Search results for: discourse construction
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4903

Search results for: discourse construction

4693 A Corpus-Linguistic Analysis of Online Iranian News Coverage on Syrian Revolution

Authors: Amaal Ali Al-Gamde

Abstract:

The Syrian revolution is a major issue in the Middle East, which draws in world powers and receives a great focus in international mass media since 2011. The heavy global reliance on cyber news and digital sources plays a key role in conveying a sense of bias to a wide range of online readers. Thus, based on the assumption that media discourse possesses ideological implications, this study investigates the representation of Syrian revolution in online media. The paper explores the discursive constructions of anti and pro-government powers in Syrian revolution in 1000,000-word corpus of Fars online reports (an Iranian news agency), issued between 2013 and 2015. Taking a corpus assisted discourse analysis approach, the analysis investigates three types of lexicosemantic relations, the semantic macrostructures within which the two social actors are framed, the lexical collocations characterizing the news discourse and the discourse prosodies they tell about the two sides of the conflict. The study utilizes computer-based approaches, sketch engine and AntConc software to minimize the bias of the subjective analysis. The analysis moves from the insights of lexical frequencies and keyness scores to examine themes and the collocational patterns. The findings reveal the Fars agency’s ideological mode of representations in reporting events of Syrian revolution in two ways. The first is by stereotyping the opposition groups under the umbrella of terrorism, using words such as (law breakers, foreign-backed groups, militant groups, terrorists) to legitimize the atrocities of security forces against protesters and enhance horror among civilians. The second is through emphasizing the power of the government and depicting it as the defender of the Arab land by foregrounding the discourse of international conspiracy against Syria. The paper concludes discussing the potential importance of triangulating corpus linguistic tools with critical discourse analysis to elucidate more about discourses and reality.

Keywords: discourse prosody, ideology, keyness, semantic macrostructure

Procedia PDF Downloads 131
4692 Critical Discourse Analysis of President Mamnoon Hussain Speech in the Joint Session of Parliament.

Authors: Saeed Qaisrani

Abstract:

This article briefly reviews the rise of Critical Discourse Analysis about the Pakistani President Mamnoon Hussain speech which delivered in the joint session of Parliament and teases out a detailed analysis of the various critiques that have been levelled at CDA and its practitioners over the last twenty years, both by scholars working within the “critical” paradigm and by other critics. A range of criticisms are discussed which target the underlying premises, the analytical methodology and the disputed areas of reader response and the integration of contextual factors. Controversial issues such as the predominantly negative focus of much CDA scholarship, and the status of CDA as an emergent “intellectual orthodoxy”, are also reviewed. The conclusions offer a summary of the principal criticisms that emerge from this overview, and suggest some ways in which these problems could be attenuated. It also focused on the different views about president speech and how it is presented in the Pakistani print and electronic media.

Keywords: Critical Discourse Analysis, Analytical methodology, Corpus linguistics, Reader response theory, Critical paradigm, Contextualization.

Procedia PDF Downloads 484
4691 Dynamic Construction Site Layout Using Ant Colony Optimization

Authors: Yassir AbdelRazig

Abstract:

Evolutionary optimization methods such as genetic algorithms have been used extensively for the construction site layout problem. More recently, ant colony optimization algorithms, which are evolutionary methods based on the foraging behavior of ants, have been successfully applied to benchmark combinatorial optimization problems. This paper proposes a formulation of the site layout problem in terms of a sequencing problem that is suitable for solution using an ant colony optimization algorithm. In the construction industry, site layout is a very important planning problem. The objective of site layout is to position temporary facilities both geographically and at the correct time such that the construction work can be performed satisfactorily with minimal costs and improved safety and working environment. During the last decade, evolutionary methods such as genetic algorithms have been used extensively for the construction site layout problem. This paper proposes an ant colony optimization model for construction site layout. A simple case study for a highway project is utilized to illustrate the application of the model.

