Search results for: construction and geological engineering
6572 Ranking of the Main Criteria for Contractor Selection Procedures on Major Construction Projects in Libya Using the Delphi Method
Authors: Othoman Elsayah, Naren Gupta, Binsheng Zhang
Abstract:
The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then, the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.Keywords: contractor selection, Libyan construction industry, decision experts, Delphi technique
Procedia PDF Downloads 3326571 Safety Climate Assessment and Its Impact on the Productivity of Construction Enterprises
Authors: Krzysztof J. Czarnocki, F. Silveira, E. Czarnocka, K. Szaniawska
Abstract:
Research background: Problems related to the occupational health and decreasing level of safety occur commonly in the construction industry. Important factor in the occupational safety in construction industry is scaffold use. All scaffolds used in construction, renovation, and demolition shall be erected, dismantled and maintained in accordance with safety procedure. Increasing demand for new construction projects unfortunately still is linked to high level of occupational accidents. Therefore, it is crucial to implement concrete actions while dealing with scaffolds and risk assessment in construction industry, the way on doing assessment and liability of assessment is critical for both construction workers and regulatory framework. Unfortunately, professionals, who tend to rely heavily on their own experience and knowledge when taking decisions regarding risk assessment, may show lack of reliability in checking the results of decisions taken. Purpose of the article: The aim was to indicate crucial parameters that could be modeling with Risk Assessment Model (RAM) use for improving both building enterprise productivity and/or developing potential and safety climate. The developed RAM could be a benefit for predicting high-risk construction activities and thus preventing accidents occurred based on a set of historical accident data. Methodology/Methods: A RAM has been developed for assessing risk levels as various construction process stages with various work trades impacting different spheres of enterprise activity. This project includes research carried out by teams of researchers on over 60 construction sites in Poland and Portugal, under which over 450 individual research cycles were carried out. The conducted research trials included variable conditions of employee exposure to harmful physical and chemical factors, variable levels of stress of employees and differences in behaviors and habits of staff. Genetic modeling tool has been used for developing the RAM. Findings and value added: Common types of trades, accidents, and accident causes have been explored, in addition to suitable risk assessment methods and criteria. We have found that the initial worker stress level is more direct predictor for developing the unsafe chain leading to the accident rather than the workload, or concentration of harmful factors at the workplace or even training frequency and management involvement.Keywords: safety climate, occupational health, civil engineering, productivity
Procedia PDF Downloads 3196570 The HSBC Building in Shanghai: Diverse Styles of Ornament and the Construction of a Financial Empire
Authors: Lin Ji
Abstract:
The 1923 HSBC Building is one of the landmarks of Shanghai's Bund complex and is described as "one of the finest buildings from the Suez Canal to the Bering Strait". Mr George Leopold Wilson of Palmer&Turner and his design team combine the latest British design taste with Chinese elements and bring the high standard of London manufacturing to Shanghai. This paper reviews the establishment background and construction process of the Hongkong and Shanghai Bank Corporation in Shanghai, and analyzes the characteristics of various styles and ornament of HSBC. At the same time, using the research method of iconography, compared with Britain's exploration of modern design mode in the early 20th century, we can deeply understand how this "monument of world commerce and prosperity" realizes the identity construction of its financial empire in the Far East in the perfect combination of practicality and artistry.Keywords: early 20-century Shanghai, the bund, the HSBC building, classical styles, ornament, identity construction
Procedia PDF Downloads 1456569 Investigation of the Factors Influencing the Construction Planning Process Using Participant Observation Method
Authors: Ashokkumar Subbiah
Abstract:
This study investigates the impact of factors that influenced the success of construction planning for a major construction project in Qatar. An approach of participant observation is adopted which is informed by the principles of ethnography: one that reports the participants’ view of their world rather than imposing an artificial theoretical framework upon it. As participant observant, key factors were observed and identified that had an impact on the management and execution of the construction planning. It is found that a ‘shadow culture’ exists between the project participants which, it is argued, is only observable from the perspective of an embedded participant observer. The shadow culture acts to enable the management of the planning process, and its efficacy relates to the ‘quality’ of human inter-relationships amongst immediate stakeholders. Whilst this study uses the concept of shadow culture, it is treated as both a methodological stance and one of the findings of this research in the context of the major construction project in Qatar. The concept of shadow culture