Search results for: new road construction
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4751

Search results for: new road construction

4601 Calibrating Risk Factors for Road Safety in Low Income Countries

Authors: Atheer Al-Nuaimi, Harry Evdorides

Abstract:

Daily, many individuals die or get harmed on streets around the globe, which requires more particular solutions for transport safety issues. International road assessment program (iRAP) is one of the models that are considering many variables which influence road user’s safety. In iRAP, roads have been partitioned into five-star ratings from 1 star (the most reduced level) to 5 star (the most noteworthy level). These levels are calculated from risk factors which represent the effect of the geometric and traffic conditions on rod safety. The result of iRAP philosophy are the countermeasures that can be utilized to enhance safety levels and lessen fatalities numbers. These countermeasures can be utilized independently as a single treatment or in combination with other countermeasures for a section or an entire road. There is a general understanding that the efficiency of a countermeasure is liable to reduction when it is used in combination with various countermeasures. That is, crash diminishment estimations of single countermeasures cannot be summed easily. In the iRAP model, the fatalities estimations are calculated using a specific methodology. However, this methodology suffers overestimations. Therefore, this study has developed a calibration method to estimate fatalities numbers more accurately.

Keywords: crash risk factors, international road assessment program, low-income countries, road safety

Procedia PDF Downloads 113
4600 The Effect of the Construction Contract System by Simulating the Comparative Costs of Capital to the Financial Feasibility of the Construction of Toll Bali Mandara

Authors: Mas Pertiwi I. G. AG Istri, Sri Kristinayanti Wayan, Oka Aryawan I. Gede Made

Abstract:

Ability of government to meet the needs of infrastructure investment constrained by the size of the budget commitments for other sectors. Another barrier is the complexity of the process of land acquisition. Public Private Partnership can help bridge the investment gap by including the amount of funding from the private sector, shifted the responsibility of financing, construction of the asset, and the operation and post-project design and care to them. In principle, a construction project implementation always requires the investor as a party to provide resources in the form of funding which it must be contained in a successor agreement in the form of a contract. In general, construction contracts consist of contracts which passed in Indonesia and contract International. One source of funding used in the implementation of construction projects comes from funding that comes from the collaboration between the government and the private sector, for example with the system: BLT (Build Lease Transfer), BOT (Build Operate Transfer), BTO (Build Transfer Operate) and BOO (Build Operate Own). And form of payment under a construction contract can be distinguished several ways: monthly payment, payments based on progress and payment after completed projects (Turn Key). One of the tools used to analyze the feasibility of the investment is to use financial models. The financial model describes the relationship between different variables and assumptions used. From a financial model will be known how the cash flow structure of the project, which includes revenues, expenses, liabilities to creditors and the payment of taxes to the government. Net cash flow generated from the project will be used as a basis for analyzing the feasibility of investment source of project financing Public Private Partnership could come from equity or debt. The proportion of funding according to its source is a comparison of a number of investment funds originating from each source of financing for a total investment cost during the construction period by selected the contract system and several alternative financing percentage ratio determined according to sources will generate cash flow structure that is different. Of the various possibilities for the structure of the cash flow generated will be analyzed by software is to test T Paired to compared the contract system used by various alternatives comparison of financing to determine the effect of the contract system and the comparison of such financing for the feasibility of investment toll road construction project for the economic life of 20 (twenty) years. In this use case studies of toll road contruction project Bali Mandara. And in this analysis only covered two systems contracts, namely Build Operate Transfer and Turn Key. Based on the results obtained by analysis of the variable investment feasibility of the NPV, BCR and IRR between the contract system Build Operate Transfer and contract system Turn Key on the interest rate of 9%, 12% and 15%.

Keywords: contract system, financing, internal rate of return, net present value

Procedia PDF Downloads 203
4599 Production and Recycling of Construction and Demolition Waste

Authors: Vladimira Vytlacilova

Abstract:

Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.

Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management

Procedia PDF Downloads 272
4598 Phenomenon of Raveling Distress on the Flexible Pavements: An Overview

Authors: Syed Ali Shahbaz Shah

Abstract:

In the last few years, Bituminous Asphaltic roads are becoming popular day by day in the world. Plenty of research has been carried out to identify many advantages like safety, environmental effects, and comfort. Some other benefits are minimal noise and skid resistance enhancement. Besides the benefits of asphaltic roads, the permeable structure of the road also causes some distress, and raveling is one of the crucial defects. The main reason behind this distress is the failure of adhesion between bitumen mortar, specifically due to excessive load from heavy traffic. The main focus of this study is to identify the root cause and propose both the long-term and the short-term solutions of raveling on a specific road section depicting the overall road situation from the bridge of Kahuta road towards the intersection of the Islamabad express highway. The methodology adopted for this purpose is visual inspections in-situ. It was noted that there were chunks of debris on the road surface, which indicates that the asphalt binder is aged the most probably. Further laboratory testing would confirm that either asphalt binder is aged or inadequate compaction was adept during cold weather paving.

Keywords: asphaltic roads, asphalt binder, distress, raveling

Procedia PDF Downloads 67
4597 Analysis of Road Accidents in India 2016 to 2021

Authors: Ajin Frank J., Shridevi Jeevan Kamble

Abstract:

The primary objective of this research paper is to identify significant patterns and insights in road accident data in India spanning from 2016 to 2021. The study reveals that the frequency of accidents, injuries, and fatalities varies depending on numerous factors such as the type of vehicle, time of accidents, age of the vehicle, age and gender of the driver, among others. Notably, the COVID-19 pandemic and subsequent lockdown measures have significantly impacted these figures. One of the key findings of the analysis is the rise in the number of accidents and deaths involving two-wheeler vehicles, particularly among younger individuals, in major states across India. This trend is of concern, and there is a need for increased awareness and precautions to prevent these types of accidents. Additionally, with the imminent rise of electric vehicles in the coming years, ensuring their safety on the road is a critical matter. Another significant factor contributing to road accidents is the age of vehicles. As vehicles age, their handling becomes more challenging compared to new ones, increasing the risk of accidents. Thus, it is imperative for the government to impose stringent regulations and laws to reduce these accident-causing factors and raise awareness among individuals about taking necessary precautions to avoid accidents. This study highlights the importance of understanding the underlying patterns and factors contributing to road accidents in India. Through this knowledge, policymakers and stakeholders can develop effective strategies to address these challenges and promote road safety, ultimately reducing the number of accidents, injuries, and fatalities on Indian roads.

Keywords: road accidents, India, road safety, accident deaths

Procedia PDF Downloads 60
4596 Optimizing Road Transportation Network Considering the Durability Factors

Authors: Yapegue Bayogo, Ahmadou Halassi Dicko, Brahima Songore

Abstract:

In developing countries, the road transportation system occupies an important place because of its flexibility and the low prices of infrastructure and rolling stock. While road transport is necessary for economic development, the movement of people and their goods, it is urgent to use transportation systems that minimize carbon emissions in order to ensure sustainable development. One of the main objectives of OEDC and the Word Bank is to ensure sustainable economic’ development. This paper aims to develop a road transport network taking into account environmental impacts. The methodology adopted consists of formulating a model optimizing the flow of goods and then collecting information relating to the transport of products. Our model was tested with data on product transport in CMDT areas in the Republic of Mali. The results of our study indicate that emissions from the transport sector can be significantly reduced by minimizing the traffic volume. According to our study, optimizing the transportation network, we benefit from a significant amount of tons of CO₂.

Keywords: road transport, transport sustainability, pollution, flexibility, optimized network

Procedia PDF Downloads 120
4595 Reclaiming Properties of Bituminous Concrete Using Cold Mix Design Technology

Authors: Pradeep Kumar, Shalinee Shukla

Abstract:

Pavement plays a vital role in the socio-economic development of a country. Bituminous roads construction with conventional paving grade bitumen obtained from hot mix plant creates pollution and involves emission of greenhouse gases, also the construction of pavements at very high temperature is not feasible or desirable for high rainfall and snowfall areas. This problem of overheating can be eliminated by the construction of pavements with the usage of emulsified cold mixes which will eliminate emissions and help in the reduction of fuel requirement at mixing plant, which leads to energy conservation. Cold mix is a mixture of unheated aggregate and emulsion or cutback and filler. The primary objective of this research is to assess the volumetric mix design parameters of recycled aggregates with cold mixing technology and also to assess the impact of additives on volumetric mix characteristics. In this present study, bituminous pavement materials are reclaimed using cold mix technology, and Marshall specimens are prepared with the help of slow setting type 2 (SS-2) cationic bitumen emulsion as a binder for recycled aggregates. This technique of road construction is more environmentally friendly and can be done in adverse weather conditions.

