5576 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects

Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima

Abstract:

Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.

Keywords: continuous improvement, critical success factors (csf), lean thinking, project management

Procedia PDF Downloads 353
5575 Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Problem by Preemptive Fuzzy Goal Programming

Authors: Busaba Phurksaphanrat

Abstract:

This research proposes a pre-emptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of make-span. However, both time and cost should be considered at the same time with different level of important priorities. Moreover, all elements of cost functions in a project are not included in the conventional cost objective function. Incomplete total project cost causes an error in finding the project scheduling time. In this research, pre-emptive fuzzy goal programming is presented to solve the multi-objective multi-mode resource constrained project scheduling problem. It can find the compromise solution of the problem. Moreover, it is also flexible in adjusting to find a variety of alternative solutions.

Keywords: multi-mode resource constrained project scheduling problem, fuzzy set, goal programming, pre-emptive fuzzy goal programming

Procedia PDF Downloads 425
5574 Unfolding the Affective Atmospheres during the COVID-19 Pandemic Crisis: The Constitution and Performance of Affective Governance in Taiwan

Authors: Sang-Ju Yu

Abstract:

This paper examines the changing essences and effects of ‘affective atmosphere’ during the COVID-19 pandemic crisis, which have been facilitated and shaped the ‘affective governance’ in Taiwan. Due to long-term uncertainty and unpredictability, the COVID-19 pandemic not only caused unprecedented global crisis but triggered the public’s negative emotional responses. This paper unravels how the shortage of Personal Protective Equipment and the proliferating fake news heightened people’s fear and anxiety and how specific affective atmospheres can be provoked and manipulated to harness emotional appeals of citizens strategically in Taiwan. Through the in-depth interviews with diverse stakeholders involved, it unfolds the dynamics and strategies of affective governance, wherein public emotions and concerns are now given significant consideration in both policy measures and the affective expression of leadership, spatial arrangement, service delivery, and the interaction with citizens. Addressing psychosocial and emotional needs has become the core of crisis response mechanisms suited to dynamic affective atmospheres and pandemic situation. This paper also demonstrates that epidemic prevention and control is not merely the production of neutral or rational policy-making processes, as it is dominated by multiple emotions resulted from unexpected and salient events at different moments. It provides explicit insight into how different prevention scenarios operated effectively through political and affective mobilisation to strengthen emotional bonding and collective identity which energises collective action. Basically, successful affective governance calls for both negative and positive emotions, for both scientific and political decision-making, for both community and bureaucracy, and both quality and efficiency of private–public collaboration.

Keywords: affective atmospheres, affective governance, COVID-19 pandemic, private-public collaboration

Procedia PDF Downloads 82
5573 Board Characteristics, Audit Committee Characteristics, and the Level of Bahraini Corporate Compliance with Mandatory IFRS Disclosure Requirements

Authors: Omar Juhmani

Abstract:

This paper examines the relation between internal corporate governance and the level of corporate compliance with mandatory IFRS disclosure requirements. The internal corporate governance is measured by board and audit committee characteristics. Using data from Bahrain Stock Exchange, the results show that board independence is positively and significantly associated with level of compliance with IFRS disclosure requirements. This suggests that internal corporate governance mechanisms are effective in the financial reporting practices by increasing the level of compliance with IFRS disclosures. Also, the results of the regression analyses indicate that two of the control variables; company size and audit firm size are significantly positively associated with the level of corporate compliance with mandatory IFRS disclosure requirements in Bahrain.

Keywords: Bahrain, board and audit committee characteristics, compliance, disclosure, IFRS

Procedia PDF Downloads 414
5572 Metropolitan Governance in Statutory Plan Making Process

Authors: Vibhore Bakshi

Abstract:

This research paper is a step towards understanding the role of governance in the plan preparation process. It addresses the complexities of the peri-urban, historical constructions, politics and policies of sustainability, and legislative frameworks. The paper reflects on the Delhi NCT as one of the classical cases that have happened to witness different structural changes in the master plan around 1981, 2001, 2021, and Proposed Draft 2041. The Delhi Landsat imageries for 1989 and 2018 show an increase in the built-up areas around the periphery of NCT. The peri-urbanization has been a result of increasing in-migration to peri–urban areas of Delhi. The built-up extraction for years 1981, 1991, 2001, 2011, and 2018 highlights the growing peri-urbanization on scarce land therefore, it becomes equally important to research the history of the land and its legislative measures. It is interesting to understand the streaks of changes that have occurred in the land of Delhi in accordance with the different master plans and land legislative policies. The process of masterplan process in Delhi has experienced a lot of complexities in juxtaposition to other metropolitan regions of the world. The paper identifies the shortcomings in the current master planning process approach in regard to the stage of the planning process, traditional planning approach, and lagging ICT-based interventions. The metropolitan governance systems across the globe and India depict diversity in the organizational setup and varied dissemination of functions. It addresses the complexity of the peri-urban, historical constructions, politics and policies of sustainability, and legislative frameworks.

