7098 An Active Solar Energy System to Supply Heating Demands of the Teaching Staff Dormitory of Islamic Azad University Ramhormoz Branch

Authors: M. Talebzadegan, S. Bina, I. Riazi

Abstract:

The purpose of this paper is to present an active solar energy system to supply heating demands of the teaching staff dormitory of the Islamic Azad University of Ramhormoz. The design takes into account the solar radiations and climate data of Ramhormoz town and is based on the daily warm water consumption for health demands of 450 residents of the dormitory, which is equal to 27000 lit of 50-C° water, and building heating requirements with an area of 3500 m² well-protected by heatproof materials. First, heating demands of the building were calculated, then a hybrid system made up of solar and fossil energies was developed and finally, the design was economically evaluated. Since there is only roof space for using 110 flat solar water heaters, the calculations were made to hybridize solar water heating system with heat pumping system in which solar energy contributes 67% of the heat generated. According to calculations, the net present value “N.P.V.” of revenue stream exceeds “N.P.V.” of cash paid off in this project over three years, which makes economically quite promising. The return of investment and payback period of the project is 4 years. Also, the internal rate of return (IRR) of the project was 25%, which exceeds bank rate of interest in Iran and emphasizes the desirability of the project.

Keywords: Solar energy, Heat Demand, Renewable , Pollution

Procedia PDF Downloads 225
7097 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 141
7096 Developing Thai-UK Double Degree Programmes: An Exploratory Study Identifying Challenges, Competing Interests and Risks

Authors: Joy Tweed, Jon Pike

Abstract:

In Thailand, a 4.0 policy has been initiated that is designed to prepare and train an appropriate workforce to support the move to a value-based economy. One aspect of support for this policy is a project to encourage the creation of double degree programmes, specifically between Thai and UK universities. This research into the project, conducted with its key players, explores the factors that can either enable or hinder the development of such programmes. It is an area that has received little research attention to date. Key findings focus on differences in quality assurance requirements, attitudes to benefits, risks, and committed levels of institutional support, thus providing valuable input into future policy making. The Transnational Education (TNE) Development Project was initiated in 2015 by the British Council, in conjunction with the Office for Higher Education Commission (OHEC), Thailand. The purpose of the project was to facilitate opportunities for Thai Universities to partner with UK Universities so as to develop double degree programme models. In this arrangement, the student gains both a UK and a Thai qualification, spending time studying in both countries. Twenty-two partnerships were initiated via the project. Utilizing a qualitative approach, data sources included participation in TNE project workshops, peer reviews, and over 20 semi-structured interviews conducted with key informants within the participating UK and Thai universities. Interviews were recorded, transcribed, and analysed for key themes. The research has revealed that the strength of the relationship between the two partner institutions is critical. Successful partnerships are often built on previous personal contact, have senior-level involvement and are strengthened by partnership on different levels, such as research, student exchange, and other forms of mobility. The support of the British Council was regarded as a key enabler in developing these types of projects for those universities that had not been involved in TNE previously. The involvement of industry is apparent in programmes that have high scientific content but not well developed in other subject areas. Factors that hinder the development of partnership programmes include the approval processes and quality requirements of each institution. Significant differences in fee levels between Thai and UK universities provide a challenge and attempts to bridge them require goodwill on the part of the latter that may be difficult to realise. This research indicates the key factors to which attention needs to be given when developing a TNE programme. Early attention to these factors can reduce the likelihood that the partnership will fail to develop. Representatives in both partner universities need to understand their respective processes of development and approval. The research has important practical implications for policy-makers and planners involved with TNE, not only in relation to the specific TNE project but also more widely in relation to the development of TNE programmes in other countries and other subject areas. Future research will focus on assessing the success of the double degree programmes generated by the TNE Development Project from the perspective of universities, policy makers, and industry partners.

