Search results for: prefabricated construction projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5354

Search results for: prefabricated construction projects

4694 Study on Safety Management of Deep Foundation Pit Construction Site Based on Building Information Modeling

Authors: Xuewei Li, Jingfeng Yuan, Jianliang Zhou

Abstract:

The 21st century has been called the century of human exploitation of underground space. Due to the characteristics of large quantity, tight schedule, low safety reserve and high uncertainty of deep foundation pit engineering, accidents frequently occur in deep foundation pit engineering, causing huge economic losses and casualties. With the successful application of information technology in the construction industry, building information modeling has become a research hotspot in the field of architectural engineering. Therefore, the application of building information modeling (BIM) and other information communication technologies (ICTs) in construction safety management is of great significance to improve the level of safety management. This research summed up the mechanism of the deep foundation pit engineering accident through the fault tree analysis to find the control factors of deep foundation pit engineering safety management, the deficiency existing in the traditional deep foundation pit construction site safety management. According to the accident cause mechanism and the specific process of deep foundation pit construction, the hazard information of deep foundation pit engineering construction site was identified, and the hazard list was obtained, including early warning information. After that, the system framework was constructed by analyzing the early warning information demand and early warning function demand of the safety management system of deep foundation pit. Finally, the safety management system of deep foundation pit construction site based on BIM through combing the database and Web-BIM technology was developed, so as to realize the three functions of real-time positioning of construction site personnel, automatic warning of entering a dangerous area, real-time monitoring of deep foundation pit structure deformation and automatic warning. This study can initially improve the current situation of safety management in the construction site of deep foundation pit. Additionally, the active control before the occurrence of deep foundation pit accidents and the whole process dynamic control in the construction process can be realized so as to prevent and control the occurrence of safety accidents in the construction of deep foundation pit engineering.

Keywords: Web-BIM, safety management, deep foundation pit, construction

Procedia PDF Downloads 136
4693 The Coexistence of Quality Practices and Frozen Concept in R and D Projects

Authors: Ayala Kobo-Greenhut, Amos Notea, Izhar Ben-Shlomo

Abstract:

In R&D projects, there is no doubt about the need to change a current concept to an alternative one over time (i.e., concept leaping). Concept leaping is required since with most R&D projects uncertainty is present as they take place in dynamic environments. Despite the importance of concept leaping when needed, R&D teams may fail to do so (i.e., frozen concept). This research suggests a possible reason why frozen concept happens in the framework of quality engineering and control engineering. We suggest that frozen concept occurs since concept determines the derived plan and its implementation may be considered as equivalent to a closed-loop process, and is subject to the problem of not recognizing gaps as failures. We suggest that although implementing quality practices into an R&D project’s routine has many advantages, it intensifies the frozen concept problem since working according to quality practices relates to exploitation of learning behavior, while leaping to a new concept relates to exploring learning behavior.

Keywords: closed loop, control engineering, design, leaping, frozen concept, quality engineering, quality practices

Procedia PDF Downloads 459
4692 Linguistic Symbols Principle Construction in Cultural Creative Product Design

Authors: Pei-Jun Xue, Ming-Yu Hsiao

Abstract:

Language is the emblem of a culture, representing the extension of cultural life. In addition, it is also an important tool for communication and message transmission. It carries not only information but also covers the self-conscious of the information constructor as well as the situational experiences of users from different backgrounds. Moreover, design can be regarded as a language, a dynamic process of coding and decoding. With the designers’ experiences in everyday life, they bring them into the products’ experiences. Considered from the aspects of atmosphere and the five senses, a designer should consider and reconsider how to communicate the messages effectively to suit the users’ needs. In the process of language learning, we should understand the construction behind it and the rules of the compositions of language codes. Regarding the understanding of the design of works or the form of product construction, it is necessary for us to understand the coding system during the process of product construction. The form (signifiers) and meanings (signified) of Chinese characters are closely related. At the same time, it is also a process of simplifying the complicated to the simple. This study discusses the chinese characters that used in the cultural symbols construction, and analysis of existing products by Peirce's semiotic triangles. Through people's cognition of Chinese characters and constitute method, help to understand the way of construction product symbol.

Keywords: cultural-creative product design, cultural product, cultural symbols, linguistic symbols

Procedia PDF Downloads 438
4691 Entrants’ Knowledge of the Host Country’s Institutional Environments: A Critical Success Factor of International Projects in Emerging Least Developed Countries

Authors: Rameshwar Dahal, S. Ping Ho

Abstract:

Although the demand for infrastructure development forms a promising market opportunity for international firms, the dominance of informal institutions over formal ones, investors are facing extraordinary institutional challenges when investing in emerging Least Developed Countries (LDCs). We believe that, in emerging LDCs, the project performance heavily depends on how well the entrants respond to the challenges exerted by the host institutional environments. Which primarily depends on how much they learn about the host institution and what strategy they apply in response. In Nepal, almost all international or global infrastructure projects are financed by international financers, so the procurement process of the infrastructure projects financed by foreign agencies is guided by the policies and regulations of the financer. Because of limited resources and the financers’ demand, contractors and consults are procured internationally. Moreover, the resources, including but not limited to construction material, manpower, and equipment, also need to be imported. Therefore, the involvement of international companies as an entrant in global infrastructure projects of LDCs is obvious. In a global project (GP), participants from different geographical and institutional environments hold different beliefs and have disparate interests. Therefore, the entrants face the challenges exerted by the host institutional environments. The entrants must either adapt to the institutions prevailing in the environment or resist the institutional pressures. It is hypothesized that, in emerging LDCs, the project performance heavily depends on how much the entrants learn about the host institutional knowledge and how well they respond to the institutional environments. While it is impossible to generalize the phenomenon and contextual conditions because of their vast diversity, this study has answered why and how participants’ level of institutional knowledge impacts the project's implementation performance. To draw that conclusion, firstly, we explored two typical GPs from Nepal. For this study, the data were collected by conducting interviews and examining the secondary data, such as the project reports published by the financers, project data provided by interviewees, and news reports. In an event analysis, firstly, we identify the sources, causes, or nature of the institutional challenges; secondly, we analyze the entrant’s responses to the exerted challenges and evaluate the impacts of the responses on the overall project performance. In this study, at first, the events occurred during the project implementation process have a causal link with the local institutions that demand the entrants’ response are extracted. Secondly, each event is scrutinized as the critical success factor of the case project. Finally, it is crucially examined whether and what institutional knowledge in these events played a critical role in project success or failure. The results also provide insights into the crucial institutional knowledge in LDCs and the subsequent strategy implications for undertaking projects in LDCs.

