Search results for: highway company
1832 Highway Casualty Rate in Nigeria: Implication for Human Capital Development
Authors: Ali Maji
Abstract:
Highway development is an important factor for economic growth and development in both developed and developing countries. In Nigeria about two-third of transportation of goods and persons are done through highway network. It was this that made highway investment to enjoy position of relative high priority on the list of government expenditure programmes in Nigeria today. The paper noted that despite expansion of public investment in highway construction and maintenance of them, road traffic accident is increasing rate. This has acted as a drain of human capital which is a key to economic growth and development in Nigeria. In order to avoid this, the paper recommend introduction of Highway Safety Education (HSE) in Nigerian’s education system and investment in train transportation among other as a sure measure for curtailing highway accident.Keywords: accident rate, high way development, human capital, national development
Procedia PDF Downloads 2861831 A Conceptual Framework of Scheduled Waste Management in Highway Industry
Authors: Nurul Nadhirah Anuar, Muhammad Fauzi Abdul Ghani
Abstract:
Scheduled waste management is very important in environmental and health aspects. Despite it is very important, the research study on schedule waste management is very little in the highway industry even though there is a rapid growth of highway operation in the Asian region. It should be noted that there are many unnoticeable wastes in highway industry that should be managed properly. This paper aims to define the scheduled waste, to provide a conceptual framework of the scheduled waste management in highway industry, to highlight the effect of improper management of scheduled waste and to encourage future researchers to identify and share the present practice of scheduled management in their country. The understanding on effective management of scheduled waste will help the operators of highway industry, the academicians, future researchers, and encourage a friendly environment around the world. The study on scheduled waste management in highway industry is very crucial as compared to factories in which the factories are located on specified areas whereas, highway transverse and run along kilometers crossing the various type of environment, residential and schools. Using Environmental Quality (Scheduled Waste) Regulations, 2005 as a guide, this conceptual paper highlight several scheduled wastes produced by highway industry in Malaysia and provide a conceptual framework of scheduled waste management that focused on the highway industry. Understanding on schedule waste management is vital in order to preserve the environment. Besides that, the waste substances are hazardous to human being. Many diseases have been associated with the improper management of scheduled waste such as cancer, throat irritation and respiration problem.Keywords: Asia region, environment, highway industry, scheduled waste
Procedia PDF Downloads 4221830 Dynamic Compaction Assessment for Improving Pasdaran Highway
Authors: Alireza Motamadnia, Roohollah Zohdi Oliayi, Hümeyra Bolakar, Ahmet Tortum
Abstract:
Dynamic compression as a method of soil improvement in recent decades has been considered by engineers and experts. Three methods mainly, deep dynamic compaction, soil density, dynamic and rapid change have been proposed and implemented to improve subgrade conditions of highway road. Northern highway route in Tabriz (Pasdaran), Iran that was placed on the manual soil was the main concern. Engineering properties of soil have been investigated experimentally and theoretically. Among the three methods rapid dynamic compaction for highway has been suggested to improve the soil subgrade conditions.Keywords: manual soil, subsidence, improvement, dynamic compression
Procedia PDF Downloads 6001829 Analysis of Financial Performance Measurement and Financial Distress Assessment of Highway Companies Listed on Indonesia Stock Exchange before and during COVID-19 Pandemic
Authors: Ari Prasetyo, Taufik Faturohman
Abstract:
The COVID-19 pandemic in Indonesia is part of the ongoing worldwide pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). It was confirmed to have spread to Indonesia on 2 March 2020. Moreover, the government of Indonesia has been conducting a local lockdown to limit people's movement from one city to another city. Therefore, this situation has impact on business operation, especially on highway companies listed on the Indonesia stock exchange. This study evaluates and measures three companies’ financial performance and health conditions before and during the COVID-19 pandemic from 2016 – 2020. The measurement is conducted by using financial ratio analysis and the Altman Z-score method. The ratio used to measure the financial ratio analysis is taken from the decree of the Ministry of SOE’s KEP-100/MBU/2002 about the company’s health level condition. From the decree, there are eight financial ratios used such as return on equity (ROE), return on investment (ROI), current ratio, cash ratio, collection period, inventory turnover, total asset turnover, and total equity to total asset. Altman Z-score is used to calculate the financial distress condition. The result shows that the highway companies for the period 2016 – 2020 are as follows: PT Jasa Marga (Persero) Tbk (AA, BB, BB, BB, C), PT Citra Marga Nusaphala Persada Tbk (BB, AA, BB, BBB, C), and PT Nusantara Infrastructure Tbk (BB, BB, AA, BBB, C). In addition, the Altman Z-score assessment performed in 2016-2020 shows that PT Jasa Marga (Persero) Tbk was in the grey zone area for 2015-2018 and in the distress zone for 2019-2020. PT Citra Marga Nusaphala Persada Tbk was in the grey zone area for 2015-2019 and in the distress zone for 2020. PT Nusantara Infrastructure Tbk was in the grey zone area for 2015-2018 and in the distress zone for 2019-2020.Keywords: financial performance, financial ratio, Altman Z-score, financial distress, highway company