Keywords: ant colony, construction site layout, optimization, genetic algorithms

Procedia PDF Downloads 382
4690 Treatment of the Modern Management Mechanism of the Debris Flow Processes Expected in the Mletiskhevi

Authors: G. Chakhaia, S. Gogilava, L. Tsulukidze, Z. Laoshvili, I. Khubulava, S. Bosikashvili, T. Gugushvili

Abstract:

The work reviewed and evaluated various genesis debris flow phenomena recently formatted in the Mletiskhevi, accordingly it revealed necessity of treatment modern debris flow against measures. Based on this, it is proposed the debris flow against truncated semi cone shape construction, which elements are contained in the car’s secondary tires. its constituent elements (sections), due to the possibilities of amortization and geometric shapes is effective and sustainable towards debris flow hitting force. The construction is economical, because after crossing the debris flows in the river bed, the riverbed is not cleanable, also the elements of the building are resource saving. For assessment of influence of cohesive debris flow at the construction and evaluation of the construction effectiveness have been implemented calculation in the specific assumptions with approved methodology. According to the calculation, it was established that after passing debris flow in the debris flow construction (in 3 row case) its hitting force reduces 3 times, that causes reduce of debris flow speed and kinetic energy, as well as sedimentation on a certain section of water drain in the lower part of the construction. Based on the analysis and report on the debris flow against construction, it can be said that construction is effective, inexpensive, technically relatively easy-to-reach measure, that’s why its implementation is prospective.

Keywords: construction, debris flow, sections, theoretical calculation

Procedia PDF Downloads 193
4689 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal

Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai

Abstract:

Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.

Keywords: material management, construction site, inventory, construction project

Procedia PDF Downloads 68
4688 Rethinking Peace Journalism in Pakistan: A Critical Analysis of News Discourse on the Afghan Refugee Repatriation Conflict

Authors: Ayesha Hasan

Abstract:

This study offers unique perspectives and analyses of peace and conflict journalism through interpretative repertoire, media frames, and critical discourse analyses. Two major English publications in Pakistan, representing both long and short-form journalism, are investigated to uncover how the Afghan refugee repatriation from Pakistan in 2016-17 has been framed in Pakistani English media. Peace journalism focuses on concepts such as peace initiatives and peace building, finding common ground, and preventing further conflict. This study applies Jake Lynch’s Coding Criteria to guide the critical discourse analysis and Lee and Maslog’s Peace Journalism Quotient to examine the extent of peace journalism in each text. This study finds that peace journalism is missing in Pakistani English press, but represented, to an extent, in long-form print and online coverage. Two new alternative frames are also proposed. This study gives an in-depth understanding of if and how journalists in Pakistan are covering conflicts and framing stories that can be identified as peace journalism. This study represents significant contributions to the remarkably limited scholarship on peace and conflict journalism in Pakistan and extends Shabbir Hussain’s work on critical pragmatic perspectives on peace journalism in Pakistan.

Keywords: Afghan refugee repatriation, Critical discourse analysis, Media framing , Peace and conflict journalism

Procedia PDF Downloads 201
4687 Top-Down Construction Method in Concrete Structures: Advantages and Disadvantages of This Construction Method

Authors: Hadi Rouhi Belvirdi

Abstract:

The construction of underground structures using the traditional method, which begins with excavation and the implementation of the foundation of the underground structure, continues with the construction of the main structure from the ground up, and concludes with the completion of the final ceiling, is known as the Bottom-Up Method. In contrast to this method, there is an advanced technique called the Top-Down Method, which has practically replaced the traditional construction method in large projects in industrialized countries in recent years. Unlike the traditional approach, this method starts with the construction of surrounding walls, columns, and the final ceiling and is completed with the excavation and construction of the foundation of the underground structure. Some of the most significant advantages of this method include the elimination or minimization of formwork surfaces, the removal of temporary bracing during excavation, the creation of some traffic facilities during the construction of the structure, and the possibility of using it in limited and high-traffic urban spaces. Despite these numerous advantages, unfortunately, there is still insufficient awareness of this method in our country, to the extent that it can be confidently stated that most stakeholders in the construction industry are unaware of the existence of such a construction method. However, it can be utilized as a very important execution option alongside other conventional methods in the construction of underground structures. Therefore, due to the extensive practical capabilities of this method, this article aims to present a methodology for constructing underground structures based on the aforementioned advanced method to the scientific community of the country, examine the advantages and limitations of this method and their impacts on time and costs, and discuss its application in urban spaces. Finally, some underground structures executed in the Ahvaz urban rail, which are being implemented using this advanced method to the best of our best knowledge, will be introduced.

