6370 Factors Responsible for Delays in the Execution of Adequately Funded Construction Projects

Authors: Edoghogho Ogbeifun, Charles Mbohwa, J. H. C. Pretorius

Abstract:

Several research report on the factors responsible for the delays in the completion of construction projects has identified the issue of funding as a critical factor; insufficient funding, low cash-flow or lack of funds. Indeed, adequate funding plays pivotal role in the effective execution of construction projects. In the last twenty years (or so), there has been increase in the funds available for infrastructure development in tertiary institution in Nigeria, especially, through the Tertiary Education Trust Fund. This funding body ensures that there is enough fund for each approved project, which is released in three stages during the life of the construction project. However, a random tour of many of the institutions reveals striking evidence of projects not delivered on schedule, to quality and sometime out rightly abandoned. This suggests, therefore, that there are other latent factors, responsible for project delays, that should be investigated. Thus, this research, a pilot scheme, is aimed at unearthing the possible reasons for the delays being experienced in the execution of construction projects for infrastructure upgrade in public tertiary institutions in Nigeria, funded by Tertiary Education Trust Fund. The multiple site case study of qualitative research was adopted. The respondents were the Directors of Physical Planning and the Directors of Works of four Nigerian Public Universities. The findings reveal that delays can be situated within three entities, namely, the funding body, the institutions and others. Therefore, the emerging factors have been classified as external factors (haven to do with the funding body), internal factors (these concern the operations within the institutions) and general factors. The outcome of this pilot exercise provides useful information to guide the Directors as they interact with the funding body as well as challenges themselves to address the loopholes in their internal operations.

Keywords: delays, external factors, funding, general factors, Internal factors

Procedia PDF Downloads 117
6369 A Study of the Interactions between the Inter-City Traffic System and the Spatial Structure Evolution in the Yangtze River Delta from Time and Space Dimensions

Authors: Zhang Cong, Cai Runlin, Jia Fengjiao

Abstract:

The evolution of the urban agglomeration spatial structure requires strong support of the inter-city traffic system. And the inter-city traffic system can not only meet the demand of the urban agglomeration transportation but also guide the economic development. To correctly understand the relationship between inter-city traffic planning and urban agglomeration can help the urban agglomeration coordinated developing with the inter-city traffic system. The Yangtze River Delta is one of the most representative urban agglomerations in China with strong economic vitality, high city levels, diversified urban space form, and improved transport infrastructure. With the promotion of industrial division in the Yangtze River Delta and the regional travel facilitation brought by inter-city traffic, the urban agglomeration is characterized by highly increasing of inter-city transportation demand, the urbanization of regional traffic, adjacent regional transportation links breaking administrative boundaries, the networked channels and so on. Therefore, the development of inter-city traffic system presents new trends and challenges. This paper studies the interactions between inter-city traffic system and regional economic growth, regional factor flow, and regional spatial structure evolution in the Yangtze River Delta from two dimensions of time and space. On this basis, the adaptability of inter-city traffic development mode and urban agglomeration space structure is analyzed. First of all, the coordination between urban agglomeration planning and inter-city traffic planning is judged from the planning level. Secondly, the coordination between inter-city traffic elements and industries and population distributions is judged from the perspective of space. Finally, the coordination of the cross-regional planning and construction of inter-city traffic system is judged. The conclusions can provide an empirical reference for intercity traffic planning in Yangtze River Delta region and other urban agglomerations, and it is also of great significance to optimize the allocation of urban agglomerations and the overall operational efficiency.

Keywords: evolution, interaction, inter-city traffic system, spatial structure

Procedia PDF Downloads 286
6368 Strategic Thinking to Enhance Critical Transport Infrastructure and Build Resilience

Authors: Jayantha Withanaarachchi, Sujeeva Setunge, Sara Moridpour

Abstract:

Gaps in strategic thinking and planning lead to critical transport infrastructure resilience. These gaps in strategic transport and land use development planning have an impact on communities and cities. Natural and man-induced disasters can be catastrophic to communities. After a disaster, many types of critical infrastructure, including transport infrastructure gets un-usable or gets damaged. This paper examines strategic thinking behind the resilience and protection of Critical Transport Infrastructure (CI) within transport networks by investigating the impact of disasters such as bushfires, hurricanes and earthquakes. A detailed analysis of three case studies have been conducted to identify the gaps in strategic transport planning and strategic decision making processes required to mitigate the impacts of disasters. Case studies will be analysed to identify existing gaps in road design, transport planning and decision making. This paper examines the effect of road designing, transport corridors and decision making during transport planning stages and how it impacts transport infrastructure as well as community resilience. A set of recommendations to overcome the shortcomings of existing strategic planning and designing process are presented. This research paper reviews transport infrastructure planning issues and presents the common approach suitable for future strategic thinking and planning which could be adopted in practices.

