11969 Life Cycle Cost Evaluation of Structures Retrofitted with Damped Cable System
Authors: Asad Naeem, Mohamed Nour Eldin, Jinkoo Kim
Abstract:
In this study, the seismic performance and life cycle cost (LCC) are evaluated of the structure retrofitted with the damped cable system (DCS). The DCS is a seismic retrofit system composed of a high-strength steel cable and pressurized viscous dampers. The analysis model of the system is first derived using various link elements in SAP2000, and fragility curves of the structure retrofitted with the DCS and viscous dampers are obtained using incremental dynamic analyses. The analysis results show that the residual displacements of the structure equipped with the DCS are smaller than those of the structure with retrofitted with only conventional viscous dampers, due to the enhanced stiffness/strength and self-centering capability of the damped cable system. The fragility analysis shows that the structure retrofitted with the DCS has the least probability of reaching the specific limit states compared to the bare structure and the structure with viscous damper. It is also observed that the initial cost of the DCS method required for the seismic retrofit is smaller than that of the structure with viscous dampers and that the LCC of the structure equipped with the DCS is smaller than that of the structure with viscous dampers.Keywords: damped cable system, fragility curve, life cycle cost, seismic retrofit, self-centering
Procedia PDF Downloads 55311968 Application of Knowledge Discovery in Database Techniques in Cost Overruns of Construction Projects
Authors: Mai Ghazal, Ahmed Hammad
Abstract:
Cost overruns in construction projects are considered as worldwide challenges since the cost performance is one of the main measures of success along with schedule performance. To overcome this problem, studies were conducted to investigate the cost overruns' factors, also projects' historical data were analyzed to extract new and useful knowledge from it. This research is studying and analyzing the effect of some factors causing cost overruns using the historical data from completed construction projects. Then, using these factors to estimate the probability of cost overrun occurrence and predict its percentage for future projects. First, an intensive literature review was done to study all the factors that cause cost overrun in construction projects, then another review was done for previous researcher papers about mining process in dealing with cost overruns. Second, a proposed data warehouse was structured which can be used by organizations to store their future data in a well-organized way so it can be easily analyzed later. Third twelve quantitative factors which their data are frequently available at construction projects were selected to be the analyzed factors and suggested predictors for the proposed model.Keywords: construction management, construction projects, cost overrun, cost performance, data mining, data warehousing, knowledge discovery, knowledge management
Procedia PDF Downloads 37211967 Capex Planning with and without Additional Spectrum
Authors: Koirala Abarodh, Maghaiya Ujjwal, Guragain Phani Raj
Abstract:
This analysis focuses on defining the spectrum evaluation model for telecom operators in terms of total cost of ownership (TCO). A quantitative approach for specific case analysis research methodology was used for identifying the results. Specific input parameters like target User experience, year on year traffic growth, capacity site limit per year, target additional spectrum type, bandwidth, spectrum efficiency, UE penetration have been used for the spectrum evaluation process and desired outputs in terms of the number of sites, capex in USD and required spectrum bandwidth have been calculated. Furthermore, this study gives a comparison of capex investment for target growth with and without addition spectrum. As a result, the combination of additional spectrum bands of 700 and 2600 MHz has a better evaluation in terms of TCO and performance. It is our recommendation to use these bands for expansion rather than expansion in the current 1800 and 2100 bands.Keywords: spectrum, capex planning, case study methodology, TCO
Procedia PDF Downloads 6511966 Economic Design of a Quality Control Chart for the Proportion of Defective Items
Authors: Encarnación Álvarez-Verdejo, Raúl Amor-Pulido, Pablo J. Moya-Fernández, Juan F. Muñoz-Rosas, Francisco J. Blanco-Encomienda
Abstract:
Many companies use the statistical tool named as statistical quality control, and which can have a high cost for the companies interested on these statistical tools. The evaluation of the quality of products and services is an important topic, but the reduction of the cost of the implantation of the statistical quality control also has important benefits for the companies. For this reason, it is important to implement a economic design for the various steps included into the statistical quality control. In this paper, we describe some relevant aspects related to the economic design of a quality control chart for the proportion of defective items. They are very important because the suggested issues can reduce the cost of implementing a quality control chart for the proportion of defective items. Note that the main purpose of this chart is to evaluate and control the proportion of defective items of a production process.Keywords: proportion, type I error, economic plan, distribution function
