Search results for: sixth schedule
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 592

Search results for: sixth schedule

442 Effects of Organic Manure on the Growth of Jatropha curcas in Kogi State North Central Nigeria

Authors: S. O. Amhakhian, M. Idenyi

Abstract:

A pot experiment was conducted to assess the effects of organic manure on the growth of Jatropha curcas L seedlings at the Faculty of Agriculture, Kogi State University, Anyigba. There were seven treatments, namely, three (3) levels of poultry droppings (PD) (20g, 40g and 60g/kg soil) designated as T1, T2 and T3 respectively, three (3) levels of solid cattle dung (CD) (40g, 80g and 120g/kg soil designated as T4, T5, and T6) respectively, and control (no organic manure) designated as T7. All the treatments were replicated three (3) times. Jathopha curcas L seeds were sown into the polythene pot and observed for the period of six (6) weeks. Growth parameters measured were plant height, leaf count, stem girth, numbers of branches, and fresh weight. Mean separation using F-LSD0.05 showed that 120g cow dung/kg soil (T6) gave optional level of organic manure required for Jatropha curcas throughout the growth period of the seedlings. All the treatments having organic manure were significantly better than the control (P < 0.05) except at two weeks after planting where all the treatments gave the same number of leaves and at the sixth week after planting where only 120g cow dung/kg soil (T6) showed significant difference (P <0.05) in the number of branches. As a result, 120g cow dung/kg soil (T6) is therefore recommended for raising Jatrophus curcas L seedlings in Anyigba, Kogi State.

Keywords: Jatropha curcas, cow-dungs, seedlings, poultry dropping, polythene-pot

Procedia PDF Downloads 320
441 Phytotreatment of Polychlorinated Biphenyls Contaminated Soil by Chromolaena odorata L. King and Robinson

Authors: R. O. Anyasi, H. I. Atagana

Abstract:

In this study, phytoextraction ability of a weed on Aroclor 1254 was studied under greenhouse conditions. Chromolaena odorata plants were transplanted into soil containing 100, 200, and 500 ppm of Aroclor in 1L pots. The experiments were watered daily at 70 % moisture field capacity. Parameters such as fully expanded leaves per plant, shoot length, leaf chlorophyll content as well as root length at harvest were measured. PCB was not phytotoxic to C. odorata growth but plants in the 500 ppm treatment only showed diminished growth at the sixth week. Percentage increases in height of plant were 45.9, 39.4 and 40.0 for 100, 200 and 500 ppm treatments respectively. Such decreases were observed in the leaf numbers, root length and leaf chlorophyll concentration. The control sample showed 48.3 % increase in plant height which was not significant from the treated samples, an indication that C. odorata could survive such PCB concentration and could be used to remediate contaminated soil. Mean total PCB absorbed by C. odorata plant was between 6.40 and 64.60 ppm per kilogram of soil, leading to percentage PCB absorption of 0.03 and 17.03 % per kilogram of contaminated soil. PCBs were found mostly in the root tissues of the plants, and the Bioaccumulation factor were between 0.006-0.38. Total PCB absorbed by the plant increases as the concentration of the compound is increased. With these high BAF ensured, C. odorata could serve as a promising candidate plant in phytoextraction of PCB from a PCB-contaminated soil.

Keywords: phytoremediation, bioremediation, soil restoration, polychlorinated biphenyls (PCB), biological treatment, aroclor

Procedia PDF Downloads 382
440 Scheduling of Bus Fleet Departure Time Based on Mathematical Model of Number of Bus Stops for Municipality Bus Organization

Authors: Ali Abdi Kordani, Hamid Bigdelirad, Sid Mohammad Boroomandrad

Abstract:

Operating Urban Bus Transit System is a phenomenon that has a major role in transporting passengers in cities. There are many factors involved in planning and operating an Urban Bus Transit System, one of which is selecting optimized number of stops and scheduling of bus fleet departure. In this paper, we tried to introduce desirable methodology to select number of stops and schedule properly. Selecting the right number of stops causes convenience in accessibility and reduction in travel time and finally increase in public preference of this transportation mode. The achieved results revealed that number of stops must reduce from 33 to 25. Also according to scheduling and conducted economic analysis, the number of buses must decrease from 17 to 11 to have the most appropriate status for the Bus Organization.

