Search results for: project duration
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6267

Search results for: project duration

5967 Relationship between Exercise Activity with Incidence of Overweight-Obesity in Medical Students

Authors: Randy M. Fitratullah, Afriwardi, Nurhayati

Abstract:

Overweight-obesity caused by exercise. The objective of this research is to analyze the relation between exercise with the incidence of overweight-obesity of medical students of medical faculty of Andalas Univesity batch 2013. This is an analytical observational research with case-control method. This research conducted in FK Unand on September-October 2015. The population of this research is medical students batch 2013. 26 samples (13 samples were case, 13 samples were control) were taken by purposive sampling technique and analysed using statistical univariate and bivariate analysis. Exercise questionnaire was used as research instruments. Based on the interview with questionnaire, anaerobic exercise was majority in case group and aerobic exercise was majority in control group. The case and control group have a rare category in exercise. Less category was majority in exercise duration of case and enough category was majority in control group. Bivariate analysis is using chi-square test with cell combining to 2x2 table, obtained p-value=0.097 in sort of exercise, p-value=1,000 in the frequency of exercise, and p-value=0,112 in duration of exercise, which means statistically unsignificant. There is no relation between exercise with the incidence of overweight-obesity of medical students of FK Unand batch 2013. For medical students suffers overweight-obesity is suggested for increase the frequency of exercise.

Keywords: overweight-obesity, exercise, aerobic, anaerobic, frequency, duration

Procedia PDF Downloads 240
5966 Laboratory Analysis of Stormwater Runoff Hydraulic and Pollutant Removal Performance of Pervious Concrete Based on Seashell By-Products

Authors: Jean-Jacques Randrianarimanana, Nassim Sebaibi, Mohamed Boutouil

Abstract:

In order to solve problems associated with stormwater runoff in urban areas and their effects on natural and artificial water bodies, the integration of new technical solutions to the rainwater drainage becomes even more essential. Permeable pavement systems are one of the most widely used techniques. This paper presents a laboratory analysis of stormwater runoff hydraulic and pollutant removal performance of permeable pavement system using pervious pavements based on seashell products. The laboratory prototype is a square column of 25 cm of side and consists of the surface in pervious concrete, a bedding of 3 cm in height, a geotextile and a subbase layer of 50 cm in height. A series of constant simulated rain events using semi-synthetic runoff which varied in intensity and duration were carried out. The initial vertical saturated hydraulic conductivity of the entire pervious pavement system was 0.25 cm/s (148 L/m2/min). The hydraulic functioning was influenced by both the inlet flow rate value and the test duration. The total water losses including evaporation ranged between 9% to 20% for all hydraulic experiments. The temporal and vertical variability of the pollutant removal efficiency (PRE) of the system were studied for total suspended solids (TSS). The results showed that the PRE along the vertical profile was influenced by the size of the suspended solids, and the pervious paver has the highest capacity to trap pollutant than the other porous layers of the permeable pavement system after the geotextile. The TSS removal efficiency was about 80% for the entire system. The first-flush effect of TSS was observed, but it appeared only at the beginning (2 to 6 min) of the experiments. It has been shown that the PPS can capture first-flush. The project in which this study is integrated aims to contribute to both the valorization of shellfish waste and the sustainable management of rainwater.

Keywords: hydraulic, pervious concrete, pollutant removal efficiency, seashell by-products, stormwater runoff

Procedia PDF Downloads 194
5965 Software Development and Team Diversity

Authors: J. Congalton, K. Logan, B. Crump

Abstract:

Software is a critical aspect of modern life. However it is costly to develop and industry initiatives have focused on reducing costs and improving the productivity. Increasing, software is being developed in teams, and with greater globalization and migration, the teams are becoming more ethnically diverse. This study investigated whether diversity in terms of ethnicity impacted on the productivity of software development. Project managers of software development teams were interviewed. The study found that while some issues did exist due to language problems, when project managers created an environment of trust and friendliness, diversity made a positive contribution to productivity.