Procedia PDF Downloads 44411965 Evaluation of Quick Covering Machine for Grain Drying Pavement
Authors: Fatima S. Rodriguez, Victorino T. Taylan, Manolito C. Bulaong, Helen F. Gavino, Vitaliana U. Malamug
Abstract:
In sundrying the quality of the grains are greatly reduced when paddy grains were caught by the rain unsacked and unstored resulting to reduced profit. The objectives of this study were to design and fabricate a quick covering machine for grain drying pavement; to test and evaluate the operating characteristics of the machine according to its deployment speed, recovery speed, deployment time, recovery time, power consumption, aesthetics of laminated sack; and to conduct partial budget and cost curve analysis. The machine was able to cover the grains in a 12.8 m x 22.5 m grain drying pavement at an average time of 17.13 s. It consumed 0.53 W-hr for the deployment and recovery of the cover. The machine entailed an investment cost of $1,344.40 and an annual cost charge of $647.32. Moreover, the savings per year using the quick covering machine was $101.83.Keywords: quick covering machine, grain drying pavement, laminated polypropylene, recovery time
Procedia PDF Downloads 32611964 Towards a Systematic Evaluation of Web Design
Authors: Ivayla Trifonova, Naoum Jamous, Holger Schrödl
Abstract:
A good web design is a prerequisite for a successful business nowadays, especially since the internet is the most common way for people to inform themselves. Web design includes the optical composition, the structure, and the user guidance of websites. The importance of each website leads to the question if there is a way to measure its usefulness. The aim of this paper is to suggest a methodology for the evaluation of web design. The desired outcome is to have an evaluation that is concentrated on a specific website and its target group.Keywords: evaluation methodology, factor analysis, target group, web design
Procedia PDF Downloads 63811963 Joint Replenishment and Heterogeneous Vehicle Routing Problem with Cyclical Schedule
Authors: Ming-Jong Yao, Chin-Sum Shui, Chih-Han Wang
Abstract:
This paper is developed based on a real-world decision scenario that an industrial gas company that applies the Vendor Managed Inventory model and supplies liquid oxygen with a self-operated heterogeneous vehicle fleet to hospitals in nearby cities. We name it as a Joint Replenishment and Heterogeneous Vehicle Routing Problem with Cyclical Schedule and formulate it as a non-linear mixed-integer linear programming problem which simultaneously determines the length of the planning cycle (PC), the length of the replenishment cycle and the dates of replenishment for each customer and the vehicle routes of each day within PC, such that the average daily operation cost within PC, including inventory holding cost, setup cost, transportation cost, and overtime labor cost, is minimized. A solution method based on genetic algorithm, embedded with an encoding and decoding mechanism and local search operators, is then proposed, and the hash function is adopted to avoid repetitive fitness evaluation for identical solutions. Numerical experiments demonstrate that the proposed solution method can effectively solve the problem under different lengths of PC and number of customers. The method is also shown to be effective in determining whether the company should expand the storage capacity of a customer whose demand increases. Sensitivity analysis of the vehicle fleet composition shows that deploying a mixed fleet can reduce the daily operating cost.Keywords: cyclic inventory routing problem, joint replenishment, heterogeneous vehicle, genetic algorithm
Procedia PDF Downloads 8811962 Analysing the Cost of Immigrants to the National Health System in Eastern Macedonia and Thrace
Authors: T. Theodosiou, P. Polychronidou, A. G. Karasavvoglou
Abstract:
The latest years the number of immigrants at Greece has increased dramatically. Their impact on the National Health System (NHS) has not been yet thoroughly investigated. This paper analyses the cost of immigrants to the NHS hospitals of the region of Eastern Macedonia and Thrace. The data are collected from 2005 to 2011 from five different hospitals and are analysed using linear mixed effects models in order to investigate the effects of nationality and year on the cost of hospitalization and treatment. The results show that generally the Greek nationality patients have a higher mean cost of hospitalization compared to the immigrants and that there is an increasing trend for the cost except for the year 2010.Keywords: cost, Eastern Macedonia and Thrace, immigrants, national health system