Keywords: number of optimized stops, organizing bus system, scheduling, urban transit

Procedia PDF Downloads 125
439 Modeling of Production Lines Systems with Layout Constraints

Authors: Sadegh Abebi

Abstract:

There are problems with estimating time of product process of products, especially when there is variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines, needs a precise planning to reduce volume in particular situation of line stock. In this article, by analyzing real queue systems with layout constraints and by using concepts and principles of Markov chain in queue theory, a hybrid model has been presented. This model can be a base to assess queue systems with probable parameters of service. Here by presenting a case study, the proposed model will be described. so, production lines of a home application manufacturer will be analyzed.

Keywords: Queuing theory, Markov Chain, layout, line balance

Procedia PDF Downloads 626
438 Behavior of Cold Formed Steel in Trusses

Authors: Reinhard Hermawan Lasut, Henki Wibowo Ashadi

Abstract:

The use of materials in Indonesia's construction sector requires engineers and practitioners to develop efficient construction technology, one of the materials used in cold-formed steel. Generally, the use of cold-formed steel is used in the construction of roof trusses found in houses or factories. The failure of the roof truss structure causes errors in the calculation analysis in the form of cross-sectional dimensions or frame configuration. The roof truss structure, vertical distance effect to the span length at the edge of the frame carries the compressive load. If the span is too long, local buckling will occur which causes problems in the frame strength. The model analysis uses various shapes of roof trusses, span lengths and angles with analysis of the structural stiffness matrix method. Model trusses with one-fifth shortened span and one-sixth shortened span also The trusses model is reviewed with increasing angles. It can be concluded that the trusses model by shortening the span in the compression area can reduce deflection and the model by increasing the angle does not get good results because the higher the roof, the heavier the load carried by the roof so that the force is not channeled properly. The shape of the truss must be calculated correctly so the truss is able to withstand the working load so that there is no structural failure.

Keywords: cold-formed, trusses, deflection, stiffness matrix method

Procedia PDF Downloads 167
437 Critical Activity Effect on Project Duration in Precedence Diagram Method

Authors: Salman Ali Nisar, Koshi Suzuki

Abstract:

Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.

Keywords: construction project management, critical path method, project scheduling, precedence diagram method

Procedia PDF Downloads 512
436 3rd Generation Modular Execution: A Global Breakthrough in Modular Facility Construction System

Authors: Sean Bryner S. Rey, Eric Tanjutco

Abstract:

Modular execution strategies are performed to address the various challenges of any projects and are implemented on each project phase that covers Engineering, Procurement, Fabrication and Construction. It was until the recent years that the intent to surpass mechanical modularization approach were conceptualized to give solution to much greater demands of project components such as site location and adverse weather condition, material sourcing, construction schedule, safety risks and overall plot layout and allocation. The intent of this paper is to introduce the 3rd Generation Modular Execution with an overview of its advantages on project execution and will give emphasis on Engineering, Construction, Operation and Maintenance. Most importantly, the paper will present the key differentiator of 3rd Gen modular execution against other conventional project execution and the merits it bears for the industry.

Keywords: 3rd generation modular, process block, construction, operation & maintenance

Procedia PDF Downloads 475
435 The Convergence between Science Practical Work and Scientific Discourse: Lessons Learnt from Using a Practical Activity to Encourage Student Discourse

Authors: Abraham Motlhabane

Abstract:

In most practical-related science lessons, the focus is on completing the experimental procedure as directed by the teacher. However, the scientific discourse among learners themselves and teacher–learner discourse about scientific processes, scientific inquiry and the nature of science should play an important role in the teaching and learning of science. This means the incorporation of inquiry-based activities aimed at sparking debates about scientific concepts. This article analyses a science lesson presented by a teacher to his colleagues acting as learners. Six lessons were presented and transcribed. One of the lessons has been used for this study as the basis for the events as they unfolded during the lesson. Data was obtained through direct observations and the use of a predetermined observation schedule. Field notes were compiled during teacher preparations and the presentation of the lessons.

