Search results for: construction health and safety regulations
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 15607

Search results for: construction health and safety regulations

15337 Socio-Economic Status and Quality of Life of Construction Workers in Bengaluru Sub-Urban Area in Pre and Post COVID-19

Authors: Priyanka R. Sagar

Abstract:

Social economic status (SES) is a variable that denotes the social standing of a person in society, and quality of life is a measure of health, happiness, and comfort of an individual. During early 2020, the world was stuck by the blow of the COVID-19 pandemic resulting in minimal or no economic activities to takes place. The present research paper is an attempt to analyze the socioeconomic status and quality of life of construction workers dwelling in the sub-urban areas of Hoskote located in the Bengaluru rural district pre and post-COVID-19. It also tries to analyze the difference in these variables pre and post-COVID-19. The study uses a retrospective design and data collected through a questionnaire survey from the respondents of Hoskote. A total of 100 samples were collected, out of which 73% were men and 27% were women. The mean age group of the participants is 41.04 ± 6.97 years. The overall analysis of the study shows that there is a significant difference in the socioeconomic status of construction workers pre and post-COVID-19. The study shows SES of the workers pre-pandemic is higher than post-pandemic. The other variable is quality of life which consists of physical health, psychological health, social relationships, and environmental domains. The study depicts that the psychological domain alone has been impacted by the pandemic; workers had better mental health pre-COVID-19. The other domains, i.e., physical health, social relationship, and environment, remain unaffected.

Keywords: socio-economic status, quality of life, construction workers, COVID-19

Procedia PDF Downloads 116
15336 Study of Structural Health Monitoring System for Vam Cong Cable-Stayed Bridge

Authors: L. M. Chinh

Abstract:

Vam Cong Bridge beside Can Tho Bridge is the next cable-stayed bridge spanning the Hau River, connecting Lap Vo district with Thot Not district. After construction by the end of 2018, the Vam Cong Bridge with Cao Lanh Bridge will help to improve the road network in this region of Mekong Delta. For this bridge, the SHM system also had designed for two stages – construction stage and exploitation stage. At the moment over 65% of the bridge construction had completed, and the bridge will be completed at the end of 2018. During the construction stage, the SHM system had been install to monitor behaviors of the bridge. Based on the study of the design documentation of the SHM system of the Vam Cong Bridge and site visit during construction work, many designs and installation errors have been detected. In this paper author thoroughly analyzed the pros and cons of this SHM system, simultaneously make conclusions and recommendations for this system. Specially concentrated on the possibility of implementing the acoustic emission method (AE) into this SHM system, which is an alternative to the further development of the system, enabling a full and cost-effective solution for the bridge management, which is of utmost importance for the service life and safe operation of the bridge.

Keywords: SHM system, design and installation, Vam Cong bridge, construction stage, acoustic emission method (AE)

Procedia PDF Downloads 236
15335 Effect of a Traffic Psychology Workshop on Enhancing Positive Attitudes towards Road Safety Awareness among Youths

Authors: C. Ah Gang Getrude, Iqbal Hashmi Shazia, Mohd Nawi Nurul Hudani

Abstract:

This study examined the effectiveness of a Traffic Psychology Workshop in enhancing positive attitudes towards road safety awareness among youths. We predicted that youths’ attitudes towards road safety would be more positive after they participated in the one-day workshop. We examined their attitudes towards road safety awareness before and after they attended a one-day workshop. There were 21 participants who completed the pre and post-studies (9 males & 12 females, mean age 22.86, SD=2.03). A Wilcoxon signed-ranks test showed that the mean for post-test ranks for students’ attitudes towards road safety awareness was higher than the mean pre-test ranks, z =-3.16, p = .00. The study showed that the Traffic Psychology Module which focuses on the three elements: i) personality & emotion; Sensation, perception and visual; and mental workload could have positive effects on youths’ attitudes towards road safety awareness. We believe that the Traffic Psychology Module could be used as a guide by relevant authorities, such as the Sabah Road Safety Department, in implementing road safety awareness workshops and programs for the public, particularly road-users.

Keywords: attitude, road safety, traffic psychology, youth

Procedia PDF Downloads 328
15334 Evaulation of Food Safety Management in Central Elementary School Canteens in Tuguegarao City, Philippines

Authors: Lea B. Milan

Abstract:

This descriptive study evaluated the existing Food Safety Management in Central Elementary School Canteens of Region 3. It made used of survey questionnaires, interview guide questions and validated knowledge test on food for data gathering. Results of the study revealed that school principals and canteen managers shared responsibilities in food safety management of school canteen. It also showed that the schools applied different methods of communication, monitoring and evaluation of food safety management. The study further revealed that implementation of monitoring and evaluation of food safety compliance are not being practiced in all elementary schools in the region. The study also showed that school canteens in the Region 3 do not have the thermometers and timers to use to conduct proper monitoring of foods during storage, preparation and serving. It was also found out from the study that canteen personnel lacks the basic knowledge and trainings on food safety. Potential source of physical, chemical and biological hazards that could contaminate foods were also found present in the canteen facilities of the elementary schools in the region. Moreover, evaluation showed that the existing implementation of food safety management in the Central Elementary School Canteens of Region 3 were below the expected level and the need to strengthen the appreciation and advocacy on food safety management in school canteens of Region 3 is still wanting.

