Search results for: sports project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5540

Search results for: sports project

5420 Antecedents of Sport Commitment: A Comparison Based on Demographic Factors

Authors: Navodita Mishra, T. J. Kamalanabhan

Abstract:

Purpose: The primary purpose of this study was to identify the antecedents of sports commitment among cricket players and to understand demographic variables that may impact these factors. Commitment towards one’s sports plays a crucial role in determining discipline and efforts of the player. Moreover, demographic variables would seem to play an important role in determining which factors or predictors have the greatest impact on commitment level. Design /methodology/approach: This study hypothesized the effect of demographic factors on sports commitment among cricket players. It attempts to examine the extent to which demographic factors can differentially motivate players to exhibit commitment towards their respective sport. Questionnaire survey method was adopted using purposive sampling technique. Using Multiple Regression, ANOVA, and t-test, the hypotheses were tested based on a sample of 350 players from Cricket Academy. Findings: Our main results from the multivariate analysis indicated that enjoyment and leadership of coach and peer affect the level of commitment to a greater extent whereas personal investment is a significant predictor of commitment among rural background players Moreover, level of sport commitment among players is positively related to household income, the rural background players participate in sports to a greater extent than the urban players, there is no evidence of regional differentials in commitment but age differences (i.e. U-19 vs. U-25) play an important role in the decision to continue the participation in sports.

Keywords: Individual Sports Commitment, demographic indicators, cricket, player motivation

Procedia PDF Downloads 459
5419 A Model Approach of Good Practice Based on the Project Management Body of Knowledge® Guide in the Project Owner

Authors: Claudia Marcela Munoz Gonzalez, Diego Fernando Hernandez Losada, Hugo Alberto Herrera Fonseca

Abstract:

The project owner's role in the public-private investment consists of controlling and verifying the correct execution of the project's objectives and resources. Likewise, it is a discipline little explored in the academic field, whereby this work wishes to contribute with a model of good practices based on the project management methodology proposed by the Project Management Body of Knowledge® Guide. In the same way, highlight what are the controls that an integral project owner should take into account in its exercise and application, through the stages in which its contract runs. This proposal aims to structure its practice and integrate its functions according to a project management methodology. In addition, these practices will be applied in a case study of projects in the agricultural sector, particularly in the construction of irrigation district in Cundinamarca, Colombia.

Keywords: controls, construction of irrigation district, PMBOK®, project owner

Procedia PDF Downloads 434
5418 Learning outside the Box by Using Memory Techniques Skill: Case Study in Indonesia Memory Sports Council

Authors: Muhammad Fajar Suardi, Fathimatufzzahra, Dela Isnaini Sendra

Abstract:

Learning is an activity that has been used to do, especially for a student or academics. But a handful of people have not been using and maximizing their brains work and some also do not know a good brain work time in capturing the lessons, so that knowledge is absorbed is also less than the maximum. Indonesia Memory Sports Council (IMSC) is an institution which is engaged in the performance of the brain and the development of effective learning methods by using several techniques that can be used in considering the lessons and knowledge to grasp well, including: loci method, substitution method, and chain method. This study aims to determine the techniques and benefits of using the method given in learning and memorization by applying memory techniques taught by Indonesia Memory Sports Council (IMSC) to students and the difference if not using this method. This research uses quantitative research with survey method addressed to students of Indonesian Memory Sports Council (IMSC). The results of this study indicate that learn, understand and remember the lesson using the techniques of memory which is taught in Indonesia Memory Sport Council is very effective and faster to absorb the lesson than learning without using the techniques of memory, and this affects the academic achievement of students in each educational institution.

