Assessment of the Environmental Compliance at the Jurassic Production Facilities towards HSE MS Procedures and Kuwait Environment Public Authority Regulations
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 84469
Assessment of the Environmental Compliance at the Jurassic Production Facilities towards HSE MS Procedures and Kuwait Environment Public Authority Regulations

Authors: Fatemah Al-Baroud, Sudharani Shreenivas Kshatriya

Abstract:

Kuwait Oil Company (KOC) is one of the companies for gas & oil production in Kuwait. The oil and gas industry is truly global; with operations conducted in every corner of the globe, the global community will rely heavily on oil and gas supplies. KOC has made many commitments to protect all due to KOC’s operations and operational releases. As per KOC’s strategy, the substantial increase in production activities will bring many challenges in managing various environmental hazards and stresses in the company. In order to handle those environmental challenges, the need of implementing effectively the health, safety, and environmental management system (HSEMS) is significant. And by implementing the HSEMS system properly, the environmental aspects of the activities, products, and services were identified, evaluated, and controlled in order to (i) Comply with local regulatory and other obligatory requirements; (ii) Comply with company policy and business requirements; and (iii) Reduce adverse environmental impact, including adverse impact to company reputation. Assessments for the Jurassic Production Facilities are being carried out as a part of the KOC HSEMS procedural requirement and monitoring the implementation of the relevant HSEMS procedures in the facilities. The assessments have been done by conducting series of theme audits using KOC’s audit protocol at JPFs. The objectives of the audits are to evaluate the compliance of the facilities towards the implementation of environmental procedures and the status of the KEPA requirement at all JPFs. The list of the facilities that were covered during the theme audit program are the following: (1) Jurassic Production Facility (JPF) – Sabriya (2) Jurassic Production Facility (JPF) – East Raudhatian (3) Jurassic Production Facility (JPF) – West Raudhatian (4)Early Production Facility (EPF 50). The auditing process comprehensively focuses on the application of KOC HSE MS procedures at JPFs and their ability to reduce the resultant negative impacts on the environment from the operations. Number of findings and observations were noted and highlighted in the audit reports and sent to all concerned controlling teams. The results of these audits indicated that the facilities, in general view, were in line with KOC HSE Procedures, and there were commitments in documenting all the HSE issues in the right records and plans. Further, implemented several control measures at JPFs that minimized/reduced the environmental impact, such as SRU were installed for sulphur recovery. Future scope and monitoring audit after a sufficient period of time will be carried out in conjunction with the controlling teams in order to verify the current status of the recommendations and evaluate the contractors' performance towards the required actions in preserving the environment.

Keywords: assessment of the environmental compliance, environmental and social impact assessment, kuwait environment public authority regulations, health, safety and environment management procedures, jurassic production facilities

Procedia PDF Downloads 155