Keywords: community resilience, decision making , infrastructure resilience, strategic transport planning, transport infrastructure

Procedia PDF Downloads 254
6367 Displacement and Cultural Capital in East Harlem: Use of Community Space in Affordable Artist Housing

Authors: Jun Ha Whang

Abstract:

As New York City weathers a swelling 'affordability crisis' marked by rapid transformation in land development and urban culture, much of the associated scholarly debate has turned to questions of the underlying mechanisms of gentrification. Though classically approached from the point of view of urban planning, increasingly these questions have been addressed with an eye to understanding the role of cultural capital in neighborhood valuation. This paper will examine the construction of an artist-specific affordable housing development in the Spanish Harlem neighborhood of Manhattan in order to identify and discuss several cultural parameters of gentrification. This study’s goal is not to argue that the development in question, named Art space PS 109, straightforwardly increases or decreases the rate of gentrification in Spanish Harlem, but rather to study dynamics present in the construction of Art space PS 109 as a case study considered against the broader landscape of gentrification in New York, particularly with respect to the impact of artist communities on housing supply. In the end, what Art space PS 109 most valuably offers us is a reference point for a comparative analysis of affordable housing strategies currently being pursued within municipal government. Our study of Art space PS 109 has allowed us to examine a microcosm of the city’s response and evaluate its overall strategy accordingly. As a base line, the city must aggressively pursue an affordability strategy specifically suited to the needs of each of its neighborhoods. It must also conduct this in such a way so as not to undermine its own efforts by rendering them susceptible to the exploitative involvement of real estate developers seeking to identify successive waves of trendy neighborhoods. Though Art space PS 109 offers an invaluable resource for the city’s legitimate aim of preserving its artist communities, with such a high inclusion rate of artists from outside of the community the project risks additional displacement, strongly suggesting the need for further study of the implications of sites of cultural capital for neighborhood planning.

Keywords: artist housing, displacement, east Harlem, urban planning

Procedia PDF Downloads 136
6366 Participatory Planning and Pro-ecological City Development – Searching for a Remedy for Upgrading Public Greenery

Authors: D. Pazder

Abstract:

The main assumption of the study is to examine the coherence between two aspects of spatial planning important in Poland. The first one is the need to realize a participatory planning paradigm, and the second is a global trend of the pro-ecological orientation of city development. The aim of the research is the verification of the possibility of finding the right balance between economic and socio-spatial dimensions of urban redefinition, especially within public green areas. The significance of the examination lies in the fact that there are a huge anthropopressure and overinvestment in downtown areas of big Polish cities. The methodology used in the research of a case study was the three-layered comparative analyses of spatial planning documents, participatory planning undertakings, soft and hard actions concerning a given area in the period of 2008-2020. The main findings are that there is a lack of satisfactory cooperation between the municipality and local communities, a connection between soft actions and investment in green public space, inhabitants are of high ecological consciousness but not so concerned about spatial planning legislation. The conclusion is that it is needed to provide real participation in spatial planning processes so as to take advantage of local communities’ activity and to combine more top-down and bottom-up actions so as to integrate people and educate them on how to act in favor of a common good in democratic citizenship.

Keywords: placemaking, participatory planning, anesthetization, public greenery

Procedia PDF Downloads 95
6365 Technology Planning with Internal and External Resource for Open Innovation

Authors: Jeonghwan Jeon

Abstract:

Technology planning with both internal capacity and external resource is necessary for successful open innovation. Until now, many types of research have been conducted for this issue. However, technology planning for open innovation at the national level has not been researched sufficiently. This study proposes Open roadmap for open innovation at the national level. The proposed open roadmap can manage the inflow & outflow open innovation systematically. Six types of open roadmap are classified with respect to the innovation direction and characteristics. The proposed open roadmap is applied to the open innovation cases of the Roman period. The proposed open roadmap is expected to be helpful tool for technology policy planning at the national level.

Keywords: technology planning, open innovation, internal resource, external resource, technology management

Procedia PDF Downloads 458
6364 Optimizing Design Works in Construction Consultant Company: A Knowledge-Based Application

Authors: Phan Nghiem Vu, Le Tuan Vu, Ta Quang Tai

Abstract:

The optimal construction design used during the execution of a construction project is a key factor in determining high productivity and customer satisfaction, however, this management process sometimes is carried out without care and the systematic method that it deserves, bringing negative consequences. This study proposes a knowledge management (KM) approach that will enable the intelligent use of experienced and acknowledged engineers to improve the management of construction design works for a project. Then a knowledge-based application to support this decision-making process is proposed and described. To define and design the system for the application, semi-structured interviews were conducted within five construction consulting organizations with the purpose of studying the way that the method’ optimizing process is implemented in practice and the knowledge supported with it. A system of an optimizing construction design works (OCDW) based on knowledge was developed then validated with construction experts. The OCDW was liked as a valuable tool for construction design works’ optimization, by supporting organizations to generate a corporate memory on this issue, reducing the reliance on individual knowledge and also the subjectivity of the decision-making process. The benefits are described as provided by the performance support system, reducing costs and time, improving product design quality, satisfying customer requirements, expanding the brand organization.

