Search results for: cybersecurity risk management plan
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 15304

Search results for: cybersecurity risk management plan

14944 Management of Local Towns (Tambon) According to Philosophy of Sufficiency Economy

Authors: Wichian Sriprachan, Chutikarn Sriviboon

Abstract:

The objectives of this research were to study the management of local towns and to develop a better model of town management according to the Philosophy of Sufficiency Economy. This study utilized qualitative research, field research, as well as documentary research at the same time. A total of 10 local towns or Tambons of Supanburi province, Thailand were selected for an in-depth interview. The findings revealed that the model of local town management according to Philosophy of Sufficient Economy was in a level of “good” and the model of management has the five basic guidelines: 1) ability to manage budget information and keep it up-to-date, 2) ability to decision making according to democracy rules, 3) ability to use check and balance system, 4) ability to control, follow, and evaluation, and 5) ability to allow the general public to participate. In addition, the findings also revealed that the human resource management according to Philosophy of Sufficient Economy includes obeying laws, using proper knowledge, and having integrity in five areas: plan, recruit, select, train, and maintain human resources.

Keywords: management, local town (Tambon), principles of sufficiency economy, marketing management

Procedia PDF Downloads 341
14943 The Effect of Work Site Dangers on the Management of Construction Projects in Syria

Authors: Mohammed Aljoma, Eblal Zakzok

Abstract:

Safety is a science that seeks to protect and avoid humans from risks in any field and prevent losses in properties and lives as much as possible. On the other hand, occupational safety goals aim to protect workers from risks which can occur during work execution. The main purpose of occupational safety is to ultimately protect people, properties and the environment by reducing accidents and injuries that may cause losses and damages. To achieve this goal, we must remove the direct and indirect reasons which cause accidents and injuries; some of the reasons of accidents are the unsafe cases and inept behavior or both of them. This research focuses on the manner of providing instant protection from the very first beginning to people, properties and the environment by: -Inserting safety demands in the planning and designing works by identifying risk levels in every task of the project, -Using a new risk managing system or modifying or changing a previously-used one.

Keywords: planning, scheduling, risk management, project duration, site safety

Procedia PDF Downloads 292
14942 Realizing the National Disaster Management Policy of Sri Lanka through Public Private Partnerships

Authors: K. W. A. M. Kokila, Matsui Kenichi

Abstract:

Sri Lanka’s disaster management policy aims to protect lives and developments in disaster affected areas by effectively using resources for disaster risk reduction, emergency management, and community awareness. However, funding for these action programs has posed a serious challenge to the country’s economy. This paper examines the extent to which private-public partnerships (PPPs) can facilitate and expedite disaster management works. In particular, it discusses the results of the questionnaire survey among policymakers, government administrators, NGOs, and private businesses. This questionnaire was conducted in 2017. All respondents were selected based on their experience in PPP projects in the past. The survey focused on clarifying the effectiveness of past PPP projects as well as their efficiency and transparency. The respondents also provided their own opinions and suggestions to improve the future PPP projects in Sri Lanka. The questionnaire was distributed to fifteen persons. The results show that almost all respondents think that PPP projects are beneficial and important for future disaster risk management in Sri Lanka. The respondents, however, showed some reservation about effectiveness and transparency of the PPP process. This paper also discusses the results on the respondents’ perceptions about their capacity regarding human resources and management. This paper, overall, sheds light on technological, financial and human resource management practices in developed countries as well as policy and legislation provisions regarding PPP projects.

Keywords: disaster management, policy, private public partnership, projects

Procedia PDF Downloads 160
14941 The Study of Thai Millennial Attitude toward End-of-Life Planning, Opportunity of Service Design Development

Authors: Mawong R., Bussracumpakorn C.

Abstract:

Millions of young people around the world have been affected by COVID-19 to their psychological and social effects. Millennials’ stresses have been shaped by a few global issues, including climate change, political instability, and financial crisis. In particular, the spread of COVID-19 has become laying psychological and socioeconomic scars on them. When end-of-life planning turns into more widely discussed, the stigma and taboos around this issue are greatly lessened. End-of-life planning is defined as a future life plan, such as financial, legacy, funeral, and memorial planning. This plan would help millennials to discover the value and meaning of life. This study explores the attitudes of Thai Millennials toward end-of-life planning as a new normal awareness of life in order to initiate an innovative service concept to fit with their value and meaning. The study conducts an in-depth interview with 12 potential participants who have awareness or action on the plan. The framework of the customer journey map is used to analyze the responses to examine trigger points, barriers, beliefs, and expectations. The findings pointed to a service concept that is suggested for a new end-of-life planning service that is suited to Thai Millennials in 4 different groups, which are 1. Social -Conscious as a socially aware who to donate time and riches to make the world and society a better place, their end-of-life planning value is inspired by the social impact of giving something or some action that they will be able to do after life or during life which provides a variety of choice based on their preference to give to society, 2. Life Fulfillment who make a life goal for themselves and attempt to achieve it before the time comes to their value will be to inspire life value with a customized plan and provide guidance to suggest, 3. Prevention of the After-Death Effect who want to plan to avoid the effects of their death as patriarch, head of the family, and anchor of someone, so they want to have a plan that brings confidence and feel relief while they are still alive and they want to find some reliable service that they can leave the death will or asset, and 4. No Guilty Planning who plan for when they wish to be worry-free as a self-responsible they want to have the plan which is easy to understand and easy to access. The overall finding of the study is to understand the new service concept of end-of-life planning which to improve knowledge of significant life worth rather than death planning, encouraging people to reassess their lives in a positive way, leading to higher self-esteem and intrinsic motivation for this generation in this time of global crisis.