Keywords: discourse, inquiry, practical work, science, scientific

Procedia PDF Downloads 494
434 Case Study of Ground Improvement Solution for a Power Plant

Authors: Eleonora Di Mario

Abstract:

This paper describes the application of ground improvement to replace a typical piled foundation scheme in a power plant in Singapore. Several buildings within the plant were founded on vibro-compacted sand, including a turbine unit which had extremely stringent requirements on the allowable settlement. The achieved savings in terms of cost and schedule are presented. The monitoring data collected during the operation of the turbine are compared to the design predictions to validate the design approach, and the quality of the ground improvement works. In addition, the calculated carbon footprint of the ground improvement works are compared to the piled solution, showing that the vibro-compaction has a significantly lower carbon footprint.

Keywords: ground improvement, vibro-compaction, case study, sustainability, carbon footprint

Procedia PDF Downloads 111
433 Effect of Fire Exposure on the Ultimate Strength of Loaded Columns

Authors: Hatem Hamdy Ghieth

Abstract:

In the recent time many fires happened in many skeleton buildings. The fire may be continues for a long time. This fire may cause a collapse of the building. This collapse may be happened due to the time of exposure to fire as well as the rate of the loading to the carrying elements. In this research a laboratory study for reinforced concrete columns under effect of fire with temperature reaches (650 ْ C) on the behavior of columns which loaded with axial load and with exposing to fire temperature only from all sides of columns. the main parameters of this study are level of load applying to the column, and the temperature applied to the fire, this temperatures was 500oC and 650oc. Nine concrete columns with dimensions 20x20x100 cms were casted one of these columns was tested to determine the ultimate load while the least were fired according to the experimental schedule.

Keywords: columns, fire duration, concrete strength, level of loading

Procedia PDF Downloads 440
432 A Study of the Assistant Application for Tourists Taking Metros

Authors: Anqi Wang, Linye Zhang

Abstract:

With the proliferation and development of mobile devices, various mobile apps have appeared to satisfy people’s needs. Metro, with the feature of convenient, punctuality and economic, is one of the most popular modes of transportation in cities. Yet, there are still some inconveniences brought by various factors, impacting tourists’ riding experience. The aim of this study is to help tourists to shorten the time of purchasing tickets, to provide them clear metro information and direct navigation, detailed schedule as well as a way to collect metro cards as souvenir. The study collects data through three phases, including observation, survey and test. Data collected from 106 tourists totally in Wuhan metro stations are discussed in the study. The result reflects tourists’ demand when they take the metro. It also indicates the feasibility of using mobile technology to improve passenger’s experience.

Keywords: mobile app, metro, public transportation, ticket, mobile payment, indoors positioning, tourists

Procedia PDF Downloads 141
431 Protective Effects of Sinapic Acid on Organophosphate Poisoning

Authors: Turker Yardan, Bahattin Avci, S. Sirri Bilge, Ayhan Bozkurt

Abstract:

Sinapic acid (SA) is a phenylpropanoid compound with anti-inflammatory, antioxidant, and neuroprotective activities. The purpose of this study was to characterize the possible protective effect of sinapic acid on chlorpyrifos (CPF), a common organophosphorus pesticide used worldwide, induced toxicity in rats. Forty male and female rats (240-270 g) were used in this study. Each group was composed of 5 male and 5 female rats. Sinapic acid (20 mg/kg or 40 mg/kg) or vehicle (olive oil, 1 ml ⁄ rat) were given orally for 5 days. CPF (279 mg/kg) or vehicle (peanut oil, 2 ml ⁄ kg, s.c.) was administered on the sixth day, immediately after the recording of the body weight of the animals. Twenty four hours following CPF administration body weight, body temperature and locomotor activity values were recorded before decapitation of the animals. Trunk blood, brain, and liver samples were collected for biochemical examinations. Chlorpyrifos administration decreased butyrylcholinesterase activity in blood, brain, and liver, while it increased malondialdehyde (MDA) levels and advanced oxidation protein products (AOPPs) (p < 0.01 - 0.001). Additionally, CPF administration reduced the body weight, body temperature, and locomotor activity values of the animals (p < 0.01 - 0.001). All these physiological and biochemical changes induced by CPF were reduced with the 40 mg/kg dose of SA (p < 0.05 - 0.001). Our results suggest that SA administration ameliorates CPF induced toxicity in rats, possibly by supporting the antioxidant mechanism.