is not imposed upon the findings, but instead is used as a research tool: respondents report their own worldview and this is reported from the view of a participant observant in a manner that is understandable and useful to those who are not part of the construction project. The findings of this study identify similar factors influencing the planning process of the Qatar project, but the shadow culture predominantly influences these factors towards the failure of planning process. The research concludes by questioning the assumption that construction planning is a mechanistic process that has to be conducted solely by the planning team. Instead, it is a highly social phenomenon in which the seemingly mechanistic process is made workable by the quality of relationships that exist in the project. Drawing on this the final section provides a series of recommendations that may be helpful in enhancing the efficacy of project planning; these include better training/education at the pre-construction phase; recognition of the importance of shadow processes at management levels, and better appreciation of the impact of contract type and chosen procurement route.Keywords: construction planning, participant observation, project participants, shadow culture
Procedia PDF Downloads 3006568 Investigation of Lead and Zinc Oxide Deposits Using Geological and Geophysical Techniques at Oshiri Province in Onicha Local Government Area of Ebonyi State Located Within Southeastern Part of Nigeria, West Africa
Authors: Amaechi O. Azi, Uche D. Aluge, Lim H. San, Godwin A. Agbo
Abstract:
This paper is centered on the investigation of mineral deposits in selected locations in Oshiri province in Ebonyi State. Mineral deposits contribute immensely to the economic growth of a society. In researching lead and zinc oxide-bearing sites at Oshiri, geological and geophysical research technique was employed. Petrozenith, Earth Resistivity Meter, and Schlumberger setup were selected to examine the electrical characteristics of the subsurface. To determine the apparent resistivity of the subsurface, five soundings were taken, and the field data were processed using WinResist software. The mudstone, lead-shale, shale-granite, and lateritic topsoil were the four geoelectric strata that were found. The third layer, which corresponds to the shale-lead lithology, has a resistivity value between 211.9 m to 807.7 m at a depth of 25 m. Due to its resistivity levels and geological trend, this layer makes an excellent signature for lead-zinc occurrence. This zone is expected to house deposits of lead and zinc oxide in commercial quantity.Keywords: Schlumberger, current, resistivity, lithology
Procedia PDF Downloads 786567 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance
Authors: Ali Abdullah Albezaghi
Abstract:
This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.Keywords: risk management practices, external risks, internal risks, project risks, project performance
Procedia PDF Downloads 1386566 Towards Sustainable Construction in the United Arab Emirates: Challenges and Opportunities
Authors: Yousef Alqaryouti, Mariam Al Suwaidi, Raed Mohmood AlKhuwaildi, Hind Kolthoum, Issa Youssef, Mohammed Al Imam
Abstract:
The UAE has experienced rapid economic growth due to its mature oil production industry, leading to a surge in urbanization and infrastructure development in the construction sector. Sustainable development practices are becoming increasingly important, and the UAE government has taken proactive measures to promote them, including the introduction of sustainable building codes, energy-efficient technologies, and renewable energy sources. Initiatives such as the Masdar City project and the Emirates Green Building Council further demonstrate the government's commitment to a cleaner and healthier environment. By adopting sustainable practices, the UAE can reduce its carbon footprint, lessen its reliance on fossil fuels, and achieve cost savings in the long run. The purpose of this paper is to conduct a thorough review of the current state of sustainability in the construction industry of the UAE. Our research methodology includes a local market survey and qualitative observational analysis of executed housing construction projects by the Mohammed Bin Rashid Housing Establishment. The market survey assesses eleven different challenging factors that affect sustainable construction project delivery. The qualitative observational research is based on data collected from three projects, including construction progress, bill of quantity, and construction program. The study concludes that addressing these challenges requires a collaborative team approach, incentivized contracts, traditional project management practices, an integrated project team, and an increase in sustainability awareness among stakeholders. The recommendations proposed in this study aim to promote and improve the application of sustainability in the UAE's construction industry for the future.Keywords: sustainability, construction, challenges, opportunities, case study, market survey
Procedia PDF Downloads 576565 Overview of Time, Resource and Cost Planning Techniques in Construction Management Research
Authors: R. Gupta, P. Jain, S. Das
Abstract:
One way to approach construction scheduling optimization problem is to focus on the individual aspects of planning, which can be broadly classified as time scheduling, crew and resource management, and cost control. During the last four decades, construction planning has seen a lot of research, but to date, no paper had attempted to summarize the literature available under important heads. This paper addresses each of aspects separately, and presents the findings of an in-depth literature of the various planning techniques. For techniques dealing with time scheduling, the authors have adopted a rough chronological documentation. For crew and resource management, classification has been done on the basis of the different steps involved in the resource planning process. For cost control, techniques dealing with both estimation of costs and the subsequent optimization of costs have been dealt with separately.Keywords: construction planning techniques, time scheduling, resource planning, cost control
Procedia PDF Downloads 4886564 Media and Women Empowerment: An Exploration of TV Popular Shows in India
Authors: Mamita Panda
Abstract:
Popular shows are considered to be powerful medium for bringing social change and development. It has the responsibility for not only entertaining, but spreading awareness among common mass which it results social intervention in the major social institutions. Gender construction in one of these social institutions where one can build their capacity to construct a better human society. Mass media in general, TV in particular has an important intervening factor in responding to these processes. The obligatory role of media not only through news but popular shows (serials) becomes compulsion for social formation including construction through gender. This paper attempts to map and examine the gendered contents from serials including viewer’s response to understand the level of influence. The regression analysis shows that socio-economic factors have wider influence on understanding of gender equality including TV popular contents. The social construction of gender through serials remains a serious debatable issue and concern thereafter.Keywords: construction, empowerment, gender, media and women
Procedia PDF Downloads 5056563 Damage Assessment and Repair for Older Brick Buildings
Authors: Tim D. Sass
Abstract:
The experience of engineers and architects practicing today is typically limited to current building code requirements and modern construction methods and materials. However, many cities have a mix of new and old buildings with many buildings constructed over one hundred years ago when building codes and construction methods were much different. When a brick building sustains damage, a structural engineer is often hired to determine the cause of damage as well as determine the necessary repairs. Forensic studies of dozens of brick buildings shows an appreciation of historical building methods and materials is needed to correctly identify the cause of damage and design an appropriate repair. Damage on an older, brick building can be mistakenly attributed to storms or seismic events when the real source of the damage is deficient original construction. Assessing and remediating damaged brickwork on older brick buildings requires an understanding of the original construction, an understanding of older repair methods, and, an understanding of current building code requirements.Keywords: brick, damage, deterioration, facade
Procedia PDF Downloads 2286562 A Case Study: Social Network Analysis of Construction Design Teams
Authors: Elif D. Oguz Erkal, David Krackhardt, Erica Cochran-Hameen
Abstract:
Even though social network analysis (SNA) is an abundantly studied concept for many organizations and industries, a clear SNA approach to the project teams has not yet been adopted by the construction industry. The main challenges for performing SNA in construction and the apparent reason for this gap is the unique and complex structure of each construction project, the comparatively high circulation of project team members/contributing parties and the variety of authentic problems for each project. Additionally, there are stakeholders from a variety of professional backgrounds collaborating in a high-stress environment fueled by time and cost constraints. Within this case study on Project RE, a design & build project performed at the Urban Design Build Studio of Carnegie Mellon University, social network analysis of the project design team will be performed with the main goal of applying social network theory to construction project environments. The research objective is to determine a correlation between the network of how individuals relate to each other on one’s perception of their own professional strengths and weaknesses and the communication patterns within the team and the group dynamics. Data is collected through a survey performed over four rounds conducted monthly, detailed follow-up interviews and constant observations to assess the natural alteration in the network with the effect of time. The data collected is processed by the means of network analytics and in the light of the qualitative data collected with observations and individual interviews. This paper presents the full ethnography of this construction design team of fourteen architecture students based on an elaborate social network data analysis over time. This study is expected to be used as an initial step to perform a refined, targeted and large-scale social network data collection in construction projects in order to deduce the impacts of social networks on project performance and suggest better collaboration structures for construction project teams henceforth.Keywords: construction design teams, construction project management, social network analysis, team collaboration, network analytics
Procedia PDF Downloads 2026561 Use of Cyber-Physical Devices for the Implementation of Virtual and Augmented Realities in Bridge Construction
