2168 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 280
2167 Analysis of Economic Development Challenges of Rapid Population Growth in Nigeria: Way Forward

Authors: Sabiu Abdullahi Yau

Abstract:

Nigeria is a high fertility country that experiences eye-popping population growth, with no end in sight. However, there is evidence that its large population inhibits government’s efforts in meeting the basic needs of the people. Moreover, past and present governments of Nigeria have been committing huge amount of financial resources to meet the basic infrastructural requirements capable of propelling growth and development. Despite the country’s large population and abundant natural resources, poverty, unemployment, rural-urban migration, deforestation and inadequate infrastructural facilities have been persistently on the increase resulting in consistent failure of government policies to impact positively on the economy. This paper, however, identifies and critically analyses the major development challenges caused by population growth in Nigeria using secondary data. The paper concludes that for the Nigeria’s economy to develop, all the identified challenges posed by rapid population growth must be promptly and squarely addressed.

Keywords: economic development, population, growth, Nigeria

Procedia PDF Downloads 296
2166 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 355
2165 Factors Constraining the Utilization of Risk Management Strategies in the Execution of Public Construction Projects in North East Nigeria

Authors: S. U. Kunya, S. A. Mohammad

Abstract:

Construction projects in Nigeria are characterized with risks emanating from delays and accompanying cost-overruns. The aim of the study was to identify and assess factors constraining the utilization of risk management strategies in the execution of public construction project in North-East Nigeria. Data was collected with the aid of a well-structured questionnaire administered to three identified projects in the North-east. Data collected were analysed using the severity index. Findings revealed political involvement, selection of inexperienced contractors and lack of coordinated public sector strategy as the most severe factors constraining the utilization of risk management strategies. The study recommended that: formulation of laws to prevent negative political meddling in construction projects; selection of experienced, risk-informed contractors; and comprehensive risk assessment and planning on all public construction projects.

Keywords: factors, Nigeria, north-east, public projects, risk management, strategies, utilization

Procedia PDF Downloads 481
2164 Power Asymmetry and Major Corporate Social Responsibility Projects in Mhondoro-Ngezi District, Zimbabwe

Authors: A. T. Muruviwa

Abstract:

Empirical studies of the current CSR agenda have been dominated by literature from the North at the expense of the nations from the South where most TNCs are located. Therefore, owing to the limitations of the current discourse that is dominated by Western ideas such as voluntarism, philanthropy, business case and economic gains, scholars have been calling for a new CSR agenda that is South-centred and addresses the needs of developing nations. The development theme has dominated in the recent literature as scholars concerned with the relationship between business and society have tried to understand its relationship with CSR. Despite a plethora of literature on the roles of corporations in local communities and the impact of CSR initiatives, there is lack of adequate empirical evidence to help us understand the nexus between CSR and development. For all the claims made about the positive and negative consequences of CSR, there is surprisingly little information about the outcomes it delivers. This study is a response to these claims made about the developmental aspect of CSR in developing countries. It offers some empirical bases for assessing the major CSR projects that have been fulfilled by a major mining company, Zimplats in Mhondoro-Ngezi Zimbabwe. The neo-liberal idea of capitalism and market dominations has empowered TNCs to stamp their authority in the developing countries. TNCs have made their mark in developing nations as they stamp their global private authority, rivalling or implicitly challenging the state in many functions. This dominance of corporate power raises great concerns over their tendencies of abuses in terms of environmental, social and human rights concerns as well as how to make them increasingly accountable. The hegemonic power of TNCs in the developing countries has had a tremendous impact on the overall CSR practices. While TNCs are key drivers of globalization they may be acting responsibly in their Global Northern home countries where there is a combination of legal mechanisms and the fear of civil society activism associated with corporate scandals. Using a triangulated approach in which both qualitative and quantitative methods were used the study found out that most CSR projects in Zimbabwe are dominated and directed by Zimplats because of the power it possesses. Most of the major CSR projects are beneficial to the mining company as they serve the business plans of the mining company. What was deduced from the study is that the infrastructural development initiatives by Zimplats confirm that CSR is a tool to advance business obligations. This shows that although proponents of CSR might claim that business has a mandate for social obligations to society, we need not to forget the dominant idea that the primary function of CSR is to enhance the firm’s profitability.