Keywords: emerging countries, LDC, project management, project performance, institutional knowledge, institutional theory

Procedia PDF Downloads 48
4690 Optimization Technique for the Contractor’s Portfolio in the Bidding Process

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Selection between the available projects in bidding processes for the contractor is one of the essential areas to concentrate on. It is important for the contractor to choose the right projects within its portfolio during the tendering stage based on certain criteria. It should align the bidding process with its origination strategies and goals as a screening process to have the right portfolio pool to start with. Secondly, it should set the proper framework and use a suitable technique in order to optimize its selection process for concertation purpose and higher efforts during the tender stage with goals of success and winning. In this research paper, a two steps framework proposed to increase the efficiency of the contractor’s bidding process and the winning chance of getting the new projects awarded. In this framework, initially, all the projects pass through the first stage screening process, in which the portfolio basket will be evaluated and adjusted in accordance with the organization strategies to the reduced version of the portfolio pool, which is in line with organization activities. In the second stage, the contractor uses linear programming to optimize the portfolio pool based on available resources such as manpower, light equipment, heavy equipment, financial capability, return on investment, and success rate of winning the bid. Therefore, this optimization model will assist the contractor in utilizing its internal resource to its maximum and increase its winning chance for the new project considering past experience with clients, built-relation between two parties, and complexity in the exertion of the projects. The objective of this research will be to increase the contractor's winning chance in the bidding process based on the success rate and expected return on investment.

Keywords: bidding process, internal resources, optimization, contracting portfolio management

Procedia PDF Downloads 130
4689 An Assessment of Factors Affecting the Cost and Time Performance of Subcontractors

Authors: Adedayo Jeremiah Adeyekun, Samuel Oluwagbemiga Ishola,

Abstract:

This paper is an assessment of factors influencing the cost and time performance of subcontractors and the need for effective performance of subcontractors at the project sites. The factors influencing the performance of subcontractors are grouped, similar to those identified with the project or an organization and on another hand, there are significant factors influencing the performance of the subcontractors. These factors incorporate management level leadership, time required to complete the project, profit, staff capability/expertise, reputation, installment method, organization history, and project procurement method strategy, security, bidding technique, insurance, bond and relationship with the major contractors. The factors influencing the management of subcontractors in building development projects includes performance of significant past projects, standard of workmanship, consistence with guidelines, regular payment to labourers, adherence to program, regularity and viability of communication with main contractor, adherence to subcontract necessities. Other factors comprise adherence to statutory environmental regulations, number of experienced sites administrative staff, inspection and maintenance of good workplace, number of artisans and workers, quality of as-built and shop drawings and ability to carry out the quantity of work and so on. This study also aimed to suggest a way forward to improve the performance of subcontractors which is the reason for exceeding budget at the project sites. To carry out this study, a questionnaire was drafted to derive information on the causes of low performance of subcontractors and the implication to cost.

Keywords: performance, contractor, subcontractors, construction

Procedia PDF Downloads 59
4688 Social Construction of Gender: Comparison of Gender Stereotypes among Bureaucrats and Non- Bureaucrats

Authors: Arshad Ali

Abstract:

This study aims to highlight the comparative patterns of social construction of gender among bureaucrats and non-bureaucrats. For the purpose of this study purposive sample of 8 respondents, including both male and female bureaucrats and non-bureaucrats, was collected from Gujranwala and Lahore. The measures for collecting data included an indigenous demographic information sheet and interview protocol related to gender roles, social construction of gender and managerial performance. The collected data was analyzed through the Nvivo version 11 and analysis reveals that there are diverse perceptions regarding male and female stereotyping among bureaucrats and non-bureaucrats, as different kinds of social environments lead to the modification of stereotypes. The research contributes to gender studies, specifically in the context of Pakistani society. There are very few studies available, and empirical data about Gender construction is scanty, so the study provides an impetus for future research. It is suggested that future research explore the phenomenon at a larger scale, including more respondents and another dimension, by keeping in view the socio-economic factors and policies of the government regarding the elimination of gender discrimination in Pakistan.