Keywords: diversity, project management, software development, team work

Procedia PDF Downloads 350
5964 Future Sustainable Mobility for Colorado

Authors: Paolo Grazioli

Abstract:

In this paper, we present the main results achieved during an eight-week international design project on Colorado Future Sustainable Mobilitycarried out at Metropolitan State University of Denver. The project was born with the intention to seize the opportunity created by the Colorado government’s plan to promote e-bikes mobility by creating a large network of dedicated tracks. The project was supported by local entrepreneurs who offered financial and professional support. The main goal of the project was to engage design students with the skills to design a user-centered, original vehicle that would satisfy the unarticulated practical and emotional needs of “Gen Z” users by creating a fun, useful, and reliablelife companion that would helps users carry out their everyday tasks in a practical and enjoyable way. The project was carried out with the intention of proving the importance of the combination of creative methods with practical design methodologies towards the creation of an innovative yet immediately manufacturable product for a more sustainable future. The final results demonstrate the students' capability to create innovative and yet manufacturable products and, especially, their ability to create a new design paradigm for future sustainable mobility products. The design solutions explored n the project include collaborative learning and human-interaction design for future mobility. The findings of the research led students to the fabrication of two working prototypes that will be tested in Colorado and developed for manufacturing in the year 2024. The project showed that collaborative design and project-based teaching improve the quality of the outcome and can lead to the creation of real life, innovative products directly from the classroom to the market.

Keywords: sustainable transportation design, interface design, collaborative design, user -centered design research, design prototyping

Procedia PDF Downloads 71
5963 Attention States in the Sustained Attention to Response Task: Effects of Trial Duration, Mind-Wandering and Focus

Authors: Aisling Davies, Ciara Greene

Abstract:

Over the past decade the phenomenon of mind-wandering in cognitive tasks has attracted widespread scientific attention. Research indicates that mind-wandering occurrences can be detected through behavioural responses in the Sustained Attention to Response Task (SART) and several studies have attributed a specific pattern of responding around an error in this task to an observable effect of a mind-wandering state. SART behavioural responses are also widely accepted as indices of sustained attention and of general attention lapses. However, evidence suggests that these same patterns of responding may be attributable to other factors associated with more focused states and that it may also be possible to distinguish the two states within the same task. To use behavioural responses in the SART to study mind-wandering, it is essential to establish both the SART parameters that would increase the likelihood of errors due to mind-wandering, and exactly what type of responses are indicative of mind-wandering, neither of which have yet been determined. The aims of this study were to compare different versions of the SART to establish which task would induce the most mind-wandering episodes and to determine whether mind-wandering related errors can be distinguished from errors during periods of focus, by behavioural responses in the SART. To achieve these objectives, 25 Participants completed four modified versions of the SART that differed from the classic paradigm in several ways so to capture more instances of mind-wandering. The duration that trials were presented for was increased proportionately across each of the four versions of the task; Standard, Medium Slow, Slow, and Very Slow and participants intermittently responded to thought probes assessing their level of focus and degree of mind-wandering throughout. Error rates, reaction times and variability in reaction times decreased in proportion to the decrease in trial duration rate and the proportion of mind-wandering related errors increased, until the Very Slow condition where the extra decrease in duration no longer had an effect. Distinct reaction time patterns around an error, dependent on level of focus (high/low) and level of mind-wandering (high/low) were also observed indicating four separate attention states occurring within the SART. This study establishes the optimal duration of trial presentation for inducing mind-wandering in the SART, provides evidence supporting the idea that different attention states can be observed within the SART and highlights the importance of addressing other factors contributing to behavioural responses when studying mind-wandering during this task. A notable finding in relation to the standard SART, was that while more errors were observed in this version of the task, most of these errors were during periods of focus, raising significant questions about our current understanding of mind-wandering and associated failures of attention.

Keywords: attention, mind-wandering, trial duration rate, Sustained Attention to Response Task (SART)

Procedia PDF Downloads 161
5962 Postharvest Losses and Handling Improvement of Organic Pak-Choi and Choy Sum

Authors: Pichaya Poonlarp, Danai Boonyakiat, C. Chuamuangphan, M. Chanta

Abstract:

Current consumers’ behavior trends have changed towards more health awareness, the well-being of society and interest of nature and environment. The Royal Project Foundation is, therefore, well aware of organic agriculture. The project only focused on using natural products and utilizing its highland biological merits to increase resistance to diseases and insects for the produce grown. The project also brought in basic knowledge from a variety of available research information, including, but not limited to, improvement of soil fertility and a control of plant insects with biological methods in order to lay a foundation in developing and promoting farmers to grow quality produce with a high health safety. This will finally lead to sustainability for future highland agriculture and a decrease of chemical use on the highland area which is a source of natural watershed. However, there are still shortcomings of the postharvest management in term of quality and losses, such as bruising, rottenness, wilting and yellowish leaves. These losses negatively affect the maintenance and a shelf life of organic vegetables. Therefore, it is important that a research study of the appropriate and effective postharvest management is conducted for an individual organic vegetable to minimize product loss and find root causes of postharvest losses which would contribute to future postharvest management best practices. This can be achieved through surveys and data collection from postharvest processes in order to conduct analysis for causes of postharvest losses of organic pak-choi, baby pak-choi, and choy sum. Consequently, postharvest losses reduction strategies of organic vegetables can be achieved. In this study, postharvest losses of organic pak choi, baby pak-choi, and choy sum were determined at each stage of the supply chain starting from the field after harvesting, at the Development Center packinghouse, at Chiang Mai packinghouse, at Bangkok packing house and at the Royal Project retail shop in Chiang Mai. The results showed that postharvest losses of organic pak-choi, baby pak-choi, and choy sum were 86.05, 89.05 and 59.03 percent, respectively. The main factors contributing to losses of organic vegetables were due to mechanical damage and underutilized parts and/or short of minimum quality standard. Good practices had been developed after causes of losses were identified. Appropriate postharvest handling and management, for example, temperature control, hygienic cleaning, and reducing the duration of the supply chain, postharvest losses of all organic vegetables should be able to remarkably reduced postharvest losses in the supply chain.