Keywords: design management, end-of-life planning, millennial generation, service design solution

Procedia PDF Downloads 183
14940 Groundwater Monitoring Using a Community: Science Approach

Authors: Shobha Kumari Yadav, Yubaraj Satyal, Ajaya Dixit

Abstract:

In addressing groundwater depletion, it is important to develop evidence base so to be used in assessing the state of its degradation. Groundwater data is limited compared to meteorological data, which impedes the groundwater use and management plan. Monitoring of groundwater levels provides information base to assess the condition of aquifers, their responses to water extraction, land-use change, and climatic variability. It is important to maintain a network of spatially distributed, long-term monitoring wells to support groundwater management plan. Monitoring involving local community is a cost effective approach that generates real time data to effectively manage groundwater use. This paper presents the relationship between rainfall and spring flow, which are the main source of freshwater for drinking, household consumptions and agriculture in hills of Nepal. The supply and withdrawal of water from springs depends upon local hydrology and the meteorological characteristics- such as rainfall, evapotranspiration and interflow. The study offers evidence of the use of scientific method and community based initiative for managing groundwater and springshed. The approach presents a method to replicate similar initiative in other parts of the country for maintaining integrity of springs.

Keywords: citizen science, groundwater, water resource management, Nepal

Procedia PDF Downloads 193
14939 Fuzzy Multi-Criteria Decision-Making Framework for Risk Management in Construction Supply Chain

Authors: Abdullah Ali Salamai

Abstract:

Risk management in the construction supply chain (CSC) is vital in construction project risks. CSC has various risks affecting product quality and project timeline, such as operational, social, financial, technical, design, and safety risks. These risks should be mitigated in project construction. So, this paper proposed a set of technologies to overcome risks in CSC, like artificial intelligence (AI), blockchain, data analytics, and IoT, to select the best one. So, the multi-criteria decision-making (MCDM) methodology is used to deal with various risks. The Multi-Attribute Utility Theory (MAUT) method is used to rank technologies. The weights of risks are obtained by the average method by using the decision matrix. The MCDM methodology is integrated with a fuzzy set to overcome uncertainty data. Experts used triangular fuzzy numbers to express their opinions instead of exact numbers. These allow the model to overcome inconsistent and vague data. The MCDM methodology was applied to 18 risks and 5 technologies. The results show that social risks have the highest weight. AI is the best technology for overcoming risks in CSC. AI can integrate with CSC from raw data to final products to deliver to the user.

Keywords: risk management, construction supply chain, fuzzy sets, multi-criteria decision making, supply chain management, artificial intelligence, blockchain

Procedia PDF Downloads 21
14938 Impact of Risk Management Practices on Company Performance

Authors: Syed Atif Ali, Farzan Yahya

Abstract:

This research paper covers the issue of risk management impact on the company performance. Degree of financial leverage (DFL), degree of operating leverage (DOL) and the working capital ratio (WCR) are taken as independent variables which are the representative of risk and the earning price per share (EPS), return on assets (ROA), return on equity (ROE), Sales and Net profits which are the representative of performance. Last 10 years (2004-2013) of Cement sector of Pakistan data is chosen as sample for analyze their relations by multiple regression technique. Through analyses, it is found that WCR impact adequately on the company performance because if company has enough liquidity than it perform its operations smoothly and enhance its performance very well. DFL should be control moderately because enough DFL leads performance of company downward. On the other hand, the DOL should be less because it causes the less profitability for a company from its operations.

Keywords: degree of financial leverage (DFL), degree of operating leverage (DOL), working capital ratio (WCR), earning per share (EPS), return on equity (ROE), return on assets (ROA)

Procedia PDF Downloads 445
14937 Factors Contributing to Adverse Maternal and Fetal Outcome in Patients with Eclampsia

Authors: T. Pradhan, P. Rijal, M. C. Regmi

Abstract:

Background: Eclampsia is a multisystem disorder that involves vital organs and failure of these may lead to deterioration of maternal condition and hypoxia and acidosis of fetus resulting in high maternal and perinatal mortality and morbidity. Thus, evaluation of the contributing factors for this condition and its complications leading to maternal deaths should be the priority. Formulating the plan and protocol to decrease these losses should be our goal. Aims and Objectives: To evaluate the risk factors associated with adverse maternal and fetal outcome in patients with eclampsia and to correlate the risk factors associated with maternal and fetal morbidity and mortality. Methods: All patients with eclampsia admitted in Department of Obstetrics and Gynecology, B. P. Koirala Institute of Health Sciences were enrolled after informed consent from February 2013 to February 2014. Questions as per per-forma were asked to patients, and attendants like Antenatal clinic visits, parity, number of episodes of seizures, duration from onset of seizure to magnesium sulfate and the patients were followed as per the hospital protocol, the mode of delivery, outcome of baby, post partum maternal condition like maternal Intensive Care Unit admission, neurological impairment and mortality were noted before discharge. Statistical analysis was done using Statistical Package for the Social Sciences (SPSS 11). Mean and percentage were calculated for demographic variables. Pearson’s correlation test and chi-square test were applied to find the relation between the risk factors and the outcomes. P value less than 0.05 was considered significant. Results: There were 10,000 antenatal deliveries during the study period. Fifty-two patients with eclampsia were admitted. All of the patients were unbooked for our institute. Thirty-nine patients were antepartum eclampsia. Thirty-one patients required mechanical ventilator support. Twenty-four patients were delivered by emergency c-section and 21 babies were Low Birth Weight and there were 9 stillbirths. There was one maternal mortality and 45 patients were discharged with improvement but 3 patients had neurological impairment. Mortality was significantly related with number of seizure episodes and time interval between seizure onset and administration of magnesium sulphate. Conclusion: Early detection and management of hypertensive complicating pregnancy during antenatal clinic check up. Early hospitalization and management with magnesium sulphate for eclampsia can help to minimize the maternal and fetal adverse outcomes.