Keywords: governance, land provisions, built-up areas, in migration, built up extraction, master planning process, legislative policies, metropolitan governance systems

Procedia PDF Downloads 165
5571 The Choosing the Right Projects With Multi-Criteria Decision Making to Ensure the Sustainability of the Projects

Authors: Saniye Çeşmecioğlu

Abstract:

The importance of project sustainability and success has become increasingly significant due to the proliferation of external environmental factors that have decreased project resistance in contemporary times. The primary approach to forestall the failure of projects is to ensure their long-term viability through the strategic selection of projects as creating judicious project selection framework within the organization. Decision-makers require precise decision contexts (models) that conform to the company's business objectives and sustainability expectations during the project selection process. The establishment of a rational model for project selection enables organizations to create a distinctive and objective framework for the selection process. Additionally, for the optimal implementation of this decision-making model, it is crucial to establish a Project Management Office (PMO) team and Project Steering Committee within the organizational structure to oversee the framework. These teams enable updating project selection criteria and weights in response to changing conditions, ensuring alignment with the company's business goals, and facilitating the selection of potentially viable projects. This paper presents a multi-criteria decision model for selecting project sustainability and project success criteria that ensures timely project completion and retention. The model was developed using MACBETH (Measuring Attractiveness by a Categorical Based Evaluation Technique) and was based on broadcaster companies’ expectations. The ultimate results of this study provide a model that endorses the process of selecting the appropriate project objectively by utilizing project selection and sustainability criteria along with their respective weights for organizations. Additionally, the study offers suggestions that may ascertain helpful in future endeavors.

Keywords: project portfolio management, project selection, multi-criteria decision making, project sustainability and success criteria, MACBETH

Procedia PDF Downloads 50
5570 Institutional Design for Managing Irrigation Problems: A Case Study of Farmers'- and Agency-Managed Irrigation Systems of Nepal

Authors: Tirtha Raj Dhakal, Brian Davidson, Bob Farquharson

Abstract:

Institutional design is an important aspect in efficient water resource management. In Nepal, the water supply in both farmers’- and agency-managed irrigation systems has become sub-standard because of the weak institutional framework. This study characterizes both forms of the schemes and links existing institution and governance of the schemes with its performance with reference to cost recovery, maintenance of the schemes and water distribution throughout the schemes. For this, two types of surveys were conducted. A management survey of ten farmers’-managed and five agency-managed schemes of Chitwan valley and its periphery was done. Also, a farm survey comprising 25 farmers from each of head, middle and tail regions of both schemes; Narayani Lift Irrigation Project (agency-managed) and Khageri Irrigation System (farmers’-managed) of Chitwan Valley as a case study was conducted. The results showed that cost recovery of agency-managed schemes in 2015 was less than two percent whereas service fee collection rate in farmers’-managed schemes was nearly 2/3rd that triggered poor maintenance of the schemes and unequal distribution of water throughout the schemes. Also, the institution on practice is unable to create any incentives for farmers for economical use of water as well as willingness to pay for its use. This, thus, compels the need of refined institutional framework which has been suggested in this paper aiming to improve the cost recovery and better water distribution throughout the irrigation schemes.

Keywords: cost recovery, governance, institution, schemes' performance

Procedia PDF Downloads 248
5569 A Bi-Objective Model to Address Simultaneous Formulation of Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering has been increasingly addressed within last decades as an approach to improve the project execution costs. Therefore, we have taken the problem into consideration in this paper, aiming to maximize schedules quality robustness, in addition to minimize the relevant costs. In this regard, a bi-objective mathematical model is developed to formulate the problem. Moreover, it is possible to utilize the all-unit discount for materials purchasing. The problem is then solved by the constraint method, and the Pareto front is obtained for a variety of robustness values. The applicability and efficiency of the proposed model is tested by different numerical instances, finally.