Keywords: optimizing construction design work, construction consultant organization, knowledge management, knowledge-based application

Procedia PDF Downloads 101
6363 Improving the Constructability of Highway Design Plans

Authors: R. Edward Minchin Jr.

Abstract:

The U.S. Federal Highway Administration (FHWA) Every Day Counts Program (EDC) has resulted in state DOTs putting evermore emphasis on speeding up the delivery of highway and bridge construction projects for use by the driving public. This has resulted in an increase in the use of alternative construction delivery systems such as design-build (D-B), construction manager at-risk (CMR) or construction manager/general contractor (CM/GC), and adding alternative technical concepts (ATCs) to traditional design-bid-build (DBB) contracts. ATCs have exhibited great potential for delivering substantial benefits like cost savings, increased constructability, and quicker project delivery. Previous research has found that knowledge of project constructability was lacking in state Department of Transportation (DOT) planning, programming, and environmental staffs. Many agencies have therefore relied on a set of ‘acceptable’ design solutions over the years of working with their local resource agencies. The result is that the permitting process for several government agencies has become increasingly restrictive with the result that the DOTs and their industry partners lose the ability to innovate after a permit is approved. The intent of this paper is to report on the research team’s progress in this ongoing effort furnish the United States government with a uniform set of guidelines for the application of constructability reviews during all phases of project development and delivery. The research uses surveys and interviews to determine which states have implemented formal programs to ensure that the constructor is furnished with a set of contract documents that affords said constructor with the best possible opportunity to successfully construct the project with the highest quality standards, within the contract duration and without exceeding the construction budget. Once these states are identified, workshops are held all over the nation, resulting in the team learning the best current practices and giving the team the ability to recommend new practices that will improve the process. The plan is for the FHWA to encourage or require state DOTs to use these practices on all federally funded highway and bridge construction projects. The project deliverable is a Guidebook for FHWA to use in disseminating the recommended practices to the states.

Keywords: alternative construction delivery, alternative technical concepts, constructability, construction design plans

Procedia PDF Downloads 175
6362 A New Suburb Renovation Concept

Authors: Anu Soikkelii, Laura Sorri

Abstract:

Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects. The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.

Keywords: energy efficiency, prefabrication, renovation concept, suburbs, sustainability, user-orientated

Procedia PDF Downloads 311
6361 Post-Disaster Recovery and Impacts on Construction Resources: Case Studies of Queensland Catastrophic Events

Authors: Scott A. Abbott

Abstract:

This paper examines the increase in the occurrence of natural disasters worldwide and the need to support vulnerable communities in post-disaster recovery. Preparation and implementation of post-disaster recovery projects need to be improved to allow communities to recover infrastructure, housing, economically and socially following a catastrophe. With the continual rise in catastrophic events worldwide due to climate change, impacts on construction resources affect the ability for post-disaster recovery to be undertaken. This research focuses on case studies of catastrophic events in Queensland, Australia, to contribute to the body of knowledge and gain valuable insights on lessons learned from past events and how they have been managed. The aim of this research is to adopt qualitative data using semi-structured interviews from participants predominantly from the insurance sector to understand barriers that have previously and currently exist in post-disaster recovery. Existing literature was reviewed to reveal gaps in knowledge that needed to be tested. Qualitative data was collected and summarised from field research with the results analysed and discussed. Barriers that impacted post-disaster recovery included time, cost, and resource capability and capacity. Causal themes that impacted time and cost were identified as decision making, pre-planning, and preparedness, as well as effective communication across stakeholders. The research study applied a qualitative approach to the existing literature and case studies across Queensland, Australia, to identify existing and new barriers that impact post-disaster recovery. It was recommended to implement effective procurement strategies to assist in cost control; implement pre-planning and preparedness strategies across funder, contractor, and local governments; more effective and timely decision making to reduce time and cost impacts.

Keywords: construction recovery, cost, disaster recovery, resources, time

Procedia PDF Downloads 100
6360 SCM Challenges and Opportunities in the Timber Construction Sector

Authors: K. Reitner, F. Staberhofer, W. Ortner, M. Gerschberger

Abstract:

The purpose of this paper is to identify the main challenges faced by companies in the timber construction sector and to provide improvement opportunities that can be implemented on a short-, medium- and long-term basis. To identify the challenges and propose actions for each company a literature review and a multiple case research were conducted using the Quick Scan Audit Methodology. Finally, the findings and outcomes are compared with each other to support companies in the timer construction sector when implementing and restructuring their day-to-day activities.