Keywords: top-down method, bottom-up method, underground structure, construction method

Procedia PDF Downloads 11
4686 Students’ Perceptions Regarding Homosexuality at Sefako Makgatho Health Sciences University

Authors: Deborah O. Okusanya, Chris Vanrooyen, Stefan de Jager

Abstract:

Introduction: Homosexuality has been and continues to be a controversial subject across many disciplines; it has generated many debates around religious, academic institutions, political, socio-cultural as well as medical domains. The current study investigated students from a previously disadvantaged African university’s perception regarding homosexuality. Method: This qualitative study utilized two focus groups to collect data, which then was analyzed using thematic content analysis. Result: The study revealed that students’ level of awareness with regard to homosexuality is very high and their perceptions largely negative. Students predominantly found the practice unethical, and un-African. Discussion: Students tend to show a lot of stereotypical prejudicial responses and there seems to be a general lack of willingness to discuss this in a public discourse. In conclusion, there seems to be a tension between cultural values and the open environment such as academic institutions. Students’ perceptions go a long way in shaping public discourse and the larger population’s general attitude toward homosexuality.

Keywords: discourse, homosexuality, stereotypical, un-African

Procedia PDF Downloads 226
4685 Significant Factors to Motivate Small and Medium Enterprise (SME) Construction Firms in the Philippines to Implement ISO 9001:2008

Authors: Joseph Berlin P. Juanzon, Manuel M. Muhi

Abstract:

Motivating SME-based construction firms to adopt different management systems is not a simple task, especially if they are not aware of the benefits that they will gain from the new process-based management system. The implementation of ISO 9001:2008, Quality Management System in the construction industry is an ongoing trend, more so in the Small and Medium Enterprise. However, the level of awareness and readiness of the construction industry in the Philippines is still low as compared to the neighboring countries in Asia and in the western countries where ISO 9001:2008 originated. The purpose of this research is to determine the significant factors that will motivate SME-based construction firms in the Philippines to implement ISO 9001:2008. A field study was conducted on SME based construction firms in the Philippines, wherein a total of 139 respondents out of the 613 SME-based construction firms in CALABARZON areas were surveyed. Results reveal that the three main factors that will motivate SME-based construction firms to implement ISO 9001:2008 are: - if required by their clients, - to qualify for bidding, and - to increase customer satisfaction. Therefore, based on the results and findings, a certification of ISO 9001:2008 from an accredited auditor shall be required by clients as a constituent in accrediting SME-based construction firms and to qualify for bidding.

Keywords: construction, ISO 9001:2008, quality management systems (QMS), small medium enterprise (SME)

Procedia PDF Downloads 394
4684 We Are the 99 percent – the Occupy-Movement in Social Media

Authors: Wolfram Karg

Abstract:

The Occupy-Movement came into in 2011 existence in the US as a reaction to one of the worst economic crisis since World War II. With cuts in benefits and social services, with people being evicted from their homes on the one hand and high bonuses granted to their managers of the very same companies, a strong feeling of injustice besieged people in the US and caused them to voice their anger peacefully in social media and on the streets. Due to the world-wide-web, users all around the world read about this movement and recognized the same injustice in their own countries, making Occupy a global movement. The vast array of topics covered by Occupy offers a unique chance to carry out a corpus-based discourse analysis based on the DIMEAN-Model. The focus on this paper is limited to two aspects of DIMEAN: intertextual references and the use of connectors in texts. Because the discourse is to a large extent carried out via posts in blogs, online-articles and comments, the paper also analyses, in how far modern (i.e. computer-based media) there is a correlation between the use of connectors in different communicative types used by the Occupy-Movement.

Keywords: discourse, new media, occupy, corpus analysis

Procedia PDF Downloads 493
4683 Causality between the Construction Industry and the GDP in the United Arab Emirates

Authors: Hasan S. Mahmoud, Salwa M. Beheiry, Vian Ahmed

Abstract:

In light of the repercussions of the 2008 global economic crisis, the response of the United Arab Emirates economy and growth, and the vast construction activities that are undergoing, there is a need to investigate the relationship between construction activities and the Gross Domestic Product (GDP). This study aims to investigate the causality relationship between the construction industry in the United Arab Emirates and the GDP of the country in the last decade. For that, this study will investigate the relationship between the growth of the GDP and the growth of construction activities and their value addition to the economy. To ascertain this relationship, Granger Causality method is used to identify the causality between the time-dependent series.

