Search results for: contract
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 349

Search results for: contract

229 The Marriage of a Sui Juris Girl: Permission of Wali (Guardian) or Consent of Ward in the Context of Personal Law in Pakistan

Authors: Muhammad Farooq

Abstract:

The present article explores the woman's consent as a paramount element in contracting a Muslim marriage. Also, whether permission of the wali (guardian) is a condition per se for a valid nikah (marriage deed) in the eye of law and Sharia. The researcher attempts to treat it through the related issues, inter alia; the marriage guardian, the women's legal capacity to give consent whether she is a virgin or nonvirgin and how that consent is to be given or may be understood. Does her laugh, tears or salience needs a legal interpretation as well as other female manifestations of emotion explained by the Muslim jurists? The silence of Muslim Family Law Ordinance 1961 (hereafter; MFLO 1961) in this regard and the likely reasons behind such silence is also inquired in brief. Germane to the theme, the various cases in which the true notion of woman's consent is interpreted by courts in Pakistan are also examined. In order to address the issue in hand, it is proposed to provide a brief overview of a few contemporary writers' opinions in which the real place of woman's consent in Muslim marriage is highlighted. Key to the idea of young Muslim woman's marriage, the doctrine of kafa'a (equality or suitability) between the man and woman is argued here to be grounded in the patriarchal and social norms. It is, therefore, concluded that such concept was the result of analogical reasoning and has less importance in the present time. As such it is not a valid factor in current scenarios to validate or invalidate marital bonds. A standard qualitative convention is used for this research. Among primary and secondary sources; for examples, Qur'an, Sunnah, Books, Scholarly articles, texts of law and case law is used to point out the researcher's view. In summation, the article is concluded with a bold statement that a young woman being a party to the contract, is absolutely entitled to 'full and free' consent for the Muslim marriage contract. It is the woman, an indispensable partaker and her consent (not the guardian' permission) that does validate or invalidate the said agreement in the eye of contemporary personal law and in Sharia.

Keywords: consent of woman, ejab (declaration), Nikah (marriage agreement), qabol (acceptance), sui juris (of age; independent), wali (guardian), wilayah (guardianship)

Procedia PDF Downloads 116
228 A Survey on Important Factors of the Ethereum Network Performance

Authors: Ali Mohammad Mobaser Azad, Alireza Akhlaghinia

Abstract:

Blockchain is changing our world and launching a new generation of decentralized networks. Meanwhile, Blockchain-based networks like Ethereum have been created and they will facilitate these processes using tools like smart contracts. The Ethereum has fundamental structures, each of which affects the activity of the nodes. Our purpose in this paper is to review similar research and examine various components to demonstrate the performance of the Ethereum network and to do this, and we used the data published by the Ethereum Foundation in different time spots to examine the number of changes that determine the status of network performance. This will help other researchers understand better Ethereum in different situations.

Keywords: blockchain, ethereum, smart contract, decentralization consensus algorithm

Procedia PDF Downloads 175
227 Identifying the Determinants of the Shariah Non-Compliance Risk via Principal Axis Factoring

Authors: Muhammad Arzim Naim, Saiful Azhar Rosly, Mohamad Sahari Nordin

Abstract:

The objective of this study is to investigate the factors affecting the rise of Shariah non-compliance risk that can bring Islamic banks to succumb to monetary loss. Prior literatures have never analyzed such risk in details despite lots of it arguing on the validity of some Shariah compliance products. The Shariah non-compliance risk in this context is looking to the potentially failure of the facility to stand from the court test say that if the banks bring it to the court for compensation from the defaulted clients. The risk may also arise if the customers refuse to make the financing payments on the grounds of the validity of the contracts, for example, when relinquishing critical requirement of Islamic contract such as ownership, the risk that may lead the banks to suffer loss when the customer invalidate the contract through the court. The impact of Shariah non-compliance risk to Islamic banks is similar to that of legal risks faced by the conventional banks. Both resulted into monetary losses to the banks respectively. In conventional banking environment, losses can be in the forms of summons paid to the customers if they won the case. In banking environment, this normally can be in very huge amount. However, it is right to mention that for Islamic banks, the subsequent impact to them can be rigorously big because it will affect their reputation. If the customers do not perceive them to be Shariah compliant, they will take their money and bank it in other places. This paper provides new insights of risks faced by credit intensive Islamic banks by providing a new extension of knowledge with regards to the Shariah non-compliance risk by identifying its individual components that directly affecting the risk together with empirical evidences. Not limited to the Islamic banking fraternities, the regulators and policy makers should be able to use findings in this paper to evaluate the components of the Shariah non-compliance risk and make the necessary actions. The paper is written based on Malaysia’s Islamic banking practices which may not directly related to other jurisdictions. Even though the focuses of this study is directly towards to the Bay Bithaman Ajil or popularly known as BBA (i.e. sale with deferred payments) financing modality, the result from this study may be applicable to other Islamic financing vehicles.