Keywords: eclampsia, maternal mortality, perinatal mortality, risk factors

Procedia PDF Downloads 163
14936 Evaluation of a Risk Assessment Method for Fiber Emissions from Sprayed Asbestos-Containing Materials

Authors: Yukinori Fuse, Masato Kawaguchi

Abstract:

A quantitative risk assessment method was developed for fiber emissions from sprayed asbestos-containing materials (ACMs). In Japan, instead of being quantitative, these risk assessments have relied on the subjective judgment of skilled engineers, which may vary from one person to another. Therefore, this closed sampling method aims at avoiding any potential variability between assessments. This method was used to assess emissions from ACM sprayed in eleven buildings and the obtained results were compared with the subjective judgments of a skilled engineer. An approximate correlation tendency was found between both approaches. In spite of existing uncertainties, the closed sampling method is useful for public health protection. We firmly believe that this method may find application in the management and renovation decisions of buildings using friable and sprayed ACM.

Keywords: asbestos, renovation, risk assessment, maintenance

Procedia PDF Downloads 373
14935 Risk Aversion and Dynamic Games between Hydroelectric Operators under Uncertainty

Authors: Abdessalem Abbassi, Ahlem Dakhlaoui, Lota D. Tamini

Abstract:

This article analyses management of hydropower dams within two different industrial structures: monopolistic and oligopolistic; when hydroelectricity producers are risk averse and face demand uncertainty. In each type of market structure we determine the water release path in closed-loop equilibrium. We show how a monopoly can manage its hydropower dams by additional pumping or storage depending on the relative abundance of water between different regions to smooth the effect of uncertainty on electricity prices. In the oligopolistic case with symmetric rates of risk aversion, we determine the conditions under which the relative scarcity (abundance) of water in the dam of a hydroelectric operator can favor additional strategic pumping (storage) in its competitor’s dams. When there is asymmetry of the risk aversion coefficient, the firm’s hydroelectricity production increases as its competitor’s risk aversion increases, if and only if the average recharge speed of the competitor’s dam exceeds a certain threshold, which is an increasing function of its average water inflows.

Keywords: asymmetric risk aversion, closed-loop Cournot competition, electricity wholesale market, hydropower dams

Procedia PDF Downloads 352
14934 Risk and Uncertainty in Aviation: A Thorough Analysis of System Vulnerabilities

Authors: C. V. Pietreanu, S. E. Zaharia, C. Dinu

Abstract:

Hazard assessment and risks quantification are key components for estimating the impact of existing regulations. But since regulatory compliance cannot cover all risks in aviation, the authors point out that by studying causal factors and eliminating uncertainty, an accurate analysis can be outlined. The research debuts by making delimitations on notions, as confusion on the terms over time has reflected in less rigorous analysis. Throughout this paper, it will be emphasized the fact that the variation in human performance and organizational factors represent the biggest threat from an operational perspective. Therefore, advanced risk assessment methods analyzed by the authors aim to understand vulnerabilities of the system given by a nonlinear behavior. Ultimately, the mathematical modeling of existing hazards and risks by eliminating uncertainty implies establishing an optimal solution (i.e. risk minimization).

Keywords: control, human factor, optimization, risk management, uncertainty

Procedia PDF Downloads 244
14933 Comparative Study of the Distribution of Seismic Loads of Buildings with Asymmetries Plan

Authors: Ahmed Hamza Yache

Abstract:

The main purpose of this study is to estimate the distribution of shear forces in building structures with asymmetries in the plan submitted to seismic forces can cause, in this case, simultaneous deformations of translation and torsion. To this end, the distribution of shear forces is obtained by seismic forces calculated from the equivalent static method of the Algerian earthquake code RPA 99 (2003 version) and spectral modal analysis for an irregular building plan without kinks. Comparison of the results obtained by these two methods used to highlight the difference in terms of distributions of shear forces in such structures.

Keywords: structure, irregular, code, seismic, method, force, period

Procedia PDF Downloads 574
14932 Composing Method of Decision-Making Function for Construction Management Using Active 4D/5D/6D Objects

Authors: Hyeon-Seung Kim, Sang-Mi Park, Sun-Ju Han, Leen-Seok Kang

Abstract:

As BIM (Building Information Modeling) application continually expands, the visual simulation techniques used for facility design and construction process information are becoming increasingly advanced and diverse. For building structures, BIM application is design - oriented to utilize 3D objects for conflict management, whereas for civil engineering structures, the usability of nD object - oriented construction stage simulation is important in construction management. Simulations of 5D and 6D objects, for which cost and resources are linked along with process simulation in 4D objects, are commonly used, but they do not provide a decision - making function for process management problems that occur on site because they mostly focus on the visual representation of current status for process information. In this study, an nD CAD system is constructed that facilitates an optimized schedule simulation that minimizes process conflict, a construction duration reduction simulation according to execution progress status, optimized process plan simulation according to project cost change by year, and optimized resource simulation for field resource mobilization capability. Through this system, the usability of conventional simple simulation objects is expanded to the usability of active simulation objects with which decision - making is possible. Furthermore, to close the gap between field process situations and planned 4D process objects, a technique is developed to facilitate a comparative simulation through the coordinated synchronization of an actual video object acquired by an on - site web camera and VR concept 4D object. This synchronization and simulation technique can also be applied to smartphone video objects captured in the field in order to increase the usability of the 4D object. Because yearly project costs change frequently for civil engineering construction, an annual process plan should be recomposed appropriately according to project cost decreases/increases compared with the plan. In the 5D CAD system provided in this study, an active 5D object utilization concept is introduced to perform a simulation in an optimized process planning state by finding a process optimized for the changed project cost without changing the construction duration through a technique such as genetic algorithm. Furthermore, in resource management, an active 6D object utilization function is introduced that can analyze and simulate an optimized process plan within a possible scope of moving resources by considering those resources that can be moved under a given field condition, instead of using a simple resource change simulation by schedule. The introduction of an active BIM function is expected to increase the field utilization of conventional nD objects.

Keywords: 4D, 5D, 6D, active BIM

Procedia PDF Downloads 273
14931 Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.

Keywords: building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 303
14930 Examining Renewable Energy Policy Implementation for Sustainable Development in Kenya

Authors: Eliud Kiprop, Kenichi Matsui, Joseph Karanja, Hesborn Ondiba

Abstract:

To double the share of renewable energy in the global energy mix by 2030 as part of actions for the Paris Agreement, policymakers in each ratifying country must accelerate their efforts within the next few years by implementing their own renewable energy strategies. Kenya has increased its funding for research and development in renewable energy sources largely because it intends to reduce greenhouse gas GHG emissions by 30% from business as usual (BAU) levels (143 MtCO₂eq) by 2030. In 2013, the Kenyan government launched an ambitious plan to increase the installed power generation capacity from 1,768MW to more than 5,000MW by the end of 2017. This paper examines the formulation and implementation process of this plan and shows how this plan will affect Kenya’s renewable energy industry and national policy implementation in general. Results demonstrate that, despite having a well- documented policy in place, the Kenyan government cannot meet its target of 5000MW by the end of 2017. Among other factors, we find that the main reason is attributable to the failure in adhering to the main principles of the policy plan. We also find that the government has failed to consider the future energy demand. Had the policy been implemented on time, we argue that there would have been excess power.

Keywords: policy implementation, policy plan, renewable energy, sustainable development

Procedia PDF Downloads 210
14929 The Occurrence of Depression with Chronic Liver Disease

Authors: Roop Kiran, Muhammad Shoaib Zafar, Nazish Idrees Chaudhary

Abstract:

Depression is known to be the second most frequently occurring comorbid mental illness among patients suffering from chronic physical conditions. Around the world, depression is associated with chronic liver diseases as one of the dominant symptoms. This evidence brings attention to the research about various predictors for short life expectancy and poor quality of life in patients suffering from comorbid depression and CLD. Following are the objectives of this study i) measure the occurrence rate of comorbid depression among patients with CLD and ii) find the frequency of risk factors between patients with and without depression comorbid with CLD. This is a quantitative study with a cross-sectional design. The research data was collected through a measure called Hamilton Depression Rating Scale (HDRS) with a demographic Performa from 100 patients who visited the Department of Psychiatry for consultation at Mayo Hospital Lahore with a diagnosed CLD from the last four years. There were (42%) patients with CLD who had comorbid depression. Among depressed and non-depressed patients, significant differences were found (p<0.05) for unemployment in 25 (59.5%) males and 20 (34.5%) female patients, for co-morbidity in 25 (59.5%) males and 18 (31.0%) female patients, for illiteracy in 18 (42.9%) males and 13 (22.4%) female patients, for the history of CLD for more than the last 2years in 41 (97.6%) males and 47 (81.0%) female patients, for severity of CLD in 26 (61.9%) males and 20 (34.5%) female patients. This concludes that depression frequently occurs among patients with CLD. This study recommends considerable attention to plan preventative measures in the future and develop such intervention protocols that consider the management of risk factors that significantly influence comorbid depression with CLD.

Keywords: psychiatry, comorbid, health, quality of life

Procedia PDF Downloads 194
14928 Improving the Management Systems of the Ownership Risks in Conditions of Transformation of the Russian Economy

Authors: Mikhail V. Khachaturyan

Abstract:

The article analyzes problems of improving the management systems of the ownership risks in the conditions of the transformation of the Russian economy. Among the main sources of threats business owners should highlight is the inefficiency of the implementation of business models and interaction with hired managers. In this context, it is particularly important to analyze the relationship of business models and ownership risks. The analysis of this problem appears to be relevant for a number of reasons: Firstly, the increased risk appetite of the owner directly affects the business model and the composition of his holdings; secondly, owners with significant stakes in the company are factors in the formation of particular types of risks for owners, for which relations have a significant influence on a firm's competitiveness and ultimately determines its survival; and thirdly, inefficient system of management ownership of risk is one of the main causes of mass bankruptcies, which significantly affects the stable operation of the economy as a whole. The separation of the processes of possession, disposal and use in modern organizations is the cause of not only problems in the process of interaction between the owner and managers in managing the organization as a whole, but also the asymmetric information about the kinds and forms of the main risks. Managers tend to avoid risky projects, inhibit the diversification of the organization's assets, while owners can insist on the development of such projects, with the aim not only of creating new values for themselves and consumers, but also increasing the value of the company as a result of increasing capital. In terms of separating ownership and management, evaluation of projects by the ratio of risk-yield requires preservation of the influence of the owner on the process of development and making management decisions. It is obvious that without a clearly structured system of participation of the owner in managing the risks of their business, further development is hopeless. In modern conditions of forming a risk management system, owners are compelled to compromise between the desire to increase the organization's ability to produce new value, and, consequently, increase its cost due to the implementation of risky projects and the need to tolerate the cost of lost opportunities of risk diversification. Improving the effectiveness of the management of ownership risks may also contribute to the revitalization of creditors on implementation claims to inefficient owners, which ultimately will contribute to the efficiency models of ownership control to exclude variants of insolvency. It is obvious that in modern conditions, the success of the model of the ownership of risk management and audit is largely determined by the ability and willingness of the owner to find a compromise between potential opportunities for expanding the firm's ability to create new value through risk and maintaining the current level of new value creation and an acceptable level of risk through the use of models of diversification.

Keywords: improving, ownership risks, problem, Russia

Procedia PDF Downloads 341
14927 Risk Assessment of Heavy Rainfall and Development of Damage Prediction Function for Gyeonggi-Do Province

Authors: Jongsung Kim, Daegun Han, Myungjin Lee, Soojun Kim, Hung Soo Kim

Abstract:

Recently, the frequency and magnitude of natural disasters are gradually increasing due to climate change. Especially in Korea, large-scale damage caused by heavy rainfall frequently occurs due to rapid urbanization. Therefore, this study proposed a Heavy rain Damage Risk Index (HDRI) using PSR (Pressure – State - Response) structure for heavy rain risk assessment. We constructed pressure index, state index, and response index for the risk assessment of each local government in Gyeonggi-do province, and the evaluation indices were determined by principal component analysis. The indices were standardized using the Z-score method then HDRIs were obtained for 31 local governments in the province. The HDRI is categorized into three classes, say, the safest class is 1st class. As the results, the local governments of the 1st class were 15, 2nd class 7, and 3rd class 9. From the study, we were able to identify the risk class due to the heavy rainfall for each local government. It will be useful to develop the heavy rainfall prediction function by risk class, and this was performed in this issue. Also, this risk class could be used for the decision making for efficient disaster management. Acknowledgements: This research was supported by Basic Science Research Program through the National Research Foundation of Korea (NRF) funded by the Ministry of Science, ICT & Future Planning (2017R1A2B3005695).

Keywords: natural disaster, heavy rain risk assessment, HDRI, PSR

Procedia PDF Downloads 194
14926 The Impact of a Five-Day Basic Disaster Management Training on Disaster Risk Reduction: Case Study of Indonesia Defense University

Authors: Jazmi Adlan Bohari, I. Dewa Ketut Kerta Widana

Abstract:

Education on disaster management has been made as a mainstream focus of many countries. In Indonesia, this has been emphasized with the direct order of the President of Indonesia to implement disaster education at all levels in both formal and informal education. Indonesia Defense University (IDU) executes this order through Three Pillars of Higher Education, which consists of research, education, and community service. One of them is a five-day disaster management training for 105 participants divided into three batches that consist of faculty members and graduate students. This training uses the 2018 Basic Disaster Management Training Modul issued by the Indonesia National Disaster Management Agency (BNPB). This research aims to analyze the impact of this short training on the trainee’s knowledge and understanding of basic disaster management. This study is a qualitative research with case study approach. The research shows that after five days of training, there as a significant increase in knowledge and understanding of basic disaster management experienced by the trainees with a 61,73% overall increase. The post-training data shows that 61% of the trainees have a very good understanding, 24% with good understanding, 13% with adequate understanding, and 2% with poor understanding. The result suggests that a short-time education with a structured curriculum can successfully increase the knowledge and understanding of disaster management on a basic level and can hypothetically contribute to the effort to reduce disaster risks.

Keywords: disaster education, basic disaster management training, three Pillars of Higher Education, disaster risk reduction

Procedia PDF Downloads 123
14925 The Underestimation of Cultural Risk in the Execution of Megaprojects

Authors: Alan Walsh, Peter Walker, Michael Ellis

Abstract:

There is a real danger that both practitioners and researchers considering risks associated with megaprojects ignore or underestimate the impacts of cultural risk. The paper investigates the potential impacts of a failure to achieve cultural unity between the principal actors executing a megaproject. The principle relationships include the relationships between the principle Contractors and the project stakeholders or the project stakeholders and their principle advisors, Western Consultants. This study confirms that cultural dissonance between these parties can delay or disrupt the megaproject execution and examines why cultural issues should be prioritized as a significant risk factor in megaproject delivery. This paper addresses the practical impacts and potential mitigation measures, which may reduce cultural dissonance for a megaproject's delivery. This information is retrieved from on-going case studies in live infrastructure megaprojects in Europe and the Middle East's GCC states, from Western Consultants' perspective. The collaborating researchers each have at least 30 years of construction experience and are engaged in architecture, project management and contracts management, dealing with megaprojects in Europe or the GCC. After examining the cultural interfaces they have observed during the execution of megaprojects, they conclude that globally, culture significantly influences their efficient delivery. The study finds that cultural risk is ever-present, where different nationalities co-manage megaprojects and that cultural conflict poses a real threat to the timely delivery of megaprojects. The study indicates that the higher the cultural distance between the principal actors, the more pronounced the risk, with the risk of cultural dissonance more prominent in GCC megaprojects. The findings support a more culturally aware and cohesive team approach and recommend cross-cultural training to mitigate the effects of cultural disparity.

