken to understand impact of Integrity Pact on Public procurement is through analyzing information received from important stakeholders of the instrument. Government, information was sought through Right to Information Act 2005 about the details of adoption of this instrument by various government organizations and departments. Contractor, Company websites and annual reports were used to find out the steps taken towards implementation of Integrity Pact. Civil Society, Transparency International India’s resource materials which include publications and reports on Integrity Pact were also used to understand the impact of Integrity Pact. Some of the findings of the study include organizations adopting Integrity pacts in all kinds of contracts such that 90% of their procurements fall under Integrity Pact. Indian State governments have found merit in Integrity Pact and have adopted it in their procurement contracts. Integrity Pact has been instrumental in creating a brand image of companies. External Monitors, an essential feature of Integrity Pact have emerged as arbitrators for the bidders and are the first line of procurement auditors for the organizations. India has cancelled two defense contracts finding it conflicting with the provisions of Integrity Pact. Some of the clauses of Integrity Pact have been included in the proposed Public Procurement legislation. Integrity Pact has slowly but steadily grown to become an integral part of big ticket procurement in India. Government’s commitment to implement Integrity Pact has changed the way in which public procurement is conducted in India. Public Procurement was a segment infested with corruption but with the adoption of Integrity Pact a number of clean up acts have been performed to make procurement transparent. The paper is divided in five sections. First section elaborates on Integrity Pact. Second section talks about stakeholders of the instrument and the role it plays in its implementation. Third section talks about the efforts taken by the government to implement Integrity Pact in India. Fourth section talks about the role of External Monitor as Arbitrator. The final section puts forth suggestions to strengthen the existing form of Integrity Pact and increase its reach.

Keywords: corruption, integrity pact, procurement, vigilance

Procedia PDF Downloads 308
3805 The Principles of Clarifications during the Phase of Tender Preparation in a Public Procurement Procedure

Authors: Adelina Vrancianu

Abstract:

A public procurement procedure starts with the publication of the contract notice and the tender documentation. The documentation provides bidders with general guidelines and rules governing the tender process. At this stage, the interested economic operators start to prepare their bid. During this process, they may encounter unclear elements that, if are not clarified, may have a negative impact on the future bid with the ultimate sanction of exclusion. Until the opening of the bids, the potential bidders have the right to ask questions in order to clarify certain aspects of the tender documentation. In correlation, the contracting authorities have the obligation to answer these questions in a reasoned time and with clarity. In practice, the two conditions are not met due to a number of factors. This essay tries to outline the general principles regarding the clarifications during the phase of tender preparation. The provisions of the new directive on public procurement will be taken in consideration in this process in regard to the old directive.

Keywords: tender preparation, tender documentation, clarifications, contract notice

Procedia PDF Downloads 272
3804 Strategic Public Procurement: A Lever for Social Entrepreneurship and Innovation

Authors: B. Orser, A. Riding, Y. Li

Abstract:

To inform government about how gender gaps in SME ( small and medium-sized enterprise) contracting might be redressed, the research question was: What are the key obstacles to, and response strategies for, increasing the engagement of women business owners among SME suppliers to the government of Canada? Thirty-five interviews with senior policymakers, supplier diversity organization executives, and expert witnesses to the Canadian House of Commons, Standing Committee on Government Operations and Estimates. Qualitative data were conducted and analysed using N’Vivo 11 software. High order response categories included: (a) SME risk mitigation strategies, (b) SME procurement program design, and (c) performance measures. Primary obstacles cited were government red tape and long and complicated requests for proposals (RFPs). The majority of 'common' complaints occur when SMEs have questions about the federal procurement process. Witness responses included use of outcome-based rather than prescriptive procurement practices, more agile procurement, simplified RFPs, making payment within 30 days a procurement priority. Risk mitigation strategies included provision of procurement officers to assess risks and opportunities for businesses and development of more agile procurement procedures and processes. Recommendations to enhance program design included: improved definitional consistency of qualifiers and selection criteria, better co-ordination across agencies; clarification about how SME suppliers benefit from federal contracting; goal setting; specification of categories that are most suitable for women-owned businesses; and, increasing primary contractor awareness about the importance of subcontract relationships. Recommendations also included third-party certification of eligible firms and the need to enhance SMEs’ financial literacy to reduce financial errors. Finally, there remains the need for clear and consistent pre-program statistics to establish baselines (by sector, issuing department) performance measures, targets based on percentage of contracts granted, value of contract, percentage of target employee (women, indigenous), and community benefits including hiring local employees. The study advances strategies to enhance federal procurement programs to facilitate socio-economic policy objectives.

