Search results for: construction workers
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4936

Search results for: construction workers

4846 Mode of Suicide and Alcohol Use Pattern among Female Commercial Sex Workers

Authors: G. V. Vaniprabha, S. Madhusudhan, S. G. Jadhav

Abstract:

The purpose of this study was to explore the pattern of alcohol use, mode of suicide and extent of depression among 150 female commercial sex workers (CSWs) in Bangalore, India. After going through a short detoxification programme of two weeks, Karma yoga principles of Shrimad Bhagavad Gita were used as a tool for cognitive behavioural therapy (CBT) for a period of four weeks to maintain abstinence and help with their depression. A six month follow up indicated that they had maintained abstinence over that period and had not attempted suicide, either.

Keywords: alcohol dependence, depression, commercial sex workers, suicide

Procedia PDF Downloads 344
4845 The Link between Migration Status and Occupational Health and Safety of Filipino Migrant Workers in South Korea

Authors: Lito M. Amit, Venecio U. Ultra, Young Woong Song

Abstract:

The purpose of this study was to document the prevalence and types of work-related health and safety problems among Filipino migrant workers and the link between their migration status and occupational health and safety (OHS) problems. We conducted a survey among 116 Filipino migrant workers who were both legal and undocumented. To assess the various forms of occupational health problems, we utilized the Korean occupational stress scale (KOSS), Nordic musculoskeletal questionnaire (NMQ) and a validated health and safety questionnaire. A focus group discussion (FGD) was also conducted to record relevant information that was limited by the questionnaires. Descriptive data were presented in frequency with percentages, mean, and standard deviation. Chi-square tests and logistic regression analyses were performed to estimate the degree of association between variables (p < 0.05). Among the eight subscales of KOSS, inadequate social support (2.48), organizational injustice (2.57), and lack of reward (2.52) were experienced by workers. There was a 44.83% prevalence of musculoskeletal disorders with arm/elbow having the highest rate, followed by shoulder and low back regions. Inadequate social support and discomfort in organizational climate and overall MSDs prevalence showed significant relationships with migration status (p < 0.05). There was a positive association between migration status and seven items under language and communication. A positive association was seen between migration status and some of the OHS problems of Filipino migrant workers in Korea. Undocumented workers in this study were seen to be more vulnerable to those stressors compared to those employed legally.

Keywords: Filipino workers, migration status, occupational health and safety, undocumented workers

Procedia PDF Downloads 107
4844 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.

Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry

Procedia PDF Downloads 151
4843 Prevalence and Occupational Factors Associated with Low Back Pain among the Female Garment Workers: A Cross-Sectional Study in Bangladesh

Authors: Fazle Rabbi, Mashuda Khanom Tithi, Tasnim Mirza, Sanjida Rowshan Anannya, Ahmed Hossain

Abstract:

Background: Low Back Pain (LBP) is one of the common health problems among the garment workers that causes workers absenteeism from the work. The purpose of the study is to identify the association between occupational factors and LBP among the female garment workers in Bangladesh. Materials and Methods: A cross-sectional study was conducted with 487 female garment workers from three compliant garment factories of Bangladesh. Face-to-face interview on four different LBP measures along with questions on socio-demographic, occupational, and physical factors were used to collect the data. Result: The prevalence rates for LBP lasts for at least one day during the last six months, chronic pain, intense pain, and seeking medical care for LBP were found 63.04%, 38.60%, 13.76%, and 18.89%, respectively among the female garments workers. The multivariate logistic regression analysis indicates that duration of employment (>5 years), regular weight bearing and extended weekly working hours (>48 hours) are positively associated with LBP. Besides, age, BMI, family income, marital status and number of children are also found positively associated with the LBP measures. Conclusion: The prevalence of LBP among female garment workers in Bangladesh is found high. The duration of employment (>5 years), regular weight bearing and extended weekly working hours (>48 hours) play a significant role in developing LBP among the female workers. Factories need to consider training programs on the appropriate technique of weight bearing. It is also important to conduct regular screening programs to identify LBP, especially with married, overweight/obese and older age group to reduce the occurrence of LBP.

Keywords: Bangladesh, garment workers, low back pain, occupational health

Procedia PDF Downloads 168
4842 The Influence of an Occupation as a Calling on the Value of Job Security and Its Connection with Wage Levels

Authors: Malul Miki, Rafi Bar-El, Eithan Hourie

Abstract:

In this article, we test the influence of an occupation as a calling on the value of job security and its connection with wage levels. Our sample consists of 495 workers in Israel from 10 occupations in the public sector, who are assumed to have a relatively high level of job security, and the private sector, who are assumed to have less job security or none at all. These 10 occupations are social workers, lecturers, lawyers, administration workers, accountants, high school teachers, bank workers, high-tech worker, nurses and psychologists. Using regression analysis, we find that those who have occupations that the literature has defined as a calling value job security less than those in ordinary employment. In addition, salary level has no effect on this relationship. Finally, those who work in occupations that are regarded as a calling have less status quo bias than those in ordinary employment.

