13246 Using Construction Wastes and Recyclable Materials in Sustainable Concrete Manufacture

Authors: Mohamed T. El-Hawary, Carsten Koenke, Amr M. El-Nemr, Nagy F. Hanna

Abstract:

Sustainable construction materials using solid construction wastes are of great environmental and economic significance. Construction wastes, demolishing wastes, and wastes coming out from the preparation of traditional materials could be used in sustainable concrete manufacture, which is the main scope of this paper. Ceramics, clay bricks, marble, recycled concrete, and many other materials should be tested and validated for use in the manufacture of green concrete. Introducing waste materials in concrete helps in reducing the required landfills, leaving more space for land investments, and decrease the environmental impact of the concrete buildings industry in both stages -construction and demolition-. In this paper, marble aggregate is used as a replacement for the natural aggregate in sustainable green concrete production. The results showed that marble aggregates can be used as a full replacement for the natural aggregates in eco-friendly green concrete.

Keywords: coarse aggregate replacement, economical designs, green concrete, marble aggregates, sustainability, waste management

Procedia PDF Downloads 142
13245 Policies Promoting the Development of Green Buildings in Sub-Saharan Africa: A South African Case-Study

Authors: Peter Adekunle, Clinton Aigbavboa, Matthew Ikuabe, Opeoluwa Akinradewo

Abstract:

Contemporary building methods typically pay little attention to the built environment's greater economic, environmental, or social impacts or energy efficiency. Green construction aims to sever ties with these conventions. In order to provide better living and working conditions and lessen environmental consequences, green building today combines numerous building design, construction, and operation and maintenance approaches. As one of Sub-Saharan Africa's most industrialized nations, South Africa has a good number of green building projects. Therefore, this study examines the elements impacting the adoption of green buildings and regulations created to encourage the growth of green buildings using South Africa as a case study. The study has a survey-style design. A total of one hundred fifty (150) questionnaires were distributed to professionals in the construction industry in South Africa, of which one hundred and twenty-four (128) were returned and judged appropriate for investigation. The gathered data was examined using percentage, mean item scores, standard deviation, and Kruskal-Wallis. The findings show that cost and market circumstances are the two main elements impacting the adoption of green construction, while leadership advice is the most important policy. The study concluded that in order to encourage the construction of green buildings, additional Sub-Saharan nations should adopt these suggested policies.

Keywords: green building, Sub-Saharan Africa, building design, environmental conditions

Procedia PDF Downloads 104
13244 Infrastructure Project Management and Implementation: A Case Study Of the Mokolo-Crocodile Water Augmentation Project in South Africa

Authors: Elkington Sibusiso Mnguni

Abstract:

The Mokolo-Crocodile Water Augmentation Project (MCWAP) is located in the Limpopo Province in the northern-western part of South Africa. Its purpose is to increase water supply by 30 million cubic meters per year to meet current and future demand for users, including power stations, mining houses, and the local municipality in the Lephalale area. This paper documents the planning and implementation aspects of the MCWAP infrastructure project. The study will add to the body of knowledge with respect to bulk water infrastructure development in water-scarce regions. The method used to gather and collate relevant data and information was the desktop study. The key finding was that the project was successfully completed in 2015 using conventional project management and construction methods. The project is currently being operated and maintained by the National Department of Water and Sanitation.

Keywords: construction, contract management, infrastructure project, project management

Procedia PDF Downloads 291
13243 The Eco-Efficient Construction: A Review of Embodied Energy in Building Materials

Authors: Francesca Scalisi, Cesare Sposito

Abstract:

The building construction industry consumes a large amount of resources and energy, both during construction (embodied energy) and during the operational phase (operating energy). This paper presents a review of the literature on low carbon and low embodied energy materials in buildings. The embodied energy comprises the energy consumed during the extraction, processing, transportation, construction, and demolition of building materials. While designing a nearly zero energy building, it is necessary to choose and use materials, components, and technologies that allow to reduce the consumption of energy and also to reduce the emissions in the atmosphere during all the Life Cycle Assessment phases. The appropriate choice of building materials can contribute decisively to reduce the energy consumption of the building sector. The increasing worries for the environmental impact of construction materials are witnessed by a lot of studies. The mentioned worries have brought again the attention towards natural materials. The use of more sustainable construction materials and construction techniques represent a major contribution to the eco-efficiency of the construction industry and thus to a more sustainable development.