Keywords: e-constraint method, material ordering, project management, project scheduling

Procedia PDF Downloads 286
5568 Abusing Business Rescue Proceedings by a Director and Its Impact on the Ethics of Good Corporate Governance

Authors: Simphiwe Phungula

Abstract:

In the past few years, the impact of Covid 19 in South Africa has given rise to the need for business rescue proceedings where businesses are financially distressed. Even more, the looting unrest and floods in certain parts of South Africa have also played an impact on businesses’ financial stress. To help financially distressed companies in South Africa, the Companies Act (“the Act”) has introduced a business rescue procedure aimed at helping those ailing companies. This mechanism is aimed at rehabilitating financially distressed companies so that they become solvent again and if it is not possible, results in a better return for the company’s creditors or shareholders than would result from the immediate liquidation of the company. Unfortunately, since the introduction of business rescue, evidence has shown that sometimes companies resort to business rescue proceedings to seek refuge from creditors even if the facts do not justify that the company should commence business rescue. In most cases, the abuse of business rescue is done by directors who pass a resolution that the company should embark on business rescue even if evidence shows that the company should not commence the proceedings. This is done notwithstanding the principles of King Code IV which requires ethics and good governance on the part of directors. This paper demonstrates how the abuse of business rescue can impact the principles of good governance and ethics of King Code IV. It argues that directors should rethink their corporate practices, and ethical standards when passing a resolution to commence business rescue proceedings.

Keywords: business rescue, king code, corporate governance, ethics

Procedia PDF Downloads 86
5567 Designing a Model for Preparing Reports on the Automatic Earned Value Management Progress by the Integration of Primavera P6, SQL Database, and Power BI: A Case Study of a Six-Storey Concrete Building in Mashhad, Iran

Authors: Hamed Zolfaghari, Mojtaba Kord

Abstract:

Project planners and controllers are frequently faced with the challenge of inadequate software for the preparation of automatic project progress reports based on actual project information updates. They usually make dashboards in Microsoft Excel, which is local and not applicable online. Another shortcoming is that it is not linked to planning software such as Microsoft Project, which lacks the database required for data storage. This study aimed to propose a model for the preparation of reports on automatic online project progress based on actual project information updates by the integration of Primavera P6, SQL database, and Power BI for a construction project. The designed model could be applicable to project planners and controller agents by enabling them to prepare project reports automatically and immediately after updating the project schedule using actual information. To develop the model, the data were entered into P6, and the information was stored on the SQL database. The proposed model could prepare a wide range of reports, such as earned value management, HR reports, and financial, physical, and risk reports automatically on the Power BI application. Furthermore, the reports could be published and shared online.

Keywords: primavera P6, SQL, Power BI, EVM, integration management

Procedia PDF Downloads 98
5566 Analysis of Risks of Adopting Integrated Project Delivery: Application of Bayesian Theory

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasing attention from construction industry due to its reliability to deliver high-performing buildings. However, unavailable IPD specific insurance concerns the industry participants who are interested in IPD implementation. Even though the risk management capability can be enhanced using shared risk mechanism, some risks may occur when the partners do not commit themselves into the integrated practices in a desired manner. This is because the intense collaboration and close integration can not only create added value but bring new opportunistic behaviors and disputes. The study is aimed to investigate the risks of implementing IPD using Bayesian theory. IPD risk taxonomy is presented to identify all potential risks of implementing IPD and a risk network map is developed to capture the interdependencies between IPD risks. The conditional relations between risk occurrences and the impacts of IPD risks on project performances are evaluated and simulated based on Bayesian theory. The probability of project outcomes is predicted by simulation. In addition, it is found that some risks caused by integration are most possible occurred risks. This study can help the IPD project participants identify critical risks of adopting IPD to improve project performances. In addition, it is helpful to develop IPD specific insurance when the pertinent risks can be identified.