Authors: Muhammmad Fawad
Abstract:
The bridge construction industry has been revolutionized by the applications of Virtual Reality (VR) and Augmented Reality (AR). In this article, the author has focused on the field applications of digital technologies in structural, especially in bridge engineering. This research analyzed the use of VR/AR for the assessment of bridge concepts. For this purpose, the author has used Cyber-Physical Devices, i.e., Oculus Quest (OQ) for the implementation of VR, Trimble Microsoft HoloLens (THL), and Trimble Site Vision (TSV) for the implementation of AR/MR by visualizing the models of bridge planned to be constructed in Poland. The visualization of the models in Extended Reality (XR) is based on the development of BIM models of the bridge, which are further uploaded to the platforms required to implement these models in XR. This research helped to implement the models in MR so a bridge with a 1:1 scale at the exact location was placed, and authorities were presented with the possibility to visualize the exact scale and location of the bridge before its construction.Keywords: augmented reality, virtual reality, HoloLens, BIM, bridges
Procedia PDF Downloads 1236560 On the Construction of Some Optimal Binary Linear Codes
Authors: Skezeer John B. Paz, Ederlina G. Nocon
Abstract:
Finding an optimal binary linear code is a central problem in coding theory. A binary linear code C = [n, k, d] is called optimal if there is no linear code with higher minimum distance d given the length n and the dimension k. There are bounds giving limits for the minimum distance d of a linear code of fixed length n and dimension k. The lower bound which can be taken by construction process tells that there is a known linear code having this minimum distance. The upper bound is given by theoretic results such as Griesmer bound. One way to find an optimal binary linear code is to make the lower bound of d equal to its higher bound. That is, to construct a binary linear code which achieves the highest possible value of its minimum distance d, given n and k. Some optimal binary linear codes were presented by Andries Brouwer in his published table on bounds of the minimum distance d of binary linear codes for 1 ≤ n ≤ 256 and k ≤ n. This was further improved by Markus Grassl by giving a detailed construction process for each code exhibiting the lower bound. In this paper, we construct new optimal binary linear codes by using some construction processes on existing binary linear codes. Particularly, we developed an algorithm applied to the codes already constructed to extend the list of optimal binary linear codes up to 257 ≤ n ≤ 300 for k ≤ 7.Keywords: bounds of linear codes, Griesmer bound, construction of linear codes, optimal binary linear codes
Procedia PDF Downloads 7576559 Shape Management Method for Safety Evaluation of Bridge Based on Terrestrial Laser Scanning Using Least Squares
Authors: Gichun Cha, Dongwan Lee, Junkyeong Kim, Aoqi Zhang, Seunghee Park
Abstract:
All the world are studying the construction technology of double deck tunnel in order to respond to the increasing urban traffic demands and environmental changes. Advanced countries have the construction technology of the double deck tunnel structure. but the domestic country began research on it. Construction technologies are important. But Safety evaluation of structure is necessary to prevent possible accidents during construction. Thus, the double deck tunnel was required the shape management of middle slabs. The domestic country is preparing the construction of double deck tunnel for an alternate route and a pleasant urban environment. Shape management of double deck tunnel has been no research because it is a new attempted technology. The present, a similar study is bridge structure for the shape management. Bridge is implemented shape model using terrestrial laser scanning(TLS). Therefore, we proceed research on the bridge slabs because there is a similar structure of double deck tunnel. In the study, we develop shape management method of bridge slabs using TLS. We select the Test-bed for measurement site. This site is bridge located on Sungkyunkwan University Natural Sciences Campus. This bridge has a total length of 34m, the vertical height of 8.7m from the ground. It connects Engineering Building #1 and Engineering Building #2. Point cloud data for shape management is acquired the TLS and We utilized the Leica ScanStation C10/C5 model. We will confirm the Maximum displacement area of middle slabs using Least-Squares Fitting. We expect to raise stability for double deck tunnel through shape management for middle slabs.Keywords: bridge slabs, least squares, safety evaluation, shape management method, terrestrial laser scanning
Procedia PDF Downloads 2426558 Characterizing Compressive Strength of Compressed Stabilized Earth Blocks as a Function of Mix Design
Authors: Robert K. Hillyard, Jonathan Thomas, Brett A. Story
Abstract:
Compressed Stabilized Earth Blocks (CSEB) are masonry units that combine soil, sand, stabilizer, and water under pressure to form an earth block. These CSEB’s offer a cost-effective building solution for remote construction, using local resources and labor to minimize transportation and material costs. However, CSEB’s, and earthen construction generally have not been widely adopted as standardized construction materials. One shortcoming is the difficulty in standardizing strength values of CSEB units and systems due to the inherent variations in mix design, including production compression. This research presents findings on compressive strengths of full-scale CSEB’s from 60 different mix designs as a function of the amount of cement, sand, soil, and water added to the mixture. The full-scale results are compared with CSEB cylinder cores.Keywords: CSEB, compressive strength, earth construction, mix design
