Search results for: maintenance strategy
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1492

Search results for: maintenance strategy

1462 Maintenance Dredging at Port of Townsville

Authors: M. Jaditager, J. Lovisa, N. Sivakugan

Abstract:

The Port of Townsville conducts regular annual maintenance dredging to maintain depths of its harbor basin and approach channels for the navigational safety of the vessels against the natural accumulation of marine sediments. In addition to the regular maintenance dredging, the port undertakes emergency dredging in cases where large quantities of sediments are mobilized and deposited in port waters by cyclone or major flood events. The maintenance dredging material derived from the port may be disposed at sea or on land in accordance with relevant state and commonwealth regulations. For the land disposal, the dredged mud slurry is hydraulically placed into containment ponds and left to undergo sedimentation and self-weight consolidation to form fill material for land reclamation. This paper provides an overview of the maintenance dredging at the Port of Townsville and emphasis on maintenance dredging requirements, sediment quality, bathymetry, dredging methods used, and dredged material disposal options.

Keywords: Consolidation, dredged material, maintenance dredging, marine sediments, sedimentation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2411
1461 Maintenance Management System for Upstream Operations in Oil and Gas Industry: Case Study

Authors: Wan Hasrulnizzam Wan Mahmood, Mohd Nizam Ab Rahman, Husiah Mazli, Baba Md Deros

Abstract:

This paper explores the plant maintenance management system that has been used by giant oil and gas company in Malaysia. The system also called as PMMS used to manage the upstream operations for more than 100 plants of the case study company. Moreover, from the observations, focus group discussion with PMMS personnel and application through simulation (SAP R/3), the paper reviews the step-by-step approach and the elements that required for the PMMS. The findings show that the PMMS integrates the overall business strategy in upstream operations that consist of asset management, work management and performance management. In addition, PMMS roles are to help operations personnel organize and plan their daily activities, to improve productivity and reduce equipment downtime and to help operations management analyze the facilities and create performance, and to provide and maintain the operational effectiveness of the facilities.

Keywords: Maintenance, Oil and Gas Industry, Upstream Operations

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 12463
1460 Qualitative Survey on Managing Building Maintenance Projects

Authors: Edmond W.M. Lam, Albert P.C. Chan, Daniel W.M. Chan

Abstract:

Buildings are one of the valuable assets to provide people with shelters for work, leisure and rest. After years of attacks by weather, buildings will deteriorate which need proper maintenance in order to fulfill the requirements and satisfaction of the users. Poorly managed buildings not just give a negative image to the city itself, but also pose potential risk hazards to the health and safety of the general public. As a result, the management of maintenance projects has played an important role in cities like Hong Kong where the problem of urban decay has drawn much attention. However, most research has focused on managing new construction, and little research effort has been put on maintenance projects. Given the short duration and more diversified nature of work, repair and maintenance works are found to be more difficult to monitor and regulate when compared with new works. Project participants may face with problems in running maintenance projects which should be investigated so that proper strategies can be established. This paper aims to provide a thorough analysis on the problems of running maintenance projects. A review of literature on the characteristics of building maintenance projects was firstly conducted, which forms a solid basis for the empirical study. Results on the problems and difficulties of running maintenance projects from the viewpoints of industry practitioners will also be delivered with a view to formulating effective strategies for managing maintenance projects successfully.

Keywords: characteristics, problems, building maintenance, Hong Kong

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2066
1459 The Effect of Failure Rate on Repair and Maintenance Costs of Four Agricultural Tractor Models

Authors: Fatemeh Afsharnia, Mohammad Amin Asoodar, Abbas Abdeshahi

Abstract:

In economical evaluation literature, although the combination of some variables such as repair and maintenance costs and accumulated use hours has been widely considered in determining of optimum life for tractor, no investigation has indicated the influence of failure rate on repair and maintenance costs. In this study, the owners of three hundred tractors, which include Massey Ferguson, John Deere and Universal, were interviewed, from five regions of Khouzestan Province. A regression model was used to predict the tractors annual repair and maintenance costs based on failure rate. Results showed that the maximum percentage of annual repair and maintenance costs occurred in engine parts for MF285, JD3140 and U650 tractors while these costs for tire, ring, ball bearing and operator seat were higher compared to other MF399 tractor systems. According to the results of the regression, the failure rate increase would lead to annual repair and maintenance costs increase for all tractors. But, of all the tractors, repair and maintenance costs of JD3140 tractors extremely affected by the failure rate increase.