Keywords: Bayesian theory, integrated project delivery, project risks, project performances

Procedia PDF Downloads 289
5565 Urban Waste Water Governance in South Africa: A Case Study of Stellenbosch

Authors: R. Malisa, E. Schwella, K. I. Theletsane

Abstract:

Due to climate change, population growth and rapid urbanization, the demand for water in South Africa is inevitably surpassing supply. To address similar challenges globally, there has been a paradigm shift from conventional urban waste water management “government” to a “governance” paradigm. From the governance paradigm, Integrated Urban Water Management (IUWM) principle emerged. This principle emphasizes efficient urban waste water treatment and production of high-quality recyclable effluent. In so doing mimicking natural water systems, in their processes of recycling water efficiently, and averting depletion of natural water resources.  The objective of this study was to investigate drivers of shifting the current urban waste water management approach from a “government” paradigm towards “governance”. The study was conducted through Interactive Management soft systems research methodology which follows a qualitative research design. A case study methodology was employed, guided by realism research philosophy. Qualitative data gathered were analyzed through interpretative structural modelling using Concept Star for Professionals Decision-Making tools (CSPDM) version 3.64.  The constructed model deduced that the main drivers in shifting the Stellenbosch municipal urban waste water management towards IUWM “governance” principles are mainly social elements characterized by overambitious expectations of the public on municipal water service delivery, mis-interpretation of the constitution on access to adequate clean water and sanitation as a human right and perceptions on recycling water by different communities. Inadequate public participation also emerged as a strong driver. However, disruptive events such as draught may play a positive role in raising an awareness on the value of water, resulting in a shift on the perceptions on recycled water. Once the social elements are addressed, the alignment of governance and administration elements towards IUWM are achievable. Hence, the point of departure for the desired paradigm shift is the change of water service authorities and serviced communities’ perceptions and behaviors towards shifting urban waste water management approaches from “government” to “governance” paradigm.

Keywords: integrated urban water management, urban water system, wastewater governance, wastewater treatment works

Procedia PDF Downloads 143
5564 Designing a Method to Control and Determine the Financial Performance of the Real Cost Sub-System in the Information Management System of Construction Projects

Authors: Alireza Ghaffari, Hassan Saghi

Abstract:

Project management is more complex than managing the day-to-day affairs of an organization. When the project dimensions are broad and multiple projects have to be monitored in different locations, the integrated management becomes even more complicated. One of the main concerns of project managers is the integrated project management, which is mainly rooted in the lack of accurate and accessible information from different projects in various locations. The collection of dispersed information from various parts of the network, their integration and finally the selective reporting of this information is among the goals of integrated information systems. It can help resolve the main problem, which is bridging the information gap between executives and senior managers in the organization. Therefore, the main objective of this study is to design and implement an important subset of a project management information system in order to successfully control the cost of construction projects so that its results can be used to design raw software forms and proposed relationships between different project units for the collection of necessary information.

Keywords: financial performance, cost subsystem, PMIS, project management

Procedia PDF Downloads 96
5563 The School Governing Council as the Impetus for Collaborative Education Governance: A Case Study of Two Benguet Municipalities in the Highlands of Northern Philippines

Authors: Maria Consuelo Doble

Abstract:

For decades, basic public education in the Philippines has been beleaguered by a governance scenario of multi-layered decision-making and the lack of collaboration between sectors in addressing issues on poor access to schools, high dropout rates, low survival rates, and poor student performance. These chronic problems persisted despite multiple efforts making it appear that the education system is incapable of reforming itself. In the mountainous rural towns of La Trinidad and Tuba, in the province of Benguet in Northern Philippines, collaborative education governance was catalyzed by the intervention of Synergeia Foundation, a coalition made up of individuals, institutions and organizations that aim to improve the quality of education in the Philippines. Its major thrust is to empower the major stakeholders at the community level to make education work by building the capacities of School Governing Councils (SGCs). Although mandated by the Department of Education in 2006, the SGCs in Philippine public elementary schools remained dysfunctional. After one year of capacity-building by Synergeia Foundation, some SGCs are already exhibiting active community-based multi-sectoral collaboration, while there are many that are not. With the myriad of factors hindering collaboration, Synergeia Foundation is now confronted with the pressing question: What are the factors that promote collaborative governance in the SGCs so that they can address the education-related issues that they are facing? Using Emerson’s (2011) framework on collaborative governance, this study analyzes the application of collaborative governance by highly-functioning SGCs in the public elementary schools of Tuba and La Trinidad. Findings of this action research indicate how the dynamics of collaboration composed of three interactive and iterative components – principled engagement, shared motivation and capacity for joint action – have resulted in meaningful short-term impact such as stakeholder engagement and decreased a number of dropouts. The change in the behavior of stakeholders is indicative of adaptation to a more collaborative approach in governing education in Benguet highland settings such as Tuba and La Trinidad.

