Search results for: agricultural reform implementation project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 10679

Search results for: agricultural reform implementation project

10469 New Public Management at Public Administration in Bangladesh: An Exploratory Study

Authors: Biback Das

Abstract:

New Public Management, a phenomenal tool, which is used to enforcing in public administration in different country’s to enhance the capacities. Since the 1980s, New Public Management (NPM) is primarily focusing to modernize the public sector. From the initial period, many developed countries such as UK, New Zealand, Australia, and the USA are applied in their administration to modernize. Almost 1990s, it has been applied in many developing countries. This study can describe the real situations of NPM based administration. Bangladesh Government has taken many projects to reform the public sector under NPM. Even many Development Agencies like UN, UNDP, World Bank, Asian Development Bank and so on, along with many developed countries also invested and prescribed to take NPM based reform that can to restructure the public sector so that it can maximize the efforts to provide the better service. This study examines using many factors that effects work on Public Administration in Bangladesh and also assessing its endeavor to adopt in it. Although Government has taken such initiatives to implement NPM originated reform, it’s not effectively been implemented to bring positive change about as per NPM objectives. This study mainly examines some initiatives in Bangladesh that have the influence of NPM as well as some drawbacks that can’t help the satisfaction of these initiatives. This article help to identify the efforts of many development agencies providing a fund to enhance the NPM based projects with their specific conditions that are prescribed by them helping to get fund. Therefore, to establish effective public management or to follow NPM model, Bangladesh need having an institutional framework, sound rule of law, proper structure, effective civil service system, appropriate checks, and balances to restructure the public sector help along with donor agencies ad implement in it. Bangladesh Government has applied its recent days to enhance the capabilities in its Public Administration. Moreover, this study mainly identifies how the designing strategies, program formulating, its implementation in various sector such as education, health sector etc. and how to reduce the backdrop the during problem by smooth functioning. This paper is also assessing the influence of many projects like PPP (Public-Private and Partnership) to work along with private organizations for smooth service delivery. Accordingly, this paper briefly reviews how it applies in a global context following the taken many initiatives and the consequences of Bangladesh context.

Keywords: new public management, capacity building, conditionalities, service delivery, public-private-partnership

Procedia PDF Downloads 110
10468 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 125
10467 Enhancing Project Management Performance in Prefabricated Building Construction under Uncertainty: A Comprehensive Approach

Authors: Niyongabo Elyse

Abstract:

Prefabricated building construction is a pioneering approach that combines design, production, and assembly to attain energy efficiency, environmental sustainability, and economic feasibility. Despite continuous development in the industry in China, the low technical maturity of standardized design, factory production, and construction assembly introduces uncertainties affecting prefabricated component production and on-site assembly processes. This research focuses on enhancing project management performance under uncertainty to help enterprises navigate these challenges and optimize project resources. The study introduces a perspective on how uncertain factors influence the implementation of prefabricated building construction projects. It proposes a theoretical model considering project process management ability, adaptability to uncertain environments, and collaboration ability of project participants. The impact of uncertain factors is demonstrated through case studies and quantitative analysis, revealing constraints on implementation time, cost, quality, and safety. To address uncertainties in prefabricated component production scheduling, a fuzzy model is presented, expressing processing times in interval values. The model utilizes a cooperative co-evolution evolution algorithm (CCEA) to optimize scheduling, demonstrated through a real case study showcasing reduced project duration and minimized effects of processing time disturbances. Additionally, the research addresses on-site assembly construction scheduling, considering the relationship between task processing times and assigned resources. A multi-objective model with fuzzy activity durations is proposed, employing a hybrid cooperative co-evolution evolution algorithm (HCCEA) to optimize project scheduling. Results from real case studies indicate improved project performance in terms of duration, cost, and resilience to processing time delays and resource changes. The study also introduces a multistage dynamic process control model, utilizing IoT technology for real-time monitoring during component production and construction assembly. This approach dynamically adjusts schedules when constraints arise, leading to enhanced project management performance, as demonstrated in a real prefabricated housing project. Key contributions include a fuzzy prefabricated components production scheduling model, a multi-objective multi-mode resource-constrained construction project scheduling model with fuzzy activity durations, a multi-stage dynamic process control model, and a cooperative co-evolution evolution algorithm. The integrated mathematical model addresses the complexity of prefabricated building construction project management, providing a theoretical foundation for practical decision-making in the field.