Keywords: Failure rate, tractor, annual repair and maintenance costs, regression model, Khouzestan.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4240
1458 Development of Road Maintenance Management System Based on WebGIS

Authors: Feng Xiao, Zhou Hongyu, YuCaixia

Abstract:

Based on an analysis of the current research and application of Road maintenance, geographic information system (WebGIS) and ArcGIS Server, the platform overhead construction for Road maintenance development is studied and the key issues are presented, including the organization and design of spatial data on the basis of the geodatabase technology, middleware technology, tiles cache index technology and dynamic segmentation of WebGIS. Road maintenance geographic information platform is put forward through the researching ideas of analysis of the system design. The design and application of WebGIS system are discussed on the basis of a case study of BaNan district of Chongqing highway maintenance management .The feasibility of the theories and methods are validated through the system.

Keywords: WebGIS, Tile, Road maintenance, dynamic segmentation

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2202
1457 Estimation Model of Dry Docking Duration Using Data Mining

Authors: Isti Surjandari, Riara Novita

Abstract:

Maintenance is one of the most important activities in the shipyard industry. However, sometimes it is not supported by adequate services from the shipyard, where inaccuracy in estimating the duration of the ship maintenance is still common. This makes estimation of ship maintenance duration is crucial. This study uses Data Mining approach, i.e., CART (Classification and Regression Tree) to estimate the duration of ship maintenance that is limited to dock works or which is known as dry docking. By using the volume of dock works as an input to estimate the maintenance duration, 4 classes of dry docking duration were obtained with different linear model and job criteria for each class. These linear models can then be used to estimate the duration of dry docking based on job criteria.

Keywords: Classification and regression tree (CART), data mining, dry docking, maintenance duration.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2392
1456 Determining a Suitable Maintenance Measure for Gentelligent Components Using Case-Based Reasoning

Authors: M. Winkens, P. Nyhuis

Abstract:

Components with sensory properties such as gentelligent components developed at the Collaborative Research Centre 653 offer a new angle in terms of the full utilization of the remaining service life as well as preventive maintenance. The developed methodology of component status driven maintenance analyzes the stress data obtained during the component's useful life and on the basis of this knowledge assesses the type of maintenance required in this case. The procedure is derived from the case-based reasoning method and will be explained in detail. The method's functionality is demonstrated with real-life data obtained during test runs of a racing car prototype.

Keywords: Gentelligent Components, Preventive Maintenance, Case based Reasoning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1852
1455 Marketing Strategy Analysis of Boon Rawd Brewery Company

Authors: Sinee Sankrusme

Abstract:

Boon Rawd Brewery is a beer company based in Thailand that has an exemplary image, both as a good employer and a well-managed company with a strong record of social responsibility. The most famous of the company’s products is Singha beer. To study the company’s marketing strategy, a case study analysis was conducted together with qualitative research methods. The study analyzed the marketing strategy of Boon Rawd Brewery before the liberalization of the liquor market in 2000. The company’s marketing strategies consisted of the following: product line strategy, product development strategy, block channel strategy, media strategy, trade strategy, and consumer incentive strategy. Additionally, the company employed marketing mix strategy based on the 4Ps: product, price, promotion and place (of distribution).