Keywords: chain method, Indonesia memory sports council, loci method, substitution method

Procedia PDF Downloads 268
5417 Infrastructure Project Management and Implementation: A Case Study Of the Mokolo-Crocodile Water Augmentation Project in South Africa

Authors: Elkington Sibusiso Mnguni

Abstract:

The Mokolo-Crocodile Water Augmentation Project (MCWAP) is located in the Limpopo Province in the northern-western part of South Africa. Its purpose is to increase water supply by 30 million cubic meters per year to meet current and future demand for users, including power stations, mining houses, and the local municipality in the Lephalale area. This paper documents the planning and implementation aspects of the MCWAP infrastructure project. The study will add to the body of knowledge with respect to bulk water infrastructure development in water-scarce regions. The method used to gather and collate relevant data and information was the desktop study. The key finding was that the project was successfully completed in 2015 using conventional project management and construction methods. The project is currently being operated and maintained by the National Department of Water and Sanitation.

Keywords: construction, contract management, infrastructure project, project management

Procedia PDF Downloads 282
5416 Classification of Construction Projects

Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside

Abstract:

To address construction project requirements and specifications, scholars and practitioners need to establish a taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.

Keywords: project classification, project definition rating index (PDRI), risk, project goals alignment

Procedia PDF Downloads 655
5415 Interface between Personal Values and Social Entrepreneurship in Social Projects That Develop Sports Practice

Authors: Leticia Lengler, Jefferson Oliveira, Vania Estivalete, Jordana Marques Kneipp

Abstract:

The context of social, economic and environmental transformations has driven innumerable changes in the organizational environment, influencing the social interactions that occur in this scenario. In this sense, social entrepreneurship emerges as a unique opportunity to challenge, question, rethink certain concepts and traditional theories widely discussed in relation to entrepreneurship. Therefore, the interest in studying personal values has been based on the idea that they might be predictors of the behavior of individuals. As an attempt to relate personal values with the characteristics of social entrepreneurs, this study aims to investigate the salient values and the social entrepreneurship perceptions that occur in two social projects responsible for developing sports skills among the students. For purposes of analysis, it is intended to consider: (i) a description of both Social Projects and their respective institutions, considering their history and relevance in the context; (ii) analysis of the personal values of the idealizers and teachers responsible for the projects, (iii) identification of the characteristics of social entrepreneurship manifested in the two projects, and (iv) discussion of similarities and disparities of the categories identified among the participants of the projects. Therefore, this study will carry a qualitative analysis from the interviews with 10 participants of each social project (named Projeto Remar/ASENA and Projeto Mãos Dadas/JUDÔ SANTA MARIA): 2 projects coordinators, 2 students, 2 parents of students, 2 physical education internships and 2 businessmen who stablished a partnership with each project. The data collection will be done through semi-structured interviews that are going to last around 30 minutes each, being recorded, transcribed and later analyzed, through the categorical analysis. The option for categorical analysis is supported by the fact that it is the best alternative when one wants to study values, opinions, attitudes and beliefs, through qualitative ones. In the present research, the pre-analysis phase consisted of an organization of the material collected during the research with Remar and Mãos Dadas Project, and a dynamic reading of this material, seeking to identify the characteristics of social entrepreneurship and values addressed in the study. In the analytical description phase, a more in-depth analysis of the material collected in the research will be carried out. The third phase, referred to as referential interpretation or treatment of results obtained will allow to verify the homogeneity and the heterogeneity among the participants' perceptions of the projects. Some preliminary results coming from the first interviews revealed the projects are guided by values such as cooperation, respect, well-being and nature preservation. These values are linked to the social entrepreneurship perception of the projects managers, who established their activities in behalf of the local community.

Keywords: personal values, social entrepreneurship, social projects, sports participants

Procedia PDF Downloads 342
5414 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 627
5413 Agile Project Management: A Real Application in a Multi-Project Research and Development Center

Authors: Aysegul Sarac

Abstract:

The aim of this study is to analyze the impacts of integrating agile development principles and practices, in particular to reduce project lead time in a multi-project environment. We analyze Arçelik Washing Machine R&D Center in which multiple projects are conducted by shared resources. In the first part of the study, we illustrate the current waterfall model system by using a value stream map. We define all activities starting from the first idea of the project to the customer and measure process time and lead time of projects. In the second part of the study we estimate potential improvements and select a set of these improvements to integrate agile principles. We aim to develop a future state map and analyze the impacts of integrating lean principles on project lead time. The main contribution of this study is that we analyze and integrate agile product development principles in a real multi-project system.