Keywords: supply chain management, supply chain challenges and opportunities, timber construction sector

Procedia PDF Downloads 218
6359 Accounting Performance of the Leading Companies in the Construction Sector in Brazil during the Period 2009-2012

Authors: Fabrício José Piacente, Vanessa de Cillos Silva, Thiago Luiz Mello Melato

Abstract:

The construction industry has been demonstrating increased growth and importance in Brazil’s national economic development. This study aims to evaluate the financial performance of the leading companies in the construction sector in Brazil in the period from 2009 to 2012. An analysis is made of the capital structure, liquidity, and profitability of the six largest companies in the construction sector in Brazil: Brookfield, Cyrela, Gafisa, MRV, PDG and Rossi. The results are then compared with standard industry ratios. It was found that among the companies analyzed, MRV and Cyrela showed the best relative performance in the period under consideration.

Keywords: accounting ratios, construction, financial performance, Brazil

Procedia PDF Downloads 412
6358 Sustainable Practices through Organizational Internal Factors among South African Construction Firms

Authors: Oluremi I. Bamgbade, Oluwayomi Babatunde

Abstract:

Governments and nonprofits have been in the support of sustainability as the goal of businesses especially in the construction industry because of its considerable impacts on the environment, economy, and society. However, to measure the degree to which an organisation is being sustainable or pursuing sustainable growth can be difficult as a result of the clear sustainability strategy required to assume their commitment to the goal and competitive advantage. This research investigated the influence of organisational culture and organisational structure in achieving sustainable construction among South African construction firms. A total of 132 consultants from the nine provinces in South Africa participated in the survey. The data collected were initially screened using SPSS (version 21) while Partial Least Squares Structural Equation Modeling (PLS-SEM) algorithm and bootstrap techniques were employed to test the hypothesised paths. The empirical evidence also supported the hypothesised direct effects of organisational culture and organisational structure on sustainable construction. Similarly, the result regarding the relationship between organisational culture and organisational structure was supported. Therefore, construction industry can record a considerable level of construction sustainability and establish suitable cultures and structures within the construction organisations. Drawing upon organisational control theory, these findings supported the view that these organisational internal factors have a strong contingent effect on sustainability adoption in construction project execution. The paper makes theoretical, practical and methodological contributions within the domain of sustainable construction especially in the context of South Africa. Some limitations of the study are indicated, suggesting opportunities for future research.

Keywords: organisational culture, organisational structure, South African construction firms, sustainable construction

Procedia PDF Downloads 258
6357 The City Ecological Corridor Construction Based on the Concept Of "Sponge City"(Case Study: Lishui)

Authors: Xu Mengyuan, Xu Lei

Abstract:

Behind the rapid development of Chinese city, the contradiction of frequent urban waterlogging and the shortage of water resources is deepening. In order to solve this problem, introduce the low impact development "sponge city" construction mode in the process of the construction of new urbanization in China, make our city " resilience to adapt" environmental change and natural disaster. Firstly this paper analyses the basic reason of urban waterlogging, then introduces the basic connotation and realization approach of “sponge city”. Finally, study on the project in Lishui Guazhou, focuses on the analysis of the "urban ecological corridor" construction strategy and the positive impact on city in the construction of “sponge city”. Meanwhile, we put forward the ”local conditions” and ”sustainable” as the construction ideas, make use of ecological construction leading city development, explore the ecological balance through the city to enhance the regional value, and providing reference and reflection for the development and future of the “sponge city” in China.

Keywords: urban water logging, sponge city, urban ecological corridor, sustainable development, China

Procedia PDF Downloads 613
6356 Safety Factors for Improvement of Labor's Health and Safety in Construction Industry of Pakistan

Authors: Ahsan Ali Khan

Abstract:

During past few years, researchers are emphasizing more on the need of safety in construction industry. This need of safety is an important issue in developing countries. As due to development they are facing huge construction growth. This research is done to evaluate labor safety condition in construction industry of Pakistan. The research carried out through questionnaire survey at different construction sites. Useful data are gathered from these sites which then factor analyzed resulting in five factors. These factors reflect that most of the workers are aware of the safety need, but they divert this responsibility towards management and claim that the work is more essential for management instead of safety. Moreover, those work force which is unaware of safety state that there is lack of any training and guidance from upper management which lead to many unfavorable events on construction sites. There is need of implementation safety activities by management like training, formulation of rules and policies. This research will be helpful to divert management attention towards safety need so they will make efforts for safety of their manpower—the workers.

Keywords: labor's safety, management role, Pakistan, safety factors

Procedia PDF Downloads 161
6355 Strengthening Urban Governance and Planning Practices for Urban Sustainability Transformations in Cambodia

Authors: Fiona Lord

Abstract:

This paper presents research on strengthening urban governance and planning practices for sustainable and regenerative city transformations looking at urban governance in Cambodia as a case study. Transformations to urban sustainability and regeneration require systemic and long-term transformation processes, across multiple levels of society and inclusive of multiple urban actors. This paper presents the emerging findings of a qualitative case study comparing the urban governance and planning practices in two of Cambodia's secondary cities - Battambang and Sihanoukville. The lessons learned have broader implications for how governance and planning can be strengthened to initiate and sustain urban sustainability transformations in other developing country cities of Cambodia and the Southeast Asia region.