Keywords: Beer, Boon Rawd Brewery Company, Marketing Strategy.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 8794
1454 Methods for Case Maintenance in Case-Based Reasoning

Authors: A. Lawanna, J. Daengdej

Abstract:

Case-Based Reasoning (CBR) is one of machine learning algorithms for problem solving and learning that caught a lot of attention over the last few years. In general, CBR is composed of four main phases: retrieve the most similar case or cases, reuse the case to solve the problem, revise or adapt the proposed solution, and retain the learned cases before returning them to the case base for learning purpose. Unfortunately, in many cases, this retain process causes the uncontrolled case base growth. The problem affects competence and performance of CBR systems. This paper proposes competence-based maintenance method based on deletion policy strategy for CBR. There are three main steps in this method. Step 1, formulate problems. Step 2, determine coverage and reachability set based on coverage value. Step 3, reduce case base size. The results obtained show that this proposed method performs better than the existing methods currently discussed in literature.

Keywords: Case-Based Reasoning, Case Base Maintenance, Coverage, Reachability.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1603
1453 Maintenance Alternatives Related to Costs of Wind Turbines Using Finite State Markov Model

Authors: Boukelkoul Lahcen

Abstract:

The cumulative costs for O&M may represent as much as 65%-90% of the turbine's investment cost. Nowadays the cost effectiveness concept becomes a decision-making and technology evaluation metric. The cost of energy metric accounts for the effect replacement cost and unscheduled maintenance cost parameters. One key of the proposed approach is the idea of maintaining the WTs which can be captured via use of a finite state Markov chain. Such a model can be embedded within a probabilistic operation and maintenance simulation reflecting the action to be done. In this paper, an approach of estimating the cost of O&M is presented. The finite state Markov model is used for decision problems with number of determined periods (life cycle) to predict the cost according to various options of maintenance.

Keywords: Cost, finite state, Markov model, operation, maintenance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1433
1452 Development of a Value Evaluation Model of Highway Box-Girder Bridge

Authors: Hao Hsi Tseng

Abstract:

Taiwan’s infrastructure is gradually deteriorating, while resources for maintenance and replacement are increasingly limited, raising the urgent need for methods for maintaining existing infrastructure within constrained budgets. Infrastructure value evaluation is used to enhance the efficiency of infrastructure maintenance work, allowing administrators to quickly assess the maintenance needs and performance by observing variation in infrastructure value. This research establishes a value evaluation model for Taiwan’s highway box girder bridges. The operating mechanism and process of the model are illustrated in a practical case.

Keywords: Box girder bridge, deterioration, infrastructure, maintenance, value evaluation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1191
1451 Increasing Profitability Supported by Innovative Methods and Designing Monitoring Software in Condition-Based Maintenance: A Case Study

Authors: Nasrin Farajiparvar

Abstract:

In the present article, a new method has been developed to enhance the application of equipment monitoring, which in turn results in improving condition-based maintenance economic impact in an automobile parts manufacturing factory. This study also describes how an effective software with a simple database can be utilized to achieve cost-effective improvements in maintenance performance. The most important results of this project are indicated here: 1. 63% reduction in direct and indirect maintenance costs. 2. Creating a proper database to analyse failures. 3. Creating a method to control system performance and develop it to similar systems. 4. Designing a software to analyse database and consequently create technical knowledge to face unusual condition of the system. Moreover, the results of this study have shown that the concept and philosophy of maintenance has not been understood in most Iranian industries. Thus, more investment is strongly required to improve maintenance conditions.

Keywords: Condition-based maintenance, Economic savings, Iran industries, Machine life prediction software.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1534
1450 Designing a Tool for Software Maintenance

Authors: Amir Ngah, Masita Abdul Jalil, Zailani Abdullah

Abstract:

The aim of software maintenance is to maintain the software system in accordance with advancement in software and hardware technology. One of the early works on software maintenance is to extract information at higher level of abstraction. In this paper, we present the process of how to design an information extraction tool for software maintenance. The tool can extract the basic information from old programs such as about variables, based classes, derived classes, objects of classes, and functions. The tool have two main parts; the lexical analyzer module that can read the input file character by character, and the searching module which users can get the basic information from the existing programs. We implemented this tool for a patterned sub-C++ language as an input file.