Keywords: social construction, gender, bureaucrats, gender perception

Procedia PDF Downloads 57
4687 Hindrances to Effective Delivery of Infrastructural Development Projects in Nigeria’s Built Environment

Authors: Salisu Gidado Dalibi, Sadiq Gumi Abubakar, JingChun Feng

Abstract:

Nigeria’s population is about 190 million and is on the increase annually making it the seventh most populated nation in the world and first in Africa. This population growth comes with its prospects, needs, and challenges especially on the existing and future infrastructure. Infrastructure refers to structures, systems, and facilities serving the economy of a country, city, town, businesses, industries, etc. These include roads, railways lines, bridges, tunnels, ports, stadiums, dams and water projects, power generation plants and distribution grids, information, and communication technology (ICT), etc. The Nigerian government embarked on several infrastructural development projects (IDPs) to address the deficit as the present infrastructure cannot cater to the needs nor sustain the country. However, delivering such IDPs have not been smooth; comes with challenges from within and outside the project; frequent delays and abandonment. Thus, affecting all the stakeholders involved. Hence, the aim of this paper is to identify and assess the factors that are hindering the effective delivery of IDPs in Nigeria’s built environment with the view to offer more insight into such factors, and ways to address them. The methodology adopted in this study involves the use of secondary sources of data from several materials (official publications, journals, newspapers, internet, etc.) were reviewed within the IDPs field by laying more emphasis on Nigeria’s cases. The hindrance factors in this regard were identified which forms the backbone of the questionnaire. A pilot survey was used to test its suitability; after which it was randomly administered to various project professionals in Nigeria’s construction industry using a 5-point Likert scale format to ascertain the impact of these hindrances. Cronbach’s Alpha reliability test, mean item score computations, relative importance indices, T-test, Chi-Square statistics were used for data analyses. The results outline the impact of various internal, external and project related factors that are hindering IDPs within Nigeria’s built environment.

Keywords: built environment, development, factors, hindrances, infrastructure, Nigeria, project

Procedia PDF Downloads 155
4686 China's New "Pivots" in the Indian Ocean: Towards "String of Pearls" Strategy 2.0

Authors: Mike Chia-Yu Huang

Abstract:

China’s port facility construction projects in the Indian Ocean (IO) region, Gwadar Port and Djibouti Port projects in particular, have led to a heated debate among both Chinese and Western strategists over whether the country has literally been carrying out its “string of pearls” strategy, an alleged Chinese plan to challenge America’s military predominance in South Asia. Even though the Chinese government repeatedly denied the existence of such a strategy and highlighted the civilian/commercial nature of its port projects, it has significantly enhanced its strategic cooperation with littoral countries in the IO region since the “One Belt One Road” initiative was introduced by Chinese President Xi Jinping in 2013. Whether China does have a plan to expand its sphere of military influence westward concerns the balance of power in the IO region. If the answer is positive, the security environment there will be changed drastically. This paper argues that rather than simply copying the U.S. model of developing overseas military bases along the IO periphery, Beijing has been deliberating a more sophisticated plan for its physical presence there: creating a new set of “overseas strategic pivots.” These “pivots,” semi-military and semi-commercial in nature, are designed to help Beijing sustain its anti-piracy operations in the Gulf of Aden and serve as forward stations for the transportation of China’s imported energy and merchandise. They can support the Chinese Navy’s operations overseas but are not supposed to undertake face-to-face combat missions. This upgraded Chinese scheme can be identified as “string of pearls” strategy 2.0. Moreover, it is expected to help China deepen its roots in the IO region, implying that Beijing has to a large extent scratched its old diplomatic philosophy which highlighted the merits of non-interference and nonalignment. While a full-scale maritime confrontation between China and the U.S.-India security alliance is unlikely to be witnessed in the near future, an ambitious Chinese plan to step into the global maritime domain has been evidently shown.

Keywords: Chinese navy, Djibouti, Gwadar, Indian Ocean, string of pearls strategy

Procedia PDF Downloads 319
4685 Project and Experiment-Based Fluid Dynamics Education

Authors: Etsuo Morishita

Abstract:

This paper presents the project and experiment-based fluid dynamics education in Meisei University, a private institution in Tokyo, Japan. We pay attention not only to the basic engineering courses but also to the practical aspect of engineering experience. So, we prepare courses called the Projects from I to VI. The Projects I and II are designed for the first year, III and IV are designated for the second year, V and VI are prepared for the third year, respectively. Each supervisor is responsible for two of these projects every year. When students take the Project V and VI at the third year, we automatically assume that these students will join the lab of the project for the graduation thesis. We would like to show our experience in the Project I in the summer term, 2016. In this project, we introduce a traction flight vehicle called Cat Flyer. This is a kind of a kite towed by a car for example. This is very similar to parasailing, but flight is possible even on the roads. Experiments in mechanical engineering education are also very important, and we would like to explain our course on centrifugal pump, venture, and orifice. Although these are described in detail in the text books of fluid dynamics, it is still crucial to have practical experiments as a student.

Keywords: aerodynamics, experiment, fluid dynamics, project

Procedia PDF Downloads 246
4684 Carbon Footprint of Road Project for Sustainable Development: Lessons Learnt from Traffic Management of a Developing Urban Centre

Authors: Sajjad Shukur Ullah, Syed Shujaa Safdar Gardezi

Abstract:

Road infrastructure plays a vital role in the economic activities of any economy. Besides derived benefits from these facilities, the utilization of extensive energy resources, fuels, and materials results in a negative impact on the environment in terms of carbon footprint; carbon footprint is the overall amount of greenhouse gas (GHG) generated from any action. However, this aspect of environmental impact from road structure is not seriously considered during such developments, thus undermining a critical factor of sustainable development, which usually remains unaddressed, especially in developing countries. The current work investigates the carbon footprint impact of a small road project (0.8 km, dual carriageway) initiated for traffic management in an urban centre. Life cycle assessment (LCA) with boundary conditions of cradle to the site has been adopted. The only construction phase of the life cycle has been assessed at this stage. An impact of 10 ktons-CO2 (6260 ton-CO2/km) has been assessed. The rigid pavement dominated the contributions as compared to a flexible component. Among the structural elements, the underpass works shared the major portion. Among the materials, the concrete and steel utilized for various structural elements resulted in more than 90% of the impact. The earth-moving equipment was dominant in operational carbon. The results have highlighted that road infrastructure projects pose serious threats to the environment during their construction and which need to be considered during the approval stages. This work provides a guideline for supporting sustainable development that could only be ensured when such endeavours are properly assessed by industry professionals and decide various alternative environmental conscious solutions for the future.