Keywords: hegemonic power, projects, reciprocity, stakeholders

Procedia PDF Downloads 226
2163 Interface Problems in Construction Projects

Authors: Puti F. Marzuki, Adrianto Oktavianus, Almerinda Regina

Abstract:

Interface problems among interacting parties in Indonesian construction projects have most often led to low productivity and completion delay. In the midst of this country’s needs to accelerate construction of public infrastructure providing connectivity among regions and supporting economic growth as well as better living quality, project delays have to be seriously addressed. This paper identifies potential causes factors of interface problems experienced by construction projects in Indonesia. Data are collected through a survey involving the main actors of six important public infrastructure construction projects including railway, LRT, sports stadiums, apartment, and education building construction projects. Five of these projects adopt the design-build project delivery method and one applies the design-bid-build scheme. Interface problems’ potential causes are categorized into contract, management, technical experience, coordination, financial, and environmental factors. Research results reveal that, especially in railway and LRT projects, potential causes of interface problems are mainly technical and managerial in nature. These relate to complex construction execution in highly congested areas. Meanwhile, coordination cause factors are mainly found in the education building construction project with loan from a foreign donor. All of the six projects have to resolve interface problems caused by incomplete or low-quality contract documents. This research also shows that the design-bid-build delivery method involving more parties in construction projects tends to induce more interface problem cause factors than the design-build scheme.

Keywords: cause factors, construction delays, project delivery method, contract documents

Procedia PDF Downloads 225
2162 Internally Displaced Persons: Implication to National Development in Nigeria

Authors: Olasunkanmi G. Jeje, John G. Laah, Eunice S. A. Jeje

Abstract:

In recent times Nigeria has been bedeviled with political, religious and ethnic crises such as indigene/settler phenomena, Boko Haram etc. resulting in the emergence of internally displaced persons(IDPs), this has been a hunch on national development. Most states of the federation have had their share of one crisis or the other such as Jos, Yobe, Borno etc thereby affecting the economy of the country. These persons are uprooted from their residential locations of which they are active contributors to the national GDP. In addition, the attempt to rehabilitate them has gulped billions of naira for feeding, shelter and medicals etc., which is not adequate for such. However, the financing could have been used for projects such as capacity building and infrastructural development. Similarly, traumatic experience by this group of people is overwhelming as most of them are mainly the aged, women and children. Importantly, the active roles of youths that constitute the productive sector of the economy have also been truncated. Therefore, it is the prerogative of this research to examine the effect of IDP's on National Development and also to recommend solutions.

Keywords: development, implication, internally displaced persons, Nigeria

Procedia PDF Downloads 289
2161 Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area

Authors: Yousef S. Al-Othman

Abstract:

The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.

Keywords: oil and gas, risk management, construction projects, project lead time

Procedia PDF Downloads 83
2160 An Introduction to Critical Chain Project Management Methodology

Authors: Ranjini Ramanath, Nanjunda P. Swamy

Abstract:

Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.

Keywords: critical chain project management methodology, critical chain, project management, construction management

Procedia PDF Downloads 395
2159 Identification of Social Responsibility Factors within Mega Construction Projects

Authors: Ali Alotaibi, Francis Edum-Fotwe, Andrew Price /

Abstract:

Mega construction projects create buildings and major infrastructure to respond to work and life requirements while playing a vital role in promoting any nation’s economy. However, the industry is often criticised for not balancing economic, environmental and social dimensions of their projects, with emphasis typically on one aspect to the detriment of the others. This has resulted in many negative impacts including environmental pollution, waste throughout the project lifecycle, low productivity, and avoidable accidents. The identification of comprehensive Social Responsibility (SR) indicators, which combine social, environmental and economic aspects, is urgently needed. This is particularly the case in the context of the Kingdom of Saudi Arabia (KSA), which often has mega public construction projects. The aim of this paper is to develop a set of wide-ranging SR indicators which encompass social, economic and environmental aspects unique to the KSA. A qualitative approach was applied to explore relevant indicators through a review of the existing literature, international standards and reports. A list of appropriate indicators was developed, and its comprehensiveness was corroborated by interviews with experts on mega construction projects working with SR concepts in the KSA. The findings present 39 indicators and their metrics, covering 10 economic, 12 environmental and 17 social aspects of SR mapped against their references. These indicators are a valuable reference for decision-makers and academics in the KSA to understand factors related to SR in mega construction projects. The indicators are related to mega construction projects within the KSA and require validation in a real case scenario or within a different industry to demonstrate their generalisability.

