6297 Critical Activity Effect on Project Duration in Precedence Diagram Method

Authors: Salman Ali Nisar, Koshi Suzuki

Abstract:

Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.

Keywords: construction project management, critical path method, project scheduling, precedence diagram method

Procedia PDF Downloads 482
6296 Towards Sustainable Construction in the United Arab Emirates: Challenges and Opportunities

Authors: Yousef Alqaryouti, Mariam Al Suwaidi, Raed Mohmood AlKhuwaildi, Hind Kolthoum, Issa Youssef, Mohammed Al Imam

Abstract:

The UAE has experienced rapid economic growth due to its mature oil production industry, leading to a surge in urbanization and infrastructure development in the construction sector. Sustainable development practices are becoming increasingly important, and the UAE government has taken proactive measures to promote them, including the introduction of sustainable building codes, energy-efficient technologies, and renewable energy sources. Initiatives such as the Masdar City project and the Emirates Green Building Council further demonstrate the government's commitment to a cleaner and healthier environment. By adopting sustainable practices, the UAE can reduce its carbon footprint, lessen its reliance on fossil fuels, and achieve cost savings in the long run. The purpose of this paper is to conduct a thorough review of the current state of sustainability in the construction industry of the UAE. Our research methodology includes a local market survey and qualitative observational analysis of executed housing construction projects by the Mohammed Bin Rashid Housing Establishment. The market survey assesses eleven different challenging factors that affect sustainable construction project delivery. The qualitative observational research is based on data collected from three projects, including construction progress, bill of quantity, and construction program. The study concludes that addressing these challenges requires a collaborative team approach, incentivized contracts, traditional project management practices, an integrated project team, and an increase in sustainability awareness among stakeholders. The recommendations proposed in this study aim to promote and improve the application of sustainability in the UAE's construction industry for the future.

Keywords: sustainability, construction, challenges, opportunities, case study, market survey

Procedia PDF Downloads 27
6295 Development of Verification System of Workspace Clashes Between Construction Activities

Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.

Keywords: BIM, workspace, confliction, visualization

Procedia PDF Downloads 371
6294 Macroeconomic Measure of Projectification: An Empirical Study of Pakistani Economy

Authors: Shafaq Rana, Hina Ansar

Abstract:

Projectification is an emerging phenomenon in Western economies. The projects have become the key driver of the economic actions. The impact of projectification is understudy for over a decade. A methodology was developed to measure the degree of projectification at economical level, which was later adapted to measure the degree of projectification in Germany, Norway, and Iceland; and compared the differences in these project societies, considering their industrial structure, organizational size, and the share of project work. Using the same methodology, this study aims to provide empirical evidence of the project work in the context of Pakistan –a developing nation, keeping into consideration the macroeconomic measures, qualitative and quantitative measures of the project i/c GDP, monetary measures, and project success. The research includes a qualitative pre-study to define these macro-measures in the country-specific context and a quantitative study to measure the project work w.r.t hours working in the organizations on projects. The outcome of this study provides the key data on the projectification in a developing economy, which will help industry practitioners and decision-makers to examine the consequences of projectification and strategize, respectively. This study also provides a foundation for further research in individual sectors of the country while exploring different macroeconomic questions, including the effect of projectification on project productivity, income effects, and labor market.

Keywords: developing economy, Pakistan, project work, projectification

Procedia PDF Downloads 95
6293 Risk Factors Affecting Construction Project Cost in Oman

Authors: Omar Amoudi, Latifa Al Brashdi

Abstract:

Construction projects are always subject to risks and uncertainties due to its unique and dynamic nature, outdoor work environment, the wide range of skills employed, various parties involved in addition to situation of construction business environment at large. Altogether, these risks and uncertainties affect projects objectives and lead to cost overruns, delay, and poor quality. Construction projects in Oman often experience cost overruns and delay. Managing these risks and reducing their impacts on construction cost requires firstly identifying these risks, and then analyzing their severity on project cost to obtain deep understanding about these risks. This in turn will assist construction managers in managing and tacking these risks. This paper aims to investigate the main risk factors that affect construction projects cost in the Sultanate of Oman. In order to achieve the main aim, literature review was carried out to identify the main risk factors affecting construction cost. Thirty-three risk factors were identified from the literature. Then, a questionnaire survey was designed and distributed among construction professionals (i.e., client, contractor and consultant) to obtain their opinion toward the probability of occurrence for each risk factor and its possible impact on construction project cost. The collected data was analyzed based on qualitative aspects and in several ways. The severity of each risk factor was obtained by multiplying the probability occurrence of a risk factor with its impact. The findings of this study reveal that the most significant risk factors that have high severity impact on construction project cost are: Change of Oil Price, Delay of Materials and Equipment Delivery, Changes in Laws and Regulations, Improper Budgeting, and Contingencies, Lack of Skilled Workforce and Personnel, Delays Caused by Contractor, Delays of Owner Payments, Delays Caused by Client, and Funding Risk. The results can be used as a basis for construction managers to make informed decisions and produce risk response procedures and strategies to tackle these risks and reduce their negative impacts on construction project cost.

Keywords: construction cost, construction projects, Oman, risk factors, risk management

Procedia PDF Downloads 305
6292 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 301
6291 Integrated Information System on Human Resource Management in Project-Based Organizations

Authors: Akbar Farahani, Afsaneh Hassani, Peyman M. Farkhondeh

Abstract:

Human Resource Management as one of the core processes of the project-based companies, despite its key role in the success and competitive advantage, is relatively unknown. In the project-based companies, due to the accelerated movement of knowledge in the work activities and the temporary nature of the project, the need to develop mechanisms for achieving optimal management of this issues is very challenging. Approach to human resource management in these companies evolves with goals, strategies, and operational processes. Therefore, the need for appropriate tools to facilitate implementation of the optimized human resource management in the project is more than before,Which currently with the development of information technology and modern communication, appropriate to address the optimal approach for dynamic management of human resources in the project have been provided.This is done by using the referral system implemented in Mahab GCE that provides 1: the ability to use humans in projects without geographic limitation and 2:information on the activities and outcomes of referrals.Furthermore, by using this system, recording the lessons learned after any particular activity on projects,accessing quantitative information, procedures, documentation of learned practices that have been stored in the data base as well as using them in future projects is provided.

Keywords: human resource management, project base company, ERP, referrals system

Procedia PDF Downloads 443
6290 Critical Success Factors for Sustainable Smart City Project in India

Authors: Debasis Sarkar

Abstract:

Development of a Smart City would depend upon the development of its infrastructure in a smart way. Primarily based on the ideology of the fourth industrial revolution a Smart City project should have Smart governance, smart health care, smart building, smart transportation, smart mobility, smart energy, smart technology and smart citizen. Considering the Indian scenario of current state of cities in India, it has become very essential to decide the specific parameters which would govern the development of a Smart City project. It has been observed that there are significant parameters beyond Information and Communication Technology (ICT), which govern the development of a Smart City project. This paper is an attempt to identify the Critical Success Factors (CSF) which are significantly responsible for the development of a Smart City project in Western India. Responses to questionnaire survey were analyzed on basis of Likert scale. They were further critically evaluated with help of Factor Comparison Method (FCM) and Analytical Hierarchy Process (AHP). The project authorities need to incorporate Building Information Modeling (BIM) to make the smart city project more collaborative. To make the project more sustainable, use of flyash in the concrete used, reduced usage of cement and steel, use of alternate fuels like biodiesel is recommended.