Keywords: embodied energy, embodied carbon, life cycle assessment, architecture, sustainability, material construction

Procedia PDF Downloads 336
13242 Design Standardization in Aramco: Strategic Analysis

Authors: Mujahid S. Alharbi

Abstract:

The construction of process plants in oil and gas-producing countries, such as Saudi Arabia, necessitates substantial investment in design and building. Each new plant, while unique, includes common building types, suggesting an opportunity for design standardization. This study investigates the adoption of standardized Issue For Construction (IFC) packages for non-process buildings in Saudi Aramco. A SWOT analysis presents the strengths, weaknesses, opportunities, and threats of this approach. The approach's benefits are illustrated using the Hawiyah Unayzah Gas Reservoir Storage Program (HUGRSP) as a case study. Standardization not only offers significant cost savings and operational efficiencies but also expedites project timelines, reduces the potential for change orders, and fosters local economic growth by allocating building tasks to local contractors. Standardization also improves project management by easing interface constraints between different contractors and promoting adaptability to future industry changes. This research underscores the standardization of non-process buildings as a powerful strategy for cost optimization, efficiency enhancement, and local economic development in process plant construction within the oil and gas sector.

Keywords: building, construction, management, project, standardization

Procedia PDF Downloads 58
13241 The Project Management for Quality Services in Special Education Schools

Authors: Aysegul Salikutluk, Zehra Altinay, Gokmen Dagli, Fahriye Altinay

Abstract:

The aim of the study is to reveal the performance of special education schools as regards the service quality and management within the school culture. The project management and school climate are the fundamental elements for the quality in organisations. Having strategic plans, activities and funded projects improve service quality and satisfaction for the families who have children with disabilities. The research has qualitative nature, self-reports were used to examine the perceptions of teachers upon project management and school climate for service quality. The results show that special education schools' teachers are aware of essence of school climate and flow of communication for service quality and project management.

Keywords: disability, education, service quality, project management

Procedia PDF Downloads 261
13240 Integrating Dependent Material Planning Cycle into Building Information Management: A Building Information Management-Based Material Management Automation Framework

Authors: Faris Elghaish, Sepehr Abrishami, Mark Gaterell, Richard Wise

Abstract:

The collaboration and integration between all building information management (BIM) processes and tasks are necessary to ensure that all project objectives can be delivered. The literature review has been used to explore the state of the art BIM technologies to manage construction materials as well as the challenges which have faced the construction process using traditional methods. Thus, this paper aims to articulate a framework to integrate traditional material planning methods such as ABC analysis theory (Pareto principle) to analyse and categorise the project materials, as well as using independent material planning methods such as Economic Order Quantity (EOQ) and Fixed Order Point (FOP) into the BIM 4D, and 5D capabilities in order to articulate a dependent material planning cycle into BIM, which relies on the constructability method. Moreover, we build a model to connect between the material planning outputs and the BIM 4D and 5D data to ensure that all project information will be accurately presented throughout integrated and complementary BIM reporting formats. Furthermore, this paper will present a method to integrate between the risk management output and the material management process to ensure that all critical materials are monitored and managed under the all project stages. The paper includes browsers which are proposed to be embedded in any 4D BIM platform in order to predict the EOQ as well as FOP and alarm the user during the construction stage. This enables the planner to check the status of the materials on the site as well as to get alarm when the new order will be requested. Therefore, this will lead to manage all the project information in a single context and avoid missing any information at early design stage. Subsequently, the planner will be capable of building a more reliable 4D schedule by allocating the categorised material with the required EOQ to check the optimum locations for inventory and the temporary construction facilitates.

Keywords: building information management, BIM, economic order quantity, EOQ, fixed order point, FOP, BIM 4D, BIM 5D

Procedia PDF Downloads 167
13239 Building Information Modelling: A Review to Indian Scenario

Authors: P. Agnivesh, P. V. Ponambala Moorthi

Abstract:

Evolution of information modelling leads to the visualisation of well-organized built environment. Building Information Modelling (BIM) is considered as evolution in the off-site construction which essentially enhances and controls the present scenario of on-site construction paradigms. Promptness, sustainability and security are considered as the important characteristics of the building information modelling. Projects that uses BIM are tied firmly by technology but distributed organizationally. This allows different team members in the project to associate and integrate the works and work flows. This will in turn improve the efficiency of work breakdown structure. Internationally BIM had been accepted as modern computer aided way of information sharing by construction industry for efficient way of manipulation in order to avoid the on-site misperceptions. Even though, in developing countries like India BIM is in the phase of start and requires lot of mandates and policies to be brought about by the government for its widespread implementations. This paper reviews the current scenario of BIM worldwide and in India and suggests for the improved implementation of building modelling for Indian policy condition.

Keywords: building information modelling, Indian polity, information modelling, information sharing, mandates and policies, sustainability.

