Search results for: temporary contract
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 638

Search results for: temporary contract

458 Reproductive Traits for Holstein Cattle

Authors: Ashraf M. Ward, Ruban S. Yu

Abstract:

Data consisting of 2757 records from tow Holstein herds made between 2000 and 2010 were used to examine environmental factors affecting age at first calving (AFC) and calving intervals (CI) and consequently estimate genetic and phenotypic parameters and trends. The overall means and standard errors for AFC and CI were 39.4 ± 7.2 months and 487.5 ± 151.6 days respectively. The respective heritability estimates were 0.091 ± 0.05 and 0.044 ± 0.032, while the repeatability estimate for CI was 0.096 ± 0.001. The genetic trends for CI and AFC were -0.6 d/yr and -0.01 mo/yr respectively and were both significant (P < 0.001), indicating a decrease in mean breeding value over the study period. Phenotypic trends were -0.31 mo/yr and -0.35 d/yr for AFC and CI respectively though non-significant (P > 0.05). The low heritability for CI and AFC indicated that temporary environmental influences were much greater than genetic influences or permanent environmental influences on these traits.

Keywords: Holstein, reproductive, genetic parameters, heritability

Procedia PDF Downloads 723
457 A Comparative Study of Insurance Policies Worldwide in Public Private Partnerships

Authors: Guanqun Shi, Xueqing Zhang

Abstract:

The frequent occurrence of failures in PPP projects which caused great loss has raised attention from the government as well as the concessionaire. PPPs are complex arrangements for its long operation period and multiple players. Many types of risks in PPP projects may cause the project fail. The insurance is an important tool to transfer the risks. Through a comparison and analysis of international government PPP guidelines and contracts as well as the case studies worldwide, we have identified eight main insurance principles, discussed thirteen insurance types in different stages. An overall procedure would be established to improve the practices in PPP projects.

Keywords: public private partnerships, insurance, contract, risk

Procedia PDF Downloads 287
456 Building Bridges on Roads With Major Constructions

Authors: Mohamed Zaidour

Abstract:

In this summary, we are going to look in brief at the bridges and their building and construction on most roads and we have followed a simple method to explain each field clearly because the geographical and climatic diversity of an area leads to different methods and types of roads and installation engineering in other areas In mountain areas we need to build retaining walls in areas of rain. It needs to construct ferries to discharge water from roads in areas of temporary or permanent rivers. There is a need to build bridges and construct road installations in the process of collecting the necessary information, such as soil type. This information needs it, engineer, when designing the constructor and in this section, we will identify the types and methods of calculation bridge columns rules phrases the walls are chock.

Keywords: bridges, buildings, concrete, constructions, roads

Procedia PDF Downloads 119
455 Management of the Experts in the Research Evaluation System of the University: Based on National Research University Higher School of Economics Example

Authors: Alena Nesterenko, Svetlana Petrikova

Abstract:

Research evaluation is one of the most important elements of self-regulation and development of researchers as it is impartial and independent process of assessment. The method of expert evaluations as a scientific instrument solving complicated non-formalized problems is firstly a scientifically sound way to conduct the assessment which maximum effectiveness of work at every step and secondly the usage of quantitative methods for evaluation, assessment of expert opinion and collective processing of the results. These two features distinguish the method of expert evaluations from long-known expertise widespread in many areas of knowledge. Different typical problems require different types of expert evaluations methods. Several issues which arise with these methods are experts’ selection, management of assessment procedure, proceeding of the results and remuneration for the experts. To address these issues an on-line system was created with the primary purpose of development of a versatile application for many workgroups with matching approaches to scientific work management. Online documentation assessment and statistics system allows: - To realize within one platform independent activities of different workgroups (e.g. expert officers, managers). - To establish different workspaces for corresponding workgroups where custom users database can be created according to particular needs. - To form for each workgroup required output documents. - To configure information gathering for each workgroup (forms of assessment, tests, inventories). - To create and operate personal databases of remote users. - To set up automatic notification through e-mail. The next stage is development of quantitative and qualitative criteria to form a database of experts. The inventory was made so that the experts may not only submit their personal data, place of work and scientific degree but also keywords according to their expertise, academic interests, ORCID, Researcher ID, SPIN-code RSCI, Scopus AuthorID, knowledge of languages, primary scientific publications. For each project, competition assessments are processed in accordance to ordering party demands in forms of apprised inventories, commentaries (50-250 characters) and overall review (1500 characters) in which expert states the absence of conflict of interest. Evaluation is conducted as follows: as applications are added to database expert officer selects experts, generally, two persons per application. Experts are selected according to the keywords; this method proved to be good unlike the OECD classifier. The last stage: the choice of the experts is approved by the supervisor, the e-mails are sent to the experts with invitation to assess the project. An expert supervisor is controlling experts writing reports for all formalities to be in place (time-frame, propriety, correspondence). If the difference in assessment exceeds four points, the third evaluation is appointed. As the expert finishes work on his expert opinion, system shows contract marked ‘new’, managers commence with the contract and the expert gets e-mail that the contract is formed and ready to be signed. All formalities are concluded and the expert gets remuneration for his work. The specificity of interaction of the examination officer with other experts will be presented in the report.