Keywords: cultural risk underestimation, cultural distance, megaproject characteristics, megaproject execution

Procedia PDF Downloads 102
14924 Analysis on the Importance and Direction of Change in Residential Environment of Apartment with the Change of Population Structure

Authors: Jo, Eui Chang, Shin, Heekang, Mun, A. Young , Kim, Hong Kyu

Abstract:

Regarding change on population and family structure in Korea after the 1980s, there has been a rapid change of low fertility, graying and increase of single household that cannot be found in any other parts of the world. With the result of total population residence by the National Statistical Office, Korea will hold 52,160,065 people in 2030 and reduction is predicted and from 2025 people above the age of 65 will take 20% of the total population, which means the entry of a super aging society. Also, average number in a family will be 2.71 in 2015 and decrease to 2.33 in 2035. On the other hand, proportion of single and two person household will be 53.7% in 2015 and it will increase up to 68.4% in 2035. Old population will increase greatly, single and two person household will take 2/3 of the total households. Delphi research was processed in 3 steps on 40 professionals about the importance and changing factors of residential environment of apartment followed by the change of population structure. For interior plan, space variety, variability, safety, convenient installation, eco-friendly installation, and IT installation were important factors for construction plan, plan on aged and single households, convenient installation, safety installation, eco-friendly installation for subdivision plan, education/child care facility, parks/gymnasium facility, community facility, and accessibility of transportation were predicted as important factors.

Keywords: change of population structure, super-graying, change of residential environment of apartment, single household, interior plan, construction plan, subdivision plan, Delphi research

Procedia PDF Downloads 430
14923 Minimizing Unscheduled Maintenance from an Aircraft and Rolling Stock Maintenance Perspective: Preventive Maintenance Model

Authors: Adel A. Ghobbar, Varun Raman

Abstract:

The Corrective maintenance of components and systems is a problem plaguing almost every industry in the world today. Train operators’ and the maintenance repair and overhaul subsidiary of the Dutch railway company is also facing this problem. A considerable portion of the maintenance activities carried out by the company are unscheduled. This, in turn, severely stresses and stretches the workforce and resources available. One possible solution is to have a robust preventive maintenance plan. The other possible solution is to plan maintenance based on real-time data obtained from sensor-based ‘Health and Usage Monitoring Systems.’ The former has been investigated in this paper. The preventive maintenance model developed for train operator will subsequently be extended, to tackle the unscheduled maintenance problem also affecting the aerospace industry. The extension of the model to the aerospace sector will be dealt with in the second part of the research, and it would, in turn, validate the soundness of the model developed. Thus, there are distinct areas that will be addressed in this paper, including the mathematical modelling of preventive maintenance and optimization based on cost and system availability. The results of this research will help an organization to choose the right maintenance strategy, allowing it to save considerable sums of money as opposed to overspending under the guise of maintaining high asset availability. The concept of delay time modelling was used to address the practical problem of unscheduled maintenance in this paper. The delay time modelling can be used to help with support planning for a given asset. The model was run using MATLAB, and the results are shown that the ideal inspection intervals computed using the extended from a minimal cost perspective were 29 days, and from a minimum downtime, perspective was 14 days. Risk matrix integration was constructed to represent the risk in terms of the probability of a fault leading to breakdown maintenance and its consequences in terms of maintenance cost. Thus, the choice of an optimal inspection interval of 29 days, resulted in a cost of approximately 50 Euros and the corresponding value of b(T) was 0.011. These values ensure that the risk associated with component X being maintained at an inspection interval of 29 days is more than acceptable. Thus, a switch in maintenance frequency from 90 days to 29 days would be optimal from the point of view of cost, downtime and risk.

Keywords: delay time modelling, unscheduled maintenance, reliability, maintainability, availability

Procedia PDF Downloads 128
14922 Impact of Network Workload between Virtualization Solutions on a Testbed Environment for Cybersecurity Learning

Authors: Kevin Fernagut, Olivier Flauzac, Erick M. G. Robledo, Florent Nolot

Abstract:

The adoption of modern lightweight virtualization often comes with new threats and network vulnerabilities. This paper seeks to assess this with a different approach studying the behavior of a testbed built with tools such as Kernel-Based Virtual Machine (KVM), Linux Containers (LXC) and Docker, by performing stress tests within a platform where students experiment simultaneously with cyber-attacks, and thus observe the impact on the campus network and also find the best solution for cyber-security learning. Interesting outcomes can be found in the literature comparing these technologies. It is, however, difficult to find results of the effects on the global network where experiments are carried out. Our work shows that other physical hosts and the faculty network were impacted while performing these trials. The problems found are discussed, as well as security solutions and the adoption of new network policies.

Keywords: containerization, containers, cybersecurity, cyberattacks, isolation, performance, virtualization, virtual machines

Procedia PDF Downloads 141
14921 Greening of Supply Chains: Benefits and Challenges Faced

Authors: Anurag Reddy Ramireddy, Abrar Ahmed, G. Sourya Sri Harsha, Pushkala Muralidharan

Abstract:

Supply chains have been developing over time since the inception of commercial trade and barter. The Green Supply Chain Management (GSCM) is a powerful way to differentiate a company from its competitors and it can greatly influence the plan success. With increased awareness to corporate responsibility and the requirement to meet the terms with environmental policy, GSCM is becoming increasingly important for companies. This paper explains the concept of green supply chain management, the difference between conventional supply chain management and green supply management and how GSCM benefits organizations while at the same time supporting a sustainable environment system. An effort has also been made to analyse research already done in this field while exploring the challenges and barriers that organizations face in implementing GSCM practices in their existing systems.