Keywords: agile project management, multi project system, project lead time, product development

Procedia PDF Downloads 281
5412 Effects of Sports Participation on Academics Performance of Students at Yaa Asantewaa Girls’ Senior High School

Authors: Alhassan Dramani Yakubu

Abstract:

The primary purpose of this study was to analyze effects that participating in sporting activities has on academic performance among students at Yaa Asantewaa Girls’ Senior High School. To dig out the main objective of the study, descriptive survey design was employed. The study used 45 respondents comprising of 25 student – athletes and 20 non-student – athletes. The purposive sampling and stratified random sampling technique were used to sample population of 455 students involved. The academic performance of sports participants is compared with those of non – participants in terms of their outcomes in the form of grades from mathematics. Data was obtained from the sample by the use of questionnaire which was self - administered. The questionnaire sought information on level of student’s participation in sports and importance of sports participation to students. Results revealed that participation in sporting activities is associated with higher grades among students. The analysis reinforces the idea that apart from their health benefits for participants, sporting activities lead to the attainment of the performance goals to which higher institutions aspire. The findings also implies that, mathematics teachers and other subject teachers should not fend off students from participating in sporting activities with the trepidation that participating in sports inflame academic performance. This study recommend that, educational programs about sports should be provided for students’ through the educational system to bring about positive academic performance.

Keywords: physical activity, physical education, intra mural, extra mural

Procedia PDF Downloads 37
5411 Hybrid Project Management Model Based on Lean and Agile Approach

Authors: Fatima-Zahra Eddoug, Jamal Benhra, Rajaa Benabbou

Abstract:

Several project management models exist in the literature and the most used ones are the hybrids for their multiple advantages. Our objective in this paper is to analyze the existing models, which are based on the Lean and Agile approaches and to propose a novel framework with the convenient tools that will allow efficient management of a general project. To create the desired framework, we were based essentially on 7 existing models. Only the Scrum tool among the agile tools was identified by several authors to be appropriate for project management. In contrast, multiple lean tools were proposed in different phases of the project.

Keywords: agility, hybrid project management, lean, scrum

Procedia PDF Downloads 113
5410 Social Networks as a Tool for Sports Marketing

Authors: Márcia Aparecida Teixeira

Abstract:

Sports, in particular football, boosts considerably the financial market of a certain locality, be it city or even a country. The financial transactions involving this medium stand out from other existing businesses, such as small industries. Strategically, social networks are inserted in this sporting environment, in order to promote and attract new fans of this modality. The present study analyzes the use of social networks in Sports Marketing with a focus on football. For the object of this study, it was chosen a specific club, the Club Atlético Mineiro, a Brazilian club of great national notoriety. The social networks on focus will be: Facebook, Twitter, and Instagram. It will be analyzed the content and frequency of the posts, reception of the target public in relation to the content made available and its feedback.

Keywords: social network, sport, strategy, marketing

Procedia PDF Downloads 363
5409 Assesment of Quality of Life among Iranian Male Amateur Athletes via WHOQOL-Brief

Authors: Shirko Ahmadi, Ahmad Fallahi, Marco C. Uchida, Gustavo L. Gutierrez

Abstract:

The aims of the present study are to assess and compare the health habits and quality of life (QoL) of Iranian amateur athletes in different sports. A total of 120 male amateur athletes between 17 and 31 years, engaged in 16 kinds of sports which include team (n=44), individual (n=40) and combat sports (n=36) from sports clubs in the west cities of Iran; and also those not involved in any competition in the past. Additionally, this is a cross-sectional, descriptive observational study, which the subjects completed the WHOQOL-brief questionnaire to evaluate QoL. The questionnaire is composed of 26 questions in four domains (physical health, psychological, social and environmental domains), that was applied in the Persian language. Information on the frequency and duration of training sessions were also collected. The Shapiro-Wilk test was used to verify normal distribution, followed by the chi-squared test for proportions and simple analysis of variance for comparisons between groups of sports. Pearson’s correlation was used to assess the relationships between the variables analyzed. According to the findings, those from individual sports obtained highest points in the all domains of QoL; physical domains (87.1 ± 8.1 point), psychological domains (87.6 ± 9.6 point), social domains (89.7 ± 9.2 point), environmental domains (75.5± 10.7 point) and overall QoL score (84.9 ± 9.4 point). Generally, social domains were the highest QoL index (84.3 ± 7.2 points), and environmental domains were the lowest QoL index (68.1 ± 10.8 points), in all of the sports. No correlations were found between QoL domains and time engaged in the sport (r = 0.01; p = 0.93), number of weekly training sessions (r = 0.09; p = 0.37) and session duration (r = -0.06; p= 0.58). Comparison of QoL results with those of the general population revealed higher levels in the physical and psychological components of amateur athletes. In the present study, engaging in sports was associated with higher QoL levels in amateur athletes, particularly in the physical and psychological domains. Moreover, correlations were found between the overall score and domains of QoL.

Keywords: amateur, domains, Iranian, quality of life

Procedia PDF Downloads 136
5408 Empirical Study for the Project and the Project Management Dimensions Comparison between SMEs and Large Companies

Authors: Amina Oukennou, Zitouni Beidouri, Otmane Bouksour

Abstract:

Small to Medium-sized enterprises are a very important component of the economy. They are present in the whole industries all over the world. They are considered as the engine for future growth in the economy. Project management is an economical international factor impacting all types of enterprises including the SMEs. This paper has the aim of measuring the weight of using projects and project management in Moroccan SMEs in comparison with the large companies. The study is based on interviews with experts: project managers, managers, directors, and consultants. They were asked questions measuring the weight of using projects, the level of using project management, and the resources employed. Eighteen Moroccan companies from a range of industries and sizes were consulted. All the companies consider projects as a key element in their strategy. Most of them affirm the great usefulness of the approach 'project', especially for the external activities. The main differences lie in the duration and the size of used projects. Despite the commonly shared idea about the importance of the project management, the interviewed persons believe that the project management knowledge has the same importance or less than the technical knowledge. All the companies affirm the need for a simpler version of project management. The content varies from one company to another.

Keywords: project dimension, project management, small to medium-sized entreprise, Morocco

Procedia PDF Downloads 288
5407 Project Management Agile Model Based on Project Management Body of Knowledge Guideline

Authors: Mehrzad Abdi Khalife, Iraj Mahdavi

Abstract:

This paper presents the agile model for project management process. For project management process, the Project Management Body of Knowledge (PMBOK) guideline has been selected as platform. Combination of computational science and artificial intelligent methodology has been added to the guideline to transfer the standard to agile project management process. The model is the combination of practical standard, computational science and artificial intelligent. In this model, we present communication model and protocols to keep process agile. Here, we illustrate the collaboration man and machine in project management area with artificial intelligent approach.

Keywords: artificial intelligent, conceptual model, man-machine collaboration, project management, standard

Procedia PDF Downloads 317
5406 Sport Facilities and Social Change: European Funds as an Opportunity for Urban Regeneration

Authors: Lorenzo Maiorino, Fabio Fortuna, Giovanni Panebianco, Marco Sanzari, Gabriella Arcese, Valerio Maria Paolozzi

Abstract:

It is well known that sport is a factor of social cohesion and the breaking down of barriers between people. From this point of view, the aim is to demonstrate how, through the (re)generation of sustainable structures, it is possible to give life to a new social, cultural, and economic pathway, where possible, in peripheral areas with problems of abandonment and degradation. The aim of this paper is, therefore, to study realities such as European programs and funds and to highlight the ways in which planning can be used to respond to critical issues such as urban decay, abandonment, and the mitigation of social differences. For this reason, the analysis will be carried out through the Multiannual Financial Framework (MFF) package, the Next Generation EU, the Recovery and Resilience Facility (RRF), the Cohesion Fund, the European Social Fund, and other managed funds. The procedure will rely on sources and data of unquestionable origin, and the relation to the object of study in question will be highlighted. The project lends itself to be ambitious and exploring a further aspect of the sports theme, which, as we know, is one of the foundations for a healthy society.