Keywords: Islamic banking, Islamic finance, Shariah Non-compliance risk, Bay Bithaman Ajil (BBA), principal axis factoring

Procedia PDF Downloads 272
226 A Comparative Study of Insurance Policies Worldwide in Public Private Partnerships

Authors: Guanqun Shi, Xueqing Zhang

Abstract:

The frequent occurrence of failures in PPP projects which caused great loss has raised attention from the government as well as the concessionaire. PPPs are complex arrangements for its long operation period and multiple players. Many types of risks in PPP projects may cause the project fail. The insurance is an important tool to transfer the risks. Through a comparison and analysis of international government PPP guidelines and contracts as well as the case studies worldwide, we have identified eight main insurance principles, discussed thirteen insurance types in different stages. An overall procedure would be established to improve the practices in PPP projects.

Keywords: public private partnerships, insurance, contract, risk

Procedia PDF Downloads 248
225 Management of the Experts in the Research Evaluation System of the University: Based on National Research University Higher School of Economics Example

Authors: Alena Nesterenko, Svetlana Petrikova

Abstract:

Research evaluation is one of the most important elements of self-regulation and development of researchers as it is impartial and independent process of assessment. The method of expert evaluations as a scientific instrument solving complicated non-formalized problems is firstly a scientifically sound way to conduct the assessment which maximum effectiveness of work at every step and secondly the usage of quantitative methods for evaluation, assessment of expert opinion and collective processing of the results. These two features distinguish the method of expert evaluations from long-known expertise widespread in many areas of knowledge. Different typical problems require different types of expert evaluations methods. Several issues which arise with these methods are experts’ selection, management of assessment procedure, proceeding of the results and remuneration for the experts. To address these issues an on-line system was created with the primary purpose of development of a versatile application for many workgroups with matching approaches to scientific work management. Online documentation assessment and statistics system allows: - To realize within one platform independent activities of different workgroups (e.g. expert officers, managers). - To establish different workspaces for corresponding workgroups where custom users database can be created according to particular needs. - To form for each workgroup required output documents. - To configure information gathering for each workgroup (forms of assessment, tests, inventories). - To create and operate personal databases of remote users. - To set up automatic notification through e-mail. The next stage is development of quantitative and qualitative criteria to form a database of experts. The inventory was made so that the experts may not only submit their personal data, place of work and scientific degree but also keywords according to their expertise, academic interests, ORCID, Researcher ID, SPIN-code RSCI, Scopus AuthorID, knowledge of languages, primary scientific publications. For each project, competition assessments are processed in accordance to ordering party demands in forms of apprised inventories, commentaries (50-250 characters) and overall review (1500 characters) in which expert states the absence of conflict of interest. Evaluation is conducted as follows: as applications are added to database expert officer selects experts, generally, two persons per application. Experts are selected according to the keywords; this method proved to be good unlike the OECD classifier. The last stage: the choice of the experts is approved by the supervisor, the e-mails are sent to the experts with invitation to assess the project. An expert supervisor is controlling experts writing reports for all formalities to be in place (time-frame, propriety, correspondence). If the difference in assessment exceeds four points, the third evaluation is appointed. As the expert finishes work on his expert opinion, system shows contract marked ‘new’, managers commence with the contract and the expert gets e-mail that the contract is formed and ready to be signed. All formalities are concluded and the expert gets remuneration for his work. The specificity of interaction of the examination officer with other experts will be presented in the report.

Keywords: expertise, management of research evaluation, method of expert evaluations, research evaluation

Procedia PDF Downloads 180
224 Improving the Constructability of Highway Design Plans

Authors: R. Edward Minchin Jr.

Abstract:

The U.S. Federal Highway Administration (FHWA) Every Day Counts Program (EDC) has resulted in state DOTs putting evermore emphasis on speeding up the delivery of highway and bridge construction projects for use by the driving public. This has resulted in an increase in the use of alternative construction delivery systems such as design-build (D-B), construction manager at-risk (CMR) or construction manager/general contractor (CM/GC), and adding alternative technical concepts (ATCs) to traditional design-bid-build (DBB) contracts. ATCs have exhibited great potential for delivering substantial benefits like cost savings, increased constructability, and quicker project delivery. Previous research has found that knowledge of project constructability was lacking in state Department of Transportation (DOT) planning, programming, and environmental staffs. Many agencies have therefore relied on a set of ‘acceptable’ design solutions over the years of working with their local resource agencies. The result is that the permitting process for several government agencies has become increasingly restrictive with the result that the DOTs and their industry partners lose the ability to innovate after a permit is approved. The intent of this paper is to report on the research team’s progress in this ongoing effort furnish the United States government with a uniform set of guidelines for the application of constructability reviews during all phases of project development and delivery. The research uses surveys and interviews to determine which states have implemented formal programs to ensure that the constructor is furnished with a set of contract documents that affords said constructor with the best possible opportunity to successfully construct the project with the highest quality standards, within the contract duration and without exceeding the construction budget. Once these states are identified, workshops are held all over the nation, resulting in the team learning the best current practices and giving the team the ability to recommend new practices that will improve the process. The plan is for the FHWA to encourage or require state DOTs to use these practices on all federally funded highway and bridge construction projects. The project deliverable is a Guidebook for FHWA to use in disseminating the recommended practices to the states.

