6915 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 317
6914 Unstructured Learning: Development of Free Form Construction in Waldorf and Normative Preschools

Authors: Salam Kodsi

Abstract:

In this research, we sought to focus on constructive play and examine its components in the context of two different educational approaches: Waldorf and normative schools. When they are free to choose, construction is one of the forms of play most favored by children. Its short-term and long-term cognitive contributions are apparent in various areas of development. The lack of empirical studies about play in Waldorf schools, which addresses the possibility of this incidental learning inspired the need to enrich the body of existing knowledge. 90 children (4-6 yrs.old) four preschools ( two normative, two Waldorf) participated in a small homogeneous city. Naturalistic observations documented the time frame, physical space, and construction materials related to the freeform building; processes of construction among focal representative children and its products. The study’s main finding with respect to the construction output points to a connection between educational approach and level of construction sophistication. Higher levels of sophistication were found at the Waldorf preschools than at the mainstream preschools. This finding emerged due to the differences in the level of sophistication among the older children in the two types of preschools, while practically no differences emerged among the younger children. Discussion of the research findings considered the differences between the play environments in terms of time, physical space, and construction materials. The construction processes were characterized according to the design model stages. The construction output was characterized according to the sophistication scale dimensions and the connections between approach, age and gender, and sophistication level.

Keywords: constructive play, preschool, design process model, complexity

Procedia PDF Downloads 89
6913 Evaluation and Analysis of the Regulations of Health and Safety in the Construction Industry: A Case of Study in Skikda, Algeria

Authors: Khorief Ouissem, Sassi Boudmagh Souad, Mahimoud Aissa

Abstract:

The health and safety problem in the construction companies has been a major subject of research in Algeria for many years. The latest statistics of the Algerian National Social Security Fund (CNAS) shows that a third of accidents recorded at the national level are originated from construction activities. It is becoming increasingly essential and urgent to investigate and address its causes in order to find measures to overcome the deficiencies in this area. Thus, this paper takes in investigating this problem through a study conducted in the city of Skikda, Algeria. The study was carried out through questionnaire where twenty construction companies were taking into consideration. First, the study identifies the regulations and the laws related to the health and safety in the construction sector in Algeria. Then it goes on to assess and evaluate the implementation of the identified regulations in the companies selected. The result of the assessment indicates that the majority of the construction companies considered do not meet the health and safety standards and regulations. To extract the main causes of the failure of the system to control this industry, the observations and the evaluation were analyzed using the 5M or Ichikawa diagram method. This method is based on identifying the causes of the problem in terms of purpose, the list of potential causes for families. These families often correspond to 5M (Labor, Material, Methods, Middle, and Management). Finally, having identified the primary motives, the present authors propose a list of actions to move towards a more controlled and effective health and safety system for the construction industry.

Keywords: health and safety, construction industry, performance measurement, Algeria

Procedia PDF Downloads 303
6912 Social Construction of Sustainability and Quality of Life Indicators for Urban Passenger Transportation

Authors: Tzay-An Shiau, Kuan-Lin Ho

Abstract:

This study developed sustainability and quality of life indicators for urban passenger transportation by using Social Construction of Technology (SCOT). The initial indicators were proposed by referring to literatures and were summarized by using impact-based framework. Subsequently, the stakeholders were defined according to their interest, power and then classified into scientific, operational, policy making, policy monitoring and nonprofessional frames. The scientific frame consisted of nine scholars in transportation field. Ten representatives from Taipei Rapid Transit Corporation (TRTC), Taiwan Railways Administration (TRA) and bus operators were grouped into the operational frame. The policy making frame comprised of ten representatives from Department of Transportation, Taipei City Government (DOT, TCG), Department of Railways and Highways, Ministry of Transportation and Communication (DORH, MOTC), Directorate General of Highways, Ministry of Transportation and Communication (DGOH, MOTC) and Institute of Transportation, Ministry of Transportation and Communication (IOT, MOTC). The policy monitoring frame consisted of 15 representatives from Taipei City Councilor, legislator and reporter. The nonprofessional frame comprised of 72 Taipei citizens. The stakeholders were asked to evaluate the relative importance of indicators using Delphi survey method. Social construction of 14 transport sustainability indicators and 12 transport quality of life indicators were obtained.