Keywords: sport, social inclusion, urban regeneration, sports facilities, European funds

Procedia PDF Downloads 203
5405 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria

Authors: Shazali Abdulahi

Abstract:

Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.

Keywords: effetive communication, ineffective communication, stakeholders, project delivery

Procedia PDF Downloads 29
5404 The Knowledge and Attitude of Doping among Junior Athletes and Coaches in Sri Lanka

Authors: Mahadula I. P. Kumari, Kasturiratne A., De Silva AP

Abstract:

Doping refers to an athlete's use of banned substances as a method to improve training and performance in sports. It is known that some young athletes use banned substances in Sri Lanka without knowing their side effects and associated health risks. The main objective of this study was to describe the level of knowledge and attitude among junior athletes and coaches on doping in sports. This is a descriptive cross-sectional study. Four individual sports and six team sports were taken into the study. Schools were selected considering the results of the all-island school sports competitions 2017. Two hundred sixty-two female athletes, 290 male athletes and 30 coaches representing all sports counted into this study. The data collection method was a self-administered questionnaire and SPSS Version 21 was used for the data analysis. According to the result, 79% of athletes have heard of the term "doping," and 21% have never heard of it. This means these children have not been educated on doping. A number of questions were asked to study the level of knowledge of the coaches and players. Those who answered the questions correctly were given a mark. According to the marks, it is evident that the level of knowledge of the players and coaches is very low. All athletes and coaches do not accept the use of banned substances. This shows that athletes and coaches have a good attitude about winning without cheating. It was evident that athletes in athletics, weightlifting, rugby, and badminton had some level of knowledge about banned substances. All coaches stated that school athletes and coaches do not have sufficient knowledge of banned substances. And they should be made aware of it. This study has revealed that school/Junior athletes and coaches have limited knowledge of banned substances. School children and coaches need to be educated about banned substances and their harmful effects.

Keywords: attitude, doping, knowledge, Sri Lanka

Procedia PDF Downloads 227
5403 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries

Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi

Abstract:

Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.

Keywords: physical progress, time progress, financial progress, delays, critical path

Procedia PDF Downloads 352
5402 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: project team, leadership, construction project, project successful

Procedia PDF Downloads 151
5401 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 240
5400 Use of a Business Intelligence Software for Interactive Visualization of Data on the Swiss Elite Sports System

Authors: Corinne Zurmuehle, Andreas Christoph Weber

Abstract:

In 2019, the Swiss Federal Institute of Sport Magglingen (SFISM) conducted a mixed-methods study on the Swiss elite sports system, which yielded a large quantity of research data. In a quantitative online survey, 1151 elite sports athletes, 542 coaches, and 102 Performance Directors of national sports federations (NF) have submitted their perceptions of the national support measures of the Swiss elite sports system. These data provide an essential database for the further development of the Swiss elite sports system. The results were published in a report presenting the results divided into 40 Olympic summer and 14 winter sports (Olympic classification). The authors of this paper assume that, in practice, this division is too unspecific to assess where further measures would be needed. The aim of this paper is to find appropriate parameters for data visualization in order to identify disparities in sports promotion that allow an assessment of where further interventions by Swiss Olympic (NF umbrella organization) are required. Method: First, the variable 'salary earned from sport' was defined as a variable to measure the impact of elite sports promotion. This variable was chosen as a measure as it represents an important indicator for the professionalization of elite athletes and therefore reflects national level sports promotion measures applied by Swiss Olympic. Afterwards, the variable salary was tested with regard to the correlation between Olympic classification [a], calculating the Eta coefficient. To estimate the appropriate parameters for data visualization, the correlation between salary and four further parameters was analyzed by calculating the Eta coefficient: [a] sport; [b] prioritization (from 1 to 5) of the sports by Swiss Olympic; [c] gender; [d] employment level in sports. Results & Discussion: The analyses reveal a very small correlation between salary and Olympic classification (ɳ² = .011, p = .005). Gender demonstrates an even small correlation (ɳ² = .006, p = .014). The parameter prioritization was correlating with small effect (ɳ² = .017, p = .001) as did employment level (ɳ² = .028, p < .001). The highest correlation was identified by the parameter sport with a moderate effect (ɳ² = .075, p = .047). The analyses show that the disparities in sports promotion cannot be determined by a particular parameter but presumably explained by a combination of several parameters. We argue that the possibility of combining parameters for data visualization should be enabled when the analysis is provided to Swiss Olympic for further strategic decision-making. However, the inclusion of multiple parameters massively multiplies the number of graphs and is therefore not suitable for practical use. Therefore, we suggest to apply interactive dashboards for data visualization using Business Intelligence Software. Practical & Theoretical Contribution: This contribution provides the first attempt to use Business Intelligence Software for strategic decision-making in national level sports regarding the prioritization of national resources for sports and athletes. This allows to set specific parameters with a significant effect as filters. By using filters, parameters can be combined and compared against each other and set individually for each strategic decision.