Keywords: construction value addition, Granger causality, growth of gross domestic product, United Arab Emirates

Procedia PDF Downloads 145
4682 Alvaro Siza’s Design Strategy: An Insight into Critical Regionalism

Authors: Rahmatollah Amirjani

Abstract:

By the emergence of the debate over the failure of Regionalism in the late 1970s, Critical Regional­ism was introduced as a different way to respond to the state of architecture in the post-war era. Critical Regionalism is most often understood as a discourse that not only mediates the language of modern architecture with the local cultures but also revives the relation between architecture and spectator as indexed by capitalism. Since the inception of Critical Regionalism, a large number of architectural practices have emerged around the globe; however, the work of the well-known Portuguese architect, Álvaro Siza, is considered as a unique case amongst works associated with the discourse of Critical Regionalism. This paper intends to respond to a number of questions, including; what are the origins of Critical Regionalism? How does Siza’s design strategy correspond to the thematic of Critical Regionalism? How does Siza recover the relation between object and subject in most of his projects? Using Siza’s housing project for the Malagueira district in Évora, Portugal, this article will attempt to answer these questions, and highlight Alvaro Siza’s design procedure which goes beyond the existing discourse of Critical Regionalism and contributes to our understanding of this practice.

Keywords: Alvaro Siza, critical regionalism, Malagueira housing, placelessness

Procedia PDF Downloads 180
4681 Assessment of Impact of Manpower Training and Development in the Construction Industry

Authors: Olalekan Bamidele Aruleba

Abstract:

This research assessed the impact of manpower training and development in the construction industry. The aim is to determine the effect of training and development on employees for effective organizational growth in the construction industry to identify the training method for each category of employee in the construction industry, challenges to training and development of workers in the construction industry and impact of manpower training and development on employees and employers. Data for the study were obtained through a well-structured questionnaire administered to building professionals in Nigeria construction firm. Eighty (80) questionnaires were distributed among building professionals in three selected local governments within Ondo State and sixty-four (64) were returned. Data collected were analysed using descriptive statistics and ranking. Findings of the study revealed that in house training and in-service training methods were preferred by most construction industry. It concluded that the attitude of top management and lack of fund was seen as the significant challenges militating against training of employees. The study recommended that manpower training and development must be sustained by all stakeholders in the industry in order to improve workers' productivity; the organization should adopt the right method in training each category of employees and carry out the need assessment for training to avoid training wrong employees.

Keywords: construction, development, manpower, training

Procedia PDF Downloads 234
4680 The Curse of Vigilante Justice: Killings of Rape Suspects in India and Its Impact on the Discourse on Sexual Violence

Authors: Hrudaya Kamasani

Abstract:

The cultural prevalence of vigilante justice is sustained through the social sanction for foregoing a judicial trial to determine guilt. Precisely due to its roots in social sanction, it has repercussions as more than just being symptomatic of cultural values that condone violence. In the long term, the practice of vigilante justice as a response to incidents of sexual violence, while veiled in civic discontent over the standards of women’s security in society, can adversely affect the discourse on sexual violence. To illustrate the impact that acts of vigilante justice can have in prematurely ending a budding discourse on sexual violence, the paper reviews three cases of heinous crimes committed against women in India that gained popular attention in the discursive spaces. The 2012 Nirbhaya rape and murder case in Delhi demonstrates how the criminal justice system can spur a social movement and can result in legislative changes and a discourse that challenged a wide range of socio-cultural issues of women’s security and treatment. The paper compares it with two incidents of sexual violence in India that ended with the suspects being killed in the name of vigilante justice that had wide social sanction. The two cases are the 2019 extrajudicial killing of Priyanka Reddy rape and murder case suspects in Hyderabad and the 2015 mob lynching of an accused in a rape case in Dimapur. The paper explains why the absence of judicial trials in sexual violence cases results in ending any likelihood of the instances inspiring civic engagement with the discourse on sexual violence.

Keywords: sexual violence, vigilante justice, extrajudicial killing, cultural values of violence, Nirbhaya rape case, mob violence

Procedia PDF Downloads 205
4679 Apps Reduce the Cost of Construction

Authors: Ali Mohammadi

Abstract:

Every construction that is done, the most important part of attention for employers and contractors is its cost, and they always try to reduce costs so that they can compete in the market, so they estimate the cost of construction before starting their activities. The costs can be generally divided into four parts: the materials used, the equipment used, the manpower required, and the time required. In this article, we are trying to talk about the three items of equipment, manpower, and time, and examine how the use of apps can reduce the cost of construction, while due to various reasons, it has received less attention in the field of app design. Also, because we intend to use these apps in construction and they are used by engineers and experts, we define these apps as engineering apps because the idea of ​​their design must be by an engineer who works in that field. Also, considering that most engineers are familiar with programming during their studies, they can design the apps they need using simple programming software.

