Search results for: sustainable construction industry
11221 Determination of the Optimal Content of Commercial Superplasticizer Additives in Cements with Calcined Clay
Authors: Amanda R. Teixeira, João H. S. Rego, Gabriel F. S. Brito, Fabricio M. Silva
Abstract:
The use of superplasticizer additives has provided several advances for the civil construction industry, enabling gains in the rheological behavior and mechanical properties of cementitious matrices. These compounds act at the solid-liquid interface of colloidal suspensions of cement pastes, preventing agglomeration of the particles. Although the use in the concrete industry is wide, the mechanisms of dispersion of concrete admixtures composed of polycarboxylate in cement with supplementary cementitious materials have ample opportunity to be investigated, providing the attainment of increasingly compatible and efficient cement-addition-additive systems. The cements used in the research are Portland Cement CPV and two cements Portland Cement Composite (CPIV) with calcined clay contents of 20% and 28% and three commercial additives based on polycarboxylate. The performance of the additives and obtaining the optimal content was determined by the Marsh Cone test and spread by Mini-Slump.Keywords: calcined clay, composite cements, superplasticizer additives, polycarboxylate
Procedia PDF Downloads 10611220 Analyzing Business Model Choices and Sustainable Value Capturing: A Multiple Case Study of Sharing Economy Business Models
Authors: Minttu Laukkanen, Janne Huiskonen
Abstract:
This study investigates the sharing economy business models as examples of the sustainable business models. The aim is to contribute to the limited literature on sharing economy in connection with sustainable business models by explaining sharing economy business models value capturing. Specifically, this research answers the following question: How business model choices affect captured sustainable value? A multiple case study approach is applied in this study. Twenty different successful sharing economy business models focusing on consumer business and covering four main areas, accommodation, mobility, food, and consumer goods, are selected for analysis. The secondary data available on companies’ websites, previous research, reports, and other public documents are used. All twenty cases are analyzed through the sharing economy business model framework and sustainable value analysis framework using qualitative data analysis. This study represents general sharing economy business model value attributes and their specifications, i.e. sustainable value propositions for different stakeholders, and further explains the sustainability impacts of different sharing economy business models through captured and uncaptured value. In conclusion, this study represents how business model choices affect sustainable value capturing through eight business model attributes identified in this study. This paper contributes to the research on sustainable business models and sharing economy by examining how business model choices affect captured sustainable value. This study highlights the importance of careful business model and sustainability impacts analyses including the triple bottom line, multiple stakeholders and value captured and uncaptured perspectives as well as sustainability trade-offs. It is not self-evident that sharing economy business models advance sustainability, and business model choices does matter.Keywords: sharing economy, sustainable business model innovation, sustainable value, value capturing
Procedia PDF Downloads 17211219 An Integrated Emergency Management System for the Tourism Industry in Oman
Authors: Majda Al Salti
Abstract:
Tourism industry is considered globally as one of the leading industries due to its noticeable contribution to countries' gross domestic product (GDP) and job creation. However, tourism is vulnerable to crisis and disaster that requires its preparedness. With its limited capabilities, there is a need to improve links and the understanding between the tourism industry and the emergency services, thus facilitating future emergency response to any potential incident. This study aims to develop the concept of an integrated emergency management system for the tourism industry. The study used face-to-face semi-structured interviews to evaluate the level of crisis and disaster preparedness of the tourism industry in Oman. The findings suggested that there is a lack of understanding of crisis and disaster management, and hence preparedness level among Oman Tourism Authorities appears to be under-expectation. Therefore, a clear need for tourism sector inter- and intra-integration and collaboration is important in the pre-disaster stage. The need for such integrations can help the tourism industry in Oman to prepare for future incidents as well as identifying its requirements in time of crisis for effective response.Keywords: tourism, emergency services, crisis, disaster
Procedia PDF Downloads 11911218 Experimental Exploration of Recycled Materials for Potential Application in Interior Design
Authors: E. P. Bhowmik, R. Singh
Abstract:
Certain materials casually thrown away as by-product household waste, such as used tea leaves, used coffee remnants, eggshells, peanut husks, coconut coir, unwanted paper, and pencil shavings- have scope in the hidden properties that they offer as recyclable raw ingredients. This paper aims to explore and experiment with the sustainable potential of such disposed wastes, obtained from domestic and commercial backgrounds, that could otherwise contribute to the field of interior design if mass-collected and repurposed. Research has been conducted on available recorded methods of mass-collection, storage, and processing of such materials by certain brands, designers, and researchers, as well as the various application and angles possible with regards to re-usage. A questionnaire survey was carried out to understand the willingness of the demographics for efforts of the mass collection and their openness to such unconventional materials for interiors. An experiment was also conducted where the selected waste ingredients were used to create small samples that could be used as decorative panels. Comparisons were made for properties like color, smell, texture, relative durability, and weight- and accordingly, applications were suggested. The experiment, therefore, helped to propose to recycle of the common household as a potential surface finish for floors, walls, and ceilings, and even founding material for furniture and decor accessories such as pottery and lamp shades; for non-structural application in both residential and commercial interiors. Common by-product wastes often see their ends at landfills- laymen unaware of their sustainable possibilities dispose of them. However, processing these waste materials and repurposing them by incorporating them into interiors would serve as a sustainable alternative to ethical dilemmas in the construction of interior design/architecture elements.Keywords: interior materials, mass-collection, sustainable, waste recycle