Keywords: expertise, management of research evaluation, method of expert evaluations, research evaluation

Procedia PDF Downloads 208
454 Status and Results from EXO-200

Authors: Ryan Maclellan

Abstract:

EXO-200 has provided one of the most sensitive searches for neutrinoless double-beta decay utilizing 175 kg of enriched liquid xenon in an ultra-low background time projection chamber. This detector has demonstrated excellent energy resolution and background rejection capabilities. Using the first two years of data, EXO-200 has set a limit of 1.1x10^25 years at 90% C.L. on the neutrinoless double-beta decay half-life of Xe-136. The experiment has experienced a brief hiatus in data taking during a temporary shutdown of its host facility: the Waste Isolation Pilot Plant. EXO-200 expects to resume data taking in earnest this fall with upgraded detector electronics. Results from the analysis of EXO-200 data and an update on the current status of EXO-200 will be presented.

Keywords: double-beta, Majorana, neutrino, neutrinoless

Procedia PDF Downloads 414
453 Displacement Due to Natural Disasters Vis-à-Vis Policy Framework: Case Study of Mising Community of Majuli, Assam

Authors: Mausumi Chetia

Abstract:

One of the main causes of impoverishment of the rural areas of Assam has been the recurrent floods and riverbank erosion. One of the life-changing consequences is displacement. This results not only in a loss of livelihoods but also has wide-reaching socio-economic and cultural effects. Thus, due to such disasters, not only families but communities too are being displaced at large. This compels them to find temporary shelter and begin life from scratch. The role of the state has been highly negligible, with a displacement not being perceived as an ‘issue’ to be addressed. A more holistic approach is thus needed to take socio-economic, cultural, political as well as ecological considerations into account.

Keywords: displacement, policy-framework, human-induced disasters, marginalised communities, India, Assam

Procedia PDF Downloads 277
452 Improving the Constructability of Highway Design Plans

Authors: R. Edward Minchin Jr.

Abstract:

The U.S. Federal Highway Administration (FHWA) Every Day Counts Program (EDC) has resulted in state DOTs putting evermore emphasis on speeding up the delivery of highway and bridge construction projects for use by the driving public. This has resulted in an increase in the use of alternative construction delivery systems such as design-build (D-B), construction manager at-risk (CMR) or construction manager/general contractor (CM/GC), and adding alternative technical concepts (ATCs) to traditional design-bid-build (DBB) contracts. ATCs have exhibited great potential for delivering substantial benefits like cost savings, increased constructability, and quicker project delivery. Previous research has found that knowledge of project constructability was lacking in state Department of Transportation (DOT) planning, programming, and environmental staffs. Many agencies have therefore relied on a set of ‘acceptable’ design solutions over the years of working with their local resource agencies. The result is that the permitting process for several government agencies has become increasingly restrictive with the result that the DOTs and their industry partners lose the ability to innovate after a permit is approved. The intent of this paper is to report on the research team’s progress in this ongoing effort furnish the United States government with a uniform set of guidelines for the application of constructability reviews during all phases of project development and delivery. The research uses surveys and interviews to determine which states have implemented formal programs to ensure that the constructor is furnished with a set of contract documents that affords said constructor with the best possible opportunity to successfully construct the project with the highest quality standards, within the contract duration and without exceeding the construction budget. Once these states are identified, workshops are held all over the nation, resulting in the team learning the best current practices and giving the team the ability to recommend new practices that will improve the process. The plan is for the FHWA to encourage or require state DOTs to use these practices on all federally funded highway and bridge construction projects. The project deliverable is a Guidebook for FHWA to use in disseminating the recommended practices to the states.

Keywords: alternative construction delivery, alternative technical concepts, constructability, construction design plans

Procedia PDF Downloads 218
451 Electrical Characterization of Hg/n-bulk GaN Schottky Diode

Authors: B. Nabil, O. Zahir, R. Abdelaziz

Abstract:

We present the results of electrical characterizations current-voltage and capacity-voltage implementation of a method of making a Schottky diode on bulk gallium nitride doped n. We made temporary Schottky contact of Mercury (Hg) and an ohmic contact of silver (Ag), the electrical characterizations current-voltage (I-V) and capacitance-voltage (C-V) allows us to determine the difference parameters of our structure (Hg /n-GaN) as the barrier height (ΦB), the ideality factor (n), the series resistor (Rs), the voltage distribution (Vd), the doping of the substrate (Nd) and density of interface states (Nss).