Procedia PDF Downloads 24511961 Contributing to Accuracy of Bid Cost Estimate in Construction Projects
Authors: Abdullah Alhomidan
Abstract:
This study is conducted to identify the main factors affecting accuracy of pretender cost estimate in building construction projects in Saudi Arabia from owners’ perspective. 44 factors affecting pretender cost estimate were identified through literature review and discussion with some construction experts. The results show that the top important factors affecting pretender cost estimate accuracy are: level of competitors in the tendering, material price changes, communications with suppliers, communications with client, and estimating method used.Keywords: cost estimate, accuracy, pretender, estimating, bid estimate
Procedia PDF Downloads 55711960 Optimal Retrofit Design of Reinforced Concrete Frame with Infill Wall Using Fiber Reinforced Plastic Materials
Authors: Sang Wook Park, Se Woon Choi, Yousok Kim, Byung Kwan Oh, Hyo Seon Park
Abstract:
Various retrofit techniques for reinforced concrete frame with infill wall have been steadily developed. Among those techniques, strengthening methodology based on diagonal FRP strips (FRP bracings) has numerous advantages such as feasibility of implementing without interrupting the building under operation, reduction of cost and time, and easy application. Considering the safety of structure and retrofit cost, the most appropriate retrofit solution is needed. Thus, the objective of this study is to suggest pareto-optimal solution for existing building using FRP bracings. To find pareto-optimal solution analysis, NSGA-II is applied. Moreover, the seismic performance of retrofit building is evaluated. The example building is 5-storey, 3-bay RC frames with infill wall. Nonlinear static pushover analyses are performed with FEMA 356. The criterion of performance evaluation is inter-story drift ratio at the performance level IO, LS, CP. Optimal retrofit solutions is obtained for 32 individuals and 200 generations. Through the proposed optimal solutions, we confirm the improvement of seismic performance of the example building.Keywords: retrofit, FRP bracings, reinforced concrete frame with infill wall, seismic performance evaluation, NSGA-II
Procedia PDF Downloads 43711959 Uncertain Time-Cost Trade off Problems of Construction Projects Using Fuzzy Set Theory
Authors: V. S. S. Kumar, B. Vikram
Abstract:
The development of effective decision support tools that adopted in the construction industry is vital in the world we live in today, since it can lead to substantial cost reduction and efficient resource consumption. Solving the time-cost trade off problems and its related variants is at the heart of scientific research for optimizing construction planning problems. In general, the classical optimization techniques have difficulties in dealing with TCT problems. One of the main reasons of their failure is that they can easily be entrapped in local minima. This paper presents an investigation on the application of meta-heuristic techniques to two particular variants of the time-cost trade of analysis, the time-cost trade off problem (TCT), and time-cost trade off optimization problem (TCO). In first problem, the total project cost should be minimized, and in the second problem, the total project cost and total project duration should be minimized simultaneously. Finally it is expected that, the optimization models developed in this paper will contribute significantly for efficient planning and management of construction project.Keywords: fuzzy sets, uncertainty, optimization, time cost trade off problems
Procedia PDF Downloads 35711958 The Meta–Evaluation of Master Degree Theses in Science Program of Evaluation Methodology, Srinakharinwirot University
Authors: Panwasn Mahalawalert
Abstract:
The objective of this study was to meta-evaluation of Master Degree theses in Science Program of Evaluation Methodology at Srinakharinwirot University, published during 2008-2011. This study was summative meta-evaluation that evaluated all theses of Master Degree in Science Program of Evaluation Methodology. Data were collected using the theses characteristics recording form and the evaluation meta-evaluation checklist. The collected data were analyzed by two parts: 1) Quantitative data were analyzed by descriptive statistics presented in frequency, percentages, mean, and standard deviation and 2) Qualitative data were analyzed by content analysis. The results of this study were found the theses characteristics was results revealed that most of theses were published in 2011. The largest group of theses researcher were female and were from the government office. The evaluation model of all theses were Decision-Oriented Evaluation Model. The objective of all theses were evaluate the project or curriculum. The most sampling technique were used the multistage random sampling technique. The most tool were used to gathering the data were questionnaires. All of the theses were analysed by descriptive statistics. The meta-evaluation results revealed that most of theses had fair on Utility Standards and Feasibility Standards, good on Propriety Standards and Accuracy Standards.Keywords: meta-evaluation, evaluation, master degree theses, Srinakharinwirot University