Keywords: double-degree, internationalization, partnerships, Thai-UK

Procedia PDF Downloads 82
7095 A Systematic Approach to Defeat Regional Terrorism and Political Violence in Pakistan: Prospects of Youth Employment through China-Pakistan Economic Corridor

Authors: Muhammad Imran

Abstract:

In recent times, terrorism has been a major area of concern globally. Terrorism is ranked the number one concern across many countries, followed by political violence and poverty. The natural response to terrorism and violence across the countries is to increase expenditure on counterterrorism. This project study aims to explore the importance of job creation through the China-Pakistan Economic Corridor (a leading mega-project of the Belt and Road Initiative) to help Pakistan’s socio-economic situation and lead to minimize terrorism and violence across the country and help Chinese companies complete their multi-billion dollar projects peacefully. During the last two decades, Pakistan has been through severe insurgencies, political violence, and terrorism, which also caused a disturbance in delaying many developmental projects, including the CPEC project, and killed dozens of Chinese citizens working in Pakistan. One major area of debate is whether or not economic factors have any role to play in determining the extent of political violence and terrorism in Pakistan. The notion of a China-Pakistan economic corridor across the Karakorum Mountains to Gawadar faces severe challenges. Counterterrorism concerns are likely to be a persistent source of tension across the CPEC projects in different regions across the CPEC route in Pakistan. China’s promise to help industrialize Pakistan will ultimately lead to youth employment and prosperity. We hypothesize that youth unemployment can explain incidences of terrorism in Pakistan in the recent past. One of the main causes of these adverse situations is the unemployment of youth, who can become readily accessible to militant organizations for recruitment and training. This research project builds on existing research investigating the root causes of political violence and terrorism by considering youth unemployment as a measure of economic deprivation. We focus on the terrorism incident count data for 2001–2022, using negative binomial regression models. Literature suggests that, in the exogenous model, youth unemployment tends to increase political violence and domestic terrorism. Given concerns about the endogeneity of youth unemployment in these models, we will use two kinds of corrections: instrumental variables and lagged variables. To control for endogeneity, we intend to incorporate total population, military expenditure, foreign direct investment, and CPEC investment as instrumental variables.

Keywords: regional terrorism, political violence, youth employment, CPEC, belt and road initiative, Pakistan, China

Procedia PDF Downloads 24
7094 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 129
7093 Valuation of Caps and Floors in a LIBOR Market Model with Markov Jump Risks

Authors: Shih-Kuei Lin

Abstract:

The characterization of the arbitrage-free dynamics of interest rates is developed in this study under the presence of Markov jump risks, when the term structure of the interest rates is modeled through simple forward rates. We consider Markov jump risks by allowing randomness in jump sizes, independence between jump sizes and jump times. The Markov jump diffusion model is used to capture empirical phenomena and to accurately describe interest jump risks in a financial market. We derive the arbitrage-free model of simple forward rates under the spot measure. Moreover, the analytical pricing formulas for a cap and a floor are derived under the forward measure when the jump size follows a lognormal distribution. In our empirical analysis, we find that the LIBOR market model with Markov jump risk better accounts for changes from/to different states and different rates.

Keywords: arbitrage-free, cap and floor, Markov jump diffusion model, simple forward rate model, volatility smile, EM algorithm

Procedia PDF Downloads 393
7092 Risk Assessment of Building Information Modelling Adoption in Construction Projects

Authors: Amirhossein Karamoozian, Desheng Wu, Behzad Abbasnejad

Abstract:

Building information modelling (BIM) is a new technology to enhance the efficiency of project management in the construction industry. In addition to the potential benefits of this useful technology, there are various risks and obstacles to applying it in construction projects. In this study, a decision making approach is presented for risk assessment in BIM adoption in construction projects. Various risk factors of exerting BIM during different phases of the project lifecycle are identified with the help of Delphi method, experts’ opinions and related literature. Afterward, Shannon’s entropy and Fuzzy TOPSIS (Technique for Order Preference by Similarity to Ideal Situation) are applied to derive priorities of the identified risk factors. Results indicated that lack of knowledge between professional engineers about workflows in BIM and conflict of opinions between different stakeholders are the risk factors with the highest priority.