Keywords: sustainability, quality of life, Social Construction of Technology (SCOT), stakeholder

Procedia PDF Downloads 441
6911 A Study on the Construction Process and Sustainable Renewal Development of High-Rise Residential Areas in Chongqing (1978-2023)

Authors: Xiaoting Jing, Ling Huang

Abstract:

After the reform and opening up, Chongqing has formed far more high-rise residential areas than other cities in its more than 40 years of urban construction. High-rise residential areas have become one of the main modern living models in Chongqing and an important carrier reflecting the city's high quality of life. Reviewing the construction process and renewal work helps understand the characteristics of high-rise residential areas in Chongqing at different stages, clarify current development demands, and look forward to the focus of future renewal work. Based on socio-economic development and policy background, the article sorts the construction process of high-rise residential areas in Chongqing into four stages: the early experimental construction period of high-rise residential areas (1978-1996), the rapid start-up period of high-rise commodity housing construction (1997-2006), the large-scale construction period of high-rise commodity housing and public rental housing (2007-2014), and the period of renewal and renovation of high-rise residential areas and step-by-step construction of quality commodity housing (2015-present). Based on the construction demands and main construction types of each stage, the article summarizes that the construction of high-rise residential areas in Chongqing features large scale, high speed, and high density. It points out that a large number of high-rise residential areas built after 2000 will become important objects of renewal and renovation in the future. Based on existing renewal work experience, it is urgent to explore a path for sustainable renewal and development in terms of policy mechanisms, digital supervision, and renewal and renovation models, leading the high-rise living in Chongqing toward high-quality development.

Keywords: high-rise residential areas, construction process, renewal and renovation, Chongqing

Procedia PDF Downloads 31
6910 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.

Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry

Procedia PDF Downloads 155
6909 Study on the Renewal Strategy of Mountain City Trail Based on Place Attachment Theory

Authors: Long Xumeng

Abstract:

Place attachment focuses on the emotions and practices between people and their environment, and the influencing factors of place attachment vary depending on the nature of the place. As an important carrier of public slow-moving activities and urban culture, the feelings, cognition, and behaviors of the subjects involved in the use of mountain city trails have become the focus of research in this field. This paper will take Daijiaxiang Cliff Walkway in Yuzhong District, Chongqing City, as an example and analyze the evaluation results and correlation of each factor through questionnaire survey and field observation, using the three scales of Recreational Experience Scale, Satisfaction Scale, and Place Attachment Scale, as well as the intensity of activity, by using SPSS software. The study shows that there is a significant difference between the demographic variables of users' identity and age and the formation of place attachment; the degree of place attachment is significantly positively correlated with the emotion, industry, and service quality of recreational experience; and the recreational experience of the Mountain City Trail is significantly positively correlated with the overall satisfaction. By analyzing the influencing factors of recreational experience, satisfaction and place attachment, the corresponding conclusions and enhancement strategies were drawn to provide references for the renewal and construction of mountain city trails.

Keywords: mountain city trail, place attachment, recreational experience, satisfaction, urban renewal

Procedia PDF Downloads 55
6908 Production and Recycling of Construction and Demolition Waste

Authors: Vladimira Vytlacilova

Abstract:

Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.

Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management

Procedia PDF Downloads 275
6907 Recycled Asphalt Pavement with Warm Mix Additive for Sustainable Road Construction

Authors: Meor Othman Hamzah, Lillian Gungat, Nur Izzi Md. Yusoff, Jan Valentin

Abstract:

The recent hike in raw materials costs and the quest for preservation of the environment has prompted asphalt industries to adopt greener road construction technology. This paper presents a study on such technology by means of asphalt recycling and use of warm mix asphalt (WMA) additive. It evaluates the effects of a WMA named RH-WMA on binder rheological properties and asphalt mixture performance. The recycled asphalt, obtained from local roads, was processed, fractionated, and incorporated with virgin aggregate and binder. For binder testing, the recycled asphalt was extracted and blended with virgin binder. The binder and mixtures specimen containing 30 % and 50 % recycled asphalt contents were mixed with 3 % RH-WMA. The rheological properties of the binder were evaluated based on fundamental, viscosity, and frequency sweep tests. Indirect tensile strength and resilient modulus tests were carried out to assess the mixture’s performances. The rheological properties and strength performance results showed that the addition of RH-WMA slightly reduced the binder and mixtures stiffness. The percentage of recycled asphalt increased the stiffness of binder and mixture, and thus improves the resistance to rutting. Therefore, the integration of recycled asphalt and RH-WMA can be an alternative material for road sustainable construction for countries in the tropics.