Keywords: basic public education, Benguet highlands, collaborative governance, School Governing Council

Procedia PDF Downloads 281
5562 The Role and Effectiveness of Audit Committee in Corporate Governance of Credit Institutions

Authors: Tina Vuko, Marija Maretić, Marko Čular

Abstract:

The aim of this study is to analyze the role and effectiveness of internal mechanism (audit committee) of corporate governance on credit institutions performance in Croatia. Based on research objective, sample of 78 credit institutions listed on Zagreb Stock Exchange, from 2007 to 2012, has been collected and efficiency index of audit committee (EIAC) has been created. Based on the sample and created EIAC, conclusions are as follows: audit committees of credit institutions have medium efficiency, based on EIAC measurement; there is a significant difference in audit committee effectiveness, in observed period; there is no positive relationship between audit committee effectiveness and credit institution performance; there is a significant difference between level of audit committee effectiveness and audit firm type. Future research should contain increased number of elements in EIAC creation and increased sample, for all obligators who need to establish audit committee.

Keywords: corporate governance, audit committee, financial institutions, efficiency index of audit committee

Procedia PDF Downloads 307
5561 Duality of Leagility and Governance: A New Normal Demand Network Management Paradigm under Pandemic

Authors: Jacky Hau

Abstract:

The prevalence of emerging technologies disrupts various industries as well as consumer behavior. Data collection has been in the fingertip and inherited through enabled Internet-of-things (IOT) devices. Big data analytics (BDA) becomes possible and allows real-time demand network management (DNM) through leagile supply chain. To enhance further on its resilience and predictability, governance is going to be examined to promote supply chain transparency and trust in an efficient manner. Leagility combines lean thinking and agile techniques in supply chain management. It aims at reducing costs and waste, as well as maintaining responsiveness to any volatile consumer demand by means of adjusting the decoupling point where the product flow changes from push to pull. Leagility would only be successful when collaborative planning, forecasting, and replenishment (CPFR) process or alike is in place throughout the supply chain business entities. Governance and procurement of the supply chain, however, is crucial and challenging for the execution of CPFR as every entity has to walk-the-talk generously for the sake of overall benefits of supply chain performance, not to mention the complexity of exercising the polices at both of within across various supply chain business entities on account of organizational behavior and mutual trust. Empirical survey results showed that the effective timespan on demand forecasting had been drastically shortening in the magnitude of months to weeks planning horizon, thus agility shall come first and preferably following by lean approach in a timely manner.

Keywords: governance, leagility, procure-to-pay, source-to-contract

Procedia PDF Downloads 102
5560 Public-Private Partnership for Community Empowerment and Sustainability: Exploring Save the Children’s 'School Me' Project in West Africa

Authors: Gae Hee Song

Abstract:

This paper aims to address the evolution of public-private partnerships for mainstreaming an evaluation approach in the community-based education project. It examines the distinctive features of Save the Children’s School Me project in terms of empowerment evaluation principles introduced by David M. Fetterman, especially community ownership, capacity building, and organizational learning. School Me is a Save the Children Korea funded-project, having been implemented in Cote d’Ivoire and Sierra Leone since 2016. The objective of this project is to reduce gender-based disparities in school completion and learning outcomes by creating an empowering learning environment for girls and boys. Both quasi-experimental and experimental methods for impact evaluation have been used to explore changes in learning outcomes, gender attitudes, and learning environments. To locate School Me in the public-private partnership framework for community empowerment and sustainability, the data have been collected from School Me progress/final reports, baseline, and endline reports, fieldwork observations, inter-rater reliability of baseline and endline data collected from a total of 75 schools in Cote d’Ivoire and Sierra Leone. The findings of this study show that School Me project has a significant evaluation component, including qualitative exploratory research, participatory monitoring, and impact evaluation. It strongly encourages key actors, girls, boys, parents, teachers, community leaders, and local education authorities, to participate in the collection and interpretation of data. For example, 45 community volunteers collected baseline data in Cote d’Ivoire; on the other hand, three local government officers and fourteen enumerators participated in the follow-up data collection of Sierra Leone. Not only does this public-private partnership improve local government and community members’ knowledge and skills of monitoring and evaluation, but the evaluative findings also help them find their own problems and solutions with a strong sense of community ownership. Such community empowerment enables Save the Children country offices and member offices to gain invaluable experiences and lessons learned. As a result, empowerment evaluation leads to community-oriented governance and the sustainability of the School Me project.