Keywords: risk, BIM, fuzzy TOPSIS, construction projects

Procedia PDF Downloads 191
7091 Stochastic Prioritization of Dependent Actuarial Risks: Preferences among Prospects

Authors: Ezgi Nevruz, Kasirga Yildirak, Ashis SenGupta

Abstract:

Comparing or ranking risks is the main motivating factor behind the human trait of making choices. Cumulative prospect theory (CPT) is a preference theory approach that evaluates perception and bias in decision making under risk and uncertainty. We aim to investigate the aggregate claims of different risk classes in terms of their comparability and amenability to ordering when the impact of risk perception is considered. For this aim, we prioritize the aggregate claims taken as actuarial risks by using various stochastic ordering relations. In order to prioritize actuarial risks, we use stochastic relations such as stochastic dominance and stop-loss dominance that are proposed in the frame of partial order theory. We take into account the dependency of the individual claims exposed to similar environmental risks. At first, we modify the zero-utility premium principle in order to obtain a solution for the stop-loss premium under CPT. Then, we propose a stochastic stop-loss dominance of the aggregate claims and find a relation between the stop-loss dominance and the first-order stochastic dominance under the dependence assumption by using properties of the familiar as well as some emerging multivariate claim distributions.

Keywords: cumulative prospect theory, partial order theory, risk perception, stochastic dominance, stop-loss dominance

Procedia PDF Downloads 299
7090 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 431
7089 Materialisation of Good Governance Concept by Effective Investment Dispute Resolution in the European Union

Authors: Jagna Mucha, Anna Kańciak

Abstract:

The concept of good governance constitutes a wide perspective for academic discussion, because it provides a substantial theoretical background for settling many practical problems faced contemporarily by the EU. The basic assumptions of good governance have basically remained unchanged since the 90’s, when the concept was introduced by the World Bank, although the scholarly discussions reveal new facets of the said concept, when related to specific domains. The paper discusses the application of the specific elements of the concept of good governance in the field of the international investment law. Specifically, it seeks to demonstrate that the concept of good governance regulates the issue of international investments in that, among others, it requires the application of the alternative dispute resolution in order to make the investment law enforceable in the best possible way.

Keywords: dispute resolution, european union, investments, good governance

Procedia PDF Downloads 328
7088 Project Stakeholders' Perceptions of Sustainability: A Case Example From the Turkish Construction Industry

Authors: F. Heyecan Giritli, Gizem Akgül

Abstract:

Because of the raising population of world; the need for houses, buildings and infrastructures are increasing rapidly. Energy and water consumption, waste production continues to increase. If this situation of resources continues, there will be a significant loss for next generations. Therefore, there are a lot of researches and solutions developed in the world. Also sustainability criteria are collected together by some countries to serve construction industry with certification systems. Sustainable building production process’s scope requires different path from traditional building production process. Moreover, the key objective of sustainable buildings is that the process includes whole life cycle duration. The process approaches from the decision of the project to the end of it; so the project team is needed from the beginning of the integrated project delivery model. Further more, by defining project team at the beginning of the project provides communication among the team members and defined problem solving and decision making methods. In this research includes the certification systems among the world to comprehend the head lines and assessment criteria. Therefore, it is understand that usually all green building criteria have the same contents. The aim of this research is to assess the sustainable project stakeholder’ perceptions in Turkish construction industry from the point of occupation, job title and years of experience. Therefore, a survey is made to assess the perceptions of each attendant. In Turkey, sustainability criteria are not clearly defined; on the other hand some regulations like waste management, energy efficiency are made by legal agencies. LEED certification system is the most popular system in Turkey that has attended and certificated. From the LEED official data, it’s understood that 308 project registered in Turkey. Therefore, LEED sustainability criteria are used in the survey. Head lines of LEED certification criteria; sustainable sites, water efficiency, energy and atmosphere, material and resources, indoor environmental quality, innovation and regional priority are indicated to assess the perceptions of survey participants. Moreover, only surveying of criteria are not enough; so the equipment, methods, risks and benefits also considered.