Keywords: Bulk Gallium nitride, electrical characterization, Schottky diode, series resistance, substrate doping

Procedia PDF Downloads 486
450 A Lightweight Blockchain: Enhancing Internet of Things Driven Smart Buildings Scalability and Access Control Using Intelligent Direct Acyclic Graph Architecture and Smart Contracts

Authors: Syed Irfan Raza Naqvi, Zheng Jiangbin, Ahmad Moshin, Pervez Akhter

Abstract:

Currently, the IoT system depends on a centralized client-servant architecture that causes various scalability and privacy vulnerabilities. Distributed ledger technology (DLT) introduces a set of opportunities for the IoT, which leads to practical ideas for existing components at all levels of existing architectures. Blockchain Technology (BCT) appears to be one approach to solving several IoT problems, like Bitcoin (BTC) and Ethereum, which offer multiple possibilities. Besides, IoTs are resource-constrained devices with insufficient capacity and computational overhead to process blockchain consensus mechanisms; the traditional BCT existing challenge for IoTs is poor scalability, energy efficiency, and transaction fees. IOTA is a distributed ledger based on Direct Acyclic Graph (DAG) that ensures M2M micro-transactions are free of charge. IOTA has the potential to address existing IoT-related difficulties such as infrastructure scalability, privacy and access control mechanisms. We proposed an architecture, SLDBI: A Scalable, lightweight DAG-based Blockchain Design for Intelligent IoT Systems, which adapts the DAG base Tangle and implements a lightweight message data model to address the IoT limitations. It enables the smooth integration of new IoT devices into a variety of apps. SLDBI enables comprehensive access control, energy efficiency, and scalability in IoT ecosystems by utilizing the Masked Authentication Message (MAM) protocol and the IOTA Smart Contract Protocol (ISCP). Furthermore, we suggest proof-of-work (PoW) computation on the full node in an energy-efficient way. Experiments have been carried out to show the capability of a tangle to achieve better scalability while maintaining energy efficiency. The findings show user access control management at granularity levels and ensure scale up to massive networks with thousands of IoT nodes, such as Smart Connected Buildings (SCBDs).

Keywords: blockchain, IOT, direct acyclic graphy, scalability, access control, architecture, smart contract, smart connected buildings

Procedia PDF Downloads 123
449 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 140
448 Estimation of Morbidity Level of Industrial Labour Conditions at Zestafoni Ferroalloy Plant

Authors: M. Turmanauli, T. Todua, O. Gvaberidze, R. Javakhadze, N. Chkhaidze, N. Khatiashvili

Abstract:

Background: Mining process has the significant influence on human health and quality of life. In recent years the events in Georgia were reflected on the industry working process, especially minimal requirements of labor safety, hygiene standards of workplace and the regime of work and rest are not observed. This situation is often caused by the lack of responsibility, awareness, and knowledge both of workers and employers. The control of working conditions and its protection has been worsened in many of industries. Materials and Methods: For evaluation of the current situation the prospective epidemiological study by face to face interview method was conducted at Georgian “Manganese Zestafoni Ferroalloy Plant” in 2011-2013. 65.7% of employees (1428 bulletin) were surveyed and the incidence rates of temporary disability days were studied. Results: The average length of a temporary disability single accident was studied taking into consideration as sex groups as well as the whole cohort. According to the classes of harmfulness the following results were received: Class 2.0-10.3%; 3.1-12.4%; 3.2-35.1%; 3.3-12.1%; 3.4-17.6%; 4.0-12.5%. Among the employees 47.5% and 83.1% were tobacco and alcohol consumers respectively. According to the age groups and years of work on the base of previous experience ≥50 ages and ≥21 years of work data prevalence respectively. The obtained data revealed increased morbidity rate according to age and years of work. It was found that the bone and articulate system and connective tissue diseases, aggravation of chronic respiratory diseases, ischemic heart diseases, hypertension and cerebral blood discirculation were the leading among the other diseases. High prevalence of morbidity observed in the workplace with not satisfactory labor conditions from the hygienic point of view. Conclusion: According to received data the causes of morbidity are the followings: unsafety labor conditions; incomplete of preventive medical examinations (preliminary and periodic); lack of access to appropriate health care services; derangement of gathering, recording, and analysis of morbidity data. This epidemiological study was conducted at the JSC “Manganese Ferro Alloy Plant” according to State program “ Prevention of Occupational Diseases” (Program code is 35 03 02 05).