Keywords: layout, as-bilt, monitoring, maps

Procedia PDF Downloads 65
4678 Analysis of Construction Waste Generation and Its Effect in a Construction Site

Authors: R. K. D. G. Kaluarachchi

Abstract:

The generation of solid waste and its effective management are debated topics in Sri Lanka as well as in the global environment. It was estimated that the most of the waste generated in global was originated from construction and demolition of buildings. Thus, the proportion of construction waste in solid waste generation cannot be underestimated. The construction waste, which is the by-product generated and removed from work sites is collected in direct and indirect processes. Hence, the objectives of this research are to identify the proportion of construction waste which can be reused and identify the methods to reduce the waste generation without reducing the quality of the process. A 6-storey building construction site was selected for this research. The site was divided into six zones depending on the process. Ten waste materials were identified by considering the adverse effects on safety and health of people and the economic value of them. The generated construction waste in each zone was recorded per week for a period of five months. The data revealed that sand, cement, wood used for form work and rusted steel rods were the generated waste which has higher economic value in all zones. Structured interviews were conducted to gather information on how the materials are categorized as waste and the capability of reducing, reusing and recycling the waste. It was identified that waste is generated in following processes; ineffective storage of material for a longer time and improper handling of material during the work process. Further, the alteration of scheduled activities of construction work also yielded more waste. Finally, a proper management of construction waste is suggested to reduce and reuse waste.

Keywords: construction-waste, effective management, reduce, reuse

Procedia PDF Downloads 200
4677 Heading for Modern Construction Management: Recommendation for Employers

Authors: Robin Becker, Maike Eilers, Nane Roetmann, Manfred Helmus

Abstract:

The shortage of junior staff in the construction industry is a problem that will be further exacerbated in the coming years by the retirement of the baby-boom generations (1955-1969) from employment. In addition, the current working conditions in the field of construction management are not attractive for young professionals. A survey of students revealed a desire for an increase in flexibility and an improved work-life balance in everyday working life. Students of civil engineering and architecture are basically interested in a career in construction management but have reservations due to the image of the profession and the current working conditions. A survey among experts from the construction industry shows that the profession can become more attractive. This report provides recommendations for action in the form of working modules to improve the working conditions of employees. If these are taken into account, graduates can be attracted to the profession of construction management, and existing staff can be retained more effectively. The aim of this report is to show incentives for employers to respond to the wishes and needs of their current and future employees to the extent that can be implemented.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 83
4676 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 247
4675 Communication in the Sciences: A Discourse Analysis of Biology Research Articles and Magazine Articles

Authors: Gayani Ranawake

Abstract:

Effective communication is widely regarded as an important aspect of any discipline. This particular study deals with written communication in science. Writing conventions and linguistic choices play a key role in conveying the message effectively to a target audience. Scientists are responsible for conveying their findings or research results not only to their discourse community but also to the general public. Recognizing appropriate linguistic choices is crucial since they vary depending on the target audience. The majority of scientists can communicate effectively with their discourse community, but public engagement seems more challenging to them. There is a lack of research into the language use of scientists, and in particular how it varies by discipline and audience (genre). A better understanding of the different linguistic conventions used in effective science writing by scientists for scientists and by scientists for the public will help to guide scientists who are familiar with their discourse community norms to write effectively for the public. This study investigates the differences and similarities of linguistic choices in biology articles written by scientists for their discourse community and biology magazine articles written by scientists and science communicators for the general public. This study is a part of a larger project investigating linguistic differences in different genres of science academic writing. The sample for this particular study is composed of 20 research articles from the journal Biological Reviews and 20 magazine articles from the magazine Australian Popular Science. Differences in the linguistic devices were analyzed using Hyland’s metadiscourse model for academic writing proposed in 2005. The frequency of the usage of interactive resources (transitions, frame markers, endophoric markers, evidentials and code glosses) and interactional resources (hedges, boosters, attitude markers, self-mentions and engagement markers) were compared and contrasted using the NVivo textual analysis tool. The results clearly show the differences in the frequency of usage of interactional and interactive resources in the two disciplines under investigation. The findings of this study provide a reference guide for scientists and science writers to understand the differences in the linguistic choices between the two genres. This will be particularly helpful for scientists who are proficient at writing for their discourse community, but not for the public.