Procedia PDF Downloads 368
13238 Bridge Construction and Type of Bridges and Their Construction Methods

Authors: Mokhtar Nikgoo

Abstract:

Definition of bridge: A bridge is a structure that allows people to pass through the communication road with two points. There are many different types of bridges, each of which is designed to perform a specific function. This article introduces the concept, history, components, uses, types, construction methods, selected factors, damage factors and principles of bridge maintenance. A bridge is a structure to cross a passage such as a water, valley or road without blocking another path underneath. This structure makes it possible to pass obstacles that are difficult or impossible to pass. There are different designs for bridge construction, each of which is used for a particular function and condition. In the old definition, a bridge is an arch over a river, valley, or any type of passage that makes traffic possible. But today, in the topic of urban management, the bridge is considered as a structure to cross physical barriers, so that while using space (not just the surface of the earth), it can facilitate the passage and access to places. The useful life of bridges may be between 30 and 80 years depending on the location and the materials used. But with proper maintenance and improvement, their life may last for hundreds of years.

Keywords: bridge, road construction, surveying, transportation

Procedia PDF Downloads 502
13237 Treatment of Dredged Marine Sediments for Their Reuse in Road Construction

Authors: F. Ben Abdelghani, W. Maherezi

Abstract:

Dredging operations generate, each year, a great quantity of marine sediments. These raw materials can not be used in road construction without a specific treatment process. Sediments suitability tests has shown that most of studied sediments are not suitable to be used in road construction. In order to improve their compacity and their mechanical performance, addition of a granular material is recommended. The use of a dredged sand, to improve the granular mixture containing sediments, allows a better management of the two types of dredge materials (sand and sediment). In this study, a new road material containing dredged marine sediments and dredged sand is formulated and treated by adding various binders. Mechanical performance investigation of different mixtures by measuring Proctor-IPI values and simple compressive strengths is realized.

Keywords: dredged sediments, suitability tests, road construction, hydraulic binder, mechanical performance

Procedia PDF Downloads 359
13236 Risk Management for Smart Healthcare System: A Hybrid Multi-Criteria Decision-Making Framework

Authors: Abdullah Ali Salamai

Abstract:

Smart healthcare management systems (SHMS) play a vital role in medical centers. SHMS has various risks and threats that affect patient care. So, risk management is the best choice to identify and mitigate these risks. This study proposed a multi-criteria decision-making (MCDM) framework for identifying risks in SHMS and selecting the best project in SHMS to reduce risks. This study used the MCDM method to deal with conflict criteria. There are two MCDM methods: CRiteria Importance Through Intercriteria Correlation (CRITIC) and Additive Ration Assessment (ARAS). The CRITIC approach is used to compute the criteria weights, and the ARAS algorithm is used to select the appropriate projects in SHMS. The neutrosophic set (NS) was applied with MCDM methods to deal with inconsistent data in the evaluation process. The results show the Health Data Informational System project is the best. Sensitivity analysis was conducted to show the stability of the rank. The comparative study was conducted to show the effectiveness of the proposed methodology. The outcomes demonstrate the rank of projects is stable through all scenarios, and the proposed methodology is effective compared with other MCDM methods.

Keywords: risk management, portfolio management, smart healthcare, neutrosophic set, MCDM

Procedia PDF Downloads 22
13235 Integrating Music on Construction Sites: Key Benefits and Cautions: A Literature Perspective

Authors: Oluwatayomi Daniel Fadumo, Chinyere Celestina Esimone

Abstract:

The construction industry, as a massive human capital-related sector, requires an always motivated workforce. The inability to maintain this state has been found to hamper productivity which ultimately leads to poor project delivery, infrastructural development decline, and low morale among citizens. The need to develop an approach to keep this set of people inspired before, during, and after work becomes a necessity; this paper aims to evaluate the key benefits and cautions in integrating music on construction sites in Nigeria to improve effective project delivery. In attaining this, the study identified the advantages of music on construction sites, evaluated the key considerations in introducing music on construction sites, and recommended measures for the effective integration of music on construction sites in Nigeria. The study is a descriptive research through the use of secondary data gleaned from relevant literature, journals, and research sites. The study concluded that different forms of music genres can be implemented ranging from Pop music, rock, metal, and classical music. Introducing music has the advantage of industrial branding, improving workers` morale, setting the pace for working, helping in information retention, and improving mental health and happiness. The key consideration, however, is to provide the right volume and music that doesn’t pose health and safety challenges. The study finally recommended that for effective integration of music on construction sites in Nigeria, policies should be drafted regulating its use, specific radio customized for the site be introduced and that research-based music, proven to have previously helped, should be given to a group of workers.