Procedia PDF Downloads 10411217 Gender Diversity Practices in Talent Management: An Exploratory Study in the Space Industry in Luxembourg
Authors: K. Usanova
Abstract:
This study contributes to the conceptual and empirical understanding of how gender diversity management (GDM) is integrated into talent management (TM). Following the grounded theory, we interviewed 40 HR managers and talents from the space industry in Luxembourg. We provide a nuanced picture of what attitude on the GDM in TM organizations have, what strategies and practices they conduct, and how they differ from each other. Based on these differences, we developed three types of GDM integration to TM and explained the talents’ view on this issue. To the author's best knowledge, this study is the first empirical investigation of GDM in TM in the space industry that integrates both the TM executives' and TM receivers' views on gender equality in TM.Keywords: gender diversity management, high-technology industry, human resource management, talent management
Procedia PDF Downloads 13311216 Subcontractor Development Practices and Processes: A Conceptual Model for LEED Projects
Authors: Andrea N. Ofori-Boadu
Abstract:
The purpose is to develop a conceptual model of subcontractor development practices and processes that strengthen the integration of subcontractors into construction supply chain systems for improved subcontractor performance on Leadership in Energy and Environmental Design (LEED) certified building projects. The construction management of a LEED project has an important objective of meeting sustainability certification requirements. This is in addition to the typical project management objectives of cost, time, quality, and safety for traditional projects; and, therefore increases the complexity of LEED projects. Considering that construction management organizations rely heavily on subcontractors, poor performance on complex projects such as LEED projects has been largely attributed to the unsatisfactory preparation of subcontractors. Furthermore, the extensive use of unique and non-repetitive short term contracts limits the full integration of subcontractors into construction supply chains and hinders long-term cooperation and benefits that could enhance performance on construction projects. Improved subcontractor development practices are needed to better prepare and manage subcontractors, so that complex objectives can be met or exceeded. While supplier development and supply chain theories and practices for the manufacturing sector have been extensively investigated to address similar challenges, investigations in the construction sector are not that obvious. Consequently, the objective of this research is to investigate effective subcontractor development practices and processes to guide construction management organizations in their development of a strong network of high performing subcontractors. Drawing from foundational supply chain and supplier development theories in the manufacturing sector, a mixed interpretivist and empirical methodology is utilized to assess the body of knowledge within literature for conceptual model development. A self-reporting survey with five-point Likert scale items and open-ended questions is administered to 30 construction professionals to estimate their perceptions of the effectiveness of 37 practices, classified into five subcontractor development categories. Data analysis includes descriptive statistics, weighted means, and t-tests that guide the effectiveness ranking of practices and categories. The results inform the proposed three-phased LEED subcontractor development program model which focuses on preparation, development and implementation, and monitoring. Highly ranked LEED subcontractor pre-qualification, commitment, incentives, evaluation, and feedback practices are perceived as more effective, when compared to practices requiring more direct involvement and linkages between subcontractors and construction management organizations. This is attributed to unfamiliarity, conflicting interests, lack of trust, and resource sharing challenges. With strategic modifications, the recommended practices can be extended to other non-LEED complex projects. Additional research is needed to guide the development of subcontractor development programs that strengthen direct involvement between construction management organizations and their network of high performing subcontractors. Insights from this present research strengthen theoretical foundations to support future research towards more integrated construction supply chains. In the long-term, this would lead to increased performance, profits and client satisfaction.Keywords: construction management, general contractor, supply chain, sustainable construction
Procedia PDF Downloads 11011215 Formalizing a Procedure for Generating Uncertain Resource Availability Assumptions Based on Real Time Logistic Data Capturing with Auto-ID Systems for Reactive Scheduling
Authors: Lars Laußat, Manfred Helmus, Kamil Szczesny, Markus König
Abstract:
As one result of the project “Reactive Construction Project Scheduling using Real Time Construction Logistic Data and Simulation”, a procedure for using data about uncertain resource availability assumptions in reactive scheduling processes has been developed. Prediction data about resource availability is generated in a formalized way using real-time monitoring data e.g. from auto-ID systems on the construction site and in the supply chains. The paper focuses on the formalization of the procedure for monitoring construction logistic processes, for the detection of disturbance and for generating of new and uncertain scheduling assumptions for the reactive resource constrained simulation procedure that is and will be further described in other papers.Keywords: auto-ID, construction logistic, fuzzy, monitoring, RFID, scheduling