Keywords: antioxidant, Chlorpyrifos, poisoning, sinapic acid

Procedia PDF Downloads 179
430 Electric Load Forecasting Based on Artificial Neural Network for Iraqi Power System

Authors: Afaneen Anwer, Samara M. Kamil

Abstract:

Load Forecast required prediction accuracy based on optimal operation and maintenance. A good accuracy is the basis of economic dispatch, unit commitment, and system reliability. A good load forecasting system fulfilled fast speed, automatic bad data detection, and ability to access the system automatically to get the needed data. In this paper, the formulation of the load forecasting is discussed and the solution is obtained by using artificial neural network method. A MATLAB environment has been used to solve the load forecasting schedule of Iraqi super grid network considering the daily load for three years. The obtained results showed a good accuracy in predicting the forecasted load.

Keywords: load forecasting, neural network, back-propagation algorithm, Iraqi power system

Procedia PDF Downloads 583
429 A Prospective Study of a Modified Pin-In-Plaster Technique for Treatment of Distal Radius Fractures

Authors: S. alireza Mirghasemi, Shervin Rashidinia, Mohammadsaleh Sadeghi, Mohsen Talebizadeh, Narges Rahimi Gabaran, S. Shahin Eftekhari, Sara Shahmoradi

Abstract:

Purpose: There are various pin-in-plaster methods for treating distal radius fractures. This study is meant to introduce a modified technique of pin-in-plaster. Materials and methods: Fifty-four patients with distal radius fractures were followed up for one year. Patients were excluded if they had type B fractures according to AO classification, multiple injuries or pathological fractures, and were treated more than 7 days after injury. Range of motion and functional results were evaluated. Radiographic parameters including radial inclination, tilt, and height, were measured preoperatively and postoperatively. Results: The average radial tilt was 10.6° and radial height was 10.2 mm at the sixth month postoperatively. Three cases of pin tract infection were recorded, who were treated totally with oral antibiotics. There was no case of pin loosening. Of total 73 patients underwent surgery, three cases of radial nerve irritation were recorded at the time of cast removal. All of them resolved at the 6th month follow up. No median nerve compression and carpal tunnel syndrome have found. We also had no case of tendon injury. Conclusion: Our modified technique is effective to restore anatomic congruity and maintain reduction.

Keywords: distal radius fracture, percutaneous pinning, pin-in-plaster, modified method of pin-in-plaster, operative treatment

Procedia PDF Downloads 511
428 Erosion Susceptibility Zoning and Prioritization of Micro-Watersheds: A Remote Sensing-Gis Based Study of Asan River Basin, Western Doon Valley, India

Authors: Pijush Roy, Vinay Kumar Rai

Abstract:

The present study highlights the estimation of soil loss and identification of critical area for implementation of best management practice is central to the success of soil conservation programme. The quantification of morphometric and Universal Soil Loss Equation (USLE) factors using remote sensing and GIS for prioritization of micro-watersheds in Asan River catchment, western Doon valley at foothills of Siwalik ranges in the Dehradun districts of Uttarakhand, India. The watershed has classified as a dendritic pattern with sixth order stream. The area is classified into very high, high, moderately high, medium and low susceptibility zones. High to very high erosion zone exists in the urban area and agricultural land. Average annual soil loss of 64 tons/ha/year has been estimated for the watershed. The optimum management practices proposed for micro-watersheds of Asan River basin are; afforestation, contour bunding suitable sites for water harvesting structure as check dam and soil conservation, agronomical measure and bench terrace.