Keywords: music, construction sites, workers, construction industry, construction management practice

Procedia PDF Downloads 42
13234 Adverse Curing Conditions and Performance of Concrete: Bangladesh Perspective

Authors: T. Manzur

Abstract:

Concrete is the predominant construction material in Bangladesh. In large projects, stringent quality control procedures are usually followed under the supervision of experienced engineers and skilled labors. However, in the case of small projects and particularly at distant locations from major cities, proper quality control is often an issue. It has been found from experience that such quality related issues mainly arise from inappropriate proportioning of concrete mixes and improper curing conditions. In most cases external curing method is followed which requires supply of adequate quantity of water along with proper protection against evaporation. Often these conditions are found missing in the general construction sites and eventually lead to production of weaker concrete both in terms of strength and durability. In this study, an attempt has been made to investigate the performance of general concreting works of the country when subjected to several adverse curing conditions that are quite common in various small to medium construction sites. A total of six different types of adverse curing conditions were simulated in the laboratory and samples were kept under those conditions for several days. A set of samples was also submerged in normal curing condition having proper supply of curing water. Performance of concrete was evaluated in terms of compressive strength, tensile strength, chloride permeability and drying shrinkage. About 37% and 25% reduction in 28-day compressive and tensile strength were observed respectively, for samples subjected to most adverse curing condition as compared to the samples under normal curing conditions. Normal curing concrete exhibited moderate permeability (close to low permeability) whereas concrete under adverse curing conditions showed very high permeability values. Similar results were also obtained for shrinkage tests. This study, thus, will assist concerned engineers and supervisors to understand the importance of quality assurance during the curing period of concrete.

Keywords: adverse, concrete, curing, compressive strength, drying shrinkage, permeability, tensile strength

Procedia PDF Downloads 193
13233 Tender Systems and Processes within the Mauritian Construction Industry: Investigating the Predominance of International Firms and the Lack of Absorptive Capacity in Local Firms

Authors: K. Appasamy, P. Paul

Abstract:

Mauritius, a developing small-island-state, is facing a recession which is having a considerable economic impact particularly on its construction sector. Further, the presence of foreign entities, both as companies and workers, within this sector is creating a very competitive environment for local firms. This study investigates the key drivers that allow foreign firms to participate in this sector, in particular looking at the international and local tender processes, and the capacity of local industry to participate. This study also looks at how the current set up may hinder the latter’s involvement. The methodology used included qualitative semi-structured interviews conducted with established foreign companies, local companies, and public bodies. Study findings indicate: there is an adequate availability of professional skills and expertise within the Mauritian construction industry but a lack of skilled labour especially at the operative level; projects awarded to foreign firms are either due to their uniqueness and hence lack of local knowledge, or due to foreign firms having lower tender bids; tendering systems and processes are weak, including monitoring and enforcement, which encourages corruption and favouritism; a high level of ignorance of this sector’s characteristics and opportunities exists amongst the local population; local entities are very profit oriented and have short term strategies that discourage long term investment in workforce training and development; but most importantly, stakeholders do not grasp the importance of encouraging youngsters to join this sector, they have no long term vision, and there is a lack of mutual involvement and collaboration between them. Although local industry is highly competent, qualified and experienced, the tendering and procurement systems in Mauritius are not conducive enough to allow for effective strategic planning and an equitable allocation of projects during an economic downturn so that the broadest spread of stakeholders’ benefit. It is of utmost importance that all sector and government entities collaborate to formulate strategies and reforms on tender processes and capacity building to ensure fairness and continuous growth of this sector in Mauritius.

Keywords: construction industry, tender process, international firms, local capacity, Mauritius

Procedia PDF Downloads 314
13232 The Systems Theoretic Accident Model and Process (Stamp) as the New Trend to Promote Safety Culture in Construction

Authors: Natalia Ortega

Abstract:

Safety Culture (SCU) involves various perceptual, psychological, behavioral, and managerial factors. It has been shown that creating and maintaining an SCU is one way to reduce and prevent accidents and fatalities. In the construction sector, safety attitude, knowledge, and a supportive environment are predictors of safety behavior. The highest possible proportion of safety behavior among employees can be achieved by improving their safety attitude and knowledge. Accordingly, top management's commitment to safety is vital in shaping employees' safety attitude; therefore, the first step to improving employees' safety attitude is the genuine commitment of top management to safety. One of the factors affecting the successful implementation of health and safety promotion programs is the construction industry's subcontracting model. The contractual model's complexity, combined with the need for coordination among diverse stakeholders, makes it challenging to implement, manage, and follow up on health and well-being initiatives. The Systems theoretic accident model and process (STAMP) concept has expanded global consideration in recent years, increasing research attention. STAMP focuses attention on the role of constraints in safety management. The findings discover a growth of the research field from the definition in 2004 by Leveson and is being used across multiple domains. A systematic literature review of this novel model aims to meet the safety goals for human space exploration with a powerful and different approach to safety management, safety-driven design, and decision-making. Around two hundred studies have been published about applying the model. However, every single model for safety requires time to transform into research and practice, be tested and debated, and grow further and mature.