Keywords: prefabricated construction, project management performance, uncertainty, fuzzy scheduling

Procedia PDF Downloads 18
10466 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria

Authors: Shazali Abdulahi

Abstract:

Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.

Keywords: effetive communication, ineffective communication, stakeholders, project delivery

Procedia PDF Downloads 11
10465 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries

Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi

Abstract:

Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.

Keywords: physical progress, time progress, financial progress, delays, critical path

Procedia PDF Downloads 345
10464 The Development of Directed-Project Based Learning as Language Learning Model to Improve Students' English Achievement

Authors: Tri Pratiwi, Sufyarma Marsidin, Hermawati Syarif, Yahya

Abstract:

The 21st-century skills being highly promoted today are Creativity and Innovation, Critical Thinking and Problem Solving, Communication and Collaboration. Communication Skill is one of the essential skills that should be mastered by the students. To master Communication Skills, students must first master their Language Skills. Language Skills is one of the main supporting factors in improving Communication Skills of a person because by learning Language Skills students are considered capable of communicating well and correctly so that the message or how to deliver the message to the listener can be conveyed clearly and easily understood. However, it cannot be denied that English output or learning outcomes which are less optimal is the problem which is frequently found in the implementation of the learning process. This research aimed to improve students’ language skills by developing learning model in English subject for VIII graders of SMP N 1 Uram Jaya through Directed-Project Based Learning (DPjBL) implementation. This study is designed in Research and Development (R & D) using ADDIE model development. The researcher collected data through observation, questionnaire, interview, test, and documentation which were then analyzed qualitatively and quantitatively. The results showed that DPjBL is effective to use, it is seen from the difference in value between the pretest and posttest of the control class and the experimental class. From the results of a questionnaire filled in general, the students and teachers agreed to DPjBL learning model. This learning model can increase the students' English achievement.

Keywords: language skills, learning model, Directed-Project Based Learning (DPjBL), English achievement

Procedia PDF Downloads 138
10463 Experiences of Extension Officers on the Provision of Agricultural Facilities to Rural Farmers towards Improving Agricultural Practice in South Africa

Authors: Mfaniseni Wiseman Mbatha

Abstract:

The extension officers are regarded as the key role players in the provision of agricultural facilities to farmers across the world. The government of South Africa has shown a commitment to provide extensive support to farmers by the means of disseminating information and other agricultural facilities. This qualitative study on the experiences of extension officers on the provision of agricultural facilities to rural farmers towards improving agricultural practice was conducted in Msinga Local Municipality. The data was collected through the use of semi-structured interviews with extension officers who were sampled using the purposive sampling method. The qualitative data was analysed through the use of content analysis. The critical part of the findings reveals that the availability of arable land for agricultural practice, availability of agricultural schemes and availability of proper functioning community gardens were indicators of the high level of agricultural practice in the Msinga area. Therefore, the extension officers from the municipality department have shown to provide the agricultural budget to support rural farmers. Whereas, the department of agriculture provides well knowledgeable staff to train farmers about the process of farming and how they can address issues of livestock and crop diseases and also adapting to issues of climate change. The rural farmers, however, find it very difficult to learn and put into practice things that were thought by extension officers during training. There is, therefore, a need for recruitment of more extension staff and the involvement of Non-Government Organizations to increase access to extension facilities to the farmers.