Keywords: erosion susceptibility zones, morphometric characteristics, prioritization, remote sensing and GIS, universal soil loss equation

Procedia PDF Downloads 302
427 Machine Learning Approach to Project Control Threshold Reliability Evaluation

Authors: Y. Kim, H. Lee, M. Park, B. Lee

Abstract:

Planning is understood as the determination of what has to be performed, how, in which sequence, when, what resources are needed, and their cost within the organization before execution. In most construction project, it is evident that the inherent nature of planning is dynamic, and initial planning is subject to be changed due to various uncertain conditions of construction project. Planners take a continuous revision process during the course of a project and until the very end of project. However, current practice lacks reliable, systematic tool for setting variance thresholds to determine when and what corrective actions to be taken. Rather it is heavily dependent on the level of experience and knowledge of the planner. Thus, this paper introduces a machine learning approach to evaluate project control threshold reliability incorporating project-specific data and presents a method to automate the process. The results have shown that the model improves the efficiency and accuracy of the monitoring process as an early warning.

Keywords: machine learning, project control, project progress monitoring, schedule

Procedia PDF Downloads 244
426 A Fuzzy Mathematical Model for Order Acceptance and Scheduling Problem

Authors: E. Koyuncu

Abstract:

The problem of Order Acceptance and Scheduling (OAS) is defined as a joint decision of which orders to accept for processing and how to schedule them. Any linear programming model representing real-world situation involves the parameters defined by the decision maker in an uncertain way or by means of language statement. Fuzzy data can be used to incorporate vagueness in the real-life situation. In this study, a fuzzy mathematical model is proposed for a single machine OAS problem, where the orders are defined by their fuzzy due dates, fuzzy processing times, and fuzzy sequence dependent setup times. The signed distance method, one of the fuzzy ranking methods, is used to handle the fuzzy constraints in the model.

Keywords: fuzzy mathematical programming, fuzzy ranking, order acceptance, single machine scheduling

Procedia PDF Downloads 340
425 Development of a BriMAIN System for Health Monitoring of Railway Bridges

Authors: Prakher Mishra, Dikshant Bodana, Saloni Desai, Sudhanshu Dixit, Sopan Agarwal, Shriraj Patel

Abstract:

Railways are sometimes lifeline of nations as they consist of huge network of rail lines and bridges. Reportedly many of the bridges are aging, weak, distressed and accident prone. It becomes a really challenging task for Engineers and workers to keep up a regular maintenance schedule for proper functioning which itself is quite a hard hitting job. In this paper we have come up with an innvovative wireless system of maintenance called BriMAIN. In this system we have installed two types of sensors, first one is called a force sensor which will continously analyse the readings of pressure at joints of the bridges and secondly an MPU-6050 triaxial gyroscope+accelerometer which will analyse the deflection of the deck of the bridge. Apart from this a separate database is also being made at the server room so that the data can be visualized by the engineers and a warning can be issued in case reading of the sensors goes above threshold.

Keywords: Accelerometer, B-MAIN, Gyroscope, MPU-6050

Procedia PDF Downloads 384
424 Upon One Smoothing Problem in Project Management

Authors: Dimitri Golenko-Ginzburg

Abstract:

A CPM network project with deterministic activity durations, in which activities require homogenous resources with fixed capacities, is considered. The problem is to determine the optimal schedule of starting times for all network activities within their maximal allowable limits (in order not to exceed the network's critical time) to minimize the maximum required resources for the project at any point in time. In case when a non-critical activity may start only at discrete moments with the pregiven time span, the problem becomes NP-complete and an optimal solution may be obtained via a look-over algorithm. For the case when a look-over requires much computational time an approximate algorithm is suggested. The algorithm's performance ratio, i.e., the relative accuracy error, is determined. Experimentation has been undertaken to verify the suggested algorithm.