Keywords: recycled asphalt, warm mix additive, rheological, mixture performance

Procedia PDF Downloads 488
6906 A Preparatory Method for Building Construction Implemented in a Case Study in Brazil

Authors: Aline Valverde Arroteia, Tatiana Gondim do Amaral, Silvio Burrattino Melhado

Abstract:

During the last twenty years, the construction field in Brazil has evolved significantly in response to its market growing and competitiveness. However, this evolving path has faced many obstacles such as cultural barriers and the lack of efforts to achieve quality at the construction site. At the same time, the greatest amount of information generated on the designing or construction phases is lost due to the lack of an effective coordination of these activities. Face this problem, the aim of this research was to implement a French method named PEO which means preparation for building construction (in Portuguese) seeking to understand the design management process and its interface with the building construction phase. The research method applied was qualitative, and it was carried out through two case studies in the city of Goiania, in Goias, Brazil. The research was divided into two stages called pilot study at Company A and implementation of PEO at Company B. After the implementation; the results demonstrated the PEO method's effectiveness and feasibility while a booster on the quality improvement of design management. The analysis showed that the method has a purpose to improve the design and allow the reduction of failures, errors and rework commonly found in the production of buildings. Therefore, it can be concluded that the PEO is feasible to be applied to real estate and building companies. But, companies need to believe in the contribution they can make to the discovery of design failures in conjunction with other stakeholders forming a construction team. The result of PEO can be maximized when adopting the principles of simultaneous engineering and insertion of new computer technologies, which use a three-dimensional model of the building with BIM process.

Keywords: communication, design and construction interface management, preparation for building construction (PEO), proactive coordination (CPA)

Procedia PDF Downloads 137
6905 Lessons from Nature: Defensive Designs for the Built Environment

Authors: Rebecca A. Deek

Abstract:

There is evidence that erratic and extreme weather is becoming a common occurrence, and even predictions that this will become even more frequent and more severe. It also appears that the severity of earthquakes is intensifying. Some observers believe that human conduct has given reasons for such change; others attribute this to environmental and geological cycles. However, as some physicists, environmental scientists, politicians, and others continue to debate the connection between weather events, seismic activities, and climate change, other scientists, engineers, and urban planners are exploring how can our habitat become more responsive and resilient to such phenomena. There are a number of recent instances of nature’s destructive events that provide basis for the development of defensive measures.

Keywords: biomimicry, natural disasters, protection of human lives, resilient infrastructures

Procedia PDF Downloads 477
6904 Exploring the Charm of Chongqing City based on the Regional Characteristics of Mountain Walking Space: A Case Study of Yuzhong Peninsula

Authors: Liu Danping

Abstract:

Walking space has very important historical and cultural value in ancient and even modern urban development. As far as the footpath itself is concerned, it reflects the spatial organization mode and traditional architectural construction characteristics of mountain cities. In terms of the spatial nature of streets, traditional streets contain the history of urban development and the most primitive urban life. The slow walking speed allows people to carefully perceive the space and scenery along the way. The real city life in the streets often makes people feel the cultural connotation and unique charm of the city. According to the regional characteristics of pedestrian traffic in the main urban area of Chongqing, the charm of chongqing is discussed. Based on the study of chongqing characteristic walking space elements, this paper summarizes the characteristics of Chongqing urban walking traffic, analyzes the existing problems of mountain city walking traffic, and takes Yuzhong Peninsula as an example to analyze the charm promotion strategy of urban walking traffic.

