4063 Efficient Management of Construction Logistics: A Challenge to Both Conventional and Technological Systems in the Developing Nations
Authors: Nuruddeen Usman, Ahmad Muhammad Ibrahim
Abstract:
Management of construction logistics at construction sites becomes increasingly complex with rising construction volume, which made it relatively inefficient in the developing nations even with the technological advancement. The objective of this research is to conceptually synthesise the approaches and challenges befall in the course of construction logistic management, with the aim to proffer possible solution to it. Therefore, this study appraised the glitches associated with both conventional and technological methods of construction logistic management that result in its inefficiency. Thus, this investigation found that, both conventional and the technological issues were due to certain obstacles that affect the construction logistic management which resulted into delays, accidents, fraudulent activities, time and cost overrun. Therefore, this study has developed a framework that might bring a lasting solution to the challenges of construction logistic management.Keywords: construction, conventional, logistic, technological
Procedia PDF Downloads 5544062 A Probability Analysis of Construction Project Schedule Using Risk Management Tool
Authors: A. L. Agarwal, D. A. Mahajan
Abstract:
Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.Keywords: construction project, distributions, project schedule, uncertainty
Procedia PDF Downloads 3504061 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia
Authors: Kaleem Ullah, Abd Halid Bin Abdullah
Abstract:
This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun
Procedia PDF Downloads 2824060 BIM Model and Virtual Prototyping in Construction Management
Authors: Samar Alkindy
Abstract:
Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.Keywords: construction operations, construction planning, process simulation, virtual prototyping
Procedia PDF Downloads 2314059 Unmasking Theatrical Language: Exploring Ideological Connections in American Theater
Authors: Gizem Barreto Martins
Abstract:
This paper explores the subversive potential inherent in the theatrical language employed within Arthur Miller's The Crucible. The research argues that this play intricately weaves ideological connections with its audience and the historical epoch it represents, effectively serving as a channel for ideological and cultural interaction potentially exerting subversive influences on social and political realms. Using a historical-materialist methodology that situates the play within its historical and political context, all while examining its connections with theater and literary theories, the paper raises a fundamental query: How does this dramatic work embody subversion, presenting a style unburdened by the performative conventions of daily life and prevailing codes and systems of representation? In response to this inquiry, the study asserts that theatrical language has the capacity to function as a subversive catalyst against prevailing ideologies, actively contributing to the process of social transformation. To substantiate this claim, the research conducts a detailed analysis of the selected play, employing the semiotic framework pioneered by Gilles Deleuze and Felix Guattari.Keywords: arthur miller, The crucible, gilles deleuze, felix guattari, theater and literary theories
Procedia PDF Downloads 614058 Construction 4.0: The Future of the Construction Industry in South Africa
Authors: Temidayo. O. Osunsanmi, Clinton Aigbavboa, Ayodeji Oke
Abstract:
The construction industry is a renowned latecomer to the efficiency offered by the adoption of information technology. Whereas, the banking, manufacturing, retailing industries have keyed into the future by using digitization and information technology as a new approach for ensuring competitive gain and efficiency. The construction industry has yet to fully realize similar benefits because the adoption of ICT is still at the infancy stage with a major concentration on the use of software. Thus, this study evaluates the awareness and readiness of construction professionals towards embracing a full digitalization of the construction industry using construction 4.0. The term ‘construction 4.0’ was coined from the industry 4.0 concept which is regarded as the fourth industrial revolution that originated from Germany. A questionnaire was utilized for sourcing data distributed to practicing construction professionals through a convenience sampling method. Using SPSS v24, the hypotheses posed were tested with the Mann Whitney test. The result revealed that there are no differences between the consulting and contracting organizations on the readiness for adopting construction 4.0 concepts in the construction industry. Using factor analysis, the study discovers that adopting construction 4.0 will improve the performance of the construction industry regarding cost and time savings and also create sustainable buildings. In conclusion, the study determined that construction professionals have a low awareness towards construction 4.0 concepts. The study recommends an increase in awareness of construction 4.0 concepts through seminars, workshops and training, while construction professionals should take hold of the benefits of adopting construction 4.0 concepts. The study contributes to the roadmap for the implementation of construction industry 4.0 concepts in the South African construction industry.Keywords: building information technology, Construction 4.0, Industry 4.0, smart site
Procedia PDF Downloads 4104057 Causes of Construction Delays in Qatar Construction Projects
Authors: Murat Gunduz, Mohanad H. A. AbuHassan
Abstract:
Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.Keywords: construction industry, delays, importance index, frequency index
Procedia PDF Downloads 3644056 Language and Political Manipulation: A Critical Analysis of Okediran's Tenants of the House
Authors: Moses Joseph
Abstract:
Language is a veritable tool in the hands of politicians. They use it to shape social realities; create new meanings and ultimately to acquire, exercise and sustain power in the society. Language and politics both share a symbiotic relationship. The former is the medium through which members of the society communicate and cohabitate while the later is used to gain and exercise power in the society. Language therefore is the epicenter of every human activity and politicians explore, deploy and manipulate it to advance their personal interests. This paper examines the ideological use of language in Okediran’s Tenants of the House. The study further shows that language is used as an instrument of political domination and manipulation through the display of emotiveness. The study concludes that politicians do not innocently use language but deliberately employ them to foreground their ideological position.Keywords: language, ideology, political domination, manipulation
Procedia PDF Downloads 3084055 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects
Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry
Abstract:
Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry
Procedia PDF Downloads 1944054 Production and Recycling of Construction and Demolition Waste
Authors: Vladimira Vytlacilova
Abstract:
Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management
Procedia PDF Downloads 3034053 Text2Time: Transformer-Based Article Time Period Prediction
Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang
Abstract:
Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.Keywords: NLP, BERT, LLM, deep learning, classification
Procedia PDF Downloads 1044052 Stabilized Earth Roads Construction and Its Challenges
Authors: Mokhtar Nikgoo
Abstract:
Road definition and road construction: in engineering literature, a road is defined as a means of communication between two different places by air, land, and sea. In this way, all sea, land, and air routes are considered as roads. Road construction is an operation to create a road on the ground between 2 points with a specified width, which includes works such as subgrade, paving, placing tables, and traffic signs on the road. In this article, the stages of road construction are explained from the beginning to the end. Road construction is generally done in the construction of rural, urban, and inter-city roads, and according to the special conditions of this area, the precision of engineers in its design and calculations is very important. For example, if the design of a road does not pay enough attention to the way the road curves, there will undoubtedly be countless accidents. Also, adjusting the road surface and its durability and uniformity are among the things that engineers solve according to the upcoming obstacles.Keywords: road construction, surveying, freeway, pavement, excavator
Procedia PDF Downloads 934051 Modern Work Modules in Construction Practice
Authors: Robin Becker, Nane Roetmann, Manfred Helmus
Abstract:
Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model
Procedia PDF Downloads 864050 Comprehensive Risk Assessment Model in Agile Construction Environment
Authors: Jolanta Tamošaitienė
Abstract:
The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.Keywords: assessment, environment, agile, model, risk
Procedia PDF Downloads 2554049 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry
Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba
Abstract:
The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.Keywords: black business forums, construction mafia, emergence, implication
Procedia PDF Downloads 1344048 Delivery of Sustainable Construction in South Africa – Assessing the Roles of Organisational Leadership
Authors: Ayodeji Emmanuel Oke, Mathew O. Ikuabe, Clinton O. Aigbavboa, Douglas O. Aghimien
Abstract:
The call for sustainable construction has received significant drive in recent time considering the overwhelming impacts of its adoption. However, not much has been deliberated on this subject with regards to the roles of organisational leadership in delivering sustainable construction. To this end, the study empirically scrutinised the roles of organisational leadership in delivering sustainable construction. The study adopted a quantitative approach while construction professionals formed the population of the study. A well-articulated questionnaire was used in eliciting responses from the respondents, while appropriate methods of data analysis were used. Findings from the study depicted that the major role of organisational leadership in the delivery of sustainable construction is acting as sustainability integrators. Equally revealed are the internal and external factors affecting organisational leadership in delivering sustainable construction. The study concluded by emphasizing the core roles for delivering sustainable construction by organisational leadership and further recommended that sustainable construction should serve as a prominent and focal organisation goal by organisational leadership when steering the organisation towards meeting its objectivesKeywords: organisational leadership, project delivery, roles, sustainable construction
Procedia PDF Downloads 1234047 Time Overrun in Pre-Construction Planning Phase of Construction Projects
Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui
Abstract:
Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun
Procedia PDF Downloads 2554046 A Prediction of Electrical Cost for High-Rise Building Construction
Authors: Picha Sriprachan
Abstract:
The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.Keywords: high-rise building construction, electrical cost, construction phase, architectural phase
Procedia PDF Downloads 3904045 Assessing the Influence of Using Traditional Methods of Construction on Cost and Quality of Building Construction
Authors: Musoke Ivan, Birungi Racheal
Abstract:
The construction trend is characterized by increased use of modern methods yet traditional methods are cheaper in terms of costs, in addition to the benefits it offers to the construction sector, like providing more jobs that could have been worked with the intensive machines. The purpose of this research was to assess the influence of using Traditional methods of construction (TMC) on the costs and quality of building structures and determine the different ways. Traditional methods of construction (TMC) can be applicable and integrated into the construction trend, and propose ways how this can be a success. The study adopted a quantitative method approach targeting various construction professionals like Architects, Quantity surveyors, Engineers, and Construction Managers. Questionnaires and analyses of literature were used to obtain research data and findings. Simple random sampling was used to select 40 construction professionals to which questionnaires were administered. The data was then analyzed using Microsoft Excel. The findings of the research indicate that Traditional methods of construction (TMCs) in Uganda are cheaper in terms of costs, but the quality is still low. This is attributed to a lack of skilled labour and efficient supervision while undertaking tasks leading to low quality. The study identifies strategies that would improve Traditional methods of construction (TMC), which include the employment of skilled manpower and effective supervision. It also identifies the need by stakeholders like the government, clients, and professionals to appreciate Traditional methods of construction (TMCs) and allow for a levelled ground for Traditional Methods of Construction and Modern methods of construction (MMCs).Keywords: traditional methods of construction, integration, cost, quality
Procedia PDF Downloads 604044 Construction Project Planning Using Fuzzy Critical Path Approach
Authors: Omar M. Aldenali
Abstract:
Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.Keywords: construction project, critical path, fuzzy network project, planning
Procedia PDF Downloads 1434043 Using Wearable Technology to Monitor Workers’ Stress for Construction Safety: A Conceptual Framework
Authors: Namhun Lee, Seong Jin Kim
Abstract:
The construction industry represents one of the largest industries in the United States, yet it continues to face several occupational health and safety challenges. Many workers on construction sites are suffering from extended exposure to stressful situations such as poor and hazardous work environments and task complexity. Stress can be commonly defined as a feeling of emotional or physical tension, which can easily impact construction safety and result in a higher rate of job-related injuries in the construction industry. Physiological signals transmitted from wearable biosensors can be used to detect excessive stress. Therefore, workers’ stress should be detected and mitigated to prevent any type of serious incident or accident proactively. By doing this, construction productivity, as well as job satisfaction, would also be improved in the construction industry. To establish a foundation in this field of research, a conceptual framework for using wearable technology for construction safety has been developed for continuous and automatic monitoring of worker’s stress. The conceptual framework will serve as a foothold in future studies on the application of wearable technology for construction safety.Keywords: construction safety, occupational stress, stress monitoring, wearable biosensors
Procedia PDF Downloads 1614042 Uptake of Off-Site Construction: Benefit and Future Application
Authors: Faisal Alazzaz, Andrew Whyte
Abstract:
Off-site construction methods have played an important role in the construction sector in the past few decades. It is increasingly becoming a major alternative technique and strategic direction compared to traditional in-situ method. It produces a significant amount of value for the construction industry and the economy more generally. To date, an impressive number of studies have been lunched on the perceived perception of off-site construction. However, it seems that a quantifying benefit on the offsite construction area is lacking. Therefore, this paper examines the recent research literature on the benefits of off- site construction and provides future direction. In the beginning, this paper provides a brief history and current value of the off-site construction followed by a detailed discussion on the benefit of off-site construction. These benefits include but not limited to time saving, quality improvement, relieving skills shortages, cost reduction and productivity improvement. Toward this end, off-site construction should learn from other productive industry similar to services or manufacturing industry by applying operational management tools and techniques with extensive focus on employee empowerment will shed the light on future uptake of Off-site construction. This study is of value in providing scholars have a clear picture of perceived benefit of off-site construction research and give an opportunities for future uptake of off-site method.Keywords: building projects, employer empowerment, off-site construction benefits, productivity
Procedia PDF Downloads 4364041 Labour-saving Construction Using Buildability Framework through Strengthening Designers in Delivering More Buildable Designs
Authors: Muhammad Lawal A., Abdullateef Abdulkarim Jimoh
Abstract:
This study is to appraise the labour-saving construction methods achievable using a buildability framework through an improved design system. Adoption of labour-efficient technology and construction techniques will be necessary to supplement good buildable designs. Increased usage of prefabricated, modular, and standardized construction components, simplicity in the design, and the number of integrated elements all work to advance buildable design. The objectives of the study include `determining a more efficient buildability framework for designers to achieve labour-saving construction’. 20 completed building projects in Birnin Kebbi, Nigeria, is used as a case study to buttress the proposition that `a more buildable design using buildability frame result in labour-saving in construction adopting a Singapore study approach.Keywords: buildability framework, buildable designs, construction, labour-saving construction