Keywords: calling, loss aversion, job security, status quo bias

Procedia PDF Downloads 78
4841 Fatigue in Association with Road Crashes Among Healthcare Workers in Malaysia

Authors: Sharifah Liew, Azlihanis Abdul Hadi, Nurul Shahida Mohd Saffe, Azhar Hamzah, Maslina Musa

Abstract:

Fatigue is a common health problem among healthcare workers, ranging from ambulance drivers to specialist doctors. In Malaysia, majority of healthcare workers prefer to commute to work by their own vehicle compared to public transport. Thus, exposed to risk on the road while commuting to work. The aim of the study is to find out the effects of fatigue on road crashes among healthcare workers while they commute to work. The research conducted using the semi-quantitative approach based on self- reported questionnaires. In total, five hundred and fifty-one healthcare workers from selected five hospitals were involved in this study. Results showed significant differences between crash involvement, travelling distance and time to and from work among healthcare workers. Most of the participants (37%) reported that causes of road crashes were due to fatigue, sleepiness and microsleep while driving to and back from work. In addition, there were significant differences between fatigue and road crashes and near misses. This research suggests that the hospitals’ management may need to review their staffs’ job scopes and workloads to overcome the fatigue problems and, consider their feedback when designing work schedules and investigate staff commuting distance from home to workplace and vice-versa.

Keywords: fatigue, healthcare, road crashes, near misses, Malaysia

Procedia PDF Downloads 37
4840 Production and Recycling of Construction and Demolition Waste

Authors: Vladimira Vytlacilova

Abstract:

Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.

Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management

Procedia PDF Downloads 272
4839 Die Away Health Workers: The Role of Psychological Factors on Burnout

Authors: Fasanmi Samuel Sunday, Awosusi Omojola

Abstract:

The aim of the present study was to investigate the effect of abusive supervision, interactional justice and supportive workplace supervision burnout among health workers in Makurdi, Benue State, Nigeria. Three hundred and twenty (320) health workers were sampled within Makurdi metropolis, Benue State, Nigeria. Standardized questionnaire on abusive supervision scale, interactional justice scale, supportive workplace supervision scale and employee burnout scale were used in the study. The research was a 2x2x2 factorial design. Four hypotheses were generated and were tested using Analysis of Variance (ANOVA). Scheffe’s post-hoc analysis was used to know the direction of the findings. Results revealed that there was a significant main effect of perceived abusive supervision on employee burnout among health workers. Also, there was a significant main effect of interactional justice on employee burnout among health workers. It was also found out that there was a significant interaction effect of supportive workplace supervision, interactional justice, and abusive supervision on employee burnout among health workers. Results were discussed in line with hypotheses; and recommendations on how to reduce employee burnout were suggested.

Keywords: employee burnout, abusive supervision, interactional justice, supportive workplace supervision

Procedia PDF Downloads 408
4838 Effects of Safety Intervention Program towards Behaviors among Rubber Wood Processing Workers Using Theory of Planned Behavior

Authors: Junjira Mahaboon, Anongnard Boonpak, Nattakarn Worrasan, Busma Kama, Mujalin Saikliang, Siripor Dankachatarn

Abstract:

Rubber wood processing is one of the most important industries in southern Thailand. The process has several safety hazards for example unsafe wood cutting machine guarding, wood dust, noise, and heavy lifting. However, workers’ occupational health and safety measures to promote their behaviors are still limited. This quasi-experimental research was to determine factors affecting workers’ safety behaviors using theory of planned behavior after implementing job safety intervention program. The purposes were to (1) determine factors affecting workers’ behaviors and (2) to evaluate effectiveness of the intervention program. The sample of study was 66 workers from a rubber wood processing factory. Factors in the Theory of Planned Behavior model (TPB) were measured before and after the intervention. The factors of TPB included attitude towards behavior, subjective norm, perceived behavioral control, intention, and behavior. Firstly, Job Safety Analysis (JSA) was conducted and Safety Standard Operation Procedures (SSOP) were established. The questionnaire was also used to collect workers’ characteristics and TPB factors. Then, job safety intervention program to promote workers’ behavior according to SSOP were implemented for a four month period. The program included SSOP training, personal protective equipment use, and safety promotional campaign. After that, the TPB factors were again collected. Paired sample t-test and independent t-test were used to analyze the data. The result revealed that attitude towards behavior and intention increased significantly after the intervention at p<0.05. These factors also significantly determined the workers’ safety behavior according to SSOP at p<0.05. However, subjective norm, and perceived behavioral control were not significantly changed nor related to safety behaviors. In conclusion, attitude towards behavior and workers’ intention should be promoted to encourage workers’ safety behaviors. SSOP intervention program e.g. short meeting, safety training, and promotional campaign should be continuously implemented in a routine basis to improve workers’ behavior.