Keywords: occupational health, mining process, morbidity level, cerebral blood discirculation

Procedia PDF Downloads 428
447 Sustainable Concepts Applied in the Pre-Columbian Andean Architecture in Southern Ecuador

Authors: Diego Espinoza-Piedra, David Duran

Abstract:

All architectural and land use processes are framed in a cultural, social and geographical context. The present study analyzes the Andean culture before the Spanish conquest in southern Ecuador, in the province of Azuay. This area has been habited for more than 10.000 years. The Canari and the Inca cultures occupied Azuay close to the arrival of the Spanish conquers. The Inca culture was settled in the Andes Mountains. The Canari culture was established in the south of Ecuador, on the actual provinces of Azuay and Canar. In contrast with history and archeology, to the best of our knowledge, their architecture has not yet been studied in this area because of the lack of architectural structures. Consequently, the present research reviewed the land use and culture for architectonic interpretations. The two main architectural objects in these cultures were dwellings and public buildings. In the first case, housing was conceived as temporary. It had to stand as long as its inhabitants lived. Therefore, houses were built when a couple got married. The whole community started the construction through the so-called ‘minga’ or collective work. The construction materials were tree branches, reeds, agave, ground, and straw. So that when their owners aged and then died, this house was easily disarmed and overthrown. Their materials become part of the land for agriculture. Finally, this cycle was repeated indefinitely. In the second case, the buildings, which we can call public, have presented erroneous interpretations. They have been defined as temples. But according to our conclusions, they were places for temporary accommodation, storage of objects and products, and in some special cases, even astronomical observatories. These public buildings were settled along the important road system called ‘Capac-Nam’, currently declared by UNESCO as World Cultural Heritage. The buildings had different scales at regular distances. Also, they were established in special or strategic places, which constituted a system of observatories. These observatories allowed to determine the cycles or calendars (solar or lunar) necessary for the agricultural production, as well as other natural phenomena. Most of the current minimal existence of physical structures in quantity and state of conservation is at the level of foundations or pieces of walls. Therefore, this study was realized after the identification of the history and culture of the inhabitants of this Andean region.

Keywords: Andean, pre-Colombian architecture, Southern Ecuador, sustainable

Procedia PDF Downloads 128
446 Competitive Advantage on the Road Again: Exploring Nuances through a Conceptual Review and Future Research Avenues

Authors: Seyedabdolali Mortazavi Kamalabadi, Faegheh Taheran

Abstract:

By giving an overview of previous arguments and findings concerned with the concept of competitive advantage, first, we define the overall concept of competitive advantage and discuss nuances of understanding such an important and strategic idea. Finally, by considering the major concerns of marketing academia, including globalization, AI-based technologies, consumer well-being, and internal coopetition between a firm’s units, fruitful avenues to be explored by future studies are presented in the form of research propositions. In the end, relevant gaps mentioned by numerous studies that are worth investigating are demonstrated.

Keywords: artificial intelligence, competitive advantage, consumer well-being, coopetition, globalization, literature review, temporary competitive advantage

Procedia PDF Downloads 115
445 A Survey on Various Technique of Modified TORA over MANET

Authors: Shreyansh Adesara, Sneha Pandiya

Abstract:

The mobile ad-hoc network (MANET) is an important and open area research for the examination and determination of the performance evolution. Temporary ordered routing algorithm (TORA) is adaptable and distributed MANET routing algorithm which is totally dependent on internet MANET Encapsulation protocol (IMEP) for the detection of the link and sensing of the link. If IMEP detect the wrong link failure then the network suffer from congestion and unnecessary route maintenance. Thus, the improvement in link detection method of TORA is introduced by various methods on IMEP by different perspective from different person. There are also different reactive routing protocols like AODV, TORA and DSR has been compared for the knowledge of the routing scenario for different parameter and using different model.

Keywords: IMEP, mobile ad-hoc network, protocol, TORA

Procedia PDF Downloads 442
444 A Study of Blockchain Oracles

Authors: Abdeljalil Beniiche

Abstract:

The limitation with smart contracts is that they cannot access external data that might be required to control the execution of business logic. Oracles can be used to provide external data to smart contracts. An oracle is an interface that delivers data from external data outside the blockchain to a smart contract to consume. Oracle can deliver different types of data depending on the industry and requirements. In this paper, we study and describe the widely used blockchain oracles. Then, we elaborate on his potential role, technical architecture, and design patterns. Finally, we discuss the human oracle and its key role in solving the truth problem by reaching a consensus about a certain inquiry and tasks.

Keywords: blockchain, oracles, oracles design, human oracles

Procedia PDF Downloads 138
443 The Rehabilitation of The Covered Bridge Leclerc (P-00249) Passing Over the Bouchard Stream in LaSarre, Quebec

Authors: Nairy Kechichian

Abstract:

The original Leclerc Bridge is a covered wooden bridge that is considered a Quebec heritage structure with an index of 60, making it a very important provincial bridge from a historical point of view. It was constructed in 1927 and is in the rural area of Abitibi-Temiscamingue. It is a “town Québécois” type of structure, which is generally rare but common for covered bridges in Abitibi-Temiscamingue. This type of structure is composed of two trusses on both sides formed with diagonals, internal bracings, uprights and top and bottom chords to allow the transmission of loads. This structure is mostly known for its solidity, lightweightness, and ease of construction. It is a single-span bridge with a length of 25.3 meters and allows the passage of one vehicle at a time with a 4.22-meter driving lane. The structure is composed of 2 trusses located at each end of the deck, two gabion foundations at both ends, uprights and top and bottom chords. WSP (Williams Sale Partnership) Canada inc. was mandated by the Transport Minister of Quebec in 2019 to increase the capacity of the bridge from 5 tons to 30.6 tons and rehabilitate it, as it has deteriorated quite significantly over the years. The bridge was damaged due to material deterioration over time, exposure to humidity, high load effects and insect infestation. To allow the passage of 3 axle trucks, as well as to keep the integrity of this heritage structure, the final design chosen to rehabilitate the bridge involved adding a new deck independent from the roof structure of the bridge. Essentially, new steel beams support the deck loads and the desired vehicle loads. The roof of the bridge is linked to the steel deck for lateral support, but it is isolated from the wooden deck. The roof is preserved for aesthetic reasons and remains intact as it is a heritage piece. Due to strict traffic management obstacles, an efficient construction method was put into place, which consisted of building a temporary bridge and moving the existing roof onto it to allow the circulation of vehicles on one side of the temporary bridge while providing a working space for the repairs of the roof on the other side to take place simultaneously. In parallel, this method allowed the demolition and reconstruction of the existing foundation, building a new steel deck, and transporting back the roof on the new bridge. One of the main criteria for the rehabilitation of the wooden bridge was to preserve, as much as possible, the existing patrimonial architectural design of the bridge. The project was completed successfully by the end of 2021.

Keywords: covered bridge, wood-steel, short span, town Québécois structure

Procedia PDF Downloads 67
442 Execution of Joinery in Large Scale Projects: Middle East Region as a Case Study

Authors: Arsany Philip Fawzy

Abstract:

This study is going to address the hurdles of project management in the joinery field. It is widely divided into two sections; the first one will shed light on how to execute large-scale projects with a specific focus on the middle east region. It will also raise major obstacles that may face the joinery team from the site clearance and the coordination between the joinery team and the construction team. The second section is going to technically analyze the commercial side of the joinery and how to control the main cost of the project to avoid financial problems. It will also suggest empirical solutions to monitor the cost impact (e.g., Variation of contract quantity and claims).

Keywords: clearance, quality, cost, variation, claim

Procedia PDF Downloads 103
441 Quantification of Lawsone and Adulterants in Commercial Henna Products

Authors: Ruchi B. Semwal, Deepak K. Semwal, Thobile A. N. Nkosi, Alvaro M. Viljoen

Abstract:

The use of Lawsonia inermis L. (Lythraeae), commonly known as henna, has many medicinal benefits and is used as a remedy for the treatment of diarrhoea, cancer, inflammation, headache, jaundice and skin diseases in folk medicine. Although widely used for hair dyeing and temporary tattooing, henna body art has popularized over the last 15 years and changed from being a traditional bridal and festival adornment to an exotic fashion accessory. The naphthoquinone, lawsone, is one of the main constituents of the plant and responsible for its dyeing property. Henna leaves typically contain 1.8–1.9% lawsone, which is used as a marker compound for the quality control of henna products. Adulteration of henna with various toxic chemicals such as p-phenylenediamine, p-methylaminophenol, p-aminobenzene and p-toluenodiamine to produce a variety of colours, is very common and has resulted in serious health problems, including allergic reactions. This study aims to assess the quality of henna products collected from different parts of the world by determining the lawsone content, as well as the concentrations of any adulterants present. Ultra high performance liquid chromatography-mass spectrometry (UPLC-MS) was used to determine the lawsone concentrations in 172 henna products. Separation of the chemical constituents was achieved on an Acquity UPLC BEH C18 column using gradient elution (0.1% formic acid and acetonitrile). The results from UPLC-MS revealed that of 172 henna products, 11 contained 1.0-1.8% lawsone, 110 contained 0.1-0.9% lawsone, whereas 51 samples did not contain detectable levels of lawsone. High performance thin layer chromatography was investigated as a cheaper, more rapid technique for the quality control of henna in relation to the lawsone content. The samples were applied using an automatic TLC Sampler 4 (CAMAG) to pre-coated silica plates, which were subsequently developed with acetic acid, acetone and toluene (0.5: 1.0: 8.5 v/v). A Reprostar 3 digital system allowed the images to be captured. The results obtained corresponded to those from UPLC-MS analysis. Vibrational spectroscopy analysis (MIR or NIR) of the powdered henna, followed by chemometric modelling of the data, indicates that this technique shows promise as an alternative quality control method. Principal component analysis (PCA) was used to investigate the data by observing clustering and identifying outliers. Partial least squares (PLS) multivariate calibration models were constructed for the quantification of lawsone. In conclusion, only a few of the samples analysed contain lawsone in high concentrations, indicating that they are of poor quality. Currently, the presence of adulterants that may have been added to enhance the dyeing properties of the products, is being investigated.