Keywords: construction waste management, kiloton, life cycle assessment, rigid pavement

Procedia PDF Downloads 84
4683 No Space for Subculture, No Space for Disruption: Taming Creativity in Urban Development Projects

Authors: Nadine Osbild

Abstract:

Recent urban development projects often try to cater to both high-tech innovation/start-up culture and local culture/sustainable living. In the process, the so-called “creative class” (Florida 2002) has become a focal point for innovative answers to increasing urban pressures. Our paper explores local subculture and art scenes as a place where current innovation policies and alternative approaches to urban future-making collide. We explore the (re-)making of prevalent understanding of creativity in the context of Munich – an economically successful and over-saturated city with a relatively conservative approach to innovation and disruption and no apparent need for the “creative class” remedy. In particular, we investigate the opportunities and manifestations of subculture in three urban development projects that are envisioned as collaborations between innovators and (sub)culturally oriented creativity. Following a co-production STS approach, we observe that these development projects serve as sites where understandings of innovation and creativity are configured and stabilized in keeping with broader socio-political and economic rationalities. What is more, the projects materialize a de-facto split between the two understandings of a “creative scene,” whereby alternative and potentially disruptive forms of creativity become sidelined or even prevented in Munich’s imagination of urban development in the name of innovation and economic growth. Thus taming the unruliness of creativity, Munich also manages to tame the disruptive threats of innovation, ensuring that the innovation-centered modes of future-making still leave socio-economic hierarchies intact while displacing (counter-)visions rooted in the subculture.

Keywords: creative districts, science and technology studies, public engagement, innovation studies

Procedia PDF Downloads 82
4682 Analysis of the Effects of Institutions on the Sub-National Distribution of Aid Using Geo-Referenced AidData

Authors: Savas Yildiz

Abstract:

The article assesses the performance of international aid donors to determine the sub-national distribution of their aid projects dependent on recipient countries’ governance. The present paper extends the scope from a cross-country perspective to a more detailed analysis by looking at the effects of institutional qualities on the sub-national distribution of foreign aid. The analysis examines geo-referenced aid project in 37 countries and 404 regions at the first administrative division level in Sub-Saharan Africa from the World Bank (WB) and the African Development Bank (ADB) that were approved between the years 2000 and 2011. To measure the influence of institutional qualities on the distribution of aid the following measures are used: control of corruption, government effectiveness, regulatory quality and rule of law from the World Governance Indicators (WGI) and the corruption perception index from Transparency International. Furthermore, to assess the importance of ethnic heterogeneity on the sub-national distribution of aid projects, the study also includes interaction terms measuring ethnic fragmentation. The regression results indicate a general skew of aid projects towards regions which hold capital cities, however, being incumbent presidents’ birth region does not increase the allocation of aid projects significantly. Nevertheless, with increasing quality of institutions aid projects are less skewed towards capital regions and the previously estimated coefficients loose significance in most cases. Higher ethnic fragmentation also seems to impede the possibility to allocate aid projects mainly in capital city regions and presidents’ birth places. Additionally, to assess the performance of the WB based on its own proclaimed goal to aim the poor in a country, the study also includes sub-national wealth data from the Demographic and Health Surveys (DSH), and finds that, even with better institutional qualities, regions with a larger share from the richest quintile receive significantly more aid than regions with a larger share of poor people. With increasing ethnic diversity, the allocation of aid projects towards regions where the richest citizens reside diminishes, but still remains high and significant. However, regions with a larger share of poor people still do not receive significantly more aid. This might imply that the sub-national distribution of aid projects increases in general with higher ethnic fragmentation, independent of the diverse regional needs. The results provide evidence that institutional qualities matter to undermine the influence of incumbent presidents on the allocation of aid projects towards their birth regions and capital regions. Moreover, even for countries with better institutional qualities the WB and the ADB do not seem to be able to aim the poor in a country with their aid projects. Even, if one considers need-based variables, such as infant mortality and child mortality rates, aid projects do not seem to be allocated in districts with a larger share of people in need. Therefore, the study provides further evidence using more detailed information on the sub-national distribution of aid projects that aid is not being allocated effectively towards regions with a larger share of poor people to alleviate poverty in recipient countries directly. Institutions do not have any significant influence on the sub-national distribution of aid towards the poor.

Keywords: aid allocation, georeferenced data, institutions, spatial analysis

Procedia PDF Downloads 101
4681 Sustainable Engineering: Synergy of BIM and Environmental Assessment Tools in Hong Kong Construction Industry

Authors: Kwok Tak Kit

Abstract:

The construction industry plays an important role in environmental and carbon emissions as it consumes a huge amount of natural resources and energy. Sustainable engineering involves the process of planning, design, procurement, construction and delivery in which the whole building and construction process resulting from building and construction can be effectively and sustainability managed to achieve the use of natural resources. Implementation of sustainable technology development and innovation, adoption of the advanced construction process and facilitate the facilities management to implement the energy and waste control more accurately and effectively. Study and research in the relationship of BIM and environment assessment tools lack a clear discussion. In this paper, we will focus on the synergy of BIM technology and sustainable engineering in the AEC industry and outline the key factors which enhance the use of advanced innovation, technology and method and define the role of stakeholders to achieve zero-carbon emission toward the Paris Agreement to limit global warming to well below 2ᵒC above pre-industrial levels. A case study of the adoption of Building Information Modeling (BIM) and environmental assessment tools in Hong Kong will be discussed in this paper.