Keywords: Extraction tool, software maintenance, reverse engineering, C++.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2359
1449 A User - Requirements Approach in Medical Devices Maintenance System Development: A Case Study from an Industry Perspective

Authors: Manar AlJazzazi, Mohammed Rawashdeh, Tariq Alshawaheen, Aktham Malkawi

Abstract:

This paper is a part of research, in which the way the biomedical engineers follow in their work is analyzed. The goal of this paper is to present a method for specification of user requirements in the medical devices maintenance process. Data Gathering Methods, Research Model Phases and Descriptive Analysis is presented. These technology and verification rules can be implemented in Medical devices maintenance management process to the maintenance process.

Keywords: Quality Function Deployment (QFD), User - requirements approach.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2196
1448 The Link between Financial and Overall Corporate Strategies

Authors: Jaroslav Pavlíček

Abstract:

Company strategy expresses a basic idea of how to reach company objectives. A whole range of models of strategic management are used in practice. The concept of strategic management should fulfill some basic requirements to make it applicable for both the typical, but also more specific company environment. The financial strategy plays an important role in corporate strategy. The paper develops a methodology of strategic model implementing into the category of micro, small and medium-sized enterprises (SMEs). Furthermore, the methodology recommends procedures while solving an up-to-date worldwide task of the definition of the company strategy and its financial strategy.

Keywords: corporate strategy, financial strategy, corporate planning

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1904
1447 A Heuristic Statistical Model for Lifetime Distribution Analysis of Complicated Systems in the Reliability Centered Maintenance

Authors: Mojtaba Mahdavi, Mohamad Mahdavi, Maryam Yazdani

Abstract:

A heuristic conceptual model for to develop the Reliability Centered Maintenance (RCM), especially in preventive strategy, has been explored during this paper. In most real cases which complicity of system obligates high degree of reliability, this model proposes a more appropriate reliability function between life time distribution based and another which is based on relevant Extreme Value (EV) distribution. A statistical and mathematical approach is used to estimate and verify these two distribution functions. Then best one is chosen just among them, whichever is more reliable. A numeric Industrial case study will be reviewed to represent the concepts of this paper, more clearly.

Keywords: Lifetime distribution, Reliability, Estimation, Extreme value, Improving model, Series, Parallel.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1437
1446 Impact of Faults in Different Software Systems: A Survey

Authors: Neeraj Mohan, Parvinder S. Sandhu, Hardeep Singh

Abstract:

Software maintenance is extremely important activity in software development life cycle. It involves a lot of human efforts, cost and time. Software maintenance may be further subdivided into different activities such as fault prediction, fault detection, fault prevention, fault correction etc. This topic has gained substantial attention due to sophisticated and complex applications, commercial hardware, clustered architecture and artificial intelligence. In this paper we surveyed the work done in the field of software maintenance. Software fault prediction has been studied in context of fault prone modules, self healing systems, developer information, maintenance models etc. Still a lot of things like modeling and weightage of impact of different kind of faults in the various types of software systems need to be explored in the field of fault severity.

Keywords: Fault prediction, Software Maintenance, Automated Fault Prediction, and Failure Mode Analysis

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2037
1445 Optimization of the Structures of the Electric Feeder Systems of the Oil Pumping Plants in Algeria

Authors: M. Bouguerra, F. Laaouad, I. Habi, R. Azaizia

Abstract:

In Algeria, now, the oil pumping plants are fed with electric power by independent local sources. This type of feeding has many advantages (little climatic influence, independent operation). However it requires a qualified maintenance staff, a rather high frequency of maintenance and repair and additional fuel costs. Taking into account the increasing development of the national electric supply network (Sonelgaz), a real possibility of transfer of the local sources towards centralized sources appears.These latter cannot only be more economic but more reliable than the independent local sources as well. In order to carry out this transfer, it is necessary to work out an optimal strategy to rebuilding these networks taking in account the economic parameters and the indices of reliability.

Keywords: Optimization, reliability, electric network.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1237
1444 Increasing Replica Consistency Performances with Load Balancing Strategy in Data Grid Systems

Authors: Sarra Senhadji, Amar Kateb, Hafida Belbachir

Abstract:

Data replication in data grid systems is one of the important solutions that improve availability, scalability, and fault tolerance. However, this technique can also bring some involved issues such as maintaining replica consistency. Moreover, as grid environment are very dynamic some nodes can be more uploaded than the others to become eventually a bottleneck. The main idea of our work is to propose a complementary solution between replica consistency maintenance and dynamic load balancing strategy to improve access performances under a simulated grid environment.