Keywords: job safety analysis, rubber wood processing workers, safety standard operation procedure, theory of planned behavior

Procedia PDF Downloads 160
4837 Living in the Edge: Crisis in Indian Tea Industry and Social Deprivation of Tea Garden Workers in Dooars Region of India

Authors: Saraswati Kerketta

Abstract:

Tea industry is one of the oldest organised sector of India. It employs roughly 1.5 million people directly. Since the last decade Indian tea industry, especially in the northern region is experiencing worst crisis in the post-independence period. Due to many reason the prices of tea show steady decline. The workers are paid one of the lowest wage in tea industry in the world (1.5$ a day) below the UN's $2 a day for extreme poverty. The workers rely on addition benefits from plantation which includes food, housing and medical facilities. These have been effective means of enslavement of generations of labourers by the owners. There is hardly any change in the tea estates where the owners determine the fate of workers. When the tea garden is abandoned or is closed all the facilities disappear immediately. The workers are the descendants of tribes from central India also known as 'tea tribes'. Alienated from their native place, the geographical and social isolation compounded their vulnerability of these people. The economy of the region being totally dependent on tea has resulted in absolute unemployment for the workers of these tea gardens. With no other livelihood and no land to grow food, thousands of workers faced hunger and starvation. The Plantation Labour Act which ensures the decent working and living condition is violated continuously. The labours are forced to migrate and are also exposed to the risk of human trafficking. Those who are left behind suffers from starvation, malnutrition and disease. The condition in the sick tea plantation is no better. Wage are not paid regularly, subsidised food, fuel are also not supplied properly. Health care facilities are in very bad shape. Objectives: • To study the socio-cultural and demographic characteristics of the tea garden labourers in the study area. • To examine the social situation of workers in sick estates in dooars region. • To assess the magnitude of deprivation the impact of economic crisis on abandoned and closed tea estates in the region. Data Base: The study is based on data collected from field survey. Methods: Quantative: Cross-Tabulation, Regression analysis. Qualitative: Household Survey, Focussed Group Discussion, In-depth interview of key informants. Findings: Purchasing power parity has declined since in last three decades. There has been many fold increase in migration. Males migrates long distance towards central and west and south India. Females and children migrates both long and short distance. No one has reported to migrate back to the place of origin of their ancestors. Migrant males work mostly as construction labourers and as factory workers whereas females and children work as domestic help and construction labourers. In about 37 cases either they haven't contacted their families in last six months or are not traceable. The families with single earning members are more likely to migrate. Burden of disease and the duration of sickness, abandonment and closure of plantation are closely related. Death tolls are likely to rise 1.5 times in sick tea gardens and three times in closed tea estates. Sixty percent of the people are malnourished in the sick tea gardens and more than eighty five per cent in abandoned and sick tea gardens.

Keywords: migration, trafficking, starvation death, tea garden workers

Procedia PDF Downloads 356
4836 Enhancing Construction Project Management through Cognitive Science and Neuroimaging: A Comprehensive Literature Review

Authors: Krishna Kisi, Tulio Sulbaran

Abstract:

This literature review offers valuable insights into integrating cognitive science and neuroimaging with project management practices, presenting a crucial resource for leadership within the construction industry. This paper highlights the significant benefits of applying interdisciplinary approaches to enhance project management effectiveness and project outcomes by exploring the intricate connections between cognitive processes, decision-making, and project management. Key findings emphasize the critical role of cognitive status in determining the performance and project outcomes of construction workers, underlining the necessity for leadership to prioritize cognitive well-being and mental health as central components of project management strategies. The review identifies a gap in current practices, particularly the need for more objective tools for assessing cognitive status within the construction sector, and proposes the adoption of neuroimaging technologies to bridge this gap. The study highlights how integrating cognitive psychology and neuroscience clarifies decision-making processes, aiding leaders in comprehending the mental constraints and biases that influence project decisions. By integrating neuroscientific insights with traditional management practices, leaders can enhance their strategies for training, team dynamics, and risk assessment, ultimately leading to more informed, efficient, and productive construction project management. This comprehensive literature review underscores the importance of adopting an interdisciplinary approach to leadership and management within high-risk industries. It provides a foundation for construction project managers to leverage cognitive science and neuroimaging advancements to improve efficiency, productivity, and decision-making in construction projects' complex and dynamic environments.