Keywords: food safety management, food safety school catering, food safety, school food safety management

Procedia PDF Downloads 376
15333 Food Safety Aspects of Pesticide Residues in Spice Paprika

Authors: Sz. Klátyik, B. Darvas, M. Mörtl, M. Ottucsák, E. Takács, H. Bánáti, L. Simon, G. Gyurcsó, A. Székács

Abstract:

Environmental and health safety of condiments used for spicing food products in food processing or by culinary means receive relatively low attention, even though possible contamination of spices may affect food quality and safety. Contamination surveys mostly focus on microbial contaminants or their secondary metabolites, mycotoxins. Chemical contaminants, particularly pesticide residues, however, are clearly substantial factors in the case of given condiments in the Capsicum family including spice paprika and chilli. To assess food safety and support the quality of the Hungaricum product spice paprika, the pesticide residue status of spice paprika and chilli is assessed on the basis of reported pesticide contamination cases and non-compliances in the Rapid Alert System for Food and Feed of the European Union since 1998.

Keywords: spice paprika, Capsicum, pesticide residues, RASFF

Procedia PDF Downloads 393
15332 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: construction project, critical path, fuzzy network project, planning

Procedia PDF Downloads 143
15331 Mitigating the Negative Health Effects from Stress - A Social Network Analysis

Authors: Jennifer A. Kowalkowski

Abstract:

Production agriculture (farming) is a physically, emotionally, and cognitively stressful occupation, where workers have little control over the stressors that impact both their work and their lives. In an occupation already rife with hazards, these occupational-related stressors have been shown to increase farm workers’ risks for illness, injury, disability, and death associated with their work. Despite efforts to mitigate the negative health effects from occupational-related stress (ORS) and to promote health and well-being (HWB) among farmers in the US, marked improvements have not been attained. Social support accessed through social networks has been shown to buffer against the negative health effects from stress, yet no studies have directly examined these relationships among farmers. The purpose of this study was to use social network analysis to explore the social networks of farm owner-operators and the social supports available to them for mitigating the negative health effects of ORS. A convenience sample of 71 farm owner-operators from a Midwestern County in the US completed and returned a mailed survey (55.5% response rate) that solicited information about their social networks related to ORS. Farmers reported an average of 2.4 individuals in their personal networks and higher levels of comfort discussing ORS with female network members. Farmers also identified few connections (3.4% density) and indicated low comfort with members of affiliation networks specific to ORS. Findings from this study highlighted that farmers accessed different social networks and resources for their personal HWB than for issues related to occupational(farm-related) health and safety. In addition, farmers’ social networks for personal HWB were smaller, with different relational characteristics than reported in studies of farmers’ social networks related to occupational health and safety. Collectively, these findings suggest that farmers conceptualize personal HWB differently than farm health and safety. Therefore, the same research approaches and targets that guide occupational health and safety research may not be appropriate for personal HWB for farmers. Interventions and programming targeting ORS and HWB have largely been offered through the same platforms or mechanisms as occupational health and safety programs. This may be attributed to the significant overlap between the farm as a family business and place of residence, or that ORS stems from farm-related issues. However, these assumptions translated to health research of farmers and farm families from the occupational health and safety literature have not been directly studied or challenged. Thismay explain why past interventions have not been effective at improving health outcomes for farmers and farm families. A close examination of findings from this study raises important questions for researchers who study agricultural health. Findings from this study have significant implications for future research agendas focused on addressing ORS, HWB, and health disparities for farmersand farm families.

Keywords: agricultural health, occupational-related stress, social networks, well-being

Procedia PDF Downloads 108
15330 Crash Statistics Comparison for Riyadh, Eastern Province, and Qaseem for 2016 and 2017

Authors: Hassan M. Al-Ahmadi

Abstract:

The fatality index (deaths/100 K population) due to road traffic accidents in the Kingdom of Saudi Arabia (KSA) is over 25, according to the World Health Organization Statistics (WHO) statistics, which is much higher than in the neighboring Arab regions. The KSA has implemented measures to mitigate traffic accidents by enforcing road safety regulations. As a result, there has been a slight decline in the frequency of road traffic accidents within the Kingdom. This study was based on the variations in the accidents for three provinces of KSA, i.e., Riyadh, Eastern Province (EP), & Qaseem, for 2016 and 2017 using ANOVA method. Data appropriateness for the ANOVA method was confirmed by the normality and the randomness of residuals. Additionally, the half-normal plot was used to identify the significant terms for the ANOVA analysis. The analysis revealed that the accidents in the EP were significantly higher than in the other two provinces during the analysis period. The monthly variation showed a spike in the accidents from month 7th to 9th month in the EP region and a slight drop in the accidents in the Qaseem and the Riyadh region during the same period, which was attributed to the increased leisure travels from the other regions to the EP. Furthermore, most of the accidents were found to occur in the age group of 18+ and 30+, and also the major reduction of accidents in 2017 as compared to 2016 was found to have occurred in the same group. These findings can be beneficial for developing strategies to further reduce the number of accidents.

Keywords: fatality index, emergency, road traffic accident, safety, leisure travels

Procedia PDF Downloads 34
15329 Uptake of Off-Site Construction: Benefit and Future Application

Authors: Faisal Alazzaz, Andrew Whyte

Abstract:

Off-site construction methods have played an important role in the construction sector in the past few decades. It is increasingly becoming a major alternative technique and strategic direction compared to traditional in-situ method. It produces a significant amount of value for the construction industry and the economy more generally. To date, an impressive number of studies have been lunched on the perceived perception of off-site construction. However, it seems that a quantifying benefit on the offsite construction area is lacking. Therefore, this paper examines the recent research literature on the benefits of off- site construction and provides future direction. In the beginning, this paper provides a brief history and current value of the off-site construction followed by a detailed discussion on the benefit of off-site construction. These benefits include but not limited to time saving, quality improvement, relieving skills shortages, cost reduction and productivity improvement. Toward this end, off-site construction should learn from other productive industry similar to services or manufacturing industry by applying operational management tools and techniques with extensive focus on employee empowerment will shed the light on future uptake of Off-site construction. This study is of value in providing scholars have a clear picture of perceived benefit of off-site construction research and give an opportunities for future uptake of off-site method.

Keywords: building projects, employer empowerment, off-site construction benefits, productivity

Procedia PDF Downloads 436
15328 Labour-saving Construction Using Buildability Framework through Strengthening Designers in Delivering More Buildable Designs

Authors: Muhammad Lawal A., Abdullateef Abdulkarim Jimoh

Abstract:

This study is to appraise the labour-saving construction methods achievable using a buildability framework through an improved design system. Adoption of labour-efficient technology and construction techniques will be necessary to supplement good buildable designs. Increased usage of prefabricated, modular, and standardized construction components, simplicity in the design, and the number of integrated elements all work to advance buildable design. The objectives of the study include `determining a more efficient buildability framework for designers to achieve labour-saving construction’. 20 completed building projects in Birnin Kebbi, Nigeria, is used as a case study to buttress the proposition that `a more buildable design using buildability frame result in labour-saving in construction adopting a Singapore study approach.

Keywords: buildability framework, buildable designs, construction, labour-saving construction

Procedia PDF Downloads 99
15327 Assessing the Gap between the Policies and Existing Living Conditions of Migrant Construction Workers: A Case Study of Vijayawada

Authors: Ayushi Mishra

Abstract:

Migrant construction workers or construction labors are one of the majority of the working population in our urban and rural areas. Even after being the majority, their involvement in the upbringing of the economy is hardly ever documented or recognized. Non-permanent or migrant workers face loads of exploitations and susceptibilities than other informal sector workers in India which in turn has affected the productivity of the labors. The relation of their employment and migration and the links of these dynamics to their housing and other basic needs in the city are mostly unstated. Even the urban planning and housing policies do not make thoughtful provision for them, they forcing them to live in extremely wretched conditions. And even if the policies are made, it frequently happens that they are not implemented. As the issue is very much prevalent in today’s time in India with so many large-scale and labor extensive projects going on, this study focuses on the assessment of the gap between the existing government policies and the current scenario of the construction workers in ongoing projects of Vijayawada, Andhra Pradesh. A few of the policies for construction workers conditions a lot of things, out of which only a few are functional which makes this study to assess the reason behind the unorganized living condition and poor physical, the social and mental health of construction workers of Vijayawada. In present, the dignity of construction labors is compromised every day on construction sites, in terms of work and basic rights which leads to many other problems in future. So to work for the betterment of this community, knowledge on the differences is very much required and hence this study is a little effort to replenish the difference and compare the policies with the existing conditions of construction labors in Vijayawada.