Keywords: community empowerment, Cote d’Ivoire, empowerment evaluation, public-private partnership, save the children, school me, Sierra Leone, sustainability

Procedia PDF Downloads 117
5559 Perceptions of Corporate Governance and Business Ethics Practices in Kuwaiti Islamic and Conventional Banks

Authors: Khaled Alotaibi, Salah Alhamadi, Ibraheem Almubarak

Abstract:

The study attempts to explore both corporate governance (GC) and business ethics (BE) practices in Kuwaiti banks and the relationship between CG and BE, using an accountability framework. By examining the perceptions of key stakeholder groups, this study investigates the practices of BE and CG in Islamic banks (IBs) compared to conventional banks (CBs). We contribute to the scarce studies concerned with relations between CG and BE. We have employed a questionnaire survey method for a random sample of crucial relevant stakeholder groups. The empirical analysis of the participants’ perceptions highlights the importance of applying CG regulations and BE for Kuwaiti banks and the clear link between the two concepts. We find that the main concern is not the absence of CG and BE codes, but the lack of consistent enforcement of the regulations. Such a system needs to be strictly and effectively implemented in Kuwaiti banks to protect all stakeholders’ wealth, not only that of stockholders. There are significant patterns in the CG and BE expectations among different stakeholder groups. Most interestingly, banks’ client groups illustrate high expectations concerning CG and BE practices.

Keywords: corporate governance, GC, business ethics, BE, Islamic banks, IBs, conventional banks, CBs, accountability

Procedia PDF Downloads 145
5558 Preventing Corruption in Dubai: Governance, Contemporary Strategies and Systemic Flaws

Authors: Graham Brooks, Belaisha Bin Belaisha, Hakkyong Kim

Abstract:

The problem of preventing and/or reducing corruption is a major international problem. This paper, however, specifically focuses on how organisations in Dubai are tackling the problem of money laundering. This research establishes that Dubai has a clear international anti-money laundering framework but suffers from some national weaknesses such as diverse anti-money laundering working practice, lack of communication, sharing information and disparate organisational vested self-interest.

Keywords: corruption, governance, money laundering, prevention, strategies

Procedia PDF Downloads 266
5557 An Integrated Mixed-Integer Programming Model to Address Concurrent Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering can provide more flexibility to the project scheduling problem, as the project execution costs can be enhanced. Hence, the issue has been taken into account in this paper. To do so, a mixed-integer mathematical model is developed which considers the aforementioned flexibility, in addition to the materials quantity discount and space availability restrictions. Moreover, the activities duration has been treated as decision variables. Finally, the efficiency of the proposed model is tested by different instances. Additionally, the influence of the aforementioned parameters is investigated on the model performance.

Keywords: material ordering, project scheduling, quantity discount, space availability

Procedia PDF Downloads 358
5556 A Platform for Managing Residents' Carbon Trajectories Based on the City Intelligent Model (CIM) 4.0

Authors: Chen Xi, Liu Xuebing, Lao Xuerui, Kuan Sinman, Jiang Yike, Wang Hanwei, Yang Xiaolang, Zhou Junjie, Xie Jinpeng

Abstract:

Climate change is a global problem facing humanity and this is now the consensus of the mainstream scientific community. In accordance with the carbon peak and carbon neutral targets and visions set out in the United Nations Framework Convention on Climate Change, the Kyoto Protocol and the Paris Agreement, this project uses the City Intelligent Model (CIM) and Artificial Intelligence Machine Vision (ICR) as the core technologies to accurately quantify low carbon behaviour into green corn, which is a means of guiding ecologically sustainable living patterns. Using individual communities as management units and blockchain as a guarantee of fairness in the whole cycle of green currency circulation, the project will form a modern resident carbon track management system based on the principle of enhancing the ecological resilience of communities and the cohesiveness of community residents, ultimately forming an ecologically sustainable smart village that can be self-organised and managed.

Keywords: urban planning, urban governance, CIM, artificial Intelligence, sustainable development

Procedia PDF Downloads 75
5555 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion

Authors: Mamoon Mousa Atout

Abstract:

Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.

Keywords: construction management, project objectives, resource planing and scheduling, project completion

Procedia PDF Downloads 391
5554 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan

Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat

Abstract:

This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.