Keywords: postharvest losses, organic vegetables, handling improvement, shelf life, supply chain

Procedia PDF Downloads 451
5961 Improving Decision-Making in Multi-Project Environments within Organizational Information Systems Using Blockchain Technology

Authors: Seyed Hossein Iranmanesh, Hassan Nouri, Seyed Reza Iranmanesh

Abstract:

In the dynamic and complex landscape of today’s business, organizations often face challenges in impactful decision-making across multi-project settings. To efficiently allocate resources, coordinate tasks, and optimize project outcomes, establishing robust decision-making processes is essential. Furthermore, the increasing importance of information systems and their integration within organizational workflows introduces an additional layer of complexity. This research proposes the use of blockchain technology as a suitable solution to enhance decision-making in multi-project environments, particularly within the realm of information systems. The conceptual framework in this study comprises four independent variables and one dependent variable. The identified independent variables for the targeted research include: Blockchain Layer in Integrated Systems, Quality of Generated Information ,User Satisfaction with Integrated Systems and Utilization of Integrated Systems. The project’s performance, considered as the dependent variable and moderated by organizational policies and procedures, reflects the impact of blockchain technology adoption on organizational effectiveness1. The results highlight the significant influence of blockchain implementation on organizational performance.

Keywords: multi-project environments, decision support systems, information systems, blockchain technology, decentralized systems.

Procedia PDF Downloads 34
5960 The Project Evaluation to Develop the Competencies, Capabilities, and Skills in Repairing Computers of People in Jompluak Local Municipality, Bang Khonthi District, Samut Songkram Province

Authors: Wilailuk Meepracha

Abstract:

The results of the study on the project evaluation to develop the competencies, capabilities, and skills in repairing computers of people in Jompluak Local Municipality, Bang Khonthi District, Samut Songkram Province showed that the overall result was good (4.33). When considering on each aspect, it was found that the highest one was on process evaluation (4.60) followed by product evaluation (4.50) and the least one was on feeding factor (3.97). When considering in details, it was found that: 1) the context aspect was high (4.23) with the highest item on the arrangement of the training situation (4.67) followed by the appropriateness of the target (4.30) and the least aspect was on the project cooperation (3.73). 2) The evaluation of average overall primary factor or feeding factor showed high value (4.23) while the highest aspect was on the capability of the trainers (4.47) followed by the suitable venue (4.33) while the least aspect was on the insufficient budget (3.47). 3) The average result of process evaluation was very high (4.60). The highest aspect was on the follow-op supervision (4.70) followed by responsibility of each project staffs (4.50) while the least aspect was on the present situation and the problems of the community (4.40). 4) The overall result of the product evaluation was very high (4.50). The highest aspect was on the diversity of the activities and the community integration (4.67) followed by project target achievement (4.63) while the least aspect was on continuation and regularity of the activities (4.33). The trainees reported high satisfaction on the project management at very high level (43.33%) while 40% reported high level and 16.67% reported moderate level. Suggestions for the project were on the additional number of the computer sets (37.78%) followed by longer training period especially on computer skills (43.48%).