Procedia PDF Downloads 1006557 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review
Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui
Abstract:
Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.Keywords: cost overrun, public procurement, Saudi Arabia, construction projects
Procedia PDF Downloads 2716556 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory
Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy
Abstract:
Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.Keywords: fuzzy sets, uncertainty, qualitative factors, decision making
Procedia PDF Downloads 6556555 Optimizing Bridge Deck Construction: A Deep Neural Network Approach for Limiting Exterior Grider Rotation
Authors: Li Hui, Riyadh Hindi
Abstract:
In the United States, bridge construction often employs overhang brackets to support the deck overhang, the weight of fresh concrete, and loads from construction equipment. This approach, however, can lead to significant torsional moments on the exterior girders, potentially causing excessive girder rotation. Such rotations can result in various safety and maintenance issues, including thinning of the deck, reduced concrete cover, and cracking during service. Traditionally, these issues are addressed by installing temporary lateral bracing systems and conducting comprehensive torsional analysis through detailed finite element analysis for the construction of bridge deck overhang. However, this process is often intricate and time-intensive, with the spacing between temporary lateral bracing systems usually relying on the field engineers’ expertise. In this study, a deep neural network model is introduced to limit exterior girder rotation during bridge deck construction. The model predicts the optimal spacing between temporary bracing systems. To train this model, over 10,000 finite element models were generated in SAP2000, incorporating varying parameters such as girder dimensions, span length, and types and spacing of lateral bracing systems. The findings demonstrate that the deep neural network provides an effective and efficient alternative for limiting the exterior girder rotation for bridge deck construction. By reducing dependence on extensive finite element analyses, this approach stands out as a significant advancement in improving safety and maintenance effectiveness in the construction of bridge decks.Keywords: bridge deck construction, exterior girder rotation, deep learning, finite element analysis
Procedia PDF Downloads 636554 A Preliminary Study of the Subcontractor Evaluation System for the International Construction Market
Authors: Hochan Seok, Woosik Jang, Seung-Heon Han
Abstract:
The stagnant global construction market has intensified competition since 2008 among firms that aim to win overseas contracts. Against this backdrop, subcontractor selection is identified as one of the most critical success factors in overseas construction project. However, it is difficult to select qualified subcontractors due to the lack of evaluation standards and reliability. This study aims to identify the problems associated with existing subcontractor evaluations using a correlations analysis and a multiple regression analysis with pre-qualification and performance evaluation of 121 firms in six countries.Keywords: subcontractor evaluation system, pre-qualification, performance evaluation, correlation analysis, multiple regression analysis
Procedia PDF Downloads 3706553 Geophysical Approach in the Geological Characterization of a Dam Site: Case of the Chebabta-Dam, Meskiana, Oum El-Bouaghi
Authors: Benhammadi Hocine, Djamel Boubaya, Chaffai Hicham
Abstract:
Meskiana Area is characterized by a semi-arid climate where the water supply for irrigation and industry is not sufficient as the priority goes for domestic use. To meet the increasing population growth and development, the authorities have considered building a new water retaining structure on some major temporary water streams. For this purpose Chebabta site on Oued Meskiana was chosen as the future dam site. It is large enough to store the desired volume of water. This study comes to investigate the conditions of the site and the adequacy of the ground as a foundation for the projected dam. The conditions of the site include the geological structure and mainly the presence of discontinuities in the formation on which the dam will be built, the nature of the lithologies under the foundation and the future lake, and the presence of any hazard. This site characterization is usually carried out using different methods in order to highlight any underground buried problematic structure. In this context, the different geophysical technics remain the most used ones. Three geophysical methods were used in the case of the Chebabta dam site, namely, electric survey, seismic refraction, and tomography. The choice of the technics and the location of the scan line was made on the basis of the available geological data. In this sense, profiles have been established on both banks of Oued Meskiana. The obtained results have allowed a better characterization of the geological structure, defining the limit between the surface cover and the bedrock, which is, in other words, the limit between the weathered zone and the bedrock. Their respective thicknesses were also determined by seismic refraction and electrical resistivity sounding. However, the tomography imaging technic has succeeded in positioning a fault structure passing through the right bank of the wadi.Keywords: dam site, fault, geophysic, investigation, Meskiana