Keywords: stamp, risk management, accident prevention, safety culture, systems thinking, construction industry, safety

Procedia PDF Downloads 76
13231 Qualitative and Quantitative Research Methodology Theoretical Framework and Descriptive Theory: PhD Construction Management

Authors: Samuel Quashie

Abstract:

PhDs in Construction Management often designs their methods based on those established in social sciences using theoretical models, to collect, gather and analysis data to answer research questions. Work aim is to apply qualitative and quantitative as a data analysis method, and as part of the theoretical framework - descriptive theory. To improve the ability to replicate the contribution to knowledge the research. Using practical triangulation approach, which covers, interviews and observations, literature review and (archival) document studies, project-based case studies, questionnaires surveys and review of integrated systems used in, construction and construction related industries. The clarification of organisational context and management delivery that influences organizational performance and quality of product and measures are achieved. Results illustrate improved reliability in this research approach when interpreting real world phenomena; cumulative results of research can be applied with confidence under similar environments. Assisted validity of the PhD research outcomes and strengthens the confidence to apply cumulative results of research under similar conditions in the Built Environment research systems, which have been criticised for the lack of reliability in approaches when interpreting real world phenomena.

Keywords: case studies, descriptive theory, theoretical framework, qualitative and quantitative research

Procedia PDF Downloads 375
13230 A Lightweight Interlock Block from Foamed Concrete with Construction and Agriculture Waste in Malaysia

Authors: Nor Azian Binti Aziz, Muhammad Afiq Bin Tambichik, Zamri Bin Hashim

Abstract:

The rapid development of the construction industry has contributed to increased construction waste, with concrete waste being among the most abundant. This waste is generated from ready-mix batching plants after the concrete cube testing process is completed and disposed of in landfills, leading to increased solid waste management costs. This study aims to evaluate the engineering characteristics of foamed concrete with waste mixtures construction and agricultural waste to determine the usability of recycled materials in the construction of non-load-bearing walls. This study involves the collection of construction wastes, such as recycled aggregates (RCA) obtained from the remains of finished concrete cubes, which are then tested in the laboratory. Additionally, agricultural waste, such as rice husk ash, is mixed into foamed concrete interlock blocks to enhance their strength. The optimal density of foamed concrete for this study was determined by mixing mortar and foam-backed agents to achieve the minimum targeted compressive strength required for non-load-bearing walls. The tests conducted in this study involved two phases. In Phase 1, elemental analysis using an X-ray fluorescence spectrometer (XRF) was conducted on the materials used in the production of interlock blocks such as sand, recycled aggregate/recycled concrete aggregate (RCA), and husk ash paddy/rice husk ash (RHA), Phase 2 involved physical and thermal tests, such as compressive strength test, heat conductivity test, and fire resistance test, on foamed concrete mixtures. The results showed that foamed concrete can produce lightweight interlock blocks. X-ray fluorescence spectrometry plays a crucial role in the characterization, quality control, and optimization of foamed concrete mixes containing construction and agriculture waste. The unique composition mixer of foamed concrete and the resulting chemical and physical properties, as well as the nature of replacement (either as cement or fine aggregate replacement), the waste contributes differently to the performance of foamed concrete. Interlocking blocks made from foamed concrete can be advantageous due to their reduced weight, which makes them easier to handle and transport compared to traditional concrete blocks. Additionally, foamed concrete typically offers good thermal and acoustic insulation properties, making it suitable for a variety of building projects. Using foamed concrete to produce lightweight interlock blocks could contribute to more efficient and sustainable construction practices. Additionally, RCA derived from concrete cube waste can serve as a substitute for sand in producing lightweight interlock blocks.

Keywords: construction waste, recycled aggregates (RCA), sustainable concrete, structure material

Procedia PDF Downloads 49
13229 Modeling and Simulating Productivity Loss Due to Project Changes

Authors: Robert Pellerin, Michel Gamache, Remi Trudeau, Nathalie Perrier

Abstract:

The context of large engineering projects is particularly favorable to the appearance of engineering changes and contractual modifications. These elements are potential causes for claims. In this paper, we investigate one of the critical components of the claim management process: the calculation of the impacts of changes in terms of losses of productivity due to the need to accelerate some project activities. When project changes are initiated, delays can arise. Indeed, project activities are often executed in fast-tracking in an attempt to respect the completion date. But the acceleration of project execution and the resulting rework can entail important costs as well as induce productivity losses. In the past, numerous methods have been proposed to quantify the duration of delays, the gains achieved by project acceleration, and the loss of productivity. The calculation related to those changes can be divided into two categories: direct cost and indirect cost. The direct cost is easily quantifiable as opposed to indirect costs which are rarely taken into account during the calculation of the cost of an engineering change or contract modification despite several research projects have been made on this subject. However, proposed models have not been accepted by companies yet, nor they have been accepted in court. Those models require extensive data and are often seen as too specific to be used for all projects. These techniques are also ignoring the resource constraints and the interdependencies between the causes of delays and the delays themselves. To resolve this issue, this research proposes a simulation model that mimics how major engineering changes or contract modifications are handled in large construction projects. The model replicates the use of overtime in a reactive scheduling mode in order to simulate the loss of productivity present when a project change occurs. Multiple tests were conducted to compare the results of the proposed simulation model with statistical analysis conducted by other researchers. Different scenarios were also conducted in order to determine the impact the number of activities, the time of occurrence of the change, the availability of resources, and the type of project changes on productivity loss. Our results demonstrate that the number of activities in the project is a critical variable influencing the productivity of a project. When changes occur, the presence of a large number of activities leads to a much lower productivity loss than a small number of activities. The speed of reducing productivity for 30-job projects is about 25 percent faster than the reduction speed for 120-job projects. The moment of occurrence of a change also shows a significant impact on productivity. Indeed, the sooner the change occurs, the lower the productivity of the labor force. The availability of resources also impacts the productivity of a project when a change is implemented. There is a higher loss of productivity when the amount of resources is restricted.

