Search results for: low head hydropower
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1018

Search results for: low head hydropower

1018 A Case Study of Low Head Hydropower Opportunities at Existing Infrastructure in South Africa

Authors: Ione Loots, Marco van Dijk, Jay Bhagwan

Abstract:

Historically, South Africa had various small-scale hydropower installations in remote areas that were not incorporated in the national electricity grid. Unfortunately, in the 1960s most of these plants were decommissioned when Eskom, the national power utility, rapidly expanded its grid and capability to produce cheap, reliable, coal-fired electricity. This situation persisted until 2008, when rolling power cuts started to affect all citizens. This, together with the rising monetary and environmental cost of coal-based power generation, has sparked new interest in small-scale hydropower development, especially in remote areas or at locations (like wastewater treatment works) that could not afford to be without electricity for long periods at a time. Even though South Africa does not have the same, large-scale, hydropower potential as some other African countries, significant potential for micro- and small-scale hydropower is hidden in various places. As an example, large quantities of raw and potable water are conveyed daily under either pressurized or gravity conditions over large distances and elevations. Due to the relative water scarcity in the country, South Africa also has more than 4900 registered dams of varying capacities. However, institutional capacity and skills have not been maintained in recent years and therefore the identification of hydropower potential, as well as the development of micro- and small-scale hydropower plants has not gained significant momentum. An assessment model and decision support system for low head hydropower development has been developed to assist designers and decision makers with first-order potential analysis. As a result, various potential sites were identified and many of these sites were situated at existing infrastructure like weirs, barrages or pipelines. One reason for the specific interest in existing infrastructure is the fact that capital expenditure could be minimized and another is the reduced negative environmental impact compared to greenfield sites. This paper will explore the case study of retrofitting an unconventional and innovative hydropower plant to the outlet of a wastewater treatment works in South Africa.

Keywords: low head hydropower, retrofitting, small-scale hydropower, wastewater treatment works

Procedia PDF Downloads 252
1017 Application of Computational Flow Dynamics (CFD) Analysis for Surge Inception and Propagation for Low Head Hydropower Projects

Authors: M. Mohsin Munir, Taimoor Ahmad, Javed Munir, Usman Rashid

Abstract:

Determination of maximum elevation of a flowing fluid due to sudden rejection of load in a hydropower facility is of great interest to hydraulic engineers to ensure safety of the hydraulic structures. Several mathematical models exist that employ one-dimensional modeling for the determination of surge but none of these perfectly simulate real-time circumstances. The paper envisages investigation of surge inception and propagation for a Low Head Hydropower project using Computational Fluid Dynamics (CFD) analysis on FLOW-3D software package. The fluid dynamic model utilizes its analysis for surge by employing Reynolds’ Averaged Navier-Stokes Equations (RANSE). The CFD model is designed for a case study at Taunsa hydropower Project in Pakistan. Various scenarios have run through the model keeping in view upstream boundary conditions. The prototype results were then compared with the results of physical model testing for the same scenarios. The results of the numerical model proved quite accurate coherence with the physical model testing and offers insight into phenomenon which are not apparent in physical model and shall be adopted in future for the similar low head projects limiting delays and cost incurred in the physical model testing.

Keywords: surge, FLOW-3D, numerical model, Taunsa, RANSE

Procedia PDF Downloads 361
1016 Development of National Scale Hydropower Resource Assessment Scheme Using SWAT and Geospatial Techniques

Authors: Rowane May A. Fesalbon, Greyland C. Agno, Jodel L. Cuasay, Dindo A. Malonzo, Ma. Rosario Concepcion O. Ang

Abstract:

The Department of Energy of the Republic of the Philippines estimates that the country’s energy reserves for 2015 are dwindling– observed in the rotating power outages in several localities. To aid in the energy crisis, a national hydropower resource assessment scheme is developed. Hydropower is a resource that is derived from flowing water and difference in elevation. It is a renewable energy resource that is deemed abundant in the Philippines – being an archipelagic country that is rich in bodies of water and water resources. The objectives of this study is to develop a methodology for a national hydropower resource assessment using hydrologic modeling and geospatial techniques in order to generate resource maps for future reference and use of the government and other stakeholders. The methodology developed for this purpose is focused on two models – the implementation of the Soil and Water Assessment Tool (SWAT) for the river discharge and the use of geospatial techniques to analyze the topography and obtain the head, and generate the theoretical hydropower potential sites. The methodology is highly coupled with Geographic Information Systems to maximize the use of geodatabases and the spatial significance of the determined sites. The hydrologic model used in this workflow is SWAT integrated in the GIS software ArcGIS. The head is determined by a developed algorithm that utilizes a Synthetic Aperture Radar (SAR)-derived digital elevation model (DEM) which has a resolution of 10-meters. The initial results of the developed workflow indicate hydropower potential in the river reaches ranging from pico (less than 5 kW) to mini (1-3 MW) theoretical potential.