Keywords: cold mixes, bitumen emulsion, recycled aggregates, volumetric properties

Procedia PDF Downloads 116
4594 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 63
4593 Monitoring and Analysis of Bridge Crossing Ground Fissures

Authors: Zhiqing Zhang, Xiangong Zhou, Zihan Zhou

Abstract:

Ground fissures can be seen in some cities all over the world. As a special urban geological disaster, ground fissures in Xi'an have caused great harm to infrastructure. Chang'an Road Interchange in Xi'an City is a bridge across ground fissures. The damage to Chang'an Road interchange is the most serious and typical. To study the influence of ground fissures on the bridge, we established a bridge monitoring system. The main monitoring items include elevation monitoring, structural displacement monitoring, etc. The monitoring results show that the typical failure is mainly reflected in the bridge deck damage caused by horizontal tension and vertical dislocation. For the construction of urban interchange spanning ground fissures, the interchange should be divided reasonably, a simple support structure with less restriction should be adopted, and the monitoring of supports should be strengthened to prevent the occurrence of beam falling.

Keywords: bridge monitoring, ground fissures, typical disease, structural displacement

Procedia PDF Downloads 181
4592 Air Cargo Network Structure Characteristics and Robustness Analysis under the Belt and Road Area

Authors: Feng-jie Xie, Jian-hong Yan

Abstract:

Based on the complex network theory, we construct the air cargo network of the Belt and Road area, analyze its regional distribution and structural characteristics, measure the robustness of the network. The regional distribution results show that Southeast Asia and China have the most prominent development in the air cargo network of the Belt and Road area, Central Asia is the least developed. The structure characteristics found that the air cargo network has obvious small-world characteristics; the degree distribution has single-scale property; it shows a significant rich-club phenomenon simultaneously. The network robustness is measured by two attack strategies of degree and betweenness, but the betweenness of network nodes has a greater impact on network connectivity. And identified 24 key cities that have a large impact on the robustness of the network under the two attack strategies. Based on these results, recommendations are given to maintain the air cargo network connectivity in the Belt and Road area.

Keywords: air cargo, complex network, robustness, structure properties, The Belt and Road

Procedia PDF Downloads 165
4591 Fatigue in Association with Road Crashes Among Healthcare Workers in Malaysia

Authors: Sharifah Liew, Azlihanis Abdul Hadi, Nurul Shahida Mohd Saffe, Azhar Hamzah, Maslina Musa

Abstract:

Fatigue is a common health problem among healthcare workers, ranging from ambulance drivers to specialist doctors. In Malaysia, majority of healthcare workers prefer to commute to work by their own vehicle compared to public transport. Thus, exposed to risk on the road while commuting to work. The aim of the study is to find out the effects of fatigue on road crashes among healthcare workers while they commute to work. The research conducted using the semi-quantitative approach based on self- reported questionnaires. In total, five hundred and fifty-one healthcare workers from selected five hospitals were involved in this study. Results showed significant differences between crash involvement, travelling distance and time to and from work among healthcare workers. Most of the participants (37%) reported that causes of road crashes were due to fatigue, sleepiness and microsleep while driving to and back from work. In addition, there were significant differences between fatigue and road crashes and near misses. This research suggests that the hospitals’ management may need to review their staffs’ job scopes and workloads to overcome the fatigue problems and, consider their feedback when designing work schedules and investigate staff commuting distance from home to workplace and vice-versa.