Procedia PDF Downloads 51311214 Study on the Factors that Causes the Malaysian Oil and Gas Equipment (OGSE) Companies being under-Developing
Authors: Low Khee Wai
Abstract:
Lossing of opportunity by Malaysian Oil and Gas Services Equipment (OGSE) companies can be a major issue in developing and sustain Malaysia’s own Oil & Gas Industry. Despite the rapid growth of Oil & Gas industry in Malaysia for the past 40 years, Malaysia still not developing sufficient OGSE companies in order to support its own Oil & Gas Industry. In examining the scenario, this study aims to identify the factors causing the under-developing of OGSE companies in Malaysia. Conceptual Review method were used to analyse the factors that cause the under-development of Malaysia OGSE. The 4 factors identified were Time, Cost, Human Resource and Stakeholder Management. This survey explained the phenomena and the challenge of the industry and translated into the factors that cause the under-developing of OGSE companies in Malaysia. Finally, it should bring awareness to the government, authorities, and stakeholder in order to improve the ecology of Oil & Gas Industry in Malaysia.Keywords: oil & gas in Malaysia, Malaysia local oil & gas services equipment (OGSE), oil & gas project management, project performance
Procedia PDF Downloads 13211213 Factors Affecting Green Supply Chain Management of Lampang Ceramics Industry
Authors: Nattida Wannaruk, Wasawat Nakkiew
Abstract:
This research aims to study the factors that affect the performance of green supply chain management in the Lampang ceramics industry. The data investigation of this research was questionnaires which were gathered from 20 factories in the Lampang ceramics industry. The research factors are divided into five major groups which are green design, green purchasing, green manufacturing, green logistics and reverse logistics. The questionnaire has consisted of four parts that related to factors green supply chain management and general information of the Lampang ceramics industry. Then, the data were analyzed using descriptive statistic and priority of each factor by using the analytic hierarchy process (AHP). The understanding of factors affecting the green supply chain management of Lampang ceramics industry was indicated in the summary result along with each factor weight. The result of this research could be contributed to the development of indicators or performance evaluation in the future.Keywords: Lampang ceramics industry, green supply chain management, analysis hierarchy process (AHP), factors affecting
Procedia PDF Downloads 33211212 Palm Oil Production Sustainability in Delta State Nigeria
Authors: Omuvwie R. Ewien
Abstract:
Palm oil production in Delta State, Nigeria, is a significant economic activity. However, ensuring its sustainability is crucial to mitigate environmental impacts, promote social equity, and maintain long-term economic viability. This abstract provides an overview of palm oil production sustainability in Delta State, focusing on environmental, social, and economic aspects. In terms of environmental sustainability, the impact of palm oil plantations on deforestation and biodiversity loss is explored. The adoption of sustainable land use practices and measures to reduce greenhouse gas emissions, such as conserving high conservation value areas and utilizing methane capture systems, are highlighted. Social sustainability considerations encompass the inclusion and empowerment of smallholders, ensuring fair labor practices and community engagement. Supporting small-scale farmers, promoting fair working conditions, and investing in local infrastructure and services are identified as key strategies. Economic sustainability is emphasized through yield improvement, efficiency, and value addition. Enhancing productivity and profitability for farmers, promoting downstream processing and market diversification, and building economic resilience is crucial for long-term sustainability. Government policies, including regulatory frameworks and public-private collaborations, play a pivotal role in promoting sustainable palm oil production. Enabling policies and partnerships with industry stakeholders and NGOs facilitates the adoption of sustainable practices. Challenges such as illegal activities, the need to balance economic development with environmental conservation, and leveraging technology for sustainability are discussed. The abstract concludes by emphasizing the importance of stakeholders' commitment to prioritize sustainable palm oil production in Delta State, Nigeria, for a sustainable future.Keywords: palm oil production, environmental sustainability, community development, yield improvement, future outlook
Procedia PDF Downloads 9711211 Life Cycle Carbon Dioxide Emissions from the Construction Phase of Highway Sector in China
Authors: Yuanyuan Liu, Yuanqing Wang, Di Li
Abstract:
Carbon dioxide (CO2) emissions mitigation from road construction activities is one of the potential pathways to deal with climate change due to its higher use of materials, machinery energy consumption, and high quantity of vehicle and equipment fuels for transportation and on-site construction activities. Aiming to assess the environmental impact of the road infrastructure construction activities and to identify hotspots of emissions sources, this study developed a life-cycle CO2 emissions assessment framework covering three stages of material production, to-site and on-site transportation under the guidance of the principle of LCA ISO14040. Then streamlined inventory analysis on sub-processes of each stage was conducted based on the budget files from cases of highway projects in China. The calculation results were normalized into functional unit represented as ton per km per lane. Then a comparison between the amount of emissions from each stage, and sub-process was made to identify the