Keywords: resource smoothing problem, CPM network, lookover algorithm, lexicographical order, approximate algorithm, accuracy estimate

Procedia PDF Downloads 302
423 Operations Research Applications in Audit Planning and Scheduling

Authors: Abdel-Aziz M. Mohamed

Abstract:

This paper presents a state-of-the-art survey of the operations research models developed for internal audit planning. Two alternative approaches have been followed in the literature for audit planning: (1) identifying the optimal audit frequency; and (2) determining the optimal audit resource allocation. The first approach identifies the elapsed time between two successive audits, which can be presented as the optimal number of audits in a given planning horizon, or the optimal number of transactions after which an audit should be performed. It also includes the optimal audit schedule. The second approach determines the optimal allocation of audit frequency among all auditable units in the firm. In our review, we discuss both the deterministic and probabilistic models developed for audit planning. In addition, game theory models are reviewed to find the optimal auditing strategy based on the interactions between the auditors and the clients.

Keywords: operations research applications, audit frequency, audit-staff scheduling, audit planning

Procedia PDF Downloads 816
422 Characteristics of the Labor Intensity of Secondary School Teachers

Authors: Meruyert Burumbayeva, Aiman Mussina, Gulshat Yerdenova, Bakyt Ilyassova, Aiymtory Abildaeva, Gulnoza Aldabekova

Abstract:

In this paper, there were analyzed the intensity of teachers of secondary schools of Astana. The analysis is based on the account of the whole complex of factors of production, creating the preconditions for the emergence of adverse neuro-emotional states (surge). All the factors of the labor process in the qualitative or quantitative terms were grouped into types of loads: intellectual, sensory, emotional, monotone, regime. The results showed that teachers' work activity is more intense in terms of sensory, intellectual, emotional work schedule loads and characterized class working conditions for tensions as '1st degree of harmful stressful work' and by a combined indicator refers to the category of high labor intensity.

Keywords: intensity of teachers, neuro-emotional states, labor process, occupational stress

Procedia PDF Downloads 326
421 Technology Management for Early Stage Technologies

Authors: Ming Zhou, Taeho Park

Abstract:

Early stage technologies have been particularly challenging to manage due to high degrees of their numerous uncertainties. Most research results directly out of a research lab tend to be at their early, if not the infant stage. A long while uncertain commercialization process awaits these lab results. The majority of such lab technologies go nowhere and never get commercialized due to various reasons. Any efforts or financial resources put into managing these technologies turn fruitless. High stake naturally calls for better results, which make a patenting decision harder to make. A good and well protected patent goes a long way for commercialization of the technology. Our preliminary research showed that there was not a simple yet productive procedure for such valuation. Most of the studies now have been theoretical and overly comprehensive where practical suggestions were non-existent. Hence, we attempted to develop a simple and highly implementable procedure for efficient and scalable valuation. We thoroughly reviewed existing research, interviewed practitioners in the Silicon Valley area, and surveyed university technology offices. Instead of presenting another theoretical and exhaustive research, we aimed at developing a practical guidance that a government agency and/or university office could easily deploy and get things moving to later steps of managing early stage technologies. We provided a procedure to thriftily value and make the patenting decision. A patenting index was developed using survey data and expert opinions. We identified the most important factors to be used in the patenting decision using survey ratings. The rating then assisted us in generating good relative weights for the later scoring and weighted averaging step. More importantly, we validated our procedure by testing it with our practitioner contacts. Their inputs produced a general yet highly practical cut schedule. Such schedule of realistic practices has yet to be witnessed our current research. Although a technology office may choose to deviate from our cuts, what we offered here at least provided a simple and meaningful starting point. This procedure was welcomed by practitioners in our expert panel and university officers in our interview group. This research contributed to our current understanding and practices of managing early stage technologies by instating a heuristically simple yet theoretical solid method for the patenting decision. Our findings generated top decision factors, decision processes and decision thresholds of key parameters. This research offered a more practical perspective which further completed our extant knowledge. Our results could be impacted by our sample size and even biased a bit by our focus on the Silicon Valley area. Future research, blessed with bigger data size and more insights, may want to further train and validate our parameter values in order to obtain more consistent results and analyze our decision factors for different industries.