Keywords: cost, overrun, building construction projects, Jordan

Procedia PDF Downloads 93
5553 Modeling Metrics for Monitoring Software Project Performance Based on the GQM Model

Authors: Mariayee Doraisamy, Suhaimi bin Ibrahim, Mohd Naz’ri Mahrin

Abstract:

There are several methods to monitor software projects and the objective for monitoring is to ensure that the software projects are developed and delivered successfully. A performance measurement is a method that is closely associated with monitoring and it can be scrutinized by looking at two important attributes which are efficiency and effectiveness both of which are factors that are important for the success of a software project. Consequently, a successful steering is achieved by monitoring and controlling a software project via the performance measurement criteria and metrics. Hence, this paper is aimed at identifying the performance measurement criteria and the metrics for monitoring the performance of a software project by using the Goal Question Metrics (GQM) approach. The GQM approach is utilized to ensure that the identified metrics are reliable and useful. These identified metrics are useful guidelines for project managers to monitor the performance of their software projects.

Keywords: component, software project performance, goal question metrics, performance measurement criteria, metrics

Procedia PDF Downloads 340
5552 Empirical Study of Correlation between the Cost Performance Index Stability and the Project Cost Forecast Accuracy in Construction Projects

Authors: Amin AminiKhafri, James M. Dawson-Edwards, Ryan M. Simpson, Simaan M. AbouRizk

Abstract:

Earned value management (EVM) has been introduced as an integrated method to combine schedule, budget, and work breakdown structure (WBS). EVM provides various indices to demonstrate project performance including the cost performance index (CPI). CPI is also used to forecast final project cost at completion based on the cost performance during the project execution. Knowing the final project cost during execution can initiate corrective actions, which can enhance project outputs. CPI, however, is not constant during the project, and calculating the final project cost using a variable index is an inaccurate and challenging task for practitioners. Since CPI is based on the cumulative progress values and because of the learning curve effect, CPI variation dampens and stabilizes as project progress. Although various definitions for the CPI stability have been proposed in literature, many scholars have agreed upon the definition that considers a project as stable if the CPI at 20% completion varies less than 0.1 from the final CPI. While 20% completion point is recognized as the stability point for military development projects, construction projects stability have not been studied. In the current study, an empirical study was first conducted using construction project data to determine the stability point for construction projects. Early findings have demonstrated that a majority of construction projects stabilize towards completion (i.e., after 70% completion point). To investigate the effect of CPI stability on cost forecast accuracy, the correlation between CPI stability and project cost at completion forecast accuracy was also investigated. It was determined that as projects progress closer towards completion, variation of the CPI decreases and final project cost forecast accuracy increases. Most projects were found to have 90% accuracy in the final cost forecast at 70% completion point, which is inlined with findings from the CPI stability findings. It can be concluded that early stabilization of the project CPI results in more accurate cost at completion forecasts.

Keywords: cost performance index, earned value management, empirical study, final project cost

Procedia PDF Downloads 150
5551 From Government-Led to Collective Action: A Case Study of the Transformation of Urban Renewal Governance in Nanjing, China

Authors: Hanjun Hu, Jinxiang Zhang

Abstract:

With the decline of "growthism", China's urbanization process has shifted from the stage of spatial expansion to the stage of optimization of built-up spaces, and urban renewal has gradually become a new wave of China's urban movement in recent years. The ongoing urban renewal movement in China not only needs to generate new motivation for urban development but also solve the backlog of social problems caused by rapid urbanization, which provides an opportunity for the transformation of China's urban governance model. Unlike previous approaches that focused on physical space and functional renewal, such as urban reconstruction, redevelopment, and reuse, the key challenge of urban renewal in the post-growth era lies in coordinating the complex interest relationships between multiple stakeholders. The traditional theoretical frameworks that focus on the structural relations between social groups are insufficient to explain the behavior logic and mutual cooperation mechanism of various groups and individuals in the current urban renewal practices. Therefore, based on the long-term tracking of the urban renewal practices in the Old City of Nanjing (OCN), this paper introduces the "collective action" theory to deeply analyze changes in the urban renewal governance model in OCN and tries to summarize the governance strategies that promote the formation of collective action within recent practices from a micro-scale. The study found that the practice in OCN experienced three different stages "government-led", "growth coalition" and "asymmetric game". With the transformation of government governance concepts, the rise of residents' consciousness of rights, and the wider participation of social organizations in recent years, the urban renewal in OCN is entering a new stage of "collective renewal action". Through the establishment of the renewal organization model, incentive policies, and dynamic negotiation mechanism, urban renewal in OCN not only achieves a relative balance between individual interests and collective interests but also makes the willingness of residents the dominant factor in formulating urban renewal policies. However, the presentation of "collective renewal action" in OCN is still mainly based on typical cases. Although the government is no longer the dominant role, a large number of resident-led collective actions have not yet emerged, which puts forward new research needs for a sustainable governance policy innovation in this action.