Keywords: sustainability, sustainable engineering, BIM, LEED

Procedia PDF Downloads 133
4680 Barriers to the Use of Factoring Accounts Receivables: Ghanaian Contractor’s Perception

Authors: E. Kissi, V. K. Acheamfour, J. J. Gyimah, T. Adjei-Kumi

Abstract:

Factoring accounts receivable is widely accepted as an alternative financing source and utilized in almost every industry that sells business-to-business or business-to-government. However, its patronage in the construction industry is very limited as some barriers hinder its application in the construction industry. This study aims at assessing the barriers to the use of factoring accounts receivables in the Ghanaian construction industry. The study adopted the sequential exploratory research method where structured and unstructured questionnaires were conveniently distributed to D1K1 and D2K2 construction firms in Ghana. Using the one-sample t-test and Kendall’s Coefficient of concordance data was analyzed. The most severe challenge concluded is the high cost of factoring patronage. Other critical challenges identified were low knowledge on factoring processes, inadequate access to information on factoring, and high risks involved in factoring. Hence, it is recommended that contractors should be made aware of the prospects of factoring of accounts receivables in the construction industry. This study serves as basis for further rigorous research into factoring of accounts receivables in the industry.

Keywords: barriers, contractors, factoring accounts receivables, Ghanaian, perception

Procedia PDF Downloads 113
4679 Treatment of Dredged Marine Sediments for Their Reuse in Road Construction

Authors: F. Ben Abdelghani, W. Maherezi

Abstract:

Dredging operations generate, each year, a great quantity of marine sediments. These raw materials can not be used in road construction without a specific treatment process. Sediments suitability tests has shown that most of studied sediments are not suitable to be used in road construction. In order to improve their compacity and their mechanical performance, addition of a granular material is recommended. The use of a dredged sand, to improve the granular mixture containing sediments, allows a better management of the two types of dredge materials (sand and sediment). In this study, a new road material containing dredged marine sediments and dredged sand is formulated and treated by adding various binders. Mechanical performance investigation of different mixtures by measuring Proctor-IPI values and simple compressive strengths is realized.

Keywords: dredged sediments, suitability tests, road construction, hydraulic binder, mechanical performance

Procedia PDF Downloads 348
4678 Inadequacy and Inefficiency of the Scoping Requirements in the Preparation of Environmental Impact Assessment Reports for Dam and Reservoir Projects in Thailand

Authors: Natsuda Rattamanee

Abstract:

Like other countries, Thailand continually experiences strong protests against dam and reservoir proposals, especially large-scale projects. The protestors are constantly worried about the potential significant adverse impacts of the projects on the environment and society. Although project proponents are required by laws to assess the environmental and social impacts of the dam proposals by making environmental impact assessment (EIA) reports and finding mitigation measures before implementing the plans, the outcomes of the assessments often do not lessen the affected people and public’s concerns about the potential negative effects of the projects. One of the main reasons is that Thailand does not have a proper and efficient law to regulate project proponents when determining the scope of environmental impact assessments. Scoping is the crucial second stage of the preparation of an EIA report. The appropriate scope of assessments will allow EIA studies to focus only on the significant effects of the proposed project on particular resources, areas, and communities. It will offer crucial and sufficient information to the decision-makers and the public. The decision to implement the dam and reservoir projects considered based on the assessments with a proper scoping will eventually be more widely accepted by the public and reduce community opposition. The research work seeks to identify flaws in the current requirements of scoping steps under Thai laws and regulations and proposes recommendations to improve the legal scheme. The paper explores the well-established United States laws and relevant rules regulating how lead agencies determine the scope of their environmental impact assessments and some guidelines concerning scoping published by dominant institutions. Policymakers and legislature will find the results of studies helpful in improving the scoping-step requirements of EIA for dam and reservoir projects and reducing the level of anti-dam protests in Thailand.

Keywords: dam and reservoir, EIA, environmental impact assessment, law, scoping, Thailand

Procedia PDF Downloads 73
4677 Territorial Brand as a Means of Structuring the French Wood Industry

Authors: Laetitia Dari

Abstract:

The brand constitutes a source of differentiation between competitors. It highlights specific characteristics that create value for the enterprise. Today the concept of a brand is not just about the product but can concern territories. The competition between territories, due to tourism, research, jobs, etc., leads territories to develop territorial brands to bring out their identity and specificity. Some territorial brands are based on natural resources or products characteristic of a territory. In the French wood sector, we can observe the emergence of many territorial brands. Supported by the inter-professional organization, these brands have the main objective of showcasing wood as a source of solutions at the local level in terms of construction and energy. The implementation of these collective projects raises the question of the way in which relations between companies are structured and animated. The central question of our work is to understand how the territorial brand promotes the structuring of a sector and the construction of collective relations between actors. In other words, we are interested in the conditions for the emergence of the territorial brand and the way in which it will be a means of mobilizing the actors around a common project. The objectives of the research are (1) to understand in which context a territorial brand emerges, (2) to analyze the way in which the territorial brand structures the collective relations between actors, (3) to give entry keys to the actors to successfully develop this type of project. Thus, our research is based on a qualitative methodology with semi-structured interviews conducted with the main territorial brands in France. The research will answer various academic and empirical questions. From an academic point of view, it brings elements of understanding to the construction of a collective project and to the way in which governance operates. From an empirical point of view, the interest of our work is to bring out the key success factors in the development of a territorial brand and how the brand can become an element of valuation for a territory.