Keywords: Cambodia, planning practices, urban governance, urban sustainability transformations

Procedia PDF Downloads 203
6354 Mediating and Moderating Function of Corporate Governance on Firm Tax Planning and Firm Tax Disclosure Relationship

Authors: Mahfoudh Hussein Mgammal

Abstract:

The purpose of this paper is to investigate the moderating and mediating effect of corporate governance mechanisms proxy on the relationship of tax planning measured by effective tax rate components and tax disclosure. This paper tested the hypotheses by a 3-step hierarchical regression with 2010 to 2012 Malaysian-listed nonfinancial firms. We found companies positively value tax-planning activities. This indicates that tax planning is seen as a source of companies' wealth creation as the results show that there is an association between the tax disclosure and the extent of tax planning, and this relationship is highly significant. Examination of the implications of corporate governance mechanisms on the tax disclosure-tax planning association showed the lack of a significant coefficient related to any of the interactive variables. This makes it hard to understand the nature of the association. Finally, we further study the sensitivity of the results, the outcomes were also examined for the robustness and strength of the model specification utilizing OLS-effect estimators and the absence of tax planning related factors (GRTH, LEVE, and CAPNT). The findings of these tests display there is no effect on the tax planning-tax disclosure association. The outcomes of the annual regressions test show that the panel regressions results differ over time because there is a time difference impact on the associations, and the different models are not completely proportionate as a whole. Moreover, our paper lends some support to recent theory on the importance of taxes to corporate governance by demonstrating how the agency costs of tax planning allow certain shareholders to benefit from firm activities at the expense of others.

Keywords: tax disclosure, tax planning, corporate governance, effective tax rate

Procedia PDF Downloads 121
6353 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 356
6352 Waste Generation in Iranian Building Industry: Addressing a Theory

Authors: Golnaz Moghimi, Alireza Afsharghotli, Alireza Rezaei

Abstract:

Construction waste has been gradually increased as a result of upsizing construction projects which are occurred within the lifecycle of buildings. Since waste management is a major priority and has profound impacts on the volume of waste generated in construction stage, the majority of efforts have been attempted to reuse, recycle and reduce waste. However, there is still room to study on lack of sufficient knowledge about waste management in construction industry. This paper intends to provide an insight into the effect of project management knowledge areas on waste management solely on construction stage. To this end, a survey among Iranian building construction industry contractors was conducted to identify the effectiveness of project management knowledge areas on three jobsite key factors including ‘Site activity’, ‘Training’, and ‘Awareness’. As a result, four management disciplines were identified as most influential ones on amount of construction waste. These disciplines were Project Cost Management, Quality Management, Human Resource Management, and Integration Management. Based on the research findings, a new model was presented to develop effective construction waste strategies.

Keywords: awareness, PMBOK, site activity, training, waste management

Procedia PDF Downloads 311
6351 The Planning Strategies of Public Sports Facilities Based on the Field Investigation: Case Study of Songyuan, China

Authors: Li Hua Li, Ling Ling Li

Abstract:

With the National Fitness Program being established as a national strategy by the Chinese government, Chinese old planning strategies of sports facilities which are based on the purpose for hosting high-level sports events have been failed to meet the rapid growth of Chinese residents’ healthy needs. As the most important carrier for promoting the health of citizens in China, public sports facilities may have further conflicts when they are planned without considering the characteristics of the city itself and the fitness needs of the urban residents. With the planning practice in Songyuan in northeastern China, this paper explores the key planning strategies of public sports facilities through the field investigation to obtain the current situation of public sports facilities in Songyuan and the questionnaire to get the date of Songyuan residents’ fitness characteristics and needs. Findings from this investigation suggest that the planning of public sports facilities in Songyuan should first increase the quantities of public sports facilities at the community level, which could match the fitness population and meet the fitness needs in Songyuan. Secondly, the planning should combine with other available resources, such as urban parks, squares and other places where Songyuan residents often choose to do physical activities to enhance the vitality of public sports facilities. Finally, the planning should also link the urban transportation system in Songyuan to improve the accessibility and efficiency of public sports facilities. All these planning strategies could provide essential information for updating the urban and regional design of Songyuan.