Keywords: agricultural facilities, agricultural practice, extension officers, rural farmers

Procedia PDF Downloads 107
10462 Negotiating Increased Food Production with African Indigenous Agricultural Knowledge: The Ugandan Case

Authors: Harriet Najjemba, Simon Peter Rutabajuuka, Deo Katono Nzarwa

Abstract:

Scientific agricultural knowledge was introduced in Africa, including Uganda, during colonial rule. While this form of knowledge was introduced as part of Western scientific canon, African indigenous knowledge was not destroyed and has remained vital in food production. Modern scientific methods were devoted to export crops while food crop production was left to Africans who continued to use indigenous knowledge. Today, indigenous agricultural knowledge still provides farming skills and practices, more than a century since modern scientific agricultural knowledge was introduced in Uganda. It is evident that there is need to promote the still useful and more accessible indigenous agricultural practices in order to sustain increased food production. It is also important to have a tailor made agricultural knowledge system that combines practical indigenous practices with financially viable western scientific agricultural practices for sustained food production. The proposed paper will explain why the African indigenous agricultural knowledge has persisted and survived for over a century after colonial introduction of western scientific agricultural knowledge. The paper draws on research findings for a PhD study at Makerere University, Uganda. The study uses both written and oral sources, including colonial and postcolonial archival documents, and interviews. It critiques the parameters within which Western farming methods were introduced to African farmers.

Keywords: food production, food shortage, indigenous agricultural knowledge, western scientific agricultural practices

Procedia PDF Downloads 417
10461 Designing Agricultural Irrigation Systems Using Drone Technology and Geospatial Analysis

Authors: Yongqin Zhang, John Lett

Abstract:

Geospatial technologies have been increasingly used in agriculture for various applications and purposes in recent years. Unmanned aerial vehicles (drones) fit the needs of farmers in farming operations, from field spraying to grow cycles and crop health. In this research, we conducted a practical research project that used drone technology to design and map optimal locations and layouts of irrigation systems for agriculture farms. We flew a DJI Mavic 2 Pro drone to acquire aerial remote sensing images over two agriculture fields in Forest, Mississippi, in 2022. Flight plans were first designed to capture multiple high-resolution images via a 20-megapixel RGB camera mounted on the drone over the agriculture fields. The Drone Deploy web application was then utilized to develop flight plans and subsequent image processing and measurements. The images were orthorectified and processed to estimate the area of the area and measure the locations of the water line and sprinkle heads. Field measurements were conducted to measure the ground targets and validate the aerial measurements. Geospatial analysis and photogrammetric measurements were performed for the study area to determine optimal layout and quantitative estimates for irrigation systems. We created maps and tabular estimates to demonstrate the locations, spacing, amount, and layout of sprinkler heads and water lines to cover the agricultural fields. This research project provides scientific guidance to Mississippi farmers for a precision agricultural irrigation practice.

Keywords: drone images, agriculture, irrigation, geospatial analysis, photogrammetric measurements

Procedia PDF Downloads 50
10460 Best Practice for Post-Operative Surgical Site Infection Prevention

Authors: Scott Cavinder

Abstract:

Surgical site infections (SSI) are a known complication to any surgical procedure and are one of the most common nosocomial infections. Globally it is estimated 300 million surgical procedures take place annually, with an incidence of SSI’s estimated to be 11 of 100 surgical patients developing an infection within 30 days after surgery. The specific purpose of the project is to address the PICOT (Problem, Intervention, Comparison, Outcome, Time) question: In patients who have undergone cardiothoracic or vascular surgery (P), does implementation of a post-operative care bundle based on current EBP (I) as compared to current clinical agency practice standards (C) result in a decrease of SSI (O) over a 12-week period (T)? Synthesis of Supporting Evidence: A literature search of five databases, including citation chasing, was performed, which yielded fourteen pieces of evidence ranging from high to good quality. Four common themes were identified for the prevention of SSI’s including use and removal of surgical dressings; use of topical antibiotics and antiseptics; implementation of evidence-based care bundles, and implementation of surveillance through auditing and feedback. The Iowa Model was selected as the framework to help guide this project as it is a multiphase change process which encourages clinicians to recognize opportunities for improvement in healthcare practice. Practice/Implementation: The process for this project will include recruiting postsurgical participants who have undergone cardiovascular or thoracic surgery prior to discharge at a Northwest Indiana Hospital. The patients will receive education, verbal instruction, and return demonstration. The patients will be followed for 12 weeks, and wounds assessed utilizing the National Healthcare Safety Network//Centers for Disease Control (NHSN/CDC) assessment tool and compared to the SSI rate of 2021. Key stakeholders will include two cardiovascular surgeons, four physician assistants, two advance practice nurses, medical assistant and patients. Method of Evaluation: Chi Square analysis will be utilized to establish statistical significance and similarities between the two groups. Main Results/Outcomes: The proposed outcome is the prevention of SSIs in the post-op cardiothoracic and vascular patient. Implication/Recommendation(s): Implementation of standardized post operative care bundles in the prevention of SSI in cardiovascular and thoracic surgical patients.