Procedia PDF Downloads 886552 The Challenges of Implementing Building Information Modeling in Small-Medium Enterprises Architecture Firms in Indonesia
Authors: Furry A. Wilis, Dewi Larasati, Suhendri
Abstract:
Around 96% of architecture firms in Indonesia are classified as small-medium enterprises (SME). This number shows that the SME firms have an important role in architecture, engineering, and construction (AEC) industry in Indonesia. Some of them are still using conventional system (2D based) in arranging construction project documents. This system is fragmented and not fully well-coordinated, so causes many changes in the whole project cycle. Building information modeling (BIM), as a new developed system in Indonesian construction industry, has been assumed can decrease changes in the project. But BIM has not fully implemented in Indonesian AEC industry, especially in SME architecture firms. This article identifies the challenges of implementing BIM in SME architecture firms in Indonesia. Quantitative-explorative research with questionnaire was chosen to achieve the goal of this article. The scarcity of skilled BIM user, low demand from client, high investment cost, and the unwillingness of the firm to switch into BIM were found as the result of this paper.Keywords: architecture consultants, BIM, SME, Indonesia
Procedia PDF Downloads 3436551 The Analysis of the Protection of Historical and Cultural Heritage in the Development of Cities: Taking Quzhou Ancient City as an Example
Authors: Zhen Shu
Abstract:
The historical and cultural heritage demonstrates the wisdom of the entire nation and it has left its own traces in the process of urban construction. It has very important instructional significance for the construction of modern cities and the development of cultural aspects of modern people. The Protection of historical and cultural heritage has become an inevitable choice for the development of modern civilization. This paper discusses the relationship between urban development and historic preservation. And it emphasizes the important value of strengthening the protection of historical and cultural heritage in urban construction, introduces the value of cultural heritage, the process of historic preservation and its problems in Quzhou, Zhejiang Province. In conclusion, we puts forward some Suggestions for strengthening the protection of historical heritage in the process of urban construction.Keywords: cultural heritage, historic preservation, Quzhou ancient city, urban development
Procedia PDF Downloads 2796550 Emotional Intelligence as a Predictor of Job Satisfaction in the Nigerian Construction Industry
Authors: Adedayo Johnson Ogungbile, Ayodeji Emmanuel Oke, Oluwaseyi Alabi Awodele
Abstract:
This study examines the role of emotional intelligence (EI) as a predictor of job satisfaction within the Nigerian construction industry. Utilizing a methodology that combines mean comparison and correlation analysis, the research explores how EI influences job satisfaction across diverse demographic and professional categories. The construction industry, known for its dynamic and often challenging work environment, provides a unique context to investigate how EI contributes to employee satisfaction. The findings reveal a significant positive correlation between EI and job satisfaction across the industry. Gender-based analysis shows that male employees typically report higher EI and job satisfaction levels compared to their female counterparts, although the impact of EI on job satisfaction is more substantial among women. The study further explores the relationship between trait EI and specific job satisfaction categories, identifying a general positive association with overall job satisfaction but not with supervisor-related satisfaction. Employees are categorized into four EI classes, consistently showing that higher EI levels correspond to greater job satisfaction. These findings align with existing literature, underscoring EI's pivotal role in enhancing job satisfaction in the construction sector. The study concludes that fostering EI among construction industry professionals can lead to improved job satisfaction and performance. Consequently, organizations are encouraged to integrate EI development into their professional growth programs to cultivate a more satisfied and effective workforce. In essence, this research highlights the importance of EI as a key predictor of job satisfaction in the Nigerian construction industry, providing valuable insights for both industry stakeholders and researchers into the benefits of prioritizing emotional intelligence in this high-stakes environment.Keywords: emotional intelligence, job satisfaction, construction industry, workforce productivity, demographics
Procedia PDF Downloads 226549 Comparison Constructions in the Language of the Qur'an
Authors: Safiah Ahmed Yahya Madkhali
Abstract:
The aim of the present paper is to provide a characterization of the expression of comparison in the language of the Qur’an, the language of the Divine Book of the Muslim nation. It focuses on quantitative as well as qualitative comparisons. While works on comparison constructions in Arabic focus on a type(s) of the comparison construction and exclude another and investigate its behaviour in Standard Arabic, the paper aims to be inclusive of the varied instances that are scalar comparison constructions and describe its aspects in the language of the Qur’an. To the best of my knowledge, comparative constructions in the language of the Qur’an has not been tackled before and hence the characterization provided in the paper would be the contribution of the present work. The paper highlights the several rhetorical features of the construction as present in the different verses in the Qur’an which set them distinct from the ordinary use of the construction in the different verities of the Arabic language.Keywords: comparison constructions, inequality, comparative, superlative, equality
Procedia PDF Downloads 766548 Weaknesses and Performance Defects of Steel Structures According to the Executive Criteria
Authors: Ehsan Sadie
Abstract:
Despite the experience of heavy losses and damages of recent earthquakes such as 8 km E of Pāhala, Hawaii, 11 km W of Salvaleón de Higüey, Dominican Republic and 49 km SSE of Punta Cana, Dominican Republic earthquakes, the possibility of large earthquakes in most populated areas of any country and the serious need for quality control in the design and implementation of buildings, not enough attention has been paid to the proper construction. Steel structures constitute a significant part of construction in any metropolitan area. This article gives a brief overview of the implementation status of these buildings in urban areas and considers the weaknesses of performance that typically occur due to negligence or insufficient mastery of the building supervisor in the principles of operation of earthquake-resistant buildings, and provide appropriate and possible solutions to improve the construction.Keywords: bracing member, concentrated load, diaphragm system, earthquake engineering, load-bearing system, shear force, seismic retrofitting, steel building, strip foundation, supervising engineer, vulnerability of building
Procedia PDF Downloads 1466547 The Micro-Activated Organic Regeneration in Rural Construction: A Case Study of Yangdun Village in Deqing County, Zhejiang Province
Authors: Chengyuan Zhu, Zhu Wang
Abstract:
With the strategy of Rural Rejuvenation proposed in China, the rural has become the focus of all works today. In addition to the support of industry and policy, the rural planning and construction which is the space dependence of Rural Rejuvenation are also very crucial. Based on an analysis of the case of Yangdun Village in Deqing County, this paper summarizes village existing resources and construction status quo. It tries to illuminate the micro-activated organic renewal strategies and methods, based on ecological landscape, history context, industry development and living life requirements. It takes advantage of industrial linkage and then asks for the coordination of both spatial and industrial planning, the revival and remodeling of the rural image can be achieved through shaping the of architectural and landscape nodes as well as the activation of street space.Keywords: rural construction, rural human settlements, micro-activation, organic renewal
Procedia PDF Downloads 2316546 Eco-Design of Construction Industrial Park in China with Selection of Candidate Tenants
Authors: Yang Zhou, Kaijian Li, Guiwen Liu
Abstract:
Offsite construction is an innovative alternative to conventional site-based construction, with wide-ranging benefits. It requires building components, elements or modules were prefabricated and pre-assembly before installed into their final locations. To improve efficiency and achieve synergies, in recent years, construction companies were clustered into construction industrial parks (CIPs) in China. A CIP is a community of construction manufacturing and service businesses located together on a common property. Companies involved in industrial clusters can obtain environment and economic benefits by sharing resources and information in a given region. Therefore, the concept of industrial symbiosis (IS) can be applied to the traditional CIP to achieve sustainable industrial development or redevelopment through the implementation of eco-industrial parks (EIP). However, before designing a symbiosis network between companies in a CIP, candidate support tenants need to be selected to complement the existing construction companies. In this study, an access indicator system and a linear programming model are established to select candidate tenants in a CIP while satisfying the degree of connectivity among the enterprises in the CIP, minimizing the environmental impact, and maximizing the annualized profit of the CIP. The access indicator system comprises three primary indicators and fifteen secondary indicators, is proposed from the perspective of park-based level. The fifteen indicators are classified as three primary indicators including industrial symbiosis, environment performance and economic benefit, according to the three dimensions of sustainability (environment, economic and social dimensions) and the three R's of the environment (reduce, reuse and recycle). The linear programming model is a method to assess the satisfactoriness of all the indicators and to make an optimal multi-objective selection among candidate tenants. This method provides a practical tool for planners of a CIP in evaluating which among the candidate tenants would best complement existing anchor construction tenants. The reasonability and validity of the indicator system and the method is worth further study in the future.Keywords: construction industrial park, China, industrial symbiosis, offsite construction, selection of support tenants