Keywords: alternative construction delivery, alternative technical concepts, constructability, construction design plans

Procedia PDF Downloads 169
223 A Lightweight Blockchain: Enhancing Internet of Things Driven Smart Buildings Scalability and Access Control Using Intelligent Direct Acyclic Graph Architecture and Smart Contracts

Authors: Syed Irfan Raza Naqvi, Zheng Jiangbin, Ahmad Moshin, Pervez Akhter

Abstract:

Currently, the IoT system depends on a centralized client-servant architecture that causes various scalability and privacy vulnerabilities. Distributed ledger technology (DLT) introduces a set of opportunities for the IoT, which leads to practical ideas for existing components at all levels of existing architectures. Blockchain Technology (BCT) appears to be one approach to solving several IoT problems, like Bitcoin (BTC) and Ethereum, which offer multiple possibilities. Besides, IoTs are resource-constrained devices with insufficient capacity and computational overhead to process blockchain consensus mechanisms; the traditional BCT existing challenge for IoTs is poor scalability, energy efficiency, and transaction fees. IOTA is a distributed ledger based on Direct Acyclic Graph (DAG) that ensures M2M micro-transactions are free of charge. IOTA has the potential to address existing IoT-related difficulties such as infrastructure scalability, privacy and access control mechanisms. We proposed an architecture, SLDBI: A Scalable, lightweight DAG-based Blockchain Design for Intelligent IoT Systems, which adapts the DAG base Tangle and implements a lightweight message data model to address the IoT limitations. It enables the smooth integration of new IoT devices into a variety of apps. SLDBI enables comprehensive access control, energy efficiency, and scalability in IoT ecosystems by utilizing the Masked Authentication Message (MAM) protocol and the IOTA Smart Contract Protocol (ISCP). Furthermore, we suggest proof-of-work (PoW) computation on the full node in an energy-efficient way. Experiments have been carried out to show the capability of a tangle to achieve better scalability while maintaining energy efficiency. The findings show user access control management at granularity levels and ensure scale up to massive networks with thousands of IoT nodes, such as Smart Connected Buildings (SCBDs).

Keywords: blockchain, IOT, direct acyclic graphy, scalability, access control, architecture, smart contract, smart connected buildings

Procedia PDF Downloads 80
222 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 69
221 A Study of Blockchain Oracles

Authors: Abdeljalil Beniiche

Abstract:

The limitation with smart contracts is that they cannot access external data that might be required to control the execution of business logic. Oracles can be used to provide external data to smart contracts. An oracle is an interface that delivers data from external data outside the blockchain to a smart contract to consume. Oracle can deliver different types of data depending on the industry and requirements. In this paper, we study and describe the widely used blockchain oracles. Then, we elaborate on his potential role, technical architecture, and design patterns. Finally, we discuss the human oracle and its key role in solving the truth problem by reaching a consensus about a certain inquiry and tasks.

Keywords: blockchain, oracles, oracles design, human oracles

Procedia PDF Downloads 81
220 Execution of Joinery in Large Scale Projects: Middle East Region as a Case Study

Authors: Arsany Philip Fawzy

Abstract:

This study is going to address the hurdles of project management in the joinery field. It is widely divided into two sections; the first one will shed light on how to execute large-scale projects with a specific focus on the middle east region. It will also raise major obstacles that may face the joinery team from the site clearance and the coordination between the joinery team and the construction team. The second section is going to technically analyze the commercial side of the joinery and how to control the main cost of the project to avoid financial problems. It will also suggest empirical solutions to monitor the cost impact (e.g., Variation of contract quantity and claims).