Keywords: Lawsonia inermis, paraphenylenediamine, temporary tattooing, lawsone

Procedia PDF Downloads 460
440 Surrogacy in India: Emerging Business or Disguised Human Trafficking

Authors: Priya Sepaha

Abstract:

Commercial Surrogacy refers to a contract in which a woman carries a pregnancy for intended parents. There are two types of surrogacy; first, Traditional Surrogacy, in which, sperm of the donor or father is artificially inseminated in the women and carries the fetus till birth. Second, Gestational Surrogacy, in which the egg and sperm of the intended parent are collected for artificial fertilization through In Vitro Fertilization (IVF) technique and after the embryo formation, it is transferred into the womb of a surrogate mother with the help of Assisted Reproductive Technique. Surrogacy has become so widespread in India that it has now been nicknamed the "rent-a-womb" capital of the world due to relatively low cost and lack of stringent regulatory legalisation. The legal aspects surrounding surrogacy are complex, diverse and mostly unsettled. Although this appears to be beneficial for the parties concerned, there are certain sensitive issues which need to be addressed to ensure ample protection to all stakeholders. Commercial surrogacy is an emerging business and a new means of human trafficking particularly in India. Poor and illiterate women are often lured in such deals by their spouse or broker for earning easy money. Traffickers also use force, fraud, or coercion at times to intimidate the probable surrogate mothers. A major chunk of money received from covert surrogacy agreement is taken away by the brokers. The Law Commission of India has specifically reviewed the issue as India is emerging as a major global surrogacy destination. The Supreme Court of India held in the Manji's case in 2008, that commercial surrogacy can be permitted with certain restrictions but had directed the Legislature to pass an appropriate Law for governing Surrogacy in India. The draft Assisted Reproductive Technique (ART) Bill, 2010 is still pending for approval. At present, the Surrogacy Contract between the parties and the ART Clinics Guidelines are perhaps the only guiding force. The Immoral Trafficking Prevention Act (ITPA), 1956 and Sections 366(A) and 372 of the Indian Penal Code, 1860 are perhaps the only existing laws, which deal with human trafficking. Yet, none of these provisions specifically deal with the serious issue of trafficking for the purpose of Commercial Surrogacy. India remains one of the few countries that still allow commercial surrogacy. International Surrogacy involves bilateral issues, where the laws of both the nations have to be at par in order to ensure that the concerns and interests of parties involved get amicably resolved. There is urgent need to pass a comprehensive law by incorporating the latest developments in this field in order to make it ethical on the one hand and to curb disguised human trafficking on the other.

Keywords: business, human trafficking, legal, surrogacy

Procedia PDF Downloads 344
439 Validating Quantitative Stormwater Simulations in Edmonton Using MIKE URBAN

Authors: Mohamed Gaafar, Evan Davies

Abstract:

Many municipalities within Canada and abroad use chloramination to disinfect drinking water so as to avert the production of the disinfection by-products (DBPs) that result from conventional chlorination processes and their consequential public health risks. However, the long-lasting monochloramine disinfectant (NH2Cl) can pose a significant risk to the environment. As, it can be introduced into stormwater sewers, from different water uses, and thus freshwater sources. Little research has been undertaken to monitor and characterize the decay of NH2Cl and to study the parameters affecting its decomposition in stormwater networks. Therefore, the current study was intended to investigate this decay starting by building a stormwater model and validating its hydraulic and hydrologic computations, and then modelling water quality in the storm sewers and examining the effects of different parameters on chloramine decay. The presented work here is only the first stage of this study. The 30th Avenue basin in Southern Edmonton was chosen as a case study, because the well-developed basin has various land-use types including commercial, industrial, residential, parks and recreational. The City of Edmonton has already built a MIKE-URBAN stormwater model for modelling floods. Nevertheless, this model was built to the trunk level which means that only the main drainage features were presented. Additionally, this model was not calibrated and known to consistently compute pipe flows higher than the observed values; not to the benefit of studying water quality. So the first goal was to complete modelling and updating all stormwater network components. Then, available GIS Data was used to calculate different catchment properties such as slope, length and imperviousness. In order to calibrate and validate this model, data of two temporary pipe flow monitoring stations, collected during last summer, was used along with records of two other permanent stations available for eight consecutive summer seasons. The effect of various hydrological parameters on model results was investigated. It was found that model results were affected by the ratio of impervious areas. The catchment length was tested, however calculated, because it is approximate representation of the catchment shape. Surface roughness coefficients were calibrated using. Consequently, computed flows at the two temporary locations had correlation coefficients of values 0.846 and 0.815, where the lower value pertained to the larger attached catchment area. Other statistical measures, such as peak error of 0.65%, volume error of 5.6%, maximum positive and negative differences of 2.17 and -1.63 respectively, were all found in acceptable ranges.