Keywords: LEED, sustainability, perceptions, stakeholders, construction, Turkey, risk, benefit

Procedia PDF Downloads 279
7087 Identification of Factors Affecting Labor Productivity in Construction Projects of Iran

Authors: Elham Dehghan, A. Shirzadi Javid, Mohsen Tadayon

Abstract:

Labor productivity is very important and gained special concerns among professionals in the construction industry, worldwide. Productivity improvements on labors achieve higher cost savings with minimal investment. Due to the fact that profit margins are small on construction projects, cost savings associated with productivity are crucial to become a successful contractor. This research program studies and highlights the factors affecting labor productivity in Iranian construction industry. A questionnaire was used to gather the relevant data from respondents who involve in managing various types of projects in wide areas in Iran. It involved ranking 57 predefined factors divided into 5 categories: Human/Labor; Financial; Management; Equipments/Materials and Environmental. Total 62 feedbacks were analyzed through the Relative Importance Index (RII) technique. The top ten factors affecting construction labor productivity in Iran are: 1) Professional capability of contractor project manager, 2) skills of contractor’s project management team, 3) professional capability of owner project manager, 4) professional capability of Consulting Project manager, 5) discipline working, 6) delay payments by the owner, 7) material shortages, 8) delays in delivery of materials, 9) turnover power of the owner, 10) poor site management. Recommendations have been made in the study to address these factors. The research has direct benefits to key stakeholders in Iranian construction industry.

Keywords: Iranian construction projects, labor, productivity, relative importance index

Procedia PDF Downloads 236
7086 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 192
7085 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 184
7084 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 513
7083 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 193
7082 Asymmetric Information and Composition of Capital Inflows: Stock Market Microstructure Analysis of Asia Pacific Countries

Authors: Farid Habibi Tanha, Hawati Janor, Mojtaba Jahanbazi

Abstract:

The purpose of this study is to examine the effect of asymmetric information on the composition of capital inflows. This study uses the stock market microstructure to capture the asymmetric information. Such an approach allows one to capture the level and extent of the asymmetric information from a firm’s perspective. This study focuses on the two-dimensional measure of the market microstructure in capturing asymmetric information. The composition of capital inflows is measured by running six models simultaneously. By employing the panel data technique, the main finding of this research shows an increase in the asymmetric information of the stock market, in any of the two dimensions of width and depth. This leads to the reduction of foreign investments in both forms of foreign portfolio investment (FPI) and foreign direct investment (FDI), while the reduction in FPI is higher than that of the FDI. The significant effect of asymmetric information on capital inflows implicitly suggests for policymakers to control the changes of foreign capital inflows through transparency in the level of the market.

Keywords: capital flows composition, asymmetric information, stock market microstructure, foreign portfolio investment, foreign direct investment

Procedia PDF Downloads 326
7081 Readiness of Intellectual Capital Measurement: A Review of the Property Development and Investment Industry

Authors: Edward C. W. Chan, Benny C. F. Cheung

Abstract:

In the knowledge economy, the financial indicator is not the unique instrument to gauge the performance of a company. The role of intellectual capital contributing to the company performance is increasing. To measure the company performance due to intellectual capital, the value-added intellectual capital (VAIC) model is adopted to measure the intellectual capital utilisation efficiency of the subject companies. The purpose of this study is to review the readiness of measuring intellectual capital for the Hong Kong listed companies in the property development and property investment industry by using VAIC model. This study covers the financial reports from the representative Hong Kong listed property development companies and property investment companies in the period 2014-2019. The findings from this study indicated the industry is ready for IC measurement employing VAIC framework but not yet ready for using the extended VAIC model.