Keywords: project evaluation, competency development, the capability on computer repairing and computer skills

Procedia PDF Downloads 284
5959 Knowledge Sharing within a Team: Exploring the Antecedents and Role of Trust

Authors: Li Yan Hei, Au Wing Tung

Abstract:

Knowledge sharing is a process in which individuals mutually exchange existing knowledge and co-create new knowledge. Previous research has confirmed that trust is positively associated with knowledge sharing. However, only few studies systematically examined the antecedents of trust and these antecedents’ impacts on knowledge sharing. In order to explore and understand the relationships between trust and knowledge sharing in depth, this study proposed a relationship maintenance-based model to examine the antecedents of trust in knowledge sharing in project teams. Three critical elements within a project team were measured, including the environment, project team partner and interaction. It was hypothesized that the trust would lead to knowledge sharing and in turn result in perceived good team performance. With a sample of 200 Hong Kong employees, the proposed model was evaluated with structural equation modeling. Expected findings are trust will contribute to knowledge sharing, resulting in better team performance. The results will also offer insights into antecedents of trust that play a heavy role in the focal relationship. The present study contributes to a more holistic understanding of relationship between trust and knowledge sharing by linking the antecedents and outcomes. The findings will raise the awareness of project managers on ways to promote knowledge sharing.

Keywords: knowledge sharing, project management, team, trust

Procedia PDF Downloads 587
5958 Design and Māori Values: A Rebrand Project for the Social Enterprise Sector

Authors: M. Kiarna, S. Junjira, S. Casey, M. Nolwazi, M. S. Marcos, A. T. Tatiana, L. Cassandra

Abstract:

This paper details a rebrand design project developed for a non-profitable organization called Te Roopu Waiora (TRW), which is currently located in Auckland, Aotearoa New Zealand. This social enterprise is dedicated to supporting the Māori community living with sensorial, physical and intellectual disabilities (whānau hauā). As part of a year three bachelor design brief, the rebrand project enabled students to reflect on Kaupapa Māori principles and appropriately address the values of the organisation. As such, the methodology used a pragmatic paradigm approach and mixed methods design practices involving a human-centred design to problem solving. As result, the student project culminated in the development in a range of cohesive design artefacts, aiming to improve the rentability and perception of the brand with the audience and stakeholders.

Keywords: design in Aotearoa New Zealand, Kaupapa Māori, branding, design education, human-centered design

Procedia PDF Downloads 111
5957 Evaluation of Critical Success Factors in Public-Private Partnership Projects Based on Structural Equation Model

Authors: Medya Fathi

Abstract:

Today, success in the construction industry is not merely about project completion in a timely manner within an established budget and meeting required quality considerations. Management practices and partnerships need to be emphasized as well. In this regard, critical success factors (CSFs) cover necessary considerations for a successful project beyond the traditional success definition, which vary depending on project outcomes, delivery methods, project types, and partnering processes. Despite the extensive research on CSFs, there is a paucity of studies that examine CSFs for public-private partnership (PPP); the delivery method, which has gained increasing attention from researchers and practitioners over the last decade with a slow but growing adoption in the transportation infrastructure, particularly, highway industry. To fill this knowledge gap, data are collected through questionnaire surveys among private and public parties involved in PPP transportation projects in the United States. Then, the collected data are analyzed to explore the causality relationships between CSFs and PPP project success using structural equation model and provide a list of factors with the greatest influence. This study advocates adopting a critical success factor approach to enhance PPP success in the U.S. transportation industry and identify elements essential for public and private organizations to achieve this success.

Keywords: project success, critical success factors, public-private partnership, transportation

Procedia PDF Downloads 69
5956 Feasibility Study for Removing Atherosclerotic Plaque Using the Thermal Effects of a Planar Rectangular High Intensity Ultrasound Transducer

Authors: Christakis Damianou, Christos Christofi, Nicos Mylonas

Abstract:

The aim of this paper was to conduct a feasibility study using a flat rectangular (3x10 mm2) MRI compatible transducer operating at 5 MHz for destroying atherosclerotic plaque using the thermal effects of ultrasound in in vitro models. A parametric study was performed where the time needed to ablate the plaque was studied as a function of Spatial Average Temporal Average (SATA) intensity, and pulse duration. The time needed to ablate plaque is directly related to intensity, and pulse duration. The temperature measured close to the artery is above safe limits and therefore thermal ultrasound does not have a place in removing plaques in arteries.

Keywords: ultrasound, atherosclerotic, plaque, pulse

Procedia PDF Downloads 274
5955 Risk Factors for Maternal and Neonatal Morbidities Associated with Operative Vaginal Deliveries

Authors: Maria Reichenber Arcilla

Abstract:

Objective: To determine the risk factors for maternal and neonatal complications associated with operative vaginal deliveries. Methods: A retrospective chart review of 435 patients who underwent operative vaginal deliveries was done. Patient profiles – age, parity, AOG, duration of labor – and outcomes – birthweight, maternal and neonatal complications - were tabulated and multivariable analysis and logistic regression were performed using SPSS® Statistics Base. Results and Conclusion: There was no significant difference in the incidence of maternal and neonatal complications between those that underwent vacuum and forceps extraction. Among the variables analysed, parity and duration of labor reached statistical significance. The odds of maternal complications were 3 times higher among nulliparous patients. Neonatal complications were seen in those whose labor lasted more than 9 hours.