Keywords: fatigue, healthcare, road crashes, near misses, Malaysia

Procedia PDF Downloads 37
4590 Empirical Investigations on Speed Differentiations of Traffic Flow: A Case Study on a Basic Freeway Segment of O-2 in Istanbul

Authors: Hamed Rashid Sarand, Kemal Selçuk Öğüt

Abstract:

Speed is one of the fundamental variables of road traffic flow that stands as an important evaluation criterion for traffic analyses in several aspects. In particular, varieties of speed variable, such as average speed, free flow speed, optimum speed (capacity speed), acceleration/deceleration speed and so on, have been explicitly considered in the analysis of not only road safety but also road capacity. In the purpose of realizing 'road speed – maximum speed difference across lanes' and 'road flow rate – maximum speed difference across lanes' relations on freeway traffic, this study presents a case study conducted on a basic freeway segment of O-2 in Istanbul. The traffic data employed in this study have been obtained from 5 remote traffic microwave sensors operated by Istanbul Metropolitan Municipality. The study stretch is located between two successive freeway interchanges: Ümraniye and Kavacık. Daily traffic data of 4 years (2011-2014) summer months, July and August are used. The speed data are analyzed into two main flow areas such as uncongested and congested flows. In this study, the regression analyses were carried out in order to examine the relationship between maximum speed difference across lanes and road speed. These investigations were implemented at uncongested and congested flows, separately. Moreover, the relationship between maximum speed difference across lanes and road flow rate were evaluated by applying regression analyses for both uncongested and congested flows separately. It is concluded that there is the moderate relationship between maximum speed difference across lanes and road speed in 50% cases. Additionally, it is indicated that there is the moderate relationship between maximum speed difference across lanes and road flow rate in 30% cases. The maximum speed difference across lanes decreases as the road flow rate increases.

Keywords: maximum speed difference, regression analysis, remote traffic microwave sensor, speed differentiation, traffic flow

Procedia PDF Downloads 329
4589 Modern Work Modules in Construction Practice

Authors: Robin Becker, Nane Roetmann, Manfred Helmus

Abstract:

Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 53
4588 Comprehensive Risk Assessment Model in Agile Construction Environment

Authors: Jolanta Tamošaitienė

Abstract:

The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.

Keywords: assessment, environment, agile, model, risk

Procedia PDF Downloads 225
4587 Pervious Concrete for Road Intersection Drainage

Authors: Ivana Barišić, Ivanka Netinger Grubeša, Ines Barjaktarić

Abstract:

Road performance and traffic safety are highly influenced by improper water drainage system performance, particularly within intersection areas. So, the aim of the presented paper is the evaluation of pervious concrete made with two types and two aggregate fractions for potential utilization in intersection drainage areas. Although the studied pervious concrete mixtures achieved proper drainage but lower strength characteristics, this pervious concrete has a good potential for enhancing pavement drainage systems if it is embedded on limited intersection areas.

Keywords: drainage, intersection, pervious concrete, road

Procedia PDF Downloads 361
4586 Research on Residential Block Fabric: A Case Study of Hangzhou West Area

Authors: Wang Ye, Wei Wei

Abstract:

Residential block construction of big cities in China began in the 1950s, and four models had far-reaching influence on modern residential block in its development process, including unit compound and residential district in 1950s to 1980s, and gated community and open community in 1990s to now. Based on analysis of the four models’ fabric, the article takes residential blocks in Hangzhou west area as an example and carries on the studies from urban structure level and block special level, mainly including urban road network, land use, community function, road organization, public space and building fabric. At last, the article puts forward semi-open sub-community strategy to improve the current fabric.

Keywords: Hangzhou west area, residential block model, residential block fabric, semi-open sub-community strategy

Procedia PDF Downloads 377
4585 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 85
4584 Machine Learning Techniques to Develop Traffic Accident Frequency Prediction Models

Authors: Rodrigo Aguiar, Adelino Ferreira

Abstract:

Road traffic accidents are the leading cause of unnatural death and injuries worldwide, representing a significant problem of road safety. In this context, the use of artificial intelligence with advanced machine learning techniques has gained prominence as a promising approach to predict traffic accidents. This article investigates the application of machine learning algorithms to develop traffic accident frequency prediction models. Models are evaluated based on performance metrics, making it possible to do a comparative analysis with traditional prediction approaches. The results suggest that machine learning can provide a powerful tool for accident prediction, which will contribute to making more informed decisions regarding road safety.