Keywords: clearance, quality, cost, variation, claim

Procedia PDF Downloads 65
219 Surrogacy in India: Emerging Business or Disguised Human Trafficking

Authors: Priya Sepaha

Abstract:

Commercial Surrogacy refers to a contract in which a woman carries a pregnancy for intended parents. There are two types of surrogacy; first, Traditional Surrogacy, in which, sperm of the donor or father is artificially inseminated in the women and carries the fetus till birth. Second, Gestational Surrogacy, in which the egg and sperm of the intended parent are collected for artificial fertilization through In Vitro Fertilization (IVF) technique and after the embryo formation, it is transferred into the womb of a surrogate mother with the help of Assisted Reproductive Technique. Surrogacy has become so widespread in India that it has now been nicknamed the "rent-a-womb" capital of the world due to relatively low cost and lack of stringent regulatory legalisation. The legal aspects surrounding surrogacy are complex, diverse and mostly unsettled. Although this appears to be beneficial for the parties concerned, there are certain sensitive issues which need to be addressed to ensure ample protection to all stakeholders. Commercial surrogacy is an emerging business and a new means of human trafficking particularly in India. Poor and illiterate women are often lured in such deals by their spouse or broker for earning easy money. Traffickers also use force, fraud, or coercion at times to intimidate the probable surrogate mothers. A major chunk of money received from covert surrogacy agreement is taken away by the brokers. The Law Commission of India has specifically reviewed the issue as India is emerging as a major global surrogacy destination. The Supreme Court of India held in the Manji's case in 2008, that commercial surrogacy can be permitted with certain restrictions but had directed the Legislature to pass an appropriate Law for governing Surrogacy in India. The draft Assisted Reproductive Technique (ART) Bill, 2010 is still pending for approval. At present, the Surrogacy Contract between the parties and the ART Clinics Guidelines are perhaps the only guiding force. The Immoral Trafficking Prevention Act (ITPA), 1956 and Sections 366(A) and 372 of the Indian Penal Code, 1860 are perhaps the only existing laws, which deal with human trafficking. Yet, none of these provisions specifically deal with the serious issue of trafficking for the purpose of Commercial Surrogacy. India remains one of the few countries that still allow commercial surrogacy. International Surrogacy involves bilateral issues, where the laws of both the nations have to be at par in order to ensure that the concerns and interests of parties involved get amicably resolved. There is urgent need to pass a comprehensive law by incorporating the latest developments in this field in order to make it ethical on the one hand and to curb disguised human trafficking on the other.

Keywords: business, human trafficking, legal, surrogacy

Procedia PDF Downloads 315
218 Risk Identification of Investment Feasibility in Indonesia’s Toll Road Infrastructure Investment

Authors: Christo Februanto Putra

Abstract:

This paper presents risk identification that affects investment feasibility on toll road infrastructure in Indonesia using qualitative methods survey based on the expert practitioner in investor, contractor, and state officials. The problems on infrastructure investment in Indonesia, especially on KPBU model contract, is many risk factors in the investment plan is not calculated in detail thoroughly. Risk factor is a value used to provide an overview of the risk level assessment of an event which is a function of the probability of the occurrence and the consequences of the risks that arise. As results of the survey which is to show which risk factors impacts directly to the investment feasibility and rank them by their impacts on the investment.

Keywords: risk identification, indonesia toll road, investment feasibility

Procedia PDF Downloads 244
217 A Case Study of the Influence of the Covid-19 pandemic on Racial and Ethnic Gaps in Behavioral Health Care Access

Authors: Shantol McIntosh

Abstract:

Due to environmental and underlying health disparities, the COVID-19 pandemic has caused an added set of economic implications worldwide. Black and Hispanic individuals are more susceptible to contract COVID-19, and if they do, they are more likely to have a severe case that necessitates hospitalization or results in death (Altarum et al., 2020). The literature shows that disparities in health and health treatment are nothing new as they have been recorded for decades and indicate systemic and structural imbalances rooted in racism and discrimination. The purpose of this study is to determine the frequency with which these populations have access to healthcare and treatment. The study will also highlight the key drivers of health disparities. Findings and implications for research and policy will be discussed.

Keywords: COVID-19, racial and ethnic disparities, discrimination, policy

Procedia PDF Downloads 154
216 A Review of the Major Factors of Cost Overrun in Construction Projects

Authors: Hassan Abdelgadir

Abstract:

Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.

Keywords: construction projects, cost overruns, construction company, factors effect costoverruns

Procedia PDF Downloads 38
215 Research on Coordination Strategies for Coordinating Supply Chain Based on Auction Mechanisms

Authors: Changtong Wang, Lingyun Wei

Abstract:

The combination of auctions and supply chains is of great significance in improving the supply chain management system and enhancing the efficiency of economic and social operations. To address the gap in research on supply chain strategies under the auction mechanism, a model is developed for the 1-N auction model in a complete information environment, and it is concluded that the two-part contract auction model for retailers in this model can achieve supply chain coordination. The model is validated by substituting the model into the scenario of a fresh-cut flower industry flower auction in exchange for arithmetic examples to further prove the validity of the conclusions.