Keywords: analytical hierarchical process, building information modeling, critical success factors, factor comparison method

Procedia PDF Downloads 225
6289 Core-Shell Type Magnetic Nanoparticles for Targeted Drug Delivery

Authors: Yogita Patil-Sen

Abstract:

Magnetic nanoparticles such as those made of iron oxide have been widely explored as biocatalysts, contrast agents, and drug delivery systems. However, some of the challenges associated with these particles are agglomeration and biocompatibility, which lead to concern of toxicity of the particles, especially for drug delivery applications. Coating the particles with biocompatible materials such as lipids and peptides have shown to improve the mentioned issues. Thus, these core-shell type nanoparticles are emerging as the new class of nanomaterials for targeted drug delivery applications. In this study, various types of core-shell magnetic nanoparticles are prepared and characterized using techniques, such as Fourier Transform Infrared Spectroscopy (FTIR), X-ray Diffraction (XRD), Scanning Electron Microscopy (SEM), Transmission Electron Microscopy (TEM), Vibrating Sample Magnetometer (VSM) and Thermogravimetric Analysis (TGA). The heating ability of nanoparticles is tested under oscillating magnetic field. The efficacy of the nanoparticles as drug carrier is also investigated. The loading of an anticancer drug, Doxorubicin at 18 °C is measured up to 48 hours using UV-visible spectrophotometer. The drug release profile is obtained under thermal incubation condition at 37 °C and compared with that under the influence of oscillating field. The results suggest that the core-shell nanoparticles exhibit superparamagnetic behaviour, although, coating reduces the magnetic properties of the particles. Both the uncoated and coated particles show good heating ability, again it is observed that coating decreases the heating behaviour of the particles. However, coated particles show higher drug loading efficiency than the uncoated particles and the drug release is much more controlled under the oscillating magnetic field. Thus, the results strongly indicate the suitability of the prepared core-shell type nanoparticles as drug delivery vehicles and their potential in magnetic hyperthermia applications and for hyperthermia cancer therapy.

Keywords: core-shell, hyperthermia, magnetic nanoparticles, targeted drug delivery

Procedia PDF Downloads 306
6288 Engaging Mature Learners through Video Case Studies

Authors: Jacqueline Mary Jepson

Abstract:

This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.

Keywords: project management, adult learning, video case study, asynchronistic education

Procedia PDF Downloads 310
6287 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 369
6286 Iontophoretic Drug Transport: An Non-Invasive Transdermal Approach

Authors: Ashish Jain, Shivam Tayal

Abstract:

There has been great interest in the field of Iontophoresis since few years due to its great applications in the field of controlled transdermal drug delivery system. It is an technique which is used to enhance the transdermal permeation of ionized high molecular weight molecules across the skin membrane especially Peptides & Proteins by the application of direct current of 1-4 mA for 20-40 minutes whereas chemical must be placed on electrodes with same charge. Iontophoresis enhanced the delivery of drug into the skin via pores like hair follicles, sweat gland ducts etc. rather than through stratum corneum. It has wide applications in the field of experimental, Therapeutic, Diagnostic, Dentistry etc. Medical science is using it to treat Hyperhidrosis (Excessive sweating) in hands and feet and to treat other ailments like hypertension, Migraine etc. Nowadays commercial transdermal iontophoretic patches are available in the market to treat different ailments. Researchers are keen to research in this field due to its vast applications and advantages.

Keywords: iontophoresis, novel drug delivery, transdermal, permeation enhancer

Procedia PDF Downloads 221
6285 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 70
6284 Hyaluronic Acid as Potential Excipient for Buccal Delivery

Authors: Flavia Laffleur

Abstract:

Summary: Biomaterials have gained immense interest in the pharmaceutical research in the last decades. Hyaluronic acid a carbohydrate and mucopolysaccharide was chemically modified in order to achieve and establish a promising platform for buccal drug delivery. Aim: Novel biomaterial was tested for its potential for buccal drug delivery. Background: Polysaccharide hyaluronic acid (HA) was chemically modified with cysteine ethyl ether (CYS). By immobilization of the thiol-bearing ligand on the polymeric backbone the thiolated bioconjugate HA-CYS was obtained. Methodology: Mucoadhesive, permeation enhancing and stability potential as well as mechanical, physicochemical properties further mucoadhesive strength, swelling index and residence time were investigated. The developed thiolated bioconjugate displayed enhanced mucoadhesiveness on buccal mucosa as well as permeation behavior and polymer stability. The near neutral pH and negative cytotoxicity studies indicated their non-irritability and biocompatible nature with biological tissues. Further, the model drug sulforhodamine 101 was incorporated to determine its drug release profiles. Results: The synthesized thiomer showed no toxicity. The mucoadhesion of thiolated hyaluronic acid on buccal mucosa was significantly improved in comparison to unmodified one. The biomaterial showed 2.5-fold higher stability in polymer structure. The release of sulforhodamine in the presence of thiolated hyaluronic acid was 2.3-fold increased compared to hyaluronic acid. Conclusion: Thus, the promising results encourage further investigations and exploitation of this versatile polysaccharide. So far, hyaluronic acid was not evaluated for buccal drug delivery.