Keywords: stormwater, urban drainage, simulation, validation, MIKE URBAN

Procedia PDF Downloads 300
438 Risk Identification of Investment Feasibility in Indonesia’s Toll Road Infrastructure Investment

Authors: Christo Februanto Putra

Abstract:

This paper presents risk identification that affects investment feasibility on toll road infrastructure in Indonesia using qualitative methods survey based on the expert practitioner in investor, contractor, and state officials. The problems on infrastructure investment in Indonesia, especially on KPBU model contract, is many risk factors in the investment plan is not calculated in detail thoroughly. Risk factor is a value used to provide an overview of the risk level assessment of an event which is a function of the probability of the occurrence and the consequences of the risks that arise. As results of the survey which is to show which risk factors impacts directly to the investment feasibility and rank them by their impacts on the investment.

Keywords: risk identification, indonesia toll road, investment feasibility

Procedia PDF Downloads 280
437 The Synergistic Effects of Blockchain and AI on Enhancing Data Integrity and Decision-Making Accuracy in Smart Contracts

Authors: Sayor Ajfar Aaron, Sajjat Hossain Abir, Ashif Newaz, Mushfiqur Rahman

Abstract:

Investigating the convergence of blockchain technology and artificial intelligence, this paper examines their synergistic effects on data integrity and decision-making within smart contracts. By implementing AI-driven analytics on blockchain-based platforms, the research identifies improvements in automated contract enforcement and decision accuracy. The paper presents a framework that leverages AI to enhance transparency and trust while blockchain ensures immutable record-keeping, culminating in significantly optimized operational efficiencies in various industries.

Keywords: artificial intelligence, blockchain, data integrity, smart contracts

Procedia PDF Downloads 59
436 A Case Study of the Influence of the Covid-19 pandemic on Racial and Ethnic Gaps in Behavioral Health Care Access

Authors: Shantol McIntosh

Abstract:

Due to environmental and underlying health disparities, the COVID-19 pandemic has caused an added set of economic implications worldwide. Black and Hispanic individuals are more susceptible to contract COVID-19, and if they do, they are more likely to have a severe case that necessitates hospitalization or results in death (Altarum et al., 2020). The literature shows that disparities in health and health treatment are nothing new as they have been recorded for decades and indicate systemic and structural imbalances rooted in racism and discrimination. The purpose of this study is to determine the frequency with which these populations have access to healthcare and treatment. The study will also highlight the key drivers of health disparities. Findings and implications for research and policy will be discussed.

Keywords: COVID-19, racial and ethnic disparities, discrimination, policy

Procedia PDF Downloads 192
435 A Review of the Major Factors of Cost Overrun in Construction Projects

Authors: Hassan Abdelgadir

Abstract:

Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.

Keywords: construction projects, cost overruns, construction company, factors effect costoverruns

Procedia PDF Downloads 75
434 Research on Coordination Strategies for Coordinating Supply Chain Based on Auction Mechanisms

Authors: Changtong Wang, Lingyun Wei

Abstract:

The combination of auctions and supply chains is of great significance in improving the supply chain management system and enhancing the efficiency of economic and social operations. To address the gap in research on supply chain strategies under the auction mechanism, a model is developed for the 1-N auction model in a complete information environment, and it is concluded that the two-part contract auction model for retailers in this model can achieve supply chain coordination. The model is validated by substituting the model into the scenario of a fresh-cut flower industry flower auction in exchange for arithmetic examples to further prove the validity of the conclusions.

Keywords: auction mechanism, supply chain coordination strategy, fresh cut flowers industry, supply chain management

Procedia PDF Downloads 124
433 Uncertainty in Risk Modeling

Authors: Mueller Jann, Hoffmann Christian Hugo

Abstract:

Conventional quantitative risk management in banking is a risk factor of its own, because it rests on assumptions such as independence and availability of data which do not hold when rare events of extreme consequences are involved. There is a growing recognition of the need for alternative risk measures that do not make these assumptions. We propose a novel method for modeling the risk associated with investment products, in particular derivatives, by using a formal language for specifying financial contracts. Expressions in this language are interpreted in the category of values annotated with (a formal representation of) uncertainty. The choice of uncertainty formalism thus becomes a parameter of the model, so it can be adapted to the particular application and it is not constrained to classical probabilities. We demonstrate our approach using a simple logic-based uncertainty model and a case study in which we assess the risk of counter party default in a portfolio of collateralized loans.