Keywords: corporate social responsibility, green supply chain management, sustainability

Procedia PDF Downloads 372
14920 Dosimetric Comparison among Different Head and Neck Radiotherapy Techniques Using PRESAGE™ Dosimeter

Authors: Jalil ur Rehman, Ramesh C. Tailor, Muhammad Isa Khan, Jahnzeeb Ashraf, Muhammad Afzal, Geofferry S. Ibbott

Abstract:

Purpose: The purpose of this analysis was to investigate dose distribution of different techniques (3D-CRT, IMRT and VMAT) of head and neck cancer using 3-dimensional dosimeter called PRESAGETM Dosimeter. Materials and Methods: Computer tomography (CT) scans of radiological physics center (RPC) head and neck anthropomorphic phantom with both RPC standard insert and PRESAGETM insert were acquired separated with Philipp’s CT scanner and both CT scans were exported via DICOM to the Pinnacle version 9.4 treatment planning system (TPS). Each plan was delivered twice to the RPC phantom first containing the RPC standard insert having TLD and film dosimeters and then again containing the Presage insert having 3-D dosimeter (PRESAGETM) by using a Varian True Beam linear accelerator. After irradiation, the standard insert including point dose measurements (TLD) and planar Gafchromic® EBT film measurement were read using RPC standard procedure. The 3D dose distribution from PRESAGETM was read out with the Duke Midsized optical scanner dedicated to RPC (DMOS-RPC). Dose volume histogram (DVH), mean and maximal doses for organs at risk were calculated and compared among each head and neck technique. The prescription dose was same for all head and neck radiotherapy techniques which was 6.60 Gy/friction. Beam profile comparison and gamma analysis were used to quantify agreements among film measurement, PRESAGETM measurement and calculated dose distribution. Quality assurances of all plans were performed by using ArcCHECK method. Results: VMAT delivered the lowest mean and maximum doses to organ at risk (spinal cord, parotid) than IMRT and 3DCRT. Such dose distribution was verified by absolute dose distribution using thermoluminescent dosimeter (TLD) system. The central axial, sagittal and coronal planes were evaluated using 2D gamma map criteria(± 5%/3 mm) and results were 99.82% (axial), 99.78% (sagital), 98.38% (coronal) for VMAT plan and found the agreement between PRESAGE and pinnacle was better than IMRT and 3D-CRT plan excludes a 7 mm rim at the edge of the dosimeter. Profile showed good agreement for all plans between film, PRESAGE and pinnacle and 3D gamma was performed for PTV and OARs, VMAT and 3DCRT endow with better agreement than IMRT. Conclusion: VMAT delivered lowered mean and maximal doses to organs at risk and better PTV coverage during head and neck radiotherapy. TLD, EBT film and PRESAGETM dosimeters suggest that VMAT was better for the treatment of head and neck cancer than IMRT and 3D-CRT.

Keywords: RPC, 3DCRT, IMRT, VMAT, EBT2 film, TLD, PRESAGETM

Procedia PDF Downloads 381
14919 Clinical Outcomes and Symptom Management in Pediatric Patients Following Eczema Action Plans: A Quality Improvement Project

Authors: Karla Lebedoff, Susan Walsh, Michelle Bain

Abstract:

Eczema is a chronic atopy condition requiring long-term daily management in children. Written action plans for other chronic atopic conditions, such as asthma and food allergies, are widely recommended and distributed to pediatric patients' parents and caregivers, seeking to improve clinical outcomes and become empowered to manage the patient's ever-changing symptoms. Written action plans for eczema, referred to as "asthma of the skin," are not routinely used in practice. Parents of children suffering from eczema rarely receive a written action plan to follow, and commendations supporting eczema action plans are inconsistent. Pediatric patients between birth and 18 years old who were followed for eczema at an urban Midwest community hospital were eligible to participate in this quality improvement project. At the initial visit, parents received instructions on individualized eczema action plans for their child and completed two validated surveys: Health Confidence Score (HCS) and Patient-Oriented Eczema Measure (POEM). Pre- and post-survey responses were collected, and clinical symptom presentation at follow-up were outcome determinants. Project implementation was guided by Institute for Healthcare Improvement's Step-up Framework and the Plan-Do-Study-Act cycle. This project measured clinical outcomes and parent confidence in self-management of their child's eczema symptoms with the responses from 26 participant surveys. Pre-survey responses were collected from 36 participants, though ten were lost to follow-up. Average POEM scores improved by 53%, while average HCS scores remained unchanged. Of seven completed in-person follow-up visits, six clinical progress notes documented improvement. Individualized eczema action plans can be seamlessly incorporated into primary and specialty care visits for pediatric patients suffering from eczema. Following a patient-specific eczema action plan may lessen the daily physical and mental burdens of uncontrolled eczema for children and parents, managing symptoms that chronically flare and recede. Furthermore, incorporating eczema action plans into practice potentially reduces the likely underestimated $5.3 billion economic disease burden of eczema on the U.S. healthcare system.