Procedia PDF Downloads 994040 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis
Authors: Tharaki S. Hettiarachchi
Abstract:
Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.Keywords: construction, framework development, project management, sustainability
Procedia PDF Downloads 604039 Factors Affecting Time Performance in Building Construction Projects
Authors: Ibraheem A. K. Mahameed
Abstract:
The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.Keywords: delay, time performance, construction, building
Procedia PDF Downloads 4704038 Achieving Sustainable Rapid Construction Using Lean Principles
Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof
Abstract:
There is the need to take the holistic approach in achieving sustainable construction for a contemporary practice. Sustainable construction is the practice that involved method of human preservation of the environment, whether economically or socially through responsibility, management of resources and maintenance utilizing support. This paper shows the correlation of achieving rapid construction with sustainable concepts using lean principles. Lean principles being used widely in the manufacturing industry, but this research will demonstrate the principles into building construction. Lean principle offers the benefits of stabilizing work flow and elimination of unnecessary work. Therefore, this principle contributes to time and waste reduction. The correlation shows that pulling factor provides the improvement of progress curve and stabilizing the time-quality relation. The finding shows the lean principles offer the elements of rapid construction synchronized with the elements of sustainability.Keywords: sustainable construction, rapid construction, time reduction, lean construction
Procedia PDF Downloads 2364037 Causes and Effects of Delays in Construction Projects in Akure, Ondo State, South-West Nigeria
Authors: K.T Alade, A.F Lawal, A.A Omonori
Abstract:
Construction is an everlasting activity across the globe. Likewise, the problem of delay in the construction industry is a global phenomenon. Although there are several reasons that may be responsible for delay during construction, this may vary from place to place and can be reduced to the minimum when identified. This study considered the major causes and effects of delay in the execution of construction projects in Akure, Ondo State, Nigeria. Using literatures, a total number of 30 causes of construction delays were identified. The convenient sampling technique was used to select sixty respondents for a survey. The respondents comprise twenty-two (22) clients, eighteen consultants (18) and twenty (20) contractors. The analyses of the primary data revealed that the three most important causes of delay in construction projects in Akure, Ondo State Nigeria are poor site management and supervision, inadequate contractors experience and client’s financial difficulties. Based on the findings of this study, recommendations were given on how the causes and effects of delay in construction can be mitigated.Keywords: Akure, causes, construction projects, delay, effects
Procedia PDF Downloads 5084036 Ideological Manipulations and Cultural-Norm Constraints
Authors: Masoud Hassanzade Novin, Bahloul Salmani
Abstract:
Translation cannot be considered as a simple linguistic act. Through the rise of descriptive approach in the late 1970s and 1980s, translation process managed to meet the requirements of social aspects as well as linguistic approaches. To have the translation considered as the cross-cultural communication through which various cultures communicate in ideological and cultural constraints, the contrastive analysis was conducted in this paper to reveal the distortions imposed in the translated texts. The corpus of the study involved the novel 1984 written by George Orwell and its Persian translated texts which were analyzed through the qualitative type of the research based on critical discourse analysis (CDA) and Toury's norms as well as Lefever's concepts of ideology. Results of the study revealed the point that ideology and the cultural constraints were considered as an important stimulus which can control the process of the translation.Keywords: critical discourse analysis, ideology, norms, translated texts
Procedia PDF Downloads 3364035 Hybrid Concrete Construction (HCC) for Sustainable Infrastructure Development in Nigeria
Authors: Muhammad Bello Ibrahim, M. Auwal Zakari, Aliyu Usman
Abstract:
Hybrid concrete construction (HCC) combines all the benefits of pre-casting with the advantages of cast in-situ construction. Merging the two, as a hybrid structure, results in even greater construction speed, value, and the overall economy. Its variety of uses has gained popularity in the United States and in Europe due to its distinctive benefits. However, the increase of its application in some countries (including Nigeria) has been relatively slow. Several researches have shown that hybrid construction offers an ultra-high performance concrete that offers superior strength, durability and aesthetics with design flexibility and within sustainability credentials, based on the available and economically visible technologies. This paper examines and documents the criterion that will help inform the process of deciding whether or not to adopt hybrid concrete construction (HCC) technology rather than more traditional alternatives. It also the present situation of design, construction and research on hybrid structures.Keywords: hybrid concrete construction, Nigeria, sustainable infrastructure development, design flexibility
Procedia PDF Downloads 5614034 Major Causes of Delay in Construction Projects
Authors: Y. Gholipour, E. Rezazadeh
Abstract:
Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.Keywords: delay, dam construction, project management, Iran
Procedia PDF Downloads 444