Keywords: auction mechanism, supply chain coordination strategy, fresh cut flowers industry, supply chain management

Procedia PDF Downloads 81
214 Uncertainty in Risk Modeling

Authors: Mueller Jann, Hoffmann Christian Hugo

Abstract:

Conventional quantitative risk management in banking is a risk factor of its own, because it rests on assumptions such as independence and availability of data which do not hold when rare events of extreme consequences are involved. There is a growing recognition of the need for alternative risk measures that do not make these assumptions. We propose a novel method for modeling the risk associated with investment products, in particular derivatives, by using a formal language for specifying financial contracts. Expressions in this language are interpreted in the category of values annotated with (a formal representation of) uncertainty. The choice of uncertainty formalism thus becomes a parameter of the model, so it can be adapted to the particular application and it is not constrained to classical probabilities. We demonstrate our approach using a simple logic-based uncertainty model and a case study in which we assess the risk of counter party default in a portfolio of collateralized loans.

Keywords: risk model, uncertainty monad, derivatives, contract algebra

Procedia PDF Downloads 543
213 Evaluation and Strategic Development of IT in Accounting in Turkey

Authors: Eda Kocakaya, Sebahat Seker, Dogan Argun

Abstract:

The aim of this study is to determine the process of information technologies and the connections between concepts in accounting management services in Turkey. The objective of this study is to determine the adaptation and evaluation process of information technologies and the connections between concepts and differences in accounting management services in Turkey. The situation and determination of the IT applications of Accounting Management were studied. The applications of • Billing • Order Processing • Accounts Receivable/Payable Management • Contract Management • Bank Account Management Were discussed in this study. The IT applications were demonstrated and realized in actual accounting services. The sectoral representative's companies were selected, and the IT application was searched by bibliometric analysis.

Keywords: management, accounting, information technologies, adaptation

Procedia PDF Downloads 282
212 Evaluation and Selection of Construction Contractors by Polish Public Clients

Authors: Kozik Renata, Leśniak Agnieszka, Plebankiewicz Edyta

Abstract:

Contracting authorities in the public sector are obligated to apply the principles provided for in the Polish law for the evaluation and selection of contractors. To analyze the methods of contractors, applied in practice by public clients, the notices of contract award results for construction works were analyzed. The analysis shows that the procedure selected more and more often is open to competitive bidding, where the assessment of the competence of contractors is not very precise, as well as non-competitive bidding, i.e. single source procurement. The share of procurement procedures, where the only criterion is price, is increasing. The solution to the problems existing here might be the introduction of one of the forms of pre-selection of contractors. The article also briefly discusses verification systems for companies applying for public contracts used in EU countries.

Keywords: certification, contractors selection, open tendering, public investors

Procedia PDF Downloads 256
211 Application of Ontologies to Contract for Difference Documents

Authors: Renato Figueira Franco

Abstract:

This paper aims to create a representational information system applied to the securities market, particularly the development of an ontology applied to the analysis of the Key Information Documents of Contracts for Difference. The process of obtaining knowledge and its proper formal representation has raised the attention both from the scientific literature and the capital markets supervisory authorities. The formal knowledge representation is embodied in the construction of ontologies, which are responsible for defining a knowledge base structure of a given scientific domain, facilitating its understanding, and allowing its sharing among the scientific community. The scope of this study is restricted to the analysis of capital markets ontologies in order to capture its structure, semantics and knowledge sharing between people and systems.

Keywords: ontology, financial markets, CFD, PRIIPs, key information documents

Procedia PDF Downloads 34
210 A Decentralized Application for Secure Data Handling of Wireless Networks Using Ethereum Smart Contracts

Authors: Midhun Xavier

Abstract:

This paper introduces a method to verify multi-agent systems in industrial control systems using blockchain technology. The proposed solution enables to record and verify each process that occurs while generating a customized product using Ethereum-based smart contracts. Node-Red software agents are developed with the help of semantic web technologies, and these software agents interact with IEC 61499 function blocks to execute the processes. The agent associated with each mechatronic component and its controller can communicate with the blockchain to record various events that occur during each process, and the latter smart contract helps to verify these process orders of the customized product.

Keywords: blockchain, Ethereum, node-red, IEC 61499, multi-agent system, MQTT

Procedia PDF Downloads 60
209 Brazilian Transmission System Efficient Contracting: Regulatory Impact Analysis of Economic Incentives

Authors: Thelma Maria Melo Pinheiro, Guilherme Raposo Diniz Vieira, Sidney Matos da Silva, Leonardo Mendonça de Oliveira Queiroz, Mateus Sousa Pinheiro, Danyllo Wenceslau de Oliveira Lopes

Abstract:

The present article has the objective to describe the regulatory impact analysis (RIA) of the contracting efficiency of the Brazilian transmission system usage. This contracting is made by users connected to the main transmission network and is used to guide necessary investments to supply the electrical energy demand. Therefore, an inefficient contracting of this energy amount distorts the real need for grid capacity, affecting the sector planning accuracy and resources optimization. In order to provide this efficiency, the Brazilian Electricity Regulatory Agency (ANEEL) homologated the Normative Resolution (NR) No. 666, from July 23th of 2015, which consolidated the procedures for the contracting of transmission system usage and the contracting efficiency verification. Aiming for a more efficient and rational transmission system contracting, the resolution established economic incentives denominated as Inefficiency installment for excess (IIE) and inefficiency installment for over-contracting (IIOC). The first one, IIE, is verified when the contracted demand exceeds the established regulatory limit; it is applied to consumer units, generators, and distribution companies. The second one, IIOC, is verified when the distributors over-contract their demand. Thus, the establishment of the inefficiency installments IIE and IIOC intends to avoid the agent contract less energy than necessary or more than it is needed. Knowing that RIA evaluates a regulatory intervention to verify if its goals were achieved, the results from the application of the above-mentioned normative resolution to the Brazilian transmission sector were analyzed through indicators that were created for this RIA to evaluate the contracting efficiency transmission system usage, using real data from before and after the homologation of the normative resolution in 2015. For this, indicators were used as the efficiency contracting indicator (ECI), excess of demand indicator (EDI), and over-contracting of demand indicator (ODI). The results demonstrated, through the ECI analysis, a decrease of the contracting efficiency, a behaviour that was happening even before the normative resolution of 2015. On the other side, the EDI showed a considerable decrease in the amount of excess for the distributors and a small reduction for the generators; moreover, the ODI notable decreased, which optimizes the usage of the transmission installations. Hence, with the complete evaluation from the data and indicators, it was possible to conclude that IIE is a relevant incentive for a more efficient contracting, indicating to the agents that their contracting values are not adequate to keep their service provisions for their users. The IIOC also has its relevance, to the point that it shows to the distributors that their contracting values are overestimated.

Keywords: contracting, electricity regulation, evaluation, regulatory impact analysis, transmission power system

Procedia PDF Downloads 87
208 Modeling and Simulating Productivity Loss Due to Project Changes

Authors: Robert Pellerin, Michel Gamache, Remi Trudeau, Nathalie Perrier

Abstract:

The context of large engineering projects is particularly favorable to the appearance of engineering changes and contractual modifications. These elements are potential causes for claims. In this paper, we investigate one of the critical components of the claim management process: the calculation of the impacts of changes in terms of losses of productivity due to the need to accelerate some project activities. When project changes are initiated, delays can arise. Indeed, project activities are often executed in fast-tracking in an attempt to respect the completion date. But the acceleration of project execution and the resulting rework can entail important costs as well as induce productivity losses. In the past, numerous methods have been proposed to quantify the duration of delays, the gains achieved by project acceleration, and the loss of productivity. The calculation related to those changes can be divided into two categories: direct cost and indirect cost. The direct cost is easily quantifiable as opposed to indirect costs which are rarely taken into account during the calculation of the cost of an engineering change or contract modification despite several research projects have been made on this subject. However, proposed models have not been accepted by companies yet, nor they have been accepted in court. Those models require extensive data and are often seen as too specific to be used for all projects. These techniques are also ignoring the resource constraints and the interdependencies between the causes of delays and the delays themselves. To resolve this issue, this research proposes a simulation model that mimics how major engineering changes or contract modifications are handled in large construction projects. The model replicates the use of overtime in a reactive scheduling mode in order to simulate the loss of productivity present when a project change occurs. Multiple tests were conducted to compare the results of the proposed simulation model with statistical analysis conducted by other researchers. Different scenarios were also conducted in order to determine the impact the number of activities, the time of occurrence of the change, the availability of resources, and the type of project changes on productivity loss. Our results demonstrate that the number of activities in the project is a critical variable influencing the productivity of a project. When changes occur, the presence of a large number of activities leads to a much lower productivity loss than a small number of activities. The speed of reducing productivity for 30-job projects is about 25 percent faster than the reduction speed for 120-job projects. The moment of occurrence of a change also shows a significant impact on productivity. Indeed, the sooner the change occurs, the lower the productivity of the labor force. The availability of resources also impacts the productivity of a project when a change is implemented. There is a higher loss of productivity when the amount of resources is restricted.

Keywords: engineering changes, indirect costs overtime, productivity, scheduling, simulation

Procedia PDF Downloads 216
207 An Agent-Service Oriented Framework for Online Contracts in Virtual Organizations

Authors: Zahra Raeisi, Reza Akbari

Abstract:

Contracting is known as one of the important tasks in virtual organization creation. Contracting is a costly process in terms of time and effort. One way to cut the time and effort is conducting contract electronically. The online contracting enable us to form virtual organization (VO) dynamically. This work presents an agent-service oriented framework for online contracting in virtual organizations. The proposed framework considers the main aspects and steps of traditional contracting process and uses the efficiency of service and agent based methodologies in order to provide a flexible and efficient way to establish contracts electronically in a VO.