Keywords: engineering changes, indirect costs overtime, productivity, scheduling, simulation

Procedia PDF Downloads 234
13228 An Assessment of the Factors Affecting Green Building Technology (GBT) Adoption

Authors: Nuruddeen Usman, Usman Mohammed Gidado

Abstract:

A construction and post construction activity in buildings contributes to environmental degradation, because of the generation of solid waste during construction to the production of carbon dioxide by the occupants during utilization. These problems were caused as a result of lack of adopting green building technology during and after construction. However, this study aims at conceptualizing the factors that are affecting the adoption of green building technology with a view to suggest better ways for its successful adoption in the construction industry through developing a green building technology model. Thus, the research findings show that: Economic, social, cultural, and technological progresses are the factors affecting Green Building Technology Adoption. Therefore, identifying these factors and developing the model might help in the successful adoption of green building technology.

Keywords: green building technology, construction, post construction, degradation

Procedia PDF Downloads 651
13227 Dynamics of the Landscape in the Different Colonization Models Implemented in the Legal Amazon

Authors: Valdir Moura, FranciléIa De Oliveira E. Silva, Erivelto Mercante, Ranieli Dos Anjos De Souza, Jerry Adriani Johann

Abstract:

Several colonization projects were implemented in the Brazilian Legal Amazon in the 1970s and 1980s. Among all of these colonization projects, the most prominent were those with the Fishbone and Topographic models. Within this scope, the projects of settlements known as Anari and Machadinho were created, which stood out because they are contiguous areas with different models and structure of occupation and colonization. The main objective of this work was to evaluate the dynamics of Land-Use and Land-Cover (LULC) in two different colonization models, implanted in the State of Rondonia in the 1980s. The Fishbone and Topographic models were implanted in the Anari and Machadinho settlements respectively. The understanding of these two forms of occupation will help in future colonization programs of the Brazilian Legal Amazon. These settlements are contiguous areas with different occupancy structures. A 32-year Landsat time series (1984-2016) was used to evaluate the rates and trends in the LULC process in the different colonization models. In the different occupation models analyzed, the results showed a rapid loss of primary and secondary forests (deforestation), mainly due to the dynamics of use, established by the Agriculture/Pasture (A/P) relation and, with heavy dependence due to road construction.

Keywords: land-cover, deforestation, rate fragments, remote sensing, secondary succession

Procedia PDF Downloads 129
13226 A Systematic Snapshot of Software Outsourcing Challenges

Authors: Issam Jebreen, Eman Al-Qbelat

Abstract:

Outsourcing software development projects can be challenging, and there are several common challenges that organizations face. A study was conducted with a sample of 46 papers on outsourcing challenges, and the results show that there are several common challenges faced by organizations when outsourcing software development projects. Poor outsourcing relationship was identified as the most significant challenge, with 35% of the papers referencing it. Lack of quality was the second most significant challenge, with 33% of the papers referencing it. Language and cultural differences were the third most significant challenge, with 24% of the papers referencing it. Non-competitive price was another challenge faced by organizations, with 21% of the papers referencing it. Poor coordination and communication were also identified as a challenge, with 21% of the papers referencing it. Opportunistic behavior, lack of contract negotiation, inadequate user involvement, and constraints due to time zone were also challenges faced by organizations. Other challenges faced by organizations included poor project management, lack of technical capabilities, vendor employee high turnover, poor requirement specification, IPR issues, poor management of budget, schedule, and delay, geopolitical and country instability, the difference in development methodologies, failure to manage end-user expectations, and poor monitoring and control. In conclusion, outsourcing software development projects can be challenging, but organizations can mitigate these challenges by selecting the right outsourcing partner, having a well-defined contract and clear communication, having a clear understanding of the requirements, and implementing effective project management practices.

Keywords: software outsourcing, vendor, outsourcing challenges, quality model, continent, country, global outsourcing, IT workforce outsourcing.