Keywords: decision making, literature review, neuroimaging, project management

Procedia PDF Downloads 14
4835 Muslim Social Workers and Imams’ Recommendations in Marital and Child Custody Cases of Persons with Intellectual or Mental Disability

Authors: Badran Leena, Rimmerman Arie

Abstract:

Arab society in Israel is undergoing modernization and secularization. However, its approach to disability and mental illness is still dominated by religious and traditional stereotypes, as well as folk remedies and community practices. The present study examines differences in Muslim social workers' and Imams' recommendations in marriage/divorce and child custody cases of persons with intellectual disabilities (ID) or mental illness. The study has two goals: (1) To examine differences in recommendations between Imams and Muslim social workers; (2) To explore variables related to their differential recommendations as observed in their responses to vignettes—a quantitative study using vignettes resembling existing Muslim religious (Sharia) court cases. Muslim social workers (138) and Imams (48) completed a background questionnaire, a religiosity questionnaire, and a questionnaire that included 25 vignettes constructed by the researcher based on court rulings adapted for the study. Muslim social workers tended to consider the religious recommendation when the family of a person with ID or mental illness was portrayed in the vignette as religious. The same applied to Imams, albeit to a greater extent. The findings call for raising awareness among social workers and academics regarding the importance of religion and tradition in formulating professional recommendations.

Keywords: child custody, intellectual and developmental disability, marriage/divorce, mental illness, sharia court, social workers

Procedia PDF Downloads 160
4834 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 63
4833 Managing the Magnetic Protection of Workers in Magnetic Resonance Imaging

Authors: Safoin Aktaou, Aya Al Masri, Kamel Guerchouche, Malorie Martin, Fouad Maaloul

Abstract:

Introduction: In the ‘Magnetic Resonance Imaging (MRI)’ department, all workers involved in preparing the patient, setting it up, tunnel cleaning, etc. are likely to be exposed to ‘ElectroMagnetic fields (EMF)’ emitted by the MRI device. Exposure to EMF can cause adverse radio-biological effects to workers. The purpose of this study is to propose an organizational process to manage and control EMF risks. Materials and methods: The study was conducted at seven MRI departments using machines with 1.5 and 3 Tesla magnetic fields. We assessed the exposure of each one by measuring the two electromagnetic fields (static and dynamic) at different distances from the MRI machine both inside and around the examination room. Measurement values were compared with British and American references (those of the UK's ‘Medicines and Healthcare Regulatory Agency (MHRA)’ and the ‘American Radiology Society (ACR)’). Results: Following the results of EMF measurements and their comparison with the recommendations of learned societies, a zoning system that adapts to needs of different MRI services across the country has been proposed. In effect, three risk areas have been identified within the MRI services. This has led to the development of a good practice guide related to the magnetic protection of MRI workers. Conclusion: The guide established by our study is a standard that allows MRI workers to protect themselves against the risk of electromagnetic fields.

Keywords: comparison with international references, measurement of electromagnetic fields, magnetic protection of workers, magnetic resonance imaging

Procedia PDF Downloads 125
4832 Stabilized Earth Roads Construction and Its Challenges

Authors: Mokhtar Nikgoo

Abstract:

Road definition and road construction: in engineering literature, a road is defined as a means of communication between two different places by air, land, and sea. In this way, all sea, land, and air routes are considered as roads. Road construction is an operation to create a road on the ground between 2 points with a specified width, which includes works such as subgrade, paving, placing tables, and traffic signs on the road. In this article, the stages of road construction are explained from the beginning to the end. Road construction is generally done in the construction of rural, urban, and inter-city roads, and according to the special conditions of this area, the precision of engineers in its design and calculations is very important. For example, if the design of a road does not pay enough attention to the way the road curves, there will undoubtedly be countless accidents. Also, adjusting the road surface and its durability and uniformity are among the things that engineers solve according to the upcoming obstacles.