Keywords: buccal delivery, hyaluronic acid, mucoadhesion, thiomers

Procedia PDF Downloads 476
6283 Familiarity with Engineering Project Management And Their Duties In Projects

Authors: Mokhtar Nikgoo

Abstract:

Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.

Keywords: project management, crisis management, project delays bill, project duration

Procedia PDF Downloads 24
6282 Methods and Algorithms of Ensuring Data Privacy in AI-Based Healthcare Systems and Technologies

Authors: Omar Farshad Jeelani, Makaire Njie, Viktoriia M. Korzhuk

Abstract:

Recently, the application of AI-powered algorithms in healthcare continues to flourish. Particularly, access to healthcare information, including patient health history, diagnostic data, and PII (Personally Identifiable Information) is paramount in the delivery of efficient patient outcomes. However, as the exchange of healthcare information between patients and healthcare providers through AI-powered solutions increases, protecting a person’s information and their privacy has become even more important. Arguably, the increased adoption of healthcare AI has resulted in a significant concentration on the security risks and protection measures to the security and privacy of healthcare data, leading to escalated analyses and enforcement. Since these challenges are brought by the use of AI-based healthcare solutions to manage healthcare data, AI-based data protection measures are used to resolve the underlying problems. Consequently, this project proposes AI-powered safeguards and policies/laws to protect the privacy of healthcare data. The project presents the best-in-school techniques used to preserve the data privacy of AI-powered healthcare applications. Popular privacy-protecting methods like Federated learning, cryptographic techniques, differential privacy methods, and hybrid methods are discussed together with potential cyber threats, data security concerns, and prospects. Also, the project discusses some of the relevant data security acts/laws that govern the collection, storage, and processing of healthcare data to guarantee owners’ privacy is preserved. This inquiry discusses various gaps and uncertainties associated with healthcare AI data collection procedures and identifies potential correction/mitigation measures.

Keywords: data privacy, artificial intelligence (AI), healthcare AI, data sharing, healthcare organizations (HCOs)

Procedia PDF Downloads 36
6281 Estimation of Soil Erosion and Sediment Yield for ONG River Using GIS

Authors: Sanjay Kumar Behera, Kanhu Charan Patra

Abstract:

A GIS-based method has been applied for the determination of soil erosion and sediment yield in a small watershed in Ong River basin, Odisha, India. The method involves spatial disintegration of the catchment into homogenous grid cells to capture the catchment heterogeneity. The gross soil erosion in each cell was calculated using Universal Soil Loss Equation (USLE) by carefully determining its various parameters. The concept of sediment delivery ratio is used to route surface erosion from each of the discretized cells to the catchment outlet. The process of sediment delivery from grid cells to the catchment outlet is represented by the topographical characteristics of the cells. The effect of DEM resolution on sediment yield is analyzed using two different resolutions of DEM. The spatial discretization of the catchment and derivation of the physical parameters related to erosion in the cell are performed through GIS techniques.