Keywords: service oriented architecture, online contracts, agent-oriented architecture, virtual organization

Procedia PDF Downloads 474
206 A Design Framework for an Open Market Platform of Enriched Card-Based Transactional Data for Big Data Analytics and Open Banking

Authors: Trevor Toy, Josef Langerman

Abstract:

Around a quarter of the world’s data is generated by financial with an estimated 708.5 billion global non-cash transactions reached between 2018 and. And with Open Banking still a rapidly developing concept within the financial industry, there is an opportunity to create a secure mechanism for connecting its stakeholders to openly, legitimately and consensually share the data required to enable it. Integration and data sharing of anonymised transactional data are still operated in silos and centralised between the large corporate entities in the ecosystem that have the resources to do so. Smaller fintechs generating data and businesses looking to consume data are largely excluded from the process. Therefore there is a growing demand for accessible transactional data for analytical purposes and also to support the rapid global adoption of Open Banking. The following research has provided a solution framework that aims to provide a secure decentralised marketplace for 1.) data providers to list their transactional data, 2.) data consumers to find and access that data, and 3.) data subjects (the individuals making the transactions that generate the data) to manage and sell the data that relates to themselves. The platform also provides an integrated system for downstream transactional-related data from merchants, enriching the data product available to build a comprehensive view of a data subject’s spending habits. A robust and sustainable data market can be developed by providing a more accessible mechanism for data producers to monetise their data investments and encouraging data subjects to share their data through the same financial incentives. At the centre of the platform is the market mechanism that connects the data providers and their data subjects to the data consumers. This core component of the platform is developed on a decentralised blockchain contract with a market layer that manages transaction, user, pricing, payment, tagging, contract, control, and lineage features that pertain to the user interactions on the platform. One of the platform’s key features is enabling the participation and management of personal data by the individuals from whom the data is being generated. This framework developed a proof-of-concept on the Etheruem blockchain base where an individual can securely manage access to their own personal data and that individual’s identifiable relationship to the card-based transaction data provided by financial institutions. This gives data consumers access to a complete view of transactional spending behaviour in correlation to key demographic information. This platform solution can ultimately support the growth, prosperity, and development of economies, businesses, communities, and individuals by providing accessible and relevant transactional data for big data analytics and open banking.

Keywords: big data markets, open banking, blockchain, personal data management

Procedia PDF Downloads 37
205 The Legal Position of the Sporting Directors in Saudi Football Clubs

Authors: Ammar Alrefaei

Abstract:

Sporting directors in football clubs plays a prominent and important role in managing and controlling many issues related to the affairs of professional players. In view of this great importance of the role of the sporting directors, the Saudi regulation of the professional players and their transfers took over the organization and control of many aspects related to the conditions that must be met by the sporting director and the obligations that fall on his responsibility with the sport club or the Saudi Football Association. However, this regulation does not avoid ambiguity at times and shortcomings at other times in many places, as some of the texts contained in regulation raise many questions, some of which point out to the need to find more comprehensive and accurate treatment than those in the current regulations, accordingly this study comes to shed light on the aspects related to the sporting directors in sport clubs and the development of provisions.

Keywords: professional contract, sporting directors, professional player, labor law

Procedia PDF Downloads 33
204 The Non-Uniqueness of Partial Differential Equations Options Price Valuation Formula for Heston Stochastic Volatility Model

Authors: H. D. Ibrahim, H. C. Chinwenyi, T. Danjuma

Abstract:

An option is defined as a financial contract that provides the holder the right but not the obligation to buy or sell a specified quantity of an underlying asset in the future at a fixed price (called a strike price) on or before the expiration date of the option. This paper examined two approaches for derivation of Partial Differential Equation (PDE) options price valuation formula for the Heston stochastic volatility model. We obtained various PDE option price valuation formulas using the riskless portfolio method and the application of Feynman-Kac theorem respectively. From the results obtained, we see that the two derived PDEs for Heston model are distinct and non-unique. This establishes the fact of incompleteness in the model for option price valuation.

Keywords: Black-Scholes partial differential equations, Ito process, option price valuation, partial differential equations

Procedia PDF Downloads 111
203 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 307
202 Family Succession and Cost of Bank Loans: Evidence from China

Authors: Tzu-Ching Weng, Hsin-Yi Chi

Abstract:

This study examines the effect of family succession on the cost of bank loans and non-price contractual terms. We use a unique dataset from China and find that lending banks are likely to charge high-interest rates and offer tight contractual terms, such as loan maturity and collateral requirement, for family succession firms. These findings indicate that information and default risks may arise after subsequent family successions. We also find that family succession firms can reduce the cost of bank loans by hiring top-tier auditors to enhance financial reporting credibility. This finding suggests that professional and high-quality auditors can provide extremely valuable services to family succession firms.