Procedia PDF Downloads 53711957 Marketing Factors Influencing the Decision to Choose Low Cost Airlines
Authors: Noppadol Sritragool
Abstract:
The objectives of this research were to investigate the decision of passengers who choose to fry with low cost airlines and to study marketing factors which have the influence to the decision to choose each low cost airlines. This paper was a quantitative research technique. A total of 400 low cost airlines’ passengers were interviewed via English questionnaire to collect the respondents’ opinions. The findings revealed that respondents were male and female at a similar proportion. The majority had at least an undergraduate degree, have a lower management level jobs, and had income in the range of 25,000 -35,000 baht per month.. In addition, the findings also revealed that the first three marketing factors influencing the decision of the respondents to choose low-cost airlines were low price, direct flight, and online system.Keywords: decision to choose, marketing factors, low-cost airlines
Procedia PDF Downloads 42811956 User Satisfaction Survey Based Facility Performance Evaluation
Authors: Gopikrishnan Seshadhri, V. M. Topkar
Abstract:
Facility management post occupation is a facet that has gained tremendous ground in the recent times. While the efficiency of expenditure and utilization of all types of resources are monitored to ensure timely completion with minimum cost and acceptable quality during construction phase, value for money comes out only when the facility performs satisfactorily post occupation, meeting aspirations and expectations of users of the facility. It is more so for the public facilities. Due to the paradigm shift in focus to outcome based performance evaluation, user satisfaction obtained mainly through questionnaires has become the single important criterion in performance evaluation. Questionnaires presently being used to gauge user satisfaction being subjective, the feedback obtained do not necessarily reflect actual performance. Hence, there is a requirement of developing a survey instrument that can gauge user satisfaction as objectively as possible and truly reflects the ground reality. A near correct picture of actual performance of the built facility from the user point of view will enable facility managers to address pertinent issues. This paper brings out the need for an effective survey instrument that will elicit more objective user response. It also lists steps involved in formulation of such an instrument.Keywords: facility performance evaluation, attributes, attribute descriptors, user satisfaction surveys, statistical methods, performance indicators
Procedia PDF Downloads 29111955 The Impact of Artificial Intelligence on Qualty Conrol and Quality
Authors: Mary Moner Botros Fanawel
Abstract:
Many companies use the statistical tool named as statistical quality control, and which can have a high cost for the companies interested on these statistical tools. The evaluation of the quality of products and services is an important topic, but the reduction of the cost of the implantation of the statistical quality control also has important benefits for the companies. For this reason, it is important to implement a economic design for the various steps included into the statistical quality control. In this paper, we describe some relevant aspects related to the economic design of a quality control chart for the proportion of defective items. They are very important because the suggested issues can reduce the cost of implementing a quality control chart for the proportion of defective items. Note that the main purpose of this chart is to evaluate and control the proportion of defective items of a production process.Keywords: model predictive control, hierarchical control structure, genetic algorithm, water quality with DBPs objectives proportion, type I error, economic plan, distribution function bootstrap control limit, p-value method, out-of-control signals, p-value, quality characteristics
Procedia PDF Downloads 6311954 The Research of Weights Identify of Harbin Ecological Security Evaluation Index Based on AHP
Authors: Rong Guo, Mengshi Huang, Yujing Bai
Abstract:
With the rapid development of urbanization, the urban population increases and urban sprawl appeared. And these issues led to a sharp deterioration of the ecological environment. So, the urban ecological security evaluation was imminent. The weights identify of index was a key step of the research of ecological security evaluation. The AHP was widely used in the extensive research of weights identify of ecological security index. The characteristics of authority and quantitative can fully reflect the views of relevant experts. On the basis of building the ecological security evaluation index of Harbin, the paper combed and used the basic principle of the AHP, and calculated the weights of Harbin ecological security evaluation index through the process of the expert opinions “summary-feedback-summary”. And lay a foundation of future study of Harbin ecological security index, and guide the quantitative evaluation of Harbin ecological security.Keywords: AHP, ecological security, evaluation Index, weights identify, harbin