Keywords: discourse analysis, linguistic choices, metadiscourse, science writing

Procedia PDF Downloads 141
4674 Activity-Based Safety Assessment of Real Estate Projects in Western India

Authors: Patel Parul, Harsh Ganvit

Abstract:

The construction industry is the second highest industry after agriculture provides employment in India. In developing countries like India, many construction projects are coming up to meet the demand. On the one hand, construction projects are increasing; on the other hand still, construction companies are struggling with many problems. One of the major problems is to ensure safe working conditions at the construction site. Due to a lack of safety awareness and ignorance of safety aspects, many fatal accidents are very common at the construction site in India. One of the key success factors for construction projects is “Accident-Free Construction Projects”. The construction projects can be divided into various categories like Infrastructure projects, industrial construction and real estate construction. Real estate projects are mainly comprised of commercial and residential projects. In the construction industry, private sectors play a huge role in urban and rural development and also contribute significantly to the growth of the nation. Infrastructure and Industrial projects are mainly executed by well-qualified construction contractors. For such projects, ensuring safety at construction projects is inevitable and probably one of the major clauses of contract documents as well. These projects are monitored from time to time by national agencies and researchers, too. However, Real estate projects are rarely monitored for safety aspects. No systematic contract system is followed for these projects. Safety is the most neglected aspect of these projects. In the current research projects, an attempt is made to carry out safety auditing for about 75 real estate projects. The objective of this work is to collect the activity-based safety survey of real estate projects in western India. The analysis of activity-based safety implementation for real estate projects is discussed in the present work. The activities are divided into three categories based on the data collected. The findings of this work will help local monitoring authorities to implement a safety management plan for real estate projects.

Keywords: construction safety, safety assessment, activity-based safety, real estate projects

Procedia PDF Downloads 55
4673 Study on the Model Predicting Post-Construction Settlement of Soft Ground

Authors: Pingshan Chen, Zhiliang Dong

Abstract:

In order to estimate the post-construction settlement more objectively, the power-polynomial model is proposed, which can reflect the trend of settlement development based on the observed settlement data. It was demonstrated by an actual case history of an embankment, and during the prediction. Compared with the other three prediction models, the power-polynomial model can estimate the post-construction settlement more accurately with more simple calculation.

Keywords: prediction, model, post-construction settlement, soft ground

Procedia PDF Downloads 425
4672 Simultaneous Interpreting in the European Parliament: Linguistic Quality of the Political Discourse: An Empirical Analysis

Authors: Alicja Zapolnik-Plachetka

Abstract:

The paper examines the impact of the Members’ of the European Parliament (MEPs) language choice on the linguistic quality of their political discourse as delivered by the interpreters. The study, designed by the author, who is an EU interpreter herself, consisted of three phases. First, a number of speeches of Polish and Spanish MEPs were analyzed to determine whether the incidence of use of certain figures of speech depending on whether the speech had been delivered in English or their respective mother tongue. Then the use of figures of speech was also analyzed based on speeches by some British MEPs, in order to determine what was the incidence for the native users of English. Subsequently, the speeches were compared with their interpretations to find out whether the interpreters managed to convey accurately the means of oratory used by the MEPs. The final result shows that in case of institutional environments dependant on simultaneous interpretation the speakers’ choices can, in fact, influence the linguistic quality of the political communication.