Keywords: data visualization, business intelligence, Swiss elite sports system, strategic decision-making

Procedia PDF Downloads 72
5399 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 398
5398 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 159
5397 Review and Analyze on the Journal of Sport Science

Authors: Zhan Dong, Qiu Jianrong, Li Qinghui, Zhang Lei

Abstract:

The quantity and quality of the papers published on sport science from 2001 to 2013 had been counted and analysed and compared with the papers published on the journal from 1990 to 2000. The result showed that: 1. In the sports medicine field, the proportion of basic/application was abnormal. Basic research was far more than the application research. The papers on researching of imitating altitude training was the main part. Gene research made great progress.The research on sport injury and medical supervision were lower and lower. Research on sports prescription had made much progress, especially in the patients of heart infarction. 2. In building up people’s health field, the research on the old people had been more and more compared with the 10 years before, but it was not enough. 3. In the field of sports psychology, the research on disable people had been more compared with the 10 years before. Solved the problem of the sportmen before the game. 4. In the field of sports biomechanics, it showed that methods had made great progress compared with the 10 years before. Sport biomechanics combined with sports medicine, helped the sportsmen in good condition in the game. 5. In the exercise training field, the experts pay more attention to the outstanding sportsmen, and the researches emphasized that biology knowledge is the main basic for them to the research.

Keywords: sport medicine, sport injury, medical supervision

Procedia PDF Downloads 476
5396 University Students Sport’s Activities Assessment in Harsh Weather Conditions

Authors: Ammar S. M. Moohialdin, Bambang T. Suhariadi, Mohsin Siddiqui

Abstract:

This paper addresses the application of physiological status monitoring (PSM) for assessing the impact of harsh weather conditions on sports activities in universities in Saudi Arabia. Real sports measurement was conducted during sports activities such that the physiological status (HR and BR) of five students were continuously monitored by using Zephyr BioHarnessTM 3.0 sensors in order to identify the physiological bonds and zones. These bonds and zones were employed as indicators of the associated physiological risks of the performed sports activities. Furthermore, a short yes/no questionnaire was applied to collect information on participants’ health conditions and opinions of the applied PSM sensors. The results show the absence of a warning system as a protective aid for the hazardous levels of extremely hot and humid weather conditions that may cause dangerous and fatal circumstances. The applied formulas for estimating maximum HR provides accurate estimations for Maximum Heart Rate (HRmax). The physiological results reveal that the performed activities by the participants are considered the highest category (90–100%) in terms of activity intensity. This category is associated with higher HR, BR and physiological risks including losing the ability to control human body behaviors. Therefore, there is a need for immediate intervention actions to reduce the intensity of the performed activities to safer zones. The outcomes of this study assist the safety improvement of sports activities inside universities and athletes performing their sports activities. To the best of our knowledge, this is the first paper to represent a special case of the application of PSM technology for assessing sports activities in universities considering the impacts of harsh weather conditions on students’ health and safety.