Keywords: cardiovascular, evidence based practice, infection, post-operative, prevention, thoracic, surgery

Procedia PDF Downloads 56
10459 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 231
10458 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 393
10457 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 139
10456 Study on Municipal Solid Waste Management to Protect Environment

Authors: Rajesh Kumar

Abstract:

The largest issue in the current situation is managing solid waste since it pollutes the ecosystem. When considering how to manage waste, even the disposal of mixed waste is a challenge. The Saksham Yuva Project, which is managed by the Haryana government, highlights the consequences and drivers of managing the solid waste of urban areas in the municipal committee pundri in the present study. The overall goal of the Saksham Yuva project is to mobilise the public and educate them about the dangers associated with garbage management. There has been a 20% reduction in waste, according to the study's impacts, and the cost of waste management has also gone down. Further, the study also reported the alternative use of wastes in revenue generation by generating Khaad for agricultural purposes.

Keywords: solid waste management, people awareness, dry and wet waste disposal, material recover facility

Procedia PDF Downloads 60
10455 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 126
10454 Attitude to the Types of Organizational Change

Authors: O. Y. Yurieva, O. V. Yurieva, O. V. Kiselkina, A. V. Kamaseva

Abstract:

Since the early 2000s, there are some innovative changes in the civil service in Russia due to administrative reform. Perspectives of the reform of the civil service include a fundamental change in the personnel component, increasing the level of professionalism of officials, increasing their capacity for self-organization and self-regulation. In order to achieve this, the civil service must be able to continuously change. Organizational changes have long become the subject of scientific understanding; problems of research in the field of organizational change is presented by topics focused on the study of the methodological aspects of the implementation of the changes, the specifics of changes in different types of organizations (business, government, and so on), design changes in the organization, including based on the change in organizational culture. In this case, the organizational changes in the civil service are the least studied areas; research of problems of its transformation is carried out in fragments. According to the theory of resistance of Herbert Simon, the root of the opposition and rejection of change is in the person who will resist any change, if it threatens to undermine the degree of satisfaction as a member of the organization (regardless of the reasons for this change). Thus, the condition for successful adaptation to changes in the organization is the ability of its staff to perceive innovation. As part of the problem, the study sought to identify the innovation civil servants, to determine readiness for the development of proposals for the implementation of organizational change in the public service. To identify the relationship to organizational changes case study carried out by the method of "Attitudes to organizational change" of I. Motovilina, which allowed predicting the type of resistance to changes, to reveal the contradictions and hidden results. The advantage of the method of I. Motovilina is its brevity, simplicity, the analysis of the responses to each question, the use of "overlapping" issues potentially conflicting factors. Based on the study made by the authors, it was found that respondents have a positive attitude to change more local than those that take place in reality, such as "increase opportunities for professional growth", "increase the requirements for the level of professionalism of", "the emergence of possible manifestations initiatives from below". Implemented by the authors diagnostics related to organizational changes in the public service showed the presence of specific problem areas, with roots in the lack of understanding of the importance of innovation personnel in the process of bureaucratization of innovation in public service organizations.