Keywords: mountain city, walking space, urban charm, urban renewal, regional culture

Procedia PDF Downloads 70
6903 Modelling of Geotechnical Data Using Geographic Information System and MATLAB for Eastern Ahmedabad City, Gujarat

Authors: Rahul Patel

Abstract:

Ahmedabad, a city located in western India, is experiencing rapid growth due to urbanization and industrialization. It is projected to become a metropolitan city in the near future, resulting in various construction activities. Soil testing is necessary before construction can commence, requiring construction companies and contractors to periodically conduct soil testing. The focus of this study is on the process of creating a spatial database that is digitally formatted and integrated with geotechnical data and a Geographic Information System (GIS). Building a comprehensive geotechnical (Geo)-database involves three steps: collecting borehole data from reputable sources, verifying the accuracy and redundancy of the data, and standardizing and organizing the geotechnical information for integration into the database. Once the database is complete, it is integrated with GIS, allowing users to visualize, analyze, and interpret geotechnical information spatially. Using a Topographic to Raster interpolation process in GIS, estimated values are assigned to all locations based on sampled geotechnical data values. The study area was contoured for SPT N-Values, Soil Classification, Φ-Values, and Bearing Capacity (T/m2). Various interpolation techniques were cross-validated to ensure information accuracy. This GIS map enables the calculation of SPT N-Values, Φ-Values, and bearing capacities for different footing widths and various depths. This study highlights the potential of GIS in providing an efficient solution to complex phenomena that would otherwise be tedious to achieve through other means. Not only does GIS offer greater accuracy, but it also generates valuable information that can be used as input for correlation analysis. Furthermore, this system serves as a decision support tool for geotechnical engineers.

Keywords: ArcGIS, borehole data, geographic information system, geo-database, interpolation, SPT N-value, soil classification, Φ-Value, bearing capacity

Procedia PDF Downloads 50
6902 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 68
6901 Analysis of Incidences of Collapsed Buildings in the City of Douala, Cameroon from 2011-2020

Authors: Theodore Gautier Le Jeune Bikoko, Jean Claude Tchamba, Sofiane Amziane

Abstract:

This study focuses on the problem of collapsed buildings within the city of Douala over the past ten years, and more precisely, within the period from 2011 to 2020. It was carried out in a bid to ascertain the real causes of this phenomenon, which has become recurrent in the leading economic city of Cameroon. To achieve this, it was first necessary to review some works dealing with construction materials and technology as well as some case histories of structural collapse within the city. Thereafter, a statistical study was carried out on the results obtained. It was found that the causes of building collapses in the city of Douala are: Neglect of administrative procedures, use of poor quality materials, poor composition and confectioning of concrete, lack of Geotechnical study, lack of structural analysis and design, corrosion of the reinforcement bars, poor maintenance in buildings, and other causes. Out of the 46 cases of structural failure of buildings within the city of Douala, 7 of these were identified to have had no geotechnical study carried out, giving a percentage of 15.22%. It was also observed that out of the 46 cases of structural failure, 6 were as a result of lack of proper structural analysis and design, giving a percentage of 13.04%. Subsequently, recommendations and suggestions are made in a bid to placing particular emphasis on the choice of materials, the manufacture and casting of concrete, as well as the placement of the required reinforcements. All this guarantees the stability of a building.

Keywords: collapse buildings, Douala, structural collapse, Cameroon

Procedia PDF Downloads 143
6900 Conceptual Model Design for E-Readiness of Entrepreneurial City Case Study: Entrepreneurial Cities in Iran

Authors: Mohsen Yaghmoor, Sima Radmanesh, Ameneh Gholami

Abstract:

Cities are the principal ground for manifestation of an information society. To create an entrepreneurial city, it is required that just and equal access to opportunities are provided for all segments of the city and technologies are intelligently employed. Furthermore, it is necessary for us to be electronically ready in all political, economic, social, cultural, and technological aspects. Also e-city creates enormous potentials and opportunities for development of the entrepreneurial city. After improvement of e-readiness for establishment of entrepreneurial e-city, potentials, and capitals of the city become productive and more suitable opportunities are offered to citizens, state sectors, and private sectors in order to become entrepreneurs. To create and develop an entrepreneurial city, we need to have readiness to detection and creation of entrepreneurial opportunities and finally exploitation of these opportunities which, in turn, lead to use of entrepreneurial events and their quality in the city. In this model, the quality of entrepreneurial events, the productivity of activities, the necessity of reducing the digital gap, positive and active attendance in information society and compatibility and aligning with the global society are emphasized. In an entrepreneurial city, citizens are not help seekers, private sector is not passive, and the government is entrepreneurial.