Keywords: ArcSWAT, renewable energy, hydrologic model, hydropower, GIS

Procedia PDF Downloads 313
1015 Critical Terrain Slope Calculation for Locating Small Hydropower Plants

Authors: C. Vrekos, C. Evagelides, N. Samarinas, G. Arampatzis

Abstract:

As known, the water energy is a renewable and clean source of energy. Energy production from hydropower has been the first, and still is today a renewable source used to generate electricity. The optimal location and sizing of a small hydropower plant is a very important issue in engineering design which encourages investigation. The aim of this paper is to present a formula that can be utilized for locating the position of a small hydropower plant although there is a high dependence on economic, environmental, and social parameters. In this paper, the economic and technical side of the problem is considered. More specifically, there is a critical terrain slope that determines if the plant should be located at the end of the slope or not. Of course, this formula can be used for a first estimate and does not include detailed economic analysis. At the end, a case study is presented for the location of a small hydropower plant in order to demonstrate the validity of the proposed formula.

Keywords: critical terrain slope, economic analysis, hydropower plant locating, renewable energy

Procedia PDF Downloads 207
1014 Future Optimization of the Xin’anjiang Hydropower

Authors: Muhammad Zaman, Guohua Fang, Muhammad Saifullah,

Abstract:

The presented study emphasize at an optimal model to compare past and future optimal hydropower generation. In order to get maximum benefits from the Xin’anjiang hydropower station a model is developed. A Particle Swarm Optimization (PSO) has purposed and past and future water flow is used to get the maximum benefits from future water resources in this study. The results revealed that the future hydropower generation is more than the past generation. This paper gives us idea that what could we get in the past using optimal method of electricity generation and what can we get in the future using this technique.

Keywords: PSO, future water resources, optimization, Xin’anjiang,

Procedia PDF Downloads 444
1013 Opportunities of Clean Development Mechanism through Hydropower in Nepal

Authors: Usha Khatiwada

Abstract:

Nepal’s overall energy baseline: It has been proposed that hydropower projects for domestic consumption can earn CDM revenue in Nepal if a new methodology is established that takes into account not only consumption in Nepal of grid electricity but also other fuels such as kerosene, diesel, and firewood, used by a vast majority of the population for their lighting and other needs. However, this would mean that we would be trying to combine grid electricity supply and consumers not supplied from the grid into one methodology. Such a sweeping baseline may have a very small chance of success with the CDM Executive Board.

Keywords: environment, clean development mechanism, hydropower, Nepal

Procedia PDF Downloads 403
1012 Development of Numerical Model to Compute Water Hammer Transients in Pipe Flow

Authors: Jae-Young Lee, Woo-Young Jung, Myeong-Jun Nam

Abstract:

Water hammer is a hydraulic transient problem which is commonly encountered in the penstocks of hydropower plants. The numerical model was developed to estimate the transient behavior of pressure waves in pipe systems. The computational algorithm was proposed to model the water hammer phenomenon in a pipe system with pump shutdown at midstream and sudden valve closure at downstream. To predict the pressure head and flow velocity as a function of time as a result of rapidly closing a valve and pump shutdown, two boundary conditions at the ends considering pump operation and valve control can be implemented as specified equations of the pressure head and flow velocity based on the characteristics method. It was shown that the effects of transient flow make it determine the needs for protection devices, such as surge tanks, surge relief valves, or air valves, at various points in the system against overpressure and low pressure. It produced reasonably good performance with the results of the proposed transient model for pipeline systems. The proposed numerical model can be used as an efficient tool for the safety assessment of hydropower plants due to water hammer.

Keywords: water hammer, hydraulic transient, pipe systems, characteristics method

Procedia PDF Downloads 136
1011 Multi-Objective Optimization of Run-of-River Small-Hydropower Plants Considering Both Investment Cost and Annual Energy Generation

Authors: Amèdédjihundé H. J. Hounnou, Frédéric Dubas, François-Xavier Fifatin, Didier Chamagne, Antoine Vianou

Abstract:

This paper presents the techno-economic evaluation of run-of-river small-hydropower plants. In this regard, a multi-objective optimization procedure is proposed for the optimal sizing of the hydropower plants, and NSGAII is employed as the optimization algorithm. Annual generated energy and investment cost are considered as the objective functions, and number of generator units (n) and nominal turbine flow rate (QT) constitute the decision variables. Site of Yeripao in Benin is considered as the case study. We have categorized the river of this site using its environmental characteristics: gross head, and first quartile, median, third quartile and mean of flow. Effects of each decision variable on the objective functions are analysed. The results gave Pareto Front which represents the trade-offs between annual energy generation and the investment cost of hydropower plants, as well as the recommended optimal solutions. We noted that with the increase of the annual energy generation, the investment cost rises. Thus, maximizing energy generation is contradictory with minimizing the investment cost. Moreover, we have noted that the solutions of Pareto Front are grouped according to the number of generator units (n). The results also illustrate that the costs per kWh are grouped according to the n and rise with the increase of the nominal turbine flow rate. The lowest investment costs per kWh are obtained for n equal to one and are between 0.065 and 0.180 €/kWh. Following the values of n (equal to 1, 2, 3 or 4), the investment cost and investment cost per kWh increase almost linearly with increasing the nominal turbine flowrate while annual generated. Energy increases logarithmically with increasing of the nominal turbine flowrate. This study made for the Yeripao river can be applied to other rivers with their own characteristics.