Keywords: road construction, surveying, freeway, pavement, excavator

Procedia PDF Downloads 46
4831 Modern Work Modules in Construction Practice

Authors: Robin Becker, Nane Roetmann, Manfred Helmus

Abstract:

Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 53
4830 Determination of Organizational Cynicism Levels of Health Care Workers

Authors: Murat İskender Aktaş, Selma Söyük

Abstract:

The aim of this work is to specify the levels of organizational cynicism health workers. Organizational cynicism concept is evaluated in three sub-branches and these are cognitive, affective, and behavioral. The main objective of the work is to answer the questions about the relationship of demographic characteristics like sub-branches of cynicism and age, marital status, education level, total working hours, occupational groups and income levels. As works in our country are analyzed, there have been studies about cynicism in health and other sectors. However, there were no master’s thesis or organizational cynicism research found about the public health professionals. This is why the aim was chosen as to specify the levels of organizational cynicism of public health professionals. The average of the answers of the health workers to the questions about cynicism levels are 2.86. As organizational cynicism is evaluated according to the sub-branches, cognitive subscale average score is 3.21 affective subscale average score is 2.68 and behavioral subscale average score is counted as 2.67. As the results are analyzed, it is seen that the behavioral subscale has the highest average. This shows that the workers are often criticizing the internal complaints and organizational information with their friends out of the organization.

Keywords: cynicism, organizational cynicism, health care workers

Procedia PDF Downloads 311
4829 Comprehensive Risk Assessment Model in Agile Construction Environment

Authors: Jolanta Tamošaitienė

Abstract:

The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.

Keywords: assessment, environment, agile, model, risk

Procedia PDF Downloads 225
4828 Early Screening of Risk Ergonomics among Workers at Madura's Batik Industrial: Rapid Entire Body Assessment and Quick Exposure Checklist

Authors: Abdul Kadir, L. Meily Kurniawidjaja

Abstract:

Batik Madura workers are exposed to many Musculoskeletal Disorders risk factors, particularly Low Back Pain (LBP). This study was conducted as an early detection of ergonomic risk level on Workers Industrial Sentra Batik Madura in Dusun Banyumas, Klampar Subdistrict, Proppo Pamekasan, Madura, East Java. This study includes 12 workers who 11 workers had pain in the upper and lower part of the neck, back, wrist right hand, also 10 workers had pain in the right shoulder. This is a descriptive observational study with cross-sectional approach. Qualitative research by observing workers activity such as draw and putting the wax motif, fabric dyeing, fabric painting, discoloration, washing, and drying. The results are workers have identified ergonomic hazards such as awkward postures, twisting movements, repetitive, and static work postures. Using the method of REBA and QEC, the results get a very high-risk level of activity in each of Madura batik making process is the draw and putting the wax motif, coloring, painting, discoloration, washing, and drying. The level of risk can be reduced by improvement of work equipment include the provision of seats, strut fabric, high settings furnaces, drums, coloring basin, and washing tub.

Keywords: activities of Madura's batik, ergonomic risk level, equipment, QEC (Quick Exposure Checklist), REBA (Rapid Entire Body Assessment)

Procedia PDF Downloads 163
4827 Delivery of Sustainable Construction in South Africa – Assessing the Roles of Organisational Leadership

Authors: Ayodeji Emmanuel Oke, Mathew O. Ikuabe, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The call for sustainable construction has received significant drive in recent time considering the overwhelming impacts of its adoption. However, not much has been deliberated on this subject with regards to the roles of organisational leadership in delivering sustainable construction. To this end, the study empirically scrutinised the roles of organisational leadership in delivering sustainable construction. The study adopted a quantitative approach while construction professionals formed the population of the study. A well-articulated questionnaire was used in eliciting responses from the respondents, while appropriate methods of data analysis were used. Findings from the study depicted that the major role of organisational leadership in the delivery of sustainable construction is acting as sustainability integrators. Equally revealed are the internal and external factors affecting organisational leadership in delivering sustainable construction. The study concluded by emphasizing the core roles for delivering sustainable construction by organisational leadership and further recommended that sustainable construction should serve as a prominent and focal organisation goal by organisational leadership when steering the organisation towards meeting its objectives

Keywords: organisational leadership, project delivery, roles, sustainable construction

Procedia PDF Downloads 86
4826 Occupational Safety in Construction Projects

Authors: Heba Elbibas, Esra Gnijeewa, Zedan Hatush

Abstract:

This paper presents research on occupational safety in construction projects, where the importance of safety management in projects was studied, including the preparation of a safety plan and program for each project and the identification of the responsibilities of each party to the contract. The research consists of two parts: 1-Field visits: which were field visits to three construction projects, including building projects, road projects, and tower installation. The safety level of these projects was evaluated through a checklist that includes the most important safety elements in terms of the application of these items in the projects. 2-Preparation of a questionnaire: which included supervisors and engineers and aimed to determine the level of awareness and commitment of different project categories to safety standards. The results showed the following: i) There is a moderate occupational safety policy. ii) The preparation and storage of maintenance reports are not fully complied with. iii) There is a moderate level of training on occupational safety for project workers. iv) The company does not impose penalties on safety violators permanently. v) There is a moderate policy for equipment and machinery safety. vi) Self-injuries occur due to (fatigue, lack of attention, deliberate error, and emotional factors), with a rate of 82.4%.