Keywords: DEM, GIS, sediment delivery ratio, sediment yield, soil erosion

Procedia PDF Downloads 416
6280 Supplier Selection in a Scenario Based Stochastic Model with Uncertain Defectiveness and Delivery Lateness Rates

Authors: Abeer Amayri, Akif A. Bulgak

Abstract:

Due to today’s globalization as well as outsourcing practices of the companies, the Supply Chain (SC) performances have become more dependent on the efficient movement of material among places that are geographically dispersed, where there is more chance for disruptions. One such disruption is the quality and delivery uncertainties of outsourcing. These uncertainties could lead the products to be unsafe and, as is the case in a number of recent examples, companies may have to end up in recalling their products. As a result of these problems, there is a need to develop a methodology for selecting suppliers globally in view of risks associated with low quality and late delivery. Accordingly, we developed a two-stage stochastic model that captures the risks associated with uncertainty in quality and delivery as well as a solution procedure for the model. The stochastic model developed simultaneously optimizes supplier selection and purchase quantities under price discounts over a time horizon. In particular, our target is the study of global organizations with multiple sites and multiple overseas suppliers, where the pricing is offered in suppliers’ local currencies. Our proposed methodology is applied to a case study for a US automotive company having two assembly plants and four potential global suppliers to illustrate how the proposed model works in practice.

Keywords: global supply chains, quality, stochastic programming, supplier selection

Procedia PDF Downloads 427
6279 Analyzing the Effectiveness of Communication Practices and Processes within Project-Based Firms

Authors: Paul Saah, Charles Mbohwa, Nelson Sizwe Madonsela

Abstract:

The capacity to deliver projects on schedule, within budget, and to the pleasure of the client depends on effective communication, which is the lifeblood of project-based businesses. In order to pinpoint areas for development and shed light on the crucial role that communication plays in project success, the aim of this study is to evaluate the efficacy of communication practises and processes inside project-based organisations. In order to analyse concepts and get a greater grasp of their theoretical basis, this study's methodology combines a careful review of the relevant literature with a conceptual analysis of the subject. Data from a varied sample of project-based businesses spanning all industries and sizes were collected via document analysis. The relationship between communication practises, and processes were investigated in connection to key performance measures such as project outcomes, client satisfaction, and team dynamics. According to the study's findings, project-based businesses that adopt effective communication practises, and procedures experience a reduction in unfavourable experiences, stronger integration, and coordination, clarity of purpose, and practises that can hasten problem resolution. However, failing to adopt effective communication practises and procedures in project-based company result in counter issues, including project derailment from the schedule, failure to meet goals, inefficient use of existing resources, and failure to meet organisational goals. Therefore, optimising their communication practises, and procedures are crucial for sustainable growth and competitive advantage as project-based enterprises continue to play a crucial part in today's dynamic business scene.

Keywords: effective communication, project-based firms, communication practices, project success, communication strategies

Procedia PDF Downloads 34
6278 Evidence-Based Health System Strengthening in Urban India: Drawing Insights from Rapid Assessment Study

Authors: Anisur Rahman, Sabyasachi Behera, Pawan Pathak, Benazir Patil, Rajesh Khanna

Abstract:

Background: Nearly half of India’s population is expected to reside in urban areas by 2030. The extent to which India's health system can provide for this large and growing city-based population will determine the country's success in achieving universal health coverage and improved national health indices. National Urban Health Mission (NUHM) strive for improving access to primary health care in urban areas. Implementation of NUHM solicits sensitive, effective and sustainable strategies to strengthen the service delivery mechanisms. The Challenge Initiative for Healthy Cities (TCIHC) is working with the Government of India and three provincial states to develop effective service delivery mechanisms for reproductive, maternal, newborn and child health (RMNCH) through a health systems approach for the urban poor. Method: A rapid assessment study was conceptualized and executed to generate evidence in order to address the challenges impeding in functioning of urban health facilities to deliver effective, efficient and equitable health care services in 7 cities spread across two project States viz. Madhya Pradesh and Odisha. Results: The findings of the assessment reflect: 1. The overall ecosystem pertaining to planning and management of public health interventions is not conducive. 2. The challenges regarding population dynamics like migration keeps on influencing the demand-supply-enabling environment triangle for both public and private service providers. 3. Lack of norms for planning and benchmark for service delivery further impedes urban health system as a whole. 4. Operationalization of primary level services have enough potential to meet the demand of slum dwellers at large. 5. Lack of policy driven strategies on how to integrate the NUHM with other thematic areas of Maternal, Newborn & Child Health (MNCH) and Family Planning (FP). 5. The inappropriate capacity building and acute shortage of Human Resources has huge implication on service provisioning and adherence to the service delivery protocols. Conclusion: The findings from rapid assessment are aimed to inform pertinent stakeholders to develop a multiyear city health action plan to strengthen the health systems in order to improve the efficacy of service delivery mechanism in urban settings.