Keywords: hydropower plant, investment cost, multi-objective optimization, number of generator units

Procedia PDF Downloads 157
1010 Estimation of Small Hydropower Potential Using Remote Sensing and GIS Techniques in Pakistan

Authors: Malik Abid Hussain Khokhar, Muhammad Naveed Tahir, Muhammad Amin

Abstract:

Energy demand has been increased manifold due to increasing population, urban sprawl and rapid socio-economic improvements. Low water capacity in dams for continuation of hydrological power, land cover and land use are the key parameters which are creating problems for more energy production. Overall installed hydropower capacity of Pakistan is more than 35000 MW whereas Pakistan is producing up to 17000 MW and the requirement is more than 22000 that is resulting shortfall of 5000 - 7000 MW. Therefore, there is a dire need to develop small hydropower to fulfill the up-coming requirements. In this regards, excessive rainfall, snow nurtured fast flowing perennial tributaries and streams in northern mountain regions of Pakistan offer a gigantic scope of hydropower potential throughout the year. Rivers flowing in KP (Khyber Pakhtunkhwa) province, GB (Gilgit Baltistan) and AJK (Azad Jammu & Kashmir) possess sufficient water availability for rapid energy growth. In the backdrop of such scenario, small hydropower plants are believed very suitable measures for more green environment and power sustainable option for the development of such regions. Aim of this study is to estimate hydropower potential sites for small hydropower plants and stream distribution as per steam network available in the available basins in the study area. The proposed methodology will focus on features to meet the objectives i.e. site selection of maximum hydropower potential for hydroelectric generation using well emerging GIS tool SWAT as hydrological run-off model on the Neelum, Kunhar and the Dor Rivers’ basins. For validation of the results, NDWI will be computed to show water concentration in the study area while overlaying on geospatial enhanced DEM. This study will represent analysis of basins, watershed, stream links, and flow directions with slope elevation for hydropower potential to produce increasing demand of electricity by installing small hydropower stations. Later on, this study will be benefitted for other adjacent regions for further estimation of site selection for installation of such small power plants as well.

Keywords: energy, stream network, basins, SWAT, evapotranspiration

Procedia PDF Downloads 221
1009 Integration of Hydropower and Solar Photovoltaic Generation into Distribution System: Case of South Sudan

Authors: Ater Amogpai

Abstract:

Hydropower and solar photovoltaic (PV) generation are crucial in sustainability and transitioning from fossil fuel to clean energy. Integrating renewable energy sources such as hydropower and solar photovoltaic (PV) into the distributed networks contributes to achieving energy balance, pollution mitigation, and cost reduction. Frequent power outages and a lack of load reliability characterize the current South Sudan electricity distribution system. The country’s electricity demand is 300MW; however, the installed capacity is around 212.4M. Insufficient funds to build new electricity facilities and expand generation are the reasons for the gap in installed capacity. The South Sudan Ministry of Energy and Dams gave a contract to an Egyptian Elsewedy Electric Company that completed the construction of a solar PV plant in 2023. The plant has a 35 MWh battery storage and 20 MW solar PV system capacity. The construction of Juba Solar PV Park started in 2022 to increase the current installed capacity in Juba City to 53 MW. The plant will begin serving 59000 residents in Juba and save 10,886.2t of carbon dioxide (CO2) annually.

Keywords: renewable energy, hydropower, solar energy, photovoltaic, South Sudan

Procedia PDF Downloads 141
1008 An Exploratory Study of the Effects of Head Movement on Engagement within a Telepresence Environment

Authors: B. S. Bamoallem, A. J. Wodehouse, G. M. Mair

Abstract:

Communication takes place not only through speech, but also by means of gestures such as facial expressions, gaze, head movements, hand movements and body posture, and though there has been rapid development, communication platforms still lack this type of behavior. We believe communication platforms need to fully achieve this verbal and non-verbal behavior in order to make interactions more engaging and more efficient. In this study we decided to focus our research on the head rather than any other body part as it is a rich source of information for speech-related movement Thus we aim to investigate the value of incorporating head movements into the use of telepresence robots as communication platforms; this will be done by investigating a system that reproduces head movement manually as closely as possible.

Keywords: engagement, nonverbal behaviours, head movements, face-to-face interaction, telepresence robot

Procedia PDF Downloads 455
1007 Investigating the Behavior of Water Shortage Indices for Performance Evaluation of a Water Resources System

Authors: Frederick N. F. Chou, Nguyen Thi Thuy Linh

Abstract:

The impact of water shortages has been increasingly severe as a consequence of population growth, urbanization, economic development, and climate change. The need for improvements in reliable water supply systems is urgent with the increasing living standards of regions. In this study, a suitable shortage index capable of multi-aspect description - frequency, magnitude, and duration - is adopted to more accurately describe the characteristics of a shortage situation. The values of the index were determined to cope with the increasing need for reliability. There are four reservoirs in series located on the Be River of the Dong Nai River Basin in Southern Vietnam. The primary purpose of the three upstream reservoirs is hydropower generation while the primary purpose of the fourth is water supply. A compromise between hydropower generation and water supply can be negotiated for these four reservoirs to reduce the severity of water shortages. A generalized water allocation model was applied to simulate the water supply, and hydropower generation of various management alternatives and the system’s reliability was evaluated using the adopted multiple shortage indices. Modifying management policies of water resources using data-based indexes can improve the reliability of water supply.