Procedia PDF Downloads 1911828 Safety Approach Highway Alignment Optimization
Authors: Seyed Abbas Tabatabaei, Marjan Naderan Tahan, Arman Kadkhodai
Abstract:
An efficient optimization approach, called feasible gate (FG), is developed to enhance the computation efficiency and solution quality of the previously developed highway alignment optimization (HAO) model. This approach seeks to realistically represent various user preferences and environmentally sensitive areas and consider them along with geometric design constraints in the optimization process. This is done by avoiding the generation of infeasible solutions that violate various constraints and thus focusing the search on the feasible solutions. The proposed method is simple, but improves significantly the model’s computation time and solution quality. On the other, highway alignment optimization through Feasible Gates, eventuates only economic model by considering minimum design constrains includes minimum reduce of circular curves, minimum length of vertical curves and road maximum gradient. This modelling can reduce passenger comfort and road safety. In most of highway optimization models, by adding penalty function for each constraint, final result handles to satisfy minimum constraint. In this paper, we want to propose a safety-function solution by introducing gift function.Keywords: safety, highway geometry, optimization, alignment
Procedia PDF Downloads 4091827 Assessment of Heavy Metal Contamination in Roadside Soils along Shenyang-Dalian Highway in Liaoning Province, China
Authors: Zhang Hui, Wu Caiqiu, Yuan Xuyin, Qiu Jie, Zhang Hanpei
Abstract:
The heavy metal contaminations were determined with a detailed soil survey in roadside soils along Shenyang-Dalian Highway of Liaoning Province (China) and Pb, Cu, Cd, Ni and Zn were analyzed using the atomic absorption spectrophotometric method. The average concentration of Pb, Cu, Cd, Ni and Zn in roadside soils was determined to be 43.8, 26.5, 0.119, 32.1, 71.3 mg/kg respectively, and all of the heavy metal contents were higher than the background values. Different heavy metal distribution regularity was found in different land use type of roadside soil, there was an obvious peak of heavy concentration at 25m from road edge in the farmland, while in the forest and orchard soil, all heavy metals gradually decreased with the increase of distance from road edge and conformed to the exponential model. Furthermore, the heavy metal contents of heavy metals except Cd were markedly increased compared with those in 1999 and 2007, and the heavy metals concentrations of Shenyang- Dalian Highway were considered medium or low in comparison with those in other cities around the world. The assessment of heavy metal contamination of roadside soils illustrated a common low pollution for all heavy metal and recommended that more attention should be paid to Pb contamination in roadside soils in Shenyang-Dalian Highway.Keywords: heavy metal contamination, roadside, highway, Nemerow Pollution Index
Procedia PDF Downloads 2661826 Geotechnical Characteristics of Miocenemarl in the Region of Medea North-South Highway, Algeria
Authors: Y. Yongli, M. H. Aissa
Abstract:
The purpose of this paper aims for a geotechnical analysis based on experimental physical and mechanical characteristics of Miocene marl situated at Medea region in Algeria. More than 150 soil samples were taken in the investigation part of the North-South Highway which extends over than 53 km from Chiffa in the North to Berrouaghia in the South of Algeria. The analysis of data in terms of Atterberg limits, plasticity index, and clay content reflects an acceptable correlation justified by a high coefficient of regression which was compared with the previous works in the region. Finally, approximated equations that serve as a guideline for geotechnical design locally have been suggested.Keywords: correlation, geotechnical properties, miocene marl, north-south highway
Procedia PDF Downloads 2961825 Significant Stressed Zone of Highway Embankment
Authors: Sharifullah Ahmed, P. Eng
Abstract:
The Axle Pressure and the Consolidation Pressure decrease with the height of the highway embankment and the depth of subsoil. This reduction of pressure depends on the height and width of the embankment. The depth is defined as the significantly stressed zone at which the pressure is reduced to 0.2 or 20%. The axle pressure is reduced to 7% for embankment height 1-3m and to 0.7% for embankment height 4-12m at the bottom level of Highway Embankment. This observation implies that, the portion of axle pressure transferred to subsoil underlying the embankment is not significant for ESAL factor 4.8. The 70% consolidation to have occurred after the construction of the surface layer of pavement. Considering this ratio of post construction settlement, 70% consolidation pressure (Δσ70) is used in this analysis. The magnitude of influence depth or Significant Stressed Zone (Ds) had been obtained for the range of crest width (at the top level of the embankment) is kept between 5m and 50m and for the range of embankment height from 1.0m to 12.0m considering 70% of consolidation pressure (Δσ70). Significantly stressed zones (Ds) for 70% embankment pressure are found as 2-6.2He for embankment top width 5-50m.Keywords: consolidation pressure, consolidation settlement, ESAL, highway embankment, HS 20-44, significant stressed zone, stress distribution
Procedia PDF Downloads 911824 Accounting for Downtime Effects in Resilience-Based Highway Network Restoration Scheduling
Authors: Zhenyu Zhang, Hsi-Hsien Wei
Abstract:
Highway networks play a vital role in post-disaster recovery for disaster-damaged areas. Damaged bridges in such networks can disrupt the recovery activities by impeding the transportation of people, cargo, and reconstruction resources. Therefore, rapid restoration of damaged bridges is of paramount importance to long-term disaster recovery. In the post-disaster recovery phase, the key to restoration scheduling for a highway network is prioritization of bridge-repair tasks. Resilience is widely used as a measure of the ability to recover with which a network can return to its pre-disaster level of functionality. In practice, highways will be temporarily blocked during the downtime of bridge restoration, leading to the decrease of highway-network functionality. The failure to take downtime effects into account can lead to overestimation of network resilience. Additionally, post-disaster recovery of highway networks is generally divided into emergency bridge repair (EBR) in the response phase and long-term bridge repair (LBR) in the recovery phase, and both of EBR and LBR are different in terms of restoration objectives, restoration duration, budget, etc. Distinguish these two phases are important to precisely quantify highway network resilience and generate suitable restoration schedules for highway networks in the recovery phase. To address the above issues, this study proposes a novel resilience quantification method for the optimization of long-term bridge repair schedules (LBRS) taking into account the impact of EBR activities and restoration downtime on a highway network’s functionality. A time-dependent integer program with recursive functions is formulated for optimally scheduling LBR activities. Moreover, since uncertainty always exists in the LBRS problem, this paper extends the optimization model from the deterministic case to the stochastic case. A hybrid genetic algorithm that integrates a heuristic approach into a traditional genetic algorithm to accelerate the evolution process is developed. The proposed methods are tested using data from the 2008 Wenchuan earthquake, based on a regional highway network in Sichuan, China, consisting of 168 highway bridges on 36 highways connecting 25 cities/towns. The results show that, in this case, neglecting the bridge restoration downtime can lead to approximately 15% overestimation of highway network resilience. Moreover, accounting for the impact of EBR on network functionality can help to generate a more specific and reasonable LBRS. The theoretical and practical values are as follows. First, the proposed network recovery curve contributes to comprehensive quantification of highway network resilience by accounting for the impact of both restoration downtime and EBR activities on the recovery curves. Moreover, this study can improve the highway network resilience from the organizational dimension by providing bridge managers with optimal LBR strategies.Keywords: disaster management, highway network, long-term bridge repair schedule, resilience, restoration downtime
Procedia PDF Downloads 1501823 PV Module as a Design Element of Barriers for Protection against Noise
Authors: Budimir S. Sudimac, Andjela N. Dubljevic
Abstract:
The aim of thisresearch paper is to consider possibilities for improving the street lighting on the E75 highway, which passes through Serbia, using renewable sources of energy. In this paper, we analyzed the possibilities for installing sound barriers along the highway and integrating photovoltaic (PV) modules, which would generate electrical energy to power the lighting on the section of the highway running through Belgrade. The main aim of this paper is to analyze, show and promote innovative, hybrid, multi-functional solar technology using PV modules as an element of sound barriers in urban areas. The paper seeks to show the hybridity of using sustainable technologies in solving environmental issues. This structure solves the problem of noise in populated areas and provides the electricity from renewable source.Keywords: noise, PV modules, solar energy, sound barriers
Procedia PDF Downloads 4711822 A Critical Analysis of the Concept of Unconscionable Abuse under the South African Company Law
Authors: Siphethile Phiri
Abstract:
Although a company is a legal entity with separate legal personality, the courts are empowered to review and set aside the personality of a company on the ground of ‘an unconscionable abuse’. The process is called piercing of the corporate veil. Of interesting note however, it is controversial as to what the concept of ‘unconscionable abuse’ entails. The purpose of this study is to explore this concept in an attempt to understand its proper meaning and how it bears on the powers of the company director to take decision on behalf of the company as a juristic entity. Given the confounding provision, an attempt is made to identify the circumstances in which the courts may pierce the corporate veil and also to investigate the extent to which the courts can do so. The results of this study show that the term unconscionable abuse is a legislative innovation to justify the court’s interference with the separate legal personality functions of a company.Keywords: company law, unconscionable abuse, director, companies act
Procedia PDF Downloads 2971821 Effect of Lime and Leaf Ash on Engineering Properties of Red Mud
Authors: Pawandeep Kaur, Prashant Garg
Abstract:
Red mud is a byproduct of aluminum extraction from Bauxite industry. It is dumped in a pond which not only uses thousands of acres of land but having very high pH, it pollutes the ground water and the soil also. Leaves are yet another big waste especially during autumn when they contribute immensely to the blockage of drains and can easily catch fire, among other risks hence also needs to be utilized effectively. The use of leaf ash and red mud in highway construction as a filling material may be an efficient way to dispose of leaf ash and red mud. In this study, leaf ash and lime were used as admixtures to improve the geotechnical engineering properties of red mud. The red mud was taken from National Aluminum Company Limited, Odisha, and leaf ash was locally collected. The aim of present study is to investigate the effect of lime and leaf ash on compaction characteristics and strength characteristics of red mud. California Bearing Ratio and Unconfined Compression Strength tests were performed on red mud by varying different percentages of lime and leaf ash. Leaf ash was added in proportion 2%,4%,6%,8% and 10% whereas lime was added in proportions of 5% to 15%. Optimized value of lime was decided with respect to maximum CBR (California Bearing Ratio) of red mud mixed with different proportions of lime. An increase of 300% in California Bearing ratio of red mud and an increase of 125% in Unconfined Compression Strength values were observed. It may, therefore, be concluded that red mud may be effectively utilized in the highway industry as a filler material.Keywords: stabilization, lime, red mud, leaf ash
Procedia PDF Downloads 2421820 Height of Highway Embankment for Tolerable Residual Settlement of Loose Cohesionless Subsoil Overlain by Stronger Soil
Authors: Sharifullah Ahmed
Abstract:
Residual settlement of cohesionless or non-plastic soil of different strength underlying highway embankment overlain by stronger soil layer highway embankment is studied. A parametric study is carried out for different height of embankment and for different ESAL factor. The sum of elastic settlements of cohesionless subsoil due to axle induced stress and due to self-weight of pavement layers is termed as the residual settlement. The values of residual settlement (Sr) for different heights of road embankment (He) are obtained and presented as design charts for different SPT Value (N60) and ESAL factor. For rigid pavement and flexible pavement in approach to bridge or culvert, the tolerable residual settlement is 0.100m. This limit is taken as 0.200m for flexible pavement in general sections of highway without approach to bridge or culvert. A simplified guideline is developed for design of highway embankment underlain by very loose to loose cohesionless subsoil overlain by a stronger soil layer for limiting value of the residual settlement. In the current research study range of ESAL factor is 1-10 and range of SPT value (N60) is 1-10. That is found that, ground improvement is not required if the overlying stronger layer is minimum 1.5m and 4.0m for general road section of flexible pavement except bridge or culvert approach and for rigid pavement or flexible pavement in bridge or culvert approach. Tables and charts are included in the prepared guideline to obtain minimum allowable height of highway embankment to limit the residual settlement with in mentioned tolerable limit. Allowable values of the embankment height (He) are obtained corresponding to tolerable or limiting level of the residual settlement of loose subsoil for different SPT value, thickness of stronger layer (d) and ESAL factor. The developed guideline is may be issued to be used in assessment of the necessity of ground improvement in case of cohesionless subsoil underlying highway embankment overlain by stronger subsoil layer for limiting residual settlement. The ground improvement is only to be required if the residual settlement of subsoil is more than tolerable limit.Keywords: axle pressure, equivalent single axle load, ground improvement, highway embankment, tolerable residual settlement
Procedia PDF Downloads 1271819 Performance Improvement of SBR Polymer Concrete Used in Construction of Rigid Pavement Highway
Authors: Mohammed Abbas Al-Jumaili
Abstract:
There are some studies which have been conducted in resent years to investigate the possibility of producing high performance polymer concrete. However, despite the great important of this subject, very limited amount of literature is available about the strength and performance of this type of concrete in case using in rigid pavement highway. In this study, the possibility of producing high performance polymer concrete by using Styrene Butadiene Rubber (SBR) emulsion with various (SBR) percents of 5,10 ,15, and 20 % by weight of cement has been investigated. The compressive, splitting tensile and flexural strengths and dynamic modulus of elasticity tests were conducted after age of 7 and 28 days for control without polymer and SBR concretes. A total of (30) cubes, (30) cylinders and (30) prisms were prepared using different types of concrete mixes. The AASHTO guide-1993 method was used to determine slab concrete thickness of rigid pavement highway in case of using various SBR polymer concrete mixture types. The research results indicate that the use of 10% SBR by weight of cement leads to produce high performance concrete especially with regard to mechanical properties and structural relative to corresponding control concrete.Keywords: rigid pavement highway, styrene–butadiene rubber (SBR) latex, compressive test, splitting tensile test, flexural test and dynamic modulus of elasticity test
Procedia PDF Downloads 3221818 A Concept for Design of Road Super-Elevation Based on Horizontal Radius, Vertical Gradient and Accident Rate
Authors: U. Chattaraj, D. Meena
Abstract:
Growth of traffic brings various negative effects, such as road accidents. To avoid such problems, a model is developed for the purpose of highway safety. In such areas, fuzzy logic is the most well-known simulation in the larger field. A model is accomplished for hilly and steep terrain based on Fuzzy Inference System (FIS), for which output is super elevation and input data is horizontal radius, vertical gradient, accident rate (AR). This result shows that the system can be efficaciously applied as for highway safety tool distinguishing hazards components correlated to the characteristics of the highway and has a great influence to the making of decision for accident precaution in transportation models. From this model, a positive relationship between geometric elements, accident rate, and super elevation is also identified.Keywords: accident rate, fuzzy inference system, fuzzy logic, gradient, radius, super elevation