Keywords: urban renewal, collective action theory, governance, cooperation mechanism, China

Procedia PDF Downloads 40
5550 Collaborative Research between Malaysian and Australian Universities on Learning Analytics: Challenges and Strategies

Authors: Z. Tasir, S. N. Kew, D. West, Z. Abdullah, D. Toohey

Abstract:

Research on Learning Analytics is progressively developing in the higher education field by concentrating on the process of students' learning. Therefore, a research project between Malaysian and Australian Universities was initiated in 2015 to look at the use of Learning Analytics to support the development of teaching practice. The focal point of this article is to discuss and share the experiences of Malaysian and Australian universities in the process of developing the collaborative research on Learning Analytics. Three aspects of this will be discussed: 1) Establishing an international research project and team members, 2) cross-cultural understandings, and 3) ways of working in relation to the practicalities of the project. This article is intended to benefit other researchers by highlighting the challenges as well as the strategies used in this project to ensure such collaborative research succeeds.

Keywords: academic research project, collaborative research, cross-cultural understanding, international research project

Procedia PDF Downloads 234
5549 Knowledge Management Challenges within Traditional Procurement System

Authors: M. Takhtravanchi, C. Pathirage

Abstract:

In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; the ignoring of which would be detrimental to project performance. This issue is more prominent in projects undertaken through the traditional procurement system, as this system does not incentives project members for integration. Thus, disputes exist between the design and construction phases based on the poor management of knowledge between those two phases. This paper aims to highlight the challenges of the knowledge management that exists within the traditional procurement system. Expert interviews were conducted and challenges were identified and analysed by the Interpretive Structural Modelling (ISM) approach in order to summarise the relationships among them. Two identified key challenges are the Culture of an Organisation and Knowledge Management Policies. A knowledge of the challenges and their relationships will help project manager and stakeholders to have a better understanding of the importance of knowledge management.

Keywords: challenges, construction industry, knowledge management, traditional procurement system

Procedia PDF Downloads 422
5548 Decision Making during the Project Management Life Cycle of Infrastructure Projects

Authors: Karrar Raoof Kareem Kamoona, Enas Fathi Taher AlHares, Zeynep Isik

Abstract:

The various disciplines in the construction industry and the co-existence of the people in the various disciplines are what builds well-developed, closely-knit interpersonal skills at various hierarchical levels thus leading to a varied way of leadership. The varied decision making aspects during the lifecycle of a project include: autocratic, participatory and last but not least, free-rein. We can classify some of the decision makers in the construction industry in a hierarchical manner as follows: project executive, project manager, superintendent, office engineer and finally the field engineer. This survey looked at how decisions are made during the construction period by the key stakeholders in the project. From the paper it is evident that the three decision making aspects can be used at different times or at times together in order to bring out the best leadership decision. A blend of different leadership styles should be used to enhance the success rate during the project lifecycle.

Keywords: leadership style, construction, decision-making, built environment

Procedia PDF Downloads 350
5547 Analysis of the Interference from Risk-Determining Factors of Cooperative and Conventional Construction Contracts

Authors: E. Harrer, M. Mauerhofer, T. Werginz

Abstract:

As a result of intensive competition, the building sector is suffering from a high degree of rivalry. Furthermore, there can be observed an unbalanced distribution of project risks. Clients are aimed to shift their own risks into the sphere of the constructors or planners. The consequence of this is that the number of conflicts between the involved parties is inordinately high or even increasing; an alternative approach to counter on that developments are cooperative project forms in the construction sector. This research compares conventional contract models and models with partnering agreements to examine the influence on project risks by an early integration of the involved parties. The goal is to show up deviations in different project stages from the design phase to the project transfer phase. These deviations are evaluated by a survey of experts from the three spheres: clients, contractors and planners. By rating the influence of the participants on specific risk factors it is possible to identify factors which are relevant for a smooth project execution.

Keywords: building projects, contract models, partnering, project risks

Procedia PDF Downloads 260