Keywords: social responsibility, construction projects, economic, social, environmental, indicators

Procedia PDF Downloads 134
2158 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 433
2157 Resilient Strategic Approach Towards Environmental Pollution and Infrastructural Misappropriation in Niger Delta Region: A Bibliometric Analysis

Authors: Anyia Nduka, Aslan Bin Amad Senin

Abstract:

Environmental degradation and infrastructure abuse in the Niger Delta have received increasing attention over the last two decades in several sectors, like strategic management, societal impacts, etc. Resilience strategy in human capital development and technology has inspired the formulation and implementation of strategies, policies, or activities to mitigate risks while taking advantage of opportunities to respond to crisis management. This research hopes to add to the debate on the resilient strategic model in the Niger Delta region, which is plagued with environmental and infrastructure mismanagement. It further proposes a conceptual framework of robust strategy and open technology model on bibliometric analysis. This article is intended to be a starting point for an in-depth discussion of the factors that lead to these mismanagements. Four factors were discovered for a resilient strategy leading to a more efficient and effective management procedure.

Keywords: resilience strategy, infrastructural mismanagement, human capital development., strategic management

Procedia PDF Downloads 45
2156 Prospect and Challenges of Public Bicycle Sharing System in Indian Cities

Authors: Anil Kumar

Abstract:

Public Bicycle System (PBS), generally known as Public Bicycle Share System or Bike-Share, is a service provided to the everyday commuters in which several cycles are available on the shared system. The concept of PBS is new to the people of India and requires more study in the fields of essential requirements, major infrastructural requirements, social acceptability, and various challenges. In various Indian cities, MRTS, BRTS, Monorail, and other modes of transport have been adopted for the main haul of transport. These modes take more time, space and are also expensive to implement. At the same time, the PBS system is more economical and takes less time to implement. The main benefit of the PBS system is that it is more environmentally friendly. PBS is being implemented in many Indian cities for public use, but various challenges are associated with this. The study aims to determine what are the basic infrastructural requirements for PBS in India, as well as to determine to what extent a Public Bike Sharing System can provide a quality and efficient service to passengers as a primary method of transportation.

Keywords: public bicycle sharing system, sustainable transport, infrastructure, smart city

Procedia PDF Downloads 168
2155 Examination of the Impact of Projects Based on Reggio Emilia Approach on the Creative Thinking Skills of Preschool Children: A Qualitative Study

Authors: Arzu Akar Gençer, Mübeccel Gönen

Abstract:

The objective of the study is to investigate the impact of the projects based on Reggio Emilia Approach, on the creative thinking skills of preschool children. The study is carried out with eighteen 6 years old children in a class of a preschool, and entailed the development of projects based on Reggio Emilia approach with the children, for a period of 3 months. The study employs qualitative model. The children were analyzed with reference to the creative thinking aspects (rationality, originality, flexibility, and applicability) of the projects applied. As the projects based on Reggio Emilia approach arose out of the interests and curiosity of the children, and had their roots in the existing class culture, it is possible to conclude that they have an impact on the creativity of the children with reference to the aspects of creative thinking.

Keywords: Reggio Emilia approach, project, creativity, preschool children

Procedia PDF Downloads 544
2154 Problems in Establishing Alliances to Comply with SDG 17 in the Successful Execution of Environmental Conservation Projects

Authors: Elena Bulmer

Abstract:

The research for this study has found that the formation of alliances for the successful revitalization of the global partnership for sustainable development, as defined by UN Sustainable Development Goal 17, entails considerable difficulty. This study uses for its empirical work marine environmental conservation projects and analyses the potential involvement of nonhuman actors as primordial stakeholders in these types of projects. The idea is to extend the scope of SDG 17 for it to also consider nonhuman subjects in order for it to better achieve its goal. The results of this study may be extrapolated to the business and management fields, which depend on natural resources for the development of their products. In the same way, in these areas, natural resources as nonhuman actors are not present in the stakeholder maps of these projects. Environmental Conservation projects are thus especially interesting to study with regards to their stakeholder context and have been used as the experimental setting for the empirical work of this study. The primordial stakeholders of these projects are not social objects and therefore go beyond the present limits of present stakeholder theory. The study that has been used to analyse this concept is a marine conservation project based in Spain, and to shed light in potential extending the role of the 17th Sustainable Development Goal to include nonhuman beings to be able to better achieve the rest of the SDGs, in this case, SDG 14 whose aim is to promote the conservation and sustainability of the world´s oceans.