Keywords: cascade reservoirs, hydropower, shortage index, water supply

Procedia PDF Downloads 269
1006 A Review of Energy in the Democratic Republic of Congo

Authors: Kanzumba Kusakana

Abstract:

The Democratic Republic of Congo (DRC) is currently experiencing a general energy crisis due to lack of proper investment and management in the energy sector. 93, 6% of the country is highly dependent on wood fuels as main source of energy having severe impacts such as deforestation and general degradation of the environment. On the other hand, the major share of the electricity produced mainly from ill-conditioned hydro and thermal power stations is principally used to supply the industrial sector as well as very few urban areas. Nevertheless, DRC possesses huge potential in renewable resources such as hydropower, biomass, methane gas, solar geothermal and moderate wind potential that can be used for energy generation. Recently the country has initiated projects to build decentralized micro hydropower station to supply remotes and isolated areas; to rehabilitate its existent main hydropower plants and transmission lines as well as to extend its current generation capacity by building new hydropower stations able to respond to a major part of the African continent energy needs. This paper presents a comprehensive review of current energy resources as well as of the electricity situation in DRC. Recent energy projects, the energy policy as well as the energy challenges in the DRC are also presented.

Keywords: energy, biomass, hydro power, renewable energy, energy policy, Democratic Republic of Congo

Procedia PDF Downloads 337
1005 High Temperature Creep Analysis for Lower Head of Reactor Pressure Vessel

Authors: Dongchuan Su, Hai Xie, Naibin Jiang

Abstract:

Under severe accident cases, the nuclear reactor core may meltdown inside the lower head of the reactor pressure vessel (RPV). Retaining the melt pool inside the RPV is an important strategy of severe accident management. During this process, the inner wall of the lower head will be heated to high temperature of a thousand centigrade, and the outer wall is immersed in a large amount of cooling water. The material of the lower head will have serious creep damage under the high temperature and the temperature difference, and this produces a great threat to the integrity of the RPV. In this paper, the ANSYS program is employed to build the finite element method (FEM) model of the lower head, the creep phenomena is simulated under the severe accident case, the time dependent strain and stress distribution is obtained, the creep damage of the lower head is investigated, the integrity of the RPV is evaluated and the theoretical basis is provided for the optimized design and safety assessment of the RPV.

Keywords: severe accident, lower head of RPV, creep, FEM

Procedia PDF Downloads 233
1004 Optimum Flight Altitude

Authors: Ravi Nandu, Anmol Taploo

Abstract:

As per current scenario, commercial aircrafts have been very well functioning with higher efficiency, but there is something that affects it. Every aircraft runs with the combustion produced by mixture of fuel and air. For example: A flight to travel from Mumbai to Kolkata it takes 2h: 30 min and from Kolkata to Mumbai it takes 2h: 45 min. It happens due to head and tail wind. Due to head wind air craft travels faster than its usual velocity and it takes 2h: 30 min to reach to Kolkata, while it takes 2h;45min vis versa. This lag in time is caused due to head wind that increases the drag and reduces the relative velocity of the plane. So in order to reduce this wastage of fuel there is an optimal flight altitude at which the head and tail wind action is reduced compared to the present scenario.

Keywords: drag, head wind, tail wind, aircraft

Procedia PDF Downloads 468
1003 Mike Hat: Coloured-Tape-in-Hat as a Head Circumference Measuring Instrument for Early Detection of Hydrocephalus in an Infant

Authors: Nyimas Annissa Mutiara Andini

Abstract:

Every year, children develop hydrocephalus during the first year of life. If it is not treated, hydrocephalus can lead to brain damage, a loss in mental and physical abilities, and even death. To be treated, first, we have to do a proper diagnosis using some examinations especially to detect hydrocephalus earlier. One of the examination that could be done is using a head circumference measurement. Increased head circumference is a first and main sign of hydrocephalus, especially in infant (0-1 year age). Head circumference is a measurement of a child's head largest area. In this measurement, we want to get the distance from above the eyebrows and ears and around the back of the head using a measurement tape. If the head circumference of an infant is larger than normal, this infant might potentially suffer hydrocephalus. If early diagnosis and timely treatment of hydrocephalus could be done most children can recover successfully. There are some problems with early detection of hydrocephalus using regular tape for head circumference measurement. One of the problem is the infant’s comfort. We need to make the infant feel comfort along the head circumference measurement to get a proper result of the examination. For that, we can use a helpful stuff, like a hat. This paper is aimed to describe the possibility of using a head circumference measuring instrument for early detection of hydrocephalus in an infant with a mike hat, coloured-tape-in-hat. In the first life, infants’ head size is about 35 centimeters. First three months after that infants will gain 2 centimeters each month. The second three months, infant’s head circumference will increase 1 cm each month. And for the six months later, the rate is 0.5 cm per month, and end up with an average of 47 centimeters. This formula is compared to the WHO’s head circumference growth chart. The shape of this tape-in-hat is alike an upper arm measurement. This tape-in-hat diameter is about 47 centimeters. It contains twelve different colours range by age. If it is out of the normal colour, the infant potentially suffers hydrocephalus. This examination should be done monthly. If in two times of measurement there still in the same range abnormal of head circumference, or a rapid growth of the head circumference size, the infant should be referred to a pediatrician. There are the pink hat for girls and blue hat for boys. Based on this paper, we know that this measurement can be used to help early detection of hydrocephalus in an infant.