Keywords: physiological status monitoring (PSM), heart rate (HR), breathing rate (BR), Arabian Gulf

Procedia PDF Downloads 181
5395 Constructing Notation for Music Learning in Athletes: Identifying Key Concepts in Music and Body Movements

Authors: Fung Chiat Loo, Fung Ying Loo

Abstract:

This paper discusses, suggests, and constructs a notation system to facilitate the learning and understanding of the two aspects of music and movement in a sports routine. This model serves to provide a simple and logical notation that does not require training in both music and choreography. Notation is an important medium in many art forms, particularly in music and dance, transmitting information that cannot easily be expressed using words or language. Another field that is closely associated with dance and music is sports routine, which equally requires choreography and music. However, from the perspective of music, it is common to observe many incongruencies appearing between the music used and the choreography that impede an optimal perception of the performance. The concept of the notation proceeds with a discussion and review of existing dance notations that could contribute to sports routines, along with rules and a code of points in selected sports routines. The author's involvement as an insider of numerous musical theatre productions also contributed to this study. The notation constructed includes time (tempo), significances of musical accents, direction, and phrasing, along with significances of movements (jump, punch, shape). It is believed that the level of congruence between music and movement will provide optimal visualization, and in that, the notation serves to provide adequate information on both entities for the understanding of athletes and coaches.

Keywords: notation, choreography, music learning, sports routines, congruence

Procedia PDF Downloads 65
5394 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 142
5393 Interface Problems in Construction Projects

Authors: Puti F. Marzuki, Adrianto Oktavianus, Almerinda Regina

Abstract:

Interface problems among interacting parties in Indonesian construction projects have most often led to low productivity and completion delay. In the midst of this country’s needs to accelerate construction of public infrastructure providing connectivity among regions and supporting economic growth as well as better living quality, project delays have to be seriously addressed. This paper identifies potential causes factors of interface problems experienced by construction projects in Indonesia. Data are collected through a survey involving the main actors of six important public infrastructure construction projects including railway, LRT, sports stadiums, apartment, and education building construction projects. Five of these projects adopt the design-build project delivery method and one applies the design-bid-build scheme. Interface problems’ potential causes are categorized into contract, management, technical experience, coordination, financial, and environmental factors. Research results reveal that, especially in railway and LRT projects, potential causes of interface problems are mainly technical and managerial in nature. These relate to complex construction execution in highly congested areas. Meanwhile, coordination cause factors are mainly found in the education building construction project with loan from a foreign donor. All of the six projects have to resolve interface problems caused by incomplete or low-quality contract documents. This research also shows that the design-bid-build delivery method involving more parties in construction projects tends to induce more interface problem cause factors than the design-build scheme.

Keywords: cause factors, construction delays, project delivery method, contract documents

Procedia PDF Downloads 231
5392 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 439
5391 A Study for Turkish Underwater Sports Federation Athletes: Evaluation of the Street Foods Consumption

Authors: Su Tezel

Abstract:

The paper deals with licensed athletes affiliated with the Turkish Underwater Sports Federation to assess the consumption status of street food. The aim of the paper is the frequency of training during competition preparatory training or season periods, the athletes' economic situation, social life, work-life or education situations are the directs them to street food? Also to evaluate the importance that athletes attach to their nutritional status. Data were collected with survey method. 141 underwater sports athletes participated in the survey. Empirical findings on 141 respondents are related to athletes' demographic information, which underwater sports branch they doing (underwater hockey, underwater rugby and free diving), with whom they live, training hours and frequency, street food consumption frequency and preferences, which type drinks they prefer drink with or without street foods and other similar things. Most of the athletes were male (64.5%), female (35.5%) and the most athletes from the sports branches included in the survey belong to underwater hockey (95.7%). 93.7% of athletes have a training time between 08:00 pm to 00:00 am and the frequency of consuming street food after training is 88%. As a remarkable result, 48% of the reasons for consuming street food easy access to street foods after training. Statistical analyzes were made with the data obtained and the status of street food consumption of athletes, whether they were suitable for professional athlete nutrition and their attitudes were evaluated.

Keywords: nutrition, street foods, underwater hockey, underwater sport

Procedia PDF Downloads 124