Keywords: SDG 17, sustainability, stakeholder management, environmental conservation projects

Procedia PDF Downloads 179
2153 Partner Selection for Innovation Projects Related to New Product Concept Design

Authors: Odd Jarl Borch, Marina Z. Solesvik

Abstract:

The paper analyses partner selection approaches related to large scale R&D-based innovation projects at the different stages of development. We emphasize innovation projects in the maritime value chain and how partners are selected to improve quality according to high spec customer demands, and to reduce investment costs on new production technology such as advanced offshore service vessels. We elaborate on the differences in innovation approach and especially the role that purposive inflows and outflows of knowledge from external partners may be used to accelerate internal innovation. We present three cases related to different projects in terms of specificity and scope. We explore how the partner selection criteria change over time when the goals move from wide scope to a very specific R&D tasks.

Keywords: partner selection, innovation, offshore industry, concept design

Procedia PDF Downloads 488
2152 Analysis of Delay Causes in Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study aims at identifying the risk matrix for delay causes in construction projects in Saudi Arabia from consultants’ viewpoint. A questionnaire survey was undertaken of 51 consultants working on construction projects in the Northern Province of Saudi Arabia. 35 delay causes were identified through a literature review. The study concluded that the top delay causes in construction projects in Saudi Arabia from consultants’ perspective are: bid award for lowest price, changes in material types and specifications during construction, contract management, duration of contract period, fluctuation of prices of materials, frequent changes in design, improper planning, inflationary pressure, lack of adequate manpower, long period of design and time of implementation, payments delay, poor labor productivity, and rework.

Keywords: delays, construction, consultants, contributors, risk map

Procedia PDF Downloads 504
2151 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 412
2150 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 131
2149 The Importance of Adopting Sustainable Practices in Power Projects

Authors: Sikander Ali Abbassi, Wazir Muhmmad Laghari, Bashir Ahmed Laghari

Abstract:

Attaining sustainable development is one of the greatest challenges facing Pakistan today. A challenge that can only be met by developing and deploying confidence among the people. Transparency in project activities at all stages and other measures will also enhance its social and economic growth. Adopting sustainable practices and sensible policies, we mean that project activity should be economically viable, socially acceptable and environment friendly. In order to achieve this objective, there must be a continued commitment to encourage and ensure the public participation in development of power projects. Since Pakistan is an energy deficient country, it has to initiate power projects on a large scale in the near future. Therefore, it is the need of the hour to tackle these projects in a sustainable way, so that it can be benefited to the maximum possible level and have the least adverse effects on people and the environment. In order to get desirable results, careful planning, efficient implementation, standardized operational practices and community participation are the key parameters which ensure the positive impacts on economy, prosperity and the well being of our people. This paper pinpoints the potential environmental hazards due to project activity and emphasizes to adopt sustainable approaches in power projects.

Keywords: environmental hazards, sustainable practices, environment friendly, power projects

Procedia PDF Downloads 358
2148 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 60
2147 Conditionality of Aid as a Counterproductive Factor in Peacebuilding in the Afghan Context

Authors: Karimova Sitora Yuldashevna

Abstract:

The August 2021 resurgence of Taliban as a ruling force in Afghanistan once again challenged the global community into dealing with an unprecedentedly unlike-minded government. To express their disapproval of the new regime, Western governments and intergovernmental institutions have suspended their infrastructural projects and other forms of support. Moreover, the Afghan offshore reserves were frozen, and Afghanistan was disconnected from the international financial system, which impeded even independent aid agencies’ work. The already poor provision of aid was then further complicated with political conditionality. The purpose of this paper is to investigate the efficacy of conditional aid policy in the Afghan peacebuilding under Taliban rule and provide recommendations to international donors on further course of action. Arguing that conditionality of aid is a counterproductive factor in the peacebuilding process, this paper employs scholarly literature on peacebuilding alongside reports from International non-governmental organizations INGOs who operate directly in Afghanistan. The existing debate on peacebuilding in Afghanistan revolves around aid as a means of building democratic foundation for achieving peace on communal and national levels and why the previous attempts to do so were unsuccessful. This paper focuses on how to recalibrate the approach to aid provision and peacebuilding in the new reality. In the early 2000s, amid the weak Post-Cold War international will for a profound engagement in the conflict, humanitarian and development aid became the new means of achieving peace. Aid agencies provided resources directly to communities, minimizing the risk of local disputes. Through subsidizing education, governance reforms, and infrastructural projects, international aid accelerated school enrollment, introduced peace education, funded provincial council and parliamentary elections, and helped rebuild a conflict-torn country.When the Taliban seized power, the international community called on them to build an inclusive government based on respect for human rights, particularly girls’ and women’s schooling and work, as a condition to retain the aid flow. As the Taliban clearly failed to meet the demands, development aid was withdrawn. Some key United Nation agencies also refrained from collaborating with the de-facto authorities. However, contrary to the intended change in Talibs’ behavior, such a move has only led to further deprivation of those whom the donors strived to protect. This is because concern for civilians has always been the second priority for the warring parties. This paper consists of four parts. First, it describes the scope of the humanitarian crisis that began in Afghanistan in 2001. Second, it examines the previous peacebuilding attempts undertaken by the international community and the contribution that the international aid had in the peacebuilding process. Third, the paper describes the current regime and its relationships with the international donors. Finally, the paper concludes with recommendations for donors who would have to be more realistic and reconsider their priorities. While it is certainly not suggested that the Taliban regime is legitimized internationally, the crisis calls upon donors to be more flexible in collaborating with the de-facto authorities for the sake of the civilians.

Keywords: Afghanistan, international aid, donors, peacebuilding

Procedia PDF Downloads 51
2146 Feasibility Studies in Public Construction Projects in South Africa: Barriers and Implications

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The practice of feasibility studies plays a huge role in the success of construction projects. Feasibility studies according to several research should be the reason for embarking on any project. However, it has been discovered that in South Africa (SA), feasibility studies are mainly done in the private sector construction but skipped in the construction of most public projects. Hence, this study aims to evaluate the barriers to feasibility studies practice in public projects and the implications. A survey design was adopted. A total number of One hundred and fifty (150) questionnaires were administered to Quantity Surveyors, Construction managers, Construction project managers, Project managers, Architects and Civil and Structural engineers in Guateng Province, SA and ninety (90) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that political interference and corruption are the most significant barriers to feasibility studies practice in the public construction projects in SA, while late project completion, poor quality infrastructure are among the implication of not conducting feasibility studies in SA public projects. Therefore, the study recommends the development of a framework for public projects execution that will reduce the interference of the political class in the country, that way the risk of late project completion and poor quality infrastructure will be mitigated.

Keywords: arriers, feasibility studies, public construction, South Africa.

Procedia PDF Downloads 60
2145 An Exploratory Study on Challenges of Public Private Partnership Projects in Oman

Authors: Omar Amoudi, Mariya Khalid

Abstract:

The limitation of the public funds for the infrastructure projects and with the deterioration of international oil prices and the negative consequences on the economies of oil producing and exporting countries, Oman has encouraged the partnership between the public and private sectors. As the private sector has a role in planning, financing, designing, operating and the maintenance of the public services. There is no doubt that, the adoption of Public Private Partnership (PPP) strategy faces many challenges which might affect the project seriously if it is not overcome in earlier time. These challenges depend on the level of understanding of the strategy, the roles and regulations and the availability of resources as well. This research aims at identifying the challenges facing the PPP infrastructure projects in Oman based on the similar previous studies supported by questionnaire survey and semi structured interviews. It also seeks to discuss the rationale for adoption in Oman and uncover the current status of PPP strategy. The identified challenges were ranked according to the importance index of each challenge. After analysis of data, it has observed that, the main challenges facing PPPs projects in Oman are high participation cost, high projects cost and regulation changes. The PPP strategy has to be adopted well and with a high level of experience in order to ensure a successful implementation of PPP projects in Oman.

Keywords: public private partnership (PPP), challenges, infrastructure, Oman

Procedia PDF Downloads 266
2144 A New Mathematical Model for Scheduling Preventive Maintenance and Renewal Projects of Multi-Unit Systems; Application to Railway Track

Authors: Farzad Pargar

Abstract:

We introduce the preventive maintenance and renewal scheduling problem for a multi-unit system over a finite and discretized time horizon. Given the latest possible time for carrying out the next maintenance and renewal projects after the previous ones and considering several common set-up costs, the introduced scheduling model tries to minimize the cost of projects by grouping them and simultaneously finding the optimal balance between doing maintenance and renewal. We present a 0-1 pure integer linear programming that determines which projects should be performed together on which location and in which period (e.g., week or month). We consider railway track as a case for our study and test the performance of the proposed model on a set of test problems. The experimental results show that the proposed approach performs well.

Keywords: maintenance, renewal, scheduling, mathematical programming model

Procedia PDF Downloads 663
2143 An Assessment on the Effect of Participation of Rural Woman on Sustainable Rural Water Supply in Yemen

Authors: Afrah Saad Mohsen Al-Mahfadi

Abstract:

In rural areas of developing countries, participation of all stakeholders in water supply projects is an important step towards further development. As most of the beneficiaries are women, it is important that they should be involved to achieve successful and sustainable water supply projects. Women are responsible for the management of water both inside and outside home, and often spend more than six-hours a day fetching drinking water from distant water sources. The problem is that rural women play a role of little importance in the water supply projects’ phases in rural Yemen. Therefore, this research aimed at analyzing the different reasons of their lack of participation in projects and in what way a full participation -if achieved- could contribute to sustainable water supply projects in the rural mountainous areas in Yemen. Four water supply projects were selected as a case study in Al-Della'a Alaala sub-district in the Al-Mahweet governorate, two of them were implemented by the Social Fund and Development (SFD), while others were implemented by the General Authority for Rural Water Supply Projects (GARWSSP). Furthermore, the successful Al-Galba project, which is located in Badan district in Ibb governorate, was selected for comparison. The rural women's active participation in water projects have potential consequences including continuity and maintenance improvement, equipment security, and improvement in the overall health and education status of these areas. The majority of respondents taking part in GARWSSP projects estimated that there is no reason to involve women in the project activities. In the comparison project - in which a woman worked as a supervisor and implemented the project – all respondents indicated that the participation of women is vital for sustainability. Therefore, the results of this research are intended to stimulate rural women's participation in the mountainous areas of Yemen.

Keywords: assessment, rural woman, sustainability, water management

Procedia PDF Downloads 651
2142 An Explorative Study of the Application of Project Management in German Research Projects

Authors: Marcel Randermann, Roland Jochem

Abstract:

Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.

Keywords: academics, project management methods, research and science projects, scientist's mindset

Procedia PDF Downloads 166
2141 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects

Authors: Preeda Sansakorn, Min An

Abstract:

In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.

Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects

Procedia PDF Downloads 455
2140 A Development of a Conceptual Framework for Safety Culture and Safety Risk Assessment: The Case of Chinese International Construction Projects under the “New Belt and Road” Initiative in Africa

Authors: Bouba Oumarou Aboubakar, HongXia Li, Sardar Annes Farooq

Abstract:

The Belt and Road Initiative’s success strongly depends on the safety of all the million workers on construction projects sites. As the new BRI is directed toward Africa and meets a completely different culture from the Chinese project managers, maintaining low risk for workers risks shall be closely related to cultural sharing and mutual understanding. This is why this work introduces a cultural-wise safety management framework for Chinese Construction projects in Africa. The theoretical contribution of this paper is an improved risk assessment framework that integrates language, culture and difficulty of controlling risk factors into one approach. Practically, this study provides not only a useful tool for project safety management practitioners but the full understanding of all risks that may arise in the BRI projects in Africa.

Keywords: cultural-wise, safety culture, risk assessment, Chinese construction, BRI projects, Africa

Procedia PDF Downloads 58
2139 Airport Investment Risk Assessment under Uncertainty

Authors: Elena M. Capitanul, Carlos A. Nunes Cosenza, Walid El Moudani, Felix Mora Camino

Abstract:

The construction of a new airport or the extension of an existing one requires massive investments and many times public private partnerships were considered in order to make feasible such projects. One characteristic of these projects is uncertainty with respect to financial and environmental impacts on the medium to long term. Another one is the multistage nature of these types of projects. While many airport development projects have been a success, some others have turned into a nightmare for their promoters. This communication puts forward a new approach for airport investment risk assessment. The approach takes explicitly into account the degree of uncertainty in activity levels prediction and proposes milestones for the different stages of the project for minimizing risk. Uncertainty is represented through fuzzy dual theory and risk management is performed using dynamic programming. An illustration of the proposed approach is provided.

Keywords: airports, fuzzy logic, risk, uncertainty

Procedia PDF Downloads 372