Keywords: construction, labours, policy, productivity

Procedia PDF Downloads 330
15326 Effects of Safety Intervention Program towards Behaviors among Rubber Wood Processing Workers Using Theory of Planned Behavior

Authors: Junjira Mahaboon, Anongnard Boonpak, Nattakarn Worrasan, Busma Kama, Mujalin Saikliang, Siripor Dankachatarn

Abstract:

Rubber wood processing is one of the most important industries in southern Thailand. The process has several safety hazards for example unsafe wood cutting machine guarding, wood dust, noise, and heavy lifting. However, workers’ occupational health and safety measures to promote their behaviors are still limited. This quasi-experimental research was to determine factors affecting workers’ safety behaviors using theory of planned behavior after implementing job safety intervention program. The purposes were to (1) determine factors affecting workers’ behaviors and (2) to evaluate effectiveness of the intervention program. The sample of study was 66 workers from a rubber wood processing factory. Factors in the Theory of Planned Behavior model (TPB) were measured before and after the intervention. The factors of TPB included attitude towards behavior, subjective norm, perceived behavioral control, intention, and behavior. Firstly, Job Safety Analysis (JSA) was conducted and Safety Standard Operation Procedures (SSOP) were established. The questionnaire was also used to collect workers’ characteristics and TPB factors. Then, job safety intervention program to promote workers’ behavior according to SSOP were implemented for a four month period. The program included SSOP training, personal protective equipment use, and safety promotional campaign. After that, the TPB factors were again collected. Paired sample t-test and independent t-test were used to analyze the data. The result revealed that attitude towards behavior and intention increased significantly after the intervention at p<0.05. These factors also significantly determined the workers’ safety behavior according to SSOP at p<0.05. However, subjective norm, and perceived behavioral control were not significantly changed nor related to safety behaviors. In conclusion, attitude towards behavior and workers’ intention should be promoted to encourage workers’ safety behaviors. SSOP intervention program e.g. short meeting, safety training, and promotional campaign should be continuously implemented in a routine basis to improve workers’ behavior.

Keywords: job safety analysis, rubber wood processing workers, safety standard operation procedure, theory of planned behavior

Procedia PDF Downloads 193
15325 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis

Authors: Tharaki S. Hettiarachchi

Abstract:

Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.

Keywords: construction, framework development, project management, sustainability

Procedia PDF Downloads 58
15324 Study of the Impact of Quality Management System on Chinese Baby Dairy Product Industries

Authors: Qingxin Chen, Liben Jiang, Andrew Smith, Karim Hadjri

Abstract:

Since 2007, the Chinese food industry has undergone serious food contamination in the baby dairy industry, especially milk powder contamination. One of the milk powder products was found to contain melamine and a significant number (294,000) of babies were affected by kidney stones. Due to growing concerns among consumers about food safety and protection, and high pressure from central government, companies must take radical action to ensure food quality protection through the use of an appropriate quality management system. Previously, though researchers have investigated the health and safety aspects of food industries and products, quality issues concerning food products in China have been largely over-looked. Issues associated with baby dairy products and their quality issues have not been discussed in depth. This paper investigates the impact of quality management systems on the Chinese baby dairy product industry. A literature review was carried out to analyse the use of quality management systems within the Chinese milk power market. Moreover, quality concepts, relevant standards, laws, regulations and special issues (such as Melamine, Flavacin M1 contamination) have been analysed in detail. A qualitative research approach is employed, whereby preliminary analysis was conducted by interview, and data analysis based on interview responses from four selected Chinese baby dairy product companies was carried out. Through the analysis of literature review and data findings, it has been revealed that for quality management system that has been designed by many practitioners, many theories, models, conceptualisation, and systems are present. These standards and procedures should be followed in order to provide quality products to consumers, but the implementation is lacking in the Chinese baby dairy industry. Quality management systems have been applied by the selected companies but the implementation still needs improvement. For instance, the companies have to take measures to improve their processes and procedures with relevant standards. The government need to make more interventions and take a greater supervisory role in the production process. In general, this research presents implications for the regulatory bodies, Chinese Government and dairy food companies. There are food safety laws prevalent in China but they have not been widely practiced by companies. Regulatory bodies must take a greater role in ensuring compliance with laws and regulations. The Chinese government must also play a special role in urging companies to implement relevant quality control processes. The baby dairy companies not only have to accept the interventions from the regulatory bodies and government, they also need to ensure that production, storage, distribution and other processes will follow the relevant rules and standards.

Keywords: baby dairy product, food quality, milk powder contamination, quality management system

Procedia PDF Downloads 473
15323 The Importance of Fire Safety in Egypt

Authors: Omar Shakra

Abstract:

This paper contains a huge number of benefits that we can use it in several places and times in fire safety protection in the Middle East especially in Egypt . People here in Egypt did not consider the safety and fire protection as important as it is. But on the other hand, its very important for them to contain the fire systems and safety in every facility, the companies , hospitals , police stations , and even the super markets must use the fire system. It makes the facility safe to the visitors while they are using it.From my point of view as the owner Fire Safety Company called Deluge Egypt , i can say that not all of the companies use the fire system protection according to the high cost they prefer to build their company without the protection, and this is make the building totally unsafe to be used from the visitors or client.So, i am looking for new methods and technology to invest in Egypt, and this is through attending this Conference and let the audiences know more about the services i provide and [to let them know about the importance of the Fire Safety in Egypt. The Objectives of my research 1- The system that i used in my Company. 2- The benefits of the Fire System Protection. 3-The importance of the Fire System and safety. 4-The use of the new Technologies. 5-The hardships that i found while having new deals with new clients.