Keywords: procurement, small business, policy, women

Procedia PDF Downloads 89
3803 Normalized Enterprises Architectures: Portugal's Public Procurement System Application

Authors: Tiago Sampaio, André Vasconcelos, Bruno Fragoso

Abstract:

The Normalized Systems Theory, which is designed to be applied to software architectures, provides a set of theorems, elements and rules, with the purpose of enabling evolution in Information Systems, as well as ensuring that they are ready for change. In order to make that possible, this work’s solution is to apply the Normalized Systems Theory to the domain of enterprise architectures, using Archimate. This application is achieved through the adaptation of the elements of this theory, making them artifacts of the modeling language. The theorems are applied through the identification of the viewpoints to be used in the architectures, as well as the transformation of the theory’s encapsulation rules into architectural rules. This way, it is possible to create normalized enterprise architectures, thus fulfilling the needs and requirements of the business. This solution was demonstrated using the Portuguese Public Procurement System. The Portuguese government aims to make this system as fair as possible, allowing every organization to have the same business opportunities. The aim is for every economic operator to have access to all public tenders, which are published in any of the 6 existing platforms, independently of where they are registered. In order to make this possible, we applied our solution to the construction of two different architectures, which are able of fulfilling the requirements of the Portuguese government. One of those architectures, TO-BE A, has a Message Broker that performs the communication between the platforms. The other, TO-BE B, represents the scenario in which the platforms communicate with each other directly. Apart from these 2 architectures, we also represent the AS-IS architecture that demonstrates the current behavior of the Public Procurement Systems. Our evaluation is based on a comparison between the AS-IS and the TO-BE architectures, regarding the fulfillment of the rules and theorems of the Normalized Systems Theory and some quality metrics.

Keywords: archimate, architecture, broker, enterprise, evolvable systems, interoperability, normalized architectures, normalized systems, normalized systems theory, platforms

Procedia PDF Downloads 328
3802 Local Procurement in Ghana's Hotel Industry: A Study of the Driving Forces, Perceptions and Procurement Patterns

Authors: Adu-Ampomah Yaw Junior

Abstract:

Local procurement has become one of the latest trends in the discourse of sustainable tourism due to the economic benefits it generates for tourist destinations in developing countries. Local procurement helps in creating jobs which consequently helps in alleviating poverty. However, there have been limited studies on local procurement patterns in developing countries. Research on hotel procurement practices has mainly emphasized the challenges that hoteliers face when procuring locally, leaving questions regarding their motivations to engage in local procurement unanswered. The institutional theory provides a suitable framework to better understand these motivations as it underlines the importance of individual cognitive perceptions on issues in shaping organizational response strategies. More specifically, the extent to which an issue is perceived to belong to the organization’s responsibility. Also the organizational actors’ belief of losses or gains resultant from acting or not acting on an issue (degree of importance). Furthermore the organizational actors’ belief of the probability of resolving an issue (degree of feasibility). These factors influence how an organization will act on this issue. Hence, this paper adopts an institutional perspective to examine local procurement patterns of food by hoteliers in Ghana. Qualitative interviews with 20 procurement managers about their procurement practices and motivations, as well as interviews with different stakeholders for data triangulation purposes, indicated that most hotels sourced their food from middlemen who imported most of their products. However, direct importation was more prevalent foreign owned hotels as opposed to locally owned ones. Notwithstanding, the importation and the usage of foreign foods as opposed to local ones can be explained by the lack of pressure from NGOs and trade associations on hotels to act responsibly. Though guests’ menu preferences were perceived as important to hoteliers business operations, western tourists demand foreign food primarily with the foreign owned hotels make it less important to procure local produce. Lastly hoteliers, particularly those in foreign owned ones, perceive local procurement to be less feasible, raising concerns about quality and variety of local produce. The paper outlines strategies to improve the perception and degree of local Firstly, there is the need for stakeholder engagement in order to make hoteliers feel responsible for acting on the issue.Again it is crucial for Ghana government to promote and encourage hotels to buy local produce. Also, the government has to also make funds and storage facilities available for farmers to impact on the quality and quantity of local produce. Moreover, Sites need to be secured for farmers to engage in sustained farming.Furthermore, there is the need for collaborations between various stakeholders to organize training programs for farmers. Notwithstanding hotels need to market local produce to their guests. Finally, the Ghana hotels association has to encourage hotels to indulge in local procurement.