Keywords: city health plan, health system, rapid assessment, urban mission

Procedia PDF Downloads 135
6277 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 97
6276 Preparation and Characterization of Chitosan-Hydrocortisone Nanoshell for Drug Delivery Application

Authors: Suyeon Kwon, Ik Joong Kang, Wang Bingjie

Abstract:

Chitosan is a polymer that is usually produced from N-deacetylation of chitin. It is emerging as a promising biocompatible polymer that is harmless to humans. For the reason that many merits such as good adsorptive, biodegradability, many researches are being done on the chitosan for drug delivery system. Drug delivery system (DDS) has been developed for the control of drug. It makes the drug can be delivered effectively and safely into the targeted human body. The drug used in this work is hydrocortisone that is used in Rheumatism, skin diseases, allergy treatment. In this work, hydrocortisone was used to make allergic rhinitis medicine. Our study focuses on drug delivery through the nasal mucosa by using hydrocortisone impregnated chitosan nanoshells. This study has performed an investigation in order to establish the optimal conditions, changing concentration, quantity of hydrocortisone. DLS, SEM, TEM, FT-IR, UV spectrum were used to analyze the manufactured chitosan-hydrocortisone silver nanoshell and silver nanoshell, whose function as drug carriers. This study has performed an investigation on new drug carriers and delivery routes for hydrocortisone. Various methods of manufacturing chitosan-hydrocortisone nanoshells were attempted in order to establish the optimal condition. As a result, the average size of chitosan-hydrocortisone silver nanoshell is about 80 nm. So, chitosan-hydrocortisone silver nanoshell is suitable as drug carriers because optimal size of drug carrier in human body is less than 120 nm. UV spectrum of Chitosan-hydrocortisone silver nanoshell shows the characteristic peak of silver nanoshell at 420 nm. Likewise, the average size of chitosan-hydrocortisone silver nanoshell is about 100nm. It is also suitable for drug carrier in human body. Also, multi-layered silver shell over chitosan nanoshells induced the red-shift of absorption peak and increased the intensity of absorption peak. The resultant chitosan–silver nanocomposites (or nanoshells) exhibited the absorption peak around 430nm attributed to silvershell formation. i.e. the absorption peak was red-shifted by ca. 40 nm in reference to 390 nm of silver nanoshells.

Keywords: chitosan, drug delivery, hydrocortisone, rhinitis, nanoshell

Procedia PDF Downloads 238
6275 Feedback of an Automated Hospital about the Performance of an Automated Drug Dispensing System’s Implementation

Authors: Bouami Hind, Millot Patrick

Abstract:

The implementation of automated devices in life-critical systems such as hospitals can bring a new set of challenges related to automation malfunctions. While automation has been identified as great leverage for the medication dispensing system’s security and efficiency, it also increases the complexity of the organization. In particular, the installation and operation stage of automated devices can be complex when malfunctions related to automated systems occur. This paper aims to document operators’ situation awareness about the malfunctions of automated drug delivery systems (ADCs) during their implementation through Saint Brieuc hospital’s feedback. Our evaluation approach has been deployed in Saint Brieuc hospital center’s pharmacy, which has been equipped with automated nominative drug dispensing systems since January of 2021. The analysis of Saint Brieuc hospital center pharmacy’s automation revealed numerous malfunctions related to the implementation of Automated Delivery Cabinets. It appears that the targeted performance is not reached in the first year of implementation in this case study. Also, errors have been collected in patients' automated treatments’ production such as lack of drugs in pill boxes or nominative carnets, excess of drugs, wrong location of the drug, drug blister damaged, non-compliant sachet, or ticket errors. Saint Brieuc hospital center’s pharmacy is doing a tremendous job of setting up and monitoring performance indicators from the beginning of automation and throughout ADC’s operation to control ADC’s malfunctions and meet the performance targeted by the hospital. Health professionals, including pharmacists, biomedical engineers and directors of work, technical services and safety, are heavily involved in an automation project. This study highlights the importance of the evaluation of ADCs’ performance throughout the implementation process and the hospital’s team involvement in automation supervision and management.