Procedia PDF Downloads 49711953 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan
Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat
Abstract:
This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.Keywords: cost, overrun, building construction projects, Jordan
Procedia PDF Downloads 10911952 Evaluation of the Impact of Information and Communications Technology (ICT) on the Accuracy of Preliminary Cost Estimates of Building Projects in Nigeria
Authors: Nofiu A. Musa, Olubola Babalola
Abstract:
The study explored the effect of ICT on the accuracy of Preliminary Cost Estimates (PCEs) prepared by quantity surveying consulting firms in Nigeria for building projects, with a view to determining the desirability of the adoption and use of the technological innovation for preliminary estimating. Thus, data pertinent to the study were obtained through questionnaire survey conducted on a sample of one hundred and eight (108) quantity surveying firms selected from the list of registered firms compiled by the Nigerian Institute of Quantity Surveyors (NIQS), Lagos State Chapter through systematic random sampling. The data obtained were analyzed with SPSS version 17 using student’s t-tests at 5% significance level. The results obtained revealed that the mean bias and co-efficient of variation of the PCEs of the firms are significantly less at post ICT adoption period than the pre ICT adoption period, F < 0.05 in each case. The paper concluded that the adoption and use of the Technological Innovation (ICT) has significantly improved the accuracy of the Preliminary Cost Estimates (PCEs) of building projects, hence, it is desirable.Keywords: accepted tender price, accuracy, bias, building projects, consistency, information and communications technology, preliminary cost estimates
Procedia PDF Downloads 42811951 Development of Work Breakdown Structure for EVMS in South Korea
Authors: Dong-Ho Kim, Su-Sang Lim, Sang-Won Han, Chang-Taek Hyun
Abstract:
In the construction site, the cost and schedules are the most important management elements. Despite efforts to integrated management the cost and schedule, WBS classification is struggling to differ from each other. The cost and schedule can be integrated and can be managed due to the characteristic of the detail system in the case of Korea around the axis of pressure and official fixture system. In this research, the Work Breakdown Structure (WBS) integrating the cost and schedules around in government office construction, WBS which can be used in common was presented in order to analyze the detail system of the public institution construction and improve. As to this method, the efficient administration of not only the link application of the cost and schedule but also construction project is expected.Keywords: WBS, EVMS, integrated cost and schedule, Korea case
Procedia PDF Downloads 38611950 Value of Willingness to Pay for a Quality-Adjusted Life Years Gained in Iran; A Modified Chained-Approach
Authors: Seyedeh-Fariba Jahanbin, Hasan Yusefzadeh, Bahram Nabilou, Cyrus Alinia, Cyrus Alinia
Abstract:
Background: Due to the lack of a constant Willingness to Pay per one additional Quality Adjusted Life Years gained based on the preferences of Iran’s general public, the cost-efectiveness of health system interventions is unclear and making it challenging to apply economic evaluation to health resources priority setting. Methods: We have measured this cost-efectiveness threshold with the participation of 2854 individuals from fve provinces, each representing an income quintile, using a modifed Time Trade-Of-based Chained-Approach. In this online-based empirical survey, to extract the health utility value, participants were randomly assigned to one of two green (21121) and yellow (22222) health scenarios designed based on the earlier validated EQ-5D-3L questionnaire. Results: Across the two health state versions, mean values for one QALY gain (rounded) ranged from $6740-$7400 and $6480-$7120, respectively, for aggregate and trimmed models, which are equivalent to 1.35-1.18 times of the GDP per capita. Log-linear Multivariate OLS regression analysis confrmed that respondents were more likely to pay if their income, disutility, and education level were higher than their counterparts. Conclusions: In the health system of Iran, any intervention that is with the incremental cost-efectiveness ratio, equal to and less than 7402.12 USD, will be considered cost-efective.Keywords: willingness to Pay, QALY, chained-approach, cost-efectiveness threshold, Iran
Procedia PDF Downloads 8711949 Rapid-Access Multispecialty Nurse-Led Tongue Tie Service: A Retrospective Evaluation of Cost-Effectiveness
Authors: Jia Yin Tan, Daniel Rambei, Kate Mann, Samuel price, Ahmed Aboelela
Abstract:
Introduction: Breastfeeding is a complex process, influenced by various factors. Tongue-tie may lead to breastfeeding difficulties due to an inability to suck effectively, causing sore nipples and poor infant weight gain. In the UK, most frenotomies on infants are performed by doctors, nurses, health visitors or midwives. Objectives: Evaluation of safety and efficacy of a multispecialty nurse-led rapid access tongue-tie service at Sheffield Children’s Hospital, run jointly by the ENT and paediatric surgery departments. Methodology: A retrospective observational study, including all patients attending the ENT and paediatric surgery nurse-led tongue tie clinics between 1/10/2021 and 30/09/2022. Results: During the study period there were 1135 referrals for frenotomy, with a mean of 15 days between referral to clinic episode. 86.8% of referred patients underwent frenotomy, with a complication rate of 0.1% and revision rate of 5.4%. Conclusions: Our findings suggest that our rapid access nurse-led outpatient tongue tie service is safe and efficacious, with low complication and revision rates. This suggests a potential for developing a community-based service, allowing safe and effective care closer to home.Keywords: tongue tie, frenotomy, cost, nurse-led
Procedia PDF Downloads 11111948 Evaluation of Robot Application in Hospitality
Authors: Lina Zhong, Sunny Sun, Rob Law
Abstract:
Artificial intelligence has been developing rapidly. Previous studies have evaluated hotel technology either from an employee or consumer perspective. However, impacts, which mainly include the social and economic impacts of hotel robots, are unknown as they are newly introduced. To bridge the aforementioned research gap, this study evaluates hotel robots from contextual, diagnostic, evaluative, and strategic aspects using framework analysis as a basis to assist hotel managers in real-time hotel marketing strategy management, adjustment and revenue achievement. Findings show that, from a consumer perspective, the overall acceptance of hotel robots is low. The main implication is that the cost of hotel robots should be carefully estimated, and the investment should be made based on phases.Keywords: application, evaluation, framework analysis, hotel robot
Procedia PDF Downloads 17111947 Development of a Decision Model to Optimize Total Cost in Food Supply Chain
Authors: Henry Lau, Dilupa Nakandala, Li Zhao
Abstract:
All along the length of the supply chain, fresh food firms face the challenge of managing both product quality, due to the perishable nature of the products, and product cost. This paper develops a method to assist logistics managers upstream in the fresh food supply chain in making cost optimized decisions regarding transportation, with the objective of minimizing the total cost while maintaining the quality of food products above acceptable levels. Considering the case of multiple fresh food products collected from multiple farms being transported to a warehouse or a retailer, this study develops a total cost model that includes various costs incurred during transportation. The practical application of the model is illustrated by using several computational intelligence approaches including Genetic Algorithms (GA), Fuzzy Genetic Algorithms (FGA) as well as an improved Simulated Annealing (SA) procedure applied with a repair mechanism for efficiency benchmarking. We demonstrate the practical viability of these approaches by using a simulation study based on pertinent data and evaluate the simulation outcomes. The application of the proposed total cost model was demonstrated using three approaches of GA, FGA and SA with a repair mechanism. All three approaches are adoptable; however, based on the performance evaluation, it was evident that the FGA is more likely to produce a better performance than the other two approaches of GA and SA. This study provides a pragmatic approach for supporting logistics and supply chain practitioners in fresh food industry in making important decisions on the arrangements and procedures related to the transportation of multiple fresh food products to a warehouse from multiple farms in a cost-effective way without compromising product quality. This study extends the literature on cold supply chain management by investigating cost and quality optimization in a multi-product scenario from farms to a retailer and, minimizing cost by managing the quality above expected quality levels at delivery. The scalability of the proposed generic function enables the application to alternative situations in practice such as different storage environments and transportation conditions.Keywords: cost optimization, food supply chain, fuzzy sets, genetic algorithms, product quality, transportation
Procedia PDF Downloads 22411946 Towards an Intelligent Ontology Construction Cost Estimation System: Using BIM and New Rules of Measurement Techniques
Authors: F. H. Abanda, B. Kamsu-Foguem, J. H. M. Tah
Abstract:
Construction cost estimation is one of the most important aspects of construction project design. For generations, the process of cost estimating has been manual, time-consuming and error-prone. This has partly led to most cost estimates to be unclear and riddled with inaccuracies that at times lead to over- or under-estimation of construction cost. The development of standard set of measurement rules that are understandable by all those involved in a construction project, have not totally solved the challenges. Emerging Building Information Modelling (BIM) technologies can exploit standard measurement methods to automate cost estimation process and improves accuracies. This requires standard measurement methods to be structured in ontologically and machine readable format; so that BIM software packages can easily read them. Most standard measurement methods are still text-based in textbooks and require manual editing into tables or Spreadsheet during cost estimation. The aim of this study is to explore the development of an ontology based on New Rules of Measurement (NRM) commonly used in the UK for cost estimation. The methodology adopted is Methontology, one of the most widely used ontology engineering methodologies. The challenges in this exploratory study are also reported and recommendations for future studies proposed.Keywords: BIM, construction projects, cost estimation, NRM, ontology
Procedia PDF Downloads 55111945 An Evaluation Model for Enhancing Flexibility in Production Systems through Additive Manufacturing
Authors: Angela Luft, Sebastian Bremen, Nicolae Balc
Abstract:
Additive manufacturing processes have entered large parts of the industry and their range of application have progressed and grown significantly in the course of time. A major advantage of additive manufacturing is the innate flexibility of the machines. This corelates with the ongoing demand of creating highly flexible production environments. However, the potential of additive manufacturing technologies to enhance the flexibility of production systems has not yet been truly considered and quantified in a systematic way. In order to determine the potential of additive manufacturing technologies with regards to the strategic flexibility design in production systems, an integrated evaluation model has been developed, that allows for the simultaneous consideration of both conventional as well as additive production resources. With the described model, an operational scope of action can be identified and quantified in terms of mix and volume flexibility, process complexity, and machine capacity that goes beyond the current cost-oriented approaches and offers a much broader and more holistic view on the potential of additive manufacturing. A respective evaluation model is presented this paper.Keywords: additive manufacturing, capacity planning, production systems, strategic production planning, flexibility enhancement
Procedia PDF Downloads 15811944 Final Costs of Civil Claims
Authors: Behnam Habibi Dargah
Abstract:
The economics of cost-benefit theory seeks to monitor claims and determine their final price. The cost of litigation is important because it is a measure of the efficiency of the justice system. From an economic point of view, the cost of litigation is considered to be the point of equilibrium of litigation, whereby litigation is regarded as a high-risk investment and is initiated when the costs are less than the probable and expected benefits. Costs are economically separated into private and social costs. Private cost includes material (direct and indirect) and spiritual costs. The social costs of litigation are also subsidized-centric due to the public and governmental nature of litigation and cover both types of bureaucratic bureaucracy and the costs of judicial misconduct. Macroeconomic policy in the economics of justice is the reverse engineering of controlling the social costs of litigation by employing selective litigation and working on the judicial culture to achieve rationality in the monopoly system. Procedures for controlling and managing court costs are also circumscribed to economic patterns in the field. Rational cost allocation model and cost transfer model. The rational allocation model deals with cost-tolerance systems, and the transfer model also considers three models of transferability, including legal, judicial and contractual transferability, which will be described and explored in the present article in a comparative manner.Keywords: cost of litigation, economics of litigation, private cost, social cost, cost of litigation
Procedia PDF Downloads 13111943 Economical Working Hours per Workday for a Production Worker under Hazardous Environment
Authors: Mohammed Darwish
Abstract:
Workplace injuries cost organizations significant amount of money. Causes of injuries at workplace are very well documented in the literature and attributed to variety of reasons. One important reason is the long working-hours. The purpose of this paper is to develop a mathematical model that finds the optimal working-hours at workplace. The developed model minimizes the expected total cost which consists of the expected cost incurred due to unsafe conditions of workplace, the other cost is related to the lost production due to work incidents, and the production cost.Keywords: 8-hour workday, mathematical model, optimal working hours, workplace injuries