Keywords: head circumference, hydrocephalus, infant, mike hat

Procedia PDF Downloads 265
1002 Structural Analysis of Hydro-Turbine Head Cover Using Ansys

Authors: Surjit Angra, Manisha Kumari, Vinod Kumar

Abstract:

The objective of the Hydro Turbine Head Cover is to support the guide bearing, guide vane regulating mechanism and even in some design for generator thrust bearing support. Mechanical design of head cover deals with high static as well as fluctuating load acting on the structure. In the present work structural analysis of hydro turbine Head-cover using ANSYS software is carried out. Finite element method is used to calculate stresses on head cover. These calculations were done for the maximum possible loading under operating condition “LCI Quick Shut Down”. The results for equivalent Von-Mises stress, total deformation and directional deformation have been plotted and compared with the existing results whether the design is safe or not.

Keywords: ANSYS, head cover, hydro-turbine, structural analysis, total deformation, Von-Mises stress

Procedia PDF Downloads 535
1001 Documentation of Verbal and Written Head Injury Advice Given to All Adults Presenting Following a Head Injury

Authors: Rania Mustafa, Anfal Gadour

Abstract:

Specialty area: Manchester University NHS Foundation Trust, Wythenshawe Hospital Accident and Emergency Department. About, Documentation of verbal and written head injury advice given to all adults presenting following a head injury. Our aim was to assess verbal & written head injury advice for an adult patient attending ED in Wythenshawe hospital during the period from January 2022 to May 2022, with a view to evaluating the NICE head injury guidelines concerning discharge advice and also to review the clinical notes to ensure that all adult patients presenting with a head injury are documented to have received both verbal & written head injury advice as per the NICE guidelines. Here we collected data from a random sample over a 1 month period. This data was furtherly filtered to include the adult patient >16 years and resulted in 54 patients with head injuries attending ED during this time period; then patient’s age, sex and hospital number were used to identify the discharge advice for the purpose of chart review and to assess the documentation of head injuries compliance with recommendation for NICE assessment. Data were checked between January 2022 up to May 2022 to allow more intervals for better assessment. Our finding indicates that documentation of verbal advice, 26% of patients were not recorded to have received this in January compared to only 3% in May & Written advice was not recorded in 44% of patients studied in January compared to 1% in May.

Keywords: head, injuries, advice, leaflets

Procedia PDF Downloads 88
1000 Performance Analysis of Pumps-as-Turbine Under Cavitating Conditions

Authors: Calvin Stephen, Biswajit Basu, Aonghus McNabola

Abstract:

Market liberalization in the power sector has led to the emergence of micro-hydropower schemes that are dependent on the use of pumps-as-turbines in applications that were not suitable as potential hydropower sites in earlier years. These applications include energy recovery in water supply networks, sewage systems, irrigation systems, alcohol breweries, underground mining and desalination plants. As a result, there has been an accelerated adoption of pumpsas-turbine technology due to the economic advantages it presents in comparison to the conventional turbines in the micro-hydropower space. The performance of this machines under cavitation conditions, however, is not well understood as there is a deficiency of knowledge in literature focused on their turbine mode of operation. In hydraulic machines, cavitation is a common occurrence which needs to be understood to safeguard them and prolong their operation life. The overall purpose of this study is to investigate the effects of cavitation on the performance of a pumps-as-turbine system over its entire operating range. At various operating speeds, the cavitating region is identified experimentally while monitoring the effects this has on the power produced by the machine. Initial results indicate occurrence of cavitation at higher flow rates for lower operating speeds and at lower flow rates at higher operating speeds. This implies that for cavitation free operation, low speed pumps-as-turbine must be used for low flow rate conditions whereas for sites with higher flow rate conditions high speed turbines should be adopted. Such a complete understanding of pumps-as-turbine suction performance can aid avoid cavitation induced failures hence improved reliability of the micro-hydropower plant.

Keywords: cavitation, micro-hydropower, pumps-as-turbine, system design

Procedia PDF Downloads 119
999 A Feasibility and Implementation Model of Small-Scale Hydropower Development for Rural Electrification in South Africa: Design Chart Development

Authors: Gideon J. Bonthuys, Marco van Dijk, Jay N. Bhagwan

Abstract:

Small scale hydropower used to play a very important role in the provision of energy to urban and rural areas of South Africa. The national electricity grid, however, expanded and offered cheap, coal generated electricity and a large number of hydropower systems were decommissioned. Unfortunately, large numbers of households and communities will not be connected to the national electricity grid for the foreseeable future due to high cost of transmission and distribution systems to remote communities due to the relatively low electricity demand within rural communities and the allocation of current expenditure on upgrading and constructing of new coal fired power stations. This necessitates the development of feasible alternative power generation technologies. A feasibility and implementation model was developed to assist in designing and financially evaluating small-scale hydropower (SSHP) plants. Several sites were identified using the model. The SSHP plants were designed for the selected sites and the designs for the different selected sites were priced using pricing models (civil, mechanical and electrical aspects). Following feasibility studies done on the designed and priced SSHP plants, a feasibility analysis was done and a design chart developed for future similar potential SSHP plant projects. The methodology followed in conducting the feasibility analysis for other potential sites consisted of developing cost and income/saving formulae, developing net present value (NPV) formulae, Capital Cost Comparison Ratio (CCCR) and levelised cost formulae for SSHP projects for the different types of plant installations. It included setting up a model for the development of a design chart for a SSHP, calculating the NPV, CCCR and levelised cost for the different scenarios within the model by varying different parameters within the developed formulae, setting up the design chart for the different scenarios within the model and analyzing and interpreting results. From the interpretation of the develop design charts for feasible SSHP in can be seen that turbine and distribution line cost are the major influences on the cost and feasibility of SSHP. High head, short transmission line and islanded mini-grid SSHP installations are the most feasible and that the levelised cost of SSHP is high for low power generation sites. The main conclusion from the study is that the levelised cost of SSHP projects indicate that the cost of SSHP for low energy generation is high compared to the levelised cost of grid connected electricity supply; however, the remoteness of SSHP for rural electrification and the cost of infrastructure to connect remote rural communities to the local or national electricity grid provides a low CCCR and renders SSHP for rural electrification feasible on this basis.

Keywords: cost, feasibility, rural electrification, small-scale hydropower

Procedia PDF Downloads 224
998 Gravitational Water Vortex Power Plant: Experimental-Parametric Design of a Hydraulic Structure Capable of Inducing the Artificial Formation of a Gravitational Water Vortex Appropriate for Hydroelectric Generation

Authors: Henrry Vicente Rojas Asuero, Holger Manuel Benavides Muñoz

Abstract:

Approximately 80% of the energy consumed worldwide is generated from fossil sources, which are responsible for the emission of a large volume of greenhouse gases. For this reason, the global trend, at present, is the widespread use of energy produced from renewable sources. This seeks safety and diversification of energy supply, based on social cohesion, economic feasibility and environmental protection. In this scenario, small hydropower systems (P ≤ 10MW) stand out due to their high efficiency, economic competitiveness and low environmental impact. Small hydropower systems, along with wind and solar energy, are expected to represent a significant percentage of the world's energy matrix in the near term. Among the various technologies present in the state of the art, relating to small hydropower systems, is the Gravitational Water Vortex Power Plant, a recent technology that excels because of its versatility of operation, since it can operate with jumps in the range of 0.70 m-2.00 m and flow rates from 1 m3/s to 20 m3/s. Its operating system is based on the utilization of the energy of rotation contained within a large water vortex artificially induced. This paper presents the study and experimental design of an optimal hydraulic structure with the capacity to induce the artificial formation of a gravitational water vortex trough a system of easy application and high efficiency, able to operate in conditions of very low head and minimum flow. The proposed structure consists of a channel, with variable base, vortex inductor, tangential flow generator, coupled to a circular tank with a conical transition bottom hole. In the laboratory test, the angular velocity of the water vortex was related to the geometric characteristics of the inductor channel, as well as the influence of the conical transition bottom hole on the physical characteristics of the water vortex. The results show angular velocity values of greater magnitude as a function of depth, in addition the presence of the conical transition in the bottom hole of the circular tank improves the water vortex formation conditions while increasing the angular velocity values. Thus, the proposed system is a sustainable solution for the energy supply of rural areas near to watercourses.

Keywords: experimental model, gravitational water vortex power plant, renewable energy, small hydropower

Procedia PDF Downloads 290
997 Risk Aversion and Dynamic Games between Hydroelectric Operators under Uncertainty

Authors: Abdessalem Abbassi, Ahlem Dakhlaoui, Lota D. Tamini

Abstract:

This article analyses management of hydropower dams within two different industrial structures: monopolistic and oligopolistic; when hydroelectricity producers are risk averse and face demand uncertainty. In each type of market structure we determine the water release path in closed-loop equilibrium. We show how a monopoly can manage its hydropower dams by additional pumping or storage depending on the relative abundance of water between different regions to smooth the effect of uncertainty on electricity prices. In the oligopolistic case with symmetric rates of risk aversion, we determine the conditions under which the relative scarcity (abundance) of water in the dam of a hydroelectric operator can favor additional strategic pumping (storage) in its competitor’s dams. When there is asymmetry of the risk aversion coefficient, the firm’s hydroelectricity production increases as its competitor’s risk aversion increases, if and only if the average recharge speed of the competitor’s dam exceeds a certain threshold, which is an increasing function of its average water inflows.