Procedia PDF Downloads 2171817 Reducing Inventory Costs by Reducing Inventory Levels: Kuwait Flour Mills and Bakeries Company
Authors: Dana Al-Qattan, Faiza Goodarzi, Heba Al-Resheedan, Kawther Shehab, Shoug Al-Ansari
Abstract:
This project involves working with different types of forecasting methods and facility planning tools to help the company we have chosen to improve and reduce its inventory, increase its sales, and decrease its wastes and losses. The methods that have been used by the company have shown no improvement in decreasing the annual losses. The research made in the company has shown that no interest has been made in exploring different techniques to help the company. In this report, we introduce several methods and techniques that will help the company make more accurate forecasts and use of the available space efficiently. We expect our approach to reduce costs without affecting the quality of the product, and hence making production more viable.Keywords: production planning, inventory management, inventory control, simulation, facility planning and design, engineering economy and costs
Procedia PDF Downloads 5701816 Resilience-Based Emergency Bridge Inspection Routing and Repair Scheduling under Uncertainty
Authors: Zhenyu Zhang, Hsi-Hsien Wei
Abstract:
Highway network systems play a vital role in disaster response for disaster-damaged areas. Damaged bridges in such network systems can impede disaster response by disrupting transportation of rescue teams or humanitarian supplies. Therefore, emergency inspection and repair of bridges to quickly collect damage information of bridges and recover the functionality of highway networks is of paramount importance to disaster response. A widely used measure of a network’s capability to recover from disasters is resilience. To enhance highway network resilience, plenty of studies have developed various repair scheduling methods for the prioritization of bridge-repair tasks. These methods assume that repair activities are performed after the damage to a highway network is fully understood via inspection, although inspecting all bridges in a regional highway network may take days, leading to the significant delay in repairing bridges. In reality, emergency repair activities can be commenced as soon as the damage data of some bridges that are crucial to emergency response are obtained. Given that emergency bridge inspection and repair (EBIR) activities are executed simultaneously in the response phase, the real-time interactions between these activities can occur – the blockage of highways due to repair activities can affect inspection routes which in turn have an impact on emergency repair scheduling by providing real-time information on bridge damages. However, the impact of such interactions on the optimal emergency inspection routes (EIR) and emergency repair schedules (ERS) has not been discussed in prior studies. To overcome the aforementioned deficiencies, this study develops a routing and scheduling model for EBIR while accounting for real-time inspection-repair interactions to maximize highway network resilience. A stochastic, time-dependent integer program is proposed for the complex and real-time interacting EBIR problem given multiple inspection and repair teams at locations as set post-disaster. A hybrid genetic algorithm that integrates a heuristic approach into a traditional genetic algorithm to accelerate the evolution process is developed. Computational tests are performed using data from the 2008 Wenchuan earthquake, based on a regional highway network in Sichuan, China, consisting of 168 highway bridges on 36 highways connecting 25 cities/towns. The results show that the simultaneous implementation of bridge inspection and repair activities can significantly improve the highway network resilience. Moreover, the deployment of inspection and repair teams should match each other, and the network resilience will not be improved once the unilateral increase in inspection teams or repair teams exceeds a certain level. This study contributes to both knowledge and practice. First, the developed mathematical model makes it possible for capturing the impact of real-time inspection-repair interactions on inspection routing and repair scheduling and efficiently deriving optimal EIR and ERS on a large and complex highway network. Moreover, this study contributes to the organizational dimension of highway network resilience by providing optimal strategies for highway bridge management. With the decision support tool, disaster managers are able to identify the most critical bridges for disaster management and make decisions on proper inspection and repair strategies to improve highway network resilience.Keywords: disaster management, emergency bridge inspection and repair, highway network, resilience, uncertainty
Procedia PDF Downloads 1091815 The Effect of Sustainability Reporting on Company Profitability Using Literature Review Method (Asian Sphere)
Authors: Kesya Terinda Natalie, Marcellina Natasha, Rosinta Ria Panggabean
Abstract:
Purpose: Over the last few years, the company has been implementing sustainability practices to ensure business continuity. However, there are pros and cons regarding the impact of financial reports if companies provide non-financial reports. So this paper aims to prove what the effect of Sustainability Reporting (SR) has on company profitability, as well as things that can be considered as the decision-making of SR disclosure. Methodology: This paper uses the literature review method to describe the results of published articles concerning Sustainability Reporting and Profitability. This study links and analyzes the essence of 50 previous studies related to SR on company profitability, most of which were conducted in Asia. Therefore this research is limited to only 23 studies in Asia. Findings: Sustainability Reporting does not have a significant impact on company profitability because the SR quality of each company varies based on Agency & Legitimacy Theory considerations. Stakeholders are required to focus not only on profitability but also on the long-term of the company. Thus, it is found that SR is used by companies as a sustainable investment, which can improve overall company performance by reducing capital costs and generating positive company value in increasing reputation capital. Value: This paper focuses on how sustainability reporting affects company profitability, as well as things that can be considered as the decision-making of SR disclosure.Keywords: sustainability reporting, profitability, agency theory, legitimacy theory