Keywords: operative vaginal deliveries, maternal, neonatal, morbidity

Procedia PDF Downloads 382
5954 Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area

Authors: Yousef S. Al-Othman

Abstract:

The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.

Keywords: oil and gas, risk management, construction projects, project lead time

Procedia PDF Downloads 90
5953 An Argument for Agile, Lean, and Hybrid Project Management in Museum Conservation Practice: A Qualitative Evaluation of the Morris Collection Conservation Project at the Sainsbury Centre for Visual Arts

Authors: Maria Ledinskaya

Abstract:

This paper is part case study and part literature review. It seeks to introduce Agile, Lean, and Hybrid project management concepts from business, software development, and manufacturing fields to museum conservation by looking at their practical application on a recent conservation project at the Sainsbury Centre for Visual Arts. The author outlines the advantages of leaner and more agile conservation practices in today’s faster, less certain, and more budget-conscious museum climate where traditional project structures are no longer as relevant or effective. The Morris Collection Conservation Project was carried out in 2019-2021 in Norwich, UK, and concerned the remedial conservation of around 150 Abstract Constructivist artworks bequeathed to the Sainsbury Centre by private collectors Michael and Joyce Morris. It was a medium-sized conservation project of moderate complexity, planned and delivered in an environment with multiple known unknowns – unresearched collection, unknown conditions and materials, unconfirmed budget. The project was later impacted by the COVID-19 pandemic, introducing indeterminate lockdowns, budget cuts, staff changes, and the need to accommodate social distancing and remote communications. The author, then a staff conservator at the Sainsbury Centre who acted as project manager on the Morris Project, presents an incremental, iterative, and value-based approach to managing a conservation project in an uncertain environment. The paper examines the project from the point of view of Traditional, Agile, Lean, and Hybrid project management. The author argues that most academic writing on project management in conservation has focussed on a Traditional plan-driven approach – also known as Waterfall project management – which has significant drawbacks in today’s museum environment due to its over-reliance on prediction-based planning and its low tolerance to change. In the last 20 years, alternative Agile, Lean and Hybrid approaches to project management have been widely adopted in software development, manufacturing, and other industries, although their recognition in the museum sector has been slow. Using examples from the Morris Project, the author introduces key principles and tools of Agile, Lean, and Hybrid project management and presents a series of arguments on the effectiveness of these alternative methodologies in museum conservation, including the ethical and practical challenges to their implementation. These project management approaches are discussed in the context of consequentialist, relativist, and utilitarian developments in contemporary conservation ethics. Although not intentionally planned as such, the Morris Project had a number of Agile and Lean features which were instrumental to its successful delivery. These key features are identified as distributed decision-making, a co-located cross-disciplinary team, servant leadership, focus on value-added work, flexible planning done in shorter sprint cycles, light documentation, and emphasis on reducing procedural, financial, and logistical waste. Overall, the author’s findings point in favour of a hybrid model, which combines traditional and alternative project processes and tools to suit the specific needs of the project.

Keywords: agile project management, conservation, hybrid project management, lean project management, waterfall project management

Procedia PDF Downloads 51
5952 Fostering Students’ Active Learning in Speaking Class through Project-Based Learning

Authors: Rukminingsih Rukmi

Abstract:

This paper addresses the issue of L2 teaching speaking to ESL students by fostering their active learning through project-based learning. Project-based learning was employed in classrooms where teachers support students by giving sufficient guidance and feedback. The students drive the inquiry, engage in research and discovery, and collaborate effectively with teammates to deliver the final work product. The teacher provides the initial direction and acts as a facilitator along the way. This learning approach is considered helpful for fostering students’ active learning. that the steps in implementing of project-based learning that fosters students’ critical thinking in TEFL class are in the following: (1) Discussing the materials about Speaking Class, (2) Working with the group to construct scenario of ways on speaking practice, (3) Practicing the scenario, (4) Recording the speaking practice into video, and (5) Evaluating the video product. This research is aimed to develop a strategy of teaching speaking by implementing project-based learning to improve speaking skill in the second Semester of English Department of STKIP PGRI Jombang. To achieve the purpose, the researcher conducted action research. The data of the study were gathered through the following instruments: test, observation checklists, and questionnaires. The result was indicated by the increase of students’ average speaking scores from 65 in the preliminary study, 73 in the first cycle, and 82 in the second cycle. Besides, the results of the study showed that project-based learning considered to be appropriate strategy to give students the same amount of chance in practicing their speaking skill and to pay attention in creating a learning situation.