Keywords: brand, marketing, strategy, territory, third party stakeholder, wood

Procedia PDF Downloads 54
4676 Collaborative Governance in Dutch Flood Risk Management: An Historical Analysis

Authors: Emma Avoyan

Abstract:

The safety standards for flood protection in the Netherlands have been revised recently. It is expected that all major flood-protection structures will have to be reinforced to meet the new standards. The Dutch Flood Protection Programme aims at accomplishing this task through innovative integrated projects such as construction of multi-functional flood defenses. In these projects, flood safety purposes will be combined with spatial planning, nature development, emergency management or other sectoral objectives. Therefore, implementation of dike reinforcement projects requires early involvement and collaboration between public and private sectors, different governmental actors and agencies. The development and implementation of such integrated projects has been an issue in Dutch flood risk management since long. Therefore, this article analyses how cross-sector collaboration within flood risk governance in the Netherlands has evolved over time, and how this development can be explained. The integrative framework for collaborative governance is applied as an analytical tool to map external factors framing possibilities as well as constraints for cross-sector collaboration in Dutch flood risk domain. Supported by an extensive document and literature analysis, the paper offers insights on how the system context and different drivers changing over time either promoted or hindered cross-sector collaboration between flood protection sector, urban development, nature conservation or any other sector involved in flood risk governance. The system context refers to the multi-layered and interrelated suite of conditions that influence the formation and performance of complex governance systems, such as collaborative governance regimes, whereas the drivers initiate and enable the overall process of collaboration. In addition, by applying a method of process tracing we identify a causal and chronological chain of events shaping cross-sectoral interaction in Dutch flood risk management. Our results indicate that in order to evaluate the performance of complex governance systems, it is important to firstly study the system context that shapes it. Clear understanding of the system conditions and drivers for collaboration gives insight into the possibilities of and constraints for effective performance of complex governance systems. The performance of the governance system is affected by the system conditions, while at the same time the governance system can also change the system conditions. Our results show that the sequence of changes within the system conditions and drivers over time affect how cross-sector interaction in Dutch flood risk governance system happens now. Moreover, we have traced the potential of this governance system to shape and change the system context.

Keywords: collaborative governance, cross-sector interaction, flood risk management, the Netherlands

Procedia PDF Downloads 116
4675 An Integrated Framework for Seismic Risk Mitigation Decision Making

Authors: Mojtaba Sadeghi, Farshid Baniassadi, Hamed Kashani

Abstract:

One of the challenging issues faced by seismic retrofitting consultants and employers is quick decision-making on the demolition or retrofitting of a structure at the current time or in the future. For this reason, the existing models proposed by researchers have only covered one of the aspects of cost, execution method, and structural vulnerability. Given the effect of each factor on the final decision, it is crucial to devise a new comprehensive model capable of simultaneously covering all the factors. This study attempted to provide an integrated framework that can be utilized to select the most appropriate earthquake risk mitigation solution for buildings. This framework can overcome the limitations of current models by taking into account several factors such as cost, execution method, risk-taking and structural failure. In the newly proposed model, the database and essential information about retrofitting projects are developed based on the historical data on a retrofit project. In the next phase, an analysis is conducted in order to assess the vulnerability of the building under study. Then, artificial neural networks technique is employed to calculate the cost of retrofitting. While calculating the current price of the structure, an economic analysis is conducted to compare demolition versus retrofitting costs. At the next stage, the optimal method is identified. Finally, the implementation of the framework was demonstrated by collecting data concerning 155 previous projects.

Keywords: decision making, demolition, construction management, seismic retrofit

Procedia PDF Downloads 223
4674 Examining the Extent to Which the Effects of HIV/AIDS Is Addressed in Low Cost Housing Projects in South Africa: The Case of RDP Golf Course Housing Project in Alice Town, Eastern

Authors: Tatenda Manomano

Abstract:

The chronic challenges presented by HIV/AIDS globally have come with extreme negative effects on individuals, families and communities as well as governments. Sub-Saharan Africa remains strongly challenged with South Africa bearing a huge brunt of these. The paper examines the extent to which the effects of HIV/AIDS are addressed in low cost housing projects in South Africa with a case of the RDP Golf Course Housing Project in Alice Town. The study used a triangulation of both qualitative and quantitative methods with the qualitative as the dominant method while the quantitative was less dominant. Findings revealed that infection rate was high; prostitution was high; alcohol abuse was also high; and rape and sexual abuse was also high and there was also lack of hospitals and social workers around the location. These findings prompted this researcher to recommend for proactive policy making that can bolster the challenges faced by these low cost housing projects in accessing health and social services as well as massive campaigns that can promote behavior modification among other things. It is hoped that this paper will be a platform to ring a bell to both government and non-government to augment the campaign against HIV/AIDS in South Africa.