Keywords: content accuracy, European Parliament, political discourse, simultaneous interpreting

Procedia PDF Downloads 130
4671 Building Information Models Utilization for Design Improvement of Infrastructure

Authors: Keisuke Fujioka, Yuta Itoh, Masaru Minagawa, Shunji Kusayanagi

Abstract:

In this study, building information models of the underground temporary structures and adjacent embedded pipes were constructed to show the importance of the information on underground pipes adjacent to the structures to enhance the productivity of execution of construction. Next, the bar chart used in actual construction process were employed to make the Gantt chart, and the critical pass analysis was carried out to show that accurate information on the arrangement of underground existing pipes can be used for the enhancement of the productivity of the construction of underground structures. In the analyzed project, significant construction delay was not caused by unforeseeable existence of underground pipes by the management ability of the construction manager. However, in many cases of construction executions in the developing countries, the existence of unforeseeable embedded pipes often causes substantial delay of construction. Design change based on uncertainty on the position information of embedded pipe can be also important risk for contractors in domestic construction. So CPM analyses were performed by a project-management-software to the situation that influence of the tasks causing construction delay was assumed more significant. Through the analyses, the efficiency of information management on underground pipes and BIM analysis in the design stage for workability improvement was indirectly confirmed.

Keywords: building-information modelling, construction information modelling, design improvement, infrastructure

Procedia PDF Downloads 308
4670 Application of Support Vector Machines in Forecasting Non-Residential

Authors: Wiwat Kittinaraporn, Napat Harnpornchai, Sutja Boonyachut

Abstract:

This paper deals with the application of a novel neural network technique, so-called Support Vector Machine (SVM). The objective of this study is to explore the variable and parameter of forecasting factors in the construction industry to build up forecasting model for construction quantity in Thailand. The scope of the research is to study the non-residential construction quantity in Thailand. There are 44 sets of yearly data available, ranging from 1965 to 2009. The correlation between economic indicators and construction demand with the lag of one year was developed by Apichat Buakla. The selected variables are used to develop SVM models to forecast the non-residential construction quantity in Thailand. The parameters are selected by using ten-fold cross-validation method. The results are indicated in term of Mean Absolute Percentage Error (MAPE). The MAPE value for the non-residential construction quantity predicted by Epsilon-SVR in corporation with Radial Basis Function (RBF) of kernel function type is 5.90. Analysis of the experimental results show that the support vector machine modelling technique can be applied to forecast construction quantity time series which is useful for decision planning and management purpose.

Keywords: forecasting, non-residential, construction, support vector machines

Procedia PDF Downloads 434
4669 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness

Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami

Abstract:

A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.

Keywords: construction, critical success factors, performance, stakeholders, team effectiveness

Procedia PDF Downloads 127
4668 A Review of Literature on Theories of Construction Accident Causation Models

Authors: Samuel Opeyemi Williams, Razali Bin Adul Hamid, M. S. Misnan, Taki Eddine Seghier, D. I. Ajayi

Abstract:

Construction sites are characterized with occupational risks. Review of literature on construction accidents reveals that a lot of theories have been propounded over the years by different theorists, coupled with multifarious models developed by different proponents at different times. Accidents are unplanned events that are prominent in construction sites, involving materials, objects and people with attendant damages, loses and injuries. Models were developed to investigate the causations of accident with the aim of preventing its occurrence. Though, some of these theories were criticized, most especially, the Heinrich Domino theory, being mostly faulted for placing much blame on operatives rather than the management. The purpose of this paper is to unravel the significant construction accident causation theories and models for the benefit of understanding of the theories, and consequently enabling construction stakeholders identify the possible potential hazards on construction sites, as all stakeholders have significant roles to play in preventing accident. Accidents are preventable; hence, understanding the risk factors of accident and the causation theories paves way for its prevention. However, findings reveal that still some gaps missing in the existing models, while it is recommended that further research can be made in order to develop more models in order to maintain zero accident on construction sites.

Keywords: domino theory, construction site, site safety, accident causation model

Procedia PDF Downloads 304
4667 A Feminist Critical Discourse Analysis of the Representation of International Women’s Day in Algerian Print Media from 2003

Authors: Taoues Aimeur

Abstract:

The present study is the first comparative study of discourses surrounding women on International Women’s Day in French-language newspapers and Arabic-language newspapers in Algeria. It aims at critically examining the way women are positioned on International Women’s Day in four Algerian newspapers by focusing on the post-civil war era in Algeria (2003 till the present time). This is by applying Feminist Critical Discourse Analysis to question representations of women in the selected newspapers by revealing the gender ideologies embedded in their linguistic and visual discourses. The Francophone newspapers chosen for the present research are El Watan and Liberté. As for the Arabophone ones, El Khabar and Echorouk have been selected. The results of the study would help build an understanding of the meanings of gender that are embedded in the discourses of the selected news outlets which differ both linguistically and ideologically.