Keywords: active learning, project-based learning, speaking ability, L2 teaching speaking

Procedia PDF Downloads 377
5951 Engaging Local Communities on Large-Scale Construction Project

Authors: Melissa Teo

Abstract:

It is increasingly important that project managers develop greater capabilities to better manage the social, cultural, political, environmental and economic impacts on proposed construction projects. These challenges are best resolved in consultation with communities rather than in conflict with them. This is particularly important on controversial projects which are projects that have obtained government sanctioned ‘development approval’ but not ‘community approval’. While a rich body of research and intellectual frameworks exist in the fields of urban geography and planning to understand and manage community concerns during the pre-development approval stages of new projects, current theoretical frameworks guiding community engagement in project management are inadequate. A new and innovative research agenda is needed to guide thinking about the role of local communities in the construction process and is an important research gap that needs to be filled. Within this context, this research aims to assess the effectiveness of strategies adopted by project teams to engage with local communities so as to capture lessons learnt to apply to future projects. This paper reports a research methodology which uses Arnstein’s model of participation to better understand how power differentials between the project team and local communities can influence the adoption of community engagement strategies. A case study approach is utilizing interviews and documentary analysis of a large-scale controversial construction project in Queensland, Australia is presented. The findings will result in a number of recommendations to guide community engagement practices on future projects.

Keywords: community engagement, construction, case study, project management

Procedia PDF Downloads 236
5950 Pipeline Construction in Oil and Gas Fields as per Kuwait Oil Company Procedures

Authors: Jasem Al-Safran

Abstract:

Nowadays Oil and Gas industry considered as one of the biggest industries around the world although it caused a lot of pollution to the world and it caused many damages to the mankind and the other creatures around the globe it still one of the biggest industries, it create millions of careers around the globe which reduced the poorness level and make the mankind life’s much more comfortable you may compare the humans life before the exploration of the oil and after the oil industries development. Construction project’s consist of 3 major sections also we call them EPC projects the first section is the detailed engineering, the second section is the procurements section and finally is the Construction section, each section required a specialized work force with a different skills in order to handle the work load for example in the oil sector and depending on the nature of the project and the project size the Construction team required mechanical engineer, civil engineer, electrical engineer and instrumentation engineer, also a work site supervisor for each disciplines also a huge number of labors, technicians and many equipment’s.

Keywords: Construction, EPC, Project, Work force

Procedia PDF Downloads 95
5949 Managing a Cross-Disciplinary Research Project in a University: The Case of LEARNIT

Authors: Yulia Stukalina

Abstract:

This paper explores the main issues related to implementing a cross-disciplinary research project (LEARNIT) based on collaboration between universities from three European countries. The paper discusses the importance of using the holistic approach to managing scientific projects with due account for the complicated nature of the educational environment of a modern university. To illustrate this approach, the author describes some actions to be taken for supporting different focus areas of LEARNIT project, in the process using integrated tangible, non-tangible, and semi-tangible resources of the partner university. The methodology of the paper is based on the academic literature and research papers analysis within management discipline. The analysis reported in the paper is also based on the author’s professional experience in the area of managing international research projects in a university.

Keywords: LEARNIT, focus area, project management, resources

Procedia PDF Downloads 249
5948 Exploratory Study of Community Interaction Project in Environment Education for Youth

Authors: Archana Vadeyar, Smita Phatak

Abstract:

Nurturing flora and fauna is the crux of Environment Education yet one tends to forget to nurture the human minds. Youth education presently is too academic, exam oriented and lacks all-round development. A project is whole-hearted purposeful activity proceeding in a social environment. Projects at +2 stages have become, just an easier way of securing marks. The purpose of this study was to explore the concept of an experiential environment education (EE) project for youth involving community interaction. Youth were encouraged to plan activities for children-based on EE through General knowledge (GK), language, math, science, fun games, quiz, sports, art and craft, stories. A purposive sample of 73 students was administered a self-prepared and validated questionnaire; supported by content analysis of reports from EE Journals of 21 students and some photos. Responses of students revealed that project was a joyful and motivating experience, with learnings and realizations, developed concern for others, made them feel responsible, happy and contented. Community interaction programs need to be included in the regular schedule to add more meaning to EE projects and cater to the needs of adolescents for diverting youth energy towards positive action.