Keywords: intellectual capital, intellectual capital measurement, property development, property investment, Skandia navigator, VAIC

Procedia PDF Downloads 86
7080 Quality Management in Construction Project

Authors: Harsh Panchal, Saurabh Amrutkar

Abstract:

Quality management is an essential part of any project that has directly related to the performance of a project. Quality management is depended on multiple factors at different stages in a project, right from time management to construction logistics. A project is a mixture of various components that include iternary management, health and safety, crew productivity, and many more. From the survey conducted, we came to the conclusion that advancement in technology and indigenous approach to any project will result in maximum quality standards and better project performance. In this paper, we discuss various components of the factors above that lead to compromise the quality of a project and how it can be controlled in order to achieve maximum quality assurance using quality planning and total quality management. The paper also focuses on limitations and problems faced in each factor responsible for quality management and to tackle them using techniques and processes based on activities and identifying the sequence, approaching critical path, and duration. The project management concept that deals with the sequence of scope cost time give us an overview regarding the ongoing quality management, in a nutshell, giving us hints to regulate the current procedure for maximum achievable quality. It also deals with the problems faced by engineers that make the mundane work process slow, reducing the quality outcome drastically.

Keywords: management, performance, project, quality

Procedia PDF Downloads 126
7079 Proposal of a Model Supporting Decision-Making Based on Multi-Objective Optimization Analysis on Information Security Risk Treatment

Authors: Ritsuko Kawasaki (Aiba), Takeshi Hiromatsu

Abstract:

Management is required to understand all information security risks within an organization, and to make decisions on which information security risks should be treated in what level by allocating how much amount of cost. However, such decision-making is not usually easy, because various measures for risk treatment must be selected with the suitable application levels. In addition, some measures may have objectives conflicting with each other. It also makes the selection difficult. Moreover, risks generally have trends and it also should be considered in risk treatment. Therefore, this paper provides the extension of the model proposed in the previous study. The original model supports the selection of measures by applying a combination of weighted average method and goal programming method for multi-objective analysis to find an optimal solution. The extended model includes the notion of weights to the risks, and the larger weight means the priority of the risk.

Keywords: information security risk treatment, selection of risk measures, risk acceptance, multi-objective optimization

Procedia PDF Downloads 428
7078 A Mixed Approach to Assess Information System Risk, Operational Risk, and Congolese Microfinance Institutions Performance

Authors: Alfred Kamate Siviri, Angelus Mafikiri Tsongo, Jean Robert Kala Kamdjoug

Abstract:

Digitalization and information systems well organized have been selected as relevant measures to mitigate operational risks within organizations. Unfortunately, information system comes with new threats that can cause severe damage and quick organization lockout. This study aims to measure perceived information system risks and their effects on operational risks within the microfinance institution in D.R. Congo. Also, the factors influencing the operational risk are identified, and the link between operational risk with other risks and performance is to be assessed. The study proposes a research model drawn on the combination of Resources-Based-View, dynamic capabilities, the agency theory, the Information System Security Model, and social theories of risk. Therefore, we suggest adopting a mixed methods research with the sole aim of increasing the literature that already exists on perceived operational risk assessment and its link with other risk and performance, a focus on IT risk.

Keywords: Democratic Republic Congo, information system risk, microfinance performance, operational risk

Procedia PDF Downloads 193
7077 Investment Development Path and Motivations for Foreign Direct Investment in Georgia

Authors: Vakhtang Charaia, Mariam Lashkhi

Abstract:

Foreign direct investment (FDI) plays a vital role in global business. It provides firms with new markets and advertising channels, cheaper production facilities, admission to new technology, products, skills and financing. FDI can provide a recipient country/company with a source of new technologies, capital, practice, products, management skills, and as such can be a powerful drive for economic development. It is one of the key elements of stable economic development in many countries, especially in developing ones. Therefore the size of FDI inflow is one of the most crustal factors for economic perfection in small economy countries (like, Georgia), while most of developed ones are net exporters of FDI. Since, FDI provides firms with new markets; admission to new technologies, products and management skills; marketing channels; cheaper production facilities, and financing opportunities. It plays a significant role in Georgian economic development. Increasing FDI inflows from all over the world to Georgia in last decade was achieved with the outstanding reforms managed by the Georgian government. However, such important phenomenon as world financial crisis and Georgian-Russian war put its consequence on the over amount of FDI inflow in Georgia in the last years. It is important to mention that the biggest investor region for Georgia is EU, which is interested in Georgia not only from the economic points of view but from political. The case studies from main EU investor countries show that Georgia has a big potential of investment in different areas, such as; financial sector, energy, construction, tourism industry, transport and communications. Moreover, signing of Association Agreement between Georgia and EU will further boost all the fields of economy in Georgia in both short and long terms. It will attract more investments from different countries and especially from EU. The last, but not least important issue is the calculation of annual FDI inflow to Georgia, which it is calculated differently by different organizations, based on different methodologies, but what is more important is that all of them show significant increase of FDI in last decade, which gives a positive signal to investors and underlines necessity of further improvement of investment climate in the same direction.

Keywords: foreign direct investment (FDI), Georgia, investment development path, investment climate

Procedia PDF Downloads 237
7076 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.

Keywords: the urban project, the urban improvement, participation, Constantine

Procedia PDF Downloads 374
7075 Application of Agile Project Management to Construction Projects: Case Study

Authors: Ran Etgar, Sarit Freund

Abstract:

Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.

Keywords: agile project management, construction, information systems, project management

Procedia PDF Downloads 100
7074 The Positive Impact of COVID-19 on the Level of Investments of U.S. Retail Investors: Evidence from a Quantitative Online Survey and Ordered Probit Analysis

Authors: Corina E. Niculaescu, Ivan Sangiorgi, Adrian R. Bell

Abstract:

The COVID-19 pandemic has been life-changing in many aspects of people’s daily and social lives, but has it also changed attitudes towards investments? This paper explores the effect of the COVID-19 pandemic on retail investors’ levels of investments in the U.S. during the first COVID-19 wave in summer 2020. This is an unprecedented health crisis, which could lead to changes in investment behavior, including irrational behavior in retail investors. As such, this study aims to inform policymakers of what happened to investment decisions during the COVID-19 pandemic so that they can protect retail investors during extreme events like a global health crisis. The study aims to answer two research questions. First, was the level of investments affected by the COVID-19 pandemic, and if so, why? Second, how were investments affected by retail investors’ personal experience with COVID-19? The research analysis is based on primary survey data collected on the Amazon Mechanical Turk platform from a representative sample of U.S. respondents. Responses were collected between the 15th of July and 28th of August 2020 from 1,148 U.S. retail investors who hold mutual fund investments and a savings account. The research explores whether being affected by COVID-19, change in the level of savings, and risk capacity can explain the change in the level of investments by using regression analysis. The dependent variable is changed in investments measured as decrease, no change, and increase. For this reason, the methodology used is ordered probit regression models. The results show that retail investors in the U.S. increased their investments during the first wave of COVID-19, which is unexpected as investors are usually more cautious in crisis times. Moreover, the study finds that those who were affected personally by COVID-19 (e.g., tested positive) were more likely to increase their investments, which is irrational behavior and contradicts expectations. An increase in the level of savings and risk capacity was also associated with increased investments. Overall, the findings show that having personal experience with a health crisis can have an impact on one’s investment decisions as well. Those findings are important for both retail investors and policymakers, especially now that online trading platforms have made trading easily accessible to everyone. There are risks and potential irrational behaviors associated with investment decisions during times of crisis, and it is important that retail investors are aware of them before making financial decisions.