Keywords: field investigation, healthy needs, public sports facilities, planning strategies, questionnaire

Procedia PDF Downloads 203
6350 Field Management Solutions Supporting Foreman Executive Tasks

Authors: Maroua Sbiti, Karim Beddiar, Djaoued Beladjine, Romuald Perrault

Abstract:

Productivity is decreasing in construction compared to the manufacturing industry. It seems that the sector is suffering from organizational problems and have low maturity regarding technological advances. High international competition due to the growing context of globalization, complex projects, and shorter deadlines increases these challenges. Field employees are more exposed to coordination problems than design officers. Execution collaboration is then a major issue that can threaten the cost, time, and quality completion of a project. Initially, this paper will try to identify field professional requirements as to address building management process weaknesses such as the unreliability of scheduling, the fickleness of monitoring and inspection processes, the inaccuracy of project’s indicators, inconsistency of building documents and the random logistic management. Subsequently, we will focus our attention on providing solutions to improve scheduling, inspection, and hours tracking processes using emerging lean tools and field mobility applications that bring new perspectives in terms of cooperation. They have shown a great ability to connect various field teams and make informations visual and accessible to planify accurately and eliminate at the source the potential defects. In addition to software as a service use, the adoption of the human resource module of the Enterprise Resource Planning system can allow a meticulous time accounting and thus make the faster decision making. The next step is to integrate external data sources received from or destined to design engineers, logisticians, and suppliers in a holistic system. Creating a monolithic system that consolidates planning, quality, procurement, and resources management modules should be our ultimate target to build the construction industry supply chain.

Keywords: lean, last planner system, field mobility applications, construction productivity

Procedia PDF Downloads 93
6349 Effects of the Quality Construction of Public Construction in Taiwan to Implementation Three Levels Quality Management Institution

Authors: Hsin-Hung Lai, Wei Lo

Abstract:

Whether it is in virtue or vice for a construction quality of public construction project, it is one of the important indicators for national economic development and overall construction, the impact on the quality of national life is very deep. In recent years, a number of scandal of public construction project occurred, the requirements of the government agencies and the public require the quality of construction of public construction project are getting stricter than ever, the three-level public construction project construction quality of quality control system implemented by the government has a profound impact. This study mainly aggregated the evolution of ISO 9000 quality control system, the difference between the practice of implementing management of construction quality by many countries and three-level quality control of our country, so we explored and found that almost all projects of enhancing construction quality are dominated by civil organizations in foreign countries, whereas, it is induced by the national power in our country and develop our three-level quality control system and audit mechanism based on IOS system and implement the works by legislation, we also explored its enhancement and relevance with construction quality of public construction project that are intervened by such system and national power, and it really presents the effectiveness of construction quality been enhanced by the audited result. The three-level quality control system of our country to promote the policy of public construction project is almost same with the quality control system of many developed countries; however our country mainly implements such system on public construction project only, we promote the three-level quality control system is for enhancing the quality of public construction project, for establishing effective quality management system, so as to urge, correct and prevent the defects of quality management by manufacturers, whereas, those developed countries is comprehensively promoting (both public construction project and civil construction) such system. Therefore, this study is to explore the scope for public construction project only; the most important is the quality recognition by the executor, either good quality or deterioration is not a single event, there is a certain procedure extends from the demand and feasibility analysis, design, tendering, contracting, construction performance, inspection, continuous improvement, completion and acceptance, transferring and meeting the needs of the users, all of mentioned above have a causal relationship and it is a systemic problems. So the best construction quality would be manufactured and managed by reasonable cost if it is by extensive thinking and be preventive. We aggregated the implemented results in the past 10 years (2005 to 2015), the audited results of both in central units and local ones were slightly increased in A-grade while those listed in B-grade were decreased, although the levels were not evidently upgraded, yet, such result presents that the construction quality of concept of manufacturers are improving, and the construction quality has been established in the design stage, thus it is relatively beneficial to the enhancement of construction quality of overall public construction project.

Keywords: ISO 9000, three-level quality control system, audit and review mechanism for construction implementation, quality of construction implementation

Procedia PDF Downloads 311
6348 A Study on Energy-Saving Modular Housing Units Considering Environmental and Aesthetic Aspects

Authors: Jae Hee Chung, Tae Uk Kang, Byung Seo Kim

Abstract:

This study aims to propose design technologies for the energy-saving modular housing units considering environmental and aesthetic aspects. Modular houses are environmentally friendly based on 3R (Reduce, Reuse, Recycle) because they can dramatically reduce carbon dioxide and construction wastes generated during the construction, use, and disposal process by the pre-fabrication at the factory and the recyclability of the unit, compared to the existing construction methods. The existing modular housing, however, tends to focus on quantitative aspects of energy reduction, such as windows, insulation, and introduction of renewable energy, and there is not much research on energy-saving type units considering the environmental aspects such as daylighting and ventilation, and the design that goes beyond the standardized appearance. Therefore, this study conducts theoretical investigation and analytical case studies on the energy-saving methods through various architectural planning elements as well as materials like insulation considering the environmental and aesthetic aspects in the modular housing. Then, comparative analysis on the energy efficiency through the energy simulation is conducted. As a conclusion, the energy-saving modular housing units considering environmental and aesthetics aspects are proposed. It is expected that this study will contribute to the supply and activation of modular housing through deriving design technologies for the energy-saving modular housing units that consider not only quantitative aspects but also qualitative aspects.