Keywords: sustainable tourism, feasible, important, local procurement

Procedia PDF Downloads 166
3801 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 370
3800 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns

Authors: Saidu Ibrahim, Winston M. W. Shakantu

Abstract:

The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.

Keywords: conceptual framework, cost overrun, material waste, project stags

Procedia PDF Downloads 262
3799 Constructability Driven Engineering in Oil and Gas Projects

Authors: Srikanth Nagarajan, P. Parthasarathy, Frits Lagers

Abstract:

Lower crude oil prices increased the pressure on oil and gas projects. Being competitive becomes very important and critical for the success in any industry. Increase in size of the project multiplies the magnitude of the issue. Timely completion of projects within the budget and schedule is very important for any project to succeed. A simple idea makes a larger impact on the total cost of the plant. In this robust world, the phases of engineering right from licensing technology, feed, different phases of detail engineering, procurement and construction has been so much compressed that they overlap with each other. Hence constructability techniques have become very important. Here in this paper, the focus will be on how these techniques can be implemented and reduce cost with the help of a case study. Constructability is a process driven by the need to impact project’s construction phase resulting in improved project delivery, costs and schedule. In construction phase of one of our fast-track mega project, it was noticed that there was an opportunity to reduce significant amount of cost and schedule by implementing Constructability study processes. In this case study, the actual methodology adopted during engineering and construction and the way for doing it better by implementing Constructability techniques with collaborative engineering efforts will be explained.

Keywords: being competitive, collaborative engineering, constructability, cost reduction

Procedia PDF Downloads 376
3798 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus

Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis

Abstract:

Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.

Keywords: BIM, project management, project monitoring, UAV

Procedia PDF Downloads 276
3797 Appraisal of Transaction Cost in South African Construction Projects

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.

Keywords: construction projects, project cost, South Africa, transaction cost

Procedia PDF Downloads 74
3796 Lessons-Learned in a Post-Alliance Framework

Authors: Olubukola Olumuyiwa Tokede, Dominic D. Ahiaga-Dagbui, John Morrison

Abstract:

The project environment in construction has been widely criticised for its inability to learn from experience effectively. As each project is bespoke, learning is ephemeral, as it is often confined within its bounds and seldom assimilated with others that are being delivered in the project environment. To engender learning across construction projects, collaborative contractual arrangements, such as alliancing and partnering, have been embraced to aid the transferability of lessons across projects. These cooperative arrangements, however, tend to be costly, and hence construction organisations could revert to less expensive traditional procurement approaches after successful collaborative project delivery. This research, therefore, seeks to assess the lessons-learned in a post-alliance contractual framework. Using a case-study approach, we examine the experiences of a public sector authority who engaged a project facilitator to foster learning during the delivery of a significant piece of critical infrastructure. It was found that the facilitator enabled optimal learning outcomes in post-alliance contractual frameworks by attenuating the otherwise adversarial relationship between clients and contractors. Further research will seek to assess the effectiveness of different knowledge-brokering agencies in construction projects.

Keywords: facilitation, knowledge-brokering, learning, projects

Procedia PDF Downloads 108
3795 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 327
3794 Investigation of the Factors Influencing the Construction Planning Process Using Participant Observation Method

Authors: Ashokkumar Subbiah

Abstract:

This study investigates the impact of factors that influenced the success of construction planning for a major construction project in Qatar. An approach of participant observation is adopted which is informed by the principles of ethnography: one that reports the participants’ view of their world rather than imposing an artificial theoretical framework upon it. As participant observant, key factors were observed and identified that had an impact on the management and execution of the construction planning. It is found that a ‘shadow culture’ exists between the project participants which, it is argued, is only observable from the perspective of an embedded participant observer. The shadow culture acts to enable the management of the planning process, and its efficacy relates to the ‘quality’ of human inter-relationships amongst immediate stakeholders. Whilst this study uses the concept of shadow culture, it is treated as both a methodological stance and one of the findings of this research in the context of the major construction project in Qatar. The concept of shadow culture is not imposed upon the findings, but instead is used as a research tool: respondents report their own worldview and this is reported from the view of a participant observant in a manner that is understandable and useful to those who are not part of the construction project. The findings of this study identify similar factors influencing the planning process of the Qatar project, but the shadow culture predominantly influences these factors towards the failure of planning process. The research concludes by questioning the assumption that construction planning is a mechanistic process that has to be conducted solely by the planning team. Instead, it is a highly social phenomenon in which the seemingly mechanistic process is made workable by the quality of relationships that exist in the project. Drawing on this the final section provides a series of recommendations that may be helpful in enhancing the efficacy of project planning; these include better training/education at the pre-construction phase; recognition of the importance of shadow processes at management levels, and better appreciation of the impact of contract type and chosen procurement route.