Procedia PDF Downloads 84
13225 Building Information Modelling: A Solution to the Limitations of Prefabricated Construction

Authors: Lucas Peries, Rolla Monib

Abstract:

The construction industry plays a vital role in the global economy, contributing billions of dollars annually. However, the industry has been struggling with persistently low productivity levels for years, unlike other sectors that have shown significant improvements. Modular and prefabricated construction methods have been identified as potential solutions to boost productivity in the construction industry. These methods offer time advantages over traditional construction methods. Despite their potential benefits, modular and prefabricated construction face hindrances and limitations that are not present in traditional building systems. Building information modelling (BIM) has the potential to address some of these hindrances, but barriers are preventing its widespread adoption in the construction industry. This research aims to enhance understanding of the shortcomings of modular and prefabricated building systems and develop BIM-based solutions to alleviate or eliminate these hindrances. The research objectives include identifying and analysing key issues hindering the use of modular and prefabricated building systems, investigating the current state of BIM adoption in the construction industry and factors affecting its successful implementation, proposing BIM-based solutions to address the issues associated with modular and prefabricated building systems, and assessing the effectiveness of the developed solutions in removing barriers to their use. The research methodology involves conducting a critical literature review to identify the key issues and challenges in modular and prefabricated construction and BIM adoption. Additionally, an online questionnaire will be used to collect primary data from construction industry professionals, allowing for feedback and evaluation of the proposed BIM-based solutions. The data collected will be analysed to evaluate the effectiveness of the solutions and their potential impact on the adoption of modular and prefabricated building systems. The main findings of the research indicate that the identified issues from the literature review align with the opinions of industry professionals, and the proposed BIM-based solutions are considered effective in addressing the challenges associated with modular and prefabricated construction. However, the research has limitations, such as a small sample size and the need to assess the feasibility of implementing the proposed solutions. In conclusion, this research contributes to enhancing the understanding of modular and prefabricated building systems' limitations and proposes BIM-based solutions to overcome these limitations. The findings are valuable to construction industry professionals and BIM software developers, providing insights into the challenges and potential solutions for implementing modular and prefabricated construction systems in future projects. Further research should focus on addressing the limitations and assessing the feasibility of implementing the proposed solutions from technical and legal perspectives.

Keywords: building information modelling, modularisation, prefabrication, technology

Procedia PDF Downloads 88
13224 Managing a Cross-Disciplinary Research Project in a University: The Case of LEARNIT

Authors: Yulia Stukalina

Abstract:

This paper explores the main issues related to implementing a cross-disciplinary research project (LEARNIT) based on collaboration between universities from three European countries. The paper discusses the importance of using the holistic approach to managing scientific projects with due account for the complicated nature of the educational environment of a modern university. To illustrate this approach, the author describes some actions to be taken for supporting different focus areas of LEARNIT project, in the process using integrated tangible, non-tangible, and semi-tangible resources of the partner university. The methodology of the paper is based on the academic literature and research papers analysis within management discipline. The analysis reported in the paper is also based on the author’s professional experience in the area of managing international research projects in a university.

Keywords: LEARNIT, focus area, project management, resources

Procedia PDF Downloads 267
13223 Suburban Large Residential Area Development Strategy with an Example of Liangzhu Culture Village in Hangzhou

Authors: Liang Fang

Abstract:

The development of the large suburban residential area is a product of the leap development during the rapid urbanization process in China. On the process of the large-scale development of large settlements in a short time, various problems arose in the suburban residential area, such as spatial layout being disorder, basic facilities construction lagging behind and being unreasonable, residential neighborhood space and street culture missing. Aimed at the contradictions mentioned above, exploring a way is imminent to construct appropriate residential area. We select a typical Liangzhu Culture Village in Hangzhou and put forward functional composite residential area of fine development strategy, along which business promotes and assists community autonomy and then a good community culture is constructed. All in all, the development and construction mode, contributing to an all-people and full-time participation, is beneficial to create a harmonious community of sustainable development, which gives good implication to a single enterprise development city real estate projects.

Keywords: community autonomy, development and construction mode, functional composite, suburban large residential area

Procedia PDF Downloads 350
13222 Familiarity with Engineering Project Management And Their Duties In Projects

Authors: Mokhtar Nikgoo

Abstract:

Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.