Keywords: aesthetic aspects, energy-saving, environmental, modular housing

Procedia PDF Downloads 325
6347 A Literature Review on Development of a Forecast Supported Approach for the Continuous Pre-Planning of Required Transport Capacity for the Design of Sustainable Transport Chains

Authors: Georg Brunnthaller, Sandra Stein, Wilfried Sihn

Abstract:

Logistics service providers are facing increasing volatility concerning future transport demand. Short-term planning horizons and planning uncertainties lead to reduced capacity utilisation and increasing empty mileage. To overcome these challenges, a model is proposed to continuously pre-plan future transport capacity in order to redesign and adjust the intermodal fleet accordingly. It is expected that the model will enable logistics service providers to organise more economically and ecologically sustainable transport chains in a more flexible way. To further describe such planning aspects, this paper gives a structured literature review on transport planning problems. The focus is on strategic and tactical planning levels, comprising relevant fleet-sizing-, network-design- and choice-of-carriers-problems. Models and their developed solution techniques are presented and the literature review is concluded with an outlook to our future research objectives

Keywords: choice of transport mode, fleet-sizing, freight transport planning, multimodal, review, service network design

Procedia PDF Downloads 337
6346 Identifying the Level of Awareness on Value Management Practice amongst Construction Practitioners in Nigeria

Authors: Alhassan Dahiru

Abstract:

Value management is widely accepted technique of eliminating unnecessary cost at different stages of project development that maximizes the functional value of a project by managing its evolution and development from concept to completion. Many construction industry practitioners are not aware of Value Management practice, and its use is less widespread in Nigeria. The aim of this research is to identify the level of awareness on value management practice amongst construction practitioners with a view to contribute to the improvement of the implementation of value management practice in the Nigerian construction industry. In this study, construction practitioners have been chosen as respondents from the 6 geopolitical zones of the federation including FCT Abuja. Through the survey, a total number of 360 semi-structured questionnaires were administered and 284 were returned and remained good for the analysis. The results indicate that most of the respondents were aware of the value management concept and issues surrounding construction industry in Nigeria, while about 32% of the respondents were not aware of its potential benefits. Therefore, organisations should review their techniques and processes from time to time for improvement on effective service delivery. Additionally, a change management strategy should also be part of every organization to ease the introduction of new techniques such as value management. There is also the need for more value management training workshops and seminars in order to enlighten the participants of the construction industry on the principles, concept, and techniques involved in the value management process.

Keywords: sustainability, value management, construction practitioners, Nigeria

Procedia PDF Downloads 202
6345 Application of Simulation of Discrete Events in Resource Management of Massive Concreting

Authors: Mohammad Amin Hamedirad, Seyed Javad Vaziri Kang Olyaei

Abstract:

Project planning and control are one of the most critical issues in the management of construction projects. Traditional methods of project planning and control, such as the critical path method or Gantt chart, are not widely used for planning projects with discrete and repetitive activities, and one of the problems of project managers is planning the implementation process and optimal allocation of its resources. Massive concreting projects is also a project with discrete and repetitive activities. This study uses the concept of simulating discrete events to manage resources, which includes finding the optimal number of resources considering various limitations such as limitations of machinery, equipment, human resources and even technical, time and implementation limitations using analysis of resource consumption rate, project completion time and critical points analysis of the implementation process. For this purpose, the concept of discrete-event simulation has been used to model different stages of implementation. After reviewing the various scenarios, the optimal number of allocations for each resource is finally determined to reach the maximum utilization rate and also to reduce the project completion time or reduce its cost according to the existing constraints. The results showed that with the optimal allocation of resources, the project completion time could be reduced by 90%, and the resulting costs can be reduced by up to 49%. Thus, allocating the optimal number of project resources using this method will reduce its time and cost.

Keywords: simulation, massive concreting, discrete event simulation, resource management

Procedia PDF Downloads 104
6344 Sustainable Management Practices of International Construction Joint Ventures: A Conceptual Model for Managing Barriers and Risks

Authors: Mershack O. Tetteh, Albert P. C. Chan, Amos Darko, Gabriel Nani

Abstract:

International construction joint ventures (ICJVs) have evolved as an effective approach to sustainable development, given their myriad socio-economic and environmental benefits. Yet, they are not free of barriers and risks. In many studies, it is termed as risks for convenience’s sake. While the barriers and risks continue to affect the success of ICJVs, a systematic and reliable approach for managing them has yet to be developed. This study aims to identify and classify the barriers and risks factors affecting ICJVs through a systematic literature review. Based on a critical review of 54 papers published in peer-reviewed journals from 1990 to 2019, a conceptual framework was proposed for managing the barriers and risks in ICJV operations. The review showed that the barriers can be grouped into six including inter-organizational differences, lack of expertise and confidence, lack of effective planning and strategies, lack of knowledge of ICJV’s fundamentals, conflicts among ICJV entities, and management difficulties. The risks were also categorized into six: policy and political risks, legal risks, financial risks, management risks, project and technical risks, and market risks. The developed model would help practitioners achieve more efficient resource allocation and bring new perspectives for managerial practices in ICJVs. Moreover, it is positioned to alleviate the negligence of previous studies that combined the barriers and risks factors as one checklist.