major contributor in the whole highway lifecycle. In addition, the calculating results were used to be compared with results in other countries for understanding the level of CO2 emissions associated with Chinese road infrastructure in the world. The results showed that materials production stage produces the most of the CO2 emissions (for more than 80%), and the production of cement and steel accounts for large quantities of carbon emissions. Life cycle CO2 emissions of fuel and electric energy associated with to-site and on-site transportation vehicle and equipment are a minor component of total life cycle CO2 emissions from highway project construction activities. Bridges and tunnels are dominant large carbon contributor compared to the road segments. The life cycle CO2 emissions of road segment in highway project in China are slightly higher than the estimation results of highways in European countries and USA, about 1500 ton per km per lane. In particularly, the life cycle CO2 emissions of road pavement in majority cities all over the world are about 500 ton per km per lane. However, there is obvious difference between the cities when the estimation on life cycle CO2 emissions of highway projects included bridge and tunnel. The findings of the study could offer decision makers a more comprehensive reference to understand the contribution of road infrastructure to climate change, especially understand the contribution from road infrastructure construction activities in China. In addition, the identified hotspots of emissions sources provide the insights of how to reduce road carbon emissions for development of sustainable transportation.Keywords: carbon dioxide emissions, construction activities, highway, life cycle assessment
Procedia PDF Downloads 26911210 Current Status of Industry 4.0 in Material Handling Automation and In-house Logistics
Authors: Orestis Κ. Efthymiou, Stavros T. Ponis
Abstract:
In the last decade, a new industrial revolution seems to be emerging, supported -once again- by the rapid advancements of Information Technology in the areas of Machine-to-Machine (M2M) communication permitting large numbers of intelligent devices, e.g. sensors to communicate with each other and take decisions without any or minimum indirect human intervention. The advent of these technologies have triggered the emergence of a new category of hybrid (cyber-physical) manufacturing systems, combining advanced manufacturing techniques with innovative M2M applications based on the Internet of Things (IoT), under the umbrella term Industry 4.0. Even though the topic of Industry 4.0 has attracted much attention during the last few years, the attempts of providing a systematic literature review of the subject are scarce. In this paper, we present the authors’ initial study of the field with a special focus on the use and applications of Industry 4.0 principles in material handling automations and in-house logistics. Research shows that despite the vivid discussion and attractiveness of the subject, there are still many challenges and issues that have to be addressed before Industry 4.0 becomes standardized and widely applicable.Keywords: Industry 4.0, internet of things, manufacturing systems, material handling, logistics
Procedia PDF Downloads 12711209 Risk Prioritization in Tunneling Construction Projects
Authors: David Nantes, George Gilbert
Abstract:
There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects
Procedia PDF Downloads 9211208 Company-Independent Standardization of Timber Construction to Promote Urban Redensification of Housing Stock
Authors: Andreas Schweiger, Matthias Gnigler, Elisabeth Wieder, Michael Grobbauer
Abstract:
Especially in the alpine region, available areas for new residential development are limited. One possible solution is to exploit the potential of existing settlements. Urban redensification, especially the addition of floors to existing buildings, requires efficient, lightweight constructions with short construction times. This topic is being addressed in the five-year Alpine Building Centre. The focus of this cooperation between Salzburg University of Applied Sciences and RSA GH Studio iSPACE is on transdisciplinary research in the fields of building and energy technology, building envelopes and geoinformation, as well as the transfer of research results to industry. One development objective is a system of wood panel system construction with a high degree of prefabrication to optimize the construction quality, the construction time and the applicability for small and medium-sized enterprises. The system serves as a reliable working basis for mastering the complex building task of redensification. The technical solution is the development of an open system in timber frame and solid wood construction, which is suitable for a maximum two-story addition of residential buildings. The applicability of the system is mainly influenced by the existing building stock. Therefore, timber frame and solid timber construction are combined where necessary to bridge large spans of the existing structure while keeping the dead weight as low as possible. Escape routes are usually constructed in reinforced concrete and are located outside the system boundary. Thus, within the framework of the legal and normative requirements of timber construction, a hybrid construction method for redensification created. Component structure, load-bearing structure and detail constructions are developed in accordance with the relevant requirements. The results are directly applicable in individual cases, with the exception of the required verifications. In order to verify the practical suitability of the developed system, stakeholder workshops are held on the one hand, and the system is applied in the planning of a two-storey extension on the other hand. A company-independent construction standard offers the possibility of cooperation and bundling of capacities in order to be able to handle larger construction volumes in collaboration with several companies. Numerous further developments can take place on the basis of the system, which is under open license. The construction system will support planners and contractors from design to execution. In this context, open means publicly published and freely usable and modifiable for own use as long as the authorship and deviations are mentioned. The companies are provided with a system manual, which contains the system description and an application manual. This manual will facilitate the selection of the correct component cross-sections for the specific construction projects by means of all component and detail specifications. This presentation highlights the initial situation, the motivation, the approach, but especially the technical solution as well as the possibilities for the application. After an explanation of the objectives and working methods, the component and detail specifications are presented as work results and their application.Keywords: redensification, SME, urban development, wood building system