Procedia PDF Downloads 871814 Study and Analysis of the Factors Affecting Road Safety Using Decision Tree Algorithms
Authors: Naina Mahajan, Bikram Pal Kaur
Abstract:
The purpose of traffic accident analysis is to find the possible causes of an accident. Road accidents cannot be totally prevented but by suitable traffic engineering and management the accident rate can be reduced to a certain extent. This paper discusses the classification techniques C4.5 and ID3 using the WEKA Data mining tool. These techniques use on the NH (National highway) dataset. With the C4.5 and ID3 technique it gives best results and high accuracy with less computation time and error rate.Keywords: C4.5, ID3, NH(National highway), WEKA data mining tool
Procedia PDF Downloads 3381813 Development of a Value Evaluation Model of Highway Box-Girder Bridge
Authors: Hao Hsi Tseng
Abstract:
Taiwan’s infrastructure is gradually deteriorating, while resources for maintenance and replacement are increasingly limited, raising the urgent need for methods for maintaining existing infrastructure within constrained budgets. Infrastructure value evaluation is used to enhance the efficiency of infrastructure maintenance work, allowing administrators to quickly assess the maintenance needs and performance by observing variation in infrastructure value. This research establishes a value evaluation model for Taiwan’s highway box girder bridges. The operating mechanism and process of the model are illustrated in a practical case.Keywords: box girder bridge, deterioration, infrastructure, maintenance, value evaluation
Procedia PDF Downloads 1901812 Analysing Waste Management Options in the Printing Industry: Case of a South African Company
Authors: Stanley Fore
Abstract:
The case study company is one of the leading newsprint companies in South Africa. The company has achieved this status through operational expansion, diversification and investing in cutting-edge technology. They have a reputation for the highest quality and personalised service that transcends borders and industries. The company offers a wide variety of small and large scales printing services. The company is faced with the challenge of significant waste production during normal operations. The company generates 1200 kg of plastic waste and 60 – 70 tonnes of paper waste per month. The company operates a waste management process currently, whereby waste paper is sold, at low cost, to recycling firms for further processing. Having considered the quantity of waste being generated, the company has embarked on a venture to find a more profitable solution to its current waste production. As waste management and recycling is not the company’s core business, the aim of the venture is to implement a secondary profitable waste process business. The venture will be expedited as a strategic project. This research aims to estimate the financial feasibility of a selected solution as well as the impact of non-financial considerations thereof. The financial feasibility is analysed using metrics such as Payback period; internal rate of return and net present value.Keywords: waste, printing industry, up-cycling, management
Procedia PDF Downloads 2621811 Study on Effectiveness of Strategies to Re-Establish Landscape Connectivity of Expressways with Reference to Southern Expressway Sri Lanka
Authors: N. G. I. Aroshana, S. Edirisooriya
Abstract:
Construction of highway is the most emerging development tendency in Sri Lanka. With these development activities, there are a lot of environmental and social issues started. Landscape fragmentation is one of the main issues that highly effect to the environment by the construction of expressways. Sri Lankan expressway system getting effort to treat fragmented landscape by using highway crossing structures. This paper designates, a highway post construction landscape study on the effectiveness of the landscape connectivity structures to restore connectivity. Geographic Information Systems (GIS), least cost path tool has been used in the selected two plots; 25km alone the expressway to identify animal crossing paths. Animal accident data use as measure for determining the most contributed plot for landscape connectivity. Number of patches, Mean patch size, Class area use as a parameter to determine the most effective land use class to reestablish the landscape connectivity. The findings of the research express scrub, grass and marsh were the most positively affected land use typologies for increase the landscape connectivity. It represents the growth increased by 8% within the 12 years of time. From the least cost analysis within the plot one, 28.5% of total animal crossing structures are within the high resistance land use classes. Southern expressway used reinforced compressed earth technologies for construction. It has been controlled the growth of the climax community. According to all findings, it could assume that involvement of the landscape crossing structures contributes to re-establish connectivity, but it is not enough to restore the majority of disturbance performed by the expressway. Connectivity measures used within the study can use as a tool for re-evaluate future involvement of highway crossing structures. Proper placement of the highway crossing structures leads to increase the rate of connectivity. The study recommends that monitoring the all stages (preconstruction, construction and post construction) of the project and preliminary design, and the involvement of the research applied connectivity assessment strategies helps to overcome the complication regarding the re-establishment of landscape connectivity using the highway crossing structures that facilitate the growth of flora and fauna.Keywords: landscape fragmentation, least cost path, land use analysis, landscape connectivity structures