Keywords: project management, crisis management, project delays bill, project duration

Procedia PDF Downloads 48
13221 Examination of the Impact of Projects Based on Reggio Emilia Approach on the Creative Thinking Skills of Preschool Children: A Qualitative Study

Authors: Arzu Akar Gençer, Mübeccel Gönen

Abstract:

The objective of the study is to investigate the impact of the projects based on Reggio Emilia Approach, on the creative thinking skills of preschool children. The study is carried out with eighteen 6 years old children in a class of a preschool, and entailed the development of projects based on Reggio Emilia approach with the children, for a period of 3 months. The study employs qualitative model. The children were analyzed with reference to the creative thinking aspects (rationality, originality, flexibility, and applicability) of the projects applied. As the projects based on Reggio Emilia approach arose out of the interests and curiosity of the children, and had their roots in the existing class culture, it is possible to conclude that they have an impact on the creativity of the children with reference to the aspects of creative thinking.

Keywords: Reggio Emilia approach, project, creativity, preschool children

Procedia PDF Downloads 568
13220 Investigating Causes of Pavement Deterioration in Khartoum State, Sudan

Authors: Magdi Mohamed Eltayeb Zumrawi

Abstract:

It is quite essential to investigate the causes of pavement deterioration in order to select the proper maintenance technique. The objective of this study was to identify factors cause deterioration of recently constructed roads in Khartoum state. A comprehensive literature concerning the factors of road deterioration, common road defects and their causes were reviewed. Three major road projects with different deterioration reasons were selected for this study. The investigation involved field survey and laboratory testing on those projects to examine the existing pavement conditions. The results revealed that the roads investigated experienced severe failures in the forms of cracks, potholes and rutting in the wheel path. The causes of those failures were found mainly linked to poor drainage, traffic overloading, expansive subgrade soils and the use of low quality materials in construction. Based on the results, recommendations were provided to help highway engineers in selecting the most effective repair techniques for specific kinds of distresses.

Keywords: pavement, deterioration, causes, failures

Procedia PDF Downloads 350
13219 Stress Variation of Underground Building Structure during Top-Down Construction

Authors: Soo-yeon Seo, Seol-ki Kim, Su-jin Jung

Abstract:

In the construction of a building, it is necessary to minimize construction period and secure enough work space for stacking of materials during the construction especially in city area. In this manner, various top-down construction methods have been developed and widely used in Korea. This paper investigates the stress variation of underground structure of a building constructed by using SPS (Strut as Permanent System) known as a top-down method in Korea through an analytical approach. Various types of earth pressure distribution related to ground condition were considered in the structural analysis of an example structure at each step of the excavation. From the analysis, the most high member force acting on beams was found when the ground type was medium sandy soil and a stress concentration was found in corner area.

Keywords: construction of building, top-down construction method, earth pressure distribution, member force, stress concentration

Procedia PDF Downloads 298
13218 Environment and Social Management Strategy at Kuwait Integrated Petroleum Industries Company

Authors: Hannan Al-Qanai, Haitham Mustafa, Rajeswaran Sivasankar

Abstract:

Kuwait Integrated Petroleum Industries Company (KIPIC, Company), established in 2016 as a subsidiary to Kuwait Petroleum Corporation (KPC), is responsible for operating and managing the largest grassroots integrated complex for refining, petrochemicals manufacture businesses, and liquefied natural gas import facilities at Al-Zour, Kuwait. KIPIC and its Contractors/sub-contractors employ over 69,000 staff in its current projects at Al-Zour during peak construction activity. KIPIC holds a unique responsibility to the society, which includes all stakeholders, and demonstrates its social commitment in developing an integrated environment & social management system (ESMS) and ensuring sustainability. This paper mainly demonstrates the knowledge on corporate branding from a corporate social responsibility (CSR) perspective and presents the achievements and best practices of KIPIC in the field of CSR and the challenges faced in handling social issues. Moreover, the study is based on qualitative data abstracted from KIPIC Health, Safety, Security & Environment Management System (HSSE MS) procedures, audit reports, the outcome of counseling sessions, national and international laws and regulations, and International Guidelines on Environment and Social Management System (ESMS). KIPIC has committed to caring for the environmental concerns and acting on social as they do on profits and economic growth. The main findings of this paper are that the successful implementation and operationalization of CSR within an organization depends on a simple but stringent process with both top-down and bottom-up commitment.

Keywords: welfare, corporate social responsibility, social management, sustainability

Procedia PDF Downloads 203
13217 Partner Selection for Innovation Projects Related to New Product Concept Design

Authors: Odd Jarl Borch, Marina Z. Solesvik

Abstract:

The paper analyses partner selection approaches related to large scale R&D-based innovation projects at the different stages of development. We emphasize innovation projects in the maritime value chain and how partners are selected to improve quality according to high spec customer demands, and to reduce investment costs on new production technology such as advanced offshore service vessels. We elaborate on the differences in innovation approach and especially the role that purposive inflows and outflows of knowledge from external partners may be used to accelerate internal innovation. We present three cases related to different projects in terms of specificity and scope. We explore how the partner selection criteria change over time when the goals move from wide scope to a very specific R&D tasks.

Keywords: partner selection, innovation, offshore industry, concept design

Procedia PDF Downloads 506