Keywords: asymmetric risk aversion, closed-loop Cournot competition, electricity wholesale market, hydropower dams

Procedia PDF Downloads 354
996 Feasibility of Small Hydropower Plants Odisha

Authors: Sanoj Sahu, Ramakar Jha

Abstract:

Odisha (India) is in need of reliable, cost-effective power generation. A prolonged electricity crisis and increasing power demand have left over thousands of citizens without access to electricity, and much of the population suffers from sporadic outages. The purpose of this project is to build a methodology to evaluate small hydropower potential, which can be used to alleviate the Odisha’s energy problem among rural communities. This project has three major tasks: the design of a simple SHEP for a single location along a river in the Odisha; the development of water flow prediction equations through a linear regression analysis; and the design of an ArcGIS toolset to estimate the flow duration curves (FDCs) at locations where data do not exist. An explanation of the inputs to the tool, as well has how it produces a suitable output for SHEP evaluation will be presented. The paper also gives an explanation of hydroelectric power generation in the Odisha, SHEPs, and the technical and practical aspects of hydroelectric power. Till now, based on topographical and rainfall analysis we have located hundreds of sites. Further work on more number of site location and accuracy of location is to be done.

Keywords: small hydropower, ArcGIS, rainfall analysis, Odisha’s energy problem

Procedia PDF Downloads 448
995 Modelling the Effect of Head and Bucket Splitter Angle on the Power Output of a Pelton Turbine

Authors: J. A. Ujam, J. L. Chukwuneke, C. H. Achebe, G. O. R. Ikwu

Abstract:

This work investigates the effect of head and bucket splitter angle on the power output of a pelton turbine (water turbine), so as to boost the efficiency of Hydro-electric power generation systems. A simulation program was developed using MatLab to depict the force generated by the bucket as the water jet strikes the existing splitter angle (100 to 150) and predicted (10 to 250) splitter angles. Result shows that in addition to the existing splitter angle, six more angles have been investigated for the two operating conditions to give maximum power. The angles are 250, 60 and 190 for high head and low flow with increased pressure while low head and high flow with decreased pressure are 230, 210 and 30 in order of the maximum generating power. The Turbine power output for simulation was more than that of the experiment. This was as a result of their head conditions and the bucket splitter angle.

Keywords: bucket splitter angle, force, head, modelling, pelton turbine, power output, shaft output

Procedia PDF Downloads 355
994 The Predictors of Head and Neck Cancer-Head and Neck Cancer-Related Lymphedema in Patients with Resected Advanced Head and Neck Cancer

Authors: Shu-Ching Chen, Li-Yun Lee

Abstract:

The purpose of the study was to identify the factors associated with head and neck cancer-related lymphoedema (HNCRL)-related symptoms, body image, and HNCRL-related functional outcomes among patients with resected advanced head and neck cancer. A cross-sectional correlational design was conducted to examine the predictors of HNCRL-related functional outcomes in patients with resected advanced head and neck cancer. Eligible patients were recruited from a single medical center in northern Taiwan. Consecutive patients were approached and recruited from the Radiation Head and Neck Outpatient Department of this medical center. Eligible subjects were assessed for the Symptom Distress Scale–Modified for Head and Neck Cancer (SDS-mhnc), Brief International Classification of Functioning, Disability and Health (ICF) Core Set for Head and Neck Cancer (BCSQ-H&N), Body Image Scale–Modified (BIS-m), The MD Anderson Head and Neck Lymphedema Rating Scale (MDAHNLRS), The Foldi’s Stages of Lymphedema (Foldi’s Scale), Patterson’s Scale, UCLA Shoulder Rating Scale (UCLA SRS), and Karnofsky’s Performance Status Index (KPS). The results showed that the worst problems with body HNCRL functional outcomes. Patients’ HNCRL symptom distress and performance status are robust predictors across over for overall HNCRL functional outcomes, problems with body HNCRL functional outcomes, and activity and social functioning HNCRL functional outcomes. Based on the results of this period research program, we will develop a Cancer Rehabilitation and Lymphedema Care Program (CRLCP) to use in the care of patients with resected advanced head and neck cancer.

Keywords: head and neck cancer, resected, lymphedema, symptom, body image, functional outcome

Procedia PDF Downloads 258
993 Development of Femoral Head Osteonecrosis Due to Corticosteroids Consumption; Probable Role of OCP: A Case Report

Authors: S. Alireza Mirghasemi, Shervin Rashidinia, Mohammad Saleh Sadeghi, Mohsen Talebizadeh, Narges Rahimi Gabaran, Seyed Shahin Eftekhari, Sara Shahmoradi

Abstract:

Avascular necrosis of femoral head is a pathologic condition that the main cause is decreased blood supply of femoral head. Among predisposing risk factors, chronic use of corticosteroids, alcoholism, smocking and hip traumas have more important role. Also we can mention OCP consumption as a risk factor among less common predisposing factors that lead to AVNF, in this study we introduce another cause of AVNF with a period of treatment with moderate dose of corticosteroids accompanied by OCP as a probable facilitating factor that leads to AVNF.