Keywords: fire, system, protection, fire hydrants, security, alarms

Procedia PDF Downloads 109
15322 Drought Resilient Water Supply for Livelihood: Establishment of Groundwater Treatment Plant at Construction Sites in Taichung City

Authors: Shang-Hsin Ou, Yang-Chun Lin, Ke-Hao Cheng

Abstract:

The year 2021 marked a historic drought in Taiwan, posing unprecedented challenges due to record-low rainfall and inadequate reservoir storage. The central region experienced water scarcity, leading to the implementation of "Groundwater Utilization at Construction Sites" for drought-resilient livelihood water supply. This study focuses on the establishment process of temporary groundwater treatment plants at construction sites in Taichung City, serving as a reference for future emergency response and the utilization of construction site groundwater. To identify suitable sites for groundwater reuse projects, site selection operations were carried out based on relevant water quality regulations and assessment principles. Subsequently, the planning and design of temporary water treatment plants were conducted, considering the water quality, quantity, and on-site conditions of groundwater wells associated with construction projects. The study consolidates the major water treatment facilities at each site and addresses encountered challenges during the establishment process. Practical insights gained from operating temporary groundwater treatment plants are presented, including improvements related to stable water quality, water quantity, equipment operation, and hydraulic control. In light of possible future droughts, this study provides an outlook and recommendations to expedite and improve the setup of groundwater treatment plants at construction sites. This includes considering on-site water abstraction, treatment, and distribution conditions. The study's results aim to offer practical guidelines for effectively establishing and managing such treatment plants, while offering experiences and recommendations for other regions facing similar emergencies, water shortages, and drought situations. These endeavors contribute to ensuring sustainable water supply for drought-resilient livelihoods and maintaining societal stability.

Keywords: drought resilience, groundwater treatment, construction site, water supply

Procedia PDF Downloads 82
15321 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 470
15320 Achieving Sustainable Rapid Construction Using Lean Principles

Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof

Abstract:

There is the need to take the holistic approach in achieving sustainable construction for a contemporary practice. Sustainable construction is the practice that involved method of human preservation of the environment, whether economically or socially through responsibility, management of resources and maintenance utilizing support. This paper shows the correlation of achieving rapid construction with sustainable concepts using lean principles. Lean principles being used widely in the manufacturing industry, but this research will demonstrate the principles into building construction. Lean principle offers the benefits of stabilizing work flow and elimination of unnecessary work. Therefore, this principle contributes to time and waste reduction. The correlation shows that pulling factor provides the improvement of progress curve and stabilizing the time-quality relation. The finding shows the lean principles offer the elements of rapid construction synchronized with the elements of sustainability.

Keywords: sustainable construction, rapid construction, time reduction, lean construction

Procedia PDF Downloads 236
15319 Ammonia Release during Photocopying Operations

Authors: Kiurski S. Jelena, Kecić S. Vesna, Oros B. Ivana, Ranogajec G. Jonjaua

Abstract:

The paper represents the dependence of ammonia concentration on microclimate parameters and photocopying shop circulation. The concentration of ammonia was determined during 8-hours working time over five days including three sampling points of a photocopying shop in Novi Sad, Serbia. The obtained results pointed out that the room temperature possesses the highest impact on ammonia release. The obtained ammonia concentration was in the range of 1.53 to 0.42ppm and decreased with the temperature decreasing from 24.6 to 20.7 °C. As the detected concentrations were within the permissible levels of The Occupational Safety and Health Administration, The National Institute for Occupational Safety and The Health and Official Gazette of Republic of Serbia, in the range of 35 to 200ppm, there was no danger to the employee’s health in the photocopying shop.