Procedia PDF Downloads 15611942 Development of Non-Intrusive Speech Evaluation Measure Using S-Transform and Light-Gbm
Authors: Tusar Kanti Dash, Ganapati Panda
Abstract:
The evaluation of speech quality and intelligence is critical to the overall effectiveness of the Speech Enhancement Algorithms. Several intrusive and non-intrusive measures are employed to calculate these parameters. Non-Intrusive Evaluation is most challenging as, very often, the reference clean speech data is not available. In this paper, a novel non-intrusive speech evaluation measure is proposed using audio features derived from the Stockwell transform. These features are used with the Light Gradient Boosting Machine for the effective prediction of speech quality and intelligibility. The proposed model is analyzed using noisy and reverberant speech from four databases, and the results are compared with the standard Intrusive Evaluation Measures. It is observed from the comparative analysis that the proposed model is performing better than the standard Non-Intrusive models.Keywords: non-Intrusive speech evaluation, S-transform, light GBM, speech quality, and intelligibility
Procedia PDF Downloads 26011941 Multi-Objective Optimization of Run-of-River Small-Hydropower Plants Considering Both Investment Cost and Annual Energy Generation
Authors: Amèdédjihundé H. J. Hounnou, Frédéric Dubas, François-Xavier Fifatin, Didier Chamagne, Antoine Vianou
Abstract:
This paper presents the techno-economic evaluation of run-of-river small-hydropower plants. In this regard, a multi-objective optimization procedure is proposed for the optimal sizing of the hydropower plants, and NSGAII is employed as the optimization algorithm. Annual generated energy and investment cost are considered as the objective functions, and number of generator units (n) and nominal turbine flow rate (QT) constitute the decision variables. Site of Yeripao in Benin is considered as the case study. We have categorized the river of this site using its environmental characteristics: gross head, and first quartile, median, third quartile and mean of flow. Effects of each decision variable on the objective functions are analysed. The results gave Pareto Front which represents the trade-offs between annual energy generation and the investment cost of hydropower plants, as well as the recommended optimal solutions. We noted that with the increase of the annual energy generation, the investment cost rises. Thus, maximizing energy generation is contradictory with minimizing the investment cost. Moreover, we have noted that the solutions of Pareto Front are grouped according to the number of generator units (n). The results also illustrate that the costs per kWh are grouped according to the n and rise with the increase of the nominal turbine flow rate. The lowest investment costs per kWh are obtained for n equal to one and are between 0.065 and 0.180 €/kWh. Following the values of n (equal to 1, 2, 3 or 4), the investment cost and investment cost per kWh increase almost linearly with increasing the nominal turbine flowrate while annual generated. Energy increases logarithmically with increasing of the nominal turbine flowrate. This study made for the Yeripao river can be applied to other rivers with their own characteristics.Keywords: hydropower plant, investment cost, multi-objective optimization, number of generator units
Procedia PDF Downloads 15811940 Design Criteria for an Internal Information Technology Cost Allocation to Support Business Information Technology Alignment
Authors: Andrea Schnabl, Mario Bernhart
Abstract:
The controlling instrument of an internal cost allocation (IT chargeback) is commonly used to make IT costs transparent and controllable. Information Technology (IT) became, especially for information industries, a central competitive factor. Consequently, the focus is not on minimizing IT costs but on the strategic aligned application of IT. Hence, an internal IT cost allocation should be designed to enhance the business-IT alignment (strategic alignment of IT) in order to support the effective application of IT from a company’s point of view. To identify design criteria for an internal cost allocation to support business alignment a case study analysis at a typical medium-sized firm in information industry is performed. Documents, Key Performance Indicators, and cost accounting data over a period of 10 years are analyzed and interviews are performed. The derived design criteria are evaluated by 6 heads of IT departments from 6 different companies, which have an internal IT cost allocation at use. By applying these design criteria an internal cost allocation serves not only for cost controlling but also as an instrument in strategic IT management.Keywords: accounting for IT services, Business IT Alignment, internal cost allocation, IT controlling, IT governance, strategic IT management
Procedia PDF Downloads 155