Keywords: technology management, early stage technology, patent, decision

Procedia PDF Downloads 343
420 Time Management in the Public Sector in Nigeria

Authors: Sunny Ewankhiwimen Aigbomian

Abstract:

Time, is a scarce resource and in everything we do, time is required to accomplish any given task. The need for this presentation is predicated on the way majority of Nigerian especially in the public sector operators see “Time Management”. Time as resources cannot be regained if lost or managed badly. As a significant aspect of human life it should be handled with diligence and utmost seriousness if the public sector is to function as a coordinated entity. In our homes, private life and offices, we schedule different things to ensure that some things do not go the unexpected. When it comes to service delivery on the part of government, it ought to be more serious because government is all about effect and efficient service delivery and “Time” is a significant variable necessary to successful accomplishment. The need for Nigerian government to re-examine time management in her public sector with a view of repositioning the sector to be able to compete well with other public sectors in the world. The peculiarity of Time management in Public Sector in Nigerian context as examined and some useful recommendations of immerse assistance proffered.

Keywords: Nigeria, public sector, time management, task

Procedia PDF Downloads 100
419 Genetic Algorithm Optimization of Multiple Resources for Multi-Projects

Authors: A. Samer Ezeldin, Sarah A. Fotouh

Abstract:

Optimization of resources is very important in all fields, as in construction management. Project managers have to face problems regarding management of cost, time and available resources of single projects and more problems arise when managing multiple projects. Most of the studies focused on optimization of resources for a single project, but, this paper will discuss the design and modeling of multiple resources optimization for multiple projects using Genetic Algorithm. Most of the companies in construction industry optimize the resources for single projects only, but with the presence of several mega projects in several developing countries running at the same time, there is a need for a model to enhance the efficiency of available resources and decreases the fluctuation as much as possible. The proposed model calculates the cost of each resource, tries to minimize the cost of extra resources as much as possible and generates the schedule of each project within a selected program.

Keywords: construction management, genetic algorithm, multiple projects, multiple resources, optimization

Procedia PDF Downloads 460
418 A Case Study of Bee Algorithm for Ready Mixed Concrete Problem

Authors: Wuthichai Wongthatsanekorn, Nuntana Matheekrieangkrai

Abstract:

This research proposes Bee Algorithm (BA) to optimize Ready Mixed Concrete (RMC) truck scheduling problem from single batch plant to multiple construction sites. This problem is considered as an NP-hard constrained combinatorial optimization problem. This paper provides the details of the RMC dispatching process and its related constraints. BA was then developed to minimize total waiting time of RMC trucks while satisfying all constraints. The performance of BA is then evaluated on two benchmark problems (3 and 5construction sites) according to previous researchers. The simulation results of BA are compared in term of efficiency and accuracy with Genetic Algorithm (GA) and all problems show that BA approach outperforms GA in term of efficiency and accuracy to obtain optimal solution. Hence, BA approach could be practically implemented to obtain the best schedule.

Keywords: bee colony optimization, ready mixed concrete problem, ruck scheduling, multiple construction sites

Procedia PDF Downloads 385
417 The Level of Satisfaction of the Training Program from the ASEAN Camp II: A Camp to Prepare Human Resources for AEC 2015

Authors: Tanakom Potjanapitak, Kevin Wongleedee

Abstract:

The purpose of this research study was to study the level of satisfaction of the faculty members who participated in the ASEAN camp which aimed to prepare them for the readiness of AEC 2015. The population of this study included all the faculty members who participated in the activities of the ASEAN camp during April, 2014. Based on the survey of 120 faculty members who answered the questionnaire, the data was complied by using SPSS. Mean and standard deviation were utilized in analyzing the data. The findings revealed that the average mean of satisfaction was 4.41, and standard deviation was 0.7188. Moreover, the average mean can be used to rank the level of satisfaction from each of the following factors: helpful knowledge, understandable knowledge, proper materials, suitable knowledge, schedule of activities, staff, and advertising.