Keywords: life-critical systems, situation awareness, automated delivery cabinets, implementation, risks and malfunctions

Procedia PDF Downloads 71
6274 Identifying the Level of Awareness on Value Management Practice amongst Construction Practitioners in Nigeria

Authors: Alhassan Dahiru

Abstract:

Value management is widely accepted technique of eliminating unnecessary cost at different stages of project development that maximizes the functional value of a project by managing its evolution and development from concept to completion. Many construction industry practitioners are not aware of Value Management practice, and its use is less widespread in Nigeria. The aim of this research is to identify the level of awareness on value management practice amongst construction practitioners with a view to contribute to the improvement of the implementation of value management practice in the Nigerian construction industry. In this study, construction practitioners have been chosen as respondents from the 6 geopolitical zones of the federation including FCT Abuja. Through the survey, a total number of 360 semi-structured questionnaires were administered and 284 were returned and remained good for the analysis. The results indicate that most of the respondents were aware of the value management concept and issues surrounding construction industry in Nigeria, while about 32% of the respondents were not aware of its potential benefits. Therefore, organisations should review their techniques and processes from time to time for improvement on effective service delivery. Additionally, a change management strategy should also be part of every organization to ease the introduction of new techniques such as value management. There is also the need for more value management training workshops and seminars in order to enlighten the participants of the construction industry on the principles, concept, and techniques involved in the value management process.

Keywords: sustainability, value management, construction practitioners, Nigeria

Procedia PDF Downloads 200
6273 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 440
6272 Project Progress Prediction in Software Devlopment Integrating Time Prediction Algorithms and Large Language Modeling

Authors: Dong Wu, Michael Grenn

Abstract:

Managing software projects effectively is crucial for meeting deadlines, ensuring quality, and managing resources well. Traditional methods often struggle with predicting project timelines accurately due to uncertain schedules and complex data. This study addresses these challenges by combining time prediction algorithms with Large Language Models (LLMs). It makes use of real-world software project data to construct and validate a model. The model takes detailed project progress data such as task completion dynamic, team Interaction and development metrics as its input and outputs predictions of project timelines. To evaluate the effectiveness of this model, a comprehensive methodology is employed, involving simulations and practical applications in a variety of real-world software project scenarios. This multifaceted evaluation strategy is designed to validate the model's significant role in enhancing forecast accuracy and elevating overall management efficiency, particularly in complex software project environments. The results indicate that the integration of time prediction algorithms with LLMs has the potential to optimize software project progress management. These quantitative results suggest the effectiveness of the method in practical applications. In conclusion, this study demonstrates that integrating time prediction algorithms with LLMs can significantly improve the predictive accuracy and efficiency of software project management. This offers an advanced project management tool for the industry, with the potential to improve operational efficiency, optimize resource allocation, and ensure timely project completion.

Keywords: software project management, time prediction algorithms, large language models (LLMS), forecast accuracy, project progress prediction

Procedia PDF Downloads 43
6271 The Urban Project: Metropolization Tool and Sustainability Vector - Case of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad, Chouabbia Khedidja

Abstract:

Cities grow, large or small; they seek to gain a place in the market competition, which talks to sell a product that is the city itself. The metropolis are large cities enjoying a legal status and assets providing their dominions elements on a territory larger than their range, do not escape this situation. Thus, the search for promising tool metropolises better development and durability meet the challenges as economic, social and environmental is timely. The urban project is a new way to build the city; it is involved in the metropolises of two ways, either to manage the crisis and to meet the internal needs of the metropolis, or by creating a regional attractiveness with their potential. This communication will address the issue of urban project as a tool that has and should find a place in the panoply of existing institutional tools. Based on the example of the modernization project of the metropolis of eastern Algeria "Constantine", we will examine what the urban project can bring to a city, the extent of its impact but also the relationship between the visions actors so metropolization a success.