Keywords: Arabic-language newspapers, Critical Discourse Analysis, discourses, French-language newspapers, gender, International Women’s Day

Procedia PDF Downloads 193
4666 Historiography of Wood Construction in Portugal

Authors: João Gago dos Santos, Paulo Pereira Almeida

Abstract:

The present study intends to deepen and understand the reasons that led to the decline and disappearance of wooden construction systems in Portugal, for that reason, its use in history must be analyzed. It is observed that this material was an integral part of the construction systems in Europe and Portugal for centuries, and it is possible to conclude that its decline happens with the appearance of hybrid construction and later with the emergence and development of reinforced concrete technology. It is also verified that wood as a constructive element, and for that reason, an element of development had great importance in national construction, with its peak being the Pombaline period, after the 1755 earthquake. In this period, the great scarcity of materials in the metropolis led to the import wood from Brazil for the reconstruction of Lisbon. This period is linked to an accentuated exploitation of forests, resulting in laws and royal decrees aimed at protecting them, guaranteeing the continued existence of profitable forests, crucial to the reconstruction effort. The following period, with the gradual loss of memory of the catastrophe, resulted in a construction that was weakened structurally as a response to a time of real estate speculation and great urban expansion. This was the moment that precluded the inexistence of the use of wood in construction. At the beginning of the 20th century and in the 30s and 40s, with the appearance and development of reinforced concrete, it became part of the great structures of the state, and it is considered a versatile material capable of resolving issues throughout the national territory. It is at this point that the wood falls into disuse and practically disappears from the new works produced.

Keywords: construction history, construction in portugal, construction systems, wood construction

Procedia PDF Downloads 123
4665 Analysing Implementation of Best Practices in Construction Contracts for Dispute Avoidance

Authors: K. C. Iyer, Yogita Manan Bindal, Sumit Kumar Bakshi

Abstract:

Disputes and litigation are becoming inherent to the construction industry in India, and despite construction being one of the major drivers of growth, there have not been many reforms in the government construction contracts. Many of the disputes arising from the government contracts, can be avoided by the proper drafting of contracts and their administration. This study aims to 1) identify the best practices in the construction contract as reviewed from the research papers and additional literature on contract management, 2) obtain perspectives from the industry experts on the implementation of these best practices with regards to likely challenges and relative benefits for implementing the best practices in construction contracts. The best practices for disputes arising due to delay events have been identified through extensive literature survey. The industry perspective is gathered by way of a questionnaire survey to understand the applicability of the identified best practices, the benefits that are likely to be obtained and the challenges that are likely to be faced in the implementation of these practices. The study concludes with the recommended best practices that can be implemented based on the perspectives obtained from the survey. The findings of the study can be used by the industry professionals while drafting construction contracts with a view to avoid disputes related to delay events.

Keywords: best practices, construction contract, delay, dispute avoidance

Procedia PDF Downloads 196
4664 Identity (Mis)Representation and Ideological Struggles in Discourses on Boko Haram in Nigeria

Authors: Temitope Ogungbemi

Abstract:

Jama'atu Ahlis Sunna Lidda'awati wal-Jihad (also called Boko Haram) in the North-East of Nigeria has facilitated ideological binarity in discourses on the crisis. Since its proliferation, media representation of the crisis has facilitated identity contamination and ideological struggle through which other critical issues, such as religious intolerance, ethnic diversity and other forms of class conflict in the Nigerian state, are brought to public notice. Though Boko Haram insurgency is ideological laden, the manifestation of the inherent ideologies requires extensive scholarly attention in order deconstruct the veiled ideologies. Therefore, the thrust of this study is to critically investigate identity (mis)representation as a basis for ideological mapping in discourses on Boko Haram in Nigeria, adopting critical discourse analytical tools supported with insights from systemic functional linguistics and critical discourse analysis. The data for this study consist of articles on Boko Haram in Nigerian newspapers published in English. The data selection is purposive and aimed at responding to challenges that are inherent in Nigeria's multifaithism and multiculturalism, and their effects on the construction of narratives on Boko Haram. The study reveals that identity manipulation is a constructive device for ideological mapping, realised through labeling, agency activation, and transitivity. Identity representation in discourses on Boko Haram depicted four dichotomous binarities using exclusion, generalisation, contrasting and attribution.

Keywords: identity representation, ideology, Boko Haram, newspapers

Procedia PDF Downloads 340