Keywords: experiential, project, environment education, youth, community interaction

Procedia PDF Downloads 159
5947 The Role of E-Learning in Science, Technology, Engineering, and Math Education

Authors: Annette McArthur

Abstract:

The traditional model of teaching and learning, where ICT sits as a separate entity is not a model for a 21st century school. It is imperative that teaching and learning embraces technological advancements. The challenge in schools lies in shifting the mindset of teachers so they see ICT as integral to their teaching, learning and curriculum rather than a separate E-Learning curriculum stream. This research project investigates how the effective, planned, intentional integration of ICT into a STEM curriculum, can enable the shift in the teacher mindset. The project incorporated: • Developing a professional coaching relationship with key STEM teachers. • Facilitating staff professional development involving student centered project based learning pedagogy in the context of a STEM curriculum. • Facilitating staff professional development involving digital literacy. • Establishing a professional community where collaboration; sharing and reflection were part of the culture of the STEM community. • Facilitating classroom support for the effective delivery innovative STEM curriculum. • Developing STEM learning spaces where technologies were used to empower and engage learners to participate in student-centered, project-based learning.

Keywords: e-learning, ICT, project based learning, STEM

Procedia PDF Downloads 281
5946 Biogas Production Improve From Waste Activated Sludge Using Fenton Oxidation

Authors: A. Hassiba Zemmouri, B. Nabil Mameri, C. Hakim Lounici

Abstract:

In this study, the effect of Fenton technology pretreatment on the anaerobic digestion of excess waste activated sludge (WAS) was investigated. The variation of physicochemical characteristics (TOC, DS, VSS, VS) and biogas volume (as form of value added products) were also evaluated. The preselected operator conditions of Fenton pretreatment were 0.01ml H2O2/g SS, 150 [H2O2]/[Fe2+], 25g/l TS, at 25 °C and 30, 60 and120 min as treatment duration. The main results show a Maximum solubilization and biodegradability (70%) obtained at 120 min of Fenton pretreatment duration. An increasing of TOC in soluble phase related obviously by releasing organic substances of sludge flocs was contested. Improving in biogas volume was also, increased. Fenton oxidation pretreatment may be a promising chemical pre-treatment for a benefic digestion, stabilization and volume reduction.

Keywords: waste activated sludge, fenton pre-treatment, biodegradability, biogas

Procedia PDF Downloads 620
5945 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 130
5944 Identification of Successful Criteria for Measuring Large Infrastructure Projects Performance in Malaysia

Authors: M. A. N. Masrom, M. H. I. A. Rahim, G. K. Chen, S. Mohamed

Abstract:

Large infrastructure project is one of significant category in the development of Malaysian construction industry. This type of project has been recognized as a high complexity project with numerous construction risks, large cost involvement, highly technical requirements and divers of resources. Besides, the development of large infrastructure such as highway, railway, Mass Rapid Transit (MRT) and airport are also needed a large investment of public and private sector. To accomplish the development successfully, several challenges has to be determined prior the project commencement. To date, a comprehensive assessment of key success criteria particularly for large infrastructure in developing country such as Malaysia, is still not systematically defined and therefore, it needs further investigation. This paper aims to explore the potential success criteria that would be useful in gauging overall performance of large infrastructure implementation particularly in developing country. Previous successful criteria studies were used to develop a conceptual framework that possibly suitable for measuring large infrastructure performance. The findings show that successful criteria of infrastructure projects implementation could be grouped according to several key elements as it seems significant to the participants in prioritizing project challenges more systematically.

Keywords: successful criteria, performance, large infrastructure, Malaysia

Procedia PDF Downloads 383
5943 Abating the Barriers to the Deployment of RFID for Construction Project Delivery in South Africa

Authors: Matthew O. Ikuabe, Ayodeji E. Oke, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The use of technological innovations have been touted to be beneficial in the delivery of construction projects. Particularly, Radio Frequency Identification (RFID) technology is widely regarded to be of immense advantage for the management of construction projects. This study focused on evaluating the barriers to the use of Radio Frequency Identification (RFID) technology for the delivery of construction projects. Using Gauteng Provincein South Africa as the study area, questionnaire was used in eliciting responses from construction professionals, which made up the population of the study. Retrieved data was analysed using Mean Item Score and One-Sample t-test. Findings from the study showed that the most significant barriers to the deployment of RFID for construction project delivery are high cost and lack of awareness. Conclusively, the study made recommendations that would aid in the abatement of the barriers to the use of RFID technology for construction project delivery.