Keywords: family succession, cost of bank loans, loan contract terms, top-tier auditor

Procedia PDF Downloads 58
201 Jurisdiction Conflicts in Contracts of International Maritime Transport: The Application of the Forum Selection Clause in Brazilian Courts

Authors: Renan Caseiro De Almeida, Mateus Mello Garrute

Abstract:

The world walks to be ever more globalised. This trend promotes an increase on the number of transnational commercial transactions. The main modal for carriage of goods is by sea, and many countries have their economies dependent on the maritime freightage – it could be because they exercise largely this activity or because they follow the tendency of using the maritime logistic widely. Among these ones, Brazil is included. This nation counts with sixteen ports with good capacities, which receive most of the international income by sea. It is estimated that 85 per cent of the total influx of goods in Brazil is by maritime modal, leaving mere 15 per cent for the other ones. This made it necessary to develop maritime law in international and national basis, to create a standard to be applied with the intention to harmonize the transnational carriage of goods by sea. Maritime contracts are very specific and have interesting peculiarities, but in their range, little research has been made on what causes the main divergences when it comes to international contracts: the jurisdiction conflict. Likewise any other international contract, it is common for the parties to set a forum selection clause to choose the forum which will be able to judge the litigations that could rise from a maritime transport contract and, consequently, also which law should be applied to the cases. However, the forum choice in Brazil has always been somewhat polemical – not only in the maritime law sphere - for sometimes national tribunals overlook the parties’ choice and call the competence for themselves. In this sense, it is interesting to mention that the Mexico Convention of 1994 about the law applicable to international contracts did not gain strength in Brazil, nor even reached the Congress to be considered for ratification. Furthermore, it is also noteworthy that Brazil has a new Civil Procedure Code, which was put into reinforcement in 2016 bringing new legal provisions specifically about the forum selection. This represented a mark in the national legal system in this matter. Therefore, this paper intends to give an insight through Brazilian jurisprudence, making an analysis of how this issue has been treated on litigations about maritime contracts in the national tribunals, as well as the solutions found by the Brazilian legal system for the jurisdiction conflicts in those cases. To achieve the expected results, the hypothetical-deductive method will be used in combination with researches on doctrine and legislations. Also, jurisprudential research and case law study will have a special role, since the main point of this paper is to verify and study the position of the courts in Brazil in a specific matter. As a country of civil law, the Brazilian judges and tribunals are very attached to the rules displayed on codes. However, the jurisprudential understanding has been changing during the years and with the advent of the new rules about the applicable law and forum selection clause, it is noticeable that new winds are being blown.

Keywords: applicable law, forum selection clause, international business, international maritime contracts, litigation in courts

Procedia PDF Downloads 245
200 Challenges of Blockchain Applications in the Supply Chain Industry: A Regulatory Perspective

Authors: Pardis Moslemzadeh Tehrani

Abstract:

Due to the emergence of blockchain technology and the benefits of cryptocurrencies, intelligent or smart contracts are gaining traction. Artificial intelligence (AI) is transforming our lives, and it is being embraced by a wide range of sectors. Smart contracts, which are at the heart of blockchains, incorporate AI characteristics. Such contracts are referred to as "smart" contracts because of the underlying technology that allows contracting parties to agree on terms expressed in computer code that defines machine-readable instructions for computers to follow under specific situations. The transmission happens automatically if the conditions are met. Initially utilised for financial transactions, blockchain applications have since expanded to include the financial, insurance, and medical sectors, as well as supply networks. Raw material acquisition by suppliers, design, and fabrication by manufacturers, delivery of final products to consumers, and even post-sales logistics assistance are all part of supply chains. Many issues are linked with managing supply chains from the planning and coordination stages, which can be implemented in a smart contract in a blockchain due to their complexity. Manufacturing delays and limited third-party amounts of product components have raised concerns about the integrity and accountability of supply chains for food and pharmaceutical items. Other concerns include regulatory compliance in multiple jurisdictions and transportation circumstances (for instance, many products must be kept in temperature-controlled environments to ensure their effectiveness). Products are handled by several providers before reaching customers in modern economic systems. Information is sent between suppliers, shippers, distributors, and retailers at every stage of the production and distribution process. Information travels more effectively when individuals are eliminated from the equation. The usage of blockchain technology could be a viable solution to these coordination issues. In blockchains, smart contracts allow for the rapid transmission of production data, logistical data, inventory levels, and sales data. This research investigates the legal and technical advantages and disadvantages of AI-blockchain technology in the supply chain business. It aims to uncover the applicable legal problems and barriers to the use of AI-blockchain technology to supply chains, particularly in the food industry. It also discusses the essential legal and technological issues and impediments to supply chain implementation for stakeholders, as well as methods for overcoming them before releasing the technology to clients. Because there has been little research done on this topic, it is difficult for industrial stakeholders to grasp how blockchain technology could be used in their respective operations. As a result, the focus of this research will be on building advanced and complex contractual terms in supply chain smart contracts on blockchains to cover all unforeseen supply chain challenges.

Keywords: blockchain, supply chain, IoT, smart contract

Procedia PDF Downloads 87