Keywords: Consistency, replication, data grid, load balancing.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2287
1443 Comparison of Two Maintenance Policies for a Two-Unit Series System Considering General Repair

Authors: Seyedvahid Najafi, Viliam Makis

Abstract:

In recent years, maintenance optimization has attracted special attention due to the growth of industrial systems complexity. Maintenance costs are high for many systems, and preventive maintenance is effective when it increases operations' reliability and safety at a reduced cost. The novelty of this research is to consider general repair in the modeling of multi-unit series systems and solve the maintenance problem for such systems using the semi-Markov decision process (SMDP) framework. We propose an opportunistic maintenance policy for a series system composed of two main units. Unit 1, which is more expensive than unit 2, is subjected to condition monitoring, and its deterioration is modeled using a gamma process. Unit 1 hazard rate is estimated by the proportional hazards model (PHM), and two hazard rate control limits are considered as the thresholds of maintenance interventions for unit 1. Maintenance is performed on unit 2, considering an age control limit. The objective is to find the optimal control limits and minimize the long-run expected average cost per unit time. The proposed algorithm is applied to a numerical example to compare the effectiveness of the proposed policy (policy Ⅰ) with policy Ⅱ, which is similar to policy Ⅰ, but instead of general repair, replacement is performed. Results show that policy Ⅰ leads to lower average cost compared with policy Ⅱ. 

Keywords: Condition-based maintenance, proportional hazards model, semi-Markov decision process, two-unit series systems.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 515
1442 Optimal Opportunistic Maintenance Policy for a Two-Unit System

Authors: Nooshin Salari, Viliam Makis, Jane Doe

Abstract:

This paper presents a maintenance policy for a system consisting of two units. Unit 1 is gradually deteriorating and is subject to soft failure. Unit 2 has a general lifetime distribution and is subject to hard failure. Condition of unit 1 of the system is monitored periodically and it is considered as failed when its deterioration level reaches or exceeds a critical level N. At the failure time of unit 2 system is considered as failed, and unit 2 will be correctively replaced by the next inspection epoch. Unit 1 or 2 are preventively replaced when deterioration level of unit 1 or age of unit 2 exceeds the related preventive maintenance (PM) levels. At the time of corrective or preventive replacement of unit 2, there is an opportunity to replace unit 1 if its deterioration level reaches the opportunistic maintenance (OM) level. If unit 2 fails in an inspection interval, system stops operating although unit 1 has not failed. A mathematical model is derived to find the preventive and opportunistic replacement levels for unit 1 and preventive replacement age for unit 2, that minimize the long run expected average cost per unit time. The problem is formulated and solved in the semi-Markov decision process (SMDP) framework. Numerical example is provided to illustrate the performance of the proposed model and the comparison of the proposed model with an optimal policy without opportunistic maintenance level for unit 1 is carried out.

Keywords: Condition-based maintenance, opportunistic maintenance, preventive maintenance, two-unit system.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 961
1441 Reliability-Based Maintenance Management Methodology to Minimise Life Cycle Cost of Water Supply Networks

Authors: Mojtaba Mahmoodian, Joshua Phelan, Mehdi Shahparvari

Abstract:

With a large percentage of countries’ total infrastructure expenditure attributed to water network maintenance, it is essential to optimise maintenance strategies to rehabilitate or replace underground pipes before failure occurs. The aim of this paper is to provide water utility managers with a maintenance management approach for underground water pipes, subject to external loading and material corrosion, to give the lowest life cycle cost over a predetermined time period. This reliability-based maintenance management methodology details the optimal years for intervention, the ideal number of maintenance activities to perform before replacement and specifies feasible renewal options and intervention prioritisation to minimise the life cycle cost. The study was then extended to include feasible renewal methods by determining the structural condition index and potential for soil loss, then obtaining the failure impact rating to assist in prioritising pipe replacement. A case study on optimisation of maintenance plans for the Melbourne water pipe network is considered in this paper to evaluate the practicality of the proposed methodology. The results confirm that the suggested methodology can provide water utility managers with a reliable systematic approach to determining optimum maintenance plans for pipe networks.