Keywords: ammonia, emission, indoor environment, photocopying procedure

Procedia PDF Downloads 404
15318 Public Bus Transport Passenger Safety Evaluations in Ghana: A Phenomenological Constructivist Exploration

Authors: Enoch F. Sam, Kris Brijs, Stijn Daniels, Tom Brijs, Geert Wets

Abstract:

Notwithstanding the growing body of literature that recognises the importance of personal safety to public transport (PT) users, it remains unclear what PT users consider regarding their safety. In this study, we explore the criteria PT users in Ghana use to assess bus safety. This knowledge will afford a better understanding of PT users’ risk perceptions and assessments which may contribute to theoretical models of PT risk perceptions. We utilised phenomenological research methodology, with data drawn from 61 purposively sampled participants. Data collection (through focus group discussions and in-depth interviews) and analyses were done concurrently to the point of saturation. Our inductive data coding and analyses through the constant comparison and content analytic techniques resulted in 4 code categories (conceptual dimensions), 27 codes (safety items/criteria), and 100 quotations (data segments). Of the number of safety criteria participants use to assess bus safety, vehicle condition, driver’s marital status, and transport operator’s safety records were the most considered. With each criterion, participants rightly demonstrated its respective relevance to bus safety. These findings imply that investment in and maintenance of safer vehicles, and responsible and safety-conscious drivers, and prioritization of passengers’ safety are key-targets for public bus/minibus operators in Ghana.

Keywords: safety evaluations, public bus/minibus, passengers, phenomenology, Ghana

Procedia PDF Downloads 337
15317 Causes and Effects of Delays in Construction Projects in Akure, Ondo State, South-West Nigeria

Authors: K.T Alade, A.F Lawal, A.A Omonori

Abstract:

Construction is an everlasting activity across the globe. Likewise, the problem of delay in the construction industry is a global phenomenon. Although there are several reasons that may be responsible for delay during construction, this may vary from place to place and can be reduced to the minimum when identified. This study considered the major causes and effects of delay in the execution of construction projects in Akure, Ondo State, Nigeria. Using literatures, a total number of 30 causes of construction delays were identified. The convenient sampling technique was used to select sixty respondents for a survey. The respondents comprise twenty-two (22) clients, eighteen consultants (18) and twenty (20) contractors. The analyses of the primary data revealed that the three most important causes of delay in construction projects in Akure, Ondo State Nigeria are poor site management and supervision, inadequate contractors experience and client’s financial difficulties. Based on the findings of this study, recommendations were given on how the causes and effects of delay in construction can be mitigated.

Keywords: Akure, causes, construction projects, delay, effects

Procedia PDF Downloads 508
15316 A Practical Model for Managing Beach Safety Focusing on Tourist Drownings in Koh Samui, Thailand

Authors: Siyathorn Khunon, Thanawit Buafai

Abstract:

This paper aims to investigate management of beach safety with a focus on tourist drownings in Samui. The data collected in this investigation will then lead to the proposal of a practical management model suitable for use in Samui. Qualitative research was conducted in the following manner: nine stakeholders from local government organizations and tourism businesses were interviewed in-depth. Additionally, a best practice case study from Phuket was applied to analyze beach safety. Twelve foreign tourists were also interviewed. Then, a focus group comprised of 32 people was used to determine practical solutions for enhancing tourists’ safety on the beach in Samui. A steering committee to coordinate between public and private organizations was proposed to manage and enhance tourists’ safety. A practical model is proposed to increase the safety level of tourists in Samui

Keywords: beach safety, drowning, tourist, Samui

Procedia PDF Downloads 274
15315 The Framework of System Safety for Multi Human-in-The-Loop System

Authors: Hideyuki Shintani, Ichiro Koshijima

Abstract:

In Cyber Physical System (CPS), if there are a large number of persons in the process, a role of person in CPS might be different comparing with the one-man system. It is also necessary to consider how Human-in-The-Loop Cyber Physical Systems (HiTLCPS) ensure safety of each person in the loop process. In this paper, the authors discuss a system safety framework with an illustrative example with STAMP model to clarify what point for safety should be considered and what role of person in the should have.

Keywords: cyber-physical-system, human-in-the-loop, safety, STAMP model

Procedia PDF Downloads 325
15314 Assessment of the Environmental Compliance at the Jurassic Production Facilities towards HSE MS Procedures and Kuwait Environment Public Authority Regulations

Authors: Fatemah Al-Baroud, Sudharani Shreenivas Kshatriya

Abstract:

Kuwait Oil Company (KOC) is one of the companies for gas & oil production in Kuwait. The oil and gas industry is truly global; with operations conducted in every corner of the globe, the global community will rely heavily on oil and gas supplies. KOC has made many commitments to protect all due to KOC’s operations and operational releases. As per KOC’s strategy, the substantial increase in production activities will bring many challenges in managing various environmental hazards and stresses in the company. In order to handle those environmental challenges, the need of implementing effectively the health, safety, and environmental management system (HSEMS) is significant. And by implementing the HSEMS system properly, the environmental aspects of the activities, products, and services were identified, evaluated, and controlled in order to (i) Comply with local regulatory and other obligatory requirements; (ii) Comply with company policy and business requirements; and (iii) Reduce adverse environmental impact, including adverse impact to company reputation. Assessments for the Jurassic Production Facilities are being carried out as a part of the KOC HSEMS procedural requirement and monitoring the implementation of the relevant HSEMS procedures in the facilities. The assessments have been done by conducting series of theme audits using KOC’s audit protocol at JPFs. The objectives of the audits are to evaluate the compliance of the facilities towards the implementation of environmental procedures and the status of the KEPA requirement at all JPFs. The list of the facilities that were covered during the theme audit program are the following: (1) Jurassic Production Facility (JPF) – Sabriya (2) Jurassic Production Facility (JPF) – East Raudhatian (3) Jurassic Production Facility (JPF) – West Raudhatian (4)Early Production Facility (EPF 50). The auditing process comprehensively focuses on the application of KOC HSE MS procedures at JPFs and their ability to reduce the resultant negative impacts on the environment from the operations. Number of findings and observations were noted and highlighted in the audit reports and sent to all concerned controlling teams. The results of these audits indicated that the facilities, in general view, were in line with KOC HSE Procedures, and there were commitments in documenting all the HSE issues in the right records and plans. Further, implemented several control measures at JPFs that minimized/reduced the environmental impact, such as SRU were installed for sulphur recovery. Future scope and monitoring audit after a sufficient period of time will be carried out in conjunction with the controlling teams in order to verify the current status of the recommendations and evaluate the contractors' performance towards the required actions in preserving the environment.

Keywords: assessment of the environmental compliance, environmental and social impact assessment, kuwait environment public authority regulations, health, safety and environment management procedures, jurassic production facilities

Procedia PDF Downloads 184
15313 Building Collapse: Factors and Resisting Mechanisms: A Review of Case Studies

Authors: Genevieve D. Fernandes, Nisha P. Naik

Abstract:

All through the ages in all human civilizations, men have been engaged in construction activity, not only to build their dwellings and house their activities, but also roads, bridges to facilitate means of transport, and communication etc. The main concern in this activity was to ensure safety and reduce the collapse of the buildings and other structures. But even after taking all precautions, it is impossible to guarantee safety and collapse because of several unforeseen reasons like faulty constructions, design errors, overloading, soil liquefaction, gas explosion, material degradation, terrorist attacks and economic factors also contributing to the collapse. It is also uneconomical to design the structure for unforeseen events unless they have a reasonable chance of occurrence. In order to ensure safety and prevent collapse, many guidelines have been framed by local bodies and government authorities in many countries like the United States Department of Defence (DOD), United States General Service Administration (GSA) and Euro-Codes in European Nations. Some other practices are followed to incorporate redundancies in the structure like detailing, ductile designs, tying of elements at particular locations, and provision of hinges and interconnections. It is also to be admitted that a full-proof safe design structure for accidental events cannot be prepared and implemented as it is uneconomical and the chances of such occurrences are less. This paper reviews past case studies of the collapse of structures with the aim of developing an understanding of the collapse mechanism. This study will definitely help to bring about a detailed improvement in the design to maximise the quality of the construction at a minimal cost.

Keywords: unforeseen factors, progressive collapse, collapse resisting mechanisms, column removal scenario

Procedia PDF Downloads 137
15312 An Explorative Research on the Cook and Stewards Employment: Turkish Flagged Ship's Perspective

Authors: Mehmet Yahsi, Ozkan Ugurlu

Abstract:

Cabin department among the stewards and cooks on ships, has an important place in terms of a sufficient and qualified nutrition of seafarers. From this perspective, ships must be employed with a sufficient number of cabin department. In this study, in order to research on the Turkish-flagged ships cook and stewards employment; Our national manning regulation compared with international regulations. The data used in this study were collected via visiting of the ships. 3000 gross tonnage and above engaged in international voyages 181 Turkish-flagged ship’s crew lists were compared with Minimum Safety Manning Certificates. According to the findings; employment rates, %95,6 cook, and %50,8 steward. According to the results of the study; Turkish-flagged ships, although it is not obliged to cook and steward, were employed on ships.

Keywords: manning, cabin department, minimum safety manning certificate, Turkish flag

Procedia PDF Downloads 396
15311 Effects of Artificial Intelligence Technology on Children: Positives and Negatives

Authors: Paula C. Latorre Arroyo, Andrea C. Latorre Arroyo

Abstract:

In the present society, children are exposed to and impacted by technology from very early on in various ways. Artificial intelligence (AI), in particular, directly affects them, be it positively or negatively. The concept of artificial intelligence is commonly defined as the technological programming of computers or robotic mechanisms with humanlike capabilities and characteristics. These technologies are often designed as helpful machines or disguised as handy tools that could ultimately steal private information for illicit purposes. Children, being one of the most vulnerable groups due to their lack of experience and knowledge, do not have the ability to recognize or have the malice to distinguish if an apparatus with artificial intelligence is good or bad for them. For this reason, as a society, there must be a sense of responsibility to regulate and monitor different types of uses for artificial intelligence to protect children from potential risks that might arise. This article aims to investigate the many implications that artificial intelligence has in the lives of children, starting from a home setting, within the classroom, and, ultimately, in online spaces. Irrefutably, there are numerous beneficial aspects to the use of artificial intelligence. However, due to its limitless potential and lack of specific and substantial regulations to prevent the illicit use of this technology, safety and privacy concerns surface, specifically regarding the youth. This written work aims to provide an in-depth analysis of how artificial intelligence can both help children and jeopardize their safety. Concluding with resources and data supporting the aforementioned statement.