Keywords: barriers, construction, international construction joint venture, risks, sustainable development

Procedia PDF Downloads 217
6343 Establishing Taiwan's Marine Space Planning System

Authors: Wen-Yan Chiau

Abstract:

Taiwan passed the 'Basic Ocean Act' in November 2019, and in accordance with Article 4 of its provisions, the government should draft a decree on ocean space planning (MSP). In the past few years, although Taiwan has passed the 'Coastal Zone Management Act' and the 'Spatial Planning Act', in the face of multiple use of marine areas, it still lacks a comprehensive marine area use blueprint and a fundamental mechanism for multi-purpose use planning management. In particular, Taiwan's active development of offshore wind power is facing this problem, and it is impossible to fully reconcile the use of each domain and the public welfare through a holistic system, highlighting the urgency of the establishment of MSP system. Therefore, this article will review relevant Taiwan laws and regulations, refer to important international initiatives and experiences, and participate in the exchange of practical experience in international conference(s), and propose adequate framework, principles, procedures, and promotion strategies on MSP. Possible solutions to promote sustainable and wise use in Taiwan's waters will also be suggested for comments.

Keywords: basic ocean act, coastal zone management act, marine spatial planning, spatial planning act, Taiwan

Procedia PDF Downloads 104
6342 Research on Contract's Explicit Incentive and Reputation's Implicit Incentive Mechanism towards Construction Contractors

Authors: Li Ma, Meishuang Ma, Mengying Huang

Abstract:

The quality of construction projects reflects the credit and responsibilities of construction contractors for the owners and the whole society. Because the construction contractors master more relevant information about the entrusted engineering project under construction while the owners are in unfavorable position of gaining information, asymmetric information may lead the contractors act against the owners in order to pursue their own interests. Building a powerful motivation mechanism is the key to guarantee investor economic interests and the life and property of users in construction projects. Based on principal-agent theory and game theory, the authors develop relevant mathematical models to analyze and compare the contractor’s utility functions under different combinations of contracts’ explicit incentive mechanism and reputation’s implicit incentive mechanism aiming at finding out the conditions for incentive validity. The research concludes that the most rational motivation way is to combine the explicit and implicit incentive effects of both contracts and reputation mechanism, and puts forth some measures for problems on account of China’s current situation.

Keywords: construction contractors, contract, reputation, incentive mechanism

Procedia PDF Downloads 481
6341 Tourism Development and Planning in Rwanda

Authors: Ntachobazi bosco

Abstract:

Tourism Development and Planning in Rwanda: Rwanda, a small landlocked country located in the heart of Africa, has experienced significant growth in its tourism industry in recent years. The country’s stunning natural beauty, rich cultural heritage, and warm hospitality have made it an attractive destination for travelers from around the world. However, to ensure sustainable tourism development and planning, the Rwandan government has implemented various strategies and policies to promote responsible tourism practices. Infrastructure Development: To support the growth of the tourism industry, the Rwandan government has invested heavily in infrastructure development. This includes the construction of new hotels, resorts, and lodges, as well as the upgrading of existing facilities. The government has also improved the country’s transportation network, including the construction of new airports and the upgrading of existing ones. Conservation Efforts: Rwanda is home to several national parks and reserves, including the famous Volcanoes National Park, which is known for its mountain gorilla populations. To protect these natural wonders, the Rwandan government has implemented conservation efforts, such as the establishment of protected areas and the development of sustainable tourism practices. Community-Based Tourism: Community-based tourism is a key component of Rwanda’s tourism development strategy. The government has established several community-based tourism programs, which aim to involve local communities in the tourism industry and provide them with economic benefits. These programs include homestays, village tours, and cultural performances. Sustainable Tourism Practices: To promote sustainable tourism practices, the Rwandan government has implemented several initiatives, such as the use of eco-friendly accommodations and the promotion of responsible wildlife viewing practices. The government has also established the Rwanda Tourism Board, which is responsible for promoting and regulating the tourism industry. Challenges and Opportunities: Despite the growth of the tourism industry in Rwanda, several challenges need to be addressed, such as the lack of skilled labor and the need for more infrastructure development. However, there are also several opportunities for the industry, such as the potential for ecotourism and the growth of the meetings, incentives, conventions, and exhibitions (MICE) market.

Keywords: tourism, in rwanda, developent, in africa

Procedia PDF Downloads 37