Keywords: COVID-19, financial decision-making, health crisis retail investors, survey

Procedia PDF Downloads 161
7073 Novel Use of a Quality Assurance Tool for Integrating Technology to HSE

Authors: Ragi Poyyara, V. Vivek, Ashish Khaparde

Abstract:

The Product Development Process (PDP) in the technology group plays a very important role in the launch of any product. While a manufacturing process encourages the use of certain measures to reduce Health, Safety and Environmental (HSE) risks on the shop floor, the PDP concentrates on the use of Geometric Dimensioning and Tolerancing (GD&T) to develop a flawless design. Furthermore, PDP distributes and coordinates activities between different departments such as marketing, purchasing, and manufacturing. However, it is seldom realized that PDP makes a significant contribution to developing a product that reduces HSE risks by encouraging the Technology group to use effective GD&T. The GD&T is a precise communication tool that uses a set of symbols, rules, and definitions to mathematically define parts to be manufactured. It is a quality assurance method widely used in the oil and gas sector. Traditionally it is used to ensure the interchangeability of a part without affecting its form, fit, and function. Parts that do not meet these requirements are rejected during quality audits. This paper discusses how the Technology group integrates this quality assurance tool into the PDP and how the tool plays a major role in helping the HSE department in its goal towards eliminating HSE incidents. The PDP involves a thorough risk assessment and establishes a method to address those risks during the design stage. An illustration shows how GD&T helped reduce safety risks by ergonomically improving assembling operations. A brief discussion explains how tolerances provided on a part help prevent finger injury. This tool has equipped Technology to produce fixtures, which are used daily in operations as well as manufacturing. By applying GD&T to create good fits, HSE risks are mitigated for operating personnel. Both customers and service providers benefit from reduced safety risks.

Keywords: HSE risks, product development process, geometric dimensioning and tolerances, mechanical engineering

Procedia PDF Downloads 203
7072 Highway Casualty Rate in Nigeria: Implication for Human Capital Development

Authors: Ali Maji

Abstract:

Highway development is an important factor for economic growth and development in both developed and developing countries. In Nigeria about two-third of transportation of goods and persons are done through highway network. It was this that made highway investment to enjoy position of relative high priority on the list of government expenditure programmes in Nigeria today. The paper noted that despite expansion of public investment in highway construction and maintenance of them, road traffic accident is increasing rate. This has acted as a drain of human capital which is a key to economic growth and development in Nigeria. In order to avoid this, the paper recommend introduction of Highway Safety Education (HSE) in Nigerian’s education system and investment in train transportation among other as a sure measure for curtailing highway accident.

Keywords: accident rate, high way development, human capital, national development

Procedia PDF Downloads 255
7071 Knowledge Capital and Manufacturing Firms’ Innovation Management: Exploring the Impact of Transboundary Investment and Assimilative Capacity.

Authors: Suleman Bawa, Ayiku Emmanuel Lartey

Abstract:

Purpose - This paper aims to examine the association between knowledge capital and multinational firms’ innovation management. We again explored the impact of transboundary investment and assimilative capacity between knowledge capital and multinational firms’ innovation management. The vital position of knowledge capital and multinational firms’ innovation management in today’s increasingly volatile environment coupled with fierce competition has been extensively acknowledged by academics and industry investment capitals. Design/methodology/approach - The theoretical association model and an empirical correlation analysis were constructed based on relevant research using data collected from 19 multinational firms in Ghana as the subject, and path analysis was constructed using SPSS 22.0 and AMOS 24.0 to test the formulated hypotheses. Findings - Varied conclusions are drawn consequential from theoretical inferences and empirical tests. For multinational firms, knowledge capital relics positively significant to multinational firms’ innovation management. Multinational firms with advanced knowledge capital likely spawn greater corporations’ innovation management. Second, transboundary investment efficiently intermediates the association between knowledge physical capital, knowledge interactive capital, and corporations’ innovation management. At the same time, this impact is insignificant between knowledge of empirical capital and corporations’ innovation management. Lastly, the impact of transboundary investment and assimilative capacity on the association between knowledge capital and corporations’ innovation management is established. We summarized the implications for managers based on our outcomes. Research limitations/implications - Multinational firms must dynamically build knowledge capital to augment corporations’ innovation management. Conversely, knowledge capital motivates multinational firms to implement transboundary investment and cultivate assimilative capacity. Accordingly, multinational firms can efficiently exploit diverse information to augment their corporate innovation management. Practical implications – This paper presents a comprehensive justification of knowledge capital and manufacturing firms’ innovation management by exploring the impact of transboundary investment and assimilative capacity within the manufacturing industry, its sequential progress, and its associated challenges. Originality/value – This paper is amongst the first to find empirical results to back knowledge capital and manufacturing firms’ innovation management by exploring the impact of transboundary investment and assimilative capacity within the manufacturing industry. Additionally, aligning knowledge as a coordinative instrument is a significant input to our discernment in this area.