Procedia PDF Downloads 11111207 Bridge Construction and Type of Bridges and Their Construction Methods
Authors: Mokhtar Nikgoo
Abstract:
Definition of bridge: A bridge is a structure that allows people to pass through the communication road with two points. There are many different types of bridges, each of which is designed to perform a specific function. This article introduces the concept, history, components, uses, types, construction methods, selected factors, damage factors and principles of bridge maintenance. A bridge is a structure to cross a passage such as a water, valley or road without blocking another path underneath. This structure makes it possible to pass obstacles that are difficult or impossible to pass. There are different designs for bridge construction, each of which is used for a particular function and condition. In the old definition, a bridge is an arch over a river, valley, or any type of passage that makes traffic possible. But today, in the topic of urban management, the bridge is considered as a structure to cross physical barriers, so that while using space (not just the surface of the earth), it can facilitate the passage and access to places. The useful life of bridges may be between 30 and 80 years depending on the location and the materials used. But with proper maintenance and improvement, their life may last for hundreds of years.Keywords: bridge, road construction, surveying, transportation
Procedia PDF Downloads 51211206 Clients’ Priorities in Delivery of Green Projects: South African Perspective
Authors: C. Mothobiso, D. Root
Abstract:
Purpose: This study attempts to identify the clients’ main priorities when delivering green projects. The aim is to compare if the clients have the same interest that are similar in delivery of convectional buildings as compared to green buildings. The main purpose is to find why other clients are investing in green buildings while others are reluctant and adopting green building at a slow pace. Design/methodology/approach: A sample of construction professional accredited by the Green Building Council of South Africa (GBCSA) was sent a questionnaire to participate in the research. Since GBSCSA accredited professionals have knowledge and experience about the green buildings, they are chosen as the sample. The research is qualitative because it evaluates the perceptions and knowledge around the subject matter. Research limitations: The research focuses only on the South African construction clients. Findings: Findings reveal that private clients invest more on green buildings as compared to government and parastatal entities. Private clients prioritise on maximising returns on investments and they mainly invest on buildings that save energies and have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building project as compared to government and Parastatals clients. Shortage of expertise and managerial skill leads to low adaptation of green buildings in the government and parastatal projects. Other factors, which seem to disintegrate the adoption of green buildings, are the readiness of supply chain within the industry and inappropriate procurements strategies adopted by clients. The evaluation of the clients’ priorities will enable the design team to come up with innovative ways to approach the design process so that clients’ priorities and needs are identified and met. Practical implications: The findings are indicating that clients’ needs and priorities have a huge impact on the delivery of the project in terms of time, quality and cost of the project.Keywords: construction clients, design team, green construction and project deliver
Procedia PDF Downloads 27011205 A Review on the Necessities of Green Building in Bangladesh and Its Construction Process
Authors: Syeda Afsana Azad
Abstract:
Climate change, due to the release of greenhouse gases into the atmosphere has been recognized as one of the biggest threats to the present world. The condition of the earth is getting worse day by day due to climate change. Bangladesh is considered to be one of the most vulnerable countries to climate change due to large population, sharp urbanization, etc. Construction of green building is a very good solution to reduce the greenhouse effect. Green building technology refers to that kind of structures which are environmentally friendly and resource-efficient throughout a building’s service life. This technology can provide at least 50% energy saving opportunity to the nation. The necessity of the construction of structures in an environment-friendly way is increasing now. This study shows the scenario of rapid population growth, urbanization, necessity of green building in Bangladesh and also discusses the construction process of green building. As the present climate condition of Bangladesh is not friendly, construction of green building is very much needed. To battle climate change, it is mandatory to construct green building.Keywords: Bangladesh, climate change, green building, green house effect
Procedia PDF Downloads 37711204 Framework Development of Carbon Management Software Tool in Sustainable Supply Chain Management of Indian Industry
Authors: Sarbjit Singh
Abstract:
This framework development explored the status of GSCM in manufacturing SMEs and concluded that there was a significant gap w.r.t carbon emissions measurement in the supply chain activities. The measurement of carbon emissions within supply chains is important green initiative toward its reduction. The majority of the SMEs were facing the problem to quantify the green house gas emissions in its supply chain & to make it a low carbon supply chain or GSCM. Thus, the carbon management initiatives were amalgamated with the supply chain activities in order to measure and reduce the carbon emissions, confirming the GHG protocol scopes. Henceforth, it covers the development of carbon management software (CMS) tool to quantify carbon emissions for effective carbon management. This tool is cheap and easy to use for the industries for the management of their carbon emissions within the supply chain.Keywords: w.r.t carbon emissions, carbon management software, supply chain management, Indian Industry
Procedia PDF Downloads 46811203 The Sectoral Differences in the Use of Construction Incentive
Authors: Qiuwen Ma, Sai On Cheung
Abstract:
Incentive contracting has been developed to push the agent team for extra effort. Generally, there are three types of incentive arrangement, namely incentive/penalty for super performance/underperformance, risk/reward sharing and future business opportunities. It is found that there are significant differences in the use of incentive arrangement in private and public projects. In Hong Kong, very few public projects have used future business as incentivizer whereas private developers often signal repeated business coupled with heavy penalty. This study was conducted to identify various attributes affecting the use of I/D in both private and public engineering sectors of Hong Kong. The diverging preferences were unveiled with reference to a literature review and semi-structured interviews with industry experts. The findings reveal the public/private sectors would consider the implementation issues regarding the various performance targets. The most deterministic factor for the public sector is about accountability. The private sector is in general skeptical about the need to provide extra for the contractors for what they have already contracted to perform.Keywords: construction incentive, public/private projects, semi-structured interview, hong kong
Procedia PDF Downloads 10211202 Crystalline Silica Exposure in Tunnelling: Identifying Barriers to Safe Practices
Authors: Frederick Anlimah, Vinod Gopaldasani, Catherine MacPhail, Brian Davies
Abstract:
The construction industry, particularly tunnel construction, exposes workers to respirable crystalline silica (RCS), which can cause incurable illnesses such as silicosis and lung cancer. Despite various control measures, exposures remain inadequately controlled. This research aimed to identify the barriers and challenges hindering the implementation of effective controls and the adoption of safe work practices to protect workers from RCS exposure in tunnelling. A mixed-method approach was employed for this research. Tunnel construction workers were observed, surveyed and interviewed to gauge their knowledge and attitudes and understand their challenges in reducing RCS exposure. The preliminary analysis of the data reveals a diverse array of sociotechnical factors interacting to influence RCS exposure. It is noteworthy that participants consistently emphasised the project as the most exemplary one they have been involved in, although there is room for improvement. While there is a commendable level of knowledge about RCS exposure and control in tunnelling, there is a striking lack of perceived satisfaction regarding dust control. Several factors were identified as interacting to prevent the effective management of dust. These include perceived time pressure, absence of on-tool dust controls, low risk perceptions among workers, and inadequate enforcement of controls. Moreover, participants highlighted communication and heat-related challenges as hindrances to the continuous wear of respirators. This research highlights the need for a paradigm shift in tunnel construction to address the barriers associated with RCS exposure reduction. It emphasises the importance of collaboration among various stakeholders, advocating for more effective controls and enforcement strategies and enhanced worker education through knowledge sharing.Keywords: respirable crystalline silica, dust control, worker practices, exposure prevention, silicosis
Procedia PDF Downloads 6811201 Reinforced Concrete Design Construction Issues and Earthquake Failure-Damage Responses
Authors: Hasan Husnu Korkmaz, Serra Zerrin Korkmaz
Abstract:
Earthquakes are the natural disasters that threat several countries. Turkey is situated on a very active earthquake zone. During the recent earthquakes, thousands of people died due to failure of reinforced concrete structures. Although Turkey has a very sufficient earthquake code, the design and construction mistakes were repeated for old structures. Lack of the control mechanism during the construction process may be the most important reason of failure. The quality of the concrete and poor detailing of steel or reinforcement is the most important headings. In this paper, the reasons of failure of reinforced concrete structures were summarized with relevant photos. The paper is beneficial for civil engineers as well as architect who are in the process of construction and design of structures in earthquake zones.Keywords: earthquake, reinforced concrete structure, failure, material
Procedia PDF Downloads 36511200 A Preparatory Method for Building Construction Implemented in a Case Study in Brazil
Authors: Aline Valverde Arroteia, Tatiana Gondim do Amaral, Silvio Burrattino Melhado
Abstract:
During the last twenty years, the construction field in Brazil has evolved significantly in response to its market growing and competitiveness. However, this evolving path has faced many obstacles such as cultural barriers and the lack of efforts to achieve quality at the construction site. At the same time, the greatest amount of information generated on the designing or construction phases is lost due to the lack of an effective coordination of these activities. Face this problem, the aim of this research was to implement a French method named PEO which means preparation for building construction (in Portuguese) seeking to understand the design management process and its interface with the building construction phase. The research method applied was qualitative, and it was carried out through two case studies in the city of Goiania, in Goias, Brazil. The research was divided into two stages called pilot study at Company A and implementation of PEO at Company B. After the implementation; the results demonstrated the PEO method's effectiveness and feasibility while a booster on the quality improvement of design management. The analysis showed that the method has a purpose to improve the design and allow the reduction of failures, errors and rework commonly found in the production of buildings. Therefore, it can be concluded that the PEO is feasible to be applied to real estate and building companies. But, companies need to believe in the contribution they can make to the discovery of design failures in conjunction with other stakeholders forming a construction team. The result of PEO can be maximized when adopting the principles of simultaneous engineering and insertion of new computer technologies, which use a three-dimensional model of the building with BIM process.Keywords: communication, design and construction interface management, preparation for building construction (PEO), proactive coordination (CPA)
Procedia PDF Downloads 16211199 The Production of B-Group Vitamin by Lactic Acid Bacteria and Its Importance in Food Industry
Authors: Goksen Arik, Mihriban Korukluoglu
Abstract:
Lactic acid bacteria (LAB) has been used commonly in the food industry. They can be used as natural preservatives because acidifying carried out in the medium can protect the last product against microbial spoilage. Besides, other metabolites produced by LAB during fermentation period have also an antimicrobial effect on pathogen and spoilage microorganisms in the food industry. LAB are responsible for the desirable and distinctive aroma and flavour which are observed in fermented food products such as pickle, kefir, yogurt, and cheese. Various LAB strains are able to produce B-group vitamins such as folate (B11), riboflavin (B2) and cobalamin (B12). Especially wild-type strains of LAB can produce B-group vitamins in high concentrations. These cultures may be used in food industry as a starter culture and also the microbial strains can be used in encapsulation technology for new and functional food product development. This review is based on the current applications of B-group vitamin producing LAB. Furthermore, the new technologies and innovative researches about B vitamin production in LAB have been demonstrated and discussed for determining their usage availability in various area in the food industry.Keywords: B vitamin, food industry, lactic acid bacteria, starter culture, technology
Procedia PDF Downloads 39011198 Factors Influencing the Housing Price: Developers’ Perspective
Authors: Ernawati Mustafa Kamal, Hasnanywati Hassan, Atasya Osmadi
Abstract:
The housing industry is crucial for sustainable development of every country. Housing is a basic need that can enhance the quality of life. Owning a house is therefore the main aim of individuals. However, affordability has become a critical issue towards homeownership. In recent years, housing price in the main cities has increased tremendously to unaffordable level. This paper investigates factors influencing the housing price from developer’s perspective and provides recommendation on strategies to tackle this issue. Online and face-to-face survey was conducted on housing developers operating in Penang, Malaysia. The results indicate that (1) location; (2) macroeconomics factor; (3) demographic factors; (4) land/zoning and; (5) industry factors are the main factors influencing the housing price. This paper contributes towards better understanding on developers’ view on how the housing price is determined and form a basis for government to help tackle the housing affordability issue.Keywords: factors influence, house price, housing developers, Malaysia
Procedia PDF Downloads 39611197 Risk Assessment in Construction of K-Span Buildings in United Arab Emirates (UAE)
Authors: Imtiaz Ali, Imam Mansoor
Abstract:
Investigations as a part of the academic study were undertaken to identify and evaluate the significant risks associated with the construction of K-span buildings in the region of UAE. Primary field data was collected through questionnaires obtaining specific open and close-ended questions from carefully selected construction firms, civil engineers and, construction manager regarding risks associated to K-span building construction. Historical data available for other regions of the same construction technique was available which was compared for identifying various non-critical and critical risk parameters by comparative evaluation techniques to come up with important risks and potential sources for their control and minimization in K-Span buildings that is increasing in the region. The associated risks have been determined with their Relative Importance Index (RII) values of which Risk involved in Change of Design required by Owners carries the highest value (RII=0.79) whereas, Delayed Payment by Owner to Contractor is one of the least (RII=0.42) value. The overall findings suggest that most relative risks as quantified originate or associated with the contractors. It may be concluded that project proponents undertaking K-span projects in planning and budgeting the cost and delays should take into account of risks on high account if changes in design are also required any delays in the material by the supplier would then be a major risk in K-span project delay. Since projects are, less costly, so owners have limited budgets, then they hire small contractors, which are not highly competent contractors. So study suggests that owner should be aware of these types of risks associated with the construction of K-span buildings in order to make it cost effective.Keywords: k-span buildings, k-span construction, risk management, relative improvement index (RII)
Procedia PDF Downloads 37511196 Further the Future: The Exploratory Study in 3D Animation Marketing Trend and Industry in Thailand
Authors: Pawit Mongkolprasit, Proud Arunrangsiwed
Abstract:
Lately, many media organizations in Thailand have started to produce 3D animation, so the quality of personnel should be identified. As an instructor in the school of Animation and Multimedia, the researchers have to prepare the students, suitable for the need of industry. The current study used exploratory research design to establish the knowledge of about this issue, including the required qualification of employees and the potential of animation industry in Thailand. The interview sessions involved three key informants from three well-known organizations. The interview data was used to design a questionnaire for the confirmation phase. The overall results showed that the industry needed an individual with 3D animation skill, computer graphic skills, good communication skills, a high responsibility, and an ability to finish the project on time. Moreover, it is also found that there were currently various kinds of media where 3D animation has been involved, such as films, TV variety, TV advertising, online advertising, and application on mobile device.Keywords: 3D animation, animation industry, marketing trend, Thailand animation
Procedia PDF Downloads 29311195 An Integrated Planning Framework for Sustainable Tourism: Case Study of Tunisia
Authors: S. Halioui, I. Arikan, M. Schmidt
Abstract:
Tourism sector in Tunisia faces several problems that range from economic challenges to environmental degradation and social instability. These problems have been intensified because of the increased competition in the tourism market, the political instability, financial crises, and recently terrorism problems have aggravated the situation. As a consequence, a new framework that promotes sustainable tourism in the country and increases its competitiveness is urgently needed. Planning for sustainable tourism sector requires the integration of complex interactions between economic, social and environmental aspects. Sustainable tourism principles can be implemented with the help of Strategic Environmental Assessment (SEA) process, which ensures the full integration of economic, social and environmental considerations while planning for the tourism sector in Tunisia. Results of the paper have broad implications for policy makers and tourism professionals.Keywords: sustainable tourism, strategic environmental assessment, tourism planning, policy
Procedia PDF Downloads 48911194 An Outsourcing System Model for the Thai Electrical Appliances Industry
Authors: Sudawan Somjai
Abstract:
The purpose of this paper was to find an appropriate outsourcing system model for the Thai electrical appliances industry. The objective was to increase competitive capability of the industry with an outsourcing system. The population for this study was the staff in the selected 10 companies in Thai electrical appliances industry located in Bangkok and the eastern part of Thailand. Data collecting techniques included in-depth interviews, focus group and storytelling techniques. The data was collected from 5 key informants from each company, making a total of 50 informants. The findings revealed that an outsourcing model would consist of important factors including outsourcing system, labor flexibility, capability of business process, manpower management efficiency, cost reduction, business risk elimination, core competency and competitiveness. Different suggestions were made as well in this research paper.Keywords: outsourcing system, model, Thailand, electrical appliances industry
Procedia PDF Downloads 59011193 The Effect of Artificial Intelligence on Human Rights Resources and Development
Authors: Tharwat Girgis Farag Girgis
Abstract:
The link between development and human rights has long been the subject of scholarly debate. As a result, a number of principles have been adopted, from the right to development to the human rights-based development approach, to understand the dynamics between the two concepts. Despite the initiatives taken, the exact relationship between development and human rights remains unclear. However, the rapprochement between the two concepts and the need for development efforts regarding human rights have increased in recent years. On the other hand, the emergence of sustainable development as an acceptable method in development goals and policies makes this consensus even more unstable. The place of sustainable development in the legal debate on human rights and its role in promoting sustainable development programs require further research. Therefore, this article attempts to map the relationship between development and human rights, with particular emphasis on the place given to sustainable development principles in international human rights law. It will continue to investigate whether it recognizes sustainable development rights. The article will therefore give a positive answer to question mentioned here. The jurisprudence and interpretive guidelines of human rights institutions travel to confirm this hypothesis.Keywords: sustainable development, human rights, the right to development, the human rights-based approach to development, environmental rights, economic development, social sustainability human rights protection, human rights violations, workers’ rights, justice, security
Procedia PDF Downloads 5511192 Sustainable Textiles: Innovation through Waste
Authors: Ananya Mitra Pramanik, Anjali Agrawal
Abstract:
This paper traces the waste produced by the textile industry and evaluates the need for this waste to be reused or repurposed. From ancient times the textile industry has been a prominent part of all the economies of the world. It is famous for traditional as well as mill made fabrics. However the beauty and utility radiated by the textiles are juxtaposed by the piling amount of waste that the whole life cycle of a textile production and disposal entails. Waste happens in stages in a textile life cycle. It can be broadly categorised as pre-consumer and post-consumer waste. This research suggests suitable processes and techniques for channelizing post-industrial waste. It explores the scope of textile waste as a raw material for innovation and design. It discusses the role of designers in using waste to create useful and appealing designs. The paper examines the need of designers to create novel ideas to reuse textiles. This paper is based on secondary research. Most of the information used is taken from books and journals. The DEFRA report 2009 is also consulted for comprehensive data on textile waste percentage.Keywords: designers, repurposing, textiles, waste
Procedia PDF Downloads 215