Keywords: artificial intelligence, children, privacy, rights, safety

Procedia PDF Downloads 66
15310 'Pacta Sunt Servanda': Which Form of Contract to Use in the Construction Industry

Authors: Ahmed Stifi, Sascha Gentes

Abstract:

The contract in its simplest definition is an agreement involving parties with a number of documents which may be as little as a marriage contract involving two parties or as big as a contract of construction and operation of a nuclear power plant involving companies and stakeholders with hundreds or even thousands of documents. All parties in the construction industry, not only the contract experts, agree that the success of a project is linked primarily to the form of contract regulating the relationship between stakeholders of the project. Therefore it is essential for the construction industry to study, analyze and improve its contracts forms continuously. However, it should be mentioned that different contract forms are developed to suit the construction evolution in term of its machinery, materials and construction process. There exist some similarities in some clauses and variations in many of these forms depending upon the type of project, the kind of clients and more importantly the laws and regulations governing the transaction in the country where the project is carried out. This paper will discuss the most important forms of construction contracts starting from national level, intended to the contract form in Germany and moving on to the international level introducing FIDIC contracts and its different forms, some newly developed contracts forms namely the integrated form of agreement, the new engineering contract and the project alliance agreement. The result of the study shows that many of the contract’s paragraphs are similar and the main difference comes in the approach of the relationship between the parties. Is it based on co-operation and mutual trust, or in some cases a load of responsibility for a particular party which increases the problems and disputes that affects the success of the project negatively. Thus we can say that the form of the contract, that plays an essential role in the approach of the project management, which is ultimately the key factor for the success of the project. So we advise to use a form of contract, which enhance the mutual trust between the project parties, contribute to support the cooperation between them, distribute responsibility and risks on an equitable basis and build on the principle “win-win". In additional to the conventional role of the contract it should integrate all parties into one team to achieve the target value of the project.

Keywords: contract, FIDIC, integrated form of agreement, new engineering contract, project alliance agreemen

Procedia PDF Downloads 373
15309 Hybrid Concrete Construction (HCC) for Sustainable Infrastructure Development in Nigeria

Authors: Muhammad Bello Ibrahim, M. Auwal Zakari, Aliyu Usman

Abstract:

Hybrid concrete construction (HCC) combines all the benefits of pre-casting with the advantages of cast in-situ construction. Merging the two, as a hybrid structure, results in even greater construction speed, value, and the overall economy. Its variety of uses has gained popularity in the United States and in Europe due to its distinctive benefits. However, the increase of its application in some countries (including Nigeria) has been relatively slow. Several researches have shown that hybrid construction offers an ultra-high performance concrete that offers superior strength, durability and aesthetics with design flexibility and within sustainability credentials, based on the available and economically visible technologies. This paper examines and documents the criterion that will help inform the process of deciding whether or not to adopt hybrid concrete construction (HCC) technology rather than more traditional alternatives. It also the present situation of design, construction and research on hybrid structures.

Keywords: hybrid concrete construction, Nigeria, sustainable infrastructure development, design flexibility

Procedia PDF Downloads 560
15308 The Differences and Similarities between the Ship Waste Tracking Regulations of Turkey and Particular European Union Member Countries

Authors: Kaan Koyuncu, Umut Celen Arican, Sevilay Can

Abstract:

In the maritime industry, there have been regulations to prevent pollution, and the first attempt to offer a legal basis was Marpol Convention which was held in 1973 in order to provide a framework for the disposal of ship wastes. Based on this convention, ports are obliged to build waste receiving facilities. European Union regulations make several member countries to follow these directions, In Turkey, under Blue Card System, the quantity and types of wastes, the delivery time, the capacity of the receiving facilities, and other required information can be monitored online. Therefore, yachts and other boats with the bilge, sewage, and waste which illegally discharge into the sea, can be blocked. This system is an outcome of the law adopted from European Union regulations. In this study, the present systems in Turkey which occurred in 2010 after the integration of the system, which has been put in the force in 2000 in Europe will be analyzed and interpreted to provide a useful comparison, a practical guide, and a roadmap for potential improvements.

Keywords: Europe-Turkey, blue card, marine environment, ship waste tracking system

Procedia PDF Downloads 494