Keywords: machine learning, artificial intelligence, frequency of accidents, road safety

Procedia PDF Downloads 52
4583 The Belt and Road Initiative in a Spiderweb of Conflicting Great Power Interests: A Geopolitical Analysis

Authors: Csaba Barnabas Horvath

Abstract:

The Belt and Road initiative of China is one that can change the face of Eurasia as we know it. Instead of four major, densely populated subcontinents defined by Mackinder (East Asia, Europe, the Indian Subcontinent, and the Middle East) isolated from each other by vast, sparsely populated and underdeveloped regions, it can at last start to function as a geographic whole, with a sophisticated infrastructure linking its different parts to each other. This initiative, however, happens not in a geopolitical vacuum, but in a space of conflicting great power interests. In Central Asia, the influence of China and Russia are in a setting of competition, where despite the cooperation between the two powers to a great degree, issues causing mutual mistrust emerge repeatedly. In Afghanistan, besides western military presence, even India’s efforts can be added to the picture. In Southeast Asia, a key region regarding the maritime Silk Road, India’s Act East policy meets with China’s Belt and Road, not always in consensus, not to mention US and Japanese interests in the region. The presentation aims to take an overview on how conflicting great power interests are likely to influence the outcome of the Belt and Road initiative. The findings show, that overall success of the Belt and Road Initiative may not be as smooth, as hoped by China, but at the same time, in a limited number of strategically important countries (such as Pakistan, Laos, and Cambodia), this setting is actually a factor favoring China, providing at least a selected number of reliable corridors, where the initiative is actually likely to be successful.

Keywords: belt and road initiative, geostrategic corridors, geopolitics, great power rivalry

Procedia PDF Downloads 194
4582 Identification and Optimisation of South Africa's Basic Access Road Network

Authors: Diogo Prosdocimi, Don Ross, Matthew Townshend

Abstract:

Road authorities are mandated within limited budgets to both deliver improved access to basic services and facilitate economic growth. This responsibility is further complicated if maintenance backlogs and funding shortfalls exist, as evident in many countries including South Africa. These conditions require authorities to make difficult prioritisation decisions, with the effect that Road Asset Management Systems with a one-dimensional focus on traffic volumes may overlook the maintenance of low-volume roads that provide isolated communities with vital access to basic services. Given these challenges, this paper overlays the full South African road network with geo-referenced information for population, primary and secondary schools, and healthcare facilities to identify the network of connective roads between communities and basic service centres. This connective network is then rationalised according to the Gross Value Added and number of jobs per mesozone, administrative and functional road classifications, speed limit, and road length, location, and name to estimate the Basic Access Road Network. A two-step floating catchment area (2SFCA) method, capturing a weighted assessment of drive-time to service centres and the ratio of people within a catchment area to teachers and healthcare workers, is subsequently applied to generate a Multivariate Road Index. This Index is used to assign higher maintenance priority to roads within the Basic Access Road Network that provide more people with better access to services. The relatively limited incidence of Basic Access Roads indicates that authorities could maintain the entire estimated network without exhausting the available road budget before practical economic considerations get any purchase. Despite this fact, a final case study modelling exercise is performed for the Namakwa District Municipality to demonstrate the extent to which optimal relocation of schools and healthcare facilities could minimise the Basic Access Road Network and thereby release budget for investment in roads that best promote GDP growth.

Keywords: basic access roads, multivariate road index, road prioritisation, two-step floating catchment area method

Procedia PDF Downloads 200
4581 Traffic Safety and Risk Assessment Model by Analysis of Questionnaire Survey: A Case Study of S. G. Highway, Ahmedabad, India

Authors: Abhijitsinh Gohil, Kaushal Wadhvaniya, Kuldipsinh Jadeja

Abstract:

Road Safety is a multi-sectoral and multi-dimensional issue. An effective model can assess the risk associated with highway safety. A questionnaire survey is very essential to identify the events or activities which are causing unsafe condition for traffic on an urban highway. A questionnaire of standard questions including vehicular, human and infrastructure characteristics can be made. Responses from the age wise group of road users can be taken on field. Each question or an event holds a specific risk weightage, which contributes in creating an inappropriate and unsafe flow of traffic. The probability of occurrence of an event can be calculated from the data collected from the road users. Finally, the risk score can be calculated by considering the risk factor and the probability of occurrence of individual event and addition of all risk score for the individual event will give the total risk score of a particular road. Standards for risk score can be made and total risk score can be compared with the standards. Thus road can be categorized based on risk associated and traffic safety on it. With this model, one can assess the need for traffic safety improvement on a given road, and qualitative data can be analysed.