Keywords: HIV/AIDS, RDP houses, low cost housing projects, campaigns

Procedia PDF Downloads 380
4673 Application of GIS-Based Construction Engineering: An Electronic Document Management System

Authors: Mansour N. Jadid

Abstract:

This paper describes the implementation of a GIS to provide decision support for successfully monitoring the movements and storage of materials, hence ensuring that finished products travel from the point of origin to the destination construction site through the supply-chain management (SCM) system. This system ensures the efficient operation of suppliers, manufacturers, and distributors by determining the shortest path from the point of origin to the final destination to reduce construction costs, minimize time, and enhance productivity. These systems are essential to the construction industry because they reduce costs and save time, thereby improve productivity and effectiveness. This study describes a typical supply-chain model and a geographical information system (GIS)-based SCM that focuses on implementing an electronic document management system, which maps the application framework to integrate geodetic support with the supply-chain system. This process provides guidance for locating the nearest suppliers to fill the information needs of project members in different locations. Moreover, this study illustrates the use of a GIS-based SCM as a collaborative tool in innovative methods for implementing Web mapping services, as well as aspects of their integration by generating an interactive GIS for the construction industry platform.

Keywords: construction, coordinate, engineering, GIS, management, map

Procedia PDF Downloads 287
4672 An Integrated Framework for Engaging Stakeholders in the Circular Economy Processes Using Building Information Modeling and Virtual Reality

Authors: Erisasadat Sahebzamani, Núria Forcada, Francisco Lendinez

Abstract:

Global climate change has become increasingly problematic over the past few decades. The construction industry has contributed to greenhouse gas emissions in recent decades. Considering these issues and the high demand for materials in the construction industry, Circular Economy (CE) is considered necessary to keep materials in the loop and extend their useful lives. By providing tangible benefits, Construction 4.0 facilitates the adoption of CE by reducing waste, updating standard work, sharing knowledge, and increasing transparency and stability. This study aims to present a framework for integrating CE and digital tools like Building Information Modeling (BIM) and Virtual Reality (VR) to examine the impact on the construction industry based on stakeholders' perspectives.

Keywords: circular economy, building information modeling, virtual reality, stakeholder engagement

Procedia PDF Downloads 97
4671 Integrating Best Practices for Construction Waste in Quality Management Systems

Authors: Paola Villoria Sáez, Mercedes Del Río Merino, Jaime Santa Cruz Astorqui, Antonio Rodríguez Sánchez

Abstract:

The Spanish construction industry generates large volumes of waste. However, despite the legislative improvements introduced for construction and demolition waste (CDW), construction waste recycling rate remains well below other European countries and also below the target set for 2020. This situation can be due to many difficulties. i.e.: The difficulty of onsite segregation or the estimation in advance of the total amount generated. Despite these difficulties, the proper management of CDW must be one of the main aspects to be considered by the construction companies. In this sense, some large national companies are implementing Integrated Management Systems (IMS) including not only quality and safety aspects, but also environment issues. However, although this fact is a reality for large construction companies still the vast majority of companies need to adopt this trend. In short, it is common to find in small and medium enterprises a decentralized management system: A single system of quality management, another for system safety management and a third one for environmental management system (EMS). In addition, the EMSs currently used address CDW superficially and are mainly focus on other environmental concerns such as carbon emissions. Therefore, this research determines and implements a specific best practice management system for CDW based on eight procedures in a Spanish Construction company. The main advantages and drawbacks of its implementation are highlighted. Results of this study show that establishing and implementing a CDW management system in building works, improve CDW quantification as the company obtains their own CDW generation ratio. This helps construction stakeholders when developing CDW Management Plans and also helps to achieve a higher adjustment of CDW management costs. Finally, integrating this CDW system with the EMS of the company favors the cohesion of the construction process organization at all stages, establishing responsibilities in the field of waste and providing a greater control over the process.

Keywords: construction and demolition waste, waste management, best practices, waste minimization, building, quality management systems

Procedia PDF Downloads 515
4670 Key Factors of Success and Deterrent of IT Projects, Case study: Islamic Azad University, Zahedan Branch

Authors: Mohammad Reza Abidi, Zahra Nourouz Pour, Mehdi Moudi

Abstract:

In this research, firstly critical success factors and deterrent factors in implementing projects and also the factors those cause information technology productivity (IT) paradox in Islamic Azad University, Zahedan branch examined. Research method of this paper is descriptive. In fact, the researcher by using survey, proposed useful solutions. In this research, subjects’ responders to questionnaires items were based on Likert scale. In the questionnaire, economic, technical, organizational and cultural factors in the university have been assessed in order to obtain the necessary validity. We used masters and technicians of IT department’s advices to realize reliability and consistency. For the reliability test we used Cronbach’s reliability test and validity has been obtained using SPSS software. Because of the research questions and objectives, t-student test is used for hypothesis testing. Finally we analyze the findings, we offer conclusions and suggestions.

Keywords: IT projects, Islamic Azad University, success factors, deterrent factors

Procedia PDF Downloads 300
4669 The Causes and Effects of Housing Project Abandonment in Malaysia

Authors: Abdul Aziz Abdullah, Anuar Alias, Khor Hooi Ting, Guan Ngah Mei

Abstract:

One of the major sectors which contribute significant growth to socio-economic development is the construction and development industry. This industry is most badly hurt during the 1997 and 2008 economic crisis thus causing many government and private projects to be deferred and abandoned. The purpose of this study is to examine the causes and effects of housing project abandonment in Malaysia. This objective is achieved through rigorous review of literatures and documents related to housing and abandoned housing project. The finding revealed there are several causes of housing project abandonment. The significant causes are: economic recession, inadequacy of finance, poor marketing and sales strategies, technical problems faced during construction, problems caused by compensations demanded by squatters for resettlement, insolvency of contractor, cost overrun and currency fluctuation amongst others. However the alarming effect of housing project is: house buyers of abandoned project have the monthly payment although the house is delivered to house buy. In other case house buyers have to entangle in many legal action with the financial institution. This finding provides the various ministries in the Government some insights on real causes and effects of abandoned project. Perhaps this finding can enhance the current solution the Ministry of Housing Local Government on addressing the prevailing issue of reviving existing abandoned project in the country.