Keywords: atopic dermatitis, eczema action plan, eczema symptom management, pediatric eczema

Procedia PDF Downloads 132
14918 Heritage Management of Wooden Monasteries in Mandalay

Authors: Mary Oo, Thet Oo

Abstract:

Mandalay is home to the last dynasty of Myanmar and is rich in cultural heritage. In Mandalay, cultural heritage is still being seen today, in not only intangible but also many tangible heritages. Intangible heritage, a religious structure such as mosques, churches, stupas, temples, Buddha libraries and monasteries, comprise over 80%. Among these religious structures, the authors aim to study the wooden monasteries built in the 19th century and then propose heritage management for them. Although some of the wooden monasteries are being conserved by the government, NGOs or inhabitants in those buildings, because of the unsystematic management plan and some of the inappropriate traditional methods, even their authentic architectural values have been lost today. In this paper, four aspects are explored: 1) the architectural features of 19th-century wooden monasteries 2) the condition of the problems and challenges, 3) the analysis of the problems of them and finally, based on these above analyses, recommend the appropriate heritage management proposal.

Keywords: Mandalay, wooden monasteries, challenges, problems, heritage management proposal

Procedia PDF Downloads 112
14917 Flood Vulnerability Zoning for Blue Nile Basin Using Geospatial Techniques

Authors: Melese Wondatir

Abstract:

Flooding ranks among the most destructive natural disasters, impacting millions of individuals globally and resulting in substantial economic, social, and environmental repercussions. This study's objective was to create a comprehensive model that assesses the Nile River basin's susceptibility to flood damage and improves existing flood risk management strategies. Authorities responsible for enacting policies and implementing measures may benefit from this research to acquire essential information about the flood, including its scope and susceptible areas. The identification of severe flood damage locations and efficient mitigation techniques were made possible by the use of geospatial data. Slope, elevation, distance from the river, drainage density, topographic witness index, rainfall intensity, distance from road, NDVI, soil type, and land use type were all used throughout the study to determine the vulnerability of flood damage. Ranking elements according to their significance in predicting flood damage risk was done using the Analytic Hierarchy Process (AHP) and geospatial approaches. The analysis finds that the most important parameters determining the region's vulnerability are distance from the river, topographic witness index, rainfall, and elevation, respectively. The consistency ratio (CR) value obtained in this case is 0.000866 (<0.1), which signifies the acceptance of the derived weights. Furthermore, 10.84m2, 83331.14m2, 476987.15m2, 24247.29m2, and 15.83m2 of the region show varying degrees of vulnerability to flooding—very low, low, medium, high, and very high, respectively. Due to their close proximity to the river, the northern-western regions of the Nile River basin—especially those that are close to Sudanese cities like Khartoum—are more vulnerable to flood damage, according to the research findings. Furthermore, the AUC ROC curve demonstrates that the categorized vulnerability map achieves an accuracy rate of 91.0% based on 117 sample points. By putting into practice strategies to address the topographic witness index, rainfall patterns, elevation fluctuations, and distance from the river, vulnerable settlements in the area can be protected, and the impact of future flood occurrences can be greatly reduced. Furthermore, the research findings highlight the urgent requirement for infrastructure development and effective flood management strategies in the northern and western regions of the Nile River basin, particularly in proximity to major towns such as Khartoum. Overall, the study recommends prioritizing high-risk locations and developing a complete flood risk management plan based on the vulnerability map.

Keywords: analytic hierarchy process, Blue Nile Basin, geospatial techniques, flood vulnerability, multi-criteria decision making

Procedia PDF Downloads 63
14916 Perceived Social Support, Resilience and Relapse Risk in Recovered Addicts

Authors: Islah Ud Din, Amna Bibi

Abstract:

The current study was carried out to examine the perceived social support, resilience and relapse risk in recovered addicts. A purposive sampling technique was used to collect data from recovered addicts. A multidimensional scale of perceived social support by was used to measure the perceived social support. The brief Resilience Scale (BRS) was used to assess resilience. The Stimulant Relapse Risk Scale (SRRS) was used to examine the relapse risk. Resilience and Perceived social support have substantial positive correlations, whereas relapse risk and perceived social support have significant negative associations. Relapse risk and resilience have a strong inverse connection. Regression analysis was used to check the mediating effect of resilience between perceived social support and relapse risk. The findings revealed that perceived social support negatively predicted relapse risk. Results showed that Resilience plays a role as partial mediation between perceived social support and relapse risk. This Research will allow us to explore and understand the relapse risk factor and the role of perceived social support and resilience in recovered addicts. The study's findings have immediate consequences in the prevention of relapse. The study will play a significant part in drug rehabilitation centers, clinical settings and further research.

Keywords: perceived social support, resilience, relapse risk, recovered addicts, drugs addiction

Procedia PDF Downloads 19
14915 Options Trading and Crash Risk

Authors: Cameron Truong, Mikhail Bhatia, Yangyang Chen, Viet Nga Cao

Abstract:

Using a sample of U.S. firms between 1996 and 2011, this paper documents a positive association between options trading volume and future stock price crash risk. This relation is evidently more pronounced among firms with higher information asymmetry, business uncertainty, and short-sale constraints. In a dichotomous cross-sectional setting, we also document that firms with options trading have higher future crash risk than firms without options trading. We further show in a difference-in-difference analysis that firms experience an increase in crash risk immediately after the listing of options. The results suggest that options traders are able of identifying bad news hoarding by management and choose to trade in a liquid options market in anticipation of future crashes.

Keywords: bad news hoarding, cross-sectional setting, options trading, stock price crash

Procedia PDF Downloads 442