Keywords: probability of occurrence, questionnaire, risk factor, risk score

Procedia PDF Downloads 315
4580 Delivery of Sustainable Construction in South Africa – Assessing the Roles of Organisational Leadership

Authors: Ayodeji Emmanuel Oke, Mathew O. Ikuabe, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The call for sustainable construction has received significant drive in recent time considering the overwhelming impacts of its adoption. However, not much has been deliberated on this subject with regards to the roles of organisational leadership in delivering sustainable construction. To this end, the study empirically scrutinised the roles of organisational leadership in delivering sustainable construction. The study adopted a quantitative approach while construction professionals formed the population of the study. A well-articulated questionnaire was used in eliciting responses from the respondents, while appropriate methods of data analysis were used. Findings from the study depicted that the major role of organisational leadership in the delivery of sustainable construction is acting as sustainability integrators. Equally revealed are the internal and external factors affecting organisational leadership in delivering sustainable construction. The study concluded by emphasizing the core roles for delivering sustainable construction by organisational leadership and further recommended that sustainable construction should serve as a prominent and focal organisation goal by organisational leadership when steering the organisation towards meeting its objectives

Keywords: organisational leadership, project delivery, roles, sustainable construction

Procedia PDF Downloads 86
4579 Physical, Chemical and Environmental Properties of Natural and Construction/Demolition Recycled Aggregates

Authors: Débora C. Mendes, Matthias Eckert, Cláudia S. Moço, Hélio Martins, Jean-Pierre P. Gonçalves, Miguel Oliveira, José P. Da Silva

Abstract:

Uncontrolled disposal of construction and demolition waste (C & DW) in embankments in the periphery of cities causes both environmental and social problems, namely erosion, deforestation, water contamination and human conflicts. One of the milestones of EU Horizon 2020 Programme is the management of waste as a resource. To achieve this purpose for C & DW, a detailed analysis of the properties of these materials should be done. In this work we report the physical, chemical and environmental properties of C & DW aggregates from 25 different origins. The results are compared with those of common natural aggregates used in construction. Assays were performed according to European Standards. Additional analysis of heavy metals and organic compounds such as polycyclic aromatic hydrocarbons (PAHs) and polychlorinated biphenyls (PCBs), were performed to evaluate their environmental impact. Finally, properties of concrete prepared with C & DW aggregates are also reported. Physical analyses of C & DW aggregates indicated lower quality properties than natural aggregates, particularly for concrete preparation and unbound layers of road pavements. Chemical properties showed that most samples (80%) meet the values required by European regulations for concrete and unbound layers of road pavements. Analyses of heavy metals Cd, Cr, Cu, Pb, Ni, Mo and Zn in the C&DW leachates showed levels below the limits established by the Council Decision of 19 December 2002. Identification and quantification of PCBs and PAHs indicated that few samples shows the presence of these compounds. The measured levels of PCBs and PAHs are also below the limits. Other compounds identified in the C&DW leachates include phthalates and diphenylmethanol. In conclusion, the characterized C&DW aggregates show lower quality properties than natural aggregates but most samples showed to be environmentally safe. A continuous monitoring of the presence of heavy metals and organic compounds should be made to trial safe C&DW aggregates. C&DW aggregates provide a good economic and environmental alternative to natural aggregates.

Keywords: concrete preparation, construction and demolition waste, heavy metals, organic pollutants

Procedia PDF Downloads 322
4578 Assessment of Vehicular Accidents and Possible Mitigation Measures: A Case of Ahmedabad, Gujarat, India

Authors: K. Omkar, D. Nayan

Abstract:

Rapid urbanization is one of the consequences of rapid population explosion, which has also led to massive increase in number of motorized vehicles essential for carrying out all activities needed for sustaining urban livelihood. With this increased use of motorized vehicles over the time there has also been an increase in number of accidents. Study of road network and geometric features are essential to tackle problems of road accidents in any district or town. The increase in road accidents is one of the burning issues in the present society. Records show that there is one death at every 3.7 minutes because of road accident. It has been found from the research that, accidents occur due to, mistakes of the driver (86%) followed by bad street condition (5%), mistake of pedestrian (4%), as well as technical and maintenance defects (1%). Here, case study of Ahmedabad, Gujarat is taken up where first road safety level is assessed considering various parameters. The study confined to accident characteristics of all types of vehicles. For deeper analysis, road safety index for various stretches in Ahmedabad was found out. Crash rate for same stretches was found out. Based on various parameters priority was decided so that which stretch should be look out first to minimize road accidents on that stretch and which stretch should look out last. The major findings of the study are that accident severity of Ahmedabad has increased, but accident fatality risk has decreased; thus there is need to undertake some traffic engineering measures or make some traffic rules that are strictly followed by traffic. From the above study and literature studied it is found that Ahmedabad is suffering from similar problem of accidents and injuries and deaths caused by them, after properly investigating the issue short-term and long-term solutions to minimize road accidents have been presented in this paper.

Keywords: accident severity index, accident fatality rate, accident fatality risk, accident risk, road safety index

Procedia PDF Downloads 116
4577 A Study on the Planning of Urban Road Traffic Signs Based on the Leisure Involvement of Self-Driving Tourists

Authors: Chun-Lin Zhang, Min Wan

Abstract:

With the upgrade development of the tourism industry from the simple sightseeing tour to the leisure and vacation, people's travel idea has undergone a fundamental change. More and more people begin to pursue liberal and personal tourism, so self-driving tourism has become the main form of current tourism activities. With the self-driving tourism representing the general trend, the importance of convenient tourism transportation and perfect road traffic signs have become more and more prominent. A clear urban road traffic signs can help visitors quickly identify the direction and distance to the tourism destination. The purpose of this article is analyzing the planning of urban road traffic signs which can bring positive impact on the participation in the recreation involved of self-driving tourists. The content of this article is divided into three parts. Based on the literature review and theoretical analysis, the first part constructs a structural variance model. The model is from three dimensions: the attention of the self-driving tourists to the urban traffic signs along the road, the perception of the self-driving tourists to the road traffic signs itself, the perceptions of the self-driving tourists to the tourism destination information on the traffic signs. Through this model, the paper aims to explore the influence of the urban road traffic signs to the leisure psychological involvement and leisure behavior involvement of the self-driving tourists. The second part aims to verify through the hypothesis model the questionnaire survey and come to preliminary conclusions. The preliminary conclusions are as follows: firstly, the color, shape, size, setting mode and occurrence frequency of urban road traffic sign have significant influence on the leisure psychological involvement and leisure behavior involvement of the self-driving tourists. Secondly, the influence on the leisure behavior involvement is obviously higher than the influence on the leisure psychological involvement. Thirdly, the information about the tourism destination marked on the urban road traffic signs has not obviously influence on the leisure psychological involvement, but it has distinct influence on the leisure behavior involvement of self-driving tourists. The third part puts forward that the planning of urban road traffic signs should focus on the angle of the impact of road traffic signs on people's psychology and behavior. On the basis of the above conclusions, the paper researches the color, shape, size, setting mode and information labeling of urban road traffic signs so that they can preferably satisfy the demand of the leisure involvement of self-driving tourists.

Keywords: leisure involvement, self-driving tourism, structural equation, urban road traffic signs

Procedia PDF Downloads 211
4576 Time Overrun in Pre-Construction Planning Phase of Construction Projects

Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui

Abstract:

Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun

Procedia PDF Downloads 222
4575 Study on Impact of Road Loads on Full Vehicle Squeak and Rattle Performance

Authors: R. Praveen, B. R. Chandan Ravi, M. Harikrishna

Abstract:

Squeak and rattle noises are the most annoying transient vehicle noises produced due to different terrain conditions. Interpretation and prohibition of squeak and rattle noises are the dominant aspects of a vehicle refinement. This paper describes the computer-aided engineering (CAE) approach to evaluating the full vehicle squeak and rattle performance with the measured road surface profile as enforced excitation at the tire patch points. The E-Line methodology has been used to predict the relative displacement at the interface points and the risk areas were identified. Squeak and rattle performance has been evaluated at different speeds and at different road conditions to understand the vehicle characteristics. The competence of the process in predicting the risk and root cause of the problems showcased us a pleasing conformity between the physical testing and CAE simulation results.