Keywords: AVN, corticosteroids consumption, femoral head osteonecrosis, OCP

Procedia PDF Downloads 466
992 Variation in Complement Order in English: Implications for Interlanguage Syntax

Authors: Juliet Udoudom

Abstract:

Complement ordering principles of natural language phrases (XPs) stipulate that Head terms be consistently placed phrase initially or phrase-finally, yielding two basic theoretical orders – Head – Complement order or Complement – Head order. This paper examines the principles which determine complement ordering in English V- and N-bar structures. The aim is to determine the extent to which complement linearisations in the two phrase types are consistent with the two theoretical orders outlined above given the flexible and varied nature of natural language structures. The objective is to see whether there are variation(s) in the complement linearisations of the XPs studied and the implications which such variations hold for the inter-language syntax of English and Ibibio. A corpus-based approach was employed in obtaining the English data. V- and -N – bar structures containing complement structures were isolated for analysis. Data were examined from the perspective of the X-bar and Government – theories of Chomsky’s (1981) Government-Binding format. Findings from the analysis show that in V – bar structures in English, heads are consistently placed phrase – initially yielding a Head – Complement order; however, complement linearisation in the N – bar structures studied exhibited parametric variations. Thus, in some N – bar structures in English the nominal head is ordered to the left whereas in others, the head term occurs to the right. It may therefore be concluded that the principles which determine complement ordering are both Language – Particular and Phrase – specific following insights provided within Phrasal Syntax.

Keywords: complement order, complement–head order, head–complement order, language–particular principles

Procedia PDF Downloads 348
991 Semi-Automated Tracking of Vibrissal Movements in Free-Moving Rodents Captured by High-Speed Videos

Authors: Hyun June Kim, Tailong Shi, Seden Akdagli, Sam Most, Yuling Yan

Abstract:

Quantitative analysis of mouse whisker movement can be used to study functional recovery and regeneration of facial nerve after an injury. However, it is challenging to accurately track mouse whisker movements, and most whisker tracking methods require manual intervention, e.g. fixing the head of the mouse during a study. Here we describe a semi-automated image processing method that is applied to high-speed video recordings of free-moving mice to track whisker movements. We first track the head movement of a mouse by delineating the lower head contour frame-by-frame to locate and determine the orientation of its head. Then, a region of interest is identified for each frame, with subsequent application of the Hough transform to track individual whisker movements on each side of the head. Our approach is used to examine the functional recovery of damaged facial nerves in mice over a course of 21 days.

Keywords: mystacial macrovibrissae, whisker tracking, head tracking, facial nerve recovery

Procedia PDF Downloads 590
990 A Retrospective Analysis of the Impact of the Choosing Wisely Canada Campaign on Emergency Department Imaging Utilization for Head Injuries

Authors: Sameer Masood, Lucas Chartier

Abstract:

Head injuries are a commonly encountered presentation in emergency departments (ED) and the Choosing Wisely Canada (CWC) campaign was released in June 2015 in an attempt to decrease imaging utilization for patients with minor head injuries. The impact of the CWC campaign on imaging utilization for head injuries has not been explored in the ED setting. In our study, we describe the characteristics of patients with head injuries presenting to a tertiary care academic ED and the impact of the CWC campaign on CT head utilization. This retrospective cohort study used linked databases from the province of Ontario, Canada to assess emergency department visits with a primary diagnosis of head injury made between June 1, 2014 and Aug 31, 2016 at the University Health Network in Toronto, Canada. We examined the number of visits during the study period, the proportion of patients that had a CT head performed before and after the release of the CWC campaign, as well as mode of arrival, and disposition. There were 4,322 qualifying visits at our site during the study period. The median presenting age was 44.12 years (IQR 27.83,67.45), the median GCS was 15 (IQR 15,15) and the majority of patients presenting had intermediate acuity (CTAS 3). Overall, 43.17% of patients arrived via ambulance, 49.24 % of patients received a CT head and 10.46% of patients were admitted. Compared to patients presenting before the CWC campaign release, there was no significant difference in the rate of CT heads after the CWC (50.41% vs 47.68%, P = 0.07). There were also no significant differences between the two groups in mode of arrival (ambulance vs ambulatory) (42.94% vs 43.48%, P = 0.72) or admission rates (9.85% vs 11.26%, P = 0.15). However, more patients belonged to the high acuity groups (CTAS 1 or 2) in the post CWC campaign release group (12.98% vs 8.11% P <0.001). Visits for head injuries make up a significant proportion of total ED visits and approximately half of these patients receive CT imaging in the ED. The CWC campaign did not seem to impact imaging utilization for head injuries in the 14 months following its launch. Further efforts, including local quality improvement initiatives, are likely needed to increase adherence to its recommendation and reduce imaging utilization for head injuries.

Keywords: choosing wisely, emergency department, head injury, quality improvement

Procedia PDF Downloads 225
989 Uncommon Case of Falx Subdural Hematoma

Authors: Thu Nguyen, Jane Daugherty-Luck

Abstract:

Falx subdural hematoma is a life-threatening condition associated with high mortality. We present a patient case who had fallen with no head injury or loss of conspicuousness. She had tenderness along cervical and thoracic lumbar spine. CT head revealed falx subdural hematoma. The patient was managed medically. The pathophysiology of falx subdural hematoma is linked to laceration of bridging veins provoked by frontal or occipital impact. Posttraumatic subdural hematoma is commonly caused by inertia instead of facture or cerebral contusion resulting from direct impact. The theory is consistent with the lack of fracture in most cases in the literature. Our patient had neither contusion nor fracture.

Keywords: falx subdural hematoma, traumatic head injury, CT head scan, bridging veins, inertia

Procedia PDF Downloads 140