Keywords: management, safety, occupational safety, classification

Procedia PDF Downloads 68
4825 Maturity Level of Knowledge Management in Whole Life Costing in the UK Construction Industry: An Empirical Study

Authors: Ndibarefinia Tobin

Abstract:

The UK construction industry has been under pressure for many years to produce economical buildings which offer value for money, not only during the construction phase, but more importantly, during the full life of the building. Whole life costing is considered as an economic analysis tool that takes into account the total investment cost in and ownership, operation and subsequent disposal of a product or system to which the whole life costing method is being applied. In spite of its importance, the practice is still crippled by the lack of tangible evidence, ‘know-how’ skills and knowledge of the practice i.e. the lack of professionals with the knowledge and training on the use of the practice in construction project, this situation is compounded by the absence of available data on whole life costing from relevant projects, lack of data collection mechanisms and so on. The aforementioned problems has forced many construction organisations to adopt project enhancement initiatives to boost their performance on the use of whole life costing techniques so as to produce economical buildings which offer value for money during the construction stage also the whole life of the building/asset. The management of knowledge in whole life costing is considered as one of the many project enhancement initiative and it is becoming imperative in the performance and sustainability of an organisation. Procuring building projects using whole life costing technique is heavily reliant on the knowledge, experience, ideas and skills of workers, which comes from many sources including other individuals, electronic media and documents. Due to the diversity of knowledge, capabilities and skills of employees that vary across an organisation, it is significant that they are directed and coordinated efficiently so as to capture, retrieve and share knowledge in order to improve the performance of the organisation. The implementation of knowledge management concept has different levels in each organisation. Measuring the maturity level of knowledge management in whole life costing practice will paint a comprehensible picture of how knowledge is managed in construction organisations. Purpose: The purpose of this study is to identify knowledge management maturity in UK construction organisations adopting whole life costing in construction project. Design/methodology/approach: This study adopted a survey method and conducted by distributing questionnaires to large construction companies that implement knowledge management activities in whole life costing practice in construction project. Four level of knowledge management maturity was proposed on this study. Findings: From the results obtained in the study shows that 34 contractors at the practiced level, 26 contractors at managed level and 12 contractors at continuously improved level.

Keywords: knowledge management, whole life costing, construction industry, knowledge

Procedia PDF Downloads 217
4824 Time Overrun in Pre-Construction Planning Phase of Construction Projects

Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui

Abstract:

Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun

Procedia PDF Downloads 222
4823 Wood Dust and Nanoparticle Exposure among Workers during a New Building Construction

Authors: Atin Adhikari, Aniruddha Mitra, Abbas Rashidi, Imaobong Ekpo, Jefferson Doehling, Alexis Pawlak, Shane Lewis, Jacob Schwartz

Abstract:

Building constructions in the US involve numerous wooden structures. Woods are routinely used in walls, framing floors, framing stairs, and making of landings in building constructions. Cross-laminated timbers are currently being used as construction materials for tall buildings. Numerous workers are involved in these timber based constructions, and wood dust is one of the most common occupational exposures for them. Wood dust is a complex substance composed of cellulose, polyoses and other substances. According to US OSHA, exposure to wood dust is associated with a variety of adverse health effects among workers, including dermatitis, allergic respiratory effects, mucosal and nonallergic respiratory effects, and cancers. The amount and size of particles released as wood dust differ according to the operations performed on woods. For example, shattering of wood during sanding operations produces finer particles than does chipping in sawing and milling industries. To our knowledge, how shattering, cutting and sanding of woods and wood slabs during new building construction release fine particles and nanoparticles are largely unknown. General belief is that the dust generated during timber cutting and sanding tasks are mostly large particles. Consequently, little attention has been given to the generated submicron ultrafine and nanoparticles and their exposure levels. These data are, however, critically important because recent laboratory studies have demonstrated cytotoxicity of nanoparticles on lung epithelial cells. The above-described knowledge gaps were addressed in this study by a novel newly developed nanoparticle monitor and conventional particle counters. This study was conducted in a large new building construction site in southern Georgia primarily during the framing of wooden side walls, inner partition walls, and landings. Exposure levels of nanoparticles (n = 10) were measured by a newly developed nanoparticle counter (TSI NanoScan SMPS Model 3910) at four different distances (5, 10, 15, and 30 m) from the work location. Other airborne particles (number of particles/m3) including PM2.5 and PM10 were monitored using a 6-channel (0.3, 0.5, 1.0, 2.5, 5.0 and 10 µm) particle counter at 15 m, 30 m, and 75 m distances at both upwind and downwind directions. Mass concentration of PM2.5 and PM10 (µg/m³) were measured by using a DustTrak Aerosol Monitor. Temperature and relative humidity levels were recorded. Wind velocity was measured by a hot wire anemometer. Concentration ranges of nanoparticles of 13 particle sizes were: 11.5 nm: 221 – 816/cm³; 15.4 nm: 696 – 1735/cm³; 20.5 nm: 879 – 1957/cm³; 27.4 nm: 1164 – 2903/cm³; 36.5 nm: 1138 – 2640/cm³; 48.7 nm: 938 – 1650/cm³; 64.9 nm: 759 – 1284/cm³; 86.6 nm: 705 – 1019/cm³; 115.5 nm: 494 – 1031/cm³; 154 nm: 417 – 806/cm³; 205.4 nm: 240 – 471/cm³; 273.8 nm: 45 – 92/cm³; and 365.2 nm: Keywords: wood dust, industrial hygiene, aerosol, occupational exposure