Keywords: e-line, enforced excitation, full vehicle, squeak and rattle, road excitation

Procedia PDF Downloads 118
4574 Natural and Construction/Demolition Waste Aggregates: A Comparative Study

Authors: Debora C. Mendes, Matthias Eckert, Claudia S. Moço, Helio Martins, Jean-Pierre Gonçalves, Miguel Oliveira, Jose P. Da Silva

Abstract:

Disposal of construction and demolition waste (C&DW) in embankments in the periphery of cities causes both environmental and social problems. To achieve the management of C&DW, a detailed analysis of the properties of these materials should be done. In this work we report a comparative study of the physical, chemical and environmental properties of natural and C&DW aggregates from 25 different origins. Assays were performed according to European Standards. Analysis of heavy metals and organic compounds, namely polycyclic aromatic hydrocarbons (PAHs) and polychlorinated biphenyls (PCBs), were performed. Finally, properties of concrete prepared with C&DW aggregates are reported. Physical analyses of C&DW aggregates indicated lower quality properties than natural aggregates, particularly for concrete preparation and unbound layers of road pavements. Chemical properties showed that most samples (80%) meet the values required by European regulations for concrete and unbound layers of road pavements. Analyses of heavy metals Cd, Cr, Cu, Pb, Ni, Mo and Zn in the C&DW leachates showed levels below the limits established by the Council Decision of 19 December 2002. Identification and quantification of PCBs and PAHs indicated that few samples shows the presence of these compounds. The measured levels of PCBs and PAHs are also below the limits. Other compounds identified in the C&DW leachates include phthalates and diphenylmethanol. The characterized C&DW aggregates show lower quality properties than natural aggregates but most samples showed to be environmentally safe. A continuous monitoring of the presence of heavy metals and organic compounds should be made to trial safe C&DW aggregates. C&DW aggregates provide a good economic and environmental alternative to natural aggregates.

Keywords: concrete preparation, construction and demolition waste, heavy metals, organic pollutants

Procedia PDF Downloads 329
4573 An Electromechanical Device to Use in Road Pavements to Convert Vehicles Mechanical Energy into Electrical Energy

Authors: Francisco Duarte, Adelino Ferreira, Paulo Fael

Abstract:

With the growing need for alternative energy sources, research into energy harvesting technologies has increased considerably in recent years. The particular case of energy harvesting on road pavements is a very recent area of research, with different technologies having been developed in recent years. However, none of them have presented high conversion efficiencies nor technical or economic viability. This paper deals with the development of a mechanical system to implement on a road pavement energy harvesting electromechanical device, to transmit energy from the device surface to an electrical generator. The main goal is to quantify the energy harvesting, transmission and conversion efficiency of the proposed system and compare it with existing systems. Conclusions about the system’s efficiency are presented.

Keywords: road pavement, energy harvesting, energy conversion, system modelling

Procedia PDF Downloads 298
4572 Occupational Safety in Construction Projects

Authors: Heba Elbibas, Esra Gnijeewa, Zedan Hatush

Abstract:

This paper presents research on occupational safety in construction projects, where the importance of safety management in projects was studied, including the preparation of a safety plan and program for each project and the identification of the responsibilities of each party to the contract. The research consists of two parts: 1-Field visits: which were field visits to three construction projects, including building projects, road projects, and tower installation. The safety level of these projects was evaluated through a checklist that includes the most important safety elements in terms of the application of these items in the projects. 2-Preparation of a questionnaire: which included supervisors and engineers and aimed to determine the level of awareness and commitment of different project categories to safety standards. The results showed the following: i) There is a moderate occupational safety policy. ii) The preparation and storage of maintenance reports are not fully complied with. iii) There is a moderate level of training on occupational safety for project workers. iv) The company does not impose penalties on safety violators permanently. v) There is a moderate policy for equipment and machinery safety. vi) Self-injuries occur due to (fatigue, lack of attention, deliberate error, and emotional factors), with a rate of 82.4%.

Keywords: management, safety, occupational safety, classification

Procedia PDF Downloads 68