Keywords: Water pipe networks, maintenance management, reliability analysis, optimum maintenance plan.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1210
1440 Repair and Maintenance Capability and Facilities Availability for MF 285 Tractor Operators in North of Khouzestan Province

Authors: Fatemeh Afsharnia, Mohammad Amin Asoodar, Abbas Abdeshahi, Afshin Marzban

Abstract:

A repairable mechanical system (as agricultural tractor) is subject to deterioration or repeated failure and needs a repair shops and also operator’s capability for the repair and maintenance operations. Data are based on field visits and interviews with 48MF 285 tractor operators from 14 villages collected in north of Khouzestan province. The results showed that most operators were lack the technical skill to service and repair tractors due to insufficient training, specific education and work experience. Inadequate repair and maintenance facilities, such as workshops, mechanics and spare parts depots cause delays in repair work in the survey areas. Farmers do not keep accurate service records and most of them disregard proper maintenance and service of their tractors, such as changing engine oil without following the manufacturer’s recommendations. Since, Repair and maintenance facilities should be established in village areas to guarantee timely repair in case of breakdowns and to make spare parts available at low price. The operators should keep service records accurately and adhere to maintenance and service schedules according to the manufacturer’s instructions. They should also be encouraged to do the service and maintain their tractors properly.

Keywords: Operators’ capability, Facilities availability, Repair and maintenance, MF 285 tractors.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1789
1439 An Overview of Issues to Consider Before Introducing Performance-Based Road Maintenance Contracting

Authors: M. Sultana, A. Rahman, S. Chowdhury

Abstract:

Road authorities have confronted problems to maintaining the serviceability of road infrastructure systems by using various traditional methods of contracting. As a solution to these problems, many road authorities have started contracting out road maintenance works to the private sector based on performance measures. This contracting method is named Performance-Based Maintenance Contracting (PBMC). It is considered more costeffective than other traditional methods of contracting. It has a substantial success records in many developed and developing countries over the last two decades. This paper discusses and analyses the potential issues to be considered before the introduction of PBMC in a country.

Keywords: Contracting, Performance-Based Maintenance, Road infrastructure

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1713
1438 A Genetic Algorithm to Schedule the Flow Shop Problem under Preventive Maintenance Activities

Authors: J. Kaabi, Y. Harrath

Abstract:

This paper studied the flow shop scheduling problem under machine availability constraints. The machines are subject to flexible preventive maintenance activities. The nonresumable scenario for the jobs was considered. That is, when a job is interrupted by an unavailability period of a machine it should be restarted from the beginning. The objective is to minimize the total tardiness time for the jobs and the advance/tardiness for the maintenance activities. To solve the problem, a genetic algorithm was developed and successfully tested and validated on many problem instances. The computational results showed that the new genetic algorithm outperforms another earlier proposed algorithm. 

Keywords: Flow shop scheduling, maintenance, genetic algorithm, priority rules.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1877
1437 A New Failure Analysis for Maintenance Management in Complex Hospitals

Authors: R. Miniati, F. Dori, E. Iadanza, M. Fregonara Medici

Abstract:

management of medical devices in hospitals includes the planning of medical equipment acquisition and maintenance. The presence of critical and non-critical areas together with technological proliferation render the management of medical devices very complex. This study creates an easy and objective methodology for the analysis of medical equipment maintenance, that makes the management of medical devices more feasible. The study has been carried out at Florence Hospital Careggi and it aims to help the clinical engineering department to manage medical equipment by clarifying the hospital situation through a characterization of the different areas, technologies and fault typologies.