Keywords: construction planning, participant observation, project participants, shadow culture

Procedia PDF Downloads 270
3793 Development of E-Tendering Models for Nigerian Public Procuring Entities

Authors: Bello Abdullahi, Kabir Bala, Yahaya M. Ibrahim, Ahmed D. Ibrahim

Abstract:

Public sector tendering has traditionally been conducted using manual paper-based processes which are known to be inefficient, less transparent, and more prone to manipulations and errors. However, the advent of the Internet and its associated technologies has led to the development of numerous e-Tendering systems that addressed many of the problems associated with the manual paper-based tendering system. Currently, in Nigeria, the public tendering processes are largely conducted based on manual paper-based system that is bedevilled by a number of problems such as inordinate delays, inefficiencies, manipulation of the tender evaluation process, corruption, lack of transparency and competition, among other problems. These problems can be addressed through the adoption of existing web-based e-Tendering systems which are known to address most of these problems. However, these existing e-Tendering systems that have been developed are not based on the Nigerian legal procurement processes and as such their suitability for local application is very limited. This paper is part of a larger study that attempt to address this problem through the development of an e-Tendering system that is based on the requirements of the Nigerian public procuring entities. In this paper, the identified tendering processes commonly used by Nigerian public procuring entities in the selection of construction sources are presented. A multi-methods research approach was used to identify those tendering processes. Specifically, 19 existing business use cases used by Nigerian public procuring entities were identified and 61 system use cases were prescribed based on the identified business use cases. The use cases were used as the basis for the development of domain and software conceptual models. The models were successfully used to guide the development of an e-Tendering system called NPS-eTender. Ripple and Unified Process were adopted as the software development methodologies.

Keywords: e-tendering, e-procurement, requirement model, conceptual model, public sector tendering, public procurement

Procedia PDF Downloads 159
3792 Reshoring Strategies for Enhanced Supply Chain Resilience: A Comprehensive Analysis of Procurement Challenges and Solutions in the United States

Authors: Emilia Segun-Ajao

Abstract:

The strategy of relocation aimed at strengthening supply chain resilience in the United States is examined, taking into account recent global disturbances and vulnerabilities in offshore manufacturing. It explains the procurement challenges faced by enterprises and offers solutions to mitigate risks and improve resilience. Through the analysis of innovative approaches, including technological advances, policy considerations, and strategic frameworks, this study provides insights to decision-makers about the complexity of supply chain management. Reshoring has gained attention as a strategy to improve supply chain resilience in the face of global disruptions. This analysis focuses on the importance of relocating as a multifaceted approach to strengthening supply chains, advocating economic benefits, technological advances, and policy frameworks to create a more robust supply landscape in the United States.

Keywords: collaborative partnerships, supply chain resilience, procurement challenges, technology adoption

Procedia PDF Downloads 12
3791 Designing Supplier Partnership Success Factors in the Coal Mining Industry

Authors: Ahmad Afif, Teuku Yuri M. Zagloel

Abstract:

Sustainable supply chain management is a new pattern that has emerged recently in industry and companies. The procurement process is one of the key factors for efficiency in supply chain management practices. Partnership is one of the procurement strategies for strategic items. The success factors of the partnership must be determined to avoid things that endanger the financial and operational status of the company. The current supplier partnership research focuses on the selection of general criteria and sustainable supplier selection. Currently, there is still limited research on the success factors of supplier partnerships that focus on strategic items in the coal mining industry. Meanwhile, the procurement of coal mining has its own characteristics, and there are regulations related to the procurement of goods. Therefore, this research was conducted to determine the categories of goods that are included in the strategic items and to design the success factors of supplier partnerships. The main factors studied are general, financial, production, reputation, synergies, and sustainable. The research was conducted using the Kraljic method to determine the categories of goods that are included in the strategic items. To design a supplier partnership success factor using the Hybrid Multi Criteria Decision Making method. Integrated Fuzzy AHP-Fuzzy TOPSIS is used to determine the weight of the success factors of supplier partnerships and to rank suppliers on the factors used.

Keywords: supplier, partnership, strategic item, success factors, and coal mining industry