Keywords: knowledge capital, transboundary investment, innovation management, assimilative capacity

Procedia PDF Downloads 35
7070 Cyberfraud Schemes: Modus Operandi, Tools and Techniques and the Role of European Legislation as a Defense Strategy

Authors: Papathanasiou Anastasios, Liontos George, Liagkou Vasiliki, Glavas Euripides

Abstract:

The purpose of this paper is to describe the growing problem of various cyber fraud schemes that exist on the internet and are currently among the most prevalent. The main focus of this paper is to provide a detailed description of the modus operandi, tools, and techniques utilized in four basic typologies of cyber frauds: Business Email Compromise (BEC) attacks, investment fraud, romance scams, and online sales fraud. The paper aims to shed light on the methods employed by cybercriminals in perpetrating these types of fraud, as well as the strategies they use to deceive and victimize individuals and businesses on the internet. Furthermore, this study outlines defense strategies intended to tackle the issue head-on, with a particular emphasis on the crucial role played by European Legislation. European legislation has proactively adapted to the evolving landscape of cyber fraud, striving to enhance cybersecurity awareness, bolster user education, and implement advanced technical controls to mitigate associated risks. The paper evaluates the advantages and innovations brought about by the European Legislation while also acknowledging potential flaws that cybercriminals might exploit. As a result, recommendations for refining the legislation are offered in this study in order to better address this pressing issue.

Keywords: business email compromise, cybercrime, European legislation, investment fraud, NIS, online sales fraud, romance scams

Procedia PDF Downloads 56
7069 Conceptualising Project Complexity in Ghana’s Construction Industry: A Qualitative Study

Authors: Kwasi Dartey-Baah, Mias De Klerk

Abstract:

Project complexity has been cited as one of the essential areas of project management. It can be observed from environmental, social, technological, and organisational viewpoints, and its handling is critical to project success. Conceptualised in varied industries, this paper seeks to ascertain the meaning and understanding of project complexity within the Ghanaian construction industry based on the three dimensions of complexities (faith, fact, and interaction) using experts' opinions. Taking the form of a focus group discussion, the paper sought to gain an in-depth understanding of project complexity issues in Ghana’s construction industry. The method use obtained data from experts (a purposely selected group) comprising project leaders and project management academics. The findings indicated that the experts broadly agreed with the complexity items but offered varied reasons for their agreement. In the composite assessment of the complexity dimensions of (faith, fact, and interaction), it emerged that there was some agreement with the complexity dimensions of fact and interaction within Ghana’s construction industry. On the other hand, with the dimension for complexity by faith, it was noted that the experts in Ghana’s construction construed complexity by faith, not as the absence of evidence but the evidence that hinges on at least a member of the project team. It is expected that other researches on project complexity will focus on other industries to enhance the knowledge of the same within the field of project management.

Keywords: project complexity, complexity by faith, complexity by fact, complexity by interaction, construction industry, Ghana

Procedia PDF Downloads 130