Keywords: Clinical Engineering, Maintenance, Medical DevicesManagement, Key Performance Indicators.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1744
1436 Innovation Strategy in Slovak Businesses

Authors: V. Lendel, M. Varmus

Abstract:

The aim of the paper is based on detailed analysis of literary sources and carried out research to develop a model development and implementation of innovation strategy in the business. The paper brings the main results of the authors conducted research on a sample of 462 respondents that shows the current situation in the Slovak enterprises in the use of innovation strategy. Carried out research and analysis provided the base for a model development and implementation of innovation strategy in the business, which is in the paper in detail, step by step explained with emphasis on the implementation process. Implementing the innovation strategy is described a separate model. Paper contains recommendations for successful implementation of innovation strategy in the business. These recommendations should serve mainly business managers as valuable tool in implementing the innovation strategy.

Keywords: innovation, innovation strategy, innovative management, innovative potential

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1691
1435 Improvement of Overall Equipment Effectiveness through Total Productive Maintenance

Authors: S. Fore, L. Zuze

Abstract:

Frequent machine breakdowns, low plant availability and increased overtime are a great threat to a manufacturing plant as they increase operating costs of an industry. The main aim of this study was to improve Overall Equipment Effectiveness (OEE) at a manufacturing company through the implementation of innovative maintenance strategies. A case study approach was used. The paper focuses on improving the maintenance in a manufacturing set up using an innovative maintenance regime mix to improve overall equipment effectiveness. Interviews, reviewing documentation and historical records, direct and participatory observation were used as data collection methods during the research. Usually production is based on the total kilowatt of motors produced per day. The target kilowatt at 91% availability is 75 Kilowatts a day. Reduced demand and lack of raw materials particularly imported items are adversely affecting the manufacturing operations. The company had to reset its targets from the usual figure of 250 Kilowatt per day to mere 75 per day due to lower availability of machines as result of breakdowns as well as lack of raw materials. The price reductions and uncertainties as well as general machine breakdowns further lowered production. Some recommendations were given. For instance, employee empowerment in the company will enhance responsibility and authority to improve and totally eliminate the six big losses. If the maintenance department is to realise its proper function in a progressive, innovative industrial society, then its personnel must be continuously trained to meet current needs as well as future requirements. To make the maintenance planning system effective, it is essential to keep track of all the corrective maintenance jobs and preventive maintenance inspections. For large processing plants these cannot be handled manually. It was therefore recommended that the company implement (Computerised Maintenance Management System) CMMS.

Keywords: Maintenance, Manufacturing, Overall Equipment Effectiveness

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3936
1434 Effect of Information System Strategies on Supply Chain Strategies and Supply Chain Performance

Authors: M. Torabizadeh, M. Khatami Rad, A. Noshadi

Abstract:

In order to achieve competitive advantage and better performance of firm, supply chain management (SCM) strategy should support and drive forward business strategy. It means that supply chain should be aligned with business strategy, at the same time supply chain (SC) managers need to use appropriate information system (IS) solution to support their strategy, which would lead to stay competitive. There are different kinds of IS strategies which enable managers to meet the SC requirement by selecting the best IS strategy. Therefore, it is important to align IS strategies and practices with SC strategies and practices, which could help us to plan for an IS application that supports and enhances a SCMS. In this study, aligning IS with SC in strategy level is considered. The main aim of this paper is to align the various IS strategies with SCM strategies and demonstrate their impact on SC and firm performance.

Keywords: Information system strategy, alignment, firm performance, supply chain strategy.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1788
1433 An Example of Open Robot Controller Architecture - For Power Distribution Line Maintenance Robot System -

Authors: Yingxin He, Kyouichi Tatsuno

Abstract:

In this paper, we propose an architecture for easily constructing a robot controller. The architecture is a multi-agent system which has eight agents: the Man-machine interface, Task planner, Task teaching editor, Motion planner, Arm controller, Vehicle controller, Vision system and CG display. The controller has three databases: the Task knowledge database, the Robot database and the Environment database. Based on this controller architecture, we are constructing an experimental power distribution line maintenance robot system and are doing the experiment for the maintenance tasks, for example, “Bolt insertion task".

Keywords: Robot controller, Software library, Maintenance robot, Robot language, Agent system.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1360