Keywords: abandoned project, abandonment, housing project, ministry of housing and local government, causes and effect

Procedia PDF Downloads 513
4668 A Taxonomy Proposal on Criterion Structure for Evaluating Freight Village Concepts in Early-Stage Design Projects

Authors: Rıza Gürhan Korkut, Metin Çelik, Süleyman Özkaynak

Abstract:

The early-stage design and development projects for the freight village initiatives require a comprehensive analysis of both qualitative and quantitative data. Considering the literature review on structural and operational management requirements, this study proposed an original taxonomy on criterion structure to assess freight village conceptualization. The potential challenges and uncertainties of the developed taxonomy are extended. Besides requirement analysis, this study is also expected to contribute to forthcoming research on benchmarking of freight villages in different regions. The methodology used in this research is a systematic review on several articles as per their modelling approaches, sustainability, entities and decisions made together with the uncertainties and features of their models taken into consideration. The major findings of the study that are the categories for assessing the projects attributes on their environmental, socio-economical, accessibility and location aspects.

Keywords: logistics centers, freight village, operational management, taxonomy

Procedia PDF Downloads 161
4667 Sustainability Rating System for Infrastructure Projects in UAE

Authors: Amrutha Venugopal, Rabee Rustum

Abstract:

In spite of huge investments and the vital role infrastructure plays in the economy of UAE, the country has not yet developed an assessment scheme to measure the sustainability of infrastructure projects/development. The aim of this study was to develop a sustainability rating system for infrastructure projects in UAE using weighted indicator scoring. The identification of the list of 66 indicators was done by content analysis. The sources of content analysis were from government guidelines, research literature and sustainability rating system for infrastructure projects namely BCA Greenmark for Infrastructure (Singapore), ISCA (Australia) and Envision (USA). These indicators were shortlisted based on their relevance in the UAE. A mixture of qualitative and quantitative research methods is utilized to find the weightage to be applied to the indicators and to find suggestive measures to improve infrastructure sustainability in this region. Interviews and surveys were conducted with a good mix of experts from the industry. The data collected from the interviews were collated to provide suggestive measures for improving infrastructure sustainability. The collected survey data were analyzed using statistical analysis techniques to find the indicator weighing. The indicators were shortlisted by 75% to minimize the effort and investment into the process. The weighing of the deleted indicators was distributed among the critical clusters identified by Pareto analysis. Finally a simple Microsoft Excel tool was developed as the rating tool by using the calculated weighing for the indicators.

Keywords: infrastructure, rating system, suggestive measures, sustainability, UAE

Procedia PDF Downloads 288
4666 Noise Measurement and Awareness at Construction Site: A Case Study

Authors: Feiruz Ab'lah, Zarini Ismail, Mohamad Zaki Hassan, Siti Nadia Mohd Bakhori, Mohamad Azlan Suhot, Mohd Yusof Md. Daud, Shamsul Sarip

Abstract:

The construction industry is one of the major sectors in Malaysia. Apart from providing facilities, services, and goods it also offers employment opportunities to local and foreign workers. In fact, the construction workers are exposed to a hazardous level of noises that generated from various sources including excavators, bulldozers, concrete mixer, and piling machines. Previous studies indicated that the piling and concrete work was recorded as the main source that contributed to the highest level of noise among the others. Therefore, the aim of this study is to obtain the noise exposure during piling process and to determine the awareness of workers against noise pollution at the construction site. Initially, the reading of noise was obtained at construction site by using a digital sound level meter (SLM), and noise exposure to the workers was mapped. Readings were taken from four different distances; 5, 10, 15 and 20 meters from the piling machine. Furthermore, a set of questionnaire was also distributed to assess the knowledge regarding noise pollution at the construction site. The result showed that the mean noise level at 5m distance was more than 90 dB which exceeded the recommended level. Although the level of awareness regarding the effect of noise pollution is satisfactory, majority of workers (90%) still did not wear ear protecting device during work period. Therefore, the safety module guidelines related to noise pollution controls should be implemented to provide a safe working environment and prevent initial occupational hearing loss.

Keywords: construction, noise awareness, noise pollution, piling machine

Procedia PDF Downloads 361
4665 Supply Chain Management Strategies of the Private Residential Construction Sector in South Africa

Authors: R. Khoza, K. K. Govender

Abstract:

The aim of the study was to review and critically evaluate the supply chain management (SCM) strategies and challenges in the private residential construction sector in South Africa. The study was grounded in three theories, namely, theory of constraints, principal-agency theory, and stakeholder theory. A quantitative approach was used to survey 320 private residential construction companies which registered with the National Homebuilders Registration Council (NHBRC) within the Gauteng province. The data from 250 questionnaires returned were analysed using SPSS (Versions 23) and Smart PLS. It became evident that the SCM challenges included lack of trust between the supplier and the organization; lack of adoption of SCM system; lack of a sufficiently skilled SCM workforce; and poor implementation of contract management. The findings also indicate that there is a significant positive relationship between the performance of the private residential construction sector in South Africa and SCM challenges, SCM strategies and SCM processes. A framework is proposed comprising SCM practices and strategies of private residential construction sector in South Africa, which will enable them to enhance performance.

Keywords: management challenges, residential housing, South Africa, supply chain management

Procedia PDF Downloads 62