Procedia PDF Downloads 1491810 Impact of Risk Management Practices on Company Performance
Authors: Syed Atif Ali, Farzan Yahya
Abstract:
This research paper covers the issue of risk management impact on the company performance. Degree of financial leverage (DFL), degree of operating leverage (DOL) and the working capital ratio (WCR) are taken as independent variables which are the representative of risk and the earning price per share (EPS), return on assets (ROA), return on equity (ROE), Sales and Net profits which are the representative of performance. Last 10 years (2004-2013) of Cement sector of Pakistan data is chosen as sample for analyze their relations by multiple regression technique. Through analyses, it is found that WCR impact adequately on the company performance because if company has enough liquidity than it perform its operations smoothly and enhance its performance very well. DFL should be control moderately because enough DFL leads performance of company downward. On the other hand, the DOL should be less because it causes the less profitability for a company from its operations.Keywords: degree of financial leverage (DFL), degree of operating leverage (DOL), working capital ratio (WCR), earning per share (EPS), return on equity (ROE), return on assets (ROA)
Procedia PDF Downloads 4531809 Public-Private Partnership Transportation Projects: An Exploratory Study in the US
Authors: Medya Fathi
Abstract:
When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, known as Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output's list are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient PPP research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results and conclusions will be provided. This study can assist practitioners in applying PPP for transportation projects by showing its ability to save time and/or cost.Keywords: cost, delivery method, highway, public-private partnership, schedule, transportation
Procedia PDF Downloads 1761808 Study on Clarification of the Core Technology in a Monozukuri Company
Authors: Nishiyama Toshiaki, Tadayuki Kyountani, Nguyen Huu Phuc, Shigeyuki Haruyama, Oke Oktavianty
Abstract:
It is important to clarify the company’s core technology in product development process to strengthen their power in providing technology that meets the customer requirement. QFD method is adopted to clarify the core technology through identifying the high element technologies that are related to the voice of customer, and offer the most delightful features for customer. AHP is used to determine the importance of evaluating factors. A case study was conducted by using this approach in Japan’s Monozukuri Company (so called manufacturing company) to clarify their core technology based on customer requirements.Keywords: core technology, QFD, voices of customer, analysis procedure
Procedia PDF Downloads 3841807 Corporate Social Responsibility vs Corporate Social Reactivity: An Exploration of Corporate Social Responsibility Planning in a Multinational Oil and Gas in Indonesia
Authors: Endang Ghani Ashfiya
Abstract:
This study explores corporate social responsibility (CSR) planning in a downstream business of multinational oil and gas company in Indonesia from managerial perspectives. The institutional logic is employed in this research to gain a comprehensive understanding of the way the MNC manages the socio-cultural aspects in the host countries, especially in the process of translation and adaptation of the company’s CSR global guidelines. The interviews are conducted with fifteen managers in that company, both at the top managerial level and operational level. In the beginning, this research explains the Indonesian society’s conception of CSR from the managerial standpoints. The society’s understanding of the CSR concept becomes the fundamental foundations of the company in developing CSR programs. This study found the company’s approach to its CSR in two ways. First, proactive CSR which reflects the global CSR guidelines. Second, reactive CSR which do not show any explicit relations to the global guidelines, but conform with society’s demands. The findings stimulate discussions regarding the power of an MNC vis-à-vis the socio-cultural implication in society’s demand for CSR.Keywords: corporate social responsibility planning, Indonesia, institutional logic, multinational company, oil and gas company, socio-cultural aspects
Procedia PDF Downloads 1521806 Corporate Culture and Subcultures: Corporate Culture Analysis in a Company without a Public Relations Department
Authors: Sibel Kurt
Abstract:
In this study, with the use of Goffee and Jones’s corporate culture classification and the scale of this classification, there aimed to analyze a company’s corporate culture which does not have a public relations or communication department. First of all, the type of corporate culture in the company had been determined. Then it questioned if there are subcultures which formed according to demographics or the department of work. In the survey questionnaire, there are 53 questions total. 6 of these questions are about demographics, and 47 of them are about corporate culture. 152 personnel of the company had answered the survey, and the data have been evaluated according to frequency, descriptive, and compare means tests. The type of corporate culture of the company was determined as the 'communal' from the typology of Goffee and Jones in the positive form. There are no subcultures in the company which bases on the demographics, but only one subculture has determined according to the department of work. As a result, the absence of public relations department, personnel’s low level of awareness about corporate culture, and the lack of information between management and employees has been revealed.Keywords: corporate culture, subculture, public relations, organizational communication