Keywords: e-city, e-readiness, entrepreneurial city, entrepreneurial events, technological entrepreneurship

Procedia PDF Downloads 354
6899 Modern Work Modules in Construction Practice

Authors: Robin Becker, Nane Roetmann, Manfred Helmus

Abstract:

Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 55
6898 Comprehensive Risk Assessment Model in Agile Construction Environment

Authors: Jolanta Tamošaitienė

Abstract:

The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.

Keywords: assessment, environment, agile, model, risk

Procedia PDF Downloads 229
6897 Numerical Modeling of Air Pollution with PM-Particles and Dust

Authors: N. Gigauri, A. Surmava, L. Intskirveli, V. Kukhalashvili, S. Mdivani

Abstract:

The subject of our study is atmospheric air pollution with numerical modeling. In the presented article, as the object of research, there is chosen city Tbilisi, the capital of Georgia, with a population of one and a half million and a difficult terrain. The main source of pollution in Tbilisi is currently vehicles and construction dust. The concentrations of dust and PM (Particulate Matter) were determined in the air of Tbilisi and in its vicinity. There are estimated their monthly maximum, minimum, and average concentrations. Processes of dust propagation in the atmosphere of the city and its surrounding territory are modelled using a 3D regional model of atmospheric processes and an admixture transfer-diffusion equation. There were taken figures of distribution of the polluted cloud and dust concentrations in different areas of the city at different heights and at different time intervals with the background stationary westward and eastward wind. It is accepted that the difficult terrain and mountain-bar circulation affect the deformation of the cloud and its spread, there are determined time periods when the dust concentration in the city is greater than MAC (Maximum Allowable Concentration, MAC=0.5 mg/m³).

Keywords: air pollution, dust, numerical modeling, PM-particles

Procedia PDF Downloads 115
6896 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 88
6895 Impact of Pandemics on Cities and Societies

Authors: Deepak Jugran

Abstract:

Purpose: The purpose of this study is to identify how past Pandemics shaped social evolution and cities. Methodology: A historical and comparative analysis of major historical pandemics in human history their origin, transmission route, biological response and the aftereffects. A Comprehensive pre & post pandemic scenario and focuses selectively on major issues and pandemics that have deepest & lasting impact on society with available secondary data. Results: Past pandemics shaped the behavior of human societies and their cities and made them more resilient biologically, intellectually & socially endorsing the theory of “Survival of the fittest” by Sir Charles Darwin. Pandemics & Infectious diseases are here to stay and as a human society, we need to strengthen our collective response & preparedness besides evolving mechanisms for strict controls on inter-continental movements of people, & especially animals who become carriers for these viruses. Conclusion: Pandemics always resulted in great mortality, but they also improved the overall individual human immunology & collective social response; at the same time, they also improved the public health system of cities, health delivery systems, water, sewage distribution system, institutionalized various welfare reforms and overall collective social response by the societies. It made human beings more resilient biologically, intellectually, and socially hence endorsing the theory of “AGIL” by Prof Talcott Parsons. Pandemics & infectious diseases are here to stay and as humans, we need to strengthen our city response & preparedness besides evolving mechanisms for strict controls on inter-continental movements of people, especially animals who always acted as carriers for these novel viruses. Pandemics over the years acted like natural storms, mitigated the prevailing social imbalances and laid the foundation for scientific discoveries. We understand that post-Covid-19, institutionalized city, state and national mechanisms will get strengthened and the recommendations issued by the various expert groups which were ignored earlier will now be implemented for reliable anticipation, better preparedness & help to minimize the impact of Pandemics. Our analysis does not intend to present chronological findings of pandemics but rather focuses selectively on major pandemics in history, their causes and how they wiped out an entire city’s population and influenced the societies, their behavior and facilitated social evolution.