Procedia PDF Downloads 161
4822 The Psychological Impact of Industrial Noise on Workers

Authors: Beriache Abderazik

Abstract:

It is clear that the psychological effects of noise and physiological eloquent on the workers, what will inevitably affect the performance of both productivity and efficiency in all its aspects, industrial noise became among the most prominent modern professional problems, That require study and analysis in order to arrive at solutions and ways that you can reduce the effects of industrial noise. These factors, in addition to other reasons, made us try in this research to know the real impact of industrial noise on the professional satisfaction of workers. In light of this title we have identified the following general problem: - Is the professional satisfaction factor varies depending on the noise level in the work environment? For the purpose of ascertaining the veracity of the assumptions, we have a comparative study between two samples of equal workers, the first sample is working under the influence of industrial noise severe about (100 Db), and the second sample is working under the influence of industrial noise is low (about 63 Db), and applied them test the professional satisfaction. The results support the hypotheses and confirm all sincerity.

Keywords: industrial noise, job satisfaction, the psychological effects of noise, work environment

Procedia PDF Downloads 550
4821 A Prediction of Electrical Cost for High-Rise Building Construction

Authors: Picha Sriprachan

Abstract:

The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.

Keywords: high-rise building construction, electrical cost, construction phase, architectural phase

Procedia PDF Downloads 358
4820 Strategies for Medium Sized Construction Firms to Survive the Current Economic Conditions That Is Compounded by the Most Recent COVID-19 Pandemic in Nigeria

Authors: Aloysius Colman Chukwuemeka Ezeabasili, Chibuike Patrick Ezeabasili

Abstract:

Medium Sized Construction Companies in Nigeria are those employing 50-250 workers that are mostly involved in roads, Commercial and domestic building Construction, among others. These companies are in the majority and contribute immensely to infrastructural development in Nigeria. Despite the last eight years of economic downturn and the past years of COVID-19 pandemic, signs of these Companies recovering from the economic recession and pandemic seem bright. Nigeria has recorded 213,000 confirmed cases 3968 deaths from COVID-19 as at now. These medium sized companies are currently trying to explore various opportunities to grow their businesses to achieve competitive advantages over others by studying and improving on their bidding efficiency, Strategies for selecting businesses, bidding markup Strategies, and cash flow. These strategies were studied through the recruitment of construction experts and professionals. Many of them have acquired new technologies that have impacted positively on their strategies. The impact of these technologies like the BIM, e-tendering, conditions of contract, and claim management strategies are advantages to them and has given them good advantages over their peers. Monte Carlo solution, Swot analysis, and average bid methods have also clearly added advantages to bidding practices. New and existing strategies are Scrutinized, and training of young Nigerians in advanced countries to acquire knowledge in best practices have elevated some of these companies. The Covid-19 has not been very harsh to Nigeria, and the country is surely not as devastated as the advanced countries. Nigeria has therefore been able to cope with the combination of the downturn and the pandemic.