Keywords: ASEAN camp, training, satisfaction, human resources

Procedia PDF Downloads 430
416 Planning for Sustainable Tourism in Chabahar Coastal Zone Using Swot Analysis

Authors: R. Karami, A. Gharaei

Abstract:

The aim of this study was to investigate ecotourism status in Chabahar coastal zone using swot analysis and strategic planning. Firstly, the current status of region was studied by literature review, field survey and statistical analysis. Then strengths and weaknesses (internal factors) were identified as well as opportunities and threats (external factors) using Delphi Method. Based on the obtained results, the total score of 2.46 in IFE matrix and 2.33 in the EFE matrix represents poor condition related to the internal and external factors respectively. This condition means both external and internal factors have not been utilized properly and the zone needs defensive plan; thus appropriate planning and organizational management practices are required to deal with these factors. Furthermore strategic goals, objectives and action plans in short, medium and long term schedule were formulated in attention to swot analysis.

Keywords: tourism, SWOT analysis, strategic planning, Chabahar

Procedia PDF Downloads 513
415 Controlled Chemotherapy Strategy Applied to HIV Model

Authors: Shohel Ahmed, Md. Abdul Alim, Sumaiya Rahman

Abstract:

Optimal control can be helpful to test and compare different vaccination strategies of a certain disease. The mathematical model of HIV we consider here is a set of ordinary differential equations (ODEs) describing the interactions of CD4+T cells of the immune system with the human immunodeficiency virus (HIV). As an early treatment setting, we investigate an optimal chemotherapy strategy where control represents the percentage of effect the chemotherapy has on the system. The aim is to obtain a new optimal chemotherapeutic strategy where an isoperimetric constraint on the chemotherapy supply plays a crucial role. We outline the steps in formulating an optimal control problem, derive optimality conditions and demonstrate numerical results of an optimal control for the model. Numerical results illustrate how such a constraint alters the optimal vaccination schedule and its effect on cell-virus interactions.

Keywords: chemotherapy of HIV, optimal control involving ODEs, optimality conditions, Pontryagin’s maximum principle

Procedia PDF Downloads 335
414 Non-Chronological Approach in Crane Girder and Composite Steel Beam Installation: Case Study

Authors: Govindaraj Ramanathan

Abstract:

The time delay and the structural stability are major issues in big size projects due to several factors. Improper planning and poor coordination lead to delay in construction, which sometimes result in reworking or rebuilding. This definitely increases the cost and time of project. This situation stresses the structural engineers to plan out of the limits of contemporary technology utilizing non-chronological approach with creative ideas. One of the strategies to solve this issue is through structural integrity solutions in a cost-effective way. We have faced several problems in a project worth 470 million USD, and one such issue is crane girder installation with composite steel beams. We have applied structural integrity approach with the proper and revised planning schedule to solve the problem efficiently with minimal expenses.

Keywords: construction management, delay, non-chronological approach, composite beam, structural integrity

Procedia PDF Downloads 237
413 Presentation of the Model of Reliability of the Signaling System with Emphasis on Determining Best Time Schedule for Repairments and Preventive Maintenance in the Iranian Railway

Authors: Maziar Yazdani, Ahmad Khodaee, Fatemeh Hajizadeh

Abstract:

The purpose of this research was analysis of the reliability of the signaling system in the railway and planning repair and maintenance of its subsystems. For this purpose, it will be endeavored to introduce practical strategies for activities control and appropriate planning for repair and preventive maintenance by statistical modeling of reliability. Therefore, modeling, evaluation, and promotion of reliability of the signaling system appear very critical. Among the key goals of the railway is provision of quality service for passengers and this purpose is gained by increasing reliability, availability, maintainability and safety of (RAMS). In this research, data were analyzed, and the reliability of the subsystems and entire system was calculated and with emphasis on preservation of performance of each of the subsystems with a reliability of 80%, a plan for repair and preventive maintenance of the subsystems of the signaling system was introduced.

Keywords: reliability, modeling reliability, plan for repair and preventive maintenance, signaling system

Procedia PDF Downloads 185