Keywords: pandemics, Covid-19, social evolution, cities

Procedia PDF Downloads 80
6894 A Journey to the Past: Hoşap Castle in Van

Authors: Muhammet Kurucu

Abstract:

Hoşap Castle, located in Gürpınar, Van, is one of the most important symbols of the city because it hosted sacred memories of its time. Besides the location and construction features of Güzelsu, in resort city of Van, Hoşap Castle is a great place with an architecture consisting of an outer fortress and the inner fortress. It is one of the Ottoman castles and was built in the 17th century by Sarı Süleyman who was known as bey of Mahmudi. Although some parts of Hoşap Castle have been destroyed by natural disasters, it has survived until today without total collapse and most places with excavations are revealed. In this study, present condition of the Hoşap Castle is observed and introduced briefly.

Keywords: Güzelsu, Hoşap Castle, natural disasters, restoration, Van

Procedia PDF Downloads 254
6893 Social Innovation, Change and the Future of Resilient Communities in Tokyo

Authors: Heide Imai

Abstract:

The paper will introduce and discuss specific examples of urban practices which take place within the dynamic urban landscape of contemporary Tokyo. The rising interest and importance of derelict places as resilient and creative clusters will be analysed, before relating this to the rediscovery of small urban niches and the emergence of different forms of social entrepreneurs. Secondly, two different case study areas will be introduced before discussing different forms of hybrid lifestyles, social micro scale enterprises and social innovations, understanding the concept of ‘small places of resilience’ as zones of human interaction, desire and care in which spontaneous practices take place.

Keywords: entrepreneurship, social innovation, Tokyo, urban regeneration

Procedia PDF Downloads 456
6892 The Kanuri Factor in the 20th Century Economy of Sokoto City

Authors: Murtala Marafa

Abstract:

This research is on socio-economic contributions of the Kanuri migrant community in Sokoto City during the 20th century. Kanuri migrants have been one of the major migrant groups who played and still playing positive role in the development of Sokoto city. The research will make an attempt to examine both the push and pulls factors responsible for Kanuri migration to Sokoto City. It is in the light of this that the research will examine and capture profiles of select prominent Kanuri migrants within the Sokoto city, in order to identify their major economic contributions to the development of Sokoto City. It is hoped that the study will show in the final analysis that the migration of Kanuri to Sokoto city have impacted positively to the socio-economic development of Sokoto city.

Keywords: development, economy, Kanuri, migration

Procedia PDF Downloads 237
6891 Delivery of Sustainable Construction in South Africa – Assessing the Roles of Organisational Leadership

Authors: Ayodeji Emmanuel Oke, Mathew O. Ikuabe, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The call for sustainable construction has received significant drive in recent time considering the overwhelming impacts of its adoption. However, not much has been deliberated on this subject with regards to the roles of organisational leadership in delivering sustainable construction. To this end, the study empirically scrutinised the roles of organisational leadership in delivering sustainable construction. The study adopted a quantitative approach while construction professionals formed the population of the study. A well-articulated questionnaire was used in eliciting responses from the respondents, while appropriate methods of data analysis were used. Findings from the study depicted that the major role of organisational leadership in the delivery of sustainable construction is acting as sustainability integrators. Equally revealed are the internal and external factors affecting organisational leadership in delivering sustainable construction. The study concluded by emphasizing the core roles for delivering sustainable construction by organisational leadership and further recommended that sustainable construction should serve as a prominent and focal organisation goal by organisational leadership when steering the organisation towards meeting its objectives

Keywords: organisational leadership, project delivery, roles, sustainable construction

Procedia PDF Downloads 89
6890 Time Overrun in Pre-Construction Planning Phase of Construction Projects

Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui

Abstract:

Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun

Procedia PDF Downloads 225
6889 Rethink Urban Resilience: An Introductory Study Towards Resilient Spatial Structure of Refugees Neighborhoods

Authors: Salwa Mohammad Alawneh

Abstract:

The ongoing humanitarian crises spur rapid and unpredicted refugee influxes resulting in demographic changes in cities. Regarding different urban systems are vulnerable in refugee neighborhoods. With the consequent social, economic, and spatial challenges, cities must respond with a more durable and sustainable approach based on urban resilience. The paper systematically approaches urban resilience to contribute to refugee spaces by reflecting on the overall urban systems of their neighborhoods. The research will review the urban resilience literature to develop an evaluation framework. The developed framework applies urban resilience more holistically in refugee neighborhoods and expands to the urban systems of social, economic, and spatial. However, the main highlight of this paper is the resilient spatial structure in refugee neighborhoods to face the internal and complex stress of refugee waves and their demographic changes. Finding a set of resilient spatial measurements and focusing on urban forms at a neighborhood scale provide vulnerability reduction and enhance adaptation capacity. As a model example, the paper applies these measurements and facilitates geospatial technologies to one of the refugee neighborhoods in Amman, Jordan, namely Al-Jubilee. The application in Al-Jubilee helps to demonstrate a road map towards a developmental pattern in design and planning by different decision-makers of inter-governmental and humanitarian organizations. In this regard, urban resilience improves the humanitarian assistantship of refugee settings beyond providing the essential needs. In conclusion, urban resilience responds to the different challenges of refugee neighborhoods by supporting urban stability, improving livability, and maintaining both urban functions and security.

Keywords: urban resilience of refugee, resilient urban form, refugee neighborhoods, humanitarian assistantship, refugee in Jordan

Procedia PDF Downloads 135
6888 A Prediction of Electrical Cost for High-Rise Building Construction

Authors: Picha Sriprachan

Abstract:

The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.

Keywords: high-rise building construction, electrical cost, construction phase, architectural phase

Procedia PDF Downloads 360
6887 Evaluation of Ecological Resilience in Mountain-plain Transition Zones: A Case Study of Dujiangyan City, Chengdu

Authors: Zhu Zhizheng, Huang Yong, Li Tong

Abstract:

In the context of land and space development and resource environmental protection. Due to its special geographical location, mountain-plain transition zones are limited by many factors such as topography, mountain forest protection, etc., and their ecology is also more sensitive, with the characteristics of disaster susceptibility and resource gradient. Taking Dujiangyan City, Chengdu as an example, this paper establishes resilience evaluation indicators on the basis of ecological suitability evaluation through the analysis of current situation data and relevant policies: water conservation evaluation, soil and water conservation evaluation, biodiversity evaluation, soil erosion sensitivity evaluation, etc. Based on GIS spatial analysis, the ecological suitability and resilience evaluation results of Dujiangyan city were obtained by disjunction operation. The ecological resilience level of Dujiangyan city was divided into three categories: high, medium and low, with an area ratio of 50.81%, 16.4% and 32.79%, respectively. This paper can provide ideas for solving the contradiction between man and land in the mountain-plain transition zones, and also provide a certain basis for the construction of regional ecological protection and the delineation of three zones and three lines.

Keywords: urban and rural planning, ecological resilience, dujiangyan city, mountain-plain transition zones

Procedia PDF Downloads 89
6886 Analysis of Spatial Form and Gene of Historical and Cultural Settlements in Mountainous Areas: Illustrated by the Example of Anju Ancient Town

Authors: Sun Gang

Abstract:

A variety of functional spaces are distributed on the vast mountain waterfront. Their functional positioning presents a spontaneous form of settlement space, and the construction features show a passive impact on the natural environment. As the precious heritage of inheriting human civilization and promoting historical culture, the traditional settlement space in mountainous areas is also the local expression of landscape pattern pattern gene. Under the impact of rapid urban construction and the stimulation of the transformation of social consumption demand, the original texture, scale and ecology of the traditional mountain settlement space, especially the historical and cultural settlement space, have been affected, and the decline of characteristics hinders the development. This paper selects Anju Ancient Town, the fourth largest ancient city in China, which is located in the city of mountains and waters as the research object, and combines spatial analysis and other methods to study the characteristics and causes of its spatial morphology, analyze the internal logic in its formation and development process, build a genetic analysis map, explore the possibility of settlement inheritance and development, and provide reference for the construction, protection and inheritance of traditional mountain settlements.

Keywords: mountain traditional settlement, historical and cultural settlement space, spatial form, spatial gene

Procedia PDF Downloads 64