Keywords: barriers, construction, project delivery, RFID

Procedia PDF Downloads 173
5942 Constructability Driven Engineering in Oil and Gas Projects

Authors: Srikanth Nagarajan, P. Parthasarathy, Frits Lagers

Abstract:

Lower crude oil prices increased the pressure on oil and gas projects. Being competitive becomes very important and critical for the success in any industry. Increase in size of the project multiplies the magnitude of the issue. Timely completion of projects within the budget and schedule is very important for any project to succeed. A simple idea makes a larger impact on the total cost of the plant. In this robust world, the phases of engineering right from licensing technology, feed, different phases of detail engineering, procurement and construction has been so much compressed that they overlap with each other. Hence constructability techniques have become very important. Here in this paper, the focus will be on how these techniques can be implemented and reduce cost with the help of a case study. Constructability is a process driven by the need to impact project’s construction phase resulting in improved project delivery, costs and schedule. In construction phase of one of our fast-track mega project, it was noticed that there was an opportunity to reduce significant amount of cost and schedule by implementing Constructability study processes. In this case study, the actual methodology adopted during engineering and construction and the way for doing it better by implementing Constructability techniques with collaborative engineering efforts will be explained.

Keywords: being competitive, collaborative engineering, constructability, cost reduction

Procedia PDF Downloads 390
5941 Students’ Satisfaction towards Science Project Subjects Based on Education Quality Assurance

Authors: Satien Janpla, Radasa Pojard

Abstract:

The objective of this study is to study bachelor's degree students’ satisfaction towards the course of Science Project based on education quality assurance. It is a case study of the Faculty of Science and Technology, Suan Sunandha Rajabhat University. The findings can be used as a guideline for analysis and revision of the content and the teaching/learning process of the subject. Moreover, other interesting factors such as teaching method can be developed based on education quality assurance. Population in this study included 267 students in year 3 and year 4 of the Faculty of Science and Technology, Suan Sunandha Rajabhat University who registered in the subject of Science Project in semester 1/2556. The research tool was a questionnaire and the research statistics included arithmetic mean and SD. The results showed that the study of bachelor degree students’ satisfaction towards the subject of Science Project based on education quality assurance reported high satisfaction with the average of 3.51. Students from different departments showed no difference in their satisfaction.

Keywords: satisfaction, science project subject, education quality assurance, students

Procedia PDF Downloads 328
5940 Documentation Project on Boat Models from Saqqara, in the Grand Egyptian Museum

Authors: Ayman Aboelkassem, Mohamoud Ali, Rezq Diab

Abstract:

This project aims to document and preserve boat models which were discovered in the Saqqara by Czech Institute of Egyptology archeological mission at Saqqara (GEM numbers, 46007, 46008, 46009). These boat models dates back to Egyptian Old Kingdom and have been transferred to the Conservation Center of the Grand Egyptian Museum, to be displayed at the new museum.The project objectives making such boat models more visible to visitors through the use of 3D reconstructed models and high resolution photos which describe the history of using the boats during the Ancient Egyptian history. Especially, The Grand Egyptian Museum is going to exhibit the second boat of King Khufu from Old kingdom. The project goals are to document the boat models and arrange an exhibition, where such Models going to be displayed next to the Khufu Second Boat. The project shows the importance of using boats in Ancient Egypt, and connecting their usage through Ancient Egyptian periods till now. The boat models had a unique Symbolized in ancient Egypt and connect the public with their kings. The Egyptian kings allowed high ranked employees to put boat models in their tombs which has a great meaning that they hope to fellow their kings in the journey of the afterlife.

Keywords: archaeology, boat models, 3D digital tools for heritage management, museums

Procedia PDF Downloads 108
5939 Green Building Delivery: Exploring Lessons and the State of Practice in Nigeria

Authors: Ayodele E. Ikudayisi, Yomi M. D. Adedeji, Olumuyiwa B. Adegun

Abstract:

The level of adoption of green building (GB) schemes in Nigeria is low. The prevailing focus on economic development has overshadowed sustainability concerns. Despite these, few project cases exist in Nigeria in which sustainability goals have been achieved. This study aims to draw lessons from these in order to understand the project attributes, certification status, and the delivery process. Through an exploratory case study approach, fifteen project cases across five cities in Nigeria were examined. These represent the first-generation of green buildings in Nigeria, a verifiable reference for future initiatives in Sub-Saharan Africa. From the result, three categories of green buildings were identified, namely certified projects, demonstration projects, and potential projects with varying delivery attributes. Then, it is concluded by setting research and practice agenda towards aligning Nigeria’s building industry with the global trends in sustainable building delivery.

Keywords: LEED, green building, Nigeria, project attributes

Procedia PDF Downloads 141
5938 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: causes of construction project delays, construction industry, construction management, power distance

Procedia PDF Downloads 196