Procedia PDF Downloads 2756545 Sustainable Project Management: Driving the Construction Industry Towards Sustainable Developmental Goals
Authors: Francis Kwesi Bondinuba, Seidu Abdullah, Mewomo Cecilia, Opoku Alex
Abstract:
Purpose: The purpose of this research is to develop a framework for understanding how sustainable project management contributes to the construction industry's pursuit of sustainable development goals. Study design/methodology/approach: The study employed a theoretical methodology to review existing theories and models that support Sustainable Project Management (SPM) in the construction industry. Additionally, a comprehensive review of current literature on SPM is conducted to provide a thorough understanding of this study. Findings: Sustainable Project Management (SPM) practices, including stakeholder engagement and collaboration, resource efficiency, waste management, risk management, and resilience, play a crucial role in achieving the Sustainable Development Goals (SDGs) within the construction industry. Conclusion: Adopting Sustainable Project Management (SPM) practices in the Ghanaian construction industry enhances social inclusivity by engaging communities and creating job opportunities. The adoption of these practices faces significant challenges, including a lack of awareness and understanding, insufficient regulatory frameworks, financial constraints, and a shortage of skilled professionals. Recommendation: There should be a comprehensive approach to project planning and execution that includes stakeholders such as local communities, government bodies, and environmental organisations, the use of green building materials and technologies, and the implementation of effective waste management strategies, all of which will ensure the achievement of SDGs in Ghana's construction industry. Originality/value: This paper adds to the current literature by offering the various theories and models in Sustainable Project Management (SPM) and a detailed review of how Sustainable Project Management (SPM) contribute to the achievement of the Sustainable Development Goals (SDGs) in the Ghanaian Construction Industry.Keywords: sustainable development, sustainable development goals, construction industry, ghana, sustainable project management
Procedia PDF Downloads 266544 Faults in the Projects, Deviation in the Cost
Authors: S. Ahmed, P. Dlask, B. Hasan
Abstract:
There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.Keywords: construction projects, building, cost, estimating costs, delay, overrun
Procedia PDF Downloads 2946543 Maturity Level of Knowledge Management in Whole Life Costing in the UK Construction Industry: An Empirical Study
Authors: Ndibarefinia Tobin
Abstract:
The UK construction industry has been under pressure for many years to produce economical buildings which offer value for money, not only during the construction phase, but more importantly, during the full life of the building. Whole life costing is considered as an economic analysis tool that takes into account the total investment cost in and ownership, operation and subsequent disposal of a product or system to which the whole life costing method is being applied. In spite of its importance, the practice is still crippled by the lack of tangible evidence, ‘know-how’ skills and knowledge of the practice i.e. the lack of professionals with the knowledge and training on the use of the practice in construction project, this situation is compounded by the absence of available data on whole life costing from relevant projects, lack of data collection mechanisms and so on. The aforementioned problems has forced many construction organisations to adopt project enhancement initiatives to boost their performance on the use of whole life costing techniques so as to produce economical buildings which offer value for money during the construction stage also the whole life of the building/asset. The management of knowledge in whole life costing is considered as one of the many project enhancement initiative and it is becoming imperative in the performance and sustainability of an organisation. Procuring building projects using whole life costing technique is heavily reliant on the knowledge, experience, ideas and skills of workers, which comes from many sources including other individuals, electronic media and documents. Due to the diversity of knowledge, capabilities and skills of employees that vary across an organisation, it is significant that they are directed and coordinated efficiently so as to capture, retrieve and share knowledge in order to improve the performance of the organisation. The implementation of knowledge management concept has different levels in each organisation. Measuring the maturity level of knowledge management in whole life costing practice will paint a comprehensible picture of how knowledge is managed in construction organisations. Purpose: The purpose of this study is to identify knowledge management maturity in UK construction organisations adopting whole life costing in construction project. Design/methodology/approach: This study adopted a survey method and conducted by distributing questionnaires to large construction companies that implement knowledge management activities in whole life costing practice in construction project. Four level of knowledge management maturity was proposed on this study. Findings: From the results obtained in the study shows that 34 contractors at the practiced level, 26 contractors at managed level and 12 contractors at continuously improved level.Keywords: knowledge management, whole life costing, construction industry, knowledge
Procedia PDF Downloads 244