Procedia PDF Downloads 1661805 Violence and Aggression of Women in Native Canada: A Postcolonial Feminist Study of The Rez Sisters and Rose by Tomson Highway
Authors: Sonia Sharma
Abstract:
In a multicultural country like Canada, Colonialism is still maintained in the form of Violence and Oppression. The Aboriginals are persistently facing Oppression and Marginalization in their own land owing to Colonial presence. Women in particular are getting most affected. They are facing double burden of patriarchy and their being Native. Tomson Highway, the Cree Canadian playwright has deftly exposed the theme of women violence and empowerment. In his plays (The Rez Sisters and Rose) taken from his Rez Septology, he has depicted Aboriginal women’s predicaments and sufferings. But simultaneously also talks about their empowerment and aggression refuting and fighting back to patriarchy and oppression. The Rez Sisters portrays women with shattering images and as a victim of both the male dominating society and the system. It represents the painful odyssey of the seven women facing several hardships. Rose represents women in entirely different light. They are shown more assertive and empowered raising their voice against the Violence and Discrimination meted out to them. The Aboriginal women in Canada are facing dual burden of Colonialism and Patriarchy which indeed is a Colonial construct. This paper is an attempt to explore the above facets Tomson Highway’s The Rez Sisters and Rose.Keywords: violence, racism, discrimination, postcolonialism feminism
Procedia PDF Downloads 6271804 Life Cycle Carbon Dioxide Emissions from the Construction Phase of Highway Sector in China
Authors: Yuanyuan Liu, Yuanqing Wang, Di Li
Abstract:
Carbon dioxide (CO2) emissions mitigation from road construction activities is one of the potential pathways to deal with climate change due to its higher use of materials, machinery energy consumption, and high quantity of vehicle and equipment fuels for transportation and on-site construction activities. Aiming to assess the environmental impact of the road infrastructure construction activities and to identify hotspots of emissions sources, this study developed a life-cycle CO2 emissions assessment framework covering three stages of material production, to-site and on-site transportation under the guidance of the principle of LCA ISO14040. Then streamlined inventory analysis on sub-processes of each stage was conducted based on the budget files from cases of highway projects in China. The calculation results were normalized into functional unit represented as ton per km per lane. Then a comparison between the amount of emissions from each stage, and sub-process was made to identify the major contributor in the whole highway lifecycle. In addition, the calculating results were used to be compared with results in other countries for understanding the level of CO2 emissions associated with Chinese road infrastructure in the world. The results showed that materials production stage produces the most of the CO2 emissions (for more than 80%), and the production of cement and steel accounts for large quantities of carbon emissions. Life cycle CO2 emissions of fuel and electric energy associated with to-site and on-site transportation vehicle and equipment are a minor component of total life cycle CO2 emissions from highway project construction activities. Bridges and tunnels are dominant large carbon contributor compared to the road segments. The life cycle CO2 emissions of road segment in highway project in China are slightly higher than the estimation results of highways in European countries and USA, about 1500 ton per km per lane. In particularly, the life cycle CO2 emissions of road pavement in majority cities all over the world are about 500 ton per km per lane. However, there is obvious difference between the cities when the estimation on life cycle CO2 emissions of highway projects included bridge and tunnel. The findings of the study could offer decision makers a more comprehensive reference to understand the contribution of road infrastructure to climate change, especially understand the contribution from road infrastructure construction activities in China. In addition, the identified hotspots of emissions sources provide the insights of how to reduce road carbon emissions for development of sustainable transportation.Keywords: carbon dioxide emissions, construction activities, highway, life cycle assessment
Procedia PDF Downloads 2691803 Measurement of Intellectual Capital in an Algerian Company
Authors: S. Brahmi, S. Aitouche, M. D. Mouss
Abstract:
Every modern company should measure the value of its intellectual capital and to report to complement the traditional annual balance sheets. The purpose of this work is to measure the intellectual capital in an Algerian company (or production system) using the Weightless Wealth Tool Kit (WWTK). The results of the measurement of intellectual capital are supplemented by traditional financial ratios. The measurement was applied to the National Company of Wells Services (ENSP) in Hassi Messaoud city, in the south of Algeria. We calculated the intellectual capital (intangible resources) of the ENSP to help the organization to better capitalize on its potential of workers and their know-how. The intangible value of the ENSP is evaluated at 16,936,173,345 DA in 2015.Keywords: financial valuation, intangible capital, intellectual capital, intellectual capital measurement
Procedia PDF Downloads 286