Keywords: innovative changes, self-organization, self-regulation, civil service

Procedia PDF Downloads 424
10453 Construction Quality Perception of Construction Professionals and Their Expectations from a Quality Improvement Technique in Pakistan

Authors: Muhammad Yousaf Sadiq

Abstract:

The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. An quantitative survey based approach was adopted in this constructive study. A questionnaire-based survey was conducted for the assessment of construction Quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals of the leading construction organizations/companies of Pakistan construction industry were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. The quality perception was found to be project-scope-oriented and considered as an excess cost for a construction project. Any quality improvement technique was expected to maximize the profit for the employer, by improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

Keywords: construction quality, expectation, improvement, perception

Procedia PDF Downloads 436
10452 Wicking Bed Cultivation System as a Strategic Proposal for the Cultivation of Milpa and Mexican Medicinal Plants in Urban Spaces

Authors: David Lynch Steinicke, Citlali Aguilera Lira, Andrea León García

Abstract:

The proposal posed in this work comes from a researching-action approach. In Mexico, a dialogue of knowledge may function as a link between traditional, local, pragmatic knowledge, and technological, scientific knowledge. The advantage of generating this nexus lies on the positive impact in the environment, in society and economy. This work attempts to combine, on the one hand the traditional Mexican knowledge such as the usage of medicinal herb and the agroecosystem milpa; and on the other hand make use of a newly created agricultural ecotechnology which main function is to take advantage of the urban space and to save water. This ecotechnology is the wicking bed. In a globalized world, is relevant to have a proposal where the most important aspect is to revalorize the culture through the acquisition of traditional knowledge but at the same time adapting them to the new social and urbanized structures without threatening the environment. The methodology used in this work comes from a researching-action approach combined with a practical dimension where an experimental model made of three wickingbeds was implemented. In this model, there were cultivated medicinal herb and milpa components. The water efficiency and the social acceptance were compared with a traditional ground crop, all this practice was made in an urban social context. The implementation of agricultural ecotechnology has had great social acceptance as its irrigation involves minimal effort and it is economically feasible for low-income people. The wicking bed system raised in this project is attainable to be implemented in schools, urban and peri-urban environments, homemade gardens and public areas. The proposal managed to carry out an innovative and sustainable knowledge-based traditional Mexican agricultural technology, allowing regain Milpa agroecosystem in urban environments to strengthen food security in favour of nutritional and protein benefits for the Mexican fare.

Keywords: milpa, traditional medicine, urban agriculture, wicking bed

Procedia PDF Downloads 356
10451 Multipurpose Agricultural Robot Platform: Conceptual Design of Control System Software for Autonomous Driving and Agricultural Operations Using Programmable Logic Controller

Authors: P. Abhishesh, B. S. Ryuh, Y. S. Oh, H. J. Moon, R. Akanksha

Abstract:

This paper discusses about the conceptual design and development of the control system software using Programmable logic controller (PLC) for autonomous driving and agricultural operations of Multipurpose Agricultural Robot Platform (MARP). Based on given initial conditions by field analysis and desired agricultural operations, the structural design development of MARP is done using modelling and analysis tool. PLC, being robust and easy to use, has been used to design the autonomous control system of robot platform for desired parameters. The robot is capable of performing autonomous driving and three automatic agricultural operations, viz. hilling, mulching, and sowing of seeds in the respective order. The input received from various sensors on the field is later transmitted to the controller via ZigBee network to make the changes in the control program to get desired field output. The research is conducted to provide assistance to farmers by reducing labor hours for agricultural activities by implementing automation. This study will provide an alternative to the existing systems with machineries attached behind tractors and rigorous manual operations on agricultural field at effective cost.

Keywords: agricultural operations, autonomous driving, MARP, PLC

Procedia PDF Downloads 332
10450 On the Road towards Effective Administrative Justice in Macedonia, Albania and Kosovo: Common Challenges and Problems

Authors: Arlinda Memetaj

Abstract:

A sound system of administrative justice represents a vital element of democratic governance. The proper control of public administration consists not only of a sound civil service framework and legislative oversight, but empowerment of the public and courts to hold public officials accountable for their decision-making through the application of fair administrative procedural rules and the use of appropriate administrative appeals processes and judicial review. The establishment of both effective public administration and administrative justice system has been for a long period of time among the most ‘important and urgent’ final strategic objectives of almost any country in the Balkans region, including Macedonia, Albania and Kosovo. Closely related to this is their common strategic goal to enter the membership in the European Union, which requires fulfilling of many criteria and standards as incorporated in EU acquis communautaire. The latter is presently done with the framework of the Stabilization and Association Agreement which each of these countries has concluded with the EU accordingly. To above aims, each of the three countries has so far adopted a huge series of legislative and strategic documents related to any aspects of their individual administrative justice system. ‘Changes and reforms’ in this field have been thus the most frequent terms being used in any of these countries. The three countries have already established their own national administrative judiciary, while permanently amending their laws on the general administrative procedure introducing thereby considerable innovations concerned. National administrative courts are expected to have crucial important role within the broader judiciary systems-related reforms of these countries; they are designed to check the legality of decisions of the state administration with the aim to guarantee an effective protection of human rights and legitimate interests of private persons through a regular, conform, fast and reasonable judicial administrative process. Further improvements in this field are presently an integral crucial part of all the relevant national strategic documents including the ones on judiciary reform and public administration reform, as adopted by each of the three countries; those strategic documents are designed among others to provide effective protection of their citizens` rights` of administrative justice. On the basis of the later, the paper finally is aimed at highlighting selective common challenges and problems of the three countries on their European road, while claiming (among others) that the current status quo situation in each of them may be overcome only if there is a proper implementation of the administrative courts decisions and a far stricter international monitoring process thereof. A new approach and strong political commitment from the highest political leadership is thus absolutely needed to ensure the principles of transparency, accountability and merit in public administration. The main methods used in this paper include the analytical and comparative ones due to the very character of the paper itself.

Keywords: administrative courts , administrative justice, administrative procedure, benefit, effective administrative justice, human rights, implementation, monitoring, reform

Procedia PDF Downloads 124
10449 Piloting a Prototype Virtual Token Economy Intervention for On-Task Support within an Inclusive Canadian Classroom

Authors: Robert L. Williamson

Abstract:

A 'token economy' refers to a method of positive behaviour support whereby ‘tokens’ are delivered to students as a reward for exhibiting specific behaviours. Students later exchange tokens to ‘purchase’ items of interest. Unfortunately, implementation fidelity can be problematic as some find physical delivery of tokens while teaching difficult. This project developed and tested a prototype, iPad-based tool that enabled teachers to deliver and track tokens electronically. Using an alternating treatment design, any differences in on-task individual and/or group behaviours between the virtual versus physical token delivery systems were examined. Results indicated that while students and teachers preferred iPad-based implementation, no significant difference was found concerning on-task behaviours of students between the two methodologies. Perhaps more interesting was that the teacher found implementation of both methods problematic and suggested a second person was most effective in implementing a token economy method. This would represent a significant cost to the effective use of such a method. Further research should focus on the use of a lay volunteer regarding method implementation fidelity and associated outcomes of the method.

Keywords: positive behaviour support, inclusion, token economy, applied behaviour analysis

Procedia PDF Downloads 119
10448 Design a Network for Implementation a Hospital Information System

Authors: Abdulqader Rasool Feqi Mohammed, Ergun Erçelebi̇

Abstract:

A large number of hospitals from developed countries are adopting hospital information system to bring efficiency in hospital information system. The purpose of this project is to research on new network security techniques in order to enhance the current network security structure of save a hospital information system (HIS). This is very important because, it will avoid the system from suffering any attack. Security architecture was optimized but there are need to keep researching on best means to protect the network from future attacks. In this final project research, security techniques were uncovered to produce best network security results when implemented in an integrated framework.

Keywords: hospital information system, HIS, network security techniques, internet protocol, IP, network

Procedia PDF Downloads 396
10447 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 190
10446 Applying the Underwriting Technique to Analyze and Mitigate the Credit Risks in Construction Project Management

Authors: Hai Chien Pham, Thi Phuong Anh Vo, Chansik Park

Abstract:

Risks management in construction projects is important to ensure the positive feasibility of the projects in which financial risks are most concerned while construction projects always run on a credit basis. Credit risks, therefore, require unique and technical tools to be well managed. Underwriting technique in credit risks, in its most basic sense, refers to the process of evaluating the risks and the potential exposure of losses. Risks analysis and underwriting are applied as a must in banks and financial institutions who are supporters for constructions projects when required. Recently, construction organizations, especially contractors, have recognized the significant increasing of credit risks which caused negative impacts to project performance and profit of construction firms. Despite the successful application of underwriting in banks and financial institutions for many years, there are few contractors who are applying this technique to analyze and mitigate the credit risks of their potential owners before signing contracts with them for delivering their performed services. Thus, contractors have taken credit risks during project implementation which might be not materialized due to the bankruptcy and/or protracted default made by their owners. With this regard, this study proposes a model using the underwriting technique for contractors to analyze and assess credit risks of their owners before making final decisions for the potential construction contracts. Contractor’s underwriters are able to analyze and evaluate the subjects such as owner, country, sector, payment terms, financial figures and their related concerns of the credit limit requests in details based on reliable information sources, and then input into the proposed model to have the Overall Assessment Score (OAS). The OAS is as a benchmark for the decision makers to grant the proper limits for the project. The proposed underwriting model is validated by 30 subjects in Asia Pacific region within 5 years to achieve their OAS, and then compare output OAS with their own practical performance in order to evaluate the potential of underwriting model for analyzing and assessing credit risks. The results revealed that the underwriting would be a powerful method to assist contractors in making precise decisions. The contribution of this research is to allow the contractors firstly to develop their own credit risk management model for proactively preventing the credit risks of construction projects and continuously improve and enhance the performance of this function during project implementation.

Keywords: underwriting technique, credit risk, risk management, construction project

Procedia PDF Downloads 183
10445 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 182
10444 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 510
10443 Considering Climate Change in Food Security: A Sociological Study Investigating the Modern Agricultural Practices and Food Security in Bangladesh

Authors: Hosen Tilat Mahal, Monir Hossain

Abstract:

Despite being a food-sufficient country after revolutionary changes in agricultural inputs, Bangladesh still has food insecurity and undernutrition. This study examines the association between agricultural practices (as social practices) and food security concentrating on the potential impact of sociodemographic factors and climate change. Using data from the 2012 Bangladesh Integrated Household Survey (BIHS), this study shows how modifiedagricultural practices are strongly associated with climate change and different sociodemographic factors (land ownership, religion, gender, education, and occupation) subsequently affect the status of food security in Bangladesh. We used linear and logistic regression models to analyze the association between modified agricultural practices and food security. The findings indicate that socioeconomic statuses are significant predictors of determining agricultural practices in a society like Bangladesh and control food security at the household level. Moreover, climate change is adversely impactingeven the modified agricultural and food security association version. We conclude that agricultural practices must consider climate change while boosting food security. Therefore, future research should integrate climate change into the agriculture and food-related mitigation and resiliency models.

Keywords: food security, agricultural productivity, climate change, bangladesh

Procedia PDF Downloads 82
10442 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 191
10441 Quality Management in Construction Project

Authors: Harsh Panchal, Saurabh Amrutkar

Abstract:

Quality management is an essential part of any project that has directly related to the performance of a project. Quality management is depended on multiple factors at different stages in a project, right from time management to construction logistics. A project is a mixture of various components that include iternary management, health and safety, crew productivity, and many more. From the survey conducted, we came to the conclusion that advancement in technology and indigenous approach to any project will result in maximum quality standards and better project performance. In this paper, we discuss various components of the factors above that lead to compromise the quality of a project and how it can be controlled in order to achieve maximum quality assurance using quality planning and total quality management. The paper also focuses on limitations and problems faced in each factor responsible for quality management and to tackle them using techniques and processes based on activities and identifying the sequence, approaching critical path, and duration. The project management concept that deals with the sequence of scope cost time give us an overview regarding the ongoing quality management, in a nutshell, giving us hints to regulate the current procedure for maximum achievable quality. It also deals with the problems faced by engineers that make the mundane work process slow, reducing the quality outcome drastically.

Keywords: management, performance, project, quality

Procedia PDF Downloads 123
10440 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal

Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai

Abstract:

Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.

Keywords: material management, construction site, inventory, construction project

Procedia PDF Downloads 26