Keywords: urban project, metropolis, institutional tools, Constantine

Procedia PDF Downloads 376
6270 Concept to Enhance the Project Success and Promote the Implementation of Success Factors in Infrastructure Projects

Authors: A. Elbaz, K. Spang

Abstract:

Infrastructure projects are often subjected to delays and cost overruns and mistakenly described as unsuccessful projects. These projects have many peculiarities such as public attention, impact on the environment, subjected to special regulations, etc. They also deal with several stakeholders with different motivations and face unique risks. With this in mind we need to reconsider our approach to manage them, define their success factors and implement these success factors. Infrastructure projects are not only lacking a unified meaning of project success or a definition of success factors, but also a clear method to implement these factors. This paper investigates this gap and introduces a concept to implement success factors in an efficient way, taking into consideration the specific characteristics of infrastructure projects. This concept consists of six enablers such as project organization, project team, project management workflow, contract management, communication and knowledge transfer and project documentations. These enablers allow other success factors to be efficiently implemented in projects. In conclusion, this paper provides project managers as well as company managers with a tool to define and implement success factors efficiently in their projects, along with upgrading their assets for the coming projects. This tool consists of processes and validated checklists to ensure the best use of company resources and knowledge. Due to the special features of infrastructure projects this tool will be tested in the German infrastructure market. However, it is meant to be adaptable to other markets and industries.

Keywords: infrastructure projects, operative success factors, project success, success factors, transportation projects

Procedia PDF Downloads 88
6269 Evaluation of Non-Pharmacological Method-Transcervical Foley Catheter and Misoprostol to Intravaginal Misoprostol for Preinduction Cervical Ripening

Authors: Krishna Dahiya, Esha Charaya

Abstract:

Induction of labour is a common obstetrical intervention. Around 1 in every 4 patient undergo induction of labour for different indications Purpose: To study the efficacy of the combination of Foley bulb and vaginal misoprostol in comparison to vaginal misoprostol alone for cervical ripening and induction of labour. Methods: A prospective randomised study was conducted on 150 patients with term singleton pregnancy admitted for induction of labour. Seventy-five patients were induced with both Foley bulb, and vaginal misoprostol and another 75 were given vaginal misoprostol alone for induction of labour. Both groups were then compared with respect to change in Bishop score, induction to the active phase of labour interval, induction delivery interval, duration of labour, maternal complications and neonatal outcomes. Data was analysed using statistical software SPSS version 11.5. Tests with P,.05 were considered significant. Results: The two groups were comparable with respect to maternal age, parity, gestational age, indication for induction, and initial Bishop scores. Both groups had a significant change in Bishop score (2.99 ± 1.72 and 2.17 ± 1.48 respectively with statistically significant difference (p=0.001 S, 95% C.I. -0.1978 to 0.8378). Mean induction to delivery interval was significantly lower in the combination group (11.76 ± 5.89 hours) than misoprostol group (14.54 ± 7.32 hours). Difference was of 2.78 hours (p=0.018,S, 95% CI -5.1042 to -0.4558). Induction to delivery interval was significantly lower in nulliparous women of combination group (13.64 ± 5.75 hours) than misoprostol group (18.4±7.09 hours), and the difference was of 4.76 hours (p=0.002, S, 95% CI 1.0465 to 14.7335). There was no difference between the groups in the mode of delivery, infant weight, Apgar score and intrapartum complications. Conclusion: From the present study it was concluded that addition of Foley catheter to vaginal misoprostol have the synergistic effect and results in early cervical ripening and delivery. These results suggest that the combination may be used to achieve timely and safe delivery in the presence of an unfavorable cervix. A combination of the Foley bulb and vaginal misoprostol resulted in a shorter induction-to-delivery time when compared with vaginal misoprostol alone without increasing labor complications.

Keywords: Bishop score, Foley catheter, induction of labor, misoprostol

Procedia PDF Downloads 286
6268 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus

Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis

Abstract:

Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.

Keywords: BIM, project management, project monitoring, UAV

Procedia PDF Downloads 276