Keywords: medium sized construction companies, competitive advantage, new bidding technologies, Nigeria

Procedia PDF Downloads 107
4819 Male Sex Workers’ Constructions of Selling Sex in South Africa

Authors: Tara Panday, Despina Learmonth

Abstract:

Sex work is often constructed as being an interaction between male clients and female sex workers. As a result, street-based male sex workers are continuously overlooked in the South African literature. This qualitative study explored male sex workers’ subjective experiences and constructions of their male clients’ identities and the client-sex worker relationship. This research was conducted from a social-constructionist perspective, which allowed for a deeper understanding of the reasons and context driving the choices and actions of male sex workers. Semi-structured face-to-face interviews were conducted with 10 South African men working as sex workers in Cape Town. Data was analysed through thematic analysis. The findings of the study construct the client-sex worker relationship in terms of a professional relationship, constrained choice, sexual identity and need, as well as companionship for pay, potentially highlighting underlying reasons for supply and demand. The data which emerged around the client-sex worker relationship and the clients’ identities also served to illuminate the power-dynamics in the client-sex worker relationship. This data increases insight into the exploitation and disempowerment experienced by male sex workers through verbal abuse, physical and sexual violence, and unfairly enforced laws and regulations. The findings of this study suggest that, in the context of South Africa, male sex workers' experiences of the client-sex worker relationship cannot be completely understood without considering the intersectionality of the triple stigmatisation of: the criminality of sex work, race, and the lack of economic power, which systematically maintains marginalization. Motivating for the Law Reform Commission to continue to review all emerging research may assist with guiding related policy and thereby, the provision of equal human rights and adequate health and social interventions for all sex workers in South Africa.

Keywords: human rights, prostitution, power relations, sex work

Procedia PDF Downloads 452
4818 Assessment of the Work-Related Stress and Associated Factors among Sanitation Workers in Public Hospitals during COVID-19, Addis Ababa, Ethiopia

Authors: Zerubabel Mihret

Abstract:

Background: Work-related stress is a pattern of reactions to work demands unmatched by worker’s knowledge, skills, or abilities. Healthcare institutions are considered high-risk and intensive work areas for work-related stress. However, there is the nonexistence of clear and strong data about the magnitude of work-related stress on sanitation workers in hospitals in Ethiopia. The aim of this study was to determine the magnitude of work-related stress among sanitation workers in public hospitals during COVID-19 in Addis Ababa, Ethiopia. Methods: Institution-based cross-sectional study was conducted from October 2021 to February 2022 among 494 sanitation workers who were selected from 4 hospitals. HSE (Health and Safety Executive of UK) standard data collection tool was used, and an interviewer-administered questionnaire was used to collect the data using KOBO collect application. The collected data were cleaned and analyzed using SPSS version 20.0. Both binary and multivariable logistic regression analyses were done to identify important factors having an association with work-related stress. Variables with p-value ≤ 0.25 in the bivariate analysis were entered into the multivariable logistic regression model. A statistically significant level was declared at a p-value ≤ 0.05. Results: This study revealed that the magnitude of work-related stress among sanitation workers was 49.2% (95% CI 45-54). Significant proportions (72.7%) of sanitation workers were dissatisfied with their current job. Sex, age, experience, and chewing khat were significantly associated with work-related stress. Conclusion: Work-related stress is significantly high among sanitation workers. Sex, age, experience, and chewing khat were identified as factors associated with work-related stress. Intervention program focusing on the prevention and control of stress is desired by hospitals.

Keywords: work-related stress, sanitation workers, Likert scale, public hospitals, Ethiopia

Procedia PDF Downloads 47
4817 Assessing the Influence of Using Traditional Methods of Construction on Cost and Quality of Building Construction

Authors: Musoke Ivan, Birungi Racheal

Abstract:

The construction trend is characterized by increased use of modern methods yet traditional methods are cheaper in terms of costs, in addition to the benefits it offers to the construction sector, like providing more jobs that could have been worked with the intensive machines. The purpose of this research was to assess the influence of using Traditional methods of construction (TMC) on the costs and quality of building structures and determine the different ways. Traditional methods of construction (TMC) can be applicable and integrated into the construction trend, and propose ways how this can be a success. The study adopted a quantitative method approach targeting various construction professionals like Architects, Quantity surveyors, Engineers, and Construction Managers. Questionnaires and analyses of literature were used to obtain research data and findings. Simple random sampling was used to select 40 construction professionals to which questionnaires were administered. The data was then analyzed using Microsoft Excel. The findings of the research indicate that Traditional methods of construction (TMCs) in Uganda are cheaper in terms of costs, but the quality is still low. This is attributed to a lack of skilled labour and efficient supervision while undertaking tasks leading to low quality. The study identifies strategies that would improve Traditional methods of construction (TMC), which include the employment of skilled manpower and effective supervision. It also identifies the need by stakeholders like the government, clients, and professionals to appreciate Traditional methods of construction (TMCs) and allow for a levelled ground for Traditional Methods of Construction and Modern methods of construction (MMCs).

Keywords: traditional methods of construction, integration, cost, quality

Procedia PDF Downloads 28