Keywords: risk model, uncertainty monad, derivatives, contract algebra

Procedia PDF Downloads 577
432 The Ephemeral Re-Use of Cultural Heritage: The Incorporation of the Festival Phenomenon Within Monuments and Archaeological Sites in Lebanon

Authors: Joe Kallas

Abstract:

It is now widely accepted that the preservation of cultural heritage must go beyond simple restoration and renovation actions. While some historic monuments have been preserved for millennia, many of them, less important or simply neglected because of lack of money, have disappeared. As a result, the adaptation of monuments and archaeological sites to new functions allow them to 'survive'. Temporary activities or 'ephemeral' re-use, are increasingly recognized as a means of vitalization of deprived areas and enhancement of historic sites that became obsolete. They have the potential to increase economic and cultural value while making the best use of existing resources. However, there are often conservation and preservation issues related to the implementation of this type of re-use, which can also threaten the integrity and authenticity of archaeological sites and monuments if they have not been properly managed. This paper aims to get a better knowledge of the ephemeral re-use of heritage, and more specifically the subject of the incorporation of the festival phenomenon within the monuments and archaeological sites in Lebanon, a topic that is not yet studied enough. This paper tried to determine the elements that compose it, in order to analyze this phenomenon and to trace its good practices, by comparing international study cases to important national cases: the International Festival of Baalbek, the International Festival of Byblos and the International Festival of Beiteddine. Various factors have been studied and analyzed in order to best respond to the main problematic of this paper: 'How can we preserve the integrity of sites and monuments after the integration of an ephemeral function? And what are the preventive conservation measures to be taken when holding festivals in archaeological sites with fragile structures?' The impacts of the technical problems were first analyzed using various data and more particularly the effects of mass tourism, the integration of temporary installations, sound vibrations, the effects of unstudied lighting, until the mystification of heritage. Unfortunately, the DGA (General Direction of Antiquities in Lebanon) does not specify any frequency limit for the sound vibrations emitted by the speakers during musical festivals. In addition, there is no requirement from its part regarding the installations of the lighting systems in the historic monuments and no monitoring is done in situ, due to the lack of awareness of the impact that could be generated by such interventions, and due to the lack of materials and tools needed for the monitoring process. The study and analysis of the various data mentioned above led us to the elaboration of the main objective of this paper, which is the establishment of a list of recommendations. This list enables to define various preventive conservation measures to be taken during the holding of the festivals within the cultural heritage sites in Lebanon. We strongly hope that this paper will be an awareness document to start taking into consideration several factors previously neglected, in order to improve the conservation practices in the archaeological sites and monuments during the incorporation of the festival phenomenon.

Keywords: archaeology, authenticity, conservation, cultural heritage, festival, historic sites, integrity, monuments, tourism

Procedia PDF Downloads 119
431 Evaluation and Strategic Development of IT in Accounting in Turkey

Authors: Eda Kocakaya, Sebahat Seker, Dogan Argun

Abstract:

The aim of this study is to determine the process of information technologies and the connections between concepts in accounting management services in Turkey. The objective of this study is to determine the adaptation and evaluation process of information technologies and the connections between concepts and differences in accounting management services in Turkey. The situation and determination of the IT applications of Accounting Management were studied. The applications of • Billing • Order Processing • Accounts Receivable/Payable Management • Contract Management • Bank Account Management Were discussed in this study. The IT applications were demonstrated and realized in actual accounting services. The sectoral representative's companies were selected, and the IT application was searched by bibliometric analysis.

Keywords: management, accounting, information technologies, adaptation

Procedia PDF Downloads 310
430 Environmental Impact of Gas Field Decommissioning

Authors: Muhammad Ahsan

Abstract:

The effective decommissioning of oil and gas fields and related assets is one of the most important challenges facing the oil and gas industry today and in the future. Decommissioning decisions can no longer be avoided by the operators and the industry as a whole. Decommissioning yields no return on investment and carries significant regulatory liabilities. The main objective of this paper is to provide an approach and mechanism for the estimation of emissions associated with decommissioning of Oil and Gas fields. The model uses gate to gate approach and considers field life from development phase up to asset end life. The model incorporates decommissioning processes which includes; well plugging, plant dismantling, wellhead, and pipeline dismantling, cutting and temporary fabrication, new manufacturing from raw material and recycling of metals. The results of the GHG emissions during decommissioning phase are 2.31x10-2 Kg CO2 Eq. per Mcf of the produced natural gas. Well plug and abandonment evolved to be the most GHG emitting activity with 84.7% of total field decommissioning operational emissions.

Keywords: LCA (life cycle analysis), gas field, decommissioning, emissions

Procedia PDF Downloads 187
429 Off-Line Parameter Estimation for the Induction Motor Drive System

Authors: Han-Woong Ahn, In-Gun Kim, Hyun-Seok Hong, Dong-Woo Kang, Ju Lee

Abstract:

It is important to accurately identify machine parameters for direct vector control. To obtain the parameter values, traditional methods can be used such as no-load and rotor locked tests. However, there are many differences between values obtained from the traditional tests and actual values. In addition, there are drawbacks that additional equipment and cost are required for the experiment. Therefore, it is hard to temporary operation to estimate induction motor parameters. Therefore, this paper deals with the estimation algorithm of induction motor parameters without a motor operation and the measurement from additional equipment such as sensors and dynamometer. The validity and usefulness of the estimation algorithm considering inverter nonlinearity is verified by comparing the conventional method with the proposed method.

Keywords: induction motor, parameter, off-